{{#Wiki_filter:Point Beach Nuclear Plant Job Performance Measure (JPM) Page 1 of 12  JPM TITLE:
{{#Wiki_filter:Point Beach Nuclear Plant Job Performance Measure (JPM)
Fast Start an Emergency Diesel Generator JPM NUMBER:
JPM TITLE:                 Fast Start an Emergency Diesel Generator JPM NUMBER:               In-Plant JPM i                 REV.       0 RELATED PRA               None INFORMATION:
In-Plant JPM i REV. 0   RELATED PRA INFORMATION:
TASK NUMBERS / TASK       PBN P000.039.AOT / Fast Start an Emergency Diesel Generator TITLE(S):
None  TASK NUMBERS / TASK TITLE(S):
K/A NUMBERS:               064 A4.01 (4.0/4.3)
PBN P000.039
.AOT / Fast Start an Emergency Diesel Generator K/A NUMBERS:
064 A4.01 (4.0/4.3)
APPLICABLE METHOD OF TESTING:
APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:             Simulate/walkthrough:       X     Perform:
Simulate/walkthrough:
EVALUATION LOCATION:           In-Plant:                 X         Control Room:
X Perform:   EVALUATION LOCATION:
Simulator:                         Other:
In-Plant: X Control Room:
Lab:
Simulator:
Time for Completion:         20     Minutes                 Time Critical: No Alternate Path:             Yes Page 1 of 12
Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
No     Alternate Path
: Yes Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator  Page 2 of 12 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.


Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Unit 2 Turbine Hall AO A loss of all AC power has occurred on Unit 2.
* You are the Unit 2 Turbine Hall AO
Emergency diesel generator G
* A loss of all AC power has occurred on Unit 2.
-01 failed to auto start and cannot be started from the Control Room.
* Emergency diesel generator G-01 failed to auto start and cannot be started from the Control Room.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The SRO directs you to perform ECA
* The SRO directs you to perform ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8. Key 43 has been obtained.
-0.0 Unit 2, Loss of All AC Power, Attachment A, G
Page 2 of 12
-01 Local Manual Start, Steps A2 through A8. Key 43 has been obtained.


Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Page 3 of 12 JPM PERFORMANCE INFORMATION Required Materials:
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator JPM PERFORMANCE INFORMATION Required Materials:         ECA-0.0 Unit 2, Loss of All AC Power, Attachment A.
ECA-0.0 Unit 2, Loss of All AC Power, Attachment A.
General  
General  


==References:==
==References:==
ECA-0.0 Unit 2, Loss of All AC Power, Attachment A.
Task Standards:            Emergency diesel generator G-01 is started and bus 2A-05 is energized in accordance with ECA-0.0 Unit 2, Loss of All AC Power Start Time:
NOTE:    When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT:        Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1            A2. Check Green POWER ON Light - LIT Critical N
* Panel C-64A
* Panel C-34 Standard:
* The Examinee checks panel C-64A and C-34 and determines Green Power On lights are lit.
Evaluator Cue:                Green Power On lights are lit.
Performance:                  SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 3 of 12


ECA-0.0 Unit 2, Loss of All AC Power, Attachment A.
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 2     A3. Check Overspeed Trip Alarms - CLEAR Critical N
Task Standards:
* Panel C-64A
Emergency diesel generator G
* Panel C-34 Standard:               The Examinee checks Panels C-64A and C-34 for Overspeed Trip Alarms -
-01 is started and bus 2A
CLEAR.
-05 is energized in accordance with ECA
Evaluator Cue:           Overspeed trip alarms are CLEAR.
-0.0 Unit 2, Loss of All AC Power Start Time:
Performance:            SATISFACTORY _____ UNSATISFACTORY _____
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
Comments:
, the examinee looks or asks for the indication).
Performance Step: 3      A4. Emergency Start G-01:
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Critical Y                    a. At C-34A, place local/remote transfer switches to LOCAL
Performance Step:
* Transfer switch No. 1
1 Critical N A2. Check Green POWER ON Light
* Transfer switch No. 2 Standard:               The Examinee manipulates the local/remote switches at C-34A to the LOCAL position.
- LIT  Panel C-64A  Panel C-34    Standard: The Examinee checks panel C
-64A and C-34 and determines Green Power On lights are lit.
Evaluator Cue:
Evaluator Cue:
Green Power On lights are lit.
* The local/remote switches at C-34A are in LOCAL.
Performance:
* Local control light on C-34A is lit, Remote Control light is off.
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator  Page 4 of 12 Performance Step:
Comments:
2 Critical  N A3. Check Overspeed Trip Alarms
Page 4 of 12
- CLEAR  Panel C-64A  Panel C-34    Standard: The Examinee checks Panels C
-64A and C-34 for Overspeed Trip Alarms
- CLEAR. Evaluator Cue:
Overspeed trip alarms are CLEAR.
Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:      Performance Step:
3 Critical  Y A4. Emergency Start G
-01:  a. At C-34A, place local/remote transfer switches to LOCAL Transfer switch No. 1 Transfer switch No. 2 Standard: The Examinee manipulates the local/remote switches at C
-34A to the LOCAL position. Evaluator Cue:
The local/remote switches at C
-34A are in LOCAL.
Local control light on C
-34A is lit, Remote Control light is off.
Performance:
SATISFACTORY _____ UNSATISFACTORY _____ Comments:    


Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Page 5 of 12 Performance Step:
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 4         b. At C - 34A, start G-01 by depressing EMERGENCY START pushbutton.
4 Critical  N
Critical N Standard:               The Examinee depresses emergency start pushbutton.
: b. At C - 34A, start G
-01 by depressing EMERGENCY START pushbutton.
Standard: The Examinee depresses emergency start pushbutton.
Evaluator Cue:
Evaluator Cue:
The FAST START pushbutton at C
* The FAST START pushbutton at C-34A has been depressed.
-34A has been depressed.
* The emergency diesel generator G-01 tachometer reads zero.
The emergency diesel generator G
* There is no audible noise from the emergency diesel generator G-01.
-01 tachometer reads zero.
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
There is no audible noise from the emergency diesel generator G
Comments:
-01. Performance:
Performance Step: 5         b. RNO IF G-01 will NOT emergency start, then manually start G-01.
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step:
Critical Y                    1) At C-64, place mode selector switch in LOCAL START.
5 Critical Y b. RNO IF G-01 will NOT emergency start, then manually start G
Standard:               The Examinee turns C-64 mode selector switch to Local Start.
-01. 1) At C-64, place mode selector switch in LOCAL START.
Evaluator Cue:          C-64 mode selector switch is in Local Start.
Standard: The Examinee turns C
Performance:            SATISFACTORY _____ UNSATISFACTORY _____
-64 mode selector switch to Local Start.
Comments:
Page 5 of 12
 
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 6              2) At C-64, depress and hold ENGINE START pushbutton until engine Critical Y                          speed rises to idle.
Standard:                The Examinee depresses Engine Start pushbutton until engine starts and reaches idle speed.
Evaluator Cue:
Evaluator Cue:
C-64 mode selector switch is in Local Start.
* G-01 noise level increases dramatically.
Performance:
* G-01 Tachometer is reading ~450 RPM and stable (when checked)
SATISFACTORY _____ UNSATISFACTORY _____ Comments:
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator  Page 6 of 12 Performance Step:
Comments:
6 Critical  Y
Performance Step: 7              3) At C-64, raise engine speed to 900 rpm by depressing IDLE Critical Y                          RELEASE pushbutton.
: 2) At C-64, depress and hold ENGINE START pushbutton until engine speed rises to idle.
Standard:               The Examinee depresses the Idle release pushbutton at C-64.
Standard: The Examinee depresses Engine Start pushbutton until engine starts and reaches idle speed.
Evaluator Cue:
Evaluator Cue:
G-01 noise level increases dramatically.
* The IDLE RELEASE pushbutton at C-64 has been depressed.
G-01 Tachometer is reading ~450 RPM and stable (when checked)
* The emergency diesel generator G-01 tachometer reads 900 RPM and stable (if checked).
Performance:
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:      Performance Step:
Comments:
7 Critical  Y
Page 6 of 12
: 3) At C-64, raise engine speed to 900 rpm by depressing IDLE RELEASE pushbutton.
 
Standard: The Examinee depresses the Idle release pushbutton at C
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 8       A5. At C-64, Check G-01 Speed - GREATER THAN OR EQUAL TO 900 RPM Critical N Standard:                 The Examinee checks engine speed at or above 900 RPM.
-64. Evaluator Cue:
Evaluator Cue:           Engine speed is 900 RPM and stable.
The IDLE RELEASE pushbutton at C
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
-64 has been depressed.
Comments:
The emergency diesel generator G
Performance Step: 9       A6. Contact Control Room To Check G-01 Frequency - BETWEEN 59.7 AND Critical N                    60.3 HZ.
-0 1 tachometer reads 900 RPM and stable (if checked).
Standard:                 The Examinee contacts Control and requests G-01 frequency.
Performance:
Evaluator Cue:           Control Room reports G-01 Frequency indicates 60.0 HZ and stable.
SATISFACTORY _____ UNSATISFACTORY _____ Comments:
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Page 7 of 12 Performance Step:
Comments:
8 Critical  N A5. At C-64, Check G
Performance Step: 10     A7. Contact Control Room To Check G-01 Voltage - BETWEEN 4050 AND 4300 Critical N                    VAC.
-01 Speed - GREATER THAN OR EQUAL TO 900 RPM Standard: The Examinee checks engine speed at or above 900 RPM.
Standard:                 The Examinee contacts Control and requests G-01 Voltage.
Evaluator Cue:
Evaluator Cue:           Control Room reports G-01 Voltage indicates 4200 VAC and stable.
Engine speed is 900 RPM and stable
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
. Performance:
Comments:
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step:
Page 7 of 12
9 Critical  N A6. Contact Control Room To Check G-01 Frequency  
- BETWEEN 59.7 AND 60.3 HZ. Standard: The Examinee contacts Control and requests G
-01 frequency.
Evaluator Cue:
Control Room reports G
-01 Frequency indicates 60.0 HZ and stable
. Performance:
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step:
10 Critical  N A7. Contact Control Room To Check G
-01 Voltage  
- BETWEEN 4050 AND 4300 VAC. Standard: The Examinee contacts Control and requests G
-01 Voltage.
Evaluator Cue:
Control Room reports G
-01 Voltage indicates 4200 VAC and stable
. Performance:
SATISFACTORY _____ UNSATISFACTORY _____ Comments:    


Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Page 8 of 12 Performance Step:
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 11     A8. Energize Bus 2A-05 From Alternate Supply G-01:
11 Critical  N A8. Energize Bus 2A
Critical N                    a. Check G RUNNING Standard:                 The Examinee checks that G-01 is running.
-05 From Alternate Supply G
Evaluator Note:           The Examinee may rely on completion of previous steps (i.e. Voltage and Frequency checks from Control) to determine that G-01 is indeed running.
-01: a. Check G RUNNING   Standard: The Examinee checks that G
-01 is running.
Evaluator Note:
The Examinee may rely on completion of previous steps (i.e. Voltage and Frequency checks from Control) to determine that G
-01 is indeed running.
Evaluator Cue:
Evaluator Cue:
G-01 Tachometer indicates 900 RPM locally (if checked).
* G-01 Tachometer indicates 900 RPM locally (if checked).
G-01 Frequency and Voltage are satisfactory (if asked).
* G-01 Frequency and Voltage are satisfactory (if asked).
Performance:
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step:
Comments:
12 Critical  N
Performance Step: 12         b. In VSG room, ensure 2A-03 to 2A-05 bus tie breaker - OPEN Critical N
: b. In VSG room, ensure 2A-03 to 2A-05 bus tie breaker  
* 2A52-76 Standard:                   2A-03 to 2A-05 bus tie breaker - OPEN
- OPEN 2A52-76   Standard: 2A-03 to 2A-05 bus tie breaker  
* 2A52-76 Evaluator Cue:
- OPEN 2A52-76   Evaluator Cue:
* Green light is on, red light is off for 2A52-76 Performance:             SATISFACTORY _____ UNSATISFACTORY _____
Green light is on, red light is off for 2A52
Comments:
-76   Performance:
Page 8 of 12
SATISFACTORY _____ UNSATISFACTORY _____ Comments:    


Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Page 9 of 12 Performance Step:
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 13         c. At C-35A, ensure G-02 to 2A-05 bus tie breaker control switch - OPEN Critical N                        AND IN PULL-OUT.
13 Critical  N
* 2A52-67 Standard:                 The Examinee places 2A52-67 in Pull-Out.
: c. At C-35A, ensure G-02 to 2A-05 bus tie breaker control switch  
Evaluator Cue:           2A52-67 is in Pull Out, both lights are off (after switch is turned and pulled out).
- OPEN AND IN PULL
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
-OUT. 2A52-67   Standard: The Examinee places 2A52
Comments:
-67 in Pull
Performance Step: 14         d. At C34A, unlock and place G-01 to bus 2A-05 breaker control switch in Critical Y                        AUTO.
-Out. Evaluator Cue:
* 2A52-73 Standard:                 The Examinee unlocks 2A52-73 and pushes in the pistol grip switch.
2A52-67 is in Pull Out, both lights are off (after switch is turned and pulled out).
Evaluator Note:           Critical action is unlocking the breaker control switch.
Performance:
Evaluator Cue:           2A-73 is unlocked and pushed in to AUTO, green light is ON, red light is OFF.
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step: 14 Critical  Y
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
: d. At C34A, unlock and place G
Comments:
-01 to bus 2A
Page 9 of 12
-05 breaker control switch in AUTO. 2A52-73   Standard: The Examinee unlocks 2A52
-73 and pushes in the pistol grip switch.
Evaluator Note:
Critical action is unlocking the breaker control switch. Evaluator Cue:
2A-73 is unlocked and pushed in to AUTO, green light is ON, red light is OFF. Performance:
SATISFACTORY _____ UNSATISFACTORY _____ Comments:    


Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Page 10 of 12 Performance Step:
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 15         e. At C34A, check G-01 to bus 2A-05 breaker - CLOSED.
15 Critical  N
Critical N
: e. At C34A, check G-01 to bus 2A
* 2A52-73 Standard:                 The Examinee checks indication on 2A52-73 and realizes it is OPEN.
-05 breaker  
Evaluator Cue:           Green light on, red light off for 2A52-73.
- CLOSED. 2A52-73   Standard: The Examinee checks indication on 2A52
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
-73 and realizes it is OPEN.
Comments:
Evaluator Cue:
Performance Step: 16         e. RNO Locally perform the following:
Green light on, red light off for 2A52
Critical N                      1) Try to auto-close breaker by placing control switch to trip position then release.
-73. Performance:
Standard:                 The Examinee places breaker switch to trip, then release.
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step:
Evaluator Cue:           Green light on, red light off (after taking switch to trip and release).
16 Critical  N
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
: e. RNO Locally perform the following:
Comments:
: 1) Try to auto
Performance Step: 17            2) IF breaker will NOT auto-close, THEN manually close breaker control Critical Y                          switch.
-close breaker by placing control switch to trip position then release. Standard: The Examinee places breaker switch to trip, then release.
Standard:                The Examinee places 2A52-73 switch to close.
Evaluator Cue:
Evaluator Cue:            Red light on, green light off (after taking switch to close and release).
Green light on, red light off (after taking switch to trip and release).
Performance:              SATISFACTORY _____ UNSATISFACTORY _____
Performance:
Comments:
Page 10 of 12


SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 18     Inform the Control Room that ECA-0.0 Unit 2, Loss of All AC Power, Attachment Critical N                A, G-01 Local Manual Start, Steps A2 through A8 have been completed and emergency diesel generator G-01 is running and the output breaker is closed on to bus 2A-05.
Performance Step:
Standard:                 The Examinee informs the Control Room that ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8 have been completed and emergency diesel generator G-01 is running and the output breaker is closed on to bus 2A-05.
17 Critical  Y
Evaluator Cue:           The Control Room acknowledges your report.
: 2) IF breaker will NOT auto
Performance:             SATISFACTORY                 UNSATISFACTORY Comments:
-close, THEN manually close breaker control switch. Standard: The Examinee places 2A52
Terminating Cues:   The evolution is complete.
-73 switch to close.
Stop Time:
Evaluator Cue:
Page 11 of 12
Red light on, green light off (after taking switch to close and release).
Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Page 11 of 12 Performance Step: 18 Critical N  Inform the Control Room that ECA
-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8 have been completed and emergency diesel generator G
-01 is running and the output breaker is closed on to bus 2A-05. Standard: The Examinee informs the Control Room that ECA
-0.0 Unit 2, Loss of All AC Power, Attachment A, G
-01 Local Manual Start, Steps A2 through A8 have been completed and emergency diesel generator G
-01 is running and the output breaker is closed on to bus 2A
-05. Evaluator Cue:
The Control Room acknowledges your report.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
The evolution is complete.
Stop Time:  


Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Page 12 of 12  TURNOVER SHEET INITIAL CONDITIONS:
Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator TURNOVER SHEET INITIAL CONDITIONS:
You are the Unit 2 Turbine Hall AO A loss of all AC power has occurred on Unit 2.
* You are the Unit 2 Turbine Hall AO
Emergency diesel generator G
* A loss of all AC power has occurred on Unit 2.
-01 failed to auto start and cannot be started from the Control Room.
* Emergency diesel generator G-01 failed to auto start and cannot be started from the Control Room.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The SRO directs you to perform ECA
* The SRO directs you to perform ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8. Key 43 has been obtained.
-0.0 Unit 2, Loss of All AC Power, Attachment A, G
Page 12 of 12
-01 Local Manual Start, Steps A2 through A8. Key 43 has been obtained.


Point Beach Nuclear Plant Job Performance Measure (JPM)   Page 1 of 7  JPM TITLE:
Point Beach Nuclear Plant Job Performance Measure (JPM)
Lineup for Transfer to Containment Sump Post
JPM TITLE:                 Lineup for Transfer to Containment Sump Post-Accident Recirculation JPM NUMBER:               In-Plant JPM j.                 REV.       0 RELATED PRA               HEP-RHR-EOP 13-23, Operator Fails to Align for Low Head Recirc INFORMATION:
-Accident Recirculation JPM NUMBER:
TASK NUMBERS / TASK       PBN P000.042.AOT / Lineup for Transfer to Containment Sump Post-Accident TITLE(S):                  Recirculation K/A NUMBERS:               011.EK3.08 (3.9/4.1) 011.EA1.11 (4.2/4.2)
In-Plant JPM j.
REV. 0   RELATED PRA INFORMATION:
HEP-RHR-EOP 13-23, "Operator Fails to Align for Low Head Recirc" TASK NUMBERS / TASK TITLE(S):
PBN P000.042.AOT / Lineup for Transfer to Containment Sump Post
-Accident Recirculation K/A NUMBERS:
011.EK3.08 (3.9/4.1) 011.EA1.11 (4.2/4.2)
APPLICABLE METHOD OF TESTING:
APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:             Simulate/walkthrough:       X     Perform:
Simulate/walkthrough:
EVALUATION LOCATION:           In-Plant:                 X       Control Room:
X Perform:   EVALUATION LOCATION:
Simulator:                         Other:
In-Plant: X Control Room:
Lab:
Simulator:
Time for Completion:         20     Minutes                 Time Critical: NO Alternate Path:             YES Page 1 of 7
Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
N O      Alternate Path
: Y ES Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation  Page 2 of 7   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.


Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Loss of Reactor Coolant (LOCA) accident has occurred on Unit 2 and RWST level is less than 60%.
* A Loss of Reactor Coolant (LOCA) accident has occurred on Unit 2 and RWST level is less than 60%.
You are assisting the Unit 2 Control Operator to transfer to containment sump recirculation.
* You are assisting the Unit 2 Control Operator to transfer to containment sump recirculation.
INITIATING CUES:
* The Unit 2 Control Operator directs you to perform EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", ATTACHMENT A, "Local Alignment of Component Cooling Water".
Instructor Note:
The normal flow of this alternate path JPM is that the student will determine the abnormal CCW system alignment during the JPM when cued at step A1 or A3.
IF the student asks for the CCW alignment now, that information is earned and can be given at this time:
* CCW Heat Exchanger status:
* 2HX-12D aligned to Unit 2 controlling CCW temperature
* HX-12C OOS / isolated (danger tagged) for tube cleaning
* HX-12B and 1HX-12A are aligned to Unit 1 Page 2 of 7


INITIATING CUES
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation JPM PERFORMANCE INFORMATION Required Materials:         EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection" General  
:  The Unit 2 Control Operator directs you to perform EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", ATTACHMENT A, "Local Alignment of Component Cooling Water".
Instructor Note
:  The normal flow of this alternate path JPM is that the student will determine the abnormal CCW system alignment during the JPM when cued at step A1 or A3. IF the student asks for the CCW alignment now, that information is earned and can be given at this time:
CCW Heat Exchanger status:
2HX-12D aligned to Unit 2 controlling CCW temperature HX-12C OOS / isolated (danger tagged) for tube cleaning  HX-12B and 1HX-12A are aligned to Unit 1
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation   Page 3 of 7  JPM PERFORMANCE INFORMATION Required Materials:
EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection" General  


==References:==
==References:==
 
EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection" Task Standards:             Local actions for establishing containment sump recirculation in accordance with EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", are completed.
EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection" Task Standards:
Local actions for establishing containment sump recirculation in accordance with EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", are completed.
Start Time:
Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
NOTE:     When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
, the examinee looks or asks for the indication).
IMPORTANT:       Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1           A1 Verify Unit 2 Component Cooling Heat Exchanger Alignment:
Performance Step: 1 Critical  Y A1 Verify Unit 2 Component Cooling Heat Exchanger Alignment:
Critical Y                        a. ENSURE component cooling heat exchangers - AT LEAST ONE ALIGNED TO UNIT 2
: a. ENSURE component cooling heat exchangers  
* HX-12C
- AT LEAST ONE ALIGNED TO UNIT 2 HX-12C 2HX-12D b. Go to Step A 3  Standard: Examinee verifies one CCW HX aligned to Unit 2: HX-12C 2HX-12D and goes to Step A 3  Evaluator Note:
* 2HX-12D
If the CCW HX status was provided at student request during the turnover, then it may not be necessary to provide it at this time.
: b. Go to Step A3 Standard:                     Examinee verifies one CCW HX aligned to Unit 2:
* HX-12C
* 2HX-12D and goes to Step A3 Evaluator Note:               If the CCW HX status was provided at student request during the turnover, then it may not be necessary to provide it at this time.
Evaluator Cue:
Evaluator Cue:
2HX-12D aligned to Unit 2 controlling CCW temperature HX-12C OOS / isolated (danger tagged) for tube cleaning HX-12B and 1HX
* 2HX-12D aligned to Unit 2 controlling CCW temperature
-12A aligned to Unit 1 Performance:
* HX-12C OOS / isolated (danger tagged) for tube cleaning
SATISFACTORY _____ UNSATISFACTORY _____
* HX-12B and 1HX-12A aligned to Unit 1 Performance:                 SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Comments:
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation   Page 4 of 7  Performance Step:
Page 3 of 7
2 Critical  Y A3 Adjust Service Water Flow:
 
: a. Check component cooling heat exchangers  
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation Performance Step: 2   A3 Adjust Service Water Flow:
- AT LEAST TWO ALIGNED a. RNO IF only one component cooling heat exchanger is aligned to Unit 2 , THEN perform the following:
Critical Y                a. Check component cooling heat exchangers - AT LEAST TWO ALIGNED
: 1) Establish 3 psid service water to aligned heat exchanger o 2 SW-307, 2DPIS-4445 for 2HX-12D 2) Go to Step A 4  Standard: Examinee throttles 2S W-3 07 to establish 3 psid service water as read on 2DPIS-4445 for 2HX
: a. RNO IF only one component cooling heat exchanger is aligned to Unit 2, THEN perform the following:
-12D and goes to Step A 4  Evaluator Note:
: 1) Establish 3 psid service water to aligned heat exchanger o 2SW-307, 2DPIS-4445 for 2HX-12D
2HX-12D is the only heat exchanger aligned to Unit 2. HX-12 C is OOS. Evaluator Cue:
: 2) Go to Step A4 Standard:             Examinee throttles 2SW-307 to establish 3 psid service water as read on 2DPIS-4445 for 2HX-12D and goes to Step A4 Evaluator Note:       2HX-12D is the only heat exchanger aligned to Unit 2. HX-12C is OOS.
2SW-307 is throttled open. 3 psid service water is indicated on 2DPIS-4445 for 2 HX-12 D    Performance:
Evaluator Cue:         2SW-307 is throttled open. 3 psid service water is indicated on 2DPIS-4445 for 2HX-12D Performance:           SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Comments:     Performance Step:
Performance Step: 3   A4 Check and Record Waste Holdup Tank Level Critical N
3 Critical  N A 4 Check and Record Waste Holdup Tank Level T-19   Standard: Examinee records Waste Holdup Tank Level Evaluator Cue:
* T-19 Standard:             Examinee records Waste Holdup Tank Level Evaluator Cue:         Use normal level indication (as shown on LI-1001, WHUT Level)
Use normal level indication (as shown on LI-1001, WH UT Level)    Performance:
Performance:          SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 4 of 7
 
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation Performance Step: 4   A5 At 8 elevation outside Unit 2 MDAFW Pump Area:
Critical Y                a. Shut bypass loop inlet stop valve.
* 2CC-744A
: b. Shut bypass test line inlet valve
* 2CC-748A Standard:              Examinee shuts 2CC-744A and 2CC-748A Evaluator Cue:            a. 2CC-744A valve handwheel is rotated fully clockwise and the valve stem is fully inserted
: b. 2CC-748A valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance:          SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 5    A6 At 8' Elevation In Walkway To Pipeway #3, Locally Shut Non-Regen Heat Critical Y                Exchanger Shell Side Inlet
* 2CC-740A Standard:              Examinee Shuts 2CC-740A, Non-Regen Heat Exchanger Shell Side Inlet Evaluator Cue:            Valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance:          SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Comments:
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation  Page 5 of 7 Performance Step:
Page 5 of 7
4 Critical  Y A 5  At 8' elevation outside Unit 2 MDAFW Pump Area:
: a. Shut bypass loop inlet stop valve.
2 CC-744A b. Shut bypass test line inlet valve 2 CC-748A  Standard: Examinee shuts 2 CC-7 44A and 2 CC-748A  Evaluator Cue:
: a. 2 CC-744A valve handwheel is rotated fully clockwise and the valve stem is fully inserted
: b. 2 CC-748A valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____
Comments:      Performance Step:
5 Critical Y A 6 At 8' Elevation In Walkway To Pipeway #3, Locally Shut Non
-Regen Heat Exchanger Shell Side Inlet 2 CC-740A  Standard: Examinee Shuts 2 CC-740A, Non-Regen Heat Exchanger Shell Side Inlet Evaluator Cue:
Valve handwheel is rotated fully clockwise and the valve stem is fully inserted    Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation  Page 6 of 7  Performance Step:
6 Critical Y A 7 At 8' Elevation In Seal Water Return Filter Cubicle, Locally Shut HX
-5 Seal Water Return HX Shell Side Inlet Valve 2 CC-750A  Standard: Examinee Shuts 2 CC-750A, HX-5 Seal Water Return HX Shell Side Inlet Valve Evaluator Note:
2CC-750A is in a HRA, DO NOT ENTER.
Evaluator Cue:
Valve handwheel is rotated fully clockwise and the valve stem is fully inserted    Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:      Performance Step:
7 Critical  N A8 Notify Control Room Of Component Cooling Water Alignment Standard: Examinee notifies Control Room of CCW alignment Evaluator Cue:
The Control Room acknowledges your report Performance:
SATISFACTORY  _____  UNSATISFACTORY  ______  Comments:      Terminating Cues:
THIS COMPLETES THIS JPM.
Stop Time:


Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation   Page 7 of 7  TURNOVER SHEET INITIAL CONDITIONS:
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation Performance Step: 6    A7 At 8' Elevation In Seal Water Return Filter Cubicle, Locally Shut HX-5 Seal Critical Y                Water Return HX Shell Side Inlet Valve
A Loss of Reactor Coolant (LOCA) accident has occurred on Unit 2 and RWST level is less than 60%.
* 2CC-750A Standard:              Examinee Shuts 2CC-750A, HX-5 Seal Water Return HX Shell Side Inlet Valve Evaluator Note:        2CC-750A is in a HRA, DO NOT ENTER.
You are assisting the Unit 2 Control Operator to transfer to containment sump recirculation.
Evaluator Cue:            Valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance:            SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 7    A8  Notify Control Room Of Component Cooling Water Alignment Critical N Standard:              Examinee notifies Control Room of CCW alignment Evaluator Cue:          The Control Room acknowledges your report Performance:            SATISFACTORY _____ UNSATISFACTORY ______
Comments:
Terminating Cues:  THIS COMPLETES THIS JPM.
Stop Time:
Page 6 of 7


INITIATING CUES
Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation TURNOVER SHEET INITIAL CONDITIONS:
The Unit 2 Control Operator directs you to perform EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", ATTACHMENT A, "Local Alignment of Component Cooling Water".
* A Loss of Reactor Coolant (LOCA) accident has occurred on Unit 2 and RWST level is less than 60%.
* You are assisting the Unit 2 Control Operator to transfer to containment sump recirculation.
INITIATING CUES:
* The Unit 2 Control Operator directs you to perform EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", ATTACHMENT A, "Local Alignment of Component Cooling Water".
Page 7 of 7


Point Beach Nuclear Plant Job Performance Measure (JPM)   Page 1 of 9  SITE: Point Beach JPM TITLE:
Point Beach Nuclear Plant Job Performance Measure (JPM)
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power JPM NUMBER:
SITE:                     Point Beach JPM TITLE:                 Provide Bearing Cooling to TDAFWP During a Loss of All AC Power JPM NUMBER:               In-Plant JPM k.                 REV.       0 RELATED PRA               None INFORMATION:
In-Plant JPM k
TASK NUMBERS / TASK       PBN P000.022.AOT / Provide Bearing Cooling To TDAFWP During a Loss of All TITLE(S):                  AC Power K/A NUMBERS:               2.4.34 (4.2/4.1)
. REV. 0   RELATED PRA INFORMATION:
None  TASK NUMBERS / TASK TITLE(S):  PBN P000.022.AOT / Provide Bearing Cooling To TDAFWP During a Loss of All AC Power   K/A NUMBERS:
2.4.34 (4.2/4.1)
APPLICABLE METHOD OF TESTING:
APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:             Simulate/walkthrough:       X       Perform:
Simulate/walkthrough:
EVALUATION LOCATION:           In-Plant:                 X       Control Room:
X Perform:   EVALUATION LOCATION:
Simulator:                         Other:
In-Plant: X Control Room:
Lab:
Simulator:
Time for Completion:         20     Minutes                   Time Critical: No Alternate Path:             Yes Page 1 of 9
Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
No     Alternate Path
: Yes Point Beach Nuclear Plant Job Performance Measure (JPM) Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Page 2 of 9   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.


Point Beach Nuclear Plant Job Performance Measure (JPM)
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Unit 1 Control Operator.
* You are the Unit 1 Control Operator.
A fire has occurred in PAB 26' Central which has caused loss of plant control from the control room.
* A fire has occurred in PAB 26 Central which has caused loss of plant control from the control room.
AOP-10C, Safe Shutdown Following Fire at PAB 26', is in progress. Attachment C has been completed through step C10.
* AOP-10C, Safe Shutdown Following Fire at PAB 26, is in progress. Attachment C has been completed through step C10.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
You are to continue with the performance of Attachment C, Step C11
* You are to continue with the performance of Attachment C, Step C11 Page 2 of 9


Point Beach Nuclear Plant Job Performance Measure (JPM) Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Page 3 of 9  JPM PERFORMANCE INFORMATION Required Materials:
Point Beach Nuclear Plant Job Performance Measure (JPM)
: 1. AOP-10C, Safe Shutdown Following Fire at PAB 26' Central, Attachment C
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power JPM PERFORMANCE INFORMATION Required Materials:         1. AOP-10C, Safe Shutdown Following Fire at PAB 26 Central, Attachment C
: 2. Diesel Fire Pump Local operator aid.
: 2. Diesel Fire Pump Local operator aid.
General  
General  


==References:==
==References:==
: 1. AOP-10C, Safe Shutdown Following Fire at PAB 26' Central, Attachment C
: 1. AOP-10C, Safe Shutdown Following Fire at PAB 26 Central, Attachment C
: 2. Diesel Fire Pump Local operator aid.
: 2. Diesel Fire Pump Local operator aid.
Task Standards:
Task Standards:             1. The Examinee properly starts diesel driven fire pump to provide bearing cooling to the Steam Driven AFW pumps.
: 1. The Examinee properly starts diesel driven fire pump to provide bearing cooling to th e Steam Driven AFW pumps.
Start Time:
Start Time:  
NOTE:    When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT:        Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1          C11. In AFW Room, Place Turbine-Driven AFW Pumps in Service:
Critical Y                        a. Open the associated service water suction.
* 1AF-4006 for 1P-29
* 2AF-4006 for 2P-29 Standard:                    Examinee declutches and opens 1AF-4006 and 2AF-4006 Evaluator Cue:                1AF-4006 handwheel stops turning, stem is extended.
2AF-4006 handwheel stops turning, stem is extended.
Performance:                  SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 3 of 9


NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Point Beach Nuclear Plant Job Performance Measure (JPM)
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 2       b. Check BOTH turbine-driven AFW pump suction pressures - GREATER Critical N                    THAN 7.5 PSIG
Performance Step:
* 1PI-4013-B
1 Critical Y C11. In AFW Room, Place Turbine
* 2PI-4013-B Standard:                 Examinee checks adequate suction pressure Evaluator Cue:             1PI-4013-B reads 9 PSIG.
-Driven AFW Pumps in Service:
: a. Open the associated service water suction.
1AF-4006 for 1P
-29  2AF-4006 for 2P
-29    Standard: Examinee declutches and opens 1AF
-4006 and 2AF
-4006  Evaluator Cue:
1AF-4006 handwheel stops turning, stem is extended.
2AF-4006 handwheel stops turning, stem is extended.
Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:
Point Beach Nuclear Plant Job Performance Measure (JPM) Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Page 4 of 9  Performance Step:
2 Critical  N
: b. Check BOTH turbine
-driven AFW pump suction pressures  
- GREATER THAN 7.5 PSIG 1PI-4013-B 2PI-4013-B   Standard: Examinee checks adequate suction pressure Evaluator Cue:
1PI-4013-B reads 9 PSIG.
2PI-4013-B reads 9 PSIG.
2PI-4013-B reads 9 PSIG.
Performance:
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step:
Comments:
3 Critical  Y
Performance Step: 3       c. Check service water pressure to turbine-driven AFW pumps - GREATER Critical Y                    THAN 10 PSIG.
: c. Check service water pressure to turbine
* PI-4364 Standard:                 Examinee checks SW pressure to AFW pumps and performs RNO actions Evaluator Note:           Examinee should realize that SW pressure is inadequate to supply bearing cooling to TDAFW pumps and perform RNO of step 11.c.
-driven AFW pumps  
Evaluator Cue:           PI-4364 reads 8 PSIG.
- GREATER THAN 10 PSIG.
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
PI-4364   Standard: Examinee checks SW pressure to AFW pumps and performs RNO actions Evaluator Note:
Comments:
Examinee should realize that SW pressure is inadequate to supply bearing cooling to TDAFW pumps and perform RNO of step 11.c.
Page 4 of 9
Evaluator Cue:
PI-4364 reads 8 PSIG.
Performance:
SATISFACTORY _____ UNSATISFACTORY _____ Comments:
Point Beach Nuclear Plant Job Performance Measure (JPM) Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Page 5 of 9 Performance Step:
4 Critical  N
: c. RNO Locally start P35B diesel fire pump per local instructions.
Standard: Examinee proceeds to CW pump house to start P35B.
Evaluator Note:
Bearing cooling is aligned earlier in Attachment C and is completed with the start of P35B diesel fire pump.
Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:      Performance Step:
5 Critical  Y Manually override the fuel shut off valve
- turn knurled knob fully clockwise.
Standard: The Examinee overrides the fuel shut off valve for the diesel driven fire pump, P
-35B by turning the knurled knob fully clockwise (as viewed from the knob end of the valve).
Evaluator Note:
The knurled knob is part of the fuel shut off valve assembly, located on the east side of the diesel and is painted orange.
If the Examinee indicates that he is overriding the fuel shut off valve by turning the black fluted knob (engine rpm adjust), provide the following cue:
The knob does not turn.
If the Examinee indicates that he has undone the locking device for the engine rpm adjust, provide the following cue:
The locking device is disengaged and the knob is rotated fully clockwise.
Evaluator Cue:
The knurled knob is rotated fully clockwise for the diesel driven fire pump, P
-35B fuel shut off valve.
Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:     


Point Beach Nuclear Plant Job Performance Measure (JPM) Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Page 6 of 9  Performance Step:
Point Beach Nuclear Plant Job Performance Measure (JPM)
6 Critical  Y Manually operate either starter solenoid joystick and start the diesel driven fire pump, P
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 4      c. RNO Locally start P35B diesel fire pump per local instructions.
-35B. Standard: The Examinee positions either starter solenoid joystick to start the diesel driven fire pump, P
Critical N Standard:                 Examinee proceeds to CW pump house to start P35B.
-35B. Evaluator Note:
Evaluator Note:           Bearing cooling is aligned earlier in Attachment C and is completed with the start of P35B diesel fire pump.
If the Examinee had repositioned the engine rpm adjust (rather than the fuel shutoff valve override), then provide the following cue:
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
The diesel driven fire pump, P
Comments:
-35B turns over but does not start.
Performance Step: 5      Manually override the fuel shut off valve - turn knurled knob fully clockwise.
Evaluator Cue:
Critical Y Standard:                 The Examinee overrides the fuel shut off valve for the diesel driven fire pump, P-35B by turning the knurled knob fully clockwise (as viewed from the knob end of the valve).
One or the other starter solenoid joysticks is position to the left to start the diesel driven fire pump, P
-35B. The diesel driven fire pump, P
-35B turns over and starts.
Performance:
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step:
7 Critical N  Inform the Control Room that the diesel driven fire pump, P
-35B has been started using the emergency start plaque , the fuel shut off valve is mechanically maintained in the open position and is running normally.
Standard: The Examinee informs the Control Room that the diesel driven fire pump, P
-35B has been started using the emergency start plaque, the fuel shut off valve is mechanically maintained in the open position and is running normally.
Evaluator Cue:
The Control Room acknowledges your report.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     
 
Point Beach Nuclear Plant Job Performance Measure (JPM) Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Page 7 of 9  Performance Step:
8 Critical  N C11 d. Ensure 1P-29 discharge to B S/G
- 10% OPEN  1AF-4000    Standard: Examinee establishes 1AF
-4000 to 10% open.
Evaluator Note:
Evaluator Note:
Examinee may check cooling water supply pressure on gauge 1PI
* The knurled knob is part of the fuel shut off valve assembly, located on the east side of the diesel and is painted orange.
-4458. If checked, pressure is 15 PSIG.  (Service water pressure on PI-4364 still reads 8 PSIG.)   Evaluator Cue:
* If the Examinee indicates that he is overriding the fuel shut off valve by turning the black fluted knob (engine rpm adjust), provide the following cue:
(prior to closing down on valve) Indicator on 1AF
* The knob does not turn.
-4000 reads as recorded on wall plaque
* If the Examinee indicates that he has undone the locking device for the engine rpm adjust, provide the following cue:
.  (after examinee declutches valve and turns handwheel clockwise) Indicator on 1AF
* The locking device is disengaged and the knob is rotated fully clockwise.
-4000 reads 10%.
Evaluator Cue:           The knurled knob is rotated fully clockwise for the diesel driven fire pump, P-35B fuel shut off valve.
Performance:
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY  _____  UNSATISFACTORY  _____  Comments:      Performance Step:
Comments:
9 Critical  N
Page 5 of 9
: e. Shut 1P-29 discharge to A S/G 1AF-4001    Standard: Examinee shuts 1AF
-4001  Evaluator Cue:
1AF-4001 handwheel stops turning, indicator reads 0%
Performance:
SATISFACTORY _____ UNSATISFACTORY _____ Comments:    


Point Beach Nuclear Plant Job Performance Measure (JPM) Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Page 8 of 9  Performance Step:
Point Beach Nuclear Plant Job Performance Measure (JPM)
10 Critical N
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 6      Manually operate either starter solenoid joystick and start the diesel driven Critical Y                fire pump, P-35B.
: f. Ensure 2P-29 discharge to B S/G
Standard:                 The Examinee positions either starter solenoid joystick to start the diesel driven fire pump, P-35B.
- 10% OPEN  2AF-4000    Standard: Examinee establishes 2AF
-4000 to 10% open.
Evaluator Note:
Evaluator Note:
Examinee may check cooling water supply pressure on gauge 2 PI-4458. If checked, pressure is 15 PSIG.  (Service water pressure on PI-4364 still reads 8 PSIG.Evaluator Cue:
* If the Examinee had repositioned the engine rpm adjust (rather than the fuel shutoff valve override), then provide the following cue:
(prior to closing down on valve) Indicator on 2AF
* The diesel driven fire pump, P-35B turns over but does not start.
-4000 reads as recorded on wall plaque
Evaluator Cue:
. (after examinee declutches valve and turns handwheel clockwise) Indicator on 2AF
* One or the other starter solenoid joysticks is position to the left to start the diesel driven fire pump, P-35B.
-4000 reads 10%.
* The diesel driven fire pump, P-35B turns over and starts.
Performance:
Performance:             SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Performance Step:
Comments:
11 Critical N
Performance Step: 7      Inform the Control Room that the diesel driven fire pump, P-35B has been Critical N               started using the emergency start plaque , the fuel shut off valve is mechanically maintained in the open position and is running normally.
: g. Shut 2P-29 discharge to A S/G 2AF-4001    Standard: Examinee shuts 2AF
Standard:                 The Examinee informs the Control Room that the diesel driven fire pump, P-35B has been started using the emergency start plaque, the fuel shut off valve is mechanically maintained in the open position and is running normally.
-4001  Evaluator Cue:
Evaluator Cue:            The Control Room acknowledges your report.
2AF-4001 handwheel stops turning, indicator reads 0%
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Page 6 of 9


Performance:
Point Beach Nuclear Plant Job Performance Measure (JPM)
SATISFACTORY _____ UNSATISFACTORY _____ Comments:       Terminating Cues:
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 8      C11 Critical N                d. Ensure 1P-29 discharge to B S/G - 10% OPEN
Stop Time:  
* 1AF-4000 Standard:                Examinee establishes 1AF-4000 to 10% open.
Evaluator Note:          Examinee may check cooling water supply pressure on gauge 1PI-4458. If checked, pressure is 15 PSIG. (Service water pressure on PI-4364 still reads 8 PSIG.)
Evaluator Cue:             * (prior to closing down on valve) Indicator on 1AF-4000 reads as recorded on wall plaque.
                          * (after examinee declutches valve and turns handwheel clockwise)
Indicator on 1AF-4000 reads 10%.
Performance:              SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 9      e. Shut 1P-29 discharge to A S/G Critical N
* 1AF-4001 Standard:                Examinee shuts 1AF-4001 Evaluator Cue:           1AF-4001 handwheel stops turning, indicator reads 0%
Performance:              SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 7 of 9


Point Beach Nuclear Plant Job Performance Measure (JPM) Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Page 9 of 9  TURNOVER SHEET INITIAL CONDITIONS:
Point Beach Nuclear Plant Job Performance Measure (JPM)
You are the Unit 1 Control Operator.
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 10      f. Ensure 2P-29 discharge to B S/G - 10% OPEN Critical N
A fire has occurred in PAB 26' Central which has caused loss of plant control from the control room.
* 2AF-4000 Standard:                  Examinee establishes 2AF-4000 to 10% open.
AOP-10C, Safe Shutdown Following Fire at PAB 26', is in progress. Attachment C has been complet ed through step C10.
Evaluator Note:            Examinee may check cooling water supply pressure on gauge 2PI-4458. If checked, pressure is 15 PSIG. (Service water pressure on PI-4364 still reads 8 PSIG.)
Evaluator Cue:              * (prior to closing down on valve) Indicator on 2AF-4000 reads as recorded on wall plaque.
                            * (after examinee declutches valve and turns handwheel clockwise)
Indicator on 2AF-4000 reads 10%.
Performance:              SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 11      g. Shut 2P-29 discharge to A S/G Critical N
* 2AF-4001 Standard:                  Examinee shuts 2AF-4001 Evaluator Cue:            2AF-4001 handwheel stops turning, indicator reads 0%
Performance:              SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Terminating Cues:
Stop Time:
Page 8 of 9


Point Beach Nuclear Plant Job Performance Measure (JPM)
Provide Bearing Cooling to TDAFWP During a Loss of All AC Power TURNOVER SHEET INITIAL CONDITIONS:
* You are the Unit 1 Control Operator.
* A fire has occurred in PAB 26 Central which has caused loss of plant control from the control room.
* AOP-10C, Safe Shutdown Following Fire at PAB 26, is in progress. Attachment C has been completed through step C10.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
You are to continue with the performance of Attachment C, Step C11}}
* You are to continue with the performance of Attachment C, Step C11 Page 9 of 9}}

Latest revision as of 18:16, 12 November 2019

2011 Point Beach Nuclear Power Plant Initial License Examination Proposed In-Plant JPMs
ML11175A227
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/15/2011
From: Mcneil D
Operations Branch III
To:
References
Download: ML11175A227 (28)


Text

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM TITLE: Fast Start an Emergency Diesel Generator JPM NUMBER: In-Plant JPM i REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / TASK PBN P000.039.AOT / Fast Start an Emergency Diesel Generator TITLE(S):

K/A NUMBERS: 064 A4.01 (4.0/4.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes Page 1 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 2 Turbine Hall AO
  • A loss of all AC power has occurred on Unit 2.

INITIATING CUES (IF APPLICABLE):

  • The SRO directs you to perform ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8. Key 43 has been obtained.

Page 2 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator JPM PERFORMANCE INFORMATION Required Materials: ECA-0.0 Unit 2, Loss of All AC Power, Attachment A.

General

References:

ECA-0.0 Unit 2, Loss of All AC Power, Attachment A.

Task Standards: Emergency diesel generator G-01 is started and bus 2A-05 is energized in accordance with ECA-0.0 Unit 2, Loss of All AC Power Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 A2. Check Green POWER ON Light - LIT Critical N

  • Panel C-64A
  • Panel C-34 Standard:
  • The Examinee checks panel C-64A and C-34 and determines Green Power On lights are lit.

Evaluator Cue: Green Power On lights are lit.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 3 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 2 A3. Check Overspeed Trip Alarms - CLEAR Critical N

  • Panel C-64A
  • Panel C-34 Standard: The Examinee checks Panels C-64A and C-34 for Overspeed Trip Alarms -

CLEAR.

Evaluator Cue: Overspeed trip alarms are CLEAR.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 3 A4. Emergency Start G-01:

Critical Y a. At C-34A, place local/remote transfer switches to LOCAL

  • Transfer switch No. 1
  • Transfer switch No. 2 Standard: The Examinee manipulates the local/remote switches at C-34A to the LOCAL position.

Evaluator Cue:

  • The local/remote switches at C-34A are in LOCAL.
  • Local control light on C-34A is lit, Remote Control light is off.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 4 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 4 b. At C - 34A, start G-01 by depressing EMERGENCY START pushbutton.

Critical N Standard: The Examinee depresses emergency start pushbutton.

Evaluator Cue:

  • The FAST START pushbutton at C-34A has been depressed.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 5 b. RNO IF G-01 will NOT emergency start, then manually start G-01.

Critical Y 1) At C-64, place mode selector switch in LOCAL START.

Standard: The Examinee turns C-64 mode selector switch to Local Start.

Evaluator Cue: C-64 mode selector switch is in Local Start.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 5 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 6 2) At C-64, depress and hold ENGINE START pushbutton until engine Critical Y speed rises to idle.

Standard: The Examinee depresses Engine Start pushbutton until engine starts and reaches idle speed.

Evaluator Cue:

  • G-01 noise level increases dramatically.
  • G-01 Tachometer is reading ~450 RPM and stable (when checked)

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 7 3) At C-64, raise engine speed to 900 rpm by depressing IDLE Critical Y RELEASE pushbutton.

Standard: The Examinee depresses the Idle release pushbutton at C-64.

Evaluator Cue:

  • The IDLE RELEASE pushbutton at C-64 has been depressed.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 6 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 8 A5. At C-64, Check G-01 Speed - GREATER THAN OR EQUAL TO 900 RPM Critical N Standard: The Examinee checks engine speed at or above 900 RPM.

Evaluator Cue: Engine speed is 900 RPM and stable.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 9 A6. Contact Control Room To Check G-01 Frequency - BETWEEN 59.7 AND Critical N 60.3 HZ.

Standard: The Examinee contacts Control and requests G-01 frequency.

Evaluator Cue: Control Room reports G-01 Frequency indicates 60.0 HZ and stable.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 10 A7. Contact Control Room To Check G-01 Voltage - BETWEEN 4050 AND 4300 Critical N VAC.

Standard: The Examinee contacts Control and requests G-01 Voltage.

Evaluator Cue: Control Room reports G-01 Voltage indicates 4200 VAC and stable.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 7 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 11 A8. Energize Bus 2A-05 From Alternate Supply G-01:

Critical N a. Check G RUNNING Standard: The Examinee checks that G-01 is running.

Evaluator Note: The Examinee may rely on completion of previous steps (i.e. Voltage and Frequency checks from Control) to determine that G-01 is indeed running.

Evaluator Cue:

  • G-01 Tachometer indicates 900 RPM locally (if checked).
  • G-01 Frequency and Voltage are satisfactory (if asked).

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 12 b. In VSG room, ensure 2A-03 to 2A-05 bus tie breaker - OPEN Critical N

  • Green light is on, red light is off for 2A52-76 Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 8 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 13 c. At C-35A, ensure G-02 to 2A-05 bus tie breaker control switch - OPEN Critical N AND IN PULL-OUT.

Evaluator Cue: 2A52-67 is in Pull Out, both lights are off (after switch is turned and pulled out).

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 14 d. At C34A, unlock and place G-01 to bus 2A-05 breaker control switch in Critical Y AUTO.

  • 2A52-73 Standard: The Examinee unlocks 2A52-73 and pushes in the pistol grip switch.

Evaluator Note: Critical action is unlocking the breaker control switch.

Evaluator Cue: 2A-73 is unlocked and pushed in to AUTO, green light is ON, red light is OFF.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 9 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 15 e. At C34A, check G-01 to bus 2A-05 breaker - CLOSED.

Critical N

  • 2A52-73 Standard: The Examinee checks indication on 2A52-73 and realizes it is OPEN.

Evaluator Cue: Green light on, red light off for 2A52-73.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 16 e. RNO Locally perform the following:

Critical N 1) Try to auto-close breaker by placing control switch to trip position then release.

Standard: The Examinee places breaker switch to trip, then release.

Evaluator Cue: Green light on, red light off (after taking switch to trip and release).

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 17 2) IF breaker will NOT auto-close, THEN manually close breaker control Critical Y switch.

Standard: The Examinee places 2A52-73 switch to close.

Evaluator Cue: Red light on, green light off (after taking switch to close and release).

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 10 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator Performance Step: 18 Inform the Control Room that ECA-0.0 Unit 2, Loss of All AC Power, Attachment Critical N A, G-01 Local Manual Start, Steps A2 through A8 have been completed and emergency diesel generator G-01 is running and the output breaker is closed on to bus 2A-05.

Standard: The Examinee informs the Control Room that ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8 have been completed and emergency diesel generator G-01 is running and the output breaker is closed on to bus 2A-05.

Evaluator Cue: The Control Room acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The evolution is complete.

Stop Time:

Page 11 of 12

Point Beach Nuclear Plant Fast Start an Emergency Diesel Generator TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 2 Turbine Hall AO
  • A loss of all AC power has occurred on Unit 2.

INITIATING CUES (IF APPLICABLE):

  • The SRO directs you to perform ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8. Key 43 has been obtained.

Page 12 of 12

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM TITLE: Lineup for Transfer to Containment Sump Post-Accident Recirculation JPM NUMBER: In-Plant JPM j. REV. 0 RELATED PRA HEP-RHR-EOP 13-23, Operator Fails to Align for Low Head Recirc INFORMATION:

TASK NUMBERS / TASK PBN P000.042.AOT / Lineup for Transfer to Containment Sump Post-Accident TITLE(S): Recirculation K/A NUMBERS: 011.EK3.08 (3.9/4.1) 011.EA1.11 (4.2/4.2)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: YES Page 1 of 7

Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are assisting the Unit 2 Control Operator to transfer to containment sump recirculation.

INITIATING CUES:

  • The Unit 2 Control Operator directs you to perform EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", ATTACHMENT A, "Local Alignment of Component Cooling Water".

Instructor Note:

The normal flow of this alternate path JPM is that the student will determine the abnormal CCW system alignment during the JPM when cued at step A1 or A3.

IF the student asks for the CCW alignment now, that information is earned and can be given at this time:

  • CCW Heat Exchanger status:
  • 2HX-12D aligned to Unit 2 controlling CCW temperature
  • HX-12C OOS / isolated (danger tagged) for tube cleaning
  • HX-12B and 1HX-12A are aligned to Unit 1 Page 2 of 7

Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation JPM PERFORMANCE INFORMATION Required Materials: EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection" General

References:

EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection" Task Standards: Local actions for establishing containment sump recirculation in accordance with EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", are completed.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 A1 Verify Unit 2 Component Cooling Heat Exchanger Alignment:

Critical Y a. ENSURE component cooling heat exchangers - AT LEAST ONE ALIGNED TO UNIT 2

  • HX-12C
b. Go to Step A3 Standard: Examinee verifies one CCW HX aligned to Unit 2:
  • HX-12C
  • 2HX-12D and goes to Step A3 Evaluator Note: If the CCW HX status was provided at student request during the turnover, then it may not be necessary to provide it at this time.

Evaluator Cue:

  • 2HX-12D aligned to Unit 2 controlling CCW temperature
  • HX-12C OOS / isolated (danger tagged) for tube cleaning
  • HX-12B and 1HX-12A aligned to Unit 1 Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 3 of 7

Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation Performance Step: 2 A3 Adjust Service Water Flow:

Critical Y a. Check component cooling heat exchangers - AT LEAST TWO ALIGNED

a. RNO IF only one component cooling heat exchanger is aligned to Unit 2, THEN perform the following:
1) Establish 3 psid service water to aligned heat exchanger o 2SW-307, 2DPIS-4445 for 2HX-12D
2) Go to Step A4 Standard: Examinee throttles 2SW-307 to establish 3 psid service water as read on 2DPIS-4445 for 2HX-12D and goes to Step A4 Evaluator Note: 2HX-12D is the only heat exchanger aligned to Unit 2. HX-12C is OOS.

Evaluator Cue: 2SW-307 is throttled open. 3 psid service water is indicated on 2DPIS-4445 for 2HX-12D Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 3 A4 Check and Record Waste Holdup Tank Level Critical N

  • T-19 Standard: Examinee records Waste Holdup Tank Level Evaluator Cue: Use normal level indication (as shown on LI-1001, WHUT Level)

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 4 of 7

Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation Performance Step: 4 A5 At 8 elevation outside Unit 2 MDAFW Pump Area:

Critical Y a. Shut bypass loop inlet stop valve.

b. Shut bypass test line inlet valve
  • 2CC-748A Standard: Examinee shuts 2CC-744A and 2CC-748A Evaluator Cue: a. 2CC-744A valve handwheel is rotated fully clockwise and the valve stem is fully inserted
b. 2CC-748A valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 5 A6 At 8' Elevation In Walkway To Pipeway #3, Locally Shut Non-Regen Heat Critical Y Exchanger Shell Side Inlet

  • 2CC-740A Standard: Examinee Shuts 2CC-740A, Non-Regen Heat Exchanger Shell Side Inlet Evaluator Cue: Valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 5 of 7

Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation Performance Step: 6 A7 At 8' Elevation In Seal Water Return Filter Cubicle, Locally Shut HX-5 Seal Critical Y Water Return HX Shell Side Inlet Valve

Evaluator Cue: Valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 7 A8 Notify Control Room Of Component Cooling Water Alignment Critical N Standard: Examinee notifies Control Room of CCW alignment Evaluator Cue: The Control Room acknowledges your report Performance: SATISFACTORY _____ UNSATISFACTORY ______

Comments:

Terminating Cues: THIS COMPLETES THIS JPM.

Stop Time:

Page 6 of 7

Point Beach Nuclear Plant Lineup for Transfer to Containment Sump Post-Accident Recirculation TURNOVER SHEET INITIAL CONDITIONS:

  • You are assisting the Unit 2 Control Operator to transfer to containment sump recirculation.

INITIATING CUES:

  • The Unit 2 Control Operator directs you to perform EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", ATTACHMENT A, "Local Alignment of Component Cooling Water".

Page 7 of 7

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Provide Bearing Cooling to TDAFWP During a Loss of All AC Power JPM NUMBER: In-Plant JPM k. REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / TASK PBN P000.022.AOT / Provide Bearing Cooling To TDAFWP During a Loss of All TITLE(S): AC Power K/A NUMBERS: 2.4.34 (4.2/4.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes Page 1 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 Control Operator.
  • A fire has occurred in PAB 26 Central which has caused loss of plant control from the control room.
  • AOP-10C, Safe Shutdown Following Fire at PAB 26, is in progress. Attachment C has been completed through step C10.

INITIATING CUES (IF APPLICABLE):

  • You are to continue with the performance of Attachment C, Step C11 Page 2 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power JPM PERFORMANCE INFORMATION Required Materials: 1. AOP-10C, Safe Shutdown Following Fire at PAB 26 Central, Attachment C

2. Diesel Fire Pump Local operator aid.

General

References:

1. AOP-10C, Safe Shutdown Following Fire at PAB 26 Central, Attachment C
2. Diesel Fire Pump Local operator aid.

Task Standards: 1. The Examinee properly starts diesel driven fire pump to provide bearing cooling to the Steam Driven AFW pumps.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 C11. In AFW Room, Place Turbine-Driven AFW Pumps in Service:

Critical Y a. Open the associated service water suction.

2AF-4006 handwheel stops turning, stem is extended.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 3 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 2 b. Check BOTH turbine-driven AFW pump suction pressures - GREATER Critical N THAN 7.5 PSIG

2PI-4013-B reads 9 PSIG.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 3 c. Check service water pressure to turbine-driven AFW pumps - GREATER Critical Y THAN 10 PSIG.

  • PI-4364 Standard: Examinee checks SW pressure to AFW pumps and performs RNO actions Evaluator Note: Examinee should realize that SW pressure is inadequate to supply bearing cooling to TDAFW pumps and perform RNO of step 11.c.

Evaluator Cue: PI-4364 reads 8 PSIG.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 4 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 4 c. RNO Locally start P35B diesel fire pump per local instructions.

Critical N Standard: Examinee proceeds to CW pump house to start P35B.

Evaluator Note: Bearing cooling is aligned earlier in Attachment C and is completed with the start of P35B diesel fire pump.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 5 Manually override the fuel shut off valve - turn knurled knob fully clockwise.

Critical Y Standard: The Examinee overrides the fuel shut off valve for the diesel driven fire pump, P-35B by turning the knurled knob fully clockwise (as viewed from the knob end of the valve).

Evaluator Note:

  • The knurled knob is part of the fuel shut off valve assembly, located on the east side of the diesel and is painted orange.
  • If the Examinee indicates that he is overriding the fuel shut off valve by turning the black fluted knob (engine rpm adjust), provide the following cue:
  • The knob does not turn.
  • If the Examinee indicates that he has undone the locking device for the engine rpm adjust, provide the following cue:
  • The locking device is disengaged and the knob is rotated fully clockwise.

Evaluator Cue: The knurled knob is rotated fully clockwise for the diesel driven fire pump, P-35B fuel shut off valve.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 5 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 6 Manually operate either starter solenoid joystick and start the diesel driven Critical Y fire pump, P-35B.

Standard: The Examinee positions either starter solenoid joystick to start the diesel driven fire pump, P-35B.

Evaluator Note:

  • If the Examinee had repositioned the engine rpm adjust (rather than the fuel shutoff valve override), then provide the following cue:
  • The diesel driven fire pump, P-35B turns over but does not start.

Evaluator Cue:

  • One or the other starter solenoid joysticks is position to the left to start the diesel driven fire pump, P-35B.
  • The diesel driven fire pump, P-35B turns over and starts.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 7 Inform the Control Room that the diesel driven fire pump, P-35B has been Critical N started using the emergency start plaque , the fuel shut off valve is mechanically maintained in the open position and is running normally.

Standard: The Examinee informs the Control Room that the diesel driven fire pump, P-35B has been started using the emergency start plaque, the fuel shut off valve is mechanically maintained in the open position and is running normally.

Evaluator Cue: The Control Room acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 6 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 8 C11 Critical N d. Ensure 1P-29 discharge to B S/G - 10% OPEN

Evaluator Note: Examinee may check cooling water supply pressure on gauge 1PI-4458. If checked, pressure is 15 PSIG. (Service water pressure on PI-4364 still reads 8 PSIG.)

Evaluator Cue: * (prior to closing down on valve) Indicator on 1AF-4000 reads as recorded on wall plaque.

  • (after examinee declutches valve and turns handwheel clockwise)

Indicator on 1AF-4000 reads 10%.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 9 e. Shut 1P-29 discharge to A S/G Critical N

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Page 7 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Performance Step: 10 f. Ensure 2P-29 discharge to B S/G - 10% OPEN Critical N

Evaluator Note: Examinee may check cooling water supply pressure on gauge 2PI-4458. If checked, pressure is 15 PSIG. (Service water pressure on PI-4364 still reads 8 PSIG.)

Evaluator Cue: * (prior to closing down on valve) Indicator on 2AF-4000 reads as recorded on wall plaque.

  • (after examinee declutches valve and turns handwheel clockwise)

Indicator on 2AF-4000 reads 10%.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 11 g. Shut 2P-29 discharge to A S/G Critical N

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Terminating Cues:

Stop Time:

Page 8 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 Control Operator.
  • A fire has occurred in PAB 26 Central which has caused loss of plant control from the control room.
  • AOP-10C, Safe Shutdown Following Fire at PAB 26, is in progress. Attachment C has been completed through step C10.

INITIATING CUES (IF APPLICABLE):

  • You are to continue with the performance of Attachment C, Step C11 Page 9 of 9