{{#Wiki_filter:JOB PERFORMANCE MEASURE APPROVAL I. JPM Title:
{{#Wiki_filter:JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
Number: JPM-A1.1R Revision:
    ~IPM  Number:           JPM-A1.1R                 Revision: -~-
0 II. Initiated:
0 II. Initiated:
Marc R. Pucel Developer 02/01/11 Date III. Reviewed: ec mea eVlewer IV. Approved:
Marc R. Pucel                         02/01/11 Developer                              Date III. Reviewed:
Cognizant Plant Supervisor (optional)
                ~~      ec mea   eVlewer IV. Approved:
Date Nuclear Training Supervisor Page 1 of 10 JOB PERFORMANCE MEASURE  
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor Page 1 of 10
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 10
OF CHANGES:
------------------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 10
--------------------JPM Number: JPM-A1.1R Rev. ___0::....-.__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                        JPM-A1.1R                                                        Rev. ___0::....-.__
MP2 Examinee:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:
Facility:      MP2                  Examinee:
Rev. ______ Task Title: System: Auxiliary Feedwater Time Critical Task: Yes No x Validated Time (minutes):
                                                ------------------------------
25 Task Applicable To: SRO RO X KIA No. 2.2.13 KIA Rating _---...:4.;;;...1:..:..../4..:..;;
JPM Number:                         JPM-A1.1R                                                             Rev. ____O~__
*.;;;..3Method of Simulated Performance:
Task Title:
Actual Performance:
System:       Auxiliary Feedwater Time Critical Task:     Yes
Classroom:
                              --
X Simulator:
No   x Validated Time (minutes):                 25 Task No.(s):
Task At the completion of this JPM, examinee determines the required configuration of system components to provide boundary isolation for maintenance on 2-FW-BB. Required Materials
Applicable To:             SRO               RO     X           PEO
* 25203-26005 SH.3 (Condensate Storage and Aux Feed). (procedures.
                                  ---                                                ---
equipment.
KIA No.                 2.2.13               KIA Rating _---...:4.;;;...1:..:..../4..:..;;*.;;;..3_ _
etc.): 25203-30005 (Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C, 24D (A3, A4>> OP 2322-001. OP-AA-200 (Equipment Clearance) Blank clearance section form. I * * *
Method of Testing:
Simulated Performance:                           Actual Performance:                                  X
                              ----                                                                ----=-.;-
Location:
Classroom:       X               Simulator: - - -                    In-Plant:
                ----                                                                                -----
Task Standards:                  At the completion of this JPM, examinee determines the required configuration of system components to provide boundary isolation for maintenance on 2-FW-BB.
Required Materials
* 25203-26005 SH.3 (Condensate Storage and Aux Feed).
(procedures. equipment. etc.):
* 25203-30005 (Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C, 24D (A3, A4>>
* OP 2322-001.
* OP-AA-200 (Equipment Clearance)
* Blank clearance section form.
I
                                  * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job erformance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job erformance measure will be satisfied. You ma use an a roved reference materials Page 3 of 10
You ma use an a roved reference materials Page 3 of 10 JPM Number:
 
Rev. ___0___ JOB PERFORMANCE MEASURE WORKSHEET (continued) normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
JPM Number:                         JPM-A1.1R                              Rev. ___0_ __
Initiating Cues: Determine the proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-88. "8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve. Initial Conditions: Unit-2 is in Mode 5 for a refueling outage. The Work Control SRO has asked for your help determining a proper clearance boundary and tag type (color) for an emergent inspection of 2-FW-88 ("8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve). There is evidence that this valve may be leaking by, and the Maintenance Department will be performing a seating surface and general condition inspection.
JOB PERFORMANCE MEASURE WORKSHEET (continued) normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Initiating Cues:
* Determine the proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-88. "8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
Initial Conditions:
* Unit-2 is in Mode 5 for a refueling outage.
* The Work Control SRO has asked for your help determining a proper clearance boundary and tag type (color) for an emergent inspection of 2-FW-88 ("8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve).
* There is evidence that this valve may be leaking by, and the Maintenance Department will be performing a seating surface and general condition inspection.
Simulator
Simulator
* Not applicable.
* Not applicable.
Requirements: * *
Requirements:
* NOTES TO EVALUATOR * * *
                                  * *
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 10
* NOTES TO EVALUATOR * * * *
____ PERFORMANCE JPM Number: PERFORMANCE Obtain the required material for determination of clearance boundary.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Cue: STANDARD
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
' _ Examinee determines and requests the N required material for determination of clearance boundary. P&ID 25203-26005 SH.3 Storage and Aux P&ID25203-30005 (Single Line & Relay Diagram 4.16KV Buses 24C, Aux Feed Valve line-upr OP 2322-001 OP-AA-200.
: 3. If necessary, question the student for details of simulated actions/observations   (i.e. "What are you looking at?" or "What are you observing?").
Eauioment Clearance Page 5 of 10 PERFORMANCE JPM Number: STEP 2. Cue: Comments:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
PERFORMANCE (OP-AA-200 3.2.2g). ESTABLISH the tagging sequence.
Page 4 of 10
WHEN procedural guidance exists, THEN the procedure takes precedence over the normal sequence of isolation. The normal sequence of isolation is as follows: POSITION control switch
 
PERFORMANCE INFORMATION JPM Number:
STEP                  PERFORMANCE                             STANDARD
                                                                                          ,,~II~Jj'~"AA,I. '
                                                                                          ~H~"ttif.11';"I~1 _____
: 1.      Obtain the required material for       Examinee determines and requests the           N determination of clearance boundary. required material for determination of clearance boundary.
* P&ID 25203-26005 SH.3 (Condensate Storage and Aux Feed).
* P&ID25203-30005 (Single Line Meter
                                                      & Relay Diagram 4.16KV Emerg.
Buses 24C, 24D)
* Aux Feed Valve line-upr OP 2322-001
* OP-AA-200. Eauioment Clearance Cue:
Page 5 of 10
 
PERFORMANCE INFORMATION JPM Number:
STEP                 PERFORMANCE                                  STANDARD
: 2.     (OP-AA-200 3.2.2g).                       Examinee establishes a clearance ESTABLISH the tagging sequence. WHEN     boundary with the following components procedural guidance exists, THEN the     and sequencing. (See attached Answer procedure takes precedence over the       Key) normal sequence of isolation. The normal sequence of isolation is as follows:
POSITION control switch
* Examinee CAUTION tags "P9B-HS        N (HANDSWITCH FOR "B" AUXILAIRY FEEDWATER PUMP" control switch indicating that the breaker is racked down
* REMOVE power from component(s)
* REMOVE power from component(s)
STANDARD Examinee establishes a clearance boundary with the following components and sequencing. (See attached Answer Key)
* Examinee removes power from "B"       y MDAFP by "RACKING DOWN" 4160VAC breaker (A406).
* Examinee CAUTION tags "P9B-HS (HANDSWITCH FOR "B" AUXILAIRY FEEDWATER PUMP" control switch indicating that the breaker is racked down N
Cue:
* Examinee removes power from "B" MDAFP by "RACKING DOWN" 4160VAC breaker (A406). y Page 6 of 10 PERFORMANCE JPM Number: JPM-A1.1R STEP PERFORMANCE
Comments:
Page 6 of 10
 
PERFORMANCE INFORMATION JPM Number:     JPM-A1.1R STEP                   PERFORMANCE                                     STANDARD
: 3.
: 3.
* ISOLATE component/system from high pressure side to low pressure side STANDARD ISOLATE component/system from high pressure side to low pressure side by Danger Tagging "CLOSED":
* ISOLATE component/system from high          ISOLATE component/system from high pressure side to low pressure side         pressure side to low pressure side by Danger Tagging "CLOSED":
2-FW-9B (liB" AUX FEED DISCHARGE STOP VALVE) y 2-FW-S2C ("B" AUX FEED RECIRCULATION STOP VALVE) y* 2-CN-29B ( "B" AUX FEED PUMP SUCTION ISOLATION) y* 2-FIRE-94B (liB" AUX FEED PUMP EMERGENCY FIRE WATER SUPPLY VALVE) y*
2-FW-9B (liB" AUX FEED DISCHARGE                   y STOP VALVE) 2-FW-S2C ("B" AUX FEED y*
* The exact sequence of suction side/recirculation alignment is NOTcritical.
RECIRCULATION STOP VALVE) 2-CN-29B ( "B" AUX FEED PUMP                     y*
However, the discharge stop must be closed first. Page 7 of 10 PERFORMANCE JPM Number: PERFORMANCE
SUCTION ISOLATION) 2-FIRE-94B (liB" AUX FEED PUMP                   y*
* OPEN drain OPEN vent TERMINATION CUE: STANDARD Examinee tags open one or both of the following drain valves and one or both of the following vent valves: 2-CN-332 ( "8" AUX FEED PUMP SUCTION HEADER DRAIN) y* 2-CN 331 ("8" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE) y* 2-CN-330 (U8" AUX FEED PUMP CASING VENT VALVE) I Y* 2-CN-329 ("8" AUX FEED PUMP CASING VENT VALVE) I y* The evaluation for this JPM is concluded.
EMERGENCY FIRE WATER SUPPLY VALVE)
Page 8 of 10
* The exact sequence of suction side/recirculation alignment is NOTcritical. However, the discharge stop must be closed first.
--JPM Number: JPM-A1.1R Rev. ___0=---__ VERIFICATION OF JPM COMPLETION Title: Date Performed:
Page 7 of 10
Student: Evaluator:
 
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
PERFORMANCE INFORMATION JPM Number:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
STEP              PERFORMANCE                               STANDARD
25 Actual Time to Complete (minutes):
: 4.
JPM Work Practice Evaluation:
* OPEN drain valve(s)              Examinee tags open one or both of the following drain valves and one or both of OPEN vent valve(s)                the following vent valves:
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) DuringthQTPEt"tnetraineQ  
2-CN-332 ( "8" AUX FEED PUMP             y*
* .L'",' ...**.,.,. .'>, *..... ". "*..* :''''''''.''''''  
SUCTION HEADER DRAIN) 2-CN 331 ("8" AUX FEED PUMP               y*
....*'........... . .......,. performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements. , never put anyone's safety at risk. Pass I Fail never equipment reliability at risk. Pass I Fail never violated radiological work practices.
DISCHARGE HEADER DRAIN VALVE) 2-CN-330 (U8" AUX FEED PUMP CASING I      Y*
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
VENT VALVE) 2-CN-329 ("8" AUX FEED PUMP CASING I      y*
Page 9 of 10
VENT VALVE)
-----JPM Number: Initiating Cues: Initial Conditions:
Cue:
Rev. o STUDENT HANDOUT Determine the proper safety clearance boundary for an inspection and possible repairireplacement of 2-FW-88, "8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve. Unit-2 is in Mode 5 for a refueling outage. The Work Control SRO has asked for your help determining a proper clearance boundary and tag type (color) for an emergent inspection of 2-FW-88 ("8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve). There is evidence that this valve may be leaking by, and the Maintenance Department will be performing a seating surface and general condition inspection.
Comments:
Page 10 of 10 Section Coversheet Tagout: 2C1.9 Section: 2322X00-002A Component to be Worked 2-FW-SB Millstone Station 03/20/111935 2_TB _00106_ AFRV AREA_ Notes: Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructions!
TERMINATION CUE: The evaluation for this JPM is concluded.
Cautions:
Page 8 of 10
 
JPM Number:                     JPM-A1.1R                                                 Rev. ___0=---__
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes             No           X
                                --
Validated Time (minutes):                             25 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                         SAT                     UNSAT                             NA           (circle one)
Overall Result of JPM:                                 SAT                     UNSAT                                           (circle one)
DuringthQTPEt"tnetraineQ *       ~. .L'",' . .**., .,.   . ' > , *..... ". "*..*
:''''''''.''''''
                                                                                                    . . *'. . . . . . >;!;i,~,EvaIUatlon;* . .......,.
performed the task correctly and in accordance with procedure usage                                                       Pass I Fail and adherence requirements.
, never put anyone's safety at risk.                                                                                       Pass I Fail never ~ut equipment reliability at risk.                                                                                 Pass I Fail never violated radiological work practices.                                                                               Pass I Fail demonstrated effective use of event-free human performance tools.                                                         Pass I Fail Areas for Improvement/Comments:
Page 9 of 10
 
JPM Number:                JPM-A1.1R                            Rev.
                                                                      - - -o - -
STUDENT HANDOUT Initiating Cues:
* Determine the proper safety clearance boundary for an inspection and possible repairireplacement of 2-FW-88, "8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
Initial Conditions:
* Unit-2 is in Mode 5 for a refueling outage.
* The Work Control SRO has asked for your help determining a proper clearance boundary and tag type (color) for an emergent inspection of 2-FW-88 ("8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve).
* There is evidence that this valve may be leaking by, and the Maintenance Department will be performing a seating surface and general condition inspection.
Page 10 of 10
 
Section Coversheet                                 Millstone Station Tagout: 2C1.9 Section: 2322X00-002A                                                                   03/20/111935 Component to be Worked 2-FW-SB 2_TB       _00106_ AFRV AREA_
Notes:
Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructions! Cautions:
Additional Information:
Additional Information:
25203-26005 SH.31 Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C/24D (A3,A4) Section Attributes:
25203-26005 SH.31 Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C/24D (A3,A4)
Work Order List: Number! Equipment ID Description 2-FW-SB Perform Check Valve Inspection Section Verification:
Section Attributes:
Status Prepared Approved Authorized Work Released To Clear System Restored Description By: Appr()vedBy:
Work Order List:
Authorized By: Work Released By: Authorize Tags to clear: Restoration Complete Name Verification Date ANSWER Section Coversheet Millstone Station Tagout: 2C19 Section: 2322X00-002A 03/20/111935 Tag Tag Equipment PIa Placement Place. 1st Ver, PIa Restoration As Left Rest. 1st Rest. 2nd Serial Type Seq :Configuration Verif Req
Number! Equipment ID                                               Description 2-FW-SB                     Perform Check Valve Inspection Section Verification:
____ _ Configuration Verif Verif* Equipment
Status                         Description                        Name Verification Date Prepared                   Prepc3r~d By:
* Notes Time/Date
Approved                    Appr()vedBy:
* Notes Time/DateTIme/Date
Authorized                  Authorized By:
* Equipment III 1 iN/A 5N/A N/A* HANDSWITCH FOR RACKED AUXIUARY FEEDWATER PUMP "DOWN ... 2_CB _03606= CNTRl RM COS Red A 2 : RACKED DOWN 4 RACKED UP RACKED UP ... 2_TB Red 2-FW-9B 3 3 OPEN OPEN * "B" AUX FEED PUMP DISCHARGE STOP IV 4 2 :OPEN OPEN *"B" AUX FEED REORCULATION STOP ,,* 2_TB 4 2 OPEN OPEN i * "B" AUX .FEED PUMP 4 iCLOSED 2 :CLOSED CLOSED "B" AUX FEED PUMP EMERGENCY FIRE WATER 1 CLOSED CLOSED * "B"AUX FEED ,PUMP CASING
Work Released              Work Released By:
* VENT VALVE ANSWER Page 2 of3 ANSWER 2-CN-329 IV 5 OPEN/UNCAPPED 1 CLOSED CLOSED
To Clear                    Authorize Tags to clear:
* tV 5 OPEN/UNCAPPED 1 .CLOSED CLOSED * "B" AUX FEED PUMP DISCHARGE
System Restored            Restoration Complete lPM-Al.1R
* HEADER DRAIN VALVE '* 2_TB _00106_ Red 2-CN-332 IV ! 5 1 CLOSED CLOSED *"B"AUX FEED PUMP SUCTION
                                                                                          ~Page1of3
* HEADER DRAIN *Note: only one vent and one drain is required to be open to provide proper venting and draining.
 
ANSWER KEY Page30f3 JOB PERFORMANCE MEASURE APPROVAL SHEET I. ..'PM Title: JPM Number: ,JPM-A2R Revision:
ANSWER KEY Section Coversheet                                                                       Millstone Station Tagout: 2C19 Section: 2322X00-002A                                                                                                                                     03/20/111935 Tag   Tag     Equipment                                                       PIa Placement           Place. 1st Ver, PIa Restoration               As Left   Rest. 1st Rest. 2nd Serial Type                                                                     Seq :Configuration         Verif   Req :Seq~~,!~!iJ~!a~i~!I____ _ Configuration   Verif     Verif
_---..:O=--_
* Equipment Description                                          ~-------------
No.
* Equipment Location
* Notes           Time/Date
* Notes                             Time/DateTIme/Date Yellow  P9B-HS                                                      III     1 iN/A                                 5N/A                     N/A
* HANDSWITCH FOR "B"                                            ~- -BREA~E; RACKED AUXIUARY FEEDWATER PUMP "DOWN
                ... 2_CB     _03606= CNTRl RM COS Red       A 406                                                            2 :RACKED DOWN                         4 RACKED UP             RACKED UP
                ... 2_TB
                    ~~R_BUS24D Red         2-FW-9B                                                       3 CLOSED                                3 OPEN                   OPEN
                * "B" AUX FEED PUMP DISCHARGE STOP VALVE AFWRM IV     4 :CLOSED                              2 :OPEN                 OPEN
                *"B" AUX FEED PUMP REORCULATION STOP VALVE
              ,,* 2_TB _OO106...ABOVE~B~AFP
            '*r2*-CN~*****c"",c.  "**~********y.*.**k",~".*,*Y**~"i' '!****.l\l 4 fCLOSED                              2 OPEN                   OPEN i * "B" AUX .FEED PUMP SUCTION ISOLATION
                                  ~qRJ2~~~~RM
      ~ed                                                                        4 iCLOSED                               2 :CLOSED               CLOSED
                * "B" AUX FEED PUMP EMERGENCY .
FIRE WATER               VALVE Red                                                                                                                1 CLOSED                 CLOSED
                * "B"AUX FEED ,PUMP CASING VENT VALVE
* ANSWER KEY                                                        Page 2 of3
 
ANSWER KEY 2-CN-329                       IV   5 OPEN/UNCAPPED             1 CLOSED           CLOSED
* tV   5 OPEN/UNCAPPED             1 .CLOSED         CLOSED
    * "B" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE                                                                                       *
    '* 2_TB             _00106_
Red 2-CN-332                       IV ! 5 ~OPEN/UNCAPPED            1 CLOSED           CLOSED
    * "B"AUX FEED PUMP SUCTION HEADER DRAIN                                                                                           *
* Note: only one vent and one drain is required to be open to provide proper venting and draining.
ANSWER KEY                                       Page30f3
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I.   ..'PM Title:
JPM Number:               ,JPM-A2R                 Revision: _---..:O=--_
II. Initiated:
II. Initiated:
Marc R. Pucel Developer 02/04/11 Date III. Reviewed:
Marc R. Pucel                         02/04/11 Developer                            Date III. Reviewed:
IV. Approved:
          ~ch1:;;2 IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Page 1 of 11
Date Page 1 of 11 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 11
OF CHANGES:
---------------------JPM Number: Rev. 0 JOB PERFORMANCE MEASURE WORKSHEET (continued)
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 11
Facility:
 
MP2 Examinee: JPM Number: JPM-A2R Rev. ___Task System: Equipment Time Critical Task: Yes No Validated Time (minutes): Task No.(s): ___________Applicable To: SRO RO X KIA No. 2.2.37 KIA Rating _--:;;.3,;;..;;.6:..:.../4,.;.:.
JPM Number:                          JPM-A2R                                                      Rev.      0
*.:;;..6__ Method of Simulated Performance:
                                                                                                      ---    --
Actual Performance:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Classroom:
Facility:      MP2                  Examinee:
X Simulator: ----Task At the completion of this JPM the examinee will have successfully determined SFP Heatup Rate and time to reach 150°F. Required Materials OU-M2-201 Section 3.2, " Heatup Calculations" (procedures, equipment.
                                                --------------~-------------------
etc.): OU-M2-201 Attachment 3, " Millstone Unit 2 SFP Time to 150°F Calculation" General  
JPM Number:                         JPM-A2R                                                           Rev. ___O~__
Task Title:
System:       Equipment Control Time Critical Task:     Yes             No   x Validated Time (minutes):                 15 Task No.(s): _ _ _ _ _ _ _ _ _ _ __
Applicable To:           SRO                 RO     X           PEO
                                  ---                                              ---
KIA No.                 2.2.37               KIA Rating _--:;;.3,;;..;;.6:..:.../4,.;.:.*.:;;..6_ _
Method of Testing:
Simulated Performance:                           Actual Performance:
                              ------                                                            - -X- -
Location:
Classroom:       X               Simulator:                         In-Plant:
                ----'--                      ----                                                ----
Task Standards:                  At the completion of this JPM the examinee will have successfully determined SFP Heatup Rate and time to reach 150°F.
Required Materials               OU-M2-201 Section 3.2, " Heatup Calculations" (procedures, equipment. etc.):   OU-M2-201 Attachment 3, " Millstone Unit 2 SFP Time to 150°F Calculation" General  


==References:==
==References:==
OU-M2-201 "Shutdown Safety Assessment Checklist"
                                  * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 11
JPM Number:                        JPM-A2R                                Rev. ___0_ __
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
* The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit Initial Conditions:
* Unit-2 is in day 12 of a refueling outage.
* Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
* Unit-2 has just experienced a Station Blackout
* Present Spent Fuel Pool temperature as read on TR-7030 is 93F.
Simulator
* N/A Requirements:
                                  * *
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, A!:L. critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3. Ifnecessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 11


OU-M2-201 "Shutdown Safety Assessment Checklist" * * *
PERFORMANCE INFORMATION JPM Number:
* READ TO THE EXAMINEE * * *
CRIT.ICAL                 I GRADE I STEP   I PERFORMANCE                   STANDARD         I              (YIN)                 (§/U)
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
                                                    **S**"AQ,~;i:I*                .M*e",
You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
                                                    ';;'l~i_;:~!;':'.": ~t£&i!;;/i;N;.,.,Y"}* _ _ __
Page 3 of 11 JPM Number: Rev. ___0___ JOB PERFORMANCE MEASURE WORKSHEET (continued)
Page 5 of 11
Initiating Cues: The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit Initial Conditions: Unit-2 is in day 12 of a refueling outage. Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool. Unit-2 has just experienced a Station Blackout Present Spent Fuel Pool temperature as read on TR-7030 is 93F. Simulator N/A Requirements: * *
 
* NOTES TO EVALUATOR * * *
PERFORMANCE INFORMATION JPM Number:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, A!:L. critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". Ifnecessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 11 PERFORMANCE JPM Number: I CRIT.ICAL I GRADE I STEP I PERFORMANCE STANDARD (YIN) (§/U) .M*e",
STEP                   PERFORMANCE                                  STANDARD
____ Page 5 of 11 JPM Number: STEP 1 . Cue: Comments:
: 1.     NOTE: The SSA Checklist or Heatup           I Examinee reads and acknowledges notes N Calculations may be completed by any licensed Operator (except the on-duty SM) or the STA using, at a minimum, the main control board system status.
PERFORMANCE PERFORMANCE STANDARD NOTE: The SSA Checklist or Heatup I Examinee reads and acknowledges notes N Calculations may be completed by any licensed Operator (except the on-duty SM) or the STA using, at a minimum, the main control board system status. NOTE: Systems planned to be removed from service in the next [[estimated NRC review hours::24 hours]] may be assumed to be out of service, and, therefore, not credited.
NOTE: Systems planned to be removed from service in the next [[estimated NRC review hours::24 hours]] may be assumed to be out of service, and, therefore, not credited.
NOTE: Attachment 4 through Attachment 8 provide further guidance while performing SSA Checklist.
NOTE: Attachment 4 through Attachment 8 provide further guidance while performing SSA Checklist. NOTE: SSA Checklists are completed as follows:- Daily* Prior to removing any equipment required to support the KSFs unless daily review already assumed equipment is out of service
NOTE: SSA Checklists are completed as follows:-Daily* Prior to removing any equipment required to support the KSFs unless daily review already assumed equipment is out of service
* Equipment available to support the KSFs unexpectedly becomes unavailable
* Equipment available to support the KSFs unexpectedly becomes unavailable
* Prior to performing plant MODE changes when shutdown
* Prior to performing plant MODE changes when shutdown
* A system/component is restored to available status and is desired to either immediately credit the system/component for Shutdown Risk or it is more than six hours until the next SSA Checklist is to be Page 6 of 11 PERFORMANCE JPM Number: CRITICAL GRADE STEP PERFORMANCE STANDARD _(V/N) _(§Ll!l__ _..... -_.. -_... -..... -_... _ ... ---.--..-.--.--..-.... ---.---... -..---..--.-.-..---... --... -....--.-..2. I 3.2 Heatup Calculations 3.2.1 IF a Time to Core Boil determination Examinee determines that this step is not is desired, THEN PERFORM the
* A system/component is restored to available status and is desired to either immediately credit the system/component for Shutdown Risk or it is more than six hours until the next SSA Checklist is to be Cue:
: a. REFER to Attachment 2, Millstone Unit RCS Time to Boil Calculation, FOLLOW
Comments:
: b. RECORD results on Attachment
Page 6 of 11
: 2. 3.2.2 IF a time to reach 150°F SFP design Examinee refers to Attachment 3, N temperature determination is desired Millstone Unit 2 SFP Time to 150°F THEN PERFORM the following:
 
Calculation.
PERFORMANCE INFORMATION JPM Number:
: a. REFER to Attachment 3, Millstone Unit SFP Time to 150°F Calculation, FOLLOW
CRITICAL GRADE STEP
: b. RECORD results on Attachment
_ ..... -_.. -_... - ..... -_ _
: 3. NOTE: SFP temperature should be I Examinee reads and acknowledges note. obtained from TR-7030 pt 1.
                              ... ... -     --.-- -.--.-- -
portable dip probe may be used (if is unavailable).
                                                  ..      .. ....
If SFP temperature expected to increase, a SFP temperature up to 5°F greater than the current temperature can be used to . expected conditions.
PERFORMANCE
Page 7 of 11 PERFORMANCE JPM Number: JPM-A2R STEP 4. Cue: Comments:
                                                                  - - - . - - - - - - - --.-.- ------
: 5. Cue: Comments:
                                                                              ... ..  ..    ..
: 6. Cue: Comments:
STANDARD-
PERFORMANCE Instructions:
                                                                                                                            -   - -... - - ... .... --.-..- - . - - -
: 1. Record time after reactor shutdown (in days), and current SFP temperature (OF). Table SFP Heatup NOTE: When using this table, the more conservative value should be used, so interpolation is not necessary (i.e., on the 23rd day shutdown, use day 20 heatup rate). STANDARD Examinee records 12 days after shutdown on Attachment 3 Examinee records current Spent Fuel pool temperature of 93F to 98F on Attachment 3 y y Examinee refers to Table 1 to obtain SFP Heatup Rate N Examinee reads and acknowledges note N Page 8 of 11 PERFORMANCE JPM Number: STEP 7. Cue: Comments:
_(V/N)  _(§Ll!l__
: 8. Cue: Comments:
: 2.                       I 3.2 Heatup Calculations 3.2.1 IF a Time to Core Boil determination                   Examinee determines that this step is not                         N is desired, THEN PERFORM the                                 applicable.
: 9. Cue: PERFORMANCE STANDARD Record SFP Heatup Rate Examinee records a SFP Heatup Rate of 17.7 F/Hr based on End-of-Cycle Core Offload using Time from Shutdown (days) of 10 days on Attachment
following:
: 3. 3. Calculate and record SFP Time to 150°F Examinee performs the following Calculation:
: a. REFER to Attachment 2, Millstone Unit 2 RCS Time to Boil Calculation, and FOLLOW instructions.
calculation to determine SFP temperature SFP Time to 150°F ={(150°F -SFP to 150F: Temperature (OF>> / SFP Heatup Rate (OF/hour)
: b. RECORD results on Attachment 2.
J SFP Time to 150°F ={(150°F -SFP Temperature rF)) / SFP Heatup Rate (OF/hour)  
3.2.2 IF a time to reach 150°F SFP design                     Examinee refers to Attachment 3,                                   N temperature determination is desired                         Millstone Unit 2 SFP Time to 150°F THEN PERFORM the following:                                   Calculation.
] TERMINATION CUE: The evaluation for this JPM is concluded. (nn) c--_) y y JsreitlME:  
: a. REFER to Attachment 3, Millstone Unit 2 SFP Time to 150°F Calculation, and FOLLOW instructions.
-""-",..
: b. RECORD results on Attachment 3.
Page 9 of 11 JPM Number: Rev. ___0,--__ VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 3.                         NOTE: SFP temperature should be                             I Examinee reads and acknowledges note.                             N obtained from TR-7030 pt 1. Otherwise, portable dip probe may be used (if TR-7030 is unavailable). If SFP temperature is expected to increase, a SFP temperature of up to 5°F greater than the current SFP temperature can be used to bound
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
                                        . expected conditions.
15 Actual Time to Complete (minutes):
1-------
JPM Work Practice Evaluation:
Cue:
Overall Result of JPM: SAT SAT UNSAT UNSAT NA (circle one) (circle one) ! During the TPE. the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
Comments:
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices.
Page 7 of 11
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for ImprovemenUComments:
 
Page 10 of 11 JPM Number: Rev. __-,0,-__ Initial Conditions:
PERFORMANCE INFORMATION JPM Number:     JPM-A2R STEP                   PERFORMANCE                                  STANDARD
Initiating Cues: STUDENT The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit. Unit-2 is in day 12 of a refueling outage. Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool. Unit-2 has just experienced a Station Blackout. Present Spent Fuel Pool temperature as read on TR-7030 is 93F. Page 11 of 11 Calculation:
: 4.                       Instructions:               Examinee records 12 days after shutdown  y
SFP Time to 150°F= {(150"F-SFP Temperature(OF)/
: 1. Record time after reactor shutdown (in     on Attachment 3 days), and current SFP temperature (OF).                                               y Examinee records current Spent Fuel pool temperature of 93F to 98F on Attachment 3
SFP Heatup Rate (OF/Hour)}
Cue:
Time From SFP SFP Heatup Shutdown Temperature Rate SFP Time to ..... Date/Time (Days) (OF) (OF/hour) 150 OF Today/now 12 93 17.7 Today/now 12 98 17.7 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: JPM Number: JPM-A3R Revision:
Comments:
0II. Initiated:
: 5.                                                    Examinee refers to Table 1 to obtain SFP N Heatup Rate Cue:
Marc R. Pucei Developer 02/01/11 Date III. Reviewed:
Comments:
: 6.                          Table 1 SFP Heatup Rates Examinee reads and acknowledges note    N NOTE: When using this table, the more conservative value should be used, so interpolation is not necessary (i.e., on the 23rd day shutdown, use day 20 heatup rate).
Cue:
Comments:
Page 8 of 11
 
PERFORMANCE INFORMATION JPM Number:
STEP                   PERFORMANCE                                  STANDARD                        (nn)            c-- _)
: 7.     Record SFP Heatup Rate                     Examinee records a SFP Heatup Rate of             y 17.7 F/Hr based on End-of-Cycle Core Offload using Time from Shutdown (days) of 10 days on Attachment 3.
Cue:
Comments:
: 8.     3. Calculate and record SFP Time to 150°F Examinee performs the following Calculation:                               calculation to determine SFP temperature
                                =
SFP Time to 150°F {(150°F - SFP           to 150F:
Temperature (OF>> / SFP Heatup Rate (OF/hour) J                                                    =
SFP Time to 150°F {(150°F - SFP Temperature rF)) / SFP Heatup Rate (OF/hour) ]
y Cue:
Comments:
9.
Cue:
TERMINATION CUE: The evaluation for this JPM is concluded.
JsreitlME:
                                                                                                -""-",.. " " . _ . , , - , - - -
Page 9 of 11
 
JPM Number:                                                         Rev. ___0,--__
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes
                                -
No   X Validated Time (minutes):                     15 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                 SAT        UNSAT            NA        (circle one)
Overall Result of JPM:                         SAT         UNSAT                     (circle one)
! During the TPE. the trainee                                                   Evaluation performed the task correctly and in accordance with procedure                 Pass I Fail usage and adherence requirements.
never put anyone's safety at risk.                                             Pass I Fail never put equipment reliability at risk.                                       Pass I Fail never violated radiological work practices.                                   Pass I Fail demonstrated effective use of event-free human performance tools.             Pass I Fail Areas for ImprovemenUComments:
Page 10 of 11
 
JPM Number:                 JPM-A2R                            Rev. _ _-,0,-__
STUDENT HANDOUT Initial Conditions:
* The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit.
Initiating Cues:
* Unit-2 is in day 12 of a refueling outage.
* Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
* Unit-2 has just experienced a Station Blackout.
* Present Spent Fuel Pool temperature as read on TR-7030 is 93F.
Page 11 of 11
 
Calculation:
SFP Time to 150°F= {(150"F-SFP Temperature(OF)/ SFP Heatup Rate (OF/Hour)}
Time From         SFP       SFP Heatup Shutdown     Temperature         Rate       SFP Time to . . .
Date/Time     (Days)         (OF)         (OF/hour)       150 OF Today/now 12           93             17.7 Today/now 12           98             17.7 JPIVl"A~Answer Key
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-A3R                 Revision:     0
                                                                  --
II. Initiated:
Marc R. Pucei                         02/01/11 Developer                            Date III. Reviewed:
IV. Approved:
IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor                   bate Page 1 of 8
Date Nuclear Training Supervisor bate Page 1 of 8 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF I All & DATE DESCRIPTION I 2006-317 Update JPM to include HUP evaluations and new Page 2 of
OF CHANGES:
---------------------------------
I   All & DATE                   DESCRIPTION                       REV/CHANGE I 2006-317     Update JPM to include HUP evaluations and new format I
------------------------------JPM Number: Rev. o JOB PERFORMANCE MEASURE WORKSHEET (continued)
I I
Facility:
Page 2 of 8
MP2 Examinee:
 
JPM Number: Rev. ___.....;0"---
JPM Number:                          JPM-A3R                              Rev.
__ Task Title: System: Radiation Protection Time Critical Task: Yes No x Validated Time Task Applicable To: SRO RO X KIA No. KIA Rating ___3_.5_/3_.6
                                                                                --- o --
___ Method of Simulated Actual Performance:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Classroom:
Facility:      MP2                    Examinee:
X Simulator:
                                                  ----------------------------
Task At the completion of this JPM, the examinee has determined all of the radiological requirements for entering the CLRW filter skid area to assist The Radwaste Coordinator Required Materials Health Physics Survey Map (procedures.
JPM Number:                           JPM-A3R                                    Rev. ___.....;0"---__
equipment.
Task Title:
etc.): Operations blanket RWP General  
System:       Radiation Protection Time Critical Task:     Yes               No   x Validated Time (minutes):
Task No.(s):
Applicable To:             SRO - - - -          RO     X       PEO - - - -
KIA No.                 2.3.7                  KIA Rating ___  3_.5_/3_.6___
Method of Testing:
Simulated Performance:
                              ----                Actual Performance:
                                                                            - -X- -
Location:
Classroom:       X               Simulator: -----            In-Plant:
                --    -                                                    ------
Task Standards:                    At the completion of this JPM, the examinee has determined all of the radiological requirements for entering the CLRW filter skid area to assist The Radwaste Coordinator Required Materials               Health Physics Survey Map (procedures. equipment. etc.):   Operations blanket RWP General  


==References:==
==References:==


* '* *
                                    * '* *
* READ TO THE EXAMINEE '* '* '*
* READ TO THE EXAMINEE '* '* '*
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
Page 3 of 8
 
.JPM Number: JPM-A3R Rev. ___0,--__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
.JPM Number:                           JPM-A3R                             Rev. ___0,--__
Initiating State the radiological requirements for entering this area. Include in your discussion: Which RWP task Gob step) is appropriate for this assignment Highest loose contamination level in the work area Protective clothing required in the work area Highest general area radiation level in the work area Dose rate alarm setting Maximum time that the operator can remain at the filter skid without exceeding any dose limit The examiner will act as Health Physics (HP) for any related questions.
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initial
Initiating Cues:              State the radiological requirements for entering this area. Include in your discussion:
* You are the BOP operator. Unit-2 is at 80% You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid The operator has 450 mrem of annual dose exposure remaining Simulator N/A Requirements:  
* Which RWP task Gob step) is appropriate for this assignment
'* '* '* NOTES TO EVALUATOR '* '* '* '* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read appropriate Ifnecessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 8 PERFORMANCE JPM Number: PERFORMANCE Which RWP task Gob step) is appropriate for this assignment 2 I Highest loose contamination level in the work area 3 I Protective clothing required in the work area
* Highest loose contamination level in the work area
: 4.
* Protective clothing required in the work area
: 5.
* Highest general area radiation level in the work area
STANDARD  
* Dose rate alarm setting
",nh
* Maximum time that the operator can remain at the filter skid without exceeding any dose limit The examiner will act as Health Physics (HP) for any related questions.
___C_'_> ____ Examinee states that the appropriate task ( job step) for this assignment is Job Examinee states that the highest contamination level in the work area is 22000 Examinee states that the clothing required in the work area is "Full PC's" (consisting of Cotton liners, Coveralls, Shoe covers, Rubber Page 5 of 8 PERFORMANCE JPM Number: STEP STANDARD Maximum time that the operator can remain Examinee states that the at the filter skid without exceeding any dose allowed stay time at the filter skid limit exceedina anv dose limit is 4.5 TERMINATION CUE: The evaluation for this JPM is concluded.
Initial Conditions:
Page 6 of 8
* You are the BOP operator.
-----JPM Number: JPM-A3R Rev. 0 VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
* Unit-2 is at 80%
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes Validated Time (minutes):
* You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid
Actual Time to Complete (minutes):
* The operator has 450 mrem of annual dose exposure remaining Simulator                           N/A Requirements:
No X 15 JPM Work Practice Evaluation:
                                  '* '* '* NOTES TO EVALUATOR '* '* '* '*
Overall Result of JPM: SAT SAT UNSAT UNSAT NA (circle one) (circle one) During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work gractices.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
: 3. Ifnecessary, question the student for details of simulated actions/observations   (Le. "What are you looking at?" or "What are you observing?").
Page 7 of 8 JPM Number: Initial Conditions:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Initiating Cues: ..Rev. ___0,,--__ STUDENT HANDOUT State the radiological requirements for entering this area. Include in your discussion: Which RWP task Gob step) is appropriate for this assignment Highest loose contamination level in the work area Protective clothing required in the work area Highest general area radiation level in the work area Dose rate alarm setting Maximum time that the operator can remain at the filter skid without exceeding any dose limit The examiner will act as Health Physics (HP) for any related questions. You are the BOP operator. Unit-2 is at 80% You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid The operator is has 450 mrem of annual dose exposure remaining Page 8 of 8 JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: JPM Number: JPM-A4R Revision:
Page 4 of 8
 
PERFORMANCE INFORMATION JPM Number:
STEP                    PERFORMANCE                                 STANDARD siTAR~nuE~
                                                                                                    ",nh ,~"-:;,, ,J;;7""'-'~___C_'_> _ _ __
: 1.        Which RWP task Gob step) is appropriate  Examinee states that the appropriate RWP for this assignment                      task ( job step) for this assignment is                     y Job Steo1 Cue:
Comments:
: 2.      I Highest loose contamination level in the Examinee states that the highest loose work area                                contamination level in the work area is                     y 22000 DPM/100cm2 Cue:
Comments:
: 3.      I Protective clothing required in the work Examinee states that the protective area                                    clothing required in the work area is "Full                 y PC's" (consisting of Cotton liners, Booties, Coveralls, Shoe covers, Rubber gloves, Cue:
Comments:
4.
Cue:
Comments:
5.
Cue:
Comments:
Page 5 of 8
 
PERFORMANCE INFORMATION JPM Number:
STEP                     PERFORMANCE                                  STANDARD
: 6.      Maximum time that the operator can remain     Examinee states that the maximum at the filter skid without exceeding any dose allowed stay time at the filter skid without limit                                         exceedina anv dose limit is 4.5 hrs Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                                                      )iST~,P~11N1E:
Page 6 of 8
 
JPM Number:                     JPM-A3R                           Rev.
                                                                          - - -
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes             No    X Validated Time (minutes):                     15 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                 SAT          UNSAT          NA        (circle one)
Overall Result of JPM:                         SAT         UNSAT                     (circle one)
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure usage             Pass I Fail and adherence requirements.
never put anyone's safety at risk.                                             Pass I   Fail never put equipment reliability at risk.                                       Pass I   Fail never violated radiological work gractices.                                     Pass I   Fail demonstrated effective use of event-free human performance tools.               Pass I Fail Areas for Improvement/Comments:
Page 7 of 8
 
JPM Number:                   ..IPM-A3R                          Rev. ___0,,--__
STUDENT HANDOUT Initial Conditions: State the radiological requirements for entering this area. Include in your discussion:
* Which RWP task Gob step) is appropriate for this assignment
* Highest loose contamination level in the work area
* Protective clothing required in the work area
* Highest general area radiation level in the work area
* Dose rate alarm setting
* Maximum time that the operator can remain at the filter skid without exceeding any dose limit The examiner will act as Health Physics (HP) for any related questions.
Initiating Cues:
* You are the BOP operator.
* Unit-2 is at 80%
* You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid
* The operator is has 450 mrem of annual dose exposure remaining Page 8 of 8
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:             JPM-A4R                 Revision: -~-
0 II. Initiated:
0 II. Initiated:
Marc R. Pucel Developer 02/01/11 Date III. Reviewed:
Marc R. Pucel                         02/01/11 Developer                            Date III. Reviewed:
IV. Approved:
IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor
Nuclear Training Supervisor Date ate Page 1 of 11 JOB PERFORMANCE MEASURE  
                                                            ~Ilate Page 1 of 11
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 12
OF CHANGES:
----------------------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 12
----------------JPM Number: JPM-A4R Rev. ___0___ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                          JPM-A4R                              Rev. ___0_ __
MP2 JPM Number: JPM-A4R Rev. __--'0'--System: Reactivity Control Time Critical Task: Yes NoX Validated Time (minutes):
JOB PERFORMANCE MEASURE WORKSHEET (continued)
25 Task No.(s): Applicable To: SRO RO X PEO KIA No. 055-EK 3.02 KIA Rating 4.3/4.6 Method of Testing: Simulated Actual Performance:
Facility:      MP2                  Examinee:
X Location:
                                                ----------------------------------
Classroom:
JPM Number:                         JPM-A4R                                     Rev. _ _--'0'--__
X In-Plant:Task At the completion of this JPM the examinee will have successfully determined whether SDM is being satisfied for a postulated SBO event. Required Materials EOP 2530" Station Blackout" (procedures.
System:       Reactivity Control Time Critical Task:     Yes             No    X
equipment.
                                -
etc.): EOP 2541, Appendix 17 "Shutdown Margin" "Reactor Engineering Curve and Data Book ( Cycle 20) General  
Validated Time (minutes):                 25 Task No.(s):
Applicable To:             SRO               RO - -  X       PEO KIA No.             055-EK 3.02               KIA Rating         4.3/4.6 Method of Testing:
Simulated Performance:
                              ----              Actual Performance:
                                                                          - -X- -
Location:
Classroom:       X               Simulator:                  In-Plant:
                --'--                        ----                        ----
Task Standards:          At the completion of this JPM the examinee will have successfully determined whether SDM is being satisfied for a postulated SBO event.
Required Materials               EOP 2530" Station Blackout" (procedures. equipment. etc.):   EOP 2541, Appendix 17 "Shutdown Margin" "Reactor Engineering Curve and Data Book ( Cycle 20)
General  


==References:==
==References:==
* * *
 
                                  * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 12
Page 3 of 12 JPM Number: JPM-A4R Rev. ___0,---__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Initiating Cues: Inilial Conditions:
JPM Number:                         JPM-A4R                               Rev. ___0,---__
Reg The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied. Additionally, if it is determined that SDM is not being satisfied, calculate the amount of boric acid that must be added to the RCS. Document data used and values calculated. Unit-2 has experienced a plant trip with a concurrent Station Blackout one half hour ago. Unit-2 had been operating at 100% power for one month prior to the trip. The crew is performing EOP 2530. Power is just being restored to Unit-2 from the SBO Diesel. Tavg is being maintained at 530F. Chemistry has determined present RCS Boron concentration to be 770 ppm. Present Core Burnup is 5000 MWD/MTU. N/A * *
JOB PERFORMANCE MEASURE WORKSHEET (continued)
* NOTES TO EVALUATOR * * *
Initiating Cues:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 12 PERFORMANCE JPM Number: JPM-A4R PERFORMANCE 1 EOP 2530 Step 30. CHECK Shutdown Margin is satisfied.
* The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied.
Refer To Appendix 17, "Shutdown Margin." Comm EOP 2541, Appendix 17 1. IF desired to calculate required shutdown boron concentration, PERFORM Attachment 17 -A, Shutdown Boron Concentration." Comments: Attachment 17 A Required Shutdown Boron Concentration NOTE The initial calculation is used to determine that SOM is met at the current conditions.
* Additionally, if it is determined that SDM is not being satisfied, calculate the amount of boric acid that must be added to the RCS.
The subsequent calculation determines if SOM will be met for anticipated , temperatures when coolina down the RCS. ------' Comments:
* Document data used and values calculated.
: 4. Comments:
Inilial Conditions:
I STANDARD l CRITICALl (YIN) GRADEl (S/U) I i:$l'liR,Tl'fttlF\i c____ Examinee reads EOP 2530 Step 30 and N determines that he/she needs to refer to Appendix 17 to determine Shutdown Examinee refers to EOP 2541, Appendix N 17 to calculate required shutdown boron concentration.
* Unit-2 has experienced a plant trip with a concurrent Station Blackout one half hour ago.
Examinee reads and acknowledges note about initial and subsequent calculations N ofSOM. Page 5 of 12 PERFORMANCE INFORMATION JPM Number: JPM-A4R
* Unit-2 had been operating at 100% power for one month prior to the trip.
..... ".. '.' .**.*...*It_.. L.lI,......___ *.d""*. ii .** .... lm-k.*... _____ .....;..
* The crew is performing EOP 2530.
___."J!t!LJi'1x
* Power is just being restored to Unit-2 from the SBO Diesel.
..........
* Tavg is being maintained at 530F.
__ . . PERFORMANCE
* Chemistry has determined present RCS Boron concentration to be 770 ppm.
: 5. I 2. RECORD the current RCS T AVE. Cue: Comments: 13. RECORD core burnup from ONE of the following:
* Present Core Burnup is 5000 MWD/MTU.
_ "CVBURNUP" (PPC) _ Control Room Daily Surveillance
Simulator
_ Reactor Engineering MWD/MTU I 'u" ." " ..... _. u._....-." . ..,"".MhW....*. _ .**
* N/A Reg uirements:
__ , Cue: Comments: 7 1 4. Refer To the applicable curve in Reactor Engineering Curve and Data Book and DETERMINE the required shutdown boron concentration for the core burnup and the current T AVE as follows: a. IF directed to this Appendix by SBO or Functional Recovery EOPs use "1.0% Shutdown Boron Concentration vs. Moderator Temperature" (RE-B-02)
                                  * *
_IF more than one CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per l greater than one, not fully inserted . **, ."e"  
* NOTES TO EVALUATOR * * * *
* """,""v;-;-.">:.," """""""k4",:."",,,,,,,,.+:  
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
.-'",,-,,"  
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
;; .d""*,,,.  
: 3. If necessary, question the student for details of simulated actions/observations   (i.e. "What are you looking at?" or "What are you observing?").
-.' """'"'' 2!L"""",&,/..:.'" Cue: Comments:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
STANDARD I Examinee records current RCS T AVE as 530F from Initial Conditions.
Page 4 of 12
'" " (Y Y Examinee records core burnup as 5000 MWD/MTU as given in Initial Conditions.
 
Y Examinee uses "1.0% Shutdown Boron Concentration vs. Moderator Temperature" (RE-B-02) and determines the required shutdown boron concentration for the core burnup and the current TAVE as -790.71 I ppm N Examinee states that there is no indication that more than one CEA is not fully inserted and that this step is not applicable.
PERFORMANCE INFORMATION JPM Number:       JPM-A4R
Page 6 of 12 
                      '~tm\i~~§tlttQiWl'ijfl~~
----PERFORMANCE JPM Number: JPM-A4R STEP STANDARD I b.IF directed to this Appendix by any other Examinee states that this step is not N EOP use "3.6% Shutdown Boron applicable.
STEP                    PERFORMANCE                  I                STANDARD                  l  CRITICALl (YIN)
Concentration vs. Moderator Temperature" (RE-B-01 ) _IF any CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per CEA not fully inserted.
GRADEl (S/U) I i:$l'liR,Tl'fttlF\ic_ _ __
td.....,." ... **. ,.* '" Cue: Comments: 5. RECORD the required shutdown boron Examinee records the required shutdown y concentration and the TAVE for which it boron concentration and the TAVE for was calculated.
: 1.       EOP 2530 Step 30. CHECK Shutdown             Examinee reads EOP 2530 Step 30 and                N Margin is satisfied. Refer To Appendix 17,    determines that he/she needs to refer to "Shutdown Margin."                            Appendix 17 to determine Shutdown Comm
which it was calculated. -790.71 ppm of L., >' _, Cue: Comments: I 6. DETERMINE Inverse Boron Worth at Examinee determines Inverse Boron Y present core burnup. Refer To Reactor Worth at present core burnup (5000 Engineering Curve and Data Book. (RE-F-MWD/MTU ) as -116.8 IBW 02) MWD/MTU (step ,(,
: 2.      EOP 2541, Appendix 17                        Examinee refers to EOP 2541, Appendix              N
,,;; Cue: Comments:
: 1. IF desired to calculate required shutdown  17 to calculate required shutdown boron boron concentration, PERFORM                  concentration.
Page 7 of 12 PERFORMANCE JPM Number: STEP 11. Cue: Comments:
Attachment 17-A, Shutdown Boron Concentration."
: 12. Cue: Comments:
Comments:
: 13. Cue: Comments:
: 3.      Attachment 17A Required Shutdown Boron        Examinee reads and acknowledges note Concentration                                about initial and subsequent calculations          N NOTE                    ofSOM.
PERFORMANCE
The initial calculation is used to determine that SOM is met at the current conditions.
: 7. DETERMINE smallest xenon reactivity worth expected within the time frame being evaluated.
The subsequent calculation determines if SOM will be met for anticipated
Refer To ANY of the following:
    ------'
_ "Xenon-Samarium Post Trip Report" _ Reactor Engineering Curve and Data Book (RE-C-01 ) _ "XENON-SAMARIUM DEMAND" program on PPC Reactor ...inoo..in... -9.CALCULATE Boron Equivalent of Xenon Reactivity Worth (BE of XRW) as follows: Xenon X Inverse ::; Boron Equivalent Reactivity Worth Boron Worth of Xenon Reactivity Worth STANDARD Examinee determines smallest xenon reactivity worth expected within the frame being evaluated by use of Engineering Curve and Data Book 01)" as 2.669 XRW (range 2.65 to Examinee calculates Boron Equivalent of Xenon Reactivity Worth (BE of XRW)
          , temperatures    when coolina down the RCS.
(2.65-2.67) 2.669 116.8 311.7 Xenon X Inverse ::; Boron Equivalent Reactivity Worth Boron Worth of Xenon Reactivity Worth (Range of 3.09-311.9)
Comments:
Page 8 of 12 PERFORMANCE JPM Number: PERFORMANCE 10. CALCULATE Xenon Corrected Required Shutdown Boron Required Shutdown Boron Equivalent  
4.
= Boron Concentration of Xenon Reactivity Worth Xenon Corrected Required Shutdown Boron Concentration C Comments: I 1 5 . 111. Record ANY of th-e following:
Comments:
RCS boron concentration at the time of the reactor trip ppm at time of Rx trip RCS boron sample results obtained from from Chern Cue: Comments: 12. CHECK RCS boron concentration greater than Xenon Corrected Required Shutdown Boron concentration.
Page 5 of 12
STANDARD Examinee calculates Xenon Corrected Required Shutdown Boron -790.71 Required Shutdown Boron Concentration (309-311.9) 311.7 Boron Equivalent of Xenon Reactivity Worth y 479.0 (478-481)
 
Xenon Corrected Required Shutdown Boron Concentration Examinee records RCS boron sample results obtained from Chemistry 770 ppm from Chemistry sample ( Initial Conditions) y Examinee determines that RCS boron concentration is greater than Xenon Corrected Required Shutdown Boron concentration.
PERFORMANCE INFORMATION JPM Number:                  JPM-A4R lIeletlmii":'+.(tutd_iIilttlll*.**!fO\\I1~J~-i)53.iiIIJ'~B';*';"Blcickaut~;5~
,',",,,,j"';;
                            .... ".. '.' .**.*. .*It_.. L.lI,......___ *.d""*.                                 ii .** ....     lm-k.*... _____ . . .;. &~_."'i'___."J!t!LJi'1x..........__ . . .<_. .
, ,."Zi, y TERMINATION CUE: The evaluation for this JPM is concluded.
STEP                                                        PERFORMANCE                                                                                                                 STANDARD          (Y
Page 9 of 12 PERFORMANCE JPM Number: STEP PERFORMANCE STANDARD Page 10 of 12 JPM Number: JPM-A4R Rev. __-'0'--__ VERIFICATION OF JPM COMPLETION Date Performed:
: 5.     I 2. RECORD the current RCS TAVE.                                                                                                                 I Examinee records current RCS TAVE as          Y 530F from Initial Conditions.
Student: Evaluator:
                                                                                                                                                              '"  "
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Cue:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
Comments:
25 Actual Time to Complete (minutes):  
: 6.      13. RECORD core burnup from ONE of the following:                                                                                                                                 Examinee records core burnup as              Y
..'PM Work Practice Evaluation:
_ "CVBURNUP" (PPC)                                                                                                                                 5000 MWD/MTU as given in Initial
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
_ Control Room Daily Surveillance                                                                                                               Conditions.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices.
_ Reactor Engineering MWD/MTU I   'u"   ." " ..... _.           u._....-." . ..,"".MhW....*.                 _ .**,,~. __ .~. ,
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Cue:
Page 11 of 12
Comments:
-----JPM Number: Rev. 0 Initial Conditions:
: 7.      14. Refer To the applicable curve in Reactor Engineering Curve and Data Book and                                                                                                             Examinee uses "1.0% Shutdown Boron            N DETERMINE the required shutdown boron                                                                                                           Concentration vs. Moderator Temperature" concentration for the core burnup and the                                                                                                       (RE-B-02) and determines the required current T AVE as follows:                                                                                                                       shutdown boron concentration for the core burnup and the current TAVE as -790.71
Initiating Cues: STUDENT The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SOM is being satisfied. Additionally, if it is determined that SOM is not being satisfied, calculate the amount of boric acid that must be added to the RCS Unit-2 has experienced a plant trip with a concurrent Station Blackout one half hour ago. Unit-2 had been operating at 100% power for one month prior to the trip. The crew is performing EOP 2530. Power is just being restored to Unit-2 from the SBO Diesel. Tavg is being maintained at 530F. Chemistry has determined present RCS Boron concentration to be 770 ppm. Present Core Burnup is 5000 MWO/MTU. Page 12 of 12 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: JPM Number: JPM-A1.1S Revision:
: a. IF directed to this Appendix by SBO or                                                                                                   I  ppm Functional Recovery EOPs use "1.0%
0Initiated:
Shutdown Boron Concentration vs.
R. J. Ashey 11/30/2011 Developer Date Reviewed: mca eVI er Approved:
Moderator Temperature" (RE-B-02)
Cognizant Plant Supervisor Date Nuclear Training Supervisor Page 1 of 8 JOB PERFORMANCE MEASURE  
Examinee states that there is no indication
_IF more than one CEA is not fully that more than one CEA is not fully inserted, INCREASE the required inserted and that this step is not shutdown boron concentration 350 ppm per applicable.
l ~."",,;u
* greater than one,
              **, ."e"         """,""v;-;-.">:.," """""""k4",:."",,,,,,,,.+: .- '",,-,,"
not fully inserted .
                                                                                          "'~'Y""?/k;;;;;;L'b_AA ;;   .d""*,,,. -.' """'"'' 2!L"""",&,/..:.'"
Cue:
Comments:
Page 6 of 12
 
PERFORMANCE INFORMATION JPM Number:                  JPM-A4R STEP                                            PERFORMANCE                      STANDARD
: 8.     I b.IF directed to this Appendix by any other            Examinee states that this step is not  N EOP use "3.6% Shutdown Boron                          applicable.
Concentration vs. Moderator Temperature" (RE-B-01 )
_IF any CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per CEA not fully inserted.
td.....,." ... ~ **. ,.* '"
Cue:
Comments:
: 9.       5. RECORD the required shutdown boron                 Examinee records the required shutdown y concentration and the TAVE for which it                boron concentration and the TAVE for was calculated.                                        which it was calculated.
ppm                        -790.71 ppm of L.,                       >J  ' _,
Cue:
----
Comments:
: 10.     I 6. DETERMINE Inverse Boron Worth at                    Examinee determines Inverse Boron      Y present core burnup. Refer To Reactor                  Worth at present core burnup (5000 Engineering Curve and Data Book. (RE-F-                MWD/MTU ) as -116.8 IBW 02)
MWD/MTU (step 3.)
IBW
                              ,(, ,'P"~      ,,;;
--,,,
Cue:
Comments:
Page 7 of 12
 
PERFORMANCE INFORMATION JPM Number:
STEP                        PERFORMANCE                                            STANDARD
: 11.       7. DETERMINE smallest xenon reactivity                Examinee determines smallest xenon                    N worth expected within the time frame being            reactivity worth expected within the time evaluated. Refer To ANY of the following:             frame being evaluated by use of "Reactor
_ "Xenon-Samarium Post Trip                          Engineering Curve and Data Book (RE-C Report"                                              01)" as 2.669 XRW (range 2.65 to 2.67).
_ Reactor Engineering Curve and Data Book (RE-C-01 )
_ "XENON-SAMARIUM DEMAND" program on PPC Reactor ~n ...inoo..in...
Cue:
Comments:
12.
Cue:
Comments:  -
: 13.        9.CALCULATE Boron Equivalent of Xenon                 Examinee calculates Boron Equivalent of                y Reactivity Worth (BE of XRW) as follows:             Xenon Reactivity Worth (BE of XRW) as follows:
(2.65-2.67)                        (309-311.9) 2.669           116.8               311.7 Xenon           X Inverse     ::; Boron Equivalent Xenon           X  Inverse    ::;  Boron Equivalent Reactivity Worth    Boron Worth    of Xenon          Reactivity Worth    Boron Worth      of Xenon Reactivity Worth                                      Reactivity Worth (Range of 3.09-311.9)
Cue:
Comments:
Page 8 of 12
 
PERFORMANCE INFORMATION JPM Number:
STEP                      PERFORMANCE                                         STANDARD
: 14.      10. CALCULATE Xenon Corrected                     Examinee calculates Xenon Corrected Required Shutdown Boron                          Required Shutdown Boron (309-311.9)
Required Shutdown         Boron Equivalent   =     -790.71                    311.7                            y Boron Concentration       of Xenon Reactivity   Required Shutdown          Boron Equivalent Worth                  Boron Concentration        ofXenon Reactivity Worth Xenon Corrected Required Shutdown Boron Concentration                              479.0 (478-481)
Xenon Corrected Required Shutdown Boron Concentration C
Comments:
I   15. 111. Record ANY of th-e following:                 Examinee records RCS boron sample                                y RCS boron concentration at the time of the       results obtained from Chemistry 770 ppm reactor trip             ppm at time of Rx trip   from Chemistry sample ( Initial Conditions)
RCS boron sample results obtained from from Chern Cue:
Comments:
: 16.      12. CHECK RCS boron concentration                 Examinee determines that RCS boron                              y greater than Xenon Corrected Required             concentration is greater than Xenon Shutdown Boron concentration.                     Corrected Required Shutdown Boron concentration.                                               ,
                                                                                                          ,',",,,,j"';; ,."Zi, Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 9 of 12
 
PERFORMANCE INFORMATION JPM Number:
STEP    PERFORMANCE                    STANDARD Page 10 of 12
 
JPM Number:                       JPM-A4R                           Rev. _ _-'0'--__
VERIFICATION OF JPM COMPLETION Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes             No   X
                                -
Validated Time (minutes):                     25 Actual Time to Complete (minutes):
..'PM Work Practice Evaluation:               SAT         UNSAT           NA         (circle one)
Overall Result of JPM:                         SAT         UNSAT                     (circle one)
During the TPE, the trainee                                                   Evaluation performed the task correctly and in accordance with procedure usage           Pass I Fail and adherence requirements.
never put anyone's safety at risk.                                             Pass I   Fail never put equipment reliability at risk.                                       Pass I   Fail never violated radiological work practices.                                   Pass I   Fail demonstrated effective use of event-free human performance tools.             Pass I   Fail Areas for Improvement/Comments:
Page 11 of 12
 
JPM Number:                 JPM-A4R                              Rev. - - -  0 --
STUDENT HANDOUT Initial Conditions:
* The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SOM is being satisfied.
* Additionally, if it is determined that SOM is not being satisfied, calculate the amount of boric acid that must be added to the RCS Initiating Cues:
* Unit-2 has experienced a plant trip with a concurrent Station Blackout one half hour ago.
* Unit-2 had been operating at 100% power for one month prior to the trip.
* The crew is performing EOP 2530.
* Power is just being restored to Unit-2 from the SBO Diesel.
* Tavg is being maintained at 530F.
* Chemistry has determined present RCS Boron concentration to be 770 ppm.
* Present Core Burnup is 5000 MWO/MTU.
Page 12 of 12
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:             JPM-A1.1S                 Revision:     0
                                                                  --'--
II. Initiated:
R. J. Ashey                        11/30/2011 Developer                            Date III. Reviewed:            ~
      ~*IR*            ec mca    eVI  er IV. Approved:
Cognizant Plant Supervisor (optional)              Date Nuclear Training Supervisor Page 1 of 8
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE 11/30/2011 DESCRIPTION Created JPM for LOIT 2011 NRC Exam REV/CHANGE 010 Page 2 of 8
OF CHANGES:
-------------------------------------------
All & DATE                   DESCRIPTION    REV/CHANGE 11/30/2011   Created JPM for LOIT 2011 NRC Exam     010 Page 2 of 8
----Facility:
 
MP-2
Facility:        MP-2                  Examinee:
...IPM Number: JPM-A1.1S Rev. Task Title: System: Conduct of Operations Time Critical Task: Yes NoN Validated Time (minutes):
                                                  -------------------------------------------
15 Task No.(s): N/A Applicable To: SRO X RO PEO KJA No. 2.1.7 KJA Rating __4_.4_/4_._7
. .IPM Number:                         JPM-A1.1S                                 Rev.                 o Task Title:
__ Method of Testing: Simulated Performance:
System:         Conduct of Operations Time Critical Task:         Yes             No    N
XActual Performance: Location:
                                  -
Classroom: Simulator:
Validated Time (minutes):                     15 Task No.(s):                       N/A Applicable To:               SRO       X       RO - -        PEO
In-Plant:Task At the completion of this JPM, the SRO will determine the appropriate Action Level for an RCS leak and determine the appropriate actions that must be taken. Reguired Materials C OP 200.15, RCS Leakage Trending and Investigation (procedures, equipment.
                                                                      --
etc.>: OPS Form 2619A-001, Control Room Daily Surveillance, MODES 1 &2 General C OP 200.15, RCS Leakage Trending and Investigation OPS Form 2619A-001, Control Room Daily Surveillance, MODES 1 &2 * * *
KJA No.                     2.1.7               KJA Rating _ _4_.4_/4_._7__
Method of Testing:
Simulated Performance:             X            Actual Performance:
                                ---'----                                ---
Location:
Classroom:         X              Simulator:                 In-Plant: - - -
                  ----'---                      ----
Task Standards:                    At the completion of this JPM, the SRO will determine the appropriate Action Level for an RCS leak and determine the appropriate actions that must be taken.
Reguired Materials               C OP 200.15, RCS Leakage Trending and Investigation (procedures, equipment. etc.>:   OPS Form 2619A-001, Control Room Daily Surveillance, MODES 1 & 2 General  
 
==References:==
C OP 200.15, RCS Leakage Trending and Investigation OPS Form 2619A-001, Control Room Daily Surveillance, MODES 1 & 2
                                      * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8 Initiating Cues: Review the Unit 2 RCS Unidentified Leakage and Unit 2 RCS Identified Leakage graphs. Initial Conditions:
Page 3 of 8
* You are the Night Crew Shift Manager. The plant is in MODE 1 and stable at 100% power. The crew began its 12 hour shift at 1800 The latest ReS Leak Rate has been determined has been entered into the Operation Trending database. (See attached graphs) There is NO indication of PRESSURE BOUNDARY LEAKAGE. The present RCS leak rate calculation has been confirmed. All input parameters have been evaluated and are valid. Simulator * *
 
* NOTES TO EVALUATOR * * *
Initiating Cues:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM only). Page 4 of 8 PERFORMANCE JPM Number: PERFORMANCE 1 .
* Review the Unit 2 RCS Unidentified Leakage and Unit 2 RCS Identified Leakage graphs.
: 2. Section 4.1 Step If leakage is PRESSURE BOUNDARY LEAKAGE, perform the following:
Initial Conditions:
: a. Refer to Technical specification 3.4.6.2 for ACTIONS. Comme STANDARD c!,i l''''_;?''''l
* You are the Night Crew Shift Manager.
_______ Examinee reviews the attached graphs and y obtains C OP 200.15, RCS Leakage Trending and Investiaatior Examinee determines from Initial Conditions N that NO PRESSURE BOUNDARY LEAKAGE exists and this step is NOT applicable.
* The plant is in MODE 1 and stable at 100% power.
Page 5 of 8 PERFORMANCE JPM Number: STEP 3. Cue: Comments:
* The crew began its 12 hour shift at 1800
PERFORMANCE Step 4.1.2 If any of the following Action Level 1 limits are exceeded, Go To Section 4.2 One seven (7) day rolling average of daily RCS UNIDENTIFIED LEAKAGE rates greater than 1.0 gpm, Nine (9) consecutive daily RCS IDENTIFIED LEAKAGE rates greater than the baseline mean. STANDARD
* The latest ReS Leak Rate has been determined has been entered into the Operation Trending database. (See attached graphs)
* Examinee determines that NO seven (7) N day rolling average of daily RCS UNIDENTIFIED LEAKAGE rates is greater than 1.0; therefore, this does NOT require entry into Action Level 1.
* There is NO indication of PRESSURE BOUNDARY LEAKAGE.
* Examinee determines that, the last nine y consecutive RCS UNIDENTIFIED LEAKAGE rates are greater than the baseline mean. o Examinee determines that Action y Level 1 is applicable.
* The present RCS leak rate calculation has been confirmed.
* Examinee oroceeds to Section 4.2. TERMINATION CUE: The evaluation for this JPM is concluded.
* All input parameters have been evaluated and are valid.
Page 6 of 8
Simulator                 N/A Reguirements:
-------JPM Number: JPM-A1.1S Rev. a VERIFICATION OF JPM Title: Date Performed:
                                        * *
Student: Evaluator:
* NOTES TO EVALUATOR * * * *
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
15 Actual Time to Complete (minutes):
: 3. If necessary, question the student for details of simulated actions/observations   (Le. "What are you looking at?" or "What are you observing?").
Overall Result of JPM: SAT UNSAT (circle one) Page 7 of 8 JPM I\lumber:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in~plant only).
Rev. ___0,,--__ STUDENT Initiating Cues: Review the Unit 2 RCS Unidentified Leakage and Unit 2 RCS Identified Leakage graphs. Initial Conditions:
Page 4 of 8
* You are the Night Crew Shift Manager. The plant is in MODE 1 and stable at 100% power. The crew began its 12 hour shift at 1800 The latest RCS Leak Rate has been determined has been entered into the Operation Trending database. (See attached graphs) There is NO indication of PRESSURE BOUNDARY LEAKAGE. The present RCS leak rate calculation has been confirmed. All input parameters have been evaluated and are valid. Page 8 of 8 Training Use Only Unit 2 ReS Unidentified Leakage 0.12 0.10 0.08 0.06 0.04 :!: Il. 0.02 (!) 0.00 !  
 
'b\\.\. <,\\.\. t>.\\.\. \.\.\\.\.1-\t>.\\.\.
PERFORMANCE INFORMATION JPM Number:
"\1-\. ,,\1-'0
STEP                PERFORMANCE                                     STANDARD
-0.04 -0.06 -0.08 -0.10 -+-Unidentified Leakage Rate -.-Unidentified Leakage Alert Level 2 (90 Day Average + 2 StDev)
                                                                                                  !,i l''''_;?''''l_______
Leakage 7 Day Average .">' I'}; '?\ -II--Unidentified Leakage 90 Day Unidentified Leakage Alert Level 3 (90 Day Average +
c
JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: JPM Number: JPM-A1.2S Revision:
: 1.                                                Examinee reviews the attached graphs and             y obtains C OP 200.15, RCS Leakage Trending and Investiaatior Cue:
0II. Initiated:
Comments:
Marc R. Pucel Developer 02/01/11 Date III. Reviewed:
: 2.      Section 4.1                              Examinee determines from Initial Conditions           N Step 4.1.1 If leakage is PRESSURE        that NO PRESSURE BOUNDARY LEAKAGE BOUNDARY LEAKAGE,            exists and this step is NOT applicable.
perform the following:
: a. Refer to Technical specification 3.4.6.2 for ACTIONS.
Comme Page 5 of 8
 
PERFORMANCE INFORMATION JPM Number:
STEP                 PERFORMANCE                                STANDARD
: 3.     Step 4.1.2
* Examinee determines that NO seven (7)      N If any of the following Action Level 1   day rolling average of daily RCS limits are exceeded, Go To Section 4.2   UNIDENTIFIED LEAKAGE rates is
* One seven (7) day rolling average of   greater than 1.0; therefore, this does NOT daily RCS UNIDENTIFIED                require entry into Action Level 1.
LEAKAGE rates greater than 1.0
* Examinee determines that, the last nine   y gpm,                                  consecutive RCS UNIDENTIFIED
* Nine (9) consecutive daily RCS          LEAKAGE rates are greater than the IDENTIFIED LEAKAGE rates greater    baseline mean.
than the baseline mean.               o Examinee determines that Action         y Level 1 is applicable.
* Examinee oroceeds to Section 4.2.
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 6 of 8
 
JPM Number:                   JPM-A1.1S                           Rev.
                                                                          ---    a --
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes           No     X
                              --
Validated Time (minutes):                   15 Actual Time to Complete (minutes):
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
Page 7 of 8
 
JPM I\lumber:               JPM-A1.1S                        Rev. ___0,,--__
STUDENT HANDOUT Initiating Cues:
* Review the Unit 2 RCS Unidentified Leakage and Unit 2 RCS Identified Leakage graphs.
Initial Conditions:
* You are the Night Crew Shift Manager.
* The plant is in MODE 1 and stable at 100% power.
* The crew began its 12 hour shift at 1800
* The latest RCS Leak Rate has been determined has been entered into the Operation Trending database. (See attached graphs)
* There is NO indication of PRESSURE BOUNDARY LEAKAGE.
* The present RCS leak rate calculation has been confirmed.
* All input parameters have been evaluated and are valid.
Page 8 of 8
 
Training Use Only Unit 2 ReS Unidentified Leakage 0.12 0.10 0.08 0.06 0.04
:!:
Il. 0.02
(!)
0.00 !
    -o~t\t\.        " \1-\.
                          ~\.\.
                                        ,,\1-'0
                                              ~\.\.         1-\t>.\\.\.       ~\\.');
                                                                                      ~\.\.      'b\\.\.
                                                                                                .">'
                                                                                                                      <,\\.\.
I'};                '?\
t>.\\.\.         \.\.\\.\.
    -0.04
    -0.06
    -0.08
    -0.10
            -+- Unidentified Leakage Rate                                                 -II-- Unidentified Leakage 90 Day Average
            - . - Unidentified Leakage Alert Level 2 (90 Day Average + 2 StDev)           ~ Unidentified     Leakage Alert Level 3 (90 Day Average + 3StDev)
            ~Unidentified Leakage 7 Day Average
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:             JPM-A1.2S                 Revision:     0
                                                                  --
II. Initiated:
Marc R. Pucel                         02/01/11 Developer                            Date III. Reviewed:
Technical Reviewer IV. Approved:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date
Date \..../Nuclear Training Supervisor Page 1 of 8 JOB PERFORMANCE MEASURE  
            \..../Nuclear Training Supervisor Page 1 of 8
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006*317 Update JPM to include HUP evaluations and new format Page 2 of 8
OF CHANGES:
--------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006*317     Update JPM to include HUP evaluations and new format Page 2 of 8
------------------------------JPM Number: JPM-A1.2S Rev. ___0=--__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                          JPM-A1.2S                                Rev. ___0=--__
MP2 Examinee:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:
Facility:      MP2                    Examinee:
Rev. o Task Title: System: Auxiliary Feedwater Time Critical Task: Yes No x Validated Time (minutes):
                                                    --------------------
20 Task No.(s): Applicable To: SRO X RO PEO KIA No. 2.2.14 KIA Rating __3._9/_4_.3
JPM Number:                           JPM-A1.2S                                     Rev.
__ Method of Testing: Simulated Actual Performance:
                                                                                        ---  o --
X Classroom:
Task Title:
X Simulator:
System:       Auxiliary Feedwater Time Critical Task:     Yes               No     x Validated Time (minutes):                   20 Task No.(s):
Task At the completion of this JPM, the examinee will determine whether the Tag Clearance can be approved and authorized and if not, why. Reguired Materials
Applicable To:             SRO         X       RO             PEO - - -
* The following P&ID's available:
                                                      ---
(25203-26005 SH.3/ (procedures.
KIA No.                 2.2.14                   KIA Rating _ _    3._9/_4_.3_ _
equipment.
Method of Testing:
etc.): Condensate Storage and Aux Feed). 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4), and 25203-29008 SH 26 ( Seal & Manifold Piping)
Simulated Performance:                              Actual Performance: - -X- -
                              ----
Location:
Classroom: - -    X -              Simulator: - - -            In-Plant: - - - - -
Task Standards:                    At the completion of this JPM, the examinee will determine whether the Tag Clearance can be approved and authorized and if not, why.
Reguired Materials
* The following P&ID's available: (25203-26005 SH.3/
(procedures. equipment. etc.):         Condensate Storage and Aux Feed). 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4),
and 25203-29008 SH 26 ( Seal & Manifold Piping)
* OP 2322-001 General  
* OP 2322-001 General  


==References:==
==References:==
* OP-M-200 (Equipment Clearance) * * *
* OP-M-200 (Equipment Clearance)
                                    * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
Page 3 of 8 JPM Number:
 
Rev. __--"-0___ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                       ~IPM-A1.2S                              Rev. _ _--"-0_ __
Initiating Cues: Your task is to review, approve. and authorize the attached Tag Clearance Sheet. Initial Conditions:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
* Unit-2 is in Mode 5 There is evidence of leak-by of 2-FW-8S, the "S" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve. Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve. Simulator N/A Requirements:  
Initiating Cues:
* *
* Your task is to review, approve. and authorize the attached Tag Clearance Sheet.
* NO"rES TO EVALUATOR  
Initial Conditions:
* * *
* Unit-2 is in Mode 5
* Critical steps for this JPM are indicated by checking "Y" . For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 8 PERFORMANCE INFORMATION JPM Number: Rev.. ',J'''.iH,.  
* There is evidence of leak-by of 2-FW-8S, the "S" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
".'.';:!'" '.:B.*.. 'i,:. ,,' i i ..'d*.*.
* Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.
a I STEP 1 PERFORMANCE
Simulator
: 1. OP-AA-200 "Equipment Clearance" 3.2.3c. REVIEW the completed Tagging Record for accuracy and completeness, referencing controlled documents as necessary.
* N/A Requirements:
The reviewing SRO or designee shall:
                                  * *
* ENSURE that the tag-out is adequate for the tasks and hazards involved.
* NO"rES TO EVALUATOR * * * *
* ENSURE that the proper sequence of component alignment and tag placement is specified.
: 1. Critical steps for this JPM are indicated by checking "Y" . For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
* ENSURE that the appropriate entries have been made in the comment section of the Tagging Record.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
* DETERMINE if support is required from Maintenance Personnel to execute the out. STANDARD Examinee reviews the completed Tagging Record for accuracy and completeness, using controlled drawings:
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
(25203-26005 SH.31 Condensate Storage and Aux Feed) For fluid systems. (25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. 8uses 24C,24D (A3,A4)) for electrical isolation.
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Examinee identifies that the incorrect 4160 VAC breaker ( A307) is Danger Tagged and that the correct breaker (A406) is required to be Danger Tagged "Racked Down" Examinee identifies that 2-FIRE-948.  
Page 4 of 8
"8" AUX FEED PUMP EMERGENCY FIRE WATER SUPPLY VALVE" has been incorrectly omitted from the tagging sheet. This alternate suction for the "8" Auxiliary Feed Pump is required to be Danger Tagged "Closed" Examinee determines that this tag clearance cannot be approved or authorized as written. CRITICAL I GRADE (YIN) (S/U) S'f N y y y Examinee may desire to tag open only one casing vent valve (2-CN-329 or 2-CN-330).
 
Additionally, examinee may desire to tag open only one header drain valve (2-CN-331 or 2-CN-332).
PERFORMANCE INFORMATION JPM Number:                                                                                                               Rev..
At least one casing vent valve and one header drain valve must be tagged open. Examinee may desire to tag open the motor heater breaker for "8" MDAFW pump. This is not required.
                                            ',J'''.iH,. ".'.';:!'" '.:B.*. 'i,:. ,,' i i. ' d*.*.
Page 5 of 8 PERFORMANCE JPM Number: CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) (&sect;ll,JJ_ TERMINATION CUE: The evaluation for this JPM is concluded.  
                                            ~.eaf:~J1lceoun. a I
;iSTOP'tfME".'" ,'" " '" 0'/ ____ Page 6 of 8 JPM Number: JPM-A1.2S Rev. ___0.0...-__ VERIFICATION OF JPM COMPLETION Title: ApprQveancFAUthorize a Clearance Boundary Date Performed:
STEP   1               PERFORMANCE                                                             STANDARD CRITICAL (YIN)
Student: Evaluator:
GRADE (S/U)
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
S'fART~filE:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
: 1.     OP-AA-200 "Equipment Clearance"                                 Examinee reviews the completed Tagging Record for accuracy and completeness, 3.2.3c. REVIEW the completed Tagging                           using controlled drawings:
20 Actual Time to Complete (minutes):
Record for accuracy and completeness,                             (25203-26005 SH.31 Condensate Storage referencing controlled documents as                                                                                  N and Aux Feed) For fluid systems.
JPM Work Practice Evaluation:
necessary. The reviewing SRO or designee (25203-30005 Single Line Meter & Relay shall:
Overall Result of JPM: SAT SAT UNSAT UNSAT NA (circle one) (circle one) During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
Diagram 4.16KV Emerg. 8uses 24C,24D
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices.
* ENSURE that the tag-out is adequate for (A3,A4)) for electrical isolation.
Pass I Fail demonstrated effective use of event-free human performance tools. Pass / Fail Areas for Improvement/Comments:
the tasks and hazards involved.                                                                                      y Examinee identifies that the incorrect 4160 VAC breaker ( A307) is Danger
Page 7 of 8 JPM Number: Rev. ___0,--__ STUDENT HANDOUT Initiating Cues: Your task is to review, approve, and authorize the attached Tag Clearance Sheet. Initial Conditions: Unit-2 is in Mode 5 There is evidence of leakby of 2-FW-8S, the "S" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve. Mechanical Maintenance wilt be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve. Page 8 of 8 Section *Coversheet Tagout: 2C19 Section: 2322X00-002A Component to be Worked 2-FW-8B Millstone Station 03/20/111935 2_TB _00106_ AFRV AREA_ Notes: Reason Tagged 2-FW-8B CHECK VALVE INSPECTION Instructions/Cautions:
* ENSURE that the proper sequence of Tagged and that the correct breaker component alignment and tag placement is (A406) is required to be Danger Tagged specified.
                                                                            "Racked Down"
* ENSURE that the appropriate entries                          Examinee identifies that 2-FIRE-948. "8"             y have been made in the comment section of                        AUX FEED PUMP EMERGENCY FIRE the Tagging Record.                                            WATER SUPPLY VALVE" has been incorrectly omitted from the tagging sheet.
* DETERMINE if support is required from                        This alternate suction for the "8" Auxiliary Maintenance Personnel to execute the tag                      Feed Pump is required to be Danger out.                                                            Tagged "Closed" Examinee determines that this tag                   y clearance cannot be approved or authorized as written.
Examinee may desire to tag open only one casing vent valve (2-CN-329 or 2-CN-330). Additionally, examinee may desire to tag open only one header drain valve (2-CN-331 or 2-CN-332). At least one casing vent valve and one header drain valve must be tagged open. Examinee may desire to tag open the motor heater breaker for "8" MDAFW pump. This is not required.
Page 5 of 8
 
PERFORMANCE INFORMATION JPM Number:
CRITICAL     GRADE STEP     PERFORMANCE                             STANDARD                   (YIN)       (&sect;ll,JJ_
TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                          ;iSTOP'tfME".'"
                                                                          ,'"   " '" 0'/ _ _ __
Page 6 of 8
 
JPM Number:                     JPM-A1.2S                           Rev. ___0.0...-__
VERIFICATION OF JPM COMPLETION Title:       ApprQveancFAUthorize a Clearance Boundary Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes -
No     X Validated Time (minutes):                     20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                 SAT          UNSAT          NA        (circle one)
Overall Result of JPM:                         SAT         UNSAT                     (circle one)
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure usage             Pass I Fail and adherence requirements.
never put anyone's safety at risk.                                             Pass I   Fail never put equipment reliability at risk.                                       Pass I   Fail never violated radiological work practices.                                     Pass I   Fail demonstrated effective use of event-free human performance tools.               Pass / Fail Areas for Improvement/Comments:
Page 7 of 8
 
JPM Number:                 JPM-A1                            Rev. ___0,--__
STUDENT HANDOUT Initiating Cues:
* Your task is to review, approve, and authorize the attached Tag Clearance Sheet.
Initial Conditions:
* Unit-2 is in Mode 5
* There is evidence of leakby of 2-FW-8S, the "S" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
* Mechanical Maintenance wilt be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.
Page 8 of 8
 
Section *Coversheet                                 Millstone Station Tagout: 2C19 Section: 2322X00-002A                                                                             03/20/111935 Component to be Worked 2-FW-8B 2_TB       _00106_ AFRV AREA_
Notes:
Reason Tagged 2-FW-8B CHECK VALVE INSPECTION Instructions/Cautions:
Additional Information:
Additional Information:
25203-26005 SH.3/ Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Re!ay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4) Section Attributes:
25203-26005 SH.3/ Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Re!ay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)
Work Order List: Number / Equipment ID Description 2-FW-8B Perform Check Valve Inspection Section Verification:
Section Attributes:
Status Prepared Approved Authorized Work Released To Clear System Restored Description Prepared By: Approved By: Authorizedf?y:
Work Order List:
Work Released By: Authori:ze Tags to clear: Restoration Complete Name "Qualified Operator" Verification Date "This Morning" Page1of3 ANSWER Section Coversheet Millstone Station ragout: 2C19 Section: 2322X00-OO2A Tag Tag ;Equipment Ver Pia Placement Place. 1st Ver: Pia Restoration Serial Type * -------------------------
Number / Equipment ID                                               Description 2-FW-8B                     Perform Check Valve Inspection Section Verification:
Req Seq Configuration Verif Req No. '", Equipment Description
Status                         Description                          Name        Verification Date Prepared                   Prepared By:                             "Qualified Operator" "This Morning" Approved                    Approved By:
* Notes Time/Date
Authorized                  Authorizedf?y:
* Notes* Equipment Location Yellow P9B-HS IV 1 N/A 4 N/A* HANDSWITCH fOR "BII
Work Released              Work Released By:
* BREAKER RACKED AUXIUARY FEEDWATER PUMP DOWN'" 2_CB _03606_ CNTRL Red A 406 2 RACKED DOWN 3 RACKED UP------------TI------------...,
To Clear                    Authori:ze Tags to clear:
* 4.16KV BREAKER P9B ,AUXILARY This is the correct FEEDWATER PUMP 24DS-2 I breaker to be tagged '" 238 _OS606_UPR_
System Restored            Restoration Complete AN!
for "B" AFW Pumpl<',." '"''"-".'''  
Page1of3
.,' Red 2-FW-98 'IV 3 CLOSED 'OPEN * "8" AUX FEED PUMP STOP
 
* 2_TB _00106_ AFW RM .... "'."A"""'.',,'., ,,,",,".w., ,,, '"'"'. Red . IV 3 CLOSED , 2 OPEN * "BII AUX FEED PUMP RECIRCULATION STOP 00106_ABOVE "8"AFP " Red 2-CN-29B IV 3 CLOSED 2 OPEN * "B" AUX FEED PUMP
ANSWER KEY Section Coversheet                                                                                                                                 Millstone Station ragout: 2C19 Section: 2322X00-OO2A                                                                                                                                                                                         03/20/111935 Tag   Tag ;Equipment                                                                                                       Ver Pia Placement                       Place. 1st Ver: Pia Restoration     As left    Rest. 1st Rest. 2nd Serial Type * --- --- - -- ----------------                                                                                   Req Seq Configuration                     Verif   Req ;Seq~l!~iI~~tion Configuration    Verif    Verif No.         '", Equipment Description
* 2_TB _00106_AFW RM Red 2-FIRE-94B  
* Notes               Time/Date
; N 3 CLOSED This is an alternate 2 CLOSED '" "B" AUX FEED PUMP EMERGENCY  
* Notes                   Time/DateTime/Date
'OIl suction that must be FIRE WATER SUPPLY VALVE : tagged ; '" 2_TB Red 2-CN-330 [OPEN/UNCAPPED 1 CLOSED * "B" AUX FEED PUMP CASING VENT '" 2_TB 03/20/111935 As left Rest. 1st Rest. 2nd Configuration Verif Verif Time/DateTime/Date RACKED UP OPEN OPEN OPEN nOSED CLOSED ANSWER KEY Page2of3 ANSWER Red 2-CN-329 IV 4 OPEN/UNCAPPED 1 CLOSED CLOSED * "BTl AUX FEED PUMP CASING VENT VALVE
* Equipment Location Yellow P9B-HS                                                                                                           IV             1 N/A                                     4 N/A
* 2_TB _00106_ Red 2-CN-331 IV 4 OPENjUNCAPPED CLOSED * "BTl AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE
* HANDSWITCH fOR "BII
* 23B Red 2-CN-332 IV 4 OPEN/UNCAPPED 1 CLOSED CLOSED * "B" AUX FEED PUMP SUCTION HEADER DRAIN
* BREAKER RACKED AUXIUARY FEEDWATER PUMP DOWN
* 2_TB _00106_ ANSWER KEY Page30f3 JOB PERFORMANCE MEASURE APPROVAL SHEET L JPM Title: JPM Number: "IPM-A2S Revision:
                '" 2_CB                         _03606_ CNTRL RM COS Red       A 406                                                                                                                       2 RACKED DOWN                             3 RACKED UP   RACKED UP
0II. Initiated:
                                                                                                                                                ------------TI------------...,
Robert L. Cimmino, Jr. Developer 02/03/11 Date III. Reviewed:
* 4.16KV BREAKER P9B ,AUXILARY                                                                                                             This is the correct FEEDWATER PUMP 24DS-2                                                                                     ~                            I breaker to be tagged
                '" 238                                     _OS606_UPR_                                                                                     for "B" AFW Pump SWG~BUS24D
                          ~," l<',." '"''"-".''' .,'
Red         2-FW-98                                                                                                 'IV               3 CLOSED                                   'OPEN       OPEN
                * "8" AUX FEED PUMP DISCHARGE STOP VALVE
* 2_TB                                   _00106_ AFW RM
                                                                *,.//:c~<<.<.,.,.,..""A.,.... "'."A"""'.',,'., ,,,",,".w., ,,, '"'"'.
Red                                                                                                                 . IV               3 CLOSED                                 , 2 OPEN         OPEN
                * "BII AUX FEED PUMP RECIRCULATION STOP VALVE 00106_ABOVE "8"AFP ,
                                              -,~"",:,&#xa5;,,,:,,,, ""';"R~-'~"":"' ~~~,~"""~""'~''',.'w+,~~,                      "~~ ~." ,~"V "
Red       2-CN-29B                                                                                                       IV             3 CLOSED                                 2 OPEN         OPEN
                * "B" AUX FEED PUMP SUCTION ISOLATION
* 2_TB                                 _00106_AFW RM Red       2-FIRE-94B                                                                                                 ;N                 3 CLOSED       This is an alternate       2 CLOSED       nOSED
                '" "B" AUX FEED PUMP EMERGENCY 'OIl                                                                                                           suction that must be FIRE WATER SUPPLY VALVE                                                                             :                                 tagged
            ; '" 2_TB Red       2-CN-330                                                                                                                       [OPEN/UNCAPPED                           1 CLOSED       CLOSED
                *   "B" AUX FEED PUMP CASING VENT VALVE
                '" 2_TB                                                           00106_
ANSWER KEY                                                   Page2of3
 
ANSWER KEY Red 2-CN-329                         IV 4 OPEN/UNCAPPED     1 CLOSED CLOSED
      * "BTl AUX FEED PUMP CASING VENT VALVE
* 2_TB               _00106_
Red 2-CN-331                         IV 4 OPENjUNCAPPED               CLOSED
      * "BTl AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE
* 23B Red   2-CN-332                       IV 4 OPEN/UNCAPPED     1 CLOSED CLOSED
    *   "B" AUX FEED PUMP SUCTION HEADER DRAIN
* 2_TB               _00106_
ANSWER KEY                 Page30f3
 
JOB PERFORMANCE MEASURE APPROVAL SHEET L   JPM Title:
JPM Number:               "IPM-A2S                 Revision: --"-
0 II. Initiated:
Robert L. Cimmino, Jr.                     02/03/11 Developer                            Date III. Reviewed:
Date IV. Approved:
Date IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor Page 1 of 7
Date Nuclear Training Supervisor Page 1 of 7 JOB PERFORMANCE MEASURE  
 
,
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE 02/03/11 DESCRIPTION Created .JPM for LOIT 2011 NRC Exam REV/CHANGE 010 Page 2 of 7 JPM Number: Rev. 010 JOB PERFORMANCE MEASURE WORKSHEET (continued)
OF CHANGES:
Initiating Cues: As the RO withdrew Group 7 CEAs, he noted that CEAPDS not track the last couple steps of CEA #1 in Group CEA Pulse Counting, the Backup Scanner and the Core Mimic all tracked motion as designed. I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input from CEA #1 is not capable of tracking any CEA motion at this time. I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C05, needs to replaced with a spare from the warehouse. Testing and replacement will take approximately six hours. Perform the Administrative duties of the US for this malfunction.
All & DATE                     DESCRIPTION    REV/CHANGE 02/03/11 Created .JPM for LOIT 2011 NRC Exam     010 Page 2 of 7
Initial Conditions: You are the on-shift US. The plant is at 100% power, having just completed Control Valve Testing. Group 7 CEAs were inserted 10 steps for power control, but have all just been fully withdrawn, as indicated by the Core Mimic. Simulator N/A Reg uirements:  
 
* *
JPM Number:                         JPM-A2S                                Rev.         010 JOB PERFORMANCE MEASURE WORKSHEET (continued)
* NOTES TO EVALUATOR * * *
Initiating Cues:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read appropriate If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" ot "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 7
* As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.
---------------------------------
* CEA Pulse Counting, the Backup Scanner and the Core Mimic all tracked motion as designed.
------------------------------JPM Number: Rev. __.::.;.01-.:;.0
* I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input from CEA #1 is not capable of tracking any CEA motion at this time.
__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
* I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C05, needs to replaced with a spare from the warehouse.
Facility:
* Testing and replacement will take approximately six hours.
MP-2 Examinee:
* Perform the Administrative duties of the US for this malfunction.
...IPM Number: JPM-A2S Rev. &deg; Task Title: System: Administrative Time Critical Task: Yes No x Validated Time (minutes):
Initial Conditions:
_-,-1.;;;..5
* You are the on-shift US.
___ Task No.(s): __________ Applicable To: SRO X RO ___ PEO ___ KIA No. 2.2.40 KIA Rating _--=..:3.:....:.;4/.....:.4.:...;...7
* The plant is at 100% power, having just completed Control Valve Testing.
__ Method of Testing: Simulated Performance:
* Group 7 CEAs were inserted 10 steps for power control, but have all just been fully withdrawn, as indicated by the Core Mimic.
X Actual Performance:
Simulator                   N/A Reg uirements:
X Location:
                                  * *
Classroom:
* NOTES TO EVALUATOR * * * *
X Simulator:
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
In-Plant:
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
Task At the completion of this JPM, the SRO should analyze the given conditions and state the required Tech. Spec. entry and surveillance.
: 3. If necessary, question the student for details of simulated actions/observations   (i.e. "What are you looking at?" ot "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 7
 
JPM Number:                            JPM-A2S                                                        Rev. _ _.::.;.01-.:;.0_ _
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility:        MP-2                  Examinee:
                                                        ---------------------------------
. .IPM Number:                         JPM-A2S                                                               Rev.               &deg;
                                                                                                                          --------
Task Title:
System:         Administrative Time Critical Task:       Yes
                                --          No       x Validated Time (minutes):               _-,-1.;;;..5_ __
Task No.(s): _ _ _ _ _ _ _ _ __
Applicable To:           SRO         X             RO _ __            PEO _ __
KIA No.                 2.2.40                       KIA Rating _--=..:3.:....:.;4/.....:.4.:...;...7_ _
Method of Testing:
Simulated Performance: - -X- -                        Actual Performance:
                                                                                                      - -X- -
Location:
Classroom:       X               Simulator: - - -                        In-Plant:
                --    -                                                                              ------
Task Standards:                    At the completion of this JPM, the SRO should analyze the given conditions and state the required Tech. Spec. entry and surveillance.
Reguired Materials
Reguired Materials
* Plant Technical Specifications Manual (procedures, equipment etc.):
* Plant Technical Specifications Manual (procedures, equipment etc.):
Line 457: Line 1,030:
==References:==
==References:==
* Plant Technical Specifications Manual
* Plant Technical Specifications Manual
* AOP-2556; CEA Malfunctions * * *
* AOP-2556; CEA Malfunctions
                                    * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 7
Page 3 of 7 PERFORMANCE JPM Number: STEP 1 . Cue: Comments:
 
: 2. Cue: PERFORMANCE Given a copy of the plant Technical Specifications Manual and, if requested, AOP-2556, CEA Malfunctions: Review the Initial Conditions and Initiating Cue. Review Tech. Specs. and, as needed, AOP-2556 for any required entries and additional surveillance reauirements.
PERFORMANCE INFORMATION JPM Number:
Explain the necessary Tech. Spec. entry requirements and the Tech. Spec. surveillance that must be performed.
STEP                     PERFORMANCE                                        STANDARD
STANDARD _ _ _ Examinee reviews the following: A copy of the plant Technical N Specifications Manual If requested: A copy of AOP-2556; CEA N Malfunctions and/or SP-2619A-001, Control Room Daily Surveillance. During the review of the plant Technical Specifications Manual, the y examinee should state the need to enter into Tech. Spec. 3.1.3.1B (B. 1 or B.2), 3.1.3.1C and perform required actions. yThe examinee should also state the need to record CEA Position Indication at least once every four (4) hours. Comments:
                                                                                                          ~~~iS'i"[
I The examinee may note that Tech. Spec. 3.1.3.6.D applies. This input is not a Critical item because the requirements of this TS is less restrictive than the Critical required TS. However, the examinee should NOT log into Tech. Spec. 3.1.3.3 or 3.0.3 as they are NOT applicable with the Backup Scanner operating as designed.
                                                                                                          ~~~~~tm,,_      _  _
TERMINATION CUE: The evaluation for this JPM is concluded. Page 5 of 7 
: 1.         Given a copy of the plant Technical             Examinee reviews the following:
-----JPM Number: JPM-A2S Rev. 0 VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Specifications Manual and, if requested,
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
* A copy of the plant Technical                      N AOP-2556, CEA Malfunctions:                         Specifications Manual
15 Actual Time to Complete (minutes):
* Review the Initial Conditions and             If requested:
Overall Result of JPM: SAT UNSAT (circle one) Page 6 of 7
Initiating Cue.
-----..IPM Number: Rev . o STUDENT HANDOUT Initiating Cues: Initial Conditions: As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7. CEA Pulse Counting, the Backup Scanner and the Core Mimic all tracked motion as designed. I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input from CEA #1 is not capable of tracking any CEA motion at this time. I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C05, needs to replaced with a spare from the warehouse. Testing and replacement will take approximately six hours. Perform the Administrative duties of the US for this malfunction. You are the on-shift US. The plant is at 100% power, having just completed Control Valve Testing. Group 7 CEAs were inserted 10 steps for power control, but have all just been fully withdrawn, as indicated by the Core Mimic. Page 7 of 7 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: JPM Number: JPM-A3S Revision:
* A copy of AOP-2556; CEA                            N
0Initiated: Robert L. Cimmino, Jr. 02/03/11 Developer Date Reviewed:
* Review Tech. Specs. and, as needed,                Malfunctions and/or SP-2619A-001, AOP-2556 for any required entries and             Control Room Daily Surveillance.
Technical eviewer Approved:
additional surveillance reauirements.
Cognizant Plant Supervisor Date Nuclear Training Supervisor Page 1 of 8 JOB PERFORMANCE MEASURE  
Cue:
Comments:
: 2.        Explain the necessary Tech. Spec. entry
* During the review of the plant requirements and the Tech. Spec.                     Technical Specifications Manual, the            y surveillance that must be performed.                 examinee should state the need to enter into Tech. Spec. 3.1.3.1B (B. 1 or B.2), 3.1.3.1C and perform required actions.
* The examinee should also state the             y need to record CEA Position Indication at least once every four (4) hours.
Cue:
Comments: I The examinee may note that Tech. Spec. 3.1.3.6.D applies. This input is not a Critical item because the requirements of this TS is less restrictive than the Critical required TS. However, the examinee should NOT log into Tech. Spec. 3.1.3.3 or 3.0.3 as they are NOT applicable with the Backup Scanner operating as designed.
TERMINATION CUE: The evaluation for this JPM is concluded.
il':ift~'~l~'"
                                                                                                            'j19JE~_A~' - - - - -
Page 5 of 7
 
JPM Number:                     JPM-A2S                             Rev. - - -  0 --
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes           No     X
                              -
Validated Time (minutes):                   15 Actual Time to Complete (minutes):
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
Page 6 of 7
 
..IPM Number:                 JPM-A2S                            Rev . - - - o --
STUDENT HANDOUT Initiating Cues:
* As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.
* CEA Pulse Counting, the Backup Scanner and the Core Mimic all tracked motion as designed.
* I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input from CEA #1 is not capable of tracking any CEA motion at this time.
* I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C05, needs to replaced with a spare from the warehouse.
* Testing and replacement will take approximately six hours.
* Perform the Administrative duties of the US for this malfunction.
Initial Conditions:
* You are the on-shift US.
* The plant is at 100% power, having just completed Control Valve Testing.
* Group 7 CEAs were inserted 10 steps for power control, but have all just been fully withdrawn, as indicated by the Core Mimic.
Page 7 of 7
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-A3S                 Revision:     0
                                                                  ---::.-
II. Initiated:
                  ~~Robert L. Cimmino, Jr.
Developer 02/03/11 Date III. Reviewed:
Technical   eviewer IV. Approved:
Cognizant Plant Supervisor (optional)              Date Nuclear Training Supervisor Page 1 of 8
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All &DATE 12/07/10 DESCRIPTION Created JPM for LOIT 2011 NRC Exam REV/CHANGE 010 Page 2 of 8
OF CHANGES:
----------------------------------
All & DATE                   DESCRIPTION    REV/CHANGE 12/07/10 Created JPM for LOIT 2011 NRC Exam     010 Page 2 of 8
-----------------------------JPM Number: Rev. 010 JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                            JPM-A3S                                                  Rev.
MP-2 Examinee:
                                                                                                    - - -010- - -
JPM Number: Rev. o Task Title: System: Administrative Time Critical Task: Yes No x Validated Time (minutes):
JOB PERFORMANCE MEASURE WORKSHEET (continued)
_--.:..'-=5
Facility:      MP-2                    Examinee:
____ Task No.(s): Applicable To: SRO X RO ___ PEO ___ KIA No. 2.3.12 KIA Rating __
                                                  ----------------------------
__ Method of Testing: Simulated Performance:
JPM Number:                            JPM-A3S                                                        Rev.        o
X Actual Performance:
                                                                                                            --------
X Location:
Task Title:
Classroom: Simulator:
System:       Administrative Time Critical Task:     Yes               No     x Validated Time (minutes):       _--.:..'-=5____
In-Plant:
Task No.(s):
Task At the completion of this JPM, the SRO should analyze the given conditions and designate which PEO should perform each of the two specified tasks, based on the radiological concerns of each. Required Materials If requested, RPM 5.2.2; Basic Radiation Worker Responsibilities. (procedures, equipment.
Applicable To:             SRO         X       RO _ __        PEO _ __
etc.): General  
KIA No.                 2.3.12                   KIA Rating __~3...;.;;.2;;:.../3';;";'.;....7 _ _
Method of Testing:
Simulated Performance:               X           Actual Performance:
                              ----.:..~-
                                                                                              - -X- -
Location:
Classroom:       X                Simulator:                     In-Plant:
                ------                          -----                                          ------
Task Standards:                    At the completion of this JPM, the SRO should analyze the given conditions and designate which PEO should perform each of the two specified tasks, based on the radiological concerns of each.
Required Materials               If requested, RPM 5.2.2; Basic Radiation Worker Responsibilities.
(procedures, equipment. etc.):
General  


==References:==
==References:==
* RPM 5.2.2; Basic Radiation Worker Responsibilities
* RPM 5.2.2; Basic Radiation Worker Responsibilities
* Radiation Worker CBT * * *
* Radiation Worker CBT
* READ TO THE EXAMINEE'" '" '" '" I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
                                    * * *
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
* READ TO THE EXAMINEE'" '" '" '"
Page 3 of 8 JPM Number: Rev. __..:...01..:...0
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
Page 3 of 8
Initiating Cues: Initial Conditions:
 
Simulator_
JPM Number:                         JPM-A3S                                Rev. _ _..:...01..:...0_ _
Reg uirements: Determine which PEO (#1 or #2) you are going to direct to perform the task of clearing the tag-out and perform the initial valve lineup and which PEO you are going to assign to perform the required valve lineup Independent Verification. You are the Work Control SRO. The plant has been shut down to repair a leak in the Regenerative Heat The work is complete and the Heat Exchanger is ready to returned to service, following the clearing of the tags subsequent required valve The following additional conditions exist: The area around the Heat Exchanger has been posted as a "Locked High Radiation Area". The area is at the minimum radiation level to meet the required posting. All valves on the valve lineup are in the posted area. There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup. PEO #1, an experienced Operator, has 400 mRem of remaining exposure. PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure. It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task. It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification.
JOB PERFORMANCE MEASURE WORKSHEET (continued)
It will take PEO #2 approximately 25 minutes of stay time to perform the same task. N/A * *
Initiating Cues:
* NOTES TO EVALUATOR * * *
* Determine which PEO (#1 or #2) you are going to direct to perform the task of clearing the tag-out and perform the initial valve lineup and which PEO you are going to assign to perform the required valve lineup Independent Verification.
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 8 PERFORMANCE JPM Number: STEP 1 . Cue: Comments: Review the Initial Conditions and Initiating Cue. Using known exposure rate in the area, calculate the maximum available stay time for each PEa. Based on available stay time, decide which PEa must perform each task. Rev. 0 STANDARD ......
Initial Conditions:
___ PEa #1 only has 400 mR of exposure N left and PEa #2 has 850 mR of exposure left. The minimum radiation level for a N Locked High Radiation area is 1000 mRlhr. Therefore, based on the available exposure for each PEa and the N expected radiation levels at the job site, the maximum stay time for PEa #1 is approximately 24 minutes. (400 mR /1000 mRlhr.
* You are the Work Control SRO.
* 60 min/hr. = 24 minutes) And 51 minutes for PEa #2 (850 mR 11000 mRlhr
* The plant has been shut down to repair a leak in the CVCS Regenerative Heat Exchanger.
* 60 min/hr. = 51 Page 5 of 8 PERFORMANCE JPM Number: STEP 2. Cue: Comments:
* The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.
PERFORMANCE PEO #1 does not have enough exposure left to clear the tags and perform the initial valve lineup. PEO #2 has enough exposure to clear the tags and perform the initial valve lineup. Then, PEO #1 will have enough exposure left to perform the valve lineup Independent Verification.
* The following additional conditions exist:
The examinee may also state the following, but it is not required: PEO #2 does not have enough exposure left to perform both tasks, clearing the tagout and performing both valve lineups (this would also not meet the "Independent Verification" Administrative Reauirements  
* The area around the Heat Exchanger has been posted as a "Locked High Radiation Area".
.. STANDARD y Based on the calculated stay times for each PEO and the individual task time requirements, PEO #2 is assigned to clear the tags and perform the initial valve lineup, while PEO #1 is assigned to perform the valve lineup Independent Verification.
* The area is at the minimum radiation level to meet the required posting.
* All valves on the valve lineup are in the posted area.
* There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
* PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
* PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure.
* It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
* It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification. It will take PEO #2 approximately 25 minutes of stay time to perform the same task.
Simulator_                  N/A Reg uirements:
                                  * *
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
: 3. If necessary, question the student for details of simulated actions/observations         (i.e. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 8
 
PERFORMANCE INFORMATION JPM Number:     JPM-A3S                                                                                          Rev. 0 STEP                 PERFORMANCE                                STANDARD I~Y~iiil~~~
                                                                                              ~ .... .
                                                                                                    ;,I~ ~j&sect;l....-'_ __
: 1.
* Review the Initial Conditions and
* PEa #1 only has 400 mR of exposure           N Initiating Cue.                          left and PEa #2 has 850 mR of
* Using known exposure rate in the area,    exposure left.
calculate the maximum available stay
* The minimum radiation level for a           N time for each PEa.                        Locked High Radiation area is 1000
* Based on available stay time, decide      mRlhr.
which PEa must perform each task.
* Therefore, based on the available exposure for each PEa and the               N expected radiation levels at the job site, the maximum stay time for PEa
                                                        #1 is approximately 24 minutes.
(400 mR /1000 mRlhr.
* 60 min/hr. =
24 minutes)
And 51 minutes for PEa #2 (850 mR 11000 mRlhr
* 60 min/hr.     =
51 Cue:
Comments:
Page 5 of 8
 
PERFORMANCE INFORMATION JPM Number:
STEP                     PERFORMANCE                                  STANDARD
: 2.
* PEO #1 does not have enough               Based on the calculated stay times for          y exposure left to clear the tags and       each PEO and the individual task time perform the initial valve lineup.         requirements, PEO #2 is assigned to clear the tags and perform the initial valve
* PEO #2 has enough exposure to clear       lineup, while PEO #1 is assigned to the tags and perform the initial valve    perform the valve lineup Independent lineup. Then, PEO #1 will have enough     Verification.
exposure left to perform the valve lineup Independent Verification.
The examinee may also state the following, but it is not required:
* PEO #2 does not have enough exposure left to perform both tasks, clearing the tagout and performing both valve lineups (this would also not meet the "Independent Verification" Administrative Reauirements ..
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
___ Page 6 of 8
_(tIlllJ!~)I,--! ___
-----JPM Number: JPM-A3S Rev. 0 VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Page 6 of 8
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
 
15 Actual Time to Complete (minutes):
JPM Number:                     JPM-A3S                             Rev.       0
Overall Result of ..IPM: SAT UNSAT (circle one) Areas for Improvement/Comments:
                                                                          ---      --
Page 7 of 8 JPM Number: Rev. ___0___ Initiating Cues: Initial Conditions:
VERIFICATION OF JPM COMPLETION Title:
STUDENT Determine which PEO (#1 or #2) you are going to direct to perform the task of clearing the tag-out and perform the initial valve lineup and which PEO you are going to assign to perform the required valve lineup Independent Verification. You are the Work Control SRO. The plant has been shut down to repair a leak in the eves Regenerative Heat Exchanger. The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups. The following additional conditions exist: The area around the Heat Exchanger has been posted as a "locked High Radiation Area". The area is at the minimum radiation level to meet the required posting. All valves on the valve lineup are in the posted area. There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup. PEO #1, an experienced Operator, has 400 mRem of remaining exposure. PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure. It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task. It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification.
Date Performed:
It will take PEO #2 approximately 25 minutes of stay time to perform the same task. Page 8 of 8
Student:
---JOB PERFORMANCE MEASURE APPROVAL JPM Title: ...IPM Number: JPM-A4S Revision:
Evaluator:
0 Initiated:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
R. J. Ashey 01/20/2011 Developer Date Reviewed:  
Time Critical Task?       Yes           No     X
/J/pr)J) T echmcal Revi J Date Approved:
                              -
Cognizant Plant Supervisor Date II( NUClear Training Supervisor Date Page 1 of 11 JOB PERFORMANCE MEASURE  
Validated Time (minutes):                   15 Actual Time to Complete (minutes):
Overall Result of ..IPM:                     SAT           UNSAT                     (circle one)
Areas for Improvement/Comments:
Page 7 of 8
 
JPM Number:                   JPM-A3S                            Rev. ___0_ __
STUDENT HANDOUT Initiating Cues:
* Determine which PEO (#1 or #2) you are going to direct to perform the task of clearing the tag-out and perform the initial valve lineup and which PEO you are going to assign to perform the required valve lineup Independent Verification.
Initial Conditions:
* You are the Work Control SRO.
* The plant has been shut down to repair a leak in the   eves Regenerative Heat Exchanger.
* The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.
* The following additional conditions exist:
* The area around the Heat Exchanger has been posted as a "locked High Radiation Area".
* The area is at the minimum radiation level to meet the required posting.
* All valves on the valve lineup are in the posted area.
* There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
* PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
* PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure.
* It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
* It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification.
It will take PEO #2 approximately 25 minutes of stay time to perform the same task.
Page 8 of 8
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
    . .IPM Number:             JPM-A4S                   Revision: - -  0 -
II. Initiated:
R. J. Ashey                         01/20/2011 Developer                             Date Ill. Reviewed:
                                                              /J/pr) J)
T echmcal Revi     r                      J Date IV. Approved:
Cognizant Plant Supervisor (optional)              Date II(
                -  NUClear Training Supervisor                     Date Page 1 of 11
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE 01/20/2011 DESCRIPTION Create for use on LOIT-2011 NRC Exam REV/CHANGE 0 Page 2 of 11 JPM Number: Rev. _____ JOB PERFORMANCE MEASURE WORKSHEET (continued)
OF CHANGES:
Facility:
All & DATE                     DESCRIPTION      REV/CHANGE 01/20/2011   Create for use on LOIT-2011 NRC Exam     0 Page 2 of 11
MP-2 Examinee:
 
JPM Number: Rev. o Task Title: System: Emergency Plan Time Critical Task: Yes X No Validated Time (minutes):
JPM Number:                             JPM-                              Rev. _ _ _ __
30 minutes Task No.(s): NUTIMS #000-05-205 Applicable To: SRO KIA No. 2.4.41 Method of Testing: Simulated Performance:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Location:
Facility:       MP-2                   Examinee:
Classroom:
JPM Number:                           JPM-A4S                                    Rev.       o Task Title:
X Task Standards:
System:         Emergency Plan Time Critical Task:     Yes       X     No Validated Time (minutes):               30 minutes Task No.(s):           NUTIMS #000-05-205 Applicable To:           SRO           X        RO            PEO
X RO PEO KIA Rating 2.9/4.6 Actual Performance:
                                                    --
X Simulator:
KIA No.                 2.4.41                   KIA Rating       2.9/4.6 Method of Testing:
X In-Plant:
Simulated Performance:                            Actual Performance:        X Location:
X At the completion of this JPM, the examinee has correctly classified the proposed event and provided the appropriate Protective Action Recommendation.
Classroom:        X                 Simulator:     X           In-Plant:     X Task Standards:                    At the completion of this JPM, the examinee has correctly classified the proposed event and provided the appropriate Protective Action Recommendation.
Required Materials
Required Materials
* MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action (procedures, equipment etc.): Levels MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations. MP-26-EPI-FAP06, Classification and PARs General  
* MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action (procedures, equipment etc.):           Levels
* MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
* MP-26-EPI-FAP06, Classification and PARs General  


==References:==
==References:==
MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations. MP-26-EPI-FAP06, Classification and PARs * * *
* MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels
* MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
* MP-26-EPI-FAP06, Classification and PARs
                                    * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 11
Page 3 of 11
 
------JPM Number: JPM-JOB PERFORMANCE MEASURE WORKSHEET Initiatinq Cues:
JPM Number:                            JPM-                               Rev.
* You are the on-duty SM. Your task is to determine the final NRC classification and state posture code for the event described on the attached form. In addition, determine any Protective Action Recommendations (PARs). Initial Conditions:
                                                                                ------
See attached form. Simulator N/A Requirements: * *
JOB PERFORMANCE MEASURE WORKSHEET (continued)
* NOTES TO EVALUATOR * * *
Initiatinq Cues:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 11 PERFORMANCE JPM Number: STEP 1 MP-26-EPI-FAP06, Step 2.1, Event Classification based on EAL Tables Obtain MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Cue: The examinee obtains Millstone 2 MP-26-N EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Comments:
* You are the on-duty SM.
I Time starts when the examinee obtains the required procedures 2 . I Perform the initia.1 for this event, per the eXisting conditions.
* Your task is to determine the final NRC classification and state posture code for the event described on the attached form. In addition, determine any Protective Action Recommendations (PARs).
Cue: Comments:
Initial Conditions:       See attached form.
: 3. MP-26-EPI-FAP06, Step 2.4.1 For Control Room PARs, Refer To FAP06-005, "Control Room Protective Action recommendations" and determine the proper PAR. Cue: Comments: Based on a "top to bottom, left to right' Y technique, the examinee will determine that this event is classified as a GENERAL EMERGENCY, State Posture Code, ALPHA. Examinee N MP-26-EPI-FAP06, Classification MP-26-EPI-FAP06-005, Control Protective Action Page 5 of 11 PERFORMANCE JPM Number: STEP STANDARD MP*26*FAP06*005 (Flowchart) Are All Three Fission Product Examinee determines that all 3 Fission Y Lost? Product Barriers are NOT lost
Simulator                 N/A Requirements:
                                  * *
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3. If necessary, question the student for details of simulated actions/observations   (i.e. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 11
 
PERFORMANCE INFORMATION JPM Number:
STEP                     PERFORMANCE                                      STANDARD
: 1.        MP-26-EPI-FAP06, Step 2.1, Event               The examinee obtains Millstone 2 MP    N Classification based on EAL Tables             EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Obtain MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Cue:
Comments: I Time starts when the examinee obtains the required procedures
: 2.     I Perform the initia.1 c.lassifica~i?n for this event, per the eXisting conditions.
Itechnique, Based on a "top to bottom, left to right' the examinee will determine Y
that this event is classified as a GENERAL EMERGENCY, State Posture Code, ALPHA.
Cue:
Comments:
: 3.       MP-26-EPI-FAP06, Step 2.4.1                   Examinee obtains:                          N For Control Room PARs, Refer To EPI
* MP-26-EPI-FAP06, Classification and FAP06-005, "Control Room Protective               PARs Action recommendations" and determine the proper PAR.
* MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
Cue:
Comments:
Page 5 of 11
 
PERFORMANCE INFORMATION JPM Number:
STEP                   PERFORMANCE                              STANDARD
: 4.      MP*26*FAP06*005 (Flowchart)             NO Are All Three Fission Product Barriers    Examinee determines that all 3 Fission Y Lost?                                   Product Barriers are NOT lost
* FCB3 (Loss)
* FCB3 (Loss)
* RCS Barrier RCB2 (Loss)
* RCS Barrier RCB2 (Loss)
* CNB2 (Potential Loss) Cue: Comments: Does Containment Radiation Exceed Table I NO 1 Values? Examinee determines that Table 1 values Y are NOT exceeded.
* CNB2 (Potential Loss)
Cue: Comments: Do 5 Mile doses Exceed Table 2 Values? YES Examinee determines from the provided Y IDA Form that Table 2 values are exceeded.
Cue:
Cue: Comments: 7 Is there a Release in Progress?
Comments:
NO Examinee determines that there is NOT a Y release in progress Cue: Comments:
: 5.      Does Containment Radiation Exceed Table INO 1 Values?                               Examinee determines that Table 1 values Y are NOT exceeded.
Page 6 of 11 PERFORMANCE JPM Number: STEP STANDARD Check the appropriate wind direction from
Cue:
* Examinee observes wind direction the 142 ft. level for zone(s) to evacuate: table and checks 139 0 -154A and Band C and Lyme in Examinee determines from the wind Y direction table that Zones to be Evacuated include A and Band C and Lyme in D. Cue: Comments:
Comments:
: 6.      Do 5 Mile doses Exceed Table 2 Values?   YES Examinee determines from the provided   Y IDA Form that Table 2 values are exceeded.
Cue:
Comments:
: 7.      Is there a Release in Progress?         NO Examinee determines that there is NOT a Y release in progress Cue:
Comments:
Page 6 of 11
 
PERFORMANCE INFORMATION JPM Number:
STEP                     PERFORMANCE                                  STANDARD
: 8.      Check the appropriate wind direction from
* Examinee observes wind direction             N the 142 ft. level for zone(s) to evacuate:     table and checks 139 0 -154 0
* A and Band C and Lyme in D.
* Examinee determines from the wind           Y direction table that Zones to be Evacuated include A and Band C and Lyme in D.
Cue:
Comments:
: 9.
* Shelter all other zones.
* Shelter all other zones.
* Examinee determines that all other zones must be Recommend state officials implement YExaminee determines that actual dose Potassium Iodide (KI) strategy for is equal to or greater than 5 REM general public. thyroid (CDE)at site boundary and recommends state officials implement Potassium Iodide (KI) strategy for the general public. Cue: Comments:
* Examinee determines that all other           Y zones must be sheltered.
I The classification is a GENERAL EMERGENCY, ALPHA, based on either OG1 or loss of all three barriers (BG1) on the Barrier Failure Reference Table (FCB3, RCB2, and CNB2) The PAR should state, "Evacuate zones A and Band C and Lyme in D. Shelter all other zones. " Additionally, recommend state officials implement Potassium Iodine (KI) strategy for the general public. TERMINATION CUE: The evaluation for this JPM is concluded. ______ Page 7 of 11
* Recommend state officials implement
-----JPM Number: JPM-A4S Rev. o VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
* Examinee determines that actual dose         Y Potassium Iodide (KI) strategy for         is equal to or greater than 5 REM general public.                           thyroid (CDE)at site boundary and recommends state officials implement Potassium Iodide (KI) strategy for the general public.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes X No --' Validated Time (minutes):
Cue:
30 Actual Time to Complete (minutes):
Comments: I The classification is a GENERAL EMERGENCY, ALPHA, based on either OG1 or loss of all three barriers (BG1) on the Barrier Failure Reference Table (FCB3, RCB2, and CNB2)
Overall Result of JPM: SAT UNSAT (circle one) Areas for Improvement/Comments:
The PAR should state, "Evacuate zones A and Band C and Lyme in D. Shelter all other zones. " Additionally, recommend state officials implement Potassium Iodine (KI) strategy for the general public.
Page 8 of 11
TERMINATION CUE: The evaluation for this JPM is concluded.
-----JPM Number: Rev. 0 STUDENT HANDOUT Initiating Cues:
_.mA~ii!!y;fI~
* You are the on-duty SM. Your task is to determine the final NRC classification and state posture code for the event described on the attached form. In addition, determine any Protective Action Recommendations (PARs), if applicable.
                                                                                                  ~~_~_~l!~,-,  ______
Initial Conditions:
Page 7 of 11
See attached form. NRC Classification:
 
___________________
JPM Number:                     JPM-A4S                             Rev.
_ State Posture Code: __________________
                                                                          ---    o --
_ PAR: ______________________
VERIFICATION OF JPM COMPLETION Title:
_ Page 9 of 11 0 JPIVI Number: Rev. __..;;...O__ Initiating Cue: Plant is at 100% power. "B" Containment Spray pump has seized TIME 14min. 21 min. during a surveillance run. The pump is presently tagged out for repair. Wind speed is 16 mph from 142&deg;. .,:. ::"
Date Performed:
:_: -_ ::-:r .:.:'  
Student:
'j")!'::'{:  
Evaluator:
;.: :-:" ..-;--: __:_:,_.' -'. ---:-".,,", ,<-::::.  
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
\: ,:\ -.--.:,-:-:
Time Critical Task?       Yes   X     No
:::.:-:::
                                            --'
:-,:--: ;-:-':--..'...-:.:-::-.-::'.':---:  
Validated Time (minutes):                   30 Actual Time to Complete (minutes):
..:-::::-::--:-:' ..
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
SOURCE Reactor trip occurs. RO/BOP EOP 2525 is commenced.
Areas for Improvement/Comments:
EOP 2525 is complete, the following conditions RO/BOP Reactor is tripped. Turbine is tripped. Buses 24A, 24B, and 24C are deenergized. (The RSST is deenergized and "An DIG will !\lOT start.) Bus 240 is energized by its associated DIG. Buses 25A, 25B are deenergized. Both D.C. Buses are energized. Facility 2 SW and RBCCW pumps are running. Pressurizer level is 0%. Head level is 61 % and stable. RCS subcooling is 2&deg;F and slowly lowering. Pressurizer pressure is 527 psia and lowering. SIAS, CIAS, EBFAS, MSI, and CSAS have actuated and available components are in their accident condition. S/G pressures are 840 psia and stable. Tave is 470 0 F and slowly lowering. AFW flow to both S/Gs at approximately 300 gpm each. SG levels are 46% and rising. Containment pressure is 42 psig and rising. Refuel Bridge and Personnel Access Rad Monitors are slowly rising, but NOT in alarm. CTMT gas and particulate Rad Monitors are in alarm, but are lowering. All other Rad Monitors are below their respective alarm setpoints. Pressurizer pressure is 321 psia and lowering.
Page 8 of 11
RO "B" LPSI Pump discharge pressure indicates between 0 and 10 psig. "B" LPSI Pump is secured due to lack of 'flow and abnormally low discharge pressure.
 
Page 10 of 11 JPM Number: JPM-A4S Rev. ___0___ 38 min. The following conditions exist:: RO/BOP Power has NOT been restored to Facility 1 . Facility 2 SW and RBCCW pumps are still operating normally. Pressurizer level is 0%. Head level is 0% on both channels. RWST level is 37% and lowering. CET subcooling is -116 of and becoming more negative. Pressurizer pressure is 19 psia and stable. SIAS, CIAS, EBFS and MSI, and CSAS are verified to the extent possible. CSAS has actuated. S/G pressures are 832 psia and stable. CETs are 342 0 F and slowly rising. AFW is being supplies to both S/Gs at approximately 200 gpm each. SG levels are 65% and stable. Containment pressure is 2 psig and lowering. Refuel Bridge and Personnel Access Rad Monitors are in alarm. CTMT gas and particulate Rad Monitors are in alarm. RM-8240 and 8241, CTMT High Range Rad Monitors, are reading 450 Rlhr and slowly rising Steam Plant Rad Monitors are elevated, but NOT in alarm. The MP2 Kaman Vent Monitor, RM 8168, is reading 100 J.lCi/cc and rising. Several other Rad Monitors outside Containment are in alarm or elevated.
JPM Number:                     JPM-A4S                            Rev. - - -  0 --
Page 11 of 11 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: JPM Number: JPM-S1.1 Revision:
STUDENT HANDOUT Initiating Cues:
0 Initiated:
* You are the on-duty SM.
Marc R. 02/01/11 Date Reviewed:
* Your task is to determine the final NRC classification and state posture code for the event described on the attached form. In addition, determine any Protective Action Recommendations (PARs), if applicable.
Odjsj;;echmca 'Date Approved:
Initial Conditions:   See attached form.
Cognizant Plant Supervisor Date Nuclear Training Supervisor Page 1 of 19 JOB PERFORMANCE MEASURE  
NRC Classification: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
State Posture Code: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
PAR: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Page 9 of 11
 
JPIVI Number:                                             JPM-A4S                                                                                                                                Rev. _ _..;;...O_ _
Initiating Cue: Plant is at 100% power. "B" Containment Spray pump has seized during a surveillance run. The pump is presently tagged out for repair. Wind speed is 16 mph from 142&deg;.
                      ;:CRI[la'<<l*p~AN;r,SARAMc":l"ERSjj*i.,                                                                                                                                                                                                       ~
::" .c: .,:
:_: -_::-:r .:.:' ~;,'~'~\:i:':)"~:" 'j")!'::'{: ;.: :-:" ..-;--: __:_:,_.' - '. ---:- ".,,", ,<-::::. ~:.+/-" ,',:~,~,:,,,,) \: ,:\ -.--.:,-:-: :::.:-::: :-,:- : ;-:-':--..'.. -:.:-: -.-: '.':- -: . :-: : -: - :-:' :-~
                                                                                                                                                                                                                                                  .*:~~t~\      ..
TIME                                                                                    INFORMATION                                                                                                                                                        SOURCE 0
* Reactor trip occurs.                                                                                                                                                                                                                         RO/BOP
* EOP 2525 is commenced.
14min.      EOP 2525 is complete, the following conditions exist:                                                                                                                                                                                            RO/BOP
* Reactor is tripped.
* Turbine is tripped.
* Buses 24A, 24B, and 24C are deenergized. (The RSST is deenergized and "An DIG will !\lOT start.)
* Bus 240 is energized by its associated DIG.
* Buses 25A, 25B are deenergized.
* Both D.C. Buses are energized.
* Facility 2 SW and RBCCW pumps are running.
* Pressurizer level is 0%.
* Head level is 61 % and stable.
* RCS subcooling is 2&deg;F and slowly lowering.
* Pressurizer pressure is 527 psia and lowering.
* SIAS, CIAS, EBFAS, MSI, and CSAS have actuated and available components are in their accident condition.
* S/G pressures are 840 psia and stable.
* Tave is 470 0 F and slowly lowering.
* AFW flow to both S/Gs at approximately 300 gpm each.
* SG levels are 46% and rising.
* Containment pressure is 42 psig and rising.
* Refuel Bridge and Personnel Access Rad Monitors are slowly rising, but NOT in alarm.
* CTMT gas and particulate Rad Monitors are in alarm, but are lowering.
* All other Rad Monitors are below their respective alarm setpoints.
21 min.
* Pressurizer pressure is 321 psia and lowering.                                                                                                                                                                                               RO
            *  "B" LPSI Pump discharge pressure indicates between 0 and 10 psig.
            *  "B" LPSI Pump is secured due to lack of 'flow and abnormally low discharge pressure.
Page 10 of 11
 
JPM Number:                   JPM-A4S                     Rev. ___0_ __
38 min. The following conditions exist::                               RO/BOP
* Power has NOT been restored to Facility 1.
* Facility 2 SW and RBCCW pumps are still operating normally.
* Pressurizer level is 0%.
* Head level is 0% on both channels.
* RWST level is 37% and lowering.
* CET subcooling is -116 of and becoming more negative.
* Pressurizer pressure is 19 psia and stable.
* SIAS, CIAS, EBFS and MSI, and CSAS are verified to the extent possible.
* CSAS has actuated.
* S/G pressures are 832 psia and stable.
* 0 CETs are 342 F and slowly rising.
* AFW is being supplies to both S/Gs at approximately 200 gpm each.
* SG levels are 65% and stable.
* Containment pressure is 2 psig and lowering.
* Refuel Bridge and Personnel Access Rad Monitors are in alarm.
* CTMT gas and particulate Rad Monitors are in alarm.
* RM-8240 and 8241, CTMT High Range Rad Monitors, are reading 450 Rlhr and slowly rising
* Steam Plant Rad Monitors are elevated, but NOT in alarm.
* The MP2 Kaman Vent Monitor, RM 8168, is reading 100 J.lCi/cc and rising.
* Several other Rad Monitors outside Containment are in alarm or elevated.
Page 11 of 11
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-S1.1                 Revision: -~-
0 II. Initiated:
Marc R. Pucel                          02/01/11 Developer                            Date III. Reviewed:
Odjsj;;
              ~.~      echmca ReViewer                    ~ 'Date IV. Approved:
Cognizant Plant Supervisor (optional)              Date Nuclear Training Supervisor Page 1 of 19
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 2 of 19
OF CHANGES:
------------------------------------
All & DATE                     DESCRIPTION                     REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format P~ge 2 of 19
-----------"IPM Number:
 
Rev. ___0'--__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
"IPM Number:                        JPM-S1.1                                Rev. ___0'--__
Facility:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
MP2 Examinee:
Facility:      MP2                  Examinee:
JPM Number:
                                                    ------------------------------------
Rev. ____0'--__ Task Title: Align Charging Discharge Path System: CVCS Time Critical Task: Yes No X Validated Time (minutes):
JPM Number:                         JPM-S1.1                                      Rev. ____0'--__
20 Task No.(s): Applicable To: SRO X RO X PEO KJA No. 004 A4.18 KJA Rating 4.3/4.1 Method of Testing: Simulated Performance:
Task Title:       Align Charging Discharge Path System:       CVCS Time Critical Task:     Yes             No     X Validated Time (minutes):                 20 Task No.(s):
X Actual Performance: Location:
Applicable To:             SRO       X       RO             X PEO KJA No.               004 A4.18               KJA Rating           4.3/4.1 Method of Testing:
Simulator:
Simulated Performance: -----=-.:.....---
X In-Plant:
X               Actual Performance:
Task At the completion of this JPM the examinee will determine that the normal Charging flow path is not available and will align Charging to Emergency Borate through the HPSI Header (Alternate Charging Flow Path). Required Materials ARP 2590B-057 " CHARGING FLOW LO" (procedures.
                                                                            -------
equipment.
Location:
etc.): AOP 2512 " Loss of All Charging" General  
Classroom:                        Simulator:         X           In-Plant:
                ------                        --....::....::...-            -----
Task Standards:                    At the completion of this JPM the examinee will determine that the normal Charging flow path is not available and will align Charging to Emergency Borate through the '~" HPSI Header (Alternate Charging Flow Path).
Required Materials               ARP 2590B-057 " CHARGING FLOW LO" (procedures. equipment. etc.):   AOP 2512 " Loss of All Charging" General  


==References:==
==References:==
AOP 2512" Loss of All Charging"
                                  * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 19


AOP 2512" Loss of All Charging" * * *
JPM Number:                         JPM-S1.1                               Rev. - - - -
* READ TO THE EXAMINEE * * *
JOB PERFORMANCE MEASURE WORKSHEET (continued)
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 19 
------JPM Number: JPM-S1.1 Rev. 0 JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
Initiating Cues:
* You are the Reactor Operator.
* You are the Reactor Operator. Respond to all alarms Initial Conditions:
Respond to all alarms Initial Conditions:
* Unit-2 is at 100% power, all rods out. No equipment out of service.
* Unit-2 is at 100% power, all rods out. No equipment out of service. Simulator IC-30 Requirements: * *
Simulator
* NOTES TO EVALUATOR * * *
* IC- 30 Requirements:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 19 PERFORMANCE JPM Number: STEP STANDARD
                                  * *
____ Observe and respond to "CHARGING Examinee observes annuciator on C-02/03 FLOW LO" Examinee refers to ARP 25908-057 for "CHARGING FLOW LO" Comments:
* NOTES TO EVALUATOR * * * *
I Examinee may recommend securing charging and letdown due to observed closure of 2-CH-429, low header flow and/or hioh charoino header oressure to orotect the olant I If requested, secure charging and letdown I Examinee secures charging and letdown by placing all charging pump switches in "PULL-TO-LOCK" and the following: "L TDN ISOL, "LTDN ISOL. Comments:
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Page 5 of 19 PERFORMANCE JPM Number: STEP PERFORMANCE STANDARD 3. I CAUTION Examinee reads and acknowledges N 1. Prior to starting a standby pump, caution. consider if charging flow low was caused by gas intrusion.[SOER 97-1, Potential Loss of High Pressure Injection and Charging Capability From Gas Intrusion"].
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
: 2. Charging flow transmitter, FT-212, is unreliable at low RCS pressure << 1 000 I psi). "/'",,,2, Cue: Comments:
: 3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
: 4. 11. IF gas intrusion intrusion was indicated, PERFORM the following:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
I Examinee observes no change in VCT I level , determines that gas intrusion is not I N 1.1 PLACE all charging pump hand indicated, and that this step is not switches in "PULL-TO-LOCK." applicable.
Page 4 of 19
1.2 CLOSE the following: (C-02) 1.2.1 "LTON ISOL, CH-515" 1.2.2 "L TON ISOL, CH-516" 1.3 Go To AOP 2512, "Loss of Cue: Comments:
 
: 5. I 2. As necessary, START another charging Examinee determines that it is not N pump and PLACE affected charging pump necessary to start another charging pump switch in "PULL TO LOCK" (C-02). and that this steo is not aoolicable.
PERFORMANCE INFORMATION JPM Number:
Cue: Comments:
STEP                     PERFORMANCE                                    STANDARD
Page 6 of 19 PERFORMANCE JPM Number: PERFORMANCE I 3. IF charging flow is restored to normal by shifting operating charging pumps, SEND operators to ensure piping integrity for pump which developed low flow and SUBMIT Trouble Report to Maintenance Department to investigate possible degradation of charging pump or discharge relief valve malfunction.
                                                                                                ~t:~R1ii;~JrfE: _ _ __
L" ,,"!?k """""" """",, Cue: Comments: 7 I 4. IF "A" or "C" charging pump is the affected pump, as necessary, PERFORM the following:
: 1.        Observe and respond to "CHARGING           Examinee observes annuciator on C-02/03       y FLOW LO" (C-02/03,A-15)                    Examinee refers to ARP 25908-057 for           N "CHARGING FLOW LO" (C-02/03,A-15 Cue:
4.1 IF available, Refer To OP 2304E, "Charging Pumps," and PERFORM applicable actions to align "B" charging pump, to serve as applicable facility OPERABLE charging pump. 4.2 IF "B" charging pump is not available AND "A" or "cn charging pump is made inoperable, LOG entry into appropriate TIS LCO ACTION Statements in SM --><--.,.,-,-.'
Comments: I Examinee may recommend securing charging and letdown due to observed closure of 2-CH-429, low charging header flow and/or hioh charoino header oressure to orotect the olant equipment.
A Cue: Comments: 5. IF "CHG HDR FLOW" is less than 40 gpm (C-02/3, F-212), Go To AOP 2512, "Loss of All Ch---'--" L Cue: Comments:
: 2.      I If requested, secure charging and letdown I Examinee secures charging and letdown         N by placing all charging pump hand switches in "PULL-TO-LOCK" and closing the following: (C-02)
STANDARD Examinee determines that this step is not N applicable. Examinee states that this step is not N necessary.
                                                          "LTDN ISOL, CH-515" "LTDN ISOL. CH-516" Cu Comments:
Examinee goes to AOP 2512, N "Loss of All Charging." Page 7 of 19 PERFORMANCE JPM Number: CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN)
Page 5 of 19
: 9. 3.0 Assessment of Loss of All Charging NOTE 1. If charging flow cannot be established I Examinee reads and acknowledges note. I N prior to Pressurizer level lowering to 10% below programmed value (less than 55% PZR level at Tavg of 561.5 F), the RX must be tripped and actions to establish HPSI flow initiated.
 
: 2. If the SM/US believe attempts to restore charging will be unsuccessful then the decision to trip the RX should not be delayed. 3. Following a reactor trip, this procedure will be performed in parallel with EOP 2526, "Reactor Trip Recovery" and OP 2207, "Plant Cooldown" 4. Power reduction should not be attempted with a loss of Charging as inventory continues to be lost and the potential for ___
PERFORMANCE INFORMATION JPM Number:
on Cue: Comments:
STEP                       PERFORMANCE                                   STANDARD
Page 8 of 19 PERFORMANCE JPM Number: STEP 10. Cue: Comments:
: 3.     I                     CAUTION                 Examinee reads and acknowledges               N
11 . Cue: Comments:
: 1. Prior to starting a standby pump,         caution.
PERFORMANCE 3.1 IF PZR level lowers to 10% below programmed value or Charging restoration is determined unlikely, PERFORM the following:
consider if charging flow low was caused by gas intrusion.[SOER 97-1, Potential Loss of High Pressure Injection and Charging Capability From Gas Intrusion"].
: a. ENSURE the reactor is tripped. b. ENSURE EOP 2525, "Standard Post Trip Actions" are completed.
: 2. Charging flow transmitter, FT-212, is unreliable at low RCS pressure << 1000 I psi).           "/'",,,2, Cue:
: c. IF desired, CONTINUE this procedure in parallel with EOPs. d. To Restore PZR level using HPSI, Refer To Section 8, "Restoration of PZR Level HPSI" 3.2 Refer To RAC 14, "Non-Emergency Station Events" and CLASSIFY the event under "Any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to shutdown the reactor and maintain it in a safe shutdown condition." 10CFR50 CRITICAL I GRADE 1 I STANDARD (YIN) (S/U) Examinee notes that this step is not required now but will keep this step Examinee requests that the US/8M determine Page 9 of 19 PERFORMANCE JPM Number: CRITICAL GRADE I STEP I PERFORMANCE I STANDARD (S/U) 12. 3.3 INITIATE forcing sprays, and Examinee initiates forcing sprays by N MONITOR PZR placing backup heaters to on and the lowering automatic setpoint on the controlling channel pressure controller to I maintain RCS pressure at -2500 psi.
Comments:
,/'" 'U',l'  
: 4.     11. IF gas intrusion intrusion was indicated, I Examinee observes no change in VCT           I N PERFORM the following:                      I level , determines that gas intrusion is not 1.1 PLACE all charging pump hand             indicated, and that this step is not switches in "PULL-TO-LOCK."                   applicable.
;'0 Page 10 of 19 PERFORMANCE JPM Number: STEP 13. PERFORMANCE 3.4 CHECK charging flowpath as follows: Suction aligned from one of the following: "VCT OUT ISOL CH-501" open "BA ISOL CH-514" OR _ "GRAV FD (SOL BAST A, CH-509", OR "GRA V FD ISOL BAST B, CH-508" _ "RWST ISOL, CH-192" and "RWST TO CHGSUCT, CH-504", open Charging header isolation valves open: "CHG HDR ISOL, "CHG ISOL, CH-518" "CHG ISOL, _ NO indication of blockage in either the suction or discha A STANDARD Examinee checks charging flowpath by observing:
1.2 CLOSE the following: (C-02) 1.2.1 "LTON ISOL, CH-515" 1.2.2 "LTON ISOL, CH-516" 1.3 Go To AOP 2512, "Loss of
Suction aligned from one of the following by red OPEN indication N_"VCT OUT ISOL CH-501" N _ "BA ISOL CH-514" OR _ "GRAV FD ISOL BAST A, CH-509", OR N _"GRA V FD ISOL BAST B, CH-508" N -"RWST ISOL CH-192" and "RWST TO , N CHGSUCT, CH-504", open Charging header isolation valves open: N "CHG ISOL, CH-518" OR N "CHG ISOL, CH-519" y Examinee notes that "CHG HDR ISOL, CH-429" is closed by green CLOSE indication
            ~k~,~~r,.qi~hg*lI.
_ NO indication of blockage in either the N suction or discharge flowpath *.
Cue:
Cue: Comments:
Comments:
Page 11 of 19 PERFORMANCE JPM Number: STEP PERFORMANCE 1 4 . I 3.4.1 PERFORM the following:
: 5.     I 2. As necessary, START another charging       Examinee determines that it is not             N pump and PLACE affected charging pump         necessary to start another charging pump switch in "PULL TO LOCK" (C-02).             and that this steo is not aoolicable.
: a. PLACE all charging pump handswitches in "PULL-TO-LOCK." b. CLOSE * "LTDN ISOL, CH-S1S" * "LTDN ISOL, CH-S16" (C-02) c. WHEN VCT level rises to 86% or as desired, PLACE letdown divert switch, "L TON DIVERT CH-SOO to "RWS" position.
Cue:
Cue: STANDARD Examinee places all charging pump handswitches in "PULL-TO-LOCK." Examinee closes the following valves by rotating their handswitches to the CLOSE direction  
Comments:
* "LTDN ISOL, CH-S1S" * "LTDN ISOL, CH-S16" WHEN VCT level rises to 86% or as desired, examinee places letdown divert switch, "L TON DIVERT CH-SOO to "RWS" position.
Page 6 of 19
CRITICAL GRADE Y Y/N* Y/N* N Comments:
 
I
PERFORMANCE INFORMATION JPM Number:
* Only one of these valves are required to be closed to isolate letdown '--___---',g!!arging pump handswitches may have already placed in "PULL-TO-LOCK" Page 12 of 19 I PERFORMANCE JPM Number: CRITICAL GRADE STEP PERFORMANCE STANDARD (yIN) (SIU) I d. Refer To the following LCOs and Examinee requests that the US/SM refer N applicability:
STEP                            PERFORMANCE                                               STANDARD
to the listed TSITRM LCOs and TRM 3.1.2.2 DETERMINE applicability:
: 6.      I 3. IF charging flow is restored to normal by                     Examinee determines that this step is not N shifting operating charging pumps, SEND                         applicable.
TRM 3.1.2.4 TRM _ TS 3.5.2.a (if PZR press> 1750 _ TS 3.5.3.a (if PZR press < 1750 TS 3.0.3 h, ",,,,,",,,,><, ", ,
operators to ensure piping integrity for pump which developed low flow and SUBMIT Trouble Report to Maintenance Department to investigate possible degradation of charging pump or discharge relief valve malfunction.
1 6. I e. Refer To the applicable section PERFORM applicable I Examinee refers to Section 5.0, Discharge Section 4.0, "Suction Flowpath I Flowpath Restoration" due to observed I N Restoration" closure of "CHG HDR ISOL, Section 5.0, Discharge Section I If the normal charging flowpath is lost and I Examinee reads and acknowledges note cannot be reestablished, a plant shutdown is necessary.
L" ,,"!?k """""" """",,
While shutting down, pressurizer level can be maintained by charging into the RCS through the alternate fl Page 13 of 19 PERFORMANCE JPM Number: I CRITICAL I GRADE STEP PERFORMANCE I STANDARD (YIN) (S/U) I S.1 IF the normal charging path is available, ESTABLISH alternate f10wpath as Examinee ensures that the flowing valves are closed: a. ENSURE the following are closed:{C-02). "L TDN ISOL, CH-S1S" "L TDN ISOL, N "L TDN ISOL, CH-S16" "L TDN ISOL, N I..". 1 9 . IUt>: ENSURE letdown flow has stopped as I Examinee ensures letdown flow has N indicated on "LTDN FLOW, FI-202" stopped by observing no flow on "L TDN FI-202" Comments:
Cue:
2 O. I d. Refer To the following TSITRM and DETERMINE Examinee requests that the US/SM refer N TS 3.0.3 to the listed TSITRM LCOs and TRM 3.1.2.2 DETERMINE applicability:
Comments:
TRM TS 3.5.2.a, if PZR press> 17S0 .i!.Page 14 of 19 I PERFORMANCE JPM Number: CRITICAL I GRADE STEP PERFORMANCE I STANDARD (YIN) e. OBTAIN key #39 from Operations key Examinee obtains key #39 from locker and CLOSE "HPSI HDR A STOP, Operations key locker and closes SI-656" (C-01). HDR A STOP, u' f. OPEN both of the following Examinee requests plant operator to valves (14'6" AB Boronometer Room): the following _ CH-340, "CHARGING PUMP CH-340, "CHARGING y DISCHARGE TO HPSI HEADER" DISCHARGE TO HPSI HEADER" y _ CH-440, "CHARGING PUMP _ CH-440, "CHARGING DISCHARGE TO HPSI DISCHARGE TO HPSI HEADER" 'v vL "",0\% Cue: Comments: g. CLOSE the following HPSI Examinee closes the following valves by injection valves (C-01): taking their handswitches to the direction and observing a green y"LOOP 1A SI-617" -"LOOP 1 A SI-617" -,"LOOP 1 B y-"LOOP 1 B, SI-627" "LOOP 2B y-"LOOP 2B, SI-647" Cue:
: 7.      I 4. IF "A" or "C" charging pump is the affected pump, as necessary, PERFORM IExaminee states that this step is not    N necessary.
____________________________________________________________________________________Page 15 of 19 PERFORMANCE JPM Number: PERFORMANCE I h. ENSURE "LOOP 2A, SI-637," is open (C-01 ). I i. OBTAI N Key #50 from Operation Key Locker and UNLOCK and CLOSE "CHG HDR ISOL, CH-429" (C-02). L""", """d"""",",,",3*
the following:
J.J. Cue: Comments:
4.1 IF available, Refer To OP 2304E, "Charging Pumps," and PERFORM applicable actions to align "B" charging pump, to serve as applicable facility OPERABLE charging pump.
Examinee may state that this valve was NOTE ____ ***:11 .... _ .... n-,.n **_1 Rev.. STANDARD I Examinee ensures "LOOP 2A. SI-637." is N Examinee obtains Key #50 from Operation I N Key Locker and unlocks and closes "CHG HDR ISOL, CH-429" by rotating the key counter-clockwise and observing a reen CLOSE lioht. ' L.:':"L."3" I Examinee reads and acknowledges note. N Page 16 of 19 PERFORMANCE JPM Number: 1 CRITICAL GRADE (YIN) (S/U) Y Y N ,
4.2 IF "B" charging pump is not available AND "A" or "cn charging pump is made inoperable, LOG entry into appropriate TIS LCO ACTION Statements --><-- .,.,- ,- .' -.~;v_,," A in SM Cue:
",,,,,,
Comments:
' ____ I STEP I PERFORMANCE j. IF desired, ALIGN charging pump suction to RWST as follows (C-02): 1) CLOSE "VCT MAKEUP BYPASS, 196." 2) OPEN "RWST TO CHG SUCT, CH-504." 3) OPEN "RWST ISOL, CH-192." 4) CLOSE "VCT OUT ISOL, CH-501." 5) Refer To AOP 2575, "Rapid Down power, .. and SELECT borate from the RWST Cue: Comments:
: 8.        5. IF "CHG HDR FLOW" is less than 40                             Examinee goes to AOP 2512,                N gpm (C-02/3, F-212), Go To AOP 2512,                             "Loss of All Charging."
1 STANDARD Examinee aligns the pump suction to RWST as Verifies "VCT MAKEUP BYPASS, 196." closed by green CLOSE indication.
              "Loss of All Ch---'-- "
Verifies "RWST TO CHG SUCT, CH-504" open by red OPEN light Opens "RWST ISOL, CH-192" by rotating its handswitch clockwise and observing a red OPEN light. Closes "VCT OUT ISOL, CH-501" by rotating its handswitch counter-clockwise and observing a green CLOSE light. Examinee states that he/she will refer to AOP 2575, "Rapid Downpower," and SELECT borate from the RWST TERMINATION CUE: The evaluation for this JPM is concluded.
L Cue:
Page 17 of 19 JPM Number: JPM-S1.1 Rev. __-,,-0__ VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Comments:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No --, Validated Time (minutes):
Page 7 of 19
20 Actual Time to Complete (minutes):
 
JPM Work Practice Evaluation:
PERFORMANCE INFORMATION JPM Number:
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) Areas for Improvement/Comments:
CRITICAL GRADE STEP                      PERFORMANCE                                STANDARD                     (YIN)  l~!~)
Page 18 of 19 JPM Number: JPM-S1.1 Rev. __....:...O__ STUDENT HANDOUT Initial Conditions:
: 9.             3.0 Assessment of Loss of All Charging NOTE
* You are the Reactor Operator.
: 1. If charging flow cannot be established   I Examinee reads and acknowledges note. I     N prior to Pressurizer level lowering to 10%
Respond to all alarms Initiating Cues:
below programmed value (less than 55%
* Unit-2 is at 100% power, all rods out. No equipment out of service. Page 19 of 19 JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: JPM Number: JPM-S4s.1 Revision:
PZR level at Tavg of 561.5 F), the RX must be tripped and actions to establish HPSI flow initiated.
0II. Initiated:
: 2. If the SM/US believe attempts to restore charging will be unsuccessful then the decision to trip the RX should not be delayed.
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
: 3. Following a reactor trip, this procedure will be performed in parallel with EOP 2526, "Reactor Trip Recovery" and OP 2207, "Plant Cooldown"
J echnical Reviewer IV. Approved:
: 4. Power reduction should not be attempted with a loss of Charging as inventory continues to be lost and the potential for I-_ _ _--II.,...,,::.~IAS on Cue:
Cognizant Plant Supervisor (optional)
Comments:
Date Nuclear Training Supervisor Page 1 of 12 JOB PERFORMANCE MEASURE  
Page 8 of 19
 
PERFORMANCE INFORMATION JPM Number:
STEP                   PERFORMANCE                  I              STANDARD CRITICAL (YIN)
I GRADE (S/U) 1
: 10.     3.1 IF PZR level lowers to 10% below         Examinee notes that this step is not          N programmed value or Charging restoration     required now but will keep this step open.
is determined unlikely, PERFORM the following:
: a. ENSURE the reactor is tripped.
: b. ENSURE EOP 2525, "Standard Post Trip Actions" are completed.
: c. IF desired, CONTINUE this procedure in parallel with EOPs.
: d. To Restore PZR level using HPSI, Refer To Section 8, "Restoration of PZR Level HPSI" Cue:
Comments:
11 . 3.2 Refer To RAC 14, "Non-Emergency           Examinee requests that the US/8M              N Station Events" and CLASSIFY the event       determine reportability/classification under "Any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to shutdown the reactor and maintain it in a safe shutdown condition."
10CFR50 Cue:
Comments:
Page 9 of 19
 
PERFORMANCE INFORMATION JPM Number:
I STEP    I            PERFORMANCE              I                                             STANDARD CRITICAL (Y"~)
GRADE (S/U)
: 12.      3.3 INITIATE forcing sprays, and      Examinee initiates forcing sprays by                                                                      N MONITOR PZR pressure.                  placing backup heaters to on and the lowering automatic setpoint on the controlling channel pressure controller to I maintain RCS pressure at - 2500 psi.
                                                    ~;<",,';"VA<;,,"'*'''',,;, ,/'" 'U',l' "~J::1i:!H:<;,.';77i~:j,n<x;,t'~;~BiL;it;~?h\-;,i.2:t;lHH ;'0 Cue:
Comments:
Page 10 of 19
 
PERFORMANCE INFORMATION JPM Number:
STEP                    PERFORMANCE                                STANDARD
: 13.      3.4 CHECK charging flowpath as            Examinee checks charging flowpath by follows:                                  observing:
Suction aligned from one of                Suction aligned from one of the following the following:                            by red OPEN indication "VCT OUT ISOL CH-501" open                                                                          N
_"VCT OUT ISOL CH-501" "BA ISOL CH-514" OR                                                                                N
_ "BA ISOL CH-514" OR
_ "GRAV FD (SOL BAST A, CH-509",
_ "GRAV FD ISOL BAST A, CH-509", OR                        N OR "GRAV FD ISOL BAST B, CH-508"
_"GRAV FD ISOL BAST B, CH-508"                             N
_ "RWST ISOL, CH-192" and "RWST TO CHGSUCT, CH-504", open                     - "RWST ISOL, CH-192" and "RWST TO                        N CHGSUCT, CH-504", open Charging header isolation valves open:                              Charging header isolation valves open:
              "CHG HDR ISOL, CH-429"                                                                             N "CHG ISOL, CH-518" OR                      "CHG ISOL, CH-518" OR                                    N "CHG ISOL, CH-519"                        "CHG ISOL, CH-519" y
Examinee notes that "CHG HDR ISOL, CH-429" is closed by green CLOSE indication
_ NO indication of blockage in either the  _ NO indication of blockage in either the N
suction or discha                          suction or discharge flowpath A "1~
                                                                                ~
                                                                                *.=0,t~,~~,-C--~.~0~~7dAA~A~.~-C=
Cue:
Comments:
Page 11 of 19
 
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP                    PERFORMANCE        ------
STANDARD                  (Y'l~L (~l~
14 . I 3.4.1 PERFORM the following:
Examinee places all charging pump
: a. PLACE all charging pump handswitches        handswitches in "PULL-TO-LOCK."             Y in "PULL-TO-LOCK."
: b. CLOSE Examinee closes the following valves by
                  * "LTDN ISOL, CH-S1S" rotating their handswitches to the CLOSE
                  * "LTDN ISOL, CH-S16" (C-02)              direction
                                                                * "LTDN ISOL, CH-S1S"                 Y/N*
                                                                * "LTDN ISOL, CH-S16"                 Y/N*
: c. WHEN VCT level rises to 86% or as           WHEN VCT level rises to 86% or as            N desired, PLACE letdown divert switch,          desired, examinee places letdown divert "L TON DIVERT CH-SOO to "RWS" position.        switch, "LTON DIVERT CH-SOO to "RWS" position.
Cue:
Comments: I
* Only one of these valves are required to be closed to isolate letdown
'--_ _ _---',g!!arging pump handswitches may have already placed in "PULL-TO-LOCK" Page 12 of 19
 
PERFORMANCE INFORMATION JPM Number:
STEP                             PERFORMANCE                           STANDARD CRITICAL (yIN)
GRADE (SIU)
: 15. I d. Refer To the following TS/TRM LCOs and DETERMINE                            Examinee requests that the US/SM refer         N applicability:                               to the listed TSITRM LCOs and TRM 3.1.2.2                             DETERMINE applicability:
TRM 3.1.2.4 TRM 7.1.1
_ TS 3.5.2.a (if PZR press> 1750 psia)
_ TS 3.5.3.a (if PZR press < 1750 psia)
TS 3.0.3 h,   ",,,,,",,,,><, ", ,
Cue:
Comments:
1 6. I e. Refer To the applicable section and PERFORM applicable actions.                IExaminee refers to Section 5.0, Discharge Section 4.0, "Suction Flowpath             I Flowpath Restoration" due to observed   I     N Restoration"                                 closure of "CHG HDR ISOL, CH-429" Section 5.0, Discharge Flowpath Restoration" L~~>
Section 7 Cue:
Comments:
: 17. I                            NOTE N
If the normal charging flowpath is lost and cannot be reestablished, a plant shutdown IExaminee reads and acknowledges note is necessary. While shutting down, pressurizer level can be maintained by charging into the RCS through the alternate fl Cue:
Comments:
Page 13 of 19
 
PERFORMANCE INFORMATION JPM Number:
I CRITICAL I GRADE STEP                     PERFORMANCE                 I                   STANDARD                   (YIN)     (S/U)
: 18. I S.1 IF the normal charging path is not available, ESTABLISH alternate charging f10wpath as follows:                      I Examinee ensures that the flowing valves are closed:
: a. ENSURE the following are closed:{C-02).
                                                          "LTDN ISOL, CH-S1S" "LTDN ISOL, CH-51S"                                                                      N "LTDN ISOL, CH-S16" "LTDN ISOL, CH-516"                                                                      N Cue:
I..".
Comments:
: 19. IUt>: ENSURE letdown flow has stopped as     IExaminee ensures letdown flow has               N indicated on "LTDN FLOW, FI-202" (C-02). stopped by observing no flow on "LTDN FI-202" Comments:
2 O.
Cue:
Comments:
: 21. I d. Refer To the following TSITRM LCOs and DETERMINE applicability:                  Examinee requests that the US/SM refer         N TS 3.0.3                                 to the listed TSITRM LCOs and TRM 3.1.2.2                             DETERMINE applicability:
TRM 7.1.1 TS 3.5.2.a, if PZR press> 17S0 psia L~<.T~,,~;~:~:a, .i!. ~?l3e.~e:.~s~.17S.o C
Page 14 of 19
 
PERFORMANCE INFORMATION JPM Number:
CRITICAL I GRADE I STEP                     PERFORMANCE             I                 STANDARD                     (YIN)     (&sect;[!J~
: 22.        e. OBTAIN key #39 from Operations key   Examinee obtains key #39 from                   y locker and CLOSE "HPSI HDR A STOP,     Operations key locker and closes "HPSI SI-656" (C-01).                         HDR A STOP, SI-656" 1------11="'                                                                                    u' Cue:
Comments:
: 23.        f. OPEN both of the following           Examinee requests plant operator to open valves (14'6" AB Boronometer Room):     the following valves:
_ CH-340, "CHARGING PUMP               CH-340, "CHARGING PUMP                          y DISCHARGE TO HPSI HEADER"               DISCHARGE TO HPSI HEADER"                       y
_ CH-440, "CHARGING PUMP               _ CH-440, "CHARGING PUMP DISCHARGE TO HPSI HEADER"              DISCHARGE TO HPSI HEADER"
                                                                          'v vL "",0\%
Cue:
Comments:
: 24.        g. CLOSE the following HPSI             Examinee closes the following valves by injection valves (C-01):               taking their handswitches to the "CLOSE" direction and observing a green CLOSE light:
y
                - "LOOP 1A, SI-617"                     - "LOOP 1A , SI-617"
              - "LOOP 1B, SI-627"                                                                     y "LOOP 1B, SI-627"
              - "LOOP 2B , SI-647"                        "LOOP 2B, SI-647"                           y Cue:
Co~me~n~ts~:~I____________________________________________________________________________________~
Page 15 of 19
 
PERFORMANCE INFORMATION JPM Number:                                                                                                                   Rev..
STEP                          PERFORMANCE                                                     STANDARD
: 25. I h. ENSURE "LOOP 2A, SI-637," is open                                 I Examinee ensures "LOOP 2A. SI-637." is          N (C-01 ).
Cue:
Comments:
: 26. I i. OBTAI N Key #50 from Operation Key                                 Examinee obtains Key #50 from Operation I      N Locker and UNLOCK and CLOSE                                           Key Locker and unlocks and closes "CHG HDR ISOL, CH-429" (C-02).                                         "CHG HDR ISOL, CH-429" by rotating the key counter-clockwise and observing a reen CLOSE lioht.
L""", """d"""",",,",3* J.J.                                         ' L.:':"L."3" Cue:
Comments:   Examinee may state that this valve was
: 27.                                  NOTE
            ~,,~~~~~..I    .~_~  ____ *** :11 .... _ ~ .... _~ n-,.n I~ **_1   I Examinee reads and acknowledges note.
N Page 16 of 19
 
PERFORMANCE INFORMATION JPM Number:
I  STEP    I               PERFORMANCE                1                STANDARD                  1  CRITICAL (YIN)
GRADE (S/U)
: 28.       j. IF desired, ALIGN charging              Examinee aligns the charging pump suction to RWST as follows (C-02):    pump suction to RWST as follows:
: 1) CLOSE "VCT MAKEUP BYPASS, CH          Verifies "VCT MAKEUP BYPASS, CH 196."                                                                                            N 196." closed by green CLOSE indication.
: 2) OPEN "RWST TO CHG SUCT, CH-504."                             Verifies "RWST TO CHG SUCT, CH-504"                  N
: 3) OPEN "RWST ISOL, CH-192."               open by red OPEN light
: 4) CLOSE "VCT OUT ISOL, CH-501."
: 5) Refer To AOP 2575, "Rapid               Opens "RWST ISOL, CH-192" by rotating Down power, .. and SELECT borate from the                                                       Y its handswitch clockwise and observing a RWST                                      red OPEN light.
Closes "VCT OUT ISOL, CH-501" by                     Y rotating its handswitch counter-clockwise and observing a green CLOSE light.
Examinee states that he/she will refer to AOP 2575, "Rapid Downpower," and                     N SELECT borate from the RWST Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                                                  ,STQRJ;gME~~***
                                                                                                      ",,,,,, "'<kdn,~' ' _ _ __
Page 17 of 19
 
JPM Number:                     JPM-S1.1                           Rev. _ _-,,-0_ _
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes           No --,
                              -
Validated Time (minutes):                   20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:               SAT           UNSAT         NA         (circle one)
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
Areas for Improvement/Comments:
Page 18 of 19
 
JPM Number:                 JPM-S1.1                           Rev. _ _....:...O_ _
STUDENT HANDOUT Initial Conditions:
* You are the Reactor Operator. Respond to all alarms Initiating Cues:
* Unit-2 is at 100% power, all rods out. No equipment out of service.
Page 19 of 19
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-S4s.1               Revision: ----=--
0 II. Initiated:
Marc R. Pucel                          02/01/11 Developer                            Date III. Reviewed:
                                                              ~~3/; J echnical Reviewer                  ~
IV. Approved:
Cognizant Plant Supervisor (optional)              Date Nuclear Training Supervisor Page 1 of 12
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: DESCRIPTION REV/CHANGE de HUP evaluations and new format Page 2 of 12
OF CHANGES:
-------------------
DESCRIPTION                       REV/CHANGE de HUP evaluations and new format Page 2 of 12
---------JPM Number: JPM-S4s.1 Rev. __.....;0=--
 
__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                         JPM-S4s.1                                         Rev. _ _.....;0=--__
Facility:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
MP2 Examinee:
Facility:       MP2                   Examinee:
JPM Number: JPM-S4s.1 Rev. ___0=--__ Task Title: System: Foxboro IA Time Critical Task: Yes No x Validated Time (minutes):
                                                -------------------
20 Task No.(s): Applicable To: SRO -RO X PEO KIA No. 041 A4.06 KIA Rating _--""-2..;......9'-'-'3"-._1
JPM Number:                         JPM-S4s.1                                               Rev. ___0=--__
__ Method of Testing: Simulated Actual Performance:
Task Title:
X Location:
System:       Foxboro IA Time Critical Task:     Yes
Simulator:
                                -
X In-Plant: Task At the completion of this JPM, the examinee will attempt to operate the #2 ADV from C-05 and determine that the controller is failed. The examinee will take manual control of #2 ADV from the Foxboro Controller.
No   x Validated Time (minutes):                   20 Task No.(s):
Required Materials EOP 2528 (Step 29) (procedures.
Applicable To:           SRO                 RO     X         PEO
equipment.
                                  - -                                          --
etc.): OP 2386 " Reactor Regulating System" General  
KIA No.               041 A4.06               KIA Rating _--""-2..;......9'-'-'3"-._1__
Method of Testing:
Simulated Performance:                          Actual Performance:                     X
                              -----                                                  ---"-"'--
Location:
Classroom: - - -                  Simulator:   X                 In-Plant:
                                              -"-=--                                ----
Task Standards:                    At the completion of this JPM, the examinee will attempt to operate the #2 ADV from C-05 and determine that the controller is failed.
The examinee will take manual control of #2 ADV from the Foxboro Controller.
Required Materials               EOP 2528 (Step 29)
(procedures. equipment. etc.):
OP 2386 " Reactor Regulating System" General  


==References:==
==References:==
* * *
 
                                    * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 12
Page 3 of 12 JPM Number: JPM-S4s.1 Rev. ___0___ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Initiating Cues: You have been directed to commence an RCS cooldown per Step 29 of EOP 2528 at a controlled cooldown rate of between 40 to 50 F/hr. using both Steam Generators.
JPM Number:                         JPM-S4s.1                             Rev. _ _ _  0_ __
Initial Conditions: Unit-2 was manually tripped due to a loss of condenser vacuum Due to a small steam leak in the 38'-6" West Enclosure Building.
JOB PERFORMANCE MEASURE WORKSHEET (continued)
the Shift Manager has restricted access to this area. Plant management has decided that the plant will go to MODE 5 to repair this steam leak. Simulator IC-152 Requirements: Instructor to act as RO to address alarms 1< 1<1< NOTES TO EVALUATOR 1<
Initiating Cues:
* 1< Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue" . If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 12 PERFORMANCE JPM Number: JPM-S4s.1
* You have been directed to commence an RCS cooldown per Step 29 of EOP 2528 at a controlled cooldown rate of between 40 to 50 F/hr.
::f"'"  
using both Steam Generators.
,\,' 1!;'.Y:(1( PERFORMANCE 1 EOP Loss Of Offsite Power/Loss Comments:  
Initial Conditions:
! Instructor will act as RO to
* Unit-2 was manually tripped due to a loss of condenser vacuum
: 2. NOTE Technical Specification cooldown rates should be observed during the cooldown.
* Due to a small steam leak in the 38'-6" West Enclosure Building. the Shift Manager has restricted access to this area.
The cooldown rates are as follows: 1. RCS TC greater than 220 F the cooldown rate is 100 F/hr. 2. RCS TC less than or equal to 220 F the cooldown rate is 50 F/hr. 3 . I Perform Controlled Cooldown 29. INITIATE a controlled cooldown using the steam dumps to establish shutdown cooling entry conditions.
* Plant management has decided that the plant will go to MODE 5 to repair this steam leak.
Simulator
* IC-152 Requirements:
* Instructor to act as RO to address alarms 1< 1< 1< NOTES TO EVALUATOR 1< 1<
* 1<
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue" .
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 12
 
PERFORMANCE INFORMATION JPM Number:                   JPM- S4s.1                                                                                                                 Rev..
tt!1~:tlm0tJ("~;M~1(~ t1t'\r::~ge:- ::f"'" 1'le"'\~di:Z;\ ,~\      ' :8,':1':14; \", tS(i': ,:;
                            ;g~~r~%~I%%~, 0~li{~v~~Qn+t;:Q ,\,' 1!;'.Y:(1( , J!;\i!;i>;it; / ,
STEP                                                    PERFORMANCE                                                         STANDARD
                                                                                                                                                        ~TARTTIME:
: 1.        EOP 2528                                                                                        Examinee refers to EOP 2528                      N Loss Of Offsite Power/Loss of                                                                  Loss Of Offsite Power/Loss of Cue:
Comments: ! Instructor will act as RO to acknowled
: 2.     I                                                            NOTE                                 Examinee reads and acknowledges note              N Technical Specification cooldown rates                                                         on cooldown rate limits.
should be observed during the cooldown.
The cooldown rates are as follows:
: 1. RCS TC greater than 220 F the cooldown rate is 100 F/hr.
: 2. RCS TC less than or equal to 220 F the cooldown rate is 50 F/hr.
Cue:
Comments:
: 3.     I Perform Controlled Cooldown                                                                     Examinee initiates a cooldown of the RCS          y using both ADV's per step 29.1 due to the
: 29. INITIATE a controlled cooldown using                                                       condenser and steam dumps not the steam dumps to establish shutdown                                                           available.
cooling entry conditions.
29.1 INITIATE a controlled cooldown using the ADVs to establish shutdown cooling entry conditions.
29.1 INITIATE a controlled cooldown using the ADVs to establish shutdown cooling entry conditions.
t" _,,, ,Y',_""
t" _,, ,Y',_"" ,"~. 0'''',,) ",aM>.,~ ,~, ",<<.w&sect;.<<~, ~ '" "" ",,,,4~'~,,.*c, "
0'''',,) '" "" " Cue: Rev.. ':8,':1':14;
Cue:
\", tS(i': ,:; , J!;\i!;i>;it; , STANDARD Examinee refers to EOP 2528 N Loss Of Offsite Power/Loss of Examinee reads and acknowledges note N on cooldown rate limits. y using both ADV's per step 29.1 due to the condenser and steam dumps not available.
Comments: I Once examinee has commenced an RCS cooldown using both ADV's, trigger malfunction RX20D to 0% to fail PIC 4224 to the Foxboro IA.
Examinee initiates a cooldown of the RCS Comments:
Page 5 of 12
I Once examinee has commenced an RCS cooldown using both ADV's, trigger malfunction RX20D to 0% to fail PIC 4224 to the Foxboro IA. Page 5 of 12 PERFORMANCE JPM Number: STEP PERFORMANCE STANDAR'-=-=D=---__
 
__J 4. #2 ADV fails closed Examinee observes the following:
PERFORMANCE INFORMATION JPM Number:
y* * #2 ADV red OPEN light is not lit
STEP                     PERFORMANCE                                 STANDAR'-=-=D=---__     __J
* The cooldown rate lowers
: 4.       #2 ADV fails closed                         Examinee observes the following:             y*
: 5. Cue: Comments:
                                                              * #2 ADV red OPEN light is not lit
I The examinee may determine that the #2 ADV can be successfully operated from C-21. If he/she chooses to rm this success oath. then oroceed to JPM Steo 19 Page 6 of 12
* The cooldown rate lowers Cue Comments:
----------
5.
PERFORMANCE JPM Number: STEP PERFORMANCE 6 . I 4.1.2 Manual Operation
Cue:
: a. PUSH the "AIM" button until "M" is b. PRESS "SEL" button until cursor appears above output (right hand bar graph). c. USING "up" and "down" buttons, ADJUST output as desired. Cue: Comments:
Comments: I The examinee may determine that the #2 ADV can be successfully operated from C-21. If he/she chooses to rm this success oath. then oroceed to JPM Steo 19 Page 6 of 12
: 7. Cue: Comments:
 
: 8. Controlling from the Foxboro screen results in the setpoint of the controller failing high such that the valve will close or remain I---------+"L closed. Cue: Comments:
PERFORMANCE INFORMATION JPM Number:
STANDARD Examinee pushes the "M" on "ATMOS N DUMP CTRL PIC 4224" in order to take manual control of 2-MS-190B N Examinee presses "SELl! button on "ATMOS DUMP CTRL PIC 4224" until cursor appears above output. Examinee raises output on "ATMOS N DUMP CTRL PIC 4224" in order to open 2-MS-190B 3th"" Examinee reads and acknowledges note N on controller setpoint failure. Page 7 of 12 
STEP                       PERFORMANCE                                     STANDARD
-----------
: 6.       I 4.1.2 Manual Operation
PERFORMANCE 0 JPM Number: JPM-Rev.. CRITICAL GRADE l STEP PERFORMANCE I STANDARD (YIN) (S/U) 4.5.1 SELECT "Change Env" (Foxboro Examinee selects "Change Env" on the controls PPC PPC Foxboro screen. I ' c" ",,,,,,Xc.,.'" '
: a. PUSH the "AIM" button until "M" is           Examinee pushes the "M" on "ATMOS    N DUMP CTRL PIC 4224" in order to take manual control of 2-MS-190B N
: 10.
: b. PRESS "SEL" button until cursor             Examinee presses "SELl! button on appears above output (right hand bar           "ATMOS DUMP CTRL PIC 4224" until graph).                                         cursor appears above output.
: c. USING "up" and "down" buttons, ADJUST output as desired.                       Examinee raises output on "ATMOS    N DUMP CTRL PIC 4224" in order to open 2-MS-190B 3th""
Cue:
Comments:
7.
Cue:
Comments:
8.
Controlling from the Foxboro screen results     Examinee reads and acknowledges note N in the setpoint of the controller failing high on controller setpoint failure.
such that the valve will close or remain I---------+"L closed.
Cue:
Comments:
    ----------
Page 7 of 12
 
PERFORMANCE INFORMATION JPM Number:             JPM- S4s.1                                                                Rev.. 0 l STEP                                   PERFORMANCE     I             STANDARD CRITICAL (YIN)
GRADE (S/U) 4.5.1 SELECT "Change Env" (Foxboro         Examinee selects "Change Env" on the controls PPC                               PPC Foxboro screen.
I     ' c" ",,,,,,Xc.,.'" '
Cue:
Comments:
    -----------
10.
Cue:
Comments:
11 .
11 .
: 12.
Cue:
: 13. 4.5.6 OBSERVE the "NORMAL" button Examinee observes the "NORMAL" button changed to "BYPASSED." changed to "BYPASSED" for PIC-4224 on the PPC Foxboro screen. ,
Comments:
Page 8 of 12 PERFORMANCE JPM Number: PERFORMANCE
12.
: 15. I 4.5.7 To take manual control SELECT I. ' Cue: Comments: 4.5.8 CHECK "MAN" button changes from grey to red. Cue: Comments:
Cue:
: 17. Cue: Comments: I 4.5.9 USING up and down buttons, ADJUST controller output as desired. h ", ,,,{$'84@\
Comments:
J.' ,/t. ,Q".Zkl""N" \i" ,< Cue: Comments:
13.
: 19. Cue: Comments: I Place #2 ADV controller HIC 4224 in manual control L,J, Cue: STANDARD Examinee selects "MANit for controller Y PIC-4224 on the PPC Foxboro screen. Examinee checks "MAN" button changes N from grey to red for controller PIC-4224 on the PPC Foxboro screen. Examinee adjusts controller PIC-4224 Y output as desired on the PPC Foxboro I screen to continue plant cooldown . .,L*A.*,<'!'h",)$",;Z;;:;S;,f ZYLy",k.9>>A'''''''' "
Cue:
* Examinee locates and places "HIC 4224" Y in the "MAN" position and establishes communication with the Control Room Page 9 of 12 PERFORMANCE JPM Number: STEP 21. Cue: Comments:
Comments:
PERFORMANCE Operate #2 ADV controller in manual to open #2 ADV STANDARD Examinee rotates control knob to open y #2 ADV to continue cooldown and maintain #2 S/G pressure approximately ual to #1 S/G TERMINATION CUE: The evaluation for this JPM is concluded.  
: 14.            4.5.6 OBSERVE the "NORMAL" button         Examinee observes the "NORMAL" button       N changed to "BYPASSED."                     changed to "BYPASSED" for controller PIC-4224 on the PPC Foxboro screen.             ,'
&sect;,TOPTIME:
Cue:
Page 10 of 12 GRADE (S/U) 
Comments:
-----JPM Number: JPM-S4s.1 Rev. __-'0"--__ VERIFICATION OF JPM COMPLETION ,( +"''' (;;; H///";:"" Title: ) <J ; Date Performed:
Page 8 of 12
Student: Evaluator:
 
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
PERFORMANCE INFORMATION JPM Number:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No Validated Time (minutes):
STEP                                        PERFORMANCE                                                                   STANDARD
20 Actual Time to Complete (minutes):  
: 15. I 4.5.7 To take manual control SELECT                                     I Examinee selects "MANit for controller                              Y PIC-4224 on the PPC Foxboro screen.
..IPM Work Practice Evaluation:
I.  '
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) During the TPE, the trainee performed the task correctly and in accordance with procedure Pass I usage and adherence never put anyone's safety at risk. Pass / never put equipment reliability at risk. Pass / never violated radiological work practices.
Cue:
Pass / demonstrated effective use of event-free human performance tools. Pass / Areas for Improvement/Comments:
Comments:
Page 11 of 12
: 16.        4.5.8 CHECK "MAN" button changes from                                     Examinee checks "MAN" button changes                              N grey to red.                                                               from grey to red for controller PIC-4224 on the PPC Foxboro screen.
-----JPM Number: JPM-Rev. 0 Initial Conditions:
Cue:
Initiating Cues: STUDENT You have been directed to commence an RCS cooldown per Step 29 of EOP 2528 at a controlled cooldown rate of between 40 to 50 F/hr. using both Steam Generators. Unit-2 was manually tripped due to a loss of condenser vacuum. Due to a small steam leak in the 38'-6" West Enclosure Building, the Shift Manager has restricted access to this area. Plant management has decided that the plant will go to MODE 5 to repair this steam leak. Page 12 of 12
Comments:
---JOB PERFORMANCE MEASURE APPROVAL JPM Title: Containment Isolatiori due to Fuel Handfing Acciaeht'  
17.
.... "IPM Number: "IPM-S5.1 Revision:
Cue:
0 Initiated:
Comments:
Marc R. Puce! 02/01/11 Developer Date Reviewed:
: 18. I 4.5.9 USING up and down buttons,                                       I Examinee adjusts controller PIC-4224                                Y ADJUST controller output as desired.                                       output as desired on the PPC Foxboro I  screen to continue plant cooldown .
Tec Dat Approved:
h 'y,'",,:L~" ,,~ ", ,,,{$'84@\ J.' ,/t. ,Q".Zkl""N" \i" ,<         .",,,~" ,L*A.*,<'!'h",)$",;Z;;:;S;,f ZYLy",k.9>>A'''''''' " AN'A'/~
Cognizant Plant Supervisor Date Nuclear Training Supervisor Page 1 of 10 JOB PERFORMANCE MEASURE  
* Cue:
Comments:
19.
Cue:
Comments:
: 20. I Place #2 ADV controller HIC 4224 in                                    IExaminee locates and places "HIC 4224"                               Y manual control                                                            in the "MAN" position and establishes L,J, communication with the Control Room Cue:
Page 9 of 12
 
PERFORMANCE INFORMATION JPM Number:
GRADE STEP                 PERFORMANCE                                STANDARD                              (S/U)
: 21.     Operate #2 ADV controller in manual to Examinee rotates control knob to open         y open #2 ADV                            #2 ADV to continue cooldown and maintain #2 S/G pressure approximately ual to #1 S/G
                                                                    ,.....-..,..-,.....--:-~
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                                            &sect;,TOPTIME:
Page 10 of 12
 
JPM Number:                     JPM- S4s.1                         Rev. _ _-'0"--__
VERIFICATION OF JPM COMPLETION
                                                                                      '~; ,(
                                                                    +"'''   (;;;
Title:                                                                )  J < ;
H///";:""
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes             No
                                --            ---
Validated Time (minutes):                     20 Actual Time to Complete (minutes):
..IPM Work Practice Evaluation:               SAT         UNSAT               NA             (circle one)
Overall Result of JPM:                         SAT         UNSAT                               (circle one)
During the TPE, the trainee                                                               Evaluation performed the task correctly and in accordance with procedure                             Pass I Fail usage and adherence requirements.
never put anyone's safety at risk.                                                       Pass / Fail never put equipment reliability at risk.                                                 Pass / Fail never violated radiological work practices.                                               Pass / Fail demonstrated effective use of event-free human performance tools.                         Pass / Fail Areas for Improvement/Comments:
Page 11 of 12
 
JPM Number:                 JPM- S4s.1                        Rev. - - -  0 --
STUDENT HANDOUT Initial Conditions:
* You have been directed to commence an RCS cooldown per Step 29 of EOP 2528 at a controlled cooldown rate of between 40 to 50 F/hr.
using both Steam Generators.
Initiating Cues:
* Unit-2 was manually tripped due to a loss of condenser vacuum.
* Due to a small steam leak in the 38'-6" West Enclosure Building, the Shift Manager has restricted access to this area.
* Plant management has decided that the plant will go to MODE 5 to repair this steam leak.
Page 12 of 12
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:       Containment Isolatiori due to Fuel Handfing Acciaeht' . .
    "IPM Number:             "IPM-S5.1                       Revision: - -  0 -
II. Initiated:
Marc R. Puce!                                 02/01/11 Developer                                     Date III. Reviewed:
Tec   IcalReviewer AJ)~/;/
Dat IV. Approved:
Cognizant Plant Supervisor (optional)                      Date Nuclear Training Supervisor Page 1 of 10
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 10   
OF CHANGES:
--------------------
All & DATE                     DESCRIPTION                     REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 10
-------------------------
 
Number:
~IPM Number:                      JPM-S5.1                              Rev. ___0,,---__
Rev. ___0,,---__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility:
Facility:      MP2                  Examinee:
MP2 Examinee:
                                                  --------------------
JPM Number:
JPM Number:                         JPM-S5.1                                    Rev. ___0,,---__
Rev. ___0,,---__ System: Containment Time Critical Task: Yes No X Validated Time (minutes):
System:       Containment Time Critical Task:     Yes             No     X Validated Time (minutes):                 15 Task No.(s):
15 Task No.(s): Applicable To: SRO X RO X PEa KIA No. 103 A2.04 KIA Rating 3.5/3.6 Method of Testing: Simulated Actual Performance:
Applicable To:           SRO -X-              RO - -X- -    PEa KIA No.               103 A2.04                 KIA Rating       3.5/3.6 Method of Testing:
X Location:
Simulated Performance:                            Actual Performance:       X
Simulator:
                              ----                                      ----
X In-Plant:
Location:
Task At the completion of this JPM, the examinee will take the required actions in the Control Room to isolate Containment due to a Fuel Handling Accident.
Classroom:                        Simulator: - -  X -          In-Plant:
Required Materials OP 2315A "Control Room Air Conditioning System" (procedures.
                ---                                                      -----
equipment.
Task Standards:                    At the completion of this JPM, the examinee will take the required actions in the Control Room to isolate Containment due to a Fuel Handling Accident.
etc.): AOP 2557 " Fuel Handling Accident" General OP 2315A "Control Room Air Conditioning System" AOP 2557 " Fuel Handling Accident" * * *
Required Materials               OP 2315A "Control Room Air Conditioning System" (procedures. equipment. etc.):   AOP 2557 " Fuel Handling Accident" General  
 
==References:==
OP 2315A "Control Room Air Conditioning System" AOP 2557 " Fuel Handling Accident"
                                  * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simUlate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simUlate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 10
Page 3 of 10
 
-----JPM Number: ..... Rev. 0 JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                         ..... I\II_.~'C> 1                    Rev. - - -  0 --
Initiating Cues: You are the RO. Respond to all alarms or direction as normal. Initial Conditions: Unit-2 is in a Refueling outage with fuel movement occurring in Containment.
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
* You are the RO. Respond to all alarms or direction as normal.
Initial Conditions:
* Unit-2 is in a Refueling outage with fuel movement occurring in Containment.
Simulator
Simulator
* IC-153 Reguirements: Train "An CRACS is operating in "NORMAL" mode. Containment purge valves are open to maintain containment habitability. Mon 1 (SDC). Mon 2 (STR). Mon 3 ( PAY) * *
* IC-153 Reguirements:
* NOTES TO EVALUATOR * * *
* Train "An CRACS is operating in "NORMAL" mode.
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 10
* Containment purge valves are open to maintain containment habitability.
----PERFORMANCE JPM Number: STEP 1 . Cue: Comments:
* Mon 1 (SDC). Mon 2 (STR). Mon 3 ( PAY)
: 2. Cue: Comments:
                                  * *
: 3. Cue: Comments:
* NOTES TO EVALUATOR * * * *
: 4. Cue: Comments:
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
JPM-S5.1
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
'9t1ildj PERFORMANCE Millstone Unit 2 Fuel Handling Accident AOP 2577 3.1 REQUEST Health Physics Department perform the following:
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
_ Evacuate personnel from SG primary sides and loop areas _ Coordinate an evacuation of personnel in containment CRITICAL I I I STANDARD StU StART TIME: Examinee states that the Fuel Handling Accident ( AOP 2577) procedure idance for this Examinee requests Health Physics Department perform the
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
_ Evacuate personnel from SG sides and loop _ Coordinate an evacuation of . I .in containment Page 5 of 10 PERFORMANCE JPM Number: STEP STANDARD 3.3 ANNOUNCE the following over plant Examinee announces the following page system: plant page y"Attention all personnel, a fuel handling "Attention all personnel, a fuel accident has occurred inside Unit 2 handling accident has occurred inside containment.
Page 4 of 10
All personnel evacuate Unit 2 Unit 2 containment.
 
All personnel containment." evacuate Unit 2 containment." Cue: Comments: I 3.4 IF purging of containment is in Examinee closes the following by progress, their switches to the "CLOSE" position VERIFY the following are closed: verifying by green" CLOSE" _ AC-4, Containment Outboard indication only that the dampers Isolation Damper Y _ AC-5, Containment Inboard _ AC-4, Containment Outboard Isolation Damper Isolation Damper _ AC-6, Containment Inboard _ AC-5, Containment Inboard y Isolation Damper Isolation Damper _ AC-7. Containment Outboard _ AC-6, Containment Inboard y Isolation Isolation Damper _ AC-7, Containment Outboard Isolation Dam Cue: Comments:
PERFORMANCE INFORMATION JPM Number:      JPM-S5.1 e~i"r'l
: 7. Cue: Comments:
                  '9t1ildj STEP                  PERFORMANCE                    I                  STANDARD CRITICAL C(t~)
Page 6 of 10 PERFORMANCE JPM Number:
I G(RA~E I StU StART TIME: - - - -
Rev.. _0_ i , ' " '" ",,' "''''''''
: 1.     Millstone Unit 2                                Examinee states that the Fuel Handling        N Fuel Handling Accident AOP 2577                Accident ( AOP 2577) procedure has idance for this event Cue:
""""""""""" """ '" ,','",'"" ",' ,"',,,'g" ,',', ""'" PERFORMANCE _3.6 VERIFY at least one train of CRACS operating in recirculation mode. (C25) Facility 1 _ HV-203A, Fan F-21A exhaust damper is open. _ Fan F-21A, supply fan is running. _ HV-206A, Fan F-31A exhaust damper is open. _ Fan F-31A, exhaustfan is running. _ HV-212A, Fan F-32A exhaust damper is open. _ Fan F-32A, filter fan is running. _ HV-202, minimum fresh air damper is closed. _ HV-207, cable vault exhaust damper is closed. _ HV-208, exhaust air damper is closed. STANDARD Examinee verifies "A" train of CRACS the recirculation mode Starting "CRACS FL TR FANF-32A" rotating its handswitch to the y Examinee y_HV-203A, Fan F-21A exhaust damper is open by red "OPEN" light lit only. y _ Fan F-21A, supply fan is running by red "ON" light lit only. _ HV-206A, Fan F-31A exhaust damper is y open by red "OPEN" light lit only. _ Fan F-31A, exhaustfan is running by red y"ON" light lit only. y_HV-212A, Fan F-32A exhaust damper is open by red "OPEN" light lit only. y _ Fan F-32A, filter fan is running by "ON" light lit _ HV-202, minimum fresh air damper is closed by green "CLOSE" light lit _ HV-207, cable vault exhaust damper is closed by green "CLOSE" light lit _ HV-208, exhaust air damper is closed y green "CLOSE" light lit only. Cue:
Comments:
2.
Cue:
Comments:
: 3.     3.1 REQUEST Health Physics                     Examinee requests Health Physics              N Department perform the following:              Department perform the following:
_ Evacuate personnel from SG primary           _ Evacuate personnel from SG primary sides and loop areas                            sides and loop areas
_ Coordinate an evacuation of personnel in     _ Coordinate an evacuation of personnel containment                                . I .in containment Cue:
Comments:
4.
Cue:
Comments:
Page 5 of 10
 
PERFORMANCE INFORMATION JPM Number:
STEP                     PERFORMANCE                                  STANDARD
: 5.        3.3 ANNOUNCE the following over plant       Examinee announces the following over page system:                               plant page system:
y "Attention all personnel, a fuel handling   "Attention all personnel, a fuel accident has occurred inside Unit 2         handling accident has occurred inside containment. All personnel evacuate Unit 2 Unit 2 containment. All personnel containment."                               evacuate Unit 2 containment."
Cue:
Comments:
: 6.      I 3.4 IF purging of containment is in         Examinee closes the following by rotating progress,                                   their switches to the "CLOSE" position and VERIFY the following are closed:           verifying by green" CLOSE" light
_ AC-4, Containment Outboard               indication only that the dampers are Isolation Damper                           closed:
_ AC-5, Containment Inboard                 _ AC-4, Containment Outboard               Y Isolation Damper                           Isolation Damper
_ AC-6, Containment Inboard                 _ AC-5, Containment Inboard               y Isolation Damper                           Isolation Damper
_ AC-7. Containment Outboard               _ AC-6, Containment Inboard               y Isolation Damper                            Isolation Damper
_ AC-7, Containment Outboard Isolation Dam Cue:
Comments:
7.
Cue:
Comments:
Comments:
I Examinee will observe that both HV -207 and HV-208 remain open if handswitches "NORM/RECIRC MODE, 8346" and "NORM/RECIRC MODE, HS-8359" are not placed in "RECIRC".
Page 6 of 10
Examinee may refer to OP 2315A for placing CRACS in recirculation mode which provides direction for placing "NORM/RECIRC MODE, HS-8346" and "NORM/RECIRC MODE, HS-8359" in "RECIRC" thus allowing HV-207 and HV-208 to go closed Page 7 of 10 PERFORMANCE JPM Number: 1 STEP PERFORMANCE
 
__________..........
PERFORMANCE INFORMATION JPM Number:        JPM-S5.1                                                                                                                                  Rev.. _0_
i cot1tatnmen(,'sGlatiot{dU6"fO~Fi.Jel
                    , ' "~'ecce " '" ",,' " ' ' ' ' ' ' ' ' " " " " " " " " " " " """ '" ,',' " , '" "
Hahdlrn~:jl!cci8ehf
                                                                                                      " , ' ,"',,,' g" ,',', ""'"
STEP                                      PERFORMANCE                                                                            STANDARD
: 8.      _3.6 VERIFY at least one train of                                                                      Examinee verifies "A" train of CRACS in CRACS operating in recirculation mode.                                                                the recirculation mode by:
(C25)                                                                                                  Starting "CRACS FL TR FANF-32A" by Facility 1                                                                                            rotating its handswitch to the "ON"            y
_ HV-203A, Fan F-21A exhaust damper is                                                                position.
open.                                                                                                  Examinee verifies:
_ Fan F-21A, supply fan is running.                                                                                                                  y
_HV-203A, Fan F-21A exhaust damper is
_ HV-206A, Fan F-31A exhaust damper is open by red "OPEN" light lit only.
open.                                                                                                                                                y
_ Fan F-21A, supply fan is running by red
_ Fan F-31A, exhaustfan is running.
                                                                                                                  "ON" light lit only.
_ HV-212A, Fan F-32A exhaust damper is open.                                                                                                _ HV-206A, Fan F-31A exhaust damper is          y
_ Fan F-32A, filter fan is running.                                                                  open by red "OPEN" light lit only.
_ HV-202, minimum fresh air damper is                                                                _ Fan F-31A, exhaustfan is running by red      y closed.                                                                                              "ON" light lit only.
y
_ HV-207, cable vault exhaust damper is                                                              _HV-212A, Fan F-32A exhaust damper is closed.                                                                                              open by red "OPEN" light lit only.
_ Fan F-32A, filter fan is running by red      y
_ HV-208, exhaust air damper is closed.
                                                                                                                  "ON" light lit only.
_ HV-202, minimum fresh air damper is          y closed by green "CLOSE" light lit only.
_ HV-207, cable vault exhaust damper is        y closed by green "CLOSE" light lit only.
_ HV-208, exhaust air damper is closed by      y green "CLOSE" light lit only.
Cue: h.f~,$~iitlJ,d'~Yd~li~,tRlml!rOP ~31S~ fc)(.pla~!rfg ~~cs'Iij";f~~ir*ulation'mod~tharid;hJli!lherOP ~~'5A.
Comments: I Examinee will observe that both HV -207 and HV-208 remain open if handswitches "NORM/RECIRC MODE, HS 8346" and "NORM/RECIRC MODE, HS-8359" are not placed in "RECIRC". Examinee may refer to OP 2315A for placing CRACS in recirculation mode which provides direction for placing "NORM/RECIRC MODE, HS-8346" and "NORM/RECIRC MODE, HS-8359" in "RECIRC" thus allowing HV-207 and HV-208 to go closed Page 7 of 10
 
PERFORMANCE INFORMATION JPM Number: 1 STEP     PERFORMANCE                             STAND=A~R~D~________~~~__~.......... L~~~
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 8 of 10 "IPM Number: JPM-S5.1 Rev. __--::...__ VERIFICATION OF JPM COMPLETION Date Performed:
                                                                          ~t6PTIME!
Student: Evaluator:
Page 8 of 10
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
 
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
"IPM Number:                     JPM-S5.1                           Rev. _ _--::..._ _
15 Actual Time to Complete (minutes):
VERIFICATION OF JPM COMPLETION Date Performed:
JPM Work Practice Evaluation:
Student:
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
Evaluator:
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices.
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Time Critical Task?       Yes -
Page 9 of 10 JPM Number:
No   X Validated Time (minutes):                   15 Actual Time to Complete (minutes):
Rev. ___0,,---__ STUDENT HANDOUT Initial Conditions: You are the RO. Respond to all alarms or direction as normal Initiating Cues: Unit-2 is in a Refueling outage with fuel movement occurring in Containment.
JPM Work Practice Evaluation:                 SAT         UNSAT           NA         (circle one)
Page 10 of 10 JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: JPM Number: Actuation Test of Various ESF  
Overall Result of JPM:                       SAT         UNSAT                     (circle one)
..... ';:<;AM-515} Monthly i;.. ** ."',,{..'
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure                   Pass I Fail usage and adherence requirements.
JPM-S7.1 Revision:
never put anyone's safety at risk.                                               Pass I Fail never put equipment reliability at risk.                                         Pass I Fail never violated radiological work practices.                                     Pass I Fail demonstrated effective use of event-free human performance tools.               Pass I Fail Areas for Improvement/Comments:
0 II. Initiated:
Page 9 of 10
Marc R. Pucel Developer 02/01/11 Date III. Reviewed:
 
JPM Number:                 JPM-S5.1                            Rev. ___0,,---__
STUDENT HANDOUT Initial Conditions:
* You are the RO. Respond to all alarms or direction as normal Initiating Cues:
* Unit-2 is in a Refueling outage with fuel movement occurring in Containment.
Page 10 of 10
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:         Actuation Test of Various ESF Co~ponent&sect;! F~,ci!inl,t;l'.....
                      ';:<;AM-515} ~ Monthly           i;.. ** ." ' , , { ..' \\!.;;'~~Ii/'
JPM Number:                JPM-S7.1                             Revision: - -      0 II. Initiated:
Marc R. Pucel                                       02/01/11 Developer                                              Date III. Reviewed:
IV. Approved:
IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)                               Date 6~N~c,~~~~or                                                        ~IIDate Page 1 of 13
Date Date Page 1 of 13 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13
OF CHANGES:
------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 13
-------------------------------..IPM Number: JPM-S7.1 Rev. ___0'--__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
..IPM Number:                        JPM-S7.1                                                Rev. ___0'--__
MP2 JPM Number: JPM-S7.1 &deg; Task Title: System: Time Critical Task: Yes No x Validated Time (minutes):
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Task No.(s): __________
Facility:      MP2                    Examinee:
_ Applicable To: SRO X RO X PEO KIA No. 013 7 KIA Rating _----'4..:...;.5;..:-14..:......
                                                  ------------------
____ Method of Simulated Performance:
JPM-S7.1                                                     Rev. - - - - -
X Actual Classroom:
JPM Number:
Task Title:
                                                                                                            &deg; System:
Time Critical Task:     Yes
                                --
No     x Validated Time (minutes):
Task No.(s): _ _ _ _ _ _ _ _ _ __
Applicable To:           SRO         X       RO     X             PEO
                                                                                      ---
KIA No.             013 A4.03                KIA Rating _----'4..:...;.5;..:-14..:......___
7 _
Method of Testing:
Simulated Performance:                          Actual Performance:
                              - -X- -                                                      ----
Location:
Classroom:
                ---
Simulator:
Simulator:
X Task At the completion of this JPM, the examinee will have performed the required actions to test actuation of ESAS component AM-515, per surveillance procedure SP 2604T. Required Materials SP 2604T " Actuation Tests of Various ESF Components" (procedures, eqUipment, etc.): SP 2604T-001 "Actuation Tests of Various ESF Facility 1) General  
                                              ------
X                     In-Plant: - - - -
Task Standards:                  At the completion of this JPM, the examinee will have performed the required actions to test actuation of ESAS component AM-515, per surveillance procedure SP 2604T.
Required Materials               SP 2604T " Actuation Tests of Various ESF Components" (procedures, eqUipment, etc.):   SP 2604T-001 "Actuation Tests of Various ESF Components Facility 1)
General  


==References:==
==References:==
* * *
 
                                    * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 13
Page 3 of 13
 
------JPM Number: JPM-S7.1 Rev. o JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                         JPM-S7.1                                           o Rev. - - - - - -
Initiating Cues: You have been assigned to perform SP 2604T, (Section 4.1) Testing Actuation Module, AM515 for monthly surveillance testing. Initial Conditions: Unit-2 is at 100% power, ARO You are the BOP operator A second licensed operator is available to assist you. Simulator
JOB PERFORMANCE MEASURE WORKSHEET (continued)
* IC-30 or IC-20 Reguirements: An instructor to act as the second licensed operator as required. * *
Initiating Cues:
* NOTES TO EVALUATOR '* '* '*
* You have been assigned to perform SP 2604T, (Section 4.1) Testing Actuation Module, AM515 for monthly surveillance testing.
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 13 PERFORMANCE JPM Number: STEP PERFORMANCE STANDARD  
Initial Conditions:
,"""',"""',',""",,i',"',,," ____ 1 . I SP 2604T (4.1) INSTRUCTIONS 4.1 Testing Actuation Module, AM515 Examinee reads and acknowledges note N NOTE about expected alarms for test of AM515. The following alarms may be during the performance of "ESAS COMPONENT UNDER FAILURE" (C-01 _ "SIAS OR UV ACTUATION SIG CH TRIP" (C-01 _ "CONT PRESS HI A" (C-01 "CTMT AIR RECIRC FAN A HI" (C-01 "CTMT AIR RECIRC FAN C HIli (C-01 "SIAS CH 1 Comments:
* Unit-2 is at 100% power, ARO
Page 5 of 13 PERFORMANCE INFORMATION JPM Number: JPM-S7.1 Rev.. 0 , .... ,,*!fii!p{;lIl_i;:lIf+.;.;.t:,<r\
* You are the BOP operator
: j. .
* A second licensed operator is available to assist you.
* i t J: iF '" 1 ( A' M'" , . '  
Simulator
,,! .. !
* IC-30 or IC-20 Reguirements:
S!, ,aCI t i , '. ,c;y: It ,:
* An instructor to act as the second licensed operator as required.
10J11,. "f" '_ttl' '\i,,< I STEP I PERFORMANCE 4.1.1 VERIFY the following:
                                  * *
_ "A" Service Water Pump is operating OR hand switch P5A, "SERVICE WATER PPA," is in "PULL TO LOCK" (C-06) _ "F-14A, CAR FAN A," and "F-14C, CAR FAN C," are operating in fast speed (C-01) No boration or dilution to VCT or charging pumps in progress Cue: Comments: 3
* NOTES TO EVALUATOR '* '* '* *
* I C AUT ION PMW or boric acid flow may commence if the respective controllers are not in manual closed or set to "0" when CH-196, "VCT MAKEUP BYP I--------j Cue: Comments: 4.1.2 VERIFY "FC-21OX PRI MAKEUP WTR FLOW CONTROLLER" and 210Y SA MAKEUP FLOW CONTROLLER," are each in one of the following conditions:
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
manual mode and set fully closed ntegrator set for "0" I., '  
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
***
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What ar~: you looking at?" or "What are you observing?").
I STANDARD CRITICAL <YIN) GRADE (SM Examinee verifies initial equipment alignments are met by verifying: "A" Service Water Pump is operating by amp indication and red operating light OR hand switch P5A, "SERVICE WATER PP A," is in "PULL TO LOCK" (C-06) N "F-14A, CAR FAN A," and "F-14C, CAR FAN C," are operating in fast speed by red light indication (C-01).
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
No boration or dilution to VCT or charging I Examinee reads and acknowledges caution statement.
Page 4 of 13
N Examinee verifies that FC-21 OX and 210Y meet one of the following conditions:
 
In manual mode and set fully closed _Integrator set for "0" Y Page 6 of 13 PERFORMANCE JPM Number: JPM-S7.1 L..S cT..... P..PERFORMANCE
PERFORMANCE INFORMATION JPM Number:
: 5. 4.1.4 Depending on current condition, PERFORM applicable action: _IF SIAS is not "Blocked" (*pzr pressure greater than or equal to 1,850 psia), CHECK all "1/5" lights or bistable "TRIP" lights not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.
STEP                     PERFORMANCE                           STANDARD
                                                                                            ~iSFAtiil~rfiMEt'_ _ __
                                                                                            ,"""',"""',',""",,i',"',,,"
: 1.     I SP 2604T (4.1) INSTRUCTIONS 4.1 Testing Actuation Module, AM515   Examinee reads and acknowledges note                   N NOTE               about expected alarms for test of AM515.
The following alarms may be received during the performance of this section:
                "ESAS COMPONENT UNDER TEST FAILURE" (C-01 B41)
_ "SIAS OR UV ACTUATION SIG CH 1 TRIP" (C-01 A34)
_ "CONT PRESS HI A" (C-01 A21)
                "CTMT AIR RECIRC FAN A VIBRATION HI" (C-01 A4)
                "CTMT AIR RECIRC FAN C VIBRATION HIli (C-01 C4)
                "SIAS CH 1 TROUBLE" Cue:
Comments:
Page 5 of 13
 
PERFORMANCE INFORMATION JPM Number:           JPM-S7.1                                                                                                                                           Rev..                                     0
                    , .~ .... ,,*!fii!p{;lIl_i;:lIf+.;.;.t:,<r\ j. . * "!'!;.ii:.:m.,i,S*C1d~~'i**'~.*~.I"*:ii: i tJ : iF '" "I'~i 1 ( A'M'" ~:.\5I,@~~~'1.IIUIII~~&sect;iII!i!!i!I :,~ ,                                                jh:~'i!!<
                      . ' .jj:'i:~ , , ! .. ! ~h ,~,p~'iVanQUS~;;t=i1iP!>~ro ~,~Iil~n S!, ,aCI t , '.                                   ,c;y: It ,: ,YJmY~I1\"; 10J11,. "$'j;!,ji~li;ii:;';i':::: iii!i:!;i!ii!i!i!,tl!1il;>,~; "f" '_ttl' '\i,,<
CRITICAL                                              GRADE I STEP     I                         PERFORMANCE                                           I                                STANDARD                                                    <YIN)                                        (SM
: 2.          4.1.1 VERIFY the following:                                                     Examinee verifies initial equipment                                                                N
_ "A" Service Water Pump is operating OR                                       alignments are met by verifying:
hand switch P5A,                                                               "A" Service Water Pump is operating by "SERVICE WATER PPA," is in "PULL TO                                             amp indication and red operating light LOCK" (C-06)                                                                   OR hand switch P5A, "SERVICE WATER
_ "F-14A, CAR FAN A," and "F-14C, CAR                                           PP A," is in "PULL TO LOCK" (C-06)
FAN C," are operating in fast speed (C-01)
No boration or dilution to VCT or charging                                   "F-14A, CAR FAN A," and "F-14C, CAR pumps in progress                                                               FAN C," are operating in fast speed by red light indication (C-01).
No boration or dilution to VCT or charging Cue:
Comments:
3*     I                           C AUT ION                                           I Examinee reads and acknowledges                                                                    N PMW or boric acid flow may commence if                                         caution statement.
the respective controllers are not in manual closed or set to "0" when CH-196, "VCT I--------j MAKEUP BYP Cue:
Comments:
: 4.          4.1.2 VERIFY "FC-21OX PRI MAKEUP                                               Examinee verifies that FC-21 OX and FC                                                            Y WTR FLOW CONTROLLER" and "FC                                                  210Y meet one of the following conditions:
210Y SA MAKEUP FLOW CONTROLLER,"                                               In manual mode and set fully closed are each in one of the following conditions:                                   _Integrator set for "0" manual mode and set fully closed ntegrator set for "0" I.,     ' ,L.!~,=.","",.'M"dlh ***h","~.A" Cue:
Comments:
Page 6 of 13
 
PERFORMANCE INFORMATION JPM Number:             JPM-S7.1 L..ScT..E
        ... P                     PERFORMANCE                                    STAND=-::.A-=.R-=.=D'--_ _ _------'
: 5.                                                         Examinee opens CH-196, "VCT MAKEUP                    y BYPASS,"
                                                                ~
Cue:
Comments:
: 6.          4.1.4 Depending on current condition,         Examinee determines that SIAS is not                  y PERFORM applicable action:                     "Blocked" (*pzr pressure greater than or equal to 1,850 psia), and checks a""1/5"
_IF SIAS is not "Blocked" (*pzr pressure       lights or bistable "TRIP" lights not lit for greater than or equal to 1,850 psia),         SIAS, CIAS, EBFAS, CSAS, or SG on CHECK all "1/5" lights or bistable "TRIP"     Facility 1 and Facility 2 ESAS actuation lights not lit for SIAS, CIAS, EBFAS, CSAS,   and sensor cabinets.
or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.
_IF SIAS is "Blocked" (pressurizer pressure less than 1,850 psia) CHECK all lower "1/5" lights (from containment pressure input) not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.
_IF SIAS is "Blocked" (pressurizer pressure less than 1,850 psia) CHECK all lower "1/5" lights (from containment pressure input) not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.
_ MSI is "Blocked" (SG pressure less than 700 psia) all lower "1/5" lights (from containment pressure input) not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor . cabinets.
_   MSI is "Blocked" (SG pressure less than 700 psia) all lower "1/5" lights (from containment pressure input) not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor 1------\
1------\
                . cabinets.
STAND=-::.A-=.R-=.=D'--
Cue:
___Examinee opens CH-196, "VCT MAKEUP BYPASS," y Examinee determines that SIAS is not "Blocked" (*pzr pressure greater than or equal to 1,850 psia), and checks a""1/5" lights or bistable "TRIP" lights not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.
Comments:
y Page 7 of 13 PERFORMANCE JPM Number: PERFORMANCE
Page 7 of 13
: 7. 4.1.5 PLACE "S-501, TEST PERMISSIVE SWITCH," in 'TEST SIAS" (ESAS actuation . cabinet
 
: 8.
PERFORMANCE INFORMATION JPM Number:
: 9.
STEP                      PERFORMANCE                                   STANDARD
1 O. 1. When the next step is performed, many "1/5" lights illuminate on the actuation modules. 2. Due to the distance between bistable, BA101, and actuation module, AM 515, two uired to initiate the test. Cue: Comments:
: 7.       4.1.5 PLACE "S-501, TEST PERMISSIVE         IExaminee places "S-501, TEST SWITCH," in 'TEST SIAS" (ESAS actuation       PERMISSIVE SWITCH," in "TEST SIAS" 1----
STANDARD Examinee places "S-501, TEST PERMISSIVE SWITCH," in "TEST SIAS" N Examinee reads and acknowledges note about 1/5 lights and requirement for additional person requirement for test initiation.
            . cabinet Cue:
Page 8 of 13 PERFORMANCE JPM Number: *CRITICAL I GRADE STEP PERFORMANCE I STANDARD l (YIN) (S/U) 1 1 4.1.8 PRESS and HOLD "TRIP TEST" Examinee either performs or directs button on bistable, BA 101. (ESAS Sensor pressing and holding of "TRIP Cabinet 'A') button on bistable, BA101 at ESAS Cabinet Comments:
Comments:
: 12. Cue: Comments: 4.1.10 To initiate start signal, PRESS lower Examinee either performs or directs the "1/5" "TEST" button on actuation module, pressing of lower "1/5" "TEST" button AM515 (ESAS actuation cabinet 5). actuation module, AM515 on actuation cabinet 5. Cue: Comments: 1 4 I 4.1.11 RELEASE "TRIP TEST" button on Examinee either performs or directs the bistable BA 101. releasing of "TRIP TEST" button bistable Cue: Comments:
8.
Page 9 of 13 PERFORMANCE JPM Number: STEP STANDARD 15. I 4.1.12 OBSERVE the following and INITIAL Examinee observes and initials for proper Y for the "Results" on SP 2604T-001:
Cue:
actuation of equipment on SP
Comments:
_ Actuation module, AM515, red "TRIP" by light is lit (ESAS actuation cabinet _ "F-14A, CAR FAN A," shifted to F-14A slow speed red light lit. speed (C-01) F-14C slow speed red light lit. "F-14C, CAR FAN C," shifted to slow CH-196 green light lit. speed _ "CH-196 , VCT MAKEUP L, n ,d ,
9.
: 16. I 4.1.13 PLACE the following switches to I Examinee places "F-14A, CAR FAN A" Y "START LOW/PULL TO LOCK" and "F-14C, CAR FAN Cit switches to "F-14A CAR FAN An I"START LOW/PULL TO LOCK. -I 14.1.14 PRESS "ACTUATION RESET SIAS" I Examinee presses "ACTUATION RESET Y button (ESAS Actuation Cabinet 5). SIAS" button at ESAS Actuation Cabinet Comments:
Cue:
: 18. I 4.1.15 PRESS red "TRIP" light on bistable, Examinee presses red "TRIP" light on Y BA 101. (ESAS Sensor Cabinet'A') bistable, BA 101. (ESAS Sensor Cabinet 'Af). Comments:
Comments:
may note that red "TRIP" Page 10 of 13 PERFORMANCE JPM Number: CRITICAL GRADE I STEP I PERFORMANCE I STANDARD (YIN) (StU) 19. 4.1 .16 PLACE "5-102, TRIP TEST" switch in "OPERATE." (ESAS Sensor Cabinet 'A') Examinee places "5-102, TRIP TEST" switch in "OPERATE." On ESAS Sensor Cabinet 'A'. Cue: Comments:
1 O.                           NOTE                                                            N
: 20. 4.1.17 PLACE "5-501, TEST PERMISSIVE SWITCH" in "OPERATE." (ESAS actuation cabinet 5) Examinee places "S-501, TEST PERMISSIVE SWITCH" in "OPERATE." on ESAS actuation cabinet 5. 1-------1 Cue: Comments:
: 1. When the next step is performed, many     Examinee reads and acknowledges note "1/5" lights illuminate on the actuation     about 1/5 lights and requirement for modules.                                     additional person requirement for test
21 . 4.1.18 PRESS red "AT I FAULT PRESS TO Examinee presses red "ATI FAULT RESET" light. (ESAS actuation cabinet 5) PRESS TO RESET" light on ESAS actuation cabinet 5. Cue: Comments:
: 2. Due to the distance between bistable,     initiation.
BA101, and actuation module, AM 515, two uired to initiate the test.
Cue:
Comments:
Page 8 of 13
 
PERFORMANCE INFORMATION JPM Number:
STEP                   PERFORMANCE                   I               STANDARD
                                                                                                    *l CRITICAL (YIN)
I GRADE (S/U)
: 11.      4.1.8 PRESS and HOLD "TRIP TEST"               Examinee either performs or directs             y button on bistable, BA 101. (ESAS Sensor       pressing and holding of "TRIP TEST" Cabinet 'A')                                   button on bistable, BA101 at ESAS Sensor Cabinet 'A'.
Cue:
Comments:
12.
Cue:
Comments:
: 13.      4.1.10 To initiate start signal, PRESS lower   Examinee either performs or directs the         Y "1/5" "TEST" button on actuation module,       pressing of lower "1/5" "TEST" button on AM515 (ESAS actuation cabinet 5).             actuation module, AM515 on ESAS actuation cabinet 5.
Cue:
Comments:
: 14. I 4.1.11 RELEASE "TRIP TEST" button on         Examinee either performs or directs the         Y bistable BA 101.                               releasing of "TRIP TEST" button on bistable BA101.
Cue:
Comments:
Page 9 of 13
 
PERFORMANCE INFORMATION JPM Number:
STEP                       PERFORMANCE                                STANDARD
: 15. I 4.1.12 OBSERVE the following and INITIAL Examinee observes and initials for proper Y for the "Results" on SP 2604T-001:         actuation of equipment on SP 2604T-001
_ Actuation module, AM515, red "TRIP"       by observing:
light is lit (ESAS actuation cabinet 5)
_ "F-14A, CAR FAN A," shifted to slow      F-14A slow speed red light lit.
speed (C-01)
F-14C slow speed red light lit.
                  "F-14C, CAR FAN C," shifted to slow speed (C-01)                                CH-196 green light lit.
_ "CH-196, VCT MAKEUP BYPASS,"
L, closed n   ,d ,
Cue:
Comments:
: 16. I 4.1.13 PLACE the following switches to     IExaminee places "F-14A, CAR FAN A"     Y "START LOW/PULL TO LOCK" (C-01):            and "F-14C, CAR FAN Cit switches to
            -
                  "F-14A CAR FAN An I
I "START LOW/PULL TO LOCK.
CARFANC" Cue:
Comments:
: 17. 14.1.14 PRESS "ACTUATION RESET SIAS"         IExaminee presses "ACTUATION RESET       Y button (ESAS Actuation Cabinet 5).         SIAS" button at ESAS Actuation Cabinet Comments:
: 18. I 4.1.15 PRESS red "TRIP" light on bistable,   Examinee presses red "TRIP" light on   Y BA 101. (ESAS Sensor Cabinet'A')             bistable, BA 101. (ESAS Sensor Cabinet
                                                          'Af).
Cue:
Comments: r"'E;~~inee may note that red "TRIP" Ii Page 10 of 13
 
PERFORMANCE INFORMATION JPM Number:
I STEP   I             PERFORMANCE                 I               STANDARD CRITICAL (YIN)
GRADE (StU)
: 19.       4.1 .16 PLACE "5-102, TRIP TEST" switch   Examinee places "5-102, TRIP TEST"          y in "OPERATE." (ESAS Sensor Cabinet 'A')   switch in "OPERATE." On ESAS Sensor Cabinet 'A'.
Cue:
Comments:
: 20.     4.1.17 PLACE "5-501, TEST PERMISSIVE       Examinee places "S-501, TEST                y SWITCH" in "OPERATE." (ESAS actuation     PERMISSIVE SWITCH" in "OPERATE."
cabinet 5)                                on ESAS actuation cabinet 5.
1-------1 Cue:
Comments:
21 . 4.1.18 PRESS red "AT I FAULT PRESS TO       Examinee presses red "ATI FAULT             y RESET" light. (ESAS actuation cabinet 5)   PRESS TO RESET" light on ESAS actuation cabinet 5.
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
y y y Page 11 of 13   
                                                                                            '~&sect;'1Qft,~tMe~~i~;l. ' - - - -
..IPM Number: 1 Rev. ___0___ VERIFICATION OF JPM COMPLETION Date Performed:
Page 11 of 13
Student: Evaluator:
 
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
  ..IPM Number:                             1                       Rev. ___0_ __
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
VERIFICATION OF JPM COMPLETION Date Performed:
15 Actual Time to Complete (minutes):
Student:
JPM Work Practice Evaluation:
Evaluator:
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) During the TPE, the trainee .. Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices.
Time Critical Task?       Yes             No   X
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
                                -
Page 12 of 13 JPM Number:
Validated Time (minutes):                     15 Actual Time to Complete (minutes):
Rev. ___0:.....-__ STUDENT HANDOUT Initial Conditions: You have been assigned to perform SP 2604T, (Section 4.1) Testing Actuation Module, AM515 for monthly surveillance testing. Initiating Cues: Unit-2 is at 100% power, ARO
JPM Work Practice Evaluation:                 SAT           UNSAT         NA       (circle one)
Overall Result of JPM:                         SAT           UNSAT                   (circle one)
During the TPE, the trainee                             ..                     Evaluation performed the task correctly and in accordance with procedure                 Pass I Fail usage and adherence requirements.
never put anyone's safety at risk.                                             Pass I Fail never put equipment reliability at risk.                                       Pass I Fail never violated radiological work practices.                                   Pass I Fail demonstrated effective use of event-free human performance tools.             Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
 
JPM Number:                 JPM-S7.1                          Rev. ___0:.....-__
STUDENT HANDOUT Initial Conditions:
* You have been assigned to perform SP 2604T, (Section 4.1) Testing Actuation Module, AM515 for monthly surveillance testing.
Initiating Cues:
* Unit-2 is at 100% power, ARO
* You are the BOP operator
* You are the BOP operator
* A second licensed operator is available to assist you. Page 13 of 13 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: ManLJalBlendedMakeLJp to.
* A second licensed operator is available to assist you.
CO(llrol*Tabf(<afllted)
Page 13 of 13
JPM Number: JPM-S2.1 Revision:
 
0Initiated:
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:     ManLJalBlendedMakeLJp to. volum~ CO(llrol*Tabf(<afllted)
R. Pucel 02/01/11 Developer Date Reviewed:
JPM Number:             JPM-S2.1                     Revision:     0
I Da(e Approved:
                                                                    ----=--
Cognizant Plant Supervisor Date Nuclear Training Supervisor Page 1 of 15 JOB PERFORMANCE MEASURE  
II. Initiated:
R. Pucel                             02/01/11 Developer                                 Date III. Reviewed:
                                                                ~)Js/J/
I Da(e IV. Approved:
Cognizant Plant Supervisor (optional)                  Date Nuclear Training Supervisor Page 1 of 15
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 15
OF CHANGES:
-------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 15
-------JPM Rev. ___0=--__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                                                                      Rev. ___0=--__
MP2 Examinee:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number: Rev. __--'0'--__ Task Title: System: _C-'--'-V-'-C-=.S
Facility:         MP2                       Examinee:
__________________________
                                                          -------------------
_ Time Critical Task: Yes No X Validated Time (minutes):
JPM Number:                                 JPM-S2.                                    Rev. _ _--'0'--__
20 Task No.(s): Applicable To: SRO X RO X PEO KIA No. 004 A4.07 KIA Rating 3.9/3.7 Method of Testing: Simulated Performance:
Task Title:
X Actual Performance: Location:
System:       _C-'--'-V-'-C-=.S_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Simulator:
Time Critical Task:             Yes           No       X Validated Time (minutes):                         20 Task No.(s):
X In-Plant: Task At the completion of this JPM, the examinee will initiate a blended makeup to the VCT, determine that the PMW Flow Control Valve failed open, and terminate the blended makeup to prevent a Boron Dilution event. Required Materials
Applicable To:                     SRO       X         RO     X       PEO KIA No.                       004 A4.07               KIA Rating       3.9/3.7 Method of Testing:
* Section 4.9, OP 2304C, Manual Blended Make Up to VCT (procedures, equipment.
Simulated Performance:                     X             Actual Performance:
etc.):
                                    ----'---                                    ---
Location:
Classroom:                              Simulator:       X           In-Plant:
                  ---                                  -'-'--                    ----
Task Standards:                          At the completion of this JPM, the examinee will initiate a blended makeup to the VCT, determine that the PMW Flow Control Valve failed open, and terminate the blended makeup to prevent a Boron Dilution event.
Required Materials
* Section 4.9, OP 2304C, Manual Blended Make Up to VCT (procedures, equipment. etc.):
* Section 4.21, OP 2304C, Maintaining VCT Level and Pressure During Normal Operation
* Section 4.21, OP 2304C, Maintaining VCT Level and Pressure During Normal Operation
* ARP 2590C-060" PMW FLOW HI/LO" General  
* ARP 2590C-060" PMW FLOW HI/LO" General  


==References:==
==References:==
OP 2304C" Make Up (Boration and Dilution) Portion of eves"
                                          * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simUlate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normall available in the Control Room, includin 10 s. Make all written re orts, oral Page 3 of 15


OP 2304C" Make Up (Boration and Dilution)
JPM Number:                         JPM-S2.1                               Rev. _ _--'-_ __
Portion of eves" * * *
JOB PERFORMANCE MEASURE WORKSHEET (continued)
* READ TO THE EXAMINEE * * *
Initiating Cues:
* I will explain the initial conditions, which step(s) to simUlate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* You have been directed to perform a blended makeup to the VCT to raise level 2%
You may use any approved reference materials normall available in the Control Room, includin 10 s. Make all written re orts, oral Page 3 of 15 JPM Number: JPM-S2.1 Rev. __--'-___ JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initial Conditions:
Initiating Cues: You have been directed to perform a blended makeup to the VCT to raise level 2% Initial Conditions: The current blend ratio is 9:1 (corrected for Boron-10 depletion) calculated using "An BAST The piping to the VCT is currently at blend concentration (no requirement for adjusting for water in the piping). Simulator
* The current blend ratio is 9:1 (corrected for Boron-10 depletion) calculated using "An BAST
* IC-30 Requirements: VCT level 78% * *
* The piping to the VCT is currently at blend concentration (no requirement for adjusting for water in the piping).
* NOTES TO EVALUATOR * * *
Simulator
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 15 I PERFORMANCE JPM Number: STEP PERFORMANCE 1 . 4.9 Manual Blended Make Up to VCT 4.9.1 Refer To Section 4.21, "Maintaining VCT Level and Pressure During Normal Operation," and PERFORM applicable actions.
* IC-30 Requirements:
: 2. CAUTION 1. Manual make up must be monitored closely as there is no automatic shutoff on a high level in the VCT. 2. When calculating the amount of boric acid required for neutral blend, the amount and effects of PMW in the pipe must be considered.
* VCT level 78%
                                  * *
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 15
 
PERFORMANCE INFORMATION JPM Number:
I I  STEP                     PERFORMANCE                 J                STANDARD CRITICAL (YIN)
GRADE (S/U) i~TART"Tjli~t; _ _ __
: 1.     4.9 Manual Blended Make Up to VCT           Examinee refers to 4.21, "Maintaining VCT          N 4.9.1 Refer To Section 4.21, "Maintaining   Level and Pressure During Normal VCT Level and Pressure During Normal         Operation," and determines that during Operation," and PERFORM applicable           this manual blend that no VCT high level actions.                                                    rameters will be exceeded.
Cue:
Comments:
: 2.                       CAUTION                   Examinee reads and acknowledges                    N
: 1. Manual make up must be monitored         caution statement.
closely as there is no automatic shutoff on   Examinee notes that the initial conditions a high level in the VCT.                     explain that the amount and effects of
: 2. When calculating the amount of boric     PMW in the pipe have been considered, acid required for neutral blend, the amount as well as the effects of Boron-10 and effects of PMW in the pipe must be       depletion.
considered.
: 3. When calculating the ratio of boric acid to PMW, the effects of Boron-10 depletion
: 3. When calculating the ratio of boric acid to PMW, the effects of Boron-10 depletion
___-Il=,.!l1ust be considered.
_ _ _-Il=,.!l1ust be considered.
CRITICAL I GRADE J STANDARD (YIN) (S/U)
Cue:
____ Examinee refers to 4.21, "Maintaining VCT Level and Pressure During Operation," and determines that this manual blend that no VCT high rameters will be exceeded.
Comments:
Examinee reads and acknowledges caution Examinee notes that the initial explain that the amount and effects PMW in the pipe have been as well as the effects of Page 5 of 15 PERFORMANCE JPM Number: PERFORMANCE 4.9.2 VERIFY the following (C-02): _ PMW is available (indicating lights for PMW transfer pumps). _ WHEN blend will be injected into the RCS, at least one charging pump running. 4.9.3 Refer To OP 2208, "Reactivity Calculations" or PPC and DETERMINE required ratio of boric acid flow to PMW Boron-10 donloti
Page 5 of 15
: 5. I 4.9.4 VERIFY the following are closed: CH-512, "MAKEUP VLV STOP," (C-04) _ CH-196, "VCT MAKEUP BYPASS," (C02) _ CH-192, "RWST ISOL," (C-02)
 
: 6.
PERFORMANCE INFORMATION JPM Number:
STANDARD Examinee notes that red "ON" indicating is lit for runnina PMW pump. N Examinee notes red "ON" lit for running Charging pump and -44 gpm indicated for charging header flow "F-212". Examinee notes that initial conditions have provided a blend ratio, corrected for Boron-10 depletion.
STEP                    PERFORMANCE                                      STANDARD
N Examinee verifies the following valves closed by their green "CLOSE" lights lit only: CH-512, "MAKEUP VLV STOP," (C-04) CH-196, "VCT MAKEUP BYPASS,"(C02)
: 3.        4.9.2 VERIFY the following (C-02):        Examinee notes that red "ON" indicating    N
CH-192, "RWST ISOL," N Page 6 of 15 PERFORMANCE JPM Number: o STEP PERFORMANCE STANDARD 7. 4.9.6 DETERMINE total gallons required to Examinee determines that an addition of N make desired level change as follows: 68 gallons are required to raise VCT level Desired level change in % x 34 gallons = 2% l
_ PMW is available (indicating lights for        is lit for runnina PMW pump.
...
PMW transfer pumps).
... ........v ... I Cue: Comments:
Examinee notes red "ON" lit for running
Page 7 of 15 PERFORMANCE JPM Number: STEP 8. Cue: Comments:
_ WHEN blend will be injected into the     Charging pump and -44 gpm indicated for RCS, at least one charging pump running. charging header flow "F-212".
PERFORMANCE 4.9.7 RESET "PRI MAKEUP WTR FLOW CONTROLLER FC-21 OX" and "BORIC ACID FLOW CONTROLLER FC-210Y" to 0 total gallons by performing the following 04): a. CHECK "RlL" light indicates b. IF a manual leak rate determination is progress AND flow controller totalizers being used to track RCS PERFORM the
Cue:
: 1) PRESS "SEL" button until TOTAL" or "BA TOTAL" is
Comments:
: 2) OBSERVE total gallons 3) Refer To SP 2602A-001, "Manual Leak Rate Determination," and total gallons c. PRESS "SEL" button and HOLD display indicates "TOTAL d. PRESS "RIL" button to transfer to mode to reset
: 4.        4.9.3 Refer To OP 2208, "Reactivity       Examinee notes that initial conditions have N Calculations" or PPC and DETERMINE         provided a blend ratio, corrected for required ratio of boric acid flow to PMW   Boron-10 depletion.
: e. PRESS "RlL" button to transfer to f. PRESS "SEL" button and HOLD controller number (FC-21OX or total gallons is STANDARD Examinee resets "PRI MAKEUP WTR FLOW CONTROLLER FC-21 OX" to 0 total gallons by performing the following:
Boron-10 donloti r-------~~~~~~~
: a. CHECK "RlL" light indicates "L" N (FC-21OX ) b. determines that a manual leak rate N determination is not in progress AND flow controller totalizers are not being used to track RCS makeup, and that this step is not applicable.
Cue:
: c. PRESS "SEL" button and HOLD until Y display indicates "TOTAL RST." 210X) d. PRESS "RlL" button to transfer to "Rn Y mode to reset totalizer (FC-21 OX). e. PRESS "RlL" button to transfer to "L" mode (FC-21 OX). f. PRESS "SEL" button and HOLD until y y controller number (FC-21 OX) total gallons is displayed.
Comments:
Page 8 of 15
: 5.     I 4.9.4 VERIFY the following are closed:     Examinee verifies the following valves      N closed by their green "CLOSE" lights lit CH-512, "MAKEUP VLV STOP," (C-04)       only:
--PERFORMANCE JPM Number: STEP STANDARD 4.9.7 Examinee resets "BORIC ACID CONTROLLER FC-210Y" to 0 gallons by performing the N a. CHECK "RlL" light indicates "L" 210Y) N b. determines that a manual leak rate determination is not in progress AND flow controller totalizers are not being used to track RCS makeup, and that this step is not applicable.
_ CH-196, "VCT MAKEUP BYPASS," (C02)       CH-512, "MAKEUP VLV STOP," (C-04)
: c. PRESS "SEL" button and HOLD until y display indicates  
_ CH-192, "RWST ISOL," (C-02)             CH-196, "VCT MAKEUP BYPASS,"(C02)
'TOTAL RST." 210Y) d. PRESS "RILl! button to transfer to URn y mode to reset totalizer (FC-21 OY). e. PRESS "RILl! button to transfer to "L" y mode (FC-210Y).
CH-192, "RWST ISOL,"
: f. PRESS "SEL" button and HOLD until y controller number (FC-210Y) total gallons is displayed. -cI Cue: Comments:
Cue:
: 9. Cue: Comments:
Comments:
Page 9 of 15 PERFORMANCE JPM Number: STEP STANDARD NOTE Examinee reads and acknowledges note N Boric acid flow rates of greater than 30 gpm for Boric Acid flow limitations.
6.
but are not to be exceeded . . h "',,:z " '. ,ACiD '" ,,,".LA}, :, ZC" "d"*'m," ,_ ,C<<, t Cue: Comments: 1 1 I 4.9.9 ADJUST automatic setpoint of "PRI MAKEUP WTR FLOW CONTROLLER 210X" and "BORIC ACID FLOW CONTROLLER FC-210Y" as follows (C04): a. VERIFY "AM" is lit. b. PRESS "SEL" button until cursor appears above setpoint (left hand bar graph). c. Using "up" and "down" buttons, ADJUST setpoint to desired flow rate. kYL ,-'-'", k', "<C/'U",",","",/;",, ;*,,*:,,:,,>>&sect;dL  
Cue:
,,_ _",*,*_*,,,,h,,,,,,,t Cue: Comments:
Comments:
11 . 4.9.9 (cont) ,.,,,,,'... ,_ -;,'.-0-,-."<.-, . _,,"',",.,":.
Page 6 of 15
Cue: Examinee adjusts automatic setpoint of "PRI MAKEUP WTR FLOW CONTROLLER FC-21 OX" as follows (C04): N a. VERIFY "AM" is lit. b. PRESS "SEL" button until cursor Y appears above setpoint (left hand bar graph). c. Using "up" and "down" y ADJUST setpoint to desired flow rate , maintain proper blend -"<"'"''
 
-,'-".h"0"',,","'" ,L,'-; Examinee adjusts automatic setpoint of "BORIC ACID FLOW CONTROLLER 210Y"as follows (C04): N a. VERIFY "AM" is lit. y b. PRESS "SEL" button until appears above setpoint (left hand c. Using "up" and "down" buttons, y ADJUST setpoint to desired flow rate to I maintain proper blend ratio. /-",.i "" Page 10 of 15  
PERFORMANCE INFORMATION JPM Number:                                                                                                      o STEP                          PERFORMANCE                                      STANDARD
-----------
: 7.        4.9.6 DETERMINE total gallons required to       Examinee determines that an addition of         N make desired level change as follows:           68 gallons are required to raise VCT level Desired level change in % x 34 gallons =         2%
PERFORMANCE JPM Number: CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) {SM I 4.9.10 PLACE "MAKEUP MODE SEL" in I Examinee places "MAKEUP MODE SEL" I "MANUAL" (C-04). in I,d,,,,",,, ,."" c',
l Tot~! ...~~II,~ns. f~!"Q'J~(~\:~~e .~o/~.lev~l.          ... ........v                     ... I Cue:
1 3. 14.9.11 START one boric acid pump (C-02). I Examinee starts "An boric acid pump by Y _ P-19A, "BA PP A" placing its handswitch to P-19B, "BA PP 1",,,:[;, 14.9.12 VERIFY the following:
Comments:
Examinee verifies "An boric acid pump _ Boric acid pump starts (C-02) starts by observing its red running light _ Boric acid pump develops Examinee verifies "An boric acid pressure of at least 98 psig, indicated develops pressure of at least 98 A DIS PRES, PI-206" or "PP B DIS indicated "PP A DIS PRES, I"" <<,i,,,S 1 NOTE I Examinee reads and acknowledges note. I When CH-512, "MAKEUP VLV STOP," opened, the "M" part of the "AM" light extinguish, indicating the controller activated.
Page 7 of 15
I,Ll", , . .wh'''', Cue n Comments:
 
Page 11 of 15 PERFORMANCE JPM Number: JPM-S2.1 STEP STANDARD 16. 4.9.13 OPEN CH-512 Y Cue: Comments:
PERFORMANCE INFORMATION JPM Number:
I Examinee may announce expected "PMW FLOW HIILO" (C-04, BB-8) and "BA MAKEUP FLOW HI/LO" 8) flow alarms prior to, (or after receiving alarm) upon initiating blend flow. It is expected that the ARP's for these alarms will be referenced.
STEP                   PERFORMANCE                                      STANDARD
: 17. I 4.9.14 VERIFY flows have stabilized at I Examinee verifies flows have stabilized at N setpoint of flow controllers setpoint of flow controllers FC-210X and FC-210Y by observing output of controller andlor FR-210 for flow values .'.
: 8.     4.9.7 RESET "PRI MAKEUP WTR FLOW               Examinee resets "PRI MAKEUP WTR CONTROLLER FC-21 OX" and "BORIC               FLOW CONTROLLER FC-21 OX" to 0 total ACID FLOW CONTROLLER FC-210Y" to 0            gallons by performing the following:
1 8. 4.9.15 MONITOR VCT level and pressure Examinee monitors VCT level and as indicated on the following: (C-02 or pressure, by observing a PPC PPC). computer trend recorder
total gallons by performing the following (C 04):                                           a. CHECK "RlL" light indicates "L"          N
_ "VCT PRES, PI-225" and/or "VCT PRES, PI-225" and "VCT L VL. LVL, LI-226"(C-02/03)
: a. CHECK "RlL" light indicates "L."            (FC-21OX )
Cue: Comments: 1 9 . I ARP Examinee refers to ARP for PMW FLOW Y AUTOMATIC HIILO" (C-04, 88-8) and takes corrective actions.1-------1-1
: b. IF a manual leak rate determination is in  b. determines that a manual leak rate      N progress AND flow controller totalizers are    determination is not in progress AND flow being used to track RCS makeup,                controller totalizers are not being used to PERFORM the following:                        track RCS makeup, and that this step is
: 1. None Cue: Comments:
: 1) PRESS "SEL" button until "PMW              not applicable.
Page 12 of 15 PERFORMANCE JPM Number: STEP STANDARD 2. CHECK flow rate on "PRI MAKEUP WTR Examinee determines that indicated flow is I FLOW, FC-21 OX," within 10 gpm of greater than 10 gpm from nt Cue: Comments: I 3. IF desired to terminate PMW flow, I Examinee determines that it is desired PERFORM the following:
TOTAL" or "BA TOTAL" is displayed.            c. PRESS "SEL" button and HOLD until        Y
terminate flow 3.1 PLACE "PRI MAKEUP WTR FLOW, 3.1 Places "PRI MAKEUP WTR FLOW, Y*FC-21 OX," to "MANUAL." FC-21 OX," to "MANUAL." 3.2 ADJUST "PRI MAKEUP WTR FLOW, 3.2 Adjusts "PRI MAKEUP WTR FLOW, FC-21 OX," to zero output. y*FC-21 OX," to zero output. 3.3 VERIFY 2-CH-196, "VCT MAKEUP 3.3 Verifies 2-CH-196, "VCT BYPASS," BYPASS," closed by ensuring green N 3.4 VERIFY 2-CH-512, "MAKEUP VLV "close" light only STOP," 3.4 Verifies 2-CH-512, "MAKEUP VLV Y*STOP," closed by placing valve handswitch in close and ensuring green "close" light only lit.
: 2) OBSERVE total gallons added.                display indicates "TOTAL RST." (FC
* A combination of steps 3.1 and 3.2 or step 3.4 alone will have the desired effect of securing the blended makeup to VCT. The JPM is complete when the blended makeup is secured. TERMINATION CUE: The evaluation for this JPM is concluded.  
: 3) Refer To SP 2602A-001, "Manual RCS          210X)
.."4",,,,',
Leak Rate Determination," and RECORD          d. PRESS "RlL" button to transfer to "Rn    Y total gallons added.                          mode to reset totalizer (FC-21 OX).
____ Page 13 of 15
: c. PRESS "SEL" button and HOLD until          e. PRESS "RlL" button to transfer to "L" y
-----JPM Number: JPM-S2.1 Rev. VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
display indicates "TOTAL RST."                mode (FC-21 OX).
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
: d. PRESS "RIL" button to transfer to "R"       f. PRESS "SEL" button and HOLD until y
20 Actual Time to Complete (minutes):
mode to reset totalizer.                      controller number (FC-21 OX) total gallons
JPM Work Practice Evaluation:
: e. PRESS "RlL" button to transfer to "L"      is displayed.
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) Areas for Improvement/Comments:
mode.
Page 14 of 15 JPM Number:
: f. PRESS "SEL" button and HOLD until controller number (FC-21OX or FC-210Y) total gallons is displayed.
Rev. ___0___ Initial Conditions:
Cue:
Initiating Cues: STUDENT You have been directed to perform a blended makeup to the VCT to raise level 2% The current blend ratio is 9:1 (corrected for Boron-10 depletion) calculated using "A" BAST The piping to the VCT is currently at blend concentration (no requirement for adjusting for water in the piping). Page 15 of 15 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: JPM Number: JPM-S6.1 Revision:
Comments:
Page 8 of 15
 
PERFORMANCE INFORMATION JPM Number:
STEP             PERFORMANCE                          STANDARD
: 8.        4.9.7                   Examinee resets "BORIC ACID FLOW (cont)                              CONTROLLER FC-210Y" to 0 total gallons by performing the following:
N
: a. CHECK "RlL" light indicates "L" (FC 210Y)
: b. determines that a manual leak rate       N determination is not in progress AND flow controller totalizers are not being used to track RCS makeup, and that this step is not applicable.
: c. PRESS "SEL" button and HOLD until y
display indicates 'TOTAL RST." (FC 210Y)
: d. PRESS "RILl! button to transfer to URn   y mode to reset totalizer (FC-21 OY).
: e. PRESS "RILl! button to transfer to "L"   y mode (FC-210Y).
: f. PRESS "SEL" button and HOLD until controller number (FC-210Y) total gallons   y is displayed.
Cue:
I                        I    ~1;;>, -c Comments:
--
9.
Cue:
Comments:
Page 9 of 15
 
PERFORMANCE INFORMATION JPM Number:
STEP                                                       PERFORMANCE                                                                                                                    STANDARD
: 10.                                                                                NOTE                                                                         Examinee reads and acknowledges note           N Boric acid flow rates of greater than 30 gpm                                                                                                         for Boric Acid flow limitations.
                .h "',,:z "":",',,:,,",,.?~,  "    '. ,ACiD ' "
but are not to be exceeded .
                                                                                            ,,,".LA}, : ":",,~.&#xa3;:,.;.,.,, , ZC" "d"*'m,"       ,_   ,C<<,   t Cue:
Comments:
: 11. I 4.9.9 ADJUST automatic setpoint of "PRI                                                                                                               Examinee adjusts automatic setpoint of MAKEUP WTR FLOW CONTROLLER FC                                                                                                                        "PRI MAKEUP WTR FLOW 210X" and "BORIC ACID FLOW                                                                                                                             CONTROLLER FC-21 OX" as follows CONTROLLER FC-210Y" as follows (C04):                                                                                                                  (C04):
: a. VERIFY "AM" is lit.                                                                                                                               a. VERIFY "AM" is lit.                          N
: b. PRESS "SEL" button until cursor                                                                                                                     b. PRESS "SEL" button until cursor              Y appears above setpoint (left hand bar                                                                                                                appears above setpoint (left hand bar graph).                                                                                                                                               graph).
: c. Using "up" and "down" buttons, ADJUST                                                                                                             c. Using "up" and "down" buttons,                y setpoint to desired flow rate.                                                                                                                       ADJUST setpoint to desired flow rate to
                                                                                                                                                                , maintain proper blend ratio.
kYL               ,-'-'",       k', "<C/'U",",","",/;",, ;*,,*:,,:,,>>&sect;dL ,,_                                                 _",*,*_*,,,,h,,,,,,,t -"<"'"''  """",:;;.."-~,, -,'-".h"0"',,","'" ,L,'- ;
Cue:
Comments:
11 .     4.9.9                                                                                                                                                  Examinee adjusts automatic setpoint of (cont)                                                                                                                                                            "BORIC ACID FLOW CONTROLLER FC 210Y"as follows (C04):
N
: a. VERIFY "AM" is lit.
y
: b. PRESS "SEL" button until cursor appears above setpoint (left hand bar graph).
: c. Using "up" and "down" buttons,                y ADJUST setpoint to desired flow rate to maintain proper blend ratio.
                                      ,.,,,,,' ...                                    ,_ -;,'.-0-,-."<.-, . _,,"',",.,":.
I
                                                                                                                                                                        /-",.i    ""
Cue:
Page 10 of 15
 
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP                                                          PERFORMANCE                                STANDARD                          (YIN)  {SM
: 12.        I 4.9.10 PLACE "MAKEUP MODE SEL" in                                        IExaminee places "MAKEUP MODE SEL"               I    Y "MANUAL" (C-04).                                                        in "MANUAL" I,d,,,,",,, ,.""           '      c', ""''''~''M""L.j;;;''",;
Cue:
Comments:
1 3.      14.9.11 START one boric acid pump (C-02).                                  I Examinee starts "An boric acid pump by              Y
_ P-19A, "BA PP A"                                                       placing its handswitch to "START' P-19B, "BA PP B" 1",,,:[;,
Cue:
Comments:
: 14.       14.9.12 VERIFY the following:                                                Examinee verifies "An boric acid pump               N
_ Boric acid pump starts (C-02)                                         starts by observing its red running light lit.
_ Boric acid pump develops discharge                                    Examinee verifies "An boric acid pump pressure of at least 98 psig, indicated "PP                             develops pressure of at least 98 psig.
A DIS PRES, PI-206" or "PP B DIS PRES,                                   indicated "PP A DIS PRES, PI-206".
I""
PI-208"      <<,i,,,S Cue:
Comments:
: 15.        1                                                              NOTE        I Examinee reads and acknowledges note.          I    N When CH-512, "MAKEUP VLV STOP," is opened, the "M" part of the "AM" light will extinguish, indicating the controller is activated.
I,Ll",             n  ,. .wh'''', ~~,
Cue
  -----------
Comments:
Page 11 of 15
 
PERFORMANCE INFORMATION JPM Number:         JPM-S2.1 STEP                     PERFORMANCE                                        STANDARD
: 16.       4.9.13 OPEN CH-512 (C-04).                                                                              Y Cue:
Comments: I Examinee may announce expected "PMW FLOW HIILO" (C-04, BB-8) and "BA MAKEUP FLOW HI/LO" 9C-04,BA
: 8) flow alarms prior to, (or after receiving alarm) upon initiating blend flow. It is expected that the ARP's for these alarms will be referenced.
: 17. I 4.9.14 VERIFY flows have stabilized at         I Examinee verifies flows have stabilized at           N setpoint of flow controllers (C-04).              setpoint of flow controllers FC-210X and FC-210Y by observing output of controller andlor FR-210 for flow values                 .'.
Cue:
Comments:
1 8.     4.9.15 MONITOR VCT level and pressure             Examinee monitors VCT level and                     Y as indicated on the following: (C-02 or           pressure, by observing a PPC trend, PPC).                                             computer trend recorder UR-243(C-04),
_ "VCT PRES, PI-225"                             and/or "VCT PRES, PI-225" and "VCT "VCT LVL. LI-226"                              LVL, LI-226"(C-02/03)
Cue:
Comments:
: 19. I ARP 2590C-060                                    Examinee refers to ARP for PMW FLOW                   Y AUTOMATIC FUNCTIONS                              HIILO" (C-04, 88-8) and takes corrective 1-------1-1   1. None                                           actions.
Cue:
Comments:
Page 12 of 15
 
PERFORMANCE INFORMATION JPM Number:
STEP                     PERFORMANCE                                    STANDARD
: 20.        2. CHECK flow rate on "PRI MAKEUP WTR         Examinee determines that indicated flow is       I                 Y FLOW, FC-21 OX," within 10 gpm of             greater than 10 gpm from setpoint.
nt (C-O Cue:
Comments:
: 21.      I 3. IF desired to terminate PMW flow, PERFORM the following:
IExaminee determines that it is desired to terminate flow and:
3.1 PLACE "PRI MAKEUP WTR FLOW,               3.1 Places "PRI MAKEUP WTR FLOW, FC-21 OX," to "MANUAL."                                                                                         Y*
FC-21 OX," to "MANUAL."
3.2 ADJUST "PRI MAKEUP WTR FLOW,             3.2 Adjusts "PRI MAKEUP WTR FLOW, FC-21 OX," to zero output.                   FC-21 OX," to zero output.                                       y*
3.3 VERIFY 2-CH-196, "VCT MAKEUP             3.3 Verifies 2-CH-196, "VCT MAKEUP BYPASS," closed.                              BYPASS," closed by ensuring green                                 N 3.4 VERIFY 2-CH-512, "MAKEUP VLV             "close" light only lit.
STOP," closed.                                3.4 Verifies 2-CH-512, "MAKEUP VLV Y*
STOP," closed by placing valve handswitch in close and ensuring green "close" light only lit.
* A combination of steps 3.1 and 3.2 or step 3.4 alone will have the desired effect of securing the blended makeup to th~ VCT. The JPM is complete when the blended makeup is secured.
TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                                                        ;'iS1l0R~TIM;E~'"
                                                                                                        '~L,'. ."4",,,,', :~'_Oi',_"" ,'.,,',,;:~/> _ _ __
Page 13 of 15
 
JPM Number:                     JPM-S2.1                           Rev. - - - - -
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes -
No     X Validated Time (minutes):                   20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:               SAT           UNSAT           NA         (circle one)
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
Areas for Improvement/Comments:
Page 14 of 15
 
JPM Number:                 JPM-S2.1                            Rev. ___0_ __
STUDENT HANDOUT Initial Conditions:
* You have been directed to perform a blended makeup to the VCT to raise level 2%
Initiating Cues:
* The current blend ratio is 9:1 (corrected for Boron-10 depletion) calculated using "A" BAST
* The piping to the VCT is currently at blend concentration (no requirement for adjusting for water in the piping).
Page 15 of 15
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-S6.1                 Revision: _~O=---_
II. Initiated:
II. Initiated:
Marc R. Developer 02/01/11 Date III. Reviewed:
Marc R.                               02/01/11 Developer                            Date III. Reviewed:
echnical RevIewer IV. Approved:
echnical RevIewer IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor Page 1 of 13
Date Nuclear Training Supervisor Page 1 of 13 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13
OF CHANGES:
----------------------------
All & DATE                     DESCRIPTION                     REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 13
-------------JPM JPM-S6.1 Rev. JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                          JPM-S6.1                              Rev.      &deg;
MP2 Examinee:
                                                                                  --------
JPM Number:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Rev. ___0'--__ Task Title: System: AC Electrical Distribution Time Critical Task: Yes No x Validated Time (minutes):
Facility:      MP2                    Examinee:
_-=2:..=;.0
                                                    --------------------
___ Task No.(s): __________
JPM Number:                          JPM-S6.1                                     Rev. ___0'--__
_ Applicable To: SRO X RO X PEO KIA No. 062 A2.05 KIA Rating __2_.9_/3_._3
Task Title:
__ Method of Simulated Performance:
System:       AC Electrical Distribution Time Critical Task:     Yes             No       x Validated Time (minutes):             _-=2:..=;.0_ __
X Actual
Task No.(s): _ _ _ _ _ _ _ _ _ __
-----=--=--Location:
Applicable To:             SRO         X           RO     X       PEO
Classroom:
                                                                        ---
Simulator:
KIA No.               062 A2.05                   KIA Rating _ _2_.9_/3_._3__
X In-Plant:
Method of Testing:
Task At the completion of this JPM, the examinee will attempt to restore power to Bus 24C from the RSST. The RSST supply breaker will fail to close and the examinee will restore power to Bus 24C from Unit 3. Required Materials EOP 2541, Appendix 23 (procedures.
Simulated Performance: -----=--=--   X              Actual Performance:
equipment.
                                                                            ---
etc.): Attachment 23-B," Energizing 4.16 kV Bus 24C From the RSST" Attachment 23-N," Energizing 4.16 kV Bus 24E From Unit 3" General  
Location:
Classroom:                         Simulator:       X           In-Plant:
                ---                                --  -                    ----
Task Standards:                    At the completion of this JPM, the examinee will attempt to restore power to Bus 24C from the RSST. The RSST supply breaker will fail to close and the examinee will restore power to Bus 24C from Unit 3.
Required Materials               EOP 2541, Appendix 23 (procedures. equipment. etc.):   Attachment 23-B," Energizing 4.16 kV Bus 24C From the RSST" Attachment 23-N," Energizing 4.16 kV Bus 24E From Unit 3" General  


==References:==
==References:==
EOP 2541, Appendix 23
                                    * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral re orts, alarm acknowled ments, and 10 entries as if the evolution was actuall bein Page 3 of 13
JPM Number:                                  1                            Rev. - - -o- - -
JOB PERFORMANCE MEASURE WORKSHEET (continued) reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Initiating Cues:
* The Unit Supervisor has directed you to repower Bus 24C from the RSST so that a Service Water Pump can be restored to Facility 1.
Initial Conditions:
* Unit-2 is in Mode 3 after experiencing a plant trip.
* All SPTA's of EOP 2525 have been carried out.
* Bus 24C failed to transfer to the RSST on the plant trip.
* There are no faults indicated on Bus 24C
                        *    "A" EDG is out of service for maintenance Simulator
* IC-154 Reguirements:
* ED17A, EGR12,EGRI7
* 1/0 06A1A556 [RSST TO 24C(A302) TRIP]
* Tag breaker A312 and START/STOP switch
* Additional operator to address board alarms 1< 1< 1< NOTES TO EVALUATOR 1< 1< * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
Page 4 of 13
PERFORMANCE INFORMATION JPM Number:
l  STEP    I                PERFORMANCE                                                STANDARD CRITICALi (YIN)
GRADE (S/U)
                                                                                                  \;~~I'ttl.l.i;;"Y____
: 1.        EOP 2541, Appendix 23                      Examinee states that he/she will choose          N Attachment 23-B," Energizing 4.16 kV Bus    EOP 2541, Appendix 23 (Attachment 23 24C From the RSST"                          B) "Energizing 4.16 kV Bus 24C From the RSST" ~......,....,...........,
Cue:
Comments:
      --~------------~~=------------,,----------------------------.--------,-------~
: 2.                            NOTE                  Examinee reads and acknowledges note              N The following may indicate a fault on 4.16  for fault indications on Bus 24C.
kV Bus 24C:
_ Annunciator "DIESEL GEN 12U BKR TRIP" lit (A-3~, C08)
_ Annunciator "DIESEL GEN 12U BKR CLOSING CKT BLOCKED" lit (C-36, C08)
Annunciator "4KV BUS 24A1C TIE BKR A304 TRIP" lit (A-10, C08)
Annunciator "4KV BUS 24C/E TIE BKR 1j\~g~c:!:~fl'litJ-ti&l;'::'-~~ (
Cue:
Comments:
3.
Cue:
Comments:
Page 5 of 13
PERFORMANCE INFORMATION JPM Number:      JPM-S6.1                                                                                                                                                                                                        Rev..        0 liM>j.**l'.*'(' '*
i~g;.:              . *::~. . ..l...tt\;;J~%'lill'l*
                                'J''*''*\g''.~          C!<.'*l'h~"~,,,.lljZ.ll.'i!b.*.*jj'n.
                                                                      *~&.!o!~\..!:i                I.****' 'It~~'.I/:"\.JgOln uau.
                                                                                          ...*. "em.                                *m.'o. *N.'W~t~*.*.c.">.*.I'
                                                                                                                'liit.'A. I.' . . .
* 11~~~[!~lO          . "",C!Si.*2'0jj~\lf~";'(.il*.'~.)'''''.:./.
f't~'*'rjJQU,~~q.;jf        S~.,'.i.'.).'" ",',  . *j~.t~j?;;
                                                                                                                                                                                                                    ;:1..7:::;              / .., . c . '
                                                                                                                                                                                                                                      .J'~Jts:JL*;
STEP                                    PERFORMANCE                                                                                                          STANDARD
: 4.      2. CHECK that no fault indications are                                                                                  Examinee notes that:                                                                                N present for 4.16 kV Bus 24C.                                                                                            _"DIESEL GEN 12U BKR TRIP"(A-30, C08)
_ "DIESEL GEN 12U BKR CLOSING CKT BLOCKED" (C-36, C08),
_"4KV BUS 24NC TIE BKR A304 TRIP" (A-10, C08)
                                                                                                                                      "4KV BUS 24C/E TIE BKR A305 TRIP"(B-10, C08) are not lit and determines that no fault exists on Bus;;;.,.;;;;...;.,..;;;...;.~=~=-
24C.
Cue:
Comments:
: 5.      3. ENSURE ALL of the following                                                                                          Examinee ensures all of the following                                                                N breakers are open (C-08):                                                                                              breakers are open (C-08):
_A304, "24N24C TIE BKR, 24C-1T-2"                                                                                          A304, "24N24C TIE BKR, 24C-1T-2"
_ A305, "24C/24E TIE BKR, 24C-2T-2"                                                                                    _ A305, "24C/24E TIE BKR, 24C-2T-2" A312, "DG A FDR BKR, 15G-12U-2"                                                                                      _A312, "DG A FOR BKR, 15G-12U-2" by observing either green "OPEN" light, or no ht lit ( racked down )for each breaker.                                                  I  .
Cue:
Comments:
: 6.      4. ENSURE A702, "RSS FOR BKR,                                                                                          Examinee notes by red "CLOSE" light that 22S3-2-2", is closed. (C-08)                                                                                            A702, "RSS FOR BKR, 22S3-2-2", is closed. (C-08 Cue:
Comments:
Page 6 of 13
PERFORMANCE INFORMATION JPM Number:
CRITICAL f  STEP    1            PERFORMANCE                  I                STANDARD                    (YIN)
GRADE (S/U)
: 7.                          NOTE Due to the "Dead Bus" state of 4.16 kV Bus I Examinee reads and acknowledges note.          N 24C, the 1--------1 Cue:
Comments:
: 8.      5. PLACE "SYN SW, 22S3-24C-2                Examinee states that the synchroscope is      N (A302)" to "ON" and CHECK                    not moving.
              "INCOMING" voltage indicated. (C-08)
Y Examinee places "SYN SW, 22S3-24C-2 (A302)" to "ON" and checks "INCOMING" indicated on
: 9.      6. PLACE ALL four "UV BUS A3"                Examinee obtains (4) "UV BUS A3"              y channel bypass keyswitches to the            channel bypass keys ( key 26) and installs "INHIBIT" position. (Key 26)                them in "UV BUS A3" locations on all (4)
(ESF Sensor Cabinets)                        ESF sensor cabinets. Examinee rotates the kevs to the "INHIBIT' Cue:
Comments:
10.
Page 7 of 13
PERFORMANCE INFORMATION JPM Number:
STEP                    PERFORMANCE                                STANDARD 11 .      8. PLACE 80TH of the following control    Examinee rotates the following control            y switches in "PULL TO LOCK":              switches to the left places in "PULL TO
_ Service Water Pump A                    LOCK" RBCCW Pump A                          _ Service Water Pump A RBCCWPumcA Cue:
Comments:
: 12. I 9. PLACE BOTH SG Auto Aux Feed            Examinee places both S/G Override Switches in "PULL TO LOCK."      "OVERI DE/MAN/START RESET" Cue:
Comments:
: 13.      10. OVERRIDE ALL of the following        Examinee overrides the following control          N control switches to prevent an            switches by to prevent an inadvertent inadvertent automatic start:              automatic start:
_HPSI Pump A                              _HPSI Pump A
_LPSI Pump A                                LPSI Pump A Containment S                            Containment Cue:
Comments:
14.
Cue:
Comments: I Student should recommend success path of energizing bus Bus 24E from Unit-3.This will allow energizing "8" Service Water Pu_m~p_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _---,
Page 8 of 13


EOP 2541, Appendix 23 * * *
PERFORMANCE INFORMATION JPM Number:
* READ TO THE EXAMINEE * * *
STEP                   PERFORMANCE                                     STANDARD
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 15.      Attachment 23-N Energizing 4.16 kV Bus           dent refers to Attachment 23-N for 24E From Unit 3                                          4.16 kV Bus 24E From Unit 1------1                                                                                             ~~~~~==~~--==~
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral re orts, alarm acknowled ments, and 10 entries as if the evolution was actuall bein Page 3 of 13 
Cue:
------JPM Number: 1 Rev. o JOB PERFORMANCE MEASURE WORKSHEET (continued) reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Comments:
Initiating Cues: The Unit Supervisor has directed you to repower Bus 24C from the RSST so that a Service Water Pump can be restored to Facility 1. Initial Conditions: Unit-2 is in Mode 3 after experiencing a plant trip. All SPT A's of EOP 2525 have been carried out. Bus 24C failed to transfer to the RSST on the plant trip. There are no faults indicated on Bus 24C "A" EDG is out of service for maintenance Simulator
1 6.                       NOTE                     Examinee reads and acknowledges note             N The following may indicate a fault on 4.16 for fault indications on Bus 24E.
* IC-154 Reguirements: ED17A, EGR12,EGRI7 1/0 06A1A556 [RSST TO 24C(A302)
kV Bus 24E:
TRIP] Tag breaker A312 and START/STOP switch Additional operator to address board alarms 1< 1< 1< NOTES TO EVALUATOR 1< 1< *
_ Annunciator "4KV BUS 24E/34B TIE BKR A505 TRIP" lit (A-9, C08)
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 13 PERFORMANCE JPM Number: CRITICALi GRADE l STEP I PERFORMANCE STANDARD (YIN) (S/U)
_ Annunciator "4KV BUS 24C/E TIE BKR A305 TRIP" lit (B-10, C08)
____ 1 EOP 2541, Appendix 23 Examinee states that he/she will choose Attachment 23-B," Energizing 4.16 kV Bus EOP 2541, Appendix 23 (Attachment 24C From the B) "Energizing 4.16 kV Bus 24C From the RSST" NOTE Examinee reads and acknowledges note The following may indicate a fault on 4.16 for fault indications on Bus kV Bus _ Annunciator "DIESEL GEN 12U TRIP" lit _ Annunciator "DIESEL GEN 12U CLOSING CKT BLOCKED" lit (C-36, Annunciator "4KV BUS 24A1C TIE A304 TRIP" lit (A-10, Annunciator "4KV BUS 24C/E TIE
Annunciator "4KV BUS 24D/E TIE BKR TRIP" lit Cue:
: 3.
Comments:
Page 5 of 13 PERFORMANCE JPM Number: JPM-S6.1 Rev.. 0 liM>j.**l'.*'(''''
: 17.      1.CHECK that no fault indications are       Examinee notes that:                              N present for 4.16 kV Bus 24E.                   "4KV BUS 24E/34B TIE BKR A505 TRIP" (A-9, C08)
*.
_ "4KV BUS 24C/E TIE BKR A305 TRIP" (B-10, C08)
.....ltt\ ..lljZ.ll.'i!b.*.*jj'n.
_ "4KV BUS 24D/E TIE BKR A408 TRIP" (D-10, C08) lights are not lit, indicating no faults on bus 24E.
I.****' 'It 'liit.'A.
Cue:
I.' ..... *m.'o
Comments:
).'" ;:1..7:::;
Page 9 of 13
/... ...*. "em. ..
 
..,.c.'.
PERFORMANCE INFORMATION JPM Number:             JPM-S6.1                                                                                            Rev.. o lfig,,_
uau.
STEP                                         PERFORMANCE                                            STANDARD
*
: 18. I 2. ENSURE 4.16 kV Bus 24E "SPLY VOLTS" voltage is indicated.
.. "",C!Si
IExaminee verifies Bus 24E "SPLY                          N VOLTS" indicate -4200 VAC Ie   .-', A, XL~_    ,,' ~_~- .--,.@,b.,
",', .
Cue:
STEP 4. Cue: Comments:
Comments:
: 5. Cue: Comments:
: 19.        3. ENSURE ALL of the following load                         Examinee verifies by green "OPEN" or no               N breakers on 4.16 kV Bus 24E are open:                       light indication that the following load
: 6. Cue: Comments:
_ A502, "SERVICE WTR PUMP B"                               breakers on 4.16 kV Bus 24E are open:
PERFORMANCE
              - A503 , "HPSI PUMP Bit                                    _ A502, "SERVICE WTR PUMP B"
: 2. CHECK that no fault indications are present for 4.16 kV Bus 24C. 3. ENSURE ALL of the following breakers are open (C-08): _A304, "24N24C TIE BKR, 24C-1T-2" _ A305, "24C/24E TIE BKR, 24C-2T-2" A312, "DG A FDR BKR, 15G-12U-2" 4. ENSURE A702, "RSS FOR BKR, 22S3-2-2", is closed. (C-08) STANDARD Examinee notes that: _"DIESEL GEN 12U BKR _ "DIESEL GEN 12U BKR CLOSING BLOCKED" (C-36, _"4KV BUS 24NC TIE BKR A304 (A-10, "4KV BUS 24C/E TIE BKR A305 TRIP"(B-10, C08) are not lit and determines that no fault exists on Bus 24C. Examinee ensures all of the following N breakers are open (C-08): A304, "24N24C TIE BKR, 24C-1T-2" _ A305, "24C/24E TIE BKR, 24C-2T-2" _A312, "DG A FOR BKR, 15G-12U-2" by observing either green "OPEN" light, or no ht lit ( racked down )for each breaker. I . Examinee notes by red "CLOSE" light that A702, "RSS FOR BKR, 22S3-2-2", is closed. (C-08 Page 6 of 13 PERFORMANCE JPM Number: CRITICAL GRADE f STEP 1 PERFORMANCE I STANDARD (YIN) (S/U) 7. 1--------1 Cue: Comments:
              - A504 , "RBCCW PUMP B"                                     - A503 , "HPSI PUMP B" "RBCCW PUMP B" Comments:
: 8. 9. Cue: Comments:
2 O.       4. ENSURE ALL of the following breakers                     Examinee ensures that the following                   N are open:                                                   breakers are open by observing green
: 10. NOTE Due to the "Dead Bus" state of 4.16 kV Bus I Examinee reads and acknowledges note. N 24C, the 5. PLACE "SYN SW, 22S3-24C-2 Examinee states that the synchroscope is (A302)" to "ON" and CHECK not "INCOMING" voltage indicated. Y Examinee places "SYN SW, 22S3-24C-2 (A302)" to "ON" and checks "INCOMING" indicated on 6. PLACE ALL four "UV BUS A3" Examinee obtains (4) "UV BUS A3" y channel bypass keyswitches to the channel bypass keys ( key 26) and installs "INHIBIT" position. (Key 26) them in "UV BUS A3" locations on all (4) (ESF Sensor Cabinets)
_ A305, "24C/24E TIE BKR, 24C-2T-2"                         "OPEN" light indication only, or no light
ESF sensor cabinets.
_ A408, "24D/24E TIE BKR, 24D-2T-2"                         indication for the breaker:
Examinee rotates the kevs to the "INHIBIT' Page 7 of 13 PERFORMANCE JPM Number: STEP 11 . Cue: Comments: 1 2 . Cue: Comments:
A305, "24C/24E TIE BKR, 24C-2T-2" l... .       .,M,.;,:,,"                             ,-,
: 13. Cue: Comments:
A408 "24D/24E
: 14. Cue: PERFORMANCE
                                                                      """X_N:;YS4b;;",,~, _,L-*
: 8. PLACE 80TH of the following control switches in "PULL TO LOCK": _ Service Water Pump A RBCCW Pump A I 9. PLACE BOTH SG Auto Aux Feed Override Switches in "PULL TO LOCK." 10. OVERRIDE ALL of the control switches to prevent inadvertent automatic _HPSI Pump _LPSI Pump Containment S STANDARD Examinee rotates the following control switches to the left places in "PULL TO LOCK" _ Service Water Pump A RBCCWPumcA y Examinee places both S/G "OVERI DE/MAN/ST ART RESET" Examinee overrides the following control switches by to prevent an inadvertent automatic start: _HPSI Pump A LPSI Pump A Containment N Comments:
TIE BKR. 24D-2T-2"
I Student should recommend success path of energizing bus Bus 24E from Unit-3.This will allow energizing Service Water
                                                      .:&                                      ,v",'""
_________________________________Page 8 of 13 PERFORMANCE JPM Number: STEP 15. 1------1 Cue: Comments:
Cue:
1 6. Cue: Comments:
Comments:
: 17. Cue: Comments:
: 21. I 5. REQUEST permission from Unit 3 Shift                       Examinee either states that he/she will call I       N Manager or Unit Supervisor to energize                       Unit-3, or calls the booth operator and Unit 2 4.16 kV Bus 24E from Unit 3 4.16 kV                 requests from Unit-3 SM/US permission to Bus 34A134B.                                               energize 24E from Unit-3.
PERFORMANCE Attachment 23-N Energizing 4.16 kV Bus 24E From Unit 3 NOTE The following may indicate a fault on 4.16 kV Bus 24E: _ Annunciator "4KV BUS 24E/34B TIE BKR A505 TRIP" lit (A-9, C08) _ Annunciator "4KV BUS 24C/E TIE BKR A305 TRIP" lit (B-10, C08) Annunciator "4KV BUS 24D/E TIE BKR TRIP" lit 1.CHECK that no fault indications are present for 4.16 kV Bus 24E. STANDARD dent refers to Attachment 23-N for 4.16 kV Bus 24E From Unit Examinee reads and acknowledges note N for fault indications on Bus 24E. Examinee notes that: N "4KV BUS 24E/34B TIE BKR A505 TRIP" (A-9, C08) _ "4KV BUS 24C/E TIE BKR A305 TRIP" (B-10, C08) _ "4KV BUS 24D/E TIE BKR A408 TRIP" (D-10, C08) lights are not lit, indicating no faults on bus 24E. Page 9 of 13 PERFORMANCE JPM Number:
Cue:
Rev.. o lfig,,_ STEP STANDARD I 2. ENSURE 4.16 kV Bus 24E "SPL Y I Examinee verifies Bus 24E "SPL Y N VOL TS" voltage is indicated.
Comments:
VOLTS" indicate -4200 VAC Ie .-', A,  
Page 10 of 13
,,' .--,.@,b., Cue: Comments: 3. ENSURE ALL of the following load Examinee verifies by green "OPEN" or no N breakers on 4.16 kV Bus 24E are open: light indication that the following load _ A502, "SERVICE WTR PUMP B" breakers on 4.16 kV Bus 24E are open: A503 "HPSI PUMP _ A502, "SERVICE WTR PUMP B" -, -A504 , "RBCCW PUMP B" -A503 "HPSI PUMP B" , "RBCCW PUMP B" Comments:
 
2 O. 4. ENSURE ALL of the following breakers Examinee ensures that the following N are open: breakers are open by observing green _ A305, "24C/24E TIE BKR, 24C-2T-2" "OPEN" light indication only, or no light _ A408, "24D/24E TIE BKR, 24D-2T-2" indication for the breaker: A305, "24C/24E TIE BKR, 24C-2T-2" A408 "24D/24E TIE BKR. 24D-2T-2" l... . .,M,.;,:,," ,-,
PERFORMANCE INFORMATION JPM Number:
_,L-* ,v",'"" Cue: Comments: I 5. REQUEST permission from Unit 3 Shift Examinee either states that he/she will call I N Manager or Unit Supervisor to energize Unit-3, or calls the booth operator and Unit 2 4.16 kV Bus 24E from Unit 3 4.16 kV requests from Unit-3 SM/US permission to Bus 34A134B. energize 24E from Unit-3. Cue: Comments:
S_cT.EP
Page 10 of 13 PERFORMANCE INFORMATION JPM Number: <---__S_cT... EP STANDARD NOTE Examinee reads and acknowledges note. N Due to the "Dead Bus" state of 4.16 kV Bus 24E, the svnchroscooe will not move. 6. PLACE "SYN SEl SW, 34B-24E-2 Examinee places "SYN SEl SW, (A505)" to "ON" and CHECK "INCOMING" 24E-2 (A505)" to "ON" and checks ' voltage indicated. "INCOMING" voltaae indicated. Y
<---__                          PERFORMANCE                                  STANDARD
: 25.
: 22.                           NOTE                   Examinee reads and acknowledges note. N Due to the "Dead Bus" state of 4.16 kV Bus 24E, the svnchroscooe will not move.
: 26.
Cue:
Comments:
      ----~-
: 23.        6. PLACE "SYN SEl SW, 34B-24E-2             Examinee places "SYN SEl SW, 34B (A505)" to "ON" and CHECK "INCOMING"       24E-2 (A505)" to "ON" and checks
~_              ' voltage indicated.                         "INCOMING" voltaae indicated.
Cue:
Comments:
: 24.                                                                                          Y Cue:
Comments:
25.
Cue:
Comments:
26.
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 11 of 13 JPM Number: JPM-S6.1 Rev. ___0,--__ VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Page 11 of 13
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
 
20 Actual Time to Complete (minutes):
JPM Number:                     JPM-S6.1                         Rev. ___0,--__
JPM Work Practice Evaluation:
VERIFICATION OF JPM COMPLETION Title:
Overall Result of JPM: SAT SAT UNSAT UNSAT NA (circle one) (circle one) *During the TPE, the trainee Evaluation  
Date Performed:
*performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
Student:
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices.
Evaluator:
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Page 12 of 13 JPM Number: Initial Conditions:
Time Critical Task?       Yes
                              -
No   X Validated Time (minutes):                   20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                 SAT          UNSAT          NA        (circle one)
Overall Result of JPM:                       SAT         UNSAT                     (circle one)
*During the TPE, the trainee                                                     Evaluation
*performed the task correctly and in accordance with procedure                   Pass I Fail usage and adherence requirements.
never put anyone's safety at risk.                                             Pass I Fail never put equipment reliability at risk.                                       Pass I Fail never violated radiological work practices.                                     Pass I Fail demonstrated effective use of event-free human performance tools.               Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
 
JPM Number:                 JPM-S6.1                          Rev. ___0=--__
STUDENT HANDOUT Initial Conditions:
* The Unit Supervisor has directed you to repower Bus 24C from the RSST so that a Service Water Pump can be restored to Facility 1.
Initiating Cues:
Initiating Cues:
Rev. ___0=--__ STUDENT The Unit Supervisor has directed you to repower Bus 24C from the RSST so that a Service Water Pump can be restored to Facility 1. Unit-2 is in Mode 3 after experiencing a plant trip. All SPT A's of EOP 2525 have been carried out. Bus 24C failed to transfer to the RSST on the plant trip. There are no faults indicated on Bus 24C "An EDG is out of service for maintenance Page 13 of 13 JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: JPM Number: JPM-S3.1 Revision:
* Unit-2 is in Mode 3 after experiencing a plant trip.
0II. Initiated:
* All SPTA's of EOP 2525 have been carried out.
Marc R. Pucel Developer 02/01/11 Date III. Reviewed:
* Bus 24C failed to transfer to the RSST on the plant trip.
* There are no faults indicated on Bus 24C
                    * "An EDG is out of service for maintenance Page 13 of 13
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-S3.1                 Revision:     0
                                                                  --=-
II. Initiated:
Marc R. Pucel                         02/01/11 Developer                            Date III. Reviewed:
IV. Approved:
IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor Page 1 of 18
Date Nuclear Training Supervisor Page 1 of 18 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 18
OF CHANGES:
----------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 18
----JPM Number: JPM-S3.1 Rev. ___0=--__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                         JPM-S3.1                             Rev. ___0=--__
MP2 JPM Number: JPM-S3.1 Rev. __-'0=--Task Time Critical Task: Yes No Validated Time (minutes): Task No.(s): ____Applicable To: SRO RO _X__ PEO KIA No. A4.07 KIA Rating ___4_.4_/4_._4Method of Simulated Performance:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Actual Performance: ----
Facility:       MP2                    Examinee:
                                                ----------------------
JPM Number:                           JPM-S3.1                                   Rev. _ _-'0=--__
Task Title:
System:
Time Critical Task:     Yes             No     x Validated Time (minutes):                 20 Task No.(s): _ _ _ __
Applicable To:             SRO                 RO _X__         PEO _ _
                                  ----
KIA No.                   A4.07               KIA Rating ___4_.4_/4_._4__
Method of Testing:
Simulated Performance:
                              ----                                          X Actual Performance: -----=--='----
Location:
Location:
Classroom:
Classroom:                       Simulator:     X             In-Plant:
Simulator:
                                                                          ---
X In-Plant: -=--Task At the completion of this JPM, the examinee will raise #1 SIT level by 2% using the HPSI Pump. Required Materials OP 23060 Section 4.1, " Raising SIT Level" (procedures.
                ---                            -=--
equipment.
Task Standards:                    At the completion of this JPM, the examinee will raise #1 SIT level by 2% using the '~" HPSI Pump.
etc.): OP 23060 Section 4.2, " Reducing SIS Loop High Pressure After Filling SIT" General OP 23060 Safety Injection Tanks, RCS >1750 psi ARP 2590A-040 "SAFETY INJECTION TANK 1 PRES LO" * * *
Required Materials               OP 23060 Section 4.1, " Raising SIT Level" (procedures. equipment. etc.):   OP 23060 Section 4.2, " Reducing SIS Loop High Pressure After Filling SIT" General  
 
==References:==
OP 23060 Safety Injection Tanks, RCS >1750 psi ARP 2590A-040 "SAFETY INJECTION TANK 1 PRES LO"
                                  * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 18
Page 3 of 18 JPM Number: JPM-S3.1 Rev. ___0,---__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
JPM Number:                         JPM-S3.1                               Rev. ___0,---__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
Initiating Cues:
* You have been directed to fill #1 SIT to a final level of -58% using P41-A ("A" HPSI Pump) to makeup for some known leakage back to the Primary Drain Tank. Initial Conditions:  
* You have been directed to fill #1 SIT to a final level of -58% using P41-A ("A" HPSI Pump) to makeup for some known leakage back to the Primary Drain Tank.
* #1 SIT level is 56.7% Sampling of the #1 SIT is not required.
Initial Conditions:     *   #1 SIT level is 56.7%
Simulator IC-151 Requirements: #1 SIT level is 56.7% "SAFETY INJECTION TANK 1 PRES LO" (C-01lD-10)  
* Sampling of the #1 SIT is not required.
* *
Simulator
* NOTES TO EVALUATOR  
* IC-151 Requirements:           *  #1 SIT level is 56.7%
* * *
                        *  "SAFETY INJECTION TANK 1 PRES LO" (C-01lD-10)
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at'!" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only). Page 4 of 18 PERFORMANCE JPM Number: STEP 1 . I OP 23060 4.1 Raising SIT Level 4.1.1 IF the cause of the SIT level reduction is unknown, Refer To SP 2604Z and PERFORM applicable steps to confirm the associated SIS header to Loop piping penetration(s) full. (UT Points 15, 16, 17, or o CRITICAL GRADE STANDARD (YIN) (S/U}_I , ....
                                * *
.... ___ Examinee notes that cause of level N change is known and that this step is not required.
* NOTES TO EVALUATOR * * * *
Page 5 of 18 PERFORMANCE JPM Number: STEP 2. Cue: Comments:
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
PERFORMANCE 4.1.2 DETERMINE desired SIT(s) level using one of the following criteria:
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
_ IF sampling is not required, do not fill greater than 58.8% (alarm C-01 59%) _IF sampling is required, do not fill greater than 59.6% (PPC high alarm 59.7%) the following alarms are expected (C-01): SAFETY INJECTION TANK 1 LEVEL HI" (A-10) _ SAFETY INJECTION TANK 2 LEVEL HI" (A-11 ) SAFETY INJECTION TANK 3 LEVEL HI" (A-12) _ SAFETY INJECTION TANK 4 LEVEL HI" (A-13) STANDARD Examinee determines that sampling is not N required as given in initial conditions, and that desired stop level is < 58.8% (alarm C-0159%) Page 6 of 18 PERFORMANCE JPM Number: I STEP I 3. Cue: Comments:
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at'!" or "What are you observing?").
: 4. Cue: Comments:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
CRITICAL GRADE PERFORMANCE I STANDARD (YIN) (S/U) NOTE 1. The facility one Header Stop (2-SI-656)
Page 4 of 18
I Examinee reads and acknowledges note. is the only HPSI HDR Stop that can opened with the DIP caused by having running HPSI Pump. The HPSI HDR must be closed, prior to starting a Pump, to prevent the pressure wave, will cause perturbations in the piping and 2. The following alarms are expected reopening
 
_ SIS TO LOOP 1A PRESS HI, window _ SIS TO LOOP 1 B PRESS HI, window _ SIS TO LOOP 2A PRESS HI, window SIS TO LOOP 2B PRESS HI. (C-01, Page 7 of 18 PERFORMANCE JPM Number: STEP STANDARD 5. 4.1.4 CLOSE 2-SI-656 "HPSI HDR A Examinee closes 2-SI-656 "HPSI HDR A STOP" by rotating its keyswitch to the y CLOSE direction and verifies closed by I Jeen CLOSE light lit on J.",)/),Lh
PERFORMANCE INFORMATION JPM Number:                                                                                                             o CRITICAL                GRADE STEP                   PERFORMANCE                                    STANDARD                            (YIN)              (S/U}_I
: 6. 4.1.5 WHEN HPSI pump is started, CHECK Examinee notes and acknowledges the following (C-01): expected pump starting parameters.
                                                                                                      .ii$TARII~E'::!J;;
N _ Motor amperage 20 to 30 amps _ Nominal discharge pressure 1250 to 1300 , psi 1-------1 Comments:
                                                                                                        , ...."".,~[~.1l!J .... ,,~_ __
: 7. 4.1.6 START one of the following HPSI Examinee starts "P-41A, HPSI PP A" as pumps directed by initiating cue by taking its y "P-41A HPSI PP A" handswitch in the clockwise direction and -, IF aligned to Facility 1, "P-418, HPSI PP verifies by light, amp, and/or discharge 8" pressure that the pump is running.
: 1. I OP 23060 4.1 Raising SIT Level Examinee notes that cause of level                    N 4.1.1 IF the cause of the SIT level reduction   change is known and that this step is not is unknown, Refer To SP 2604Z and               required.
: 8. 4.1.7 WAIT 10 After 10 second wait, examinee opens 4.1.8 OPEN 2-SI-656 "HPSI HDR A 2-SI-656 "HPSI HDR A STOP" by rotating y STOP." its keyswitch to the open direction and I observinq its red OPEN Iiaht lit.
PERFORM applicable steps to confirm the associated SIS header to Loop piping penetration(s) full. (UT Points 15, 16, 17, or Page 5 of 18
 
PERFORMANCE INFORMATION JPM Number:
STEP                   PERFORMANCE                                      STANDARD
: 2.     4.1.2 DETERMINE desired SIT(s) level using one of the following criteria:           Examinee determines that sampling is not    N
_ IF sampling is not required, do not fill     required as given in initial conditions, and greater than 58.8% (alarm C-01 59%)           that desired stop level is < 58.8% (alarm C-0159%)
_IF sampling is required, do not fill greater than 59.6% (PPC high alarm 59.7%) the following alarms are expected (C-01):
SAFETY INJECTION TANK 1 LEVEL HI" (A-10)
_ SAFETY INJECTION TANK 2 LEVEL HI" (A-11 )
SAFETY INJECTION TANK 3 LEVEL HI" (A-12)
_ SAFETY INJECTION TANK 4 LEVEL HI" (A-13)
Cue:
Comments:
Page 6 of 18
 
PERFORMANCE INFORMATION JPM Number:
GRADE I STEP     I               PERFORMANCE                 I             STANDARD CRITICAL (YIN)   (S/U)
: 3.                            NOTE
: 1. The facility one Header Stop (2-SI-656) I Examinee reads and acknowledges note. N is the only HPSI HDR Stop that can be opened with the DIP caused by having a running HPSI Pump. The HPSI HDR Stop must be closed, prior to starting a HPSI Pump, to prevent the pressure wave, which will cause perturbations in the downstream piping and valves.
: 2. The following alarms are expected after reopening 2-SI-656:
_ SIS TO LOOP 1A PRESS HI, (C-01, window A-14)
_ SIS TO LOOP 1B PRESS HI, (C-01, window B-14)
_ SIS TO LOOP 2A PRESS HI, (C-01, window C-14)
SIS TO LOOP 2B PRESS HI. (C-01, Cue:
Comments:
4.
Cue:
Comments:
Page 7 of 18
 
PERFORMANCE INFORMATION JPM Number:
STEP                     PERFORMANCE                                          STANDARD
: 5.       4.1.4 CLOSE 2-SI-656 "HPSI HDR A             Examinee closes 2-SI-656 "HPSI HDR A STOP."                                        STOP" by rotating its keyswitch to the   y CLOSE direction and verifies closed by I Jeen CLOSE light lit on J.",)/),Lh Cue:
Comments:
: 6.       4.1.5 WHEN HPSI pump is started, CHECK       Examinee notes and acknowledges the following (C-01):                         expected pump starting parameters.       N
_ Motor amperage 20 to 30 amps
_ Nominal discharge pressure 1250 to 1300 1-------1
            , psi Comments:
: 7.       4.1.6 START one of the following HPSI         Examinee starts "P-41A, HPSI PP A" as pumps (C-01).                                directed by initiating cue by taking its y
              - "P-41A, HPSI PP A"                         handswitch in the clockwise direction and IF aligned to Facility 1, "P-418, HPSI PP   verifies by light, amp, and/or discharge 8"                                           pressure that the pump is running.
Cue:
Comments:
: 8.       4.1.7 WAIT 10 seconds.                        After 10 second wait, examinee opens 4.1.8 OPEN 2-SI-656 "HPSI HDR A               2-SI-656 "HPSI HDR A STOP" by rotating   y STOP."                                       its keyswitch to the open direction and I observinq its red OPEN Iiaht lit.
                                                  ~~~~
Cue:
Comments:  I Page 8 of 18
 
PERFORMANCE INFORMATION JPM Number:
STEP                      PERFORMANCE                                  STANDARD
: 9.      I 4.1.9 LOG out of TSAS 3.5.2.a.              I Examinee informs US to log out of TSAS    N Comments:
: 10.      I                    CAUTION                  I Examinee reads and acknowledges Recirculation header must not be subjected    caution.                                  N to pressure above 300 psig as indicated on "RECIRC HDR PRESS, PI-30S."
NOTE When raising pressure during reactor I Examinee reads and acknowledges note.      N startup before containment reaches operating temperature, SIT pressure should be limited to 220 psig to allow for thermal l:)(el:l.nsio~:.
Cue:
Comments:
11 . I 4.1.10 IF filling SIT 1, PERFORM the          Examinee opens "SI-611, FILL & DRN" by following (C-01):                            rotating its handswitch to the open        y
: a. OPEN "SI-611. FILL & DRN."                direction and observing its red OPEN light lit.
Cue:
Comments:
12 . I b. THROTTLE open "SI-618, HDR-1A CK          Examinee throttles open "SI-618, HDR-1A VLV LKG DRN STOP" not to exceed 300          CK VLV LKG DRN STOP" not to exceed        y psig, indicated on "PI-305, RECIRC HDR        300 psig, indicated on "PI-30S, RECIRC PRESS."                                      HDR PRESS" usina its control knob.
Page 9 of 18
 
PERFORMANCE INFORMATION JPM Number:
STEP                              PERFORMANCE                                          STANDARD
: 13.      c. WHEN any of the following occur, CLOSE SI-618:                                                Examinee closes SI-618 after filling to    y
_ "L311 SI TK 1 LVL" at desired level (PPC)                  -58% and < 58.8% (alarm C-01 59%) by
_ "P311 SI TK 1 PRESS" pressure 225 psig                    rotating its control knob and observing its (PPC)                                                        green CLOSE light
_ "PI-311, SIT 1 PRESS" pressure 225 psig PPC SIT high level alarm (59.7%
                    ''''&#xa5; '" r ,,,Ali  """ .. ",' ~"k,,,,,,,, h/
Cue:
Comments:
1 4. I d. CLOSE "SI-611, FILL & DRN."                              Examinee closes "SI-611, FILL & DRN" by    y rotating its handswitch to the close direction and observing its green CLOSE t
Cue:
Comments:
: 15.      4.1.11 IF filling SIT 2, PERFORM the                        Examinee notes that these steps are not following (C-01):                                            required, and N/A's these steps.            N 4.1.12 IF filling SIT 3, PERFORM the following (C-01):
4.1.13 IF filling SIT 4, PERFORM the followina (C-01 Cue:
Comments:
Page 10 of 18
 
PERFORMANCE INFORMATION JPM Number:        JPM-S3.1 CRITICAL I GRADE f  STEP                    PERFORMANCE                  I                STANDARD                  ('(IN)    (S/lJ)
: 16. 4.1.14IF no longer required, STOP HPSI          Examinee stops "P-41A, HPSI PP A" by        y pump (C-01).                                    rotating its handswitch to the counter clockwise direction.
Cue:
Comments:
: 17. 4.1.15 IF any SIT fill was terminated due to  1 Examinee states that this step is not        N pressure limit AND it is desired to continued  applicable filling, Refer To Section 4.5 to vent Cue:
Comments:
Comments:
I Page 8 of 18 PERFORMANCE JPM Number: STEP STANDARD 9. I 4.1.9 LOG out of TSAS 3.5.2.a. I Examinee informs US to log out of TSAS N Comments: I CAUTION I Examinee reads and Recirculation header must not be subjected N to pressure above 300 psig as indicated on "RECIRC HDR PRESS, PI-30S." NOTE I Examinee reads and acknowledges note. When raising pressure during reactor N startup before containment reaches operating temperature, SIT pressure should be limited to 220 psig to allow for thermal 11 . I 4.1.10 IF filling SIT 1, PERFORM the Examinee opens "SI-611, FILL & DRN" by following (C-01): rotating its handswitch to the open y a. OPEN "SI-611. FILL & DRN." direction and observing its red OPEN light lit. 1 2 I b. THROTTLE open "SI-618, HDR-1A CK Examinee throttles open "SI-618, HDR-1A VLV LKG DRN STOP" not to exceed 300 CK VL V LKG DRN STOP" not to exceed y psig, indicated on "PI-305, RECIRC HDR 300 psig, indicated on "PI-30S, RECIRC PRESS." HDR PRESS" usina its control knob. Page 9 of 18 PERFORMANCE JPM Number: PERFORMANCE c. WHEN any of the following occur, CLOSE SI-618: _ "L311 SI TK 1 LVL" at desired level (PPC) _ "P311 SI TK 1 PRESS" pressure 225 psig (PPC) _ "PI-311, SIT 1 PRESS" pressure 225 psig PPC SIT high level alarm (59.7% ''''&#xa5; '" r ,,,Ali """ .. ",'
Page 11 of 18
h/ Cue: Comments:
 
1 4. I d. CLOSE "SI-611, FILL &DRN." Cue: Comments: 4.1.11 IF filling SIT 2, PERFORM the following (C-01): 4.1.12 IF filling SIT 3, PERFORM the following (C-01): 4.1.13 IF filling SIT 4, PERFORM the followina (C-01 Cue: Comments:
PERFORMANCE INFORMATION JPM Number:               1 CRITICAL GRADE STEP   I              PERFORMANCE                                STANDARD                       (YIN)  (S/U)
STANDARD Examinee closes SI-618 after filling to -58% and < 58.8% (alarm C-01 59%) by rotating its control knob and observing its green CLOSE light y Examinee closes "SI-611, FILL &DRN" by rotating its handswitch to the close direction and observing its green CLOSE t y Examinee notes that these steps are not required, and N/A's these steps. N Page 10 of 18 PERFORMANCE INFORMATION JPM Number: JPM-S3.1 CRITICAL I GRADE f STEP PERFORMANCE I STANDARD ('(IN) (S/lJ) 4.1.14IF no longer required, STOP HPSI Examinee stops "P-41A, HPSI PP A" by y pump rotating its handswitch to the clockwise 4.1.15 IF any SIT fill was terminated due to 1 Examinee states that this step is not pressure limit AND it is desired to continued filling, Refer To Section 4.5 to Page 11 of 18 PERFORMANCE JPM Number: 1 PERFORMANCE I 4.1.16 Refer To one ofthe following and RECORD new SIT level and if applicable, boron concentration.
: 18.       4.1.16 Refer To one ofthe following and  Examinee states or attempts to perform RECORD new SIT level and if applicable,  the following administrative actions prior to boron concentration.                     proceeding.
_ SP 2619A-001, "Control Room Daily Surveillance, Modes 1 and 2" _ SP 2619A-002, "Control Room Daily Surveillance, Modes 3 and 4" 4.1.17 UPDATE applicable control board marker reference level(s).
_ SP 2619A-001, "Control Room Daily                                                        N Refers to SP 2619A-001, "Control Room Surveillance, Modes 1 and 2"            Daily Surveillance, Modes 1 and 2" and
4.1.18 CHANGE applicable PPC temporary high alarm limit(s) for new reference level(s).
_ SP 2619A-002, "Control Room Daily      records new SIT level and if applicable, Surveillance, Modes 3 and 4"            boron concentration.
Cue: Comments:
4.1.17 UPDATE applicable control board marker reference level(s).                Update applicable control board marker reference level(s).
: 19. Cue: Comments:
4.1.18 CHANGE applicable PPC temporary high alarm limit(s) for new reference    Change SIT#1 PPC temporary high alarm level(s).                                limit(s) for new reference IQ\Ij:"lf~
STANDARD CRITICAL (YIN) GRADE (S/U) Examinee states or attempts to perform the following administrative actions prior to proceeding.
Cue:
Refers to SP 2619A-001, "Control Room Daily Surveillance, Modes 1 and 2" and records new SIT level and if applicable, boron concentration.
Comments:
N Update applicable control board marker reference level(s).
19.
Change SIT#1 PPC temporary high alarm limit(s) for new reference Examinee reads and acknowledges caution. N Page 12 of 18
Examinee reads and acknowledges                  N caution.
----PERFORMANCE JPM Number: I STEP PERFORMANCE
Cue:
: 20. 4.1.19 Go To Section 4.2 to lower SIS loop pressure to clear annunciator.
Comments:
L.,....... *'e'**** ,...*. J .* A.*u **.** ..* .d 21 . 4.2.1 IF "SIS TO LOOP 1A PRESS HI," 14, C-01) is lit, PERFORM the following 01 ): a. OPEN "SI-611, FILL &DRN." b. CRACK open "SI-618, HDR-1A CK LKG DRN c. WHEN "P319 SIS TO LOOP 1A (PPC) indicates 225 to 275 psig, the
Page 12 of 18
: 1) "SI-618, HDR-1A CK VLV LKG 2) "SI-611, FILL & Cue: Comments:
 
CRITICAL GRADE STANDARD (yIN) (S/U) I Examinee goes to Section 4.2 to lower SIS N Examinee performs the following to clear "SIS TO LOOP 1A PRESS HI" alarm: a. OPEN "SI-611, FILL &DRN" by rotating N its switch to the "OPEN" direction and observing the red OPEN light lit N b. CRACK open "SI-618, HDR-1B CK LKG DRN STOP" by rotating its knob observing the valve open by indication and red OPEN light
PERFORMANCE INFORMATION JPM Number:
: c. WHEN "P319 SIS TO LOOP 1B (PPC) indicates 225 to 275 psig, the 1 ) "SI-618, HDR-1 B CK VL V LKG DRN STOP" by rotating its knob and the valve closed by needle indication green CLOSE light
I STEP                              PERFORMANCE                                                  STANDARD CRITICAL (yIN)
: 2) "SI-611, FILL & DRN" by rotating N switch to the "CLOSE" direction and "hc>",r\linrt the green CLOSE licht lit Page 13 of 18 PERFORMANCE JPM Number: PERFORMANCE I 4.2.2 IF "SIS TO LOOP 1B PRESS HI," 14, C-01) is lit, PERFORM the following 01 ): a. OPEN "SI-621, FILL &DRN." b. CRACK open "SI-628, HDR-1 B CK LKG DRN c. WHEN "P329 SIS TO LOOP 1B (PPC) indicates 225 to 275 psig, the
GRADE (S/U)
: 1) "SI-628, HDR-1B CK VLV LKG 2) "SI-621, FILL &Cue: CRITICAL GRADE STANDARD (YIN) (S/U)
: 20.     4.1.19 Go To Section 4.2 to lower SIS loop                      I Examinee goes to Section 4.2 to lower SIS    N pressure to clear annunciator.
* Examinee performs the following to clear "SIS TO LOOP 1 B PRESS HI" alarm: a. OPEN "SI-621, FILL &DRN" by rotating N its switch to the "OPEN" direction and observing the red OPEN light lit N b. CRACK open "SI-628, HDR-1B CK VLV LKG DRN STOP" by rotating its knob and observing the valve open by needle indication and red OPEN light indication
L . , ....... *'e'**** , . . .*. J * ..*.* A .
: c. WHEN "P329 SIS TO LOOP 1 B PRES," (PPC) indicates 225 to 275 psig, CLOSE the following:
* u .d **.*
: 1) "SI-628, HDR-1 B CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N 2) "SI-621, FILL &DRN" by rotating its switch to the "CLOSE" direction and observino the oreen CLOSE lioht lit
Cue:
______________________________________________________________________________Page 14 of 18 PERFORMANCE JPM Number: PERFORMANCE 4.2.3 IF "S[S TO LOOP 2A PRESS HI," 14, C-01) is lit, PERFORM the following 01): a. OPEN "SI-631, FILL & DRN" b. CRACK open "SI-638, HDR-2A CK LKG DRN c. WHEN "P339 SIS TO LOOP 2A (PPC) indicates 225 to 275 psig, the
Comments:    ----
: 1) "SI-638, HDR-2A CK VLV LKG 2) "SI-631, FILL &Comment-s-:
21 . 4.2.1 IF "SIS TO LOOP 1A PRESS HI," (A                            Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C                        "SIS TO LOOP 1A PRESS HI" alarm:
STANDARD Examinee performs the following to clear "SIS TO LOOP 2A PRESS HI" alarm: a. OPEN "SI-631, FILL & DRN" by rotating N its switch to the "OPEN" direction and observing the red OPEN light lit N b. CRACK open "SI-638, HDR-1B CK VLV LKG DRN STOP" by rotating its knob and observing the valve open by needle indication and red OPEN light indication
01 ):
: c. WHEN "P339 SIS TO LOOP 1B PRES," (PPC) indicates 225 to 275 psig, CLOSE the following:
: a. OPEN "SI-611, FILL & DRN."                                      a. OPEN "SI-611, FILL & DRN" by rotating
: 1) "SI-638, HDR-1B CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N 2) "SI-631, FILL &DRN" by rotating its switch to the "CLOSE" direction and observina the areen CLOSE light lit Page 15 of 18 PERFORMANCE JPM Number: PERFORMANCE
: b. CRACK open "SI-618, HDR-1A CK VLV                                                                            N its switch to the "OPEN" direction and LKG DRN STOP."                                                    observing the red OPEN light lit
: 24. 4.2.4 IF "SIS TO LOOP 28 PRESS HI," 14, C-01) is lit, PERFORM the following 01): a. OPEN "SI-641, FILL &DRN" b. CRACK open "SI-648, HDR-28 CK VLV LKG DRN STOP." c. WHEN "P349 SIS TO LOOP 28 PRES," (PPC) indicates 225 to 275 psig, CLOSE the following:
: c. WHEN "P319 SIS TO LOOP 1A PRES,"                                b. CRACK open "SI-618, HDR-1B CK VLV          N (PPC) indicates 225 to 275 psig, CLOSE                            LKG DRN STOP" by rotating its knob and the following:                                                    observing the valve open by needle
: 1) "SI-648, HDR-2B CK VLV LKG DRN STOP" 2) "SI-641, FILL & DRN" Cue: Comments:
: 1) "SI-618, HDR-1A CK VLV LKG DRN                                  indication and red OPEN light indication STOP"                                                              c. WHEN "P319 SIS TO LOOP 1B PRES,"
STANDARD Examinee performs the following to clear "SIS TO LOOP 28 PRESS HI" alarm: a. OPEN "SI-641, FILL & DRN" by rotating N its switch to the "OPEN" direction and observing the red OPEN light lit N b. CRACK open "SI-648, HDR-18 CK VLV LKG DRN STOP" by rotating its knob and observing the valve open by needle indication and red OPEN light indication
: 2) "SI-611, FILL & DRN"                                            (PPC) indicates 225 to 275 psig, CLOSE the following:
: c. WHEN "P349 SIS TO LOOP 1 8 PRES," (PPC) indicates 225 to 275 psig, CLOSE the following:
: 1) "SI-618, HDR-1 B CK VLV LKG DRN            N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication
1} "SI-648, HDR-18 CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N 2) "SI-641, FILL &DRN" by rotating its switch to the "CLOSE" direction and the areen CLOSE liaht lit
: 2) "SI-611, FILL & DRN" by rotating its N
"" TERMINATION CUE: The evaluation for this JPM is concluded.
switch to the "CLOSE" direction and "hc>",r\linrt the green CLOSE licht lit
Page 16 of 18 
                                                                                            ~
-----JPM Number: JPM-S3.1 Rev. VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Cue:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No Validated Time (minutes):
Comments:
20 Actual Time to Complete (minutes):
Page 13 of 18
JPM Work Practice Evaluation:
 
SAT UNSAT NA (circle one) Overall of JPM: SAT UNSAT (circle one) Areas for Improvement/Comments:
PERFORMANCE INFORMATION JPM Number:
Page 17 of 18 JPM Number:
CRITICAL GRADE STEP    I               PERFORMANCE                                   STANDARD                  (YIN)  (S/U)
Rev. __-"O__ STUDENT Initial Conditions:
                                                                                                                      *
* You have been directed to fill #1 SIT to a final level of -58% using P41-A ("An HPSI Pump) to makeup for some known leakage back to the Primary Drain Tank. Initiating Cues: * #1 SIT level is 56.7% Sampling of the #1 SIT is not required.
: 22.       4.2.2 IF "SIS TO LOOP 1B PRESS HI," (B      Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C  "SIS TO LOOP 1B PRESS HI" alarm:
Page 18 of 18 JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: JPM Number: JPM-S9.1 Revision:
01 ):
0II. Initiated:
: a. OPEN "SI-621, FILL & DRN."                a. OPEN "SI-621, FILL & DRN" by rotating
Marc R. Pucel Developer 02/01/11 Date III. Reviewed:
: b. CRACK open "SI-628, HDR-1 B CK VLV                                                      N its switch to the "OPEN" direction and LKG DRN STOP."                              observing the red OPEN light lit
: c. WHEN "P329 SIS TO LOOP 1B PRES,"         b. CRACK open "SI-628, HDR-1B CK VLV          N (PPC) indicates 225 to 275 psig, CLOSE      LKG DRN STOP" by rotating its knob and the following:                               observing the valve open by needle
: 1) "SI-628, HDR-1B CK VLV LKG DRN            indication and red OPEN light indication STOP"                                        c. WHEN "P329 SIS TO LOOP 1B PRES,"
: 2) "SI-621, FILL & DRN"                      (PPC) indicates 225 to 275 psig, CLOSE the following:
: 1) "SI-628, HDR-1 B CK VLV LKG DRN           N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N
: 2) "SI-621, FILL & DRN" by rotating its switch to the "CLOSE" direction and observino the oreen CLOSE lioht lit Cue:
Commen_ts_:~I ______________________________________________________________________________~
Page 14 of 18
 
PERFORMANCE INFORMATION JPM Number:
STEP                          PERFORMANCE                                STANDARD
: 23.      4.2.3 IF "S[S TO LOOP 2A PRESS HI," (C      Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C  "SIS TO LOOP 2A PRESS HI" alarm:
01):
: a. OPEN "SI-631, FILL & DRN"                  a. OPEN "SI-631, FILL & DRN" by rotating
: b. CRACK open "SI-638, HDR-2A CK VLV                                                  N its switch to the "OPEN" direction and LKG DRN STOP."                               observing the red OPEN light lit
: c. WHEN "P339 SIS TO LOOP 2A PRES,"           b. CRACK open "SI-638, HDR-1B CK VLV      N (PPC) indicates 225 to 275 psig, CLOSE        LKG DRN STOP" by rotating its knob and the following:                               observing the valve open by needle
: 1) "SI-638, HDR-2A CK VLV LKG DRN            indication and red OPEN light indication STOP"                                        c. WHEN "P339 SIS TO LOOP 1B PRES,"
: 2) "SI-631, FILL & DRN"                      (PPC) indicates 225 to 275 psig, CLOSE the following:
: 1) "SI-638, HDR-1B CK VLV LKG DRN         N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N
: 2) "SI-631, FILL & DRN" by rotating its switch to the "CLOSE" direction and observina the areen CLOSE light lit
                                                                                        ~
Cue:
Comment-s-:+1-'-'--"--"--"--'-'--'------'-=""-'
Page 15 of 18
 
PERFORMANCE INFORMATION JPM Number:
PERFORMANCE                                    STANDARD
: 24.      4.2.4 IF "SIS TO LOOP 28 PRESS HI," (D      Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C  "SIS TO LOOP 28 PRESS HI" alarm:
01):
: a. OPEN "SI-641, FILL & DRN"                 a. OPEN "SI-641, FILL & DRN" by rotating
: b. CRACK open "SI-648, HDR-28 CK VLV                                                                N its switch to the "OPEN" direction and LKG DRN STOP."                              observing the red OPEN light lit
: c. WHEN "P349 SIS TO LOOP 28 PRES,"          b. CRACK open "SI-648, HDR-18 CK VLV                   N (PPC) indicates 225 to 275 psig, CLOSE      LKG DRN STOP" by rotating its knob and the following:                              observing the valve open by needle
: 1) "SI-648, HDR-2B CK VLV LKG DRN            indication and red OPEN light indication STOP"                                        c. WHEN "P349 SIS TO LOOP 18 PRES,"
: 2) "SI-641, FILL & DRN"                     (PPC) indicates 225 to 275 psig, CLOSE the following:
1} "SI-648, HDR-18 CK VLV LKG DRN                     N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N
: 2) "SI-641, FILL & DRN" by rotating its switch to the "CLOSE" direction and the areen CLOSE liaht lit
                                                                                          ~---r-r:-,.,-l  ""
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
:'~$'F~ej[IM]t!:
Page 16 of 18
 
JPM Number:                    JPM-S3.1                            Rev. - - - - -
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?      Yes          No
                              -            --
Validated Time (minutes):                  20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                SAT          UNSAT            NA        (circle one)
Overall RE~sult of JPM:                      SAT          UNSAT                      (circle one)
Areas for Improvement/Comments:
Page 17 of 18
 
JPM Number:                  JPM-S3.1                          Rev. _ _-"O_ _
STUDENT HANDOUT Initial Conditions:
* You have been directed to fill #1 SIT to a final level of -58% using
* P41-A ("An HPSI Pump) to makeup for some known leakage back to the Primary Drain Tank.
Initiating Cues:   * #1 SIT level is 56.7%
* Sampling of the #1 SIT is not required.
Page 18 of 18
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-S9.1                Revision:     0
                                                                  --=-
II. Initiated:
Marc R. Pucel                          02/01/11 Developer                             Date III. Reviewed:
Technical Reviewer IV. Approved:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor             ~il'    Date Page 1 of 15
Nuclear Training Supervisor Date Date Page 1 of 15 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 15
OF CHANGES:
-------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 15
----------------------JPM Number: JPM-S9.1 Rev. __......;0=--
 
__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                         JPM-S9.1                               Rev. _ _......;0=--__
Facility:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
MP2 JPM Number: JPM-S9.1 Rev. System: Radiation Monitoring Time Critical Task: Yes No x Validated Time (minutes):
Facility:      MP2                    Examinee:
20 Task No.(s): Applicable To: SRO X RO X PEO KIA No. 071 A4.25 KIA Rating _-=3.=2/:...=3=.2:....-_
                                                -------------------
Method of Testing: Simulated Actual Performance:
JPM Number:                           JPM-S9.1                                     Rev. - - - -  o- - -
X Location:
System:       Radiation Monitoring Time Critical Task:     Yes             No     x Validated Time (minutes):                 20 Task No.(s):
Simulator:
Applicable To:             SRO       X       RO     X       PEO - -
X In-Plant: Task At the completion of this JPM, the examinee will determine that the Vent Stack Radiation Monitor, RM8268, has failed and will take the appropriate actions for the failed Radiation Monitor. Required Materials ARP 2590E-061 "VENT STACK RADMONITOR HI/FAIL" (procedures.
KIA No.               071 A4.25               KIA Rating _-=3.=2/:...=3=.2:....-_
equipment.
Method of Testing:
etc.): General ARP 2590E-061 "VENT STACK RADMONITOR HI/FAIL" * * *
Simulated Performance:                          Actual Performance: - -X- -
                              ----
Location:
Classroom:                        Simulator:     X             In-Plant:
                ---                          -'--                          ----
Task Standards:                  At the completion of this JPM, the examinee will determine that the Vent Stack Radiation Monitor, RM8268, has failed and will take the appropriate actions for the failed Radiation Monitor.
Required Materials                 ARP 2590E-061 "VENT STACK RADMONITOR HI/FAIL" (procedures. equipment. etc.):
General  
 
==References:==
ARP 2590E-061 "VENT STACK RADMONITOR HI/FAIL"
                                  * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 15
Page 3 of 15
 
-----JPM Number:
JPM Number:                        JPM-S9.1                              Rev. - - -  o --
Rev. o JOB PERFORMANCE MEASURE WORKSHEET (continued)
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues: The Unit Supervisor has directed you to carry out actions in response to "VENT STACK RADMONITOR HI/FAIL (C-06/07, A-12) alarm. Initial Conditions: Unit-2 is in Mode 1 at 100% power You are the BOP operator. "VENT STACK RADMONITOR HI/FAIL" (C-06/07.
Initiating Cues:
A-12) alarm has come in a few moments ago while you were out of the Control Room. The RO has obtained ARP 2590E-061.
* The Unit Supervisor has directed you to carry out actions in response to "VENT STACK RADMONITOR HI/FAIL (C-06/07, A-12) alarm.
and has turned over this alarm response to you. Simulator
Initial Conditions:
* 1/0 RIC-8168 "EQUIP FAIL" light on. Reguirements: "VENT STACK RADMONITOR HI/FAIL" (C-06/07.
* Unit-2 is in Mode 1 at 100% power
A-12) alarm window lit. * *
* You are the BOP operator.
* NOTES TO EVALUATOR'" * *
                        *  "VENT STACK RADMONITOR HI/FAIL" (C-06/07. A-12) alarm has come in a few moments ago while you were out of the Control Room.
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read appropriate If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the pe:rformance of this JPM (in-plant only). Page 4 of 15 PERFORMANCE JPM Number: I STEP I 1 VENT STACK RADMONITOR HI/FAIL , (C-06/07, A-12) 1-------+ AUTOMATIC FUNCTIONS ALARA To prevent contaminating low range stack activity monitor during high radiation condition.
* The RO has obtained ARP 2590E-061. and has turned over this alarm response to you.
ouraina is desirable. 1. If red "HIGH" light is lit AND "STACK GAS EFFLUENT PURGE VALVE, RV-8132," is in "ENABLE," purging of Unit 2 stack gaseous monitor, RM-8132B, is ,initiated
Simulator
: 4. 1. IF high radiation condition exists, PERFORM the following:
* 1/0 RIC-8168 "EQUIP FAIL" light on.
1.1 Refer To MP-26-EPI-FAP06, "Classification and PARs" and DETERMINE reportability.
Reguirements:           *  "VENT STACK RADMONITOR HI/FAIL" (C-06/07. A-12) alarm window lit.
1.2 MONITOR Unit 2 stack discharge 1--------1;,6 activity (C-101 Cue: Comments:
                                  * *
STANDARD Examinee refers to ARP 2590E-061 for 'C-OB/07.
* NOTES TO EVALUATOR'" * * *
A-12) Examinee reads and acknowledges ALARA note. Examinee states that red "HIGH" light is not Examinee states that a high radiation condition does not exist and that this step is not applicable.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
CRITICAL I GRADE (YIN) (S/U) N N N Page 5 of 15 PERFORMANCE JPM Number: PERFORMANCE
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
: 5. NOTE Tech Spec 3.3.3.1, Radiation Monitoring Table 3.3-6 Instrument 2.C requires channel 1 or channel 2 Noble Gas to be OPERABLE.
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
ILeA.***""."",
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the pe:rformance of this JPM (in-plant only).
Cue: Comments: 12. DETERMINE if equipment failure exists as follows: 2.1 PERFORM the following to verify display indication (C-101): 2.1.1 PRESS 'TEST L T CK" pushbutton.
Page 4 of 15
2.1.2 VERIFY LED display indicates a/l 8's and all lamps are lit. Cue: Comments: 7 . I ARP 2590E-061 NOTE Failure codes are displayed in scientific E notation, e.g. 1.00EOO=1, 4.00EOO=4, 1.20E01 =12. etc. Cue: Comments:
 
STANDARD I Examinee reads and acknowledges note N about required operable channels.
PERFORMANCE INFORMATION JPM Number:
Examinee presses "TEST L T CK" Y pushbutton.
I I   STEP     I               PERFORMANCE                                  STANDARD CRITICAL (YIN)
Examinee verifies LED display indicates all I N 8's and all lamps are lit. Examinee states that this step is not applicable.
GRADE (S/U)
N Examinee reads and acknowledges note N about failure code display notation.
                                                                                                      ;sfliftf.J1I!11E~lII: . . - - - -
Page 6 of 15 PERFORMANCE JPM Number: STEP STANDARD 12.2 At RIC-8168, CHECK for the following Examinee observes and states that the Y failure conditions: "EQUIP FAIL" lamp is 2.2.1 "EQUIP FAIL" lamp lit y 2.2.2 CHECK for channel 1 failure codes Examinee presses "DSP" "1" "30" "ENT." as follows: y a. PRESS "DSP" "1" "30" "ENT." Examinee obtains CODE FAILURE value b. OBTAIN CODE FAILURE value. of "1.00EOO" for Channel Comments: I 2.2.3 CHECK for channel 2 failure codes as I Examinee presses "DSP" "2" "30" "ENT." Y follows: a. PRESS "DSP" "2" "30" "ENT." Examinee obtains CODE FAILURE value y b. OBTAIN CODE FAILURE value. of "O.OOEOO" for Channel 2. Cue: Comments: 12.2.4 CHECK for channel 3 failure codes as I Examinee presses "DSP" "3" "30" "ENT." Y follows: a. PRESS "DSP" "3" "30" "ENT." Examinee obtains CODE FAILURE value y b. OBTAIN CODE FAILURE value. of "O.OOEOO" for Channel 2. Cue: Comments:
: 1.        VENT STACK RADMONITOR HI/FAIL             Examinee refers to ARP 2590E-061 for
11 . 12.2.5 CHECK for channel 4 failure codes as I Examinee presses "DSP" "4" "30" "ENT." Y follows: a. PRESS "DSP" "4" "30" "ENT." Examinee obtains CODE FAILURE value y b. OBTAIN CODE FAILURE value. of "O.OOEDO" for Channel 4. Cue: Comments:
            , (C-06/07, A-12)                                    'C-OB/07. A-12) 1-------+
Page 7 of 15 PERFORMANCE JPM Number: CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) (S/U)_n 2.2.6 CHECK for channel 5 failure codes as I Examinee presses "DSP" "5" "30" "ENT,"
Cue:
: a. PRESS "DSP" "5" "30" "ENT," I Examinee obtains CODE FAILURE value Y . b. OBTAIN CODE FAILURE value. of "O.OOEOa" for Channel 5. 2.2.7 IF any CODE FAILURE Table display Examinee refers to CODE FAILURE Table "numbers" are indicated, to identify failure.
Comments:
REFER to Table 1 to id Page 8 of 15 PERFORMANCE JPM Number: STEP PERFORMANCEl 1 4. I Table 1, Channel Failure Codes: o No Failure 1 Detector Failure 2 Detector Saturation 3 Motor Failure 4 High Voltage Failure 5 Check Source Failure 6 Low Flow 7 Particulate Filter Failure 8 End of Particulate Filter Roll 9 High Pressure Trip Value Exceeded 10 Low Pressure Trip Value Exceeded 11 High Temperature Trip Value Exceeded 12 Low Temperature Trip Value Exceeded 13 High Delta Pressure (Moving Filter Channel Only) Trip Value Exceeded 14 Low Delta Pressure (Moving Filter Channel Only) Trip Value Exceeded 15 Reserved (High Flow on Some Monitors) 16 Tern CRITICAL GRADE STANDARD (YIN) (S/U) Examinee identifies "Detector Failure" for Y Channel 1. Page 9 of 15 PERFORMANCE JPM Number: PERFORMANCEJ NOTE 1. IF failure code "1" exists on" Channel 1" and channel is updating plant conditions, the monitor can be restored to service if failure codes are reset. 2. Channels 1 and 2 are gaseous channels.
: 2.                  AUTOMATIC FUNCTIONS ALARA                   Examinee reads and acknowledges                      N To prevent contaminating low range stack   ALARA note.
Channels 3, 4, and 5 are particulate channels.
activity monitor during high radiation condition. ouraina is desirable.
Therefore the output readings for channels 1, 2 compared to channels 3, 4, 5 could be sianificantlv different. 2.3 CHECK if monitor detector "Channel 1" is updating plant conditions, i.e. dynamic indication update once per second. 2.4 PRESS "DSP" "3" "23" "ENT' to check if monitor detector "Channel 3" is indicating plant conditions, i.e. is a static indication and will not update once per second and should not read O.
Cue:
STANDARD Examinee reads and acknowledges note on resetting failure codes, and potential differences in output readings of channels.
Comments:
Examinee states that monitor detector "Channel 1" is updating plant conditions, i.e. dynamic indication update once per second. Examinee states that "DSP" "3" "23" "ENT" monitor detector "Channel 3" is indicating plant conditions, i.e. is a static indication and will not update once per second and does not read O. CRITICAL I GRAD.EJ rf/N)
: 3.        1. If red "HIGH" light is lit AND "STACK   Examinee states that red "HIGH" light is              N GAS EFFLUENT PURGE VALVE,                 not RV-8132," is in "ENABLE," purging of Unit 2 stack gaseous monitor, RM-8132B, is
N y y Page 10 of 15 
  --~--f-,.I,initiated (C-101)'
----------JPM Number: STEP 18. Cue: Comments:
Cue:
: 19. Cue: Comments:
Comments:
: 20. Cue: Comments:
: 4.       1. IF high radiation condition exists,     Examinee states that a high radiation                N PERFORM the following:                     condition does not exist and that this step 1.1 Refer To MP-26-EPI-FAP06,             is not applicable.
PERFORMANCE GRADE PERFORMANCE STANDARD (S/U)2.5 IDENTIFY any Main Board Rad Monitor I Examinee identifies that VENT STACK alarms. RADMONITOR HI/FAIL (C-06/07, A-12) N alarm is lit. 5. IF any of the following exist: _ Failure codes exist other than No.1, Examinee states that this step is not y "Detector Failure" applicable due to only No.1, "Detector
              "Classification and PARs" and DETERMINE reportability.
_ "Channel 1" is not updating plant Failure" indicated, and both "Channel 1" conditions and "Channel 3" indicating plant _ "Channel 3" is not indicating plant conditions.
1.2 MONITOR Unit 2 stack discharge 1--------1;,6 activity (C-101 Cue:
Comments:
Page 5 of 15
 
PERFORMANCE INFORMATION JPM Number:
STEP                              PERFORMANCE                              STANDARD
: 5.      I                            NOTE Tech Spec 3.3.3.1, Radiation Monitoring      I Examinee reads and acknowledges note         N Table 3.3-6 Instrument 2.C requires            about required operable channels.
channel 1 or channel 2 Noble Gas to be OPERABLE.
ILeA.***""."", .*,.,.,.~U Cue:
Comments:
: 6.      12. DETERMINE if equipment failure exists as follows:                                     Examinee presses "TEST LT CK"                Y 2.1 PERFORM the following to verify           pushbutton.
display indication (C-101):                     Examinee verifies LED display indicates all I 2.1.1 PRESS 'TEST LT CK" pushbutton.                                                      N 8's and all lamps are lit.
2.1.2 VERIFY LED display indicates a/l 8's   Examinee states that this step is not and all lamps are lit.                         applicable.                                  N Cue:
Comments:
: 7.     I ARP 2590E-061 NOTE                 Examinee reads and acknowledges note          N Failure codes are displayed in scientific E     about failure code display notation.
notation, e.g. 1.00EOO=1, 4.00EOO=4, 1.20E01 =12. etc.
Cue:
Comments:
Page 6 of 15
 
PERFORMANCE INFORMATION JPM Number:
STEP                    PERFORMANCE                                  STANDARD
: 8.     12.2 At RIC-8168, CHECK for the following     Examinee observes and states that the Y failure conditions:                         "EQUIP FAIL" lamp is 2.2.1 "EQUIP FAIL" lamp lit                                                       y 2.2.2 CHECK for channel 1 failure codes     Examinee presses "DSP" "1" "30" "ENT."
as follows:
: a. PRESS "DSP" "1" "30" "ENT."                                                     y Examinee obtains CODE FAILURE value
: b. OBTAIN CODE FAILURE value.               of "1.00EOO" for Channel 1.
Cue:
Comments:
: 9.      I2.2.3 CHECK for channel 2 failure codes as I Examinee presses "DSP" "2" "30" "ENT." Y follows:
: a. PRESS "DSP" "2" "30" "ENT."               Examinee obtains CODE FAILURE value   y
      ,--
: b. OBTAIN CODE FAILURE value.               of "O.OOEOO" for Channel 2.
Cue:
Comments:
: 10.      12.2.4 CHECK for channel 3 failure codes as I Examinee presses "DSP" "3" "30" "ENT." Y follows:
: a. PRESS "DSP" "3" "30" "ENT."               Examinee obtains CODE FAILURE value   y
: b. OBTAIN CODE FAILURE value.               of "O.OOEOO" for Channel 2.
Cue:
Comments:
11 . 12.2.5 CHECK for channel 4 failure codes as I Examinee presses "DSP" "4" "30" "ENT." Y follows:
: a. PRESS "DSP" "4" "30" "ENT."               Examinee obtains CODE FAILURE value   y
: b. OBTAIN CODE FAILURE value.               of "O.OOEDO" for Channel 4.
Cue:
Comments:
Page 7 of 15
 
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP                   PERFORMANCE                                       STANDARD             n (YIN)   (S/U)_
: 12.      2.2.6 CHECK for channel 5 failure codes as I Examinee presses "DSP" "5" "30" "ENT,"     Y follows:
: a. PRESS "DSP" "5" "30" "ENT,"             IExaminee obtains CODE FAILURE value         Y
          . b. OBTAIN CODE FAILURE value.               of "O.OOEOa" for Channel 5.
I---~---i Cue:
Comments:
: 13.      2.2.7 IF any CODE FAILURE Table display     Examinee refers to CODE FAILURE Table "numbers" are indicated,                     to identify failure.
I---~~--i' REFER to Table 1 to id Cue:
Comments:
Page 8 of 15
 
PERFORMANCE INFORMATION JPM Number:
~          l                                                                                    CRITICAL GRADE STEP                   PERFORMANCE                              STANDARD                      (YIN)  (S/U) 1 4. I Table 1, Channel Failure Codes:
o No Failure                             Examinee identifies "Detector Failure" for    Y 1 Detector Failure                      Channel 1.
2 Detector Saturation 3 Motor Failure 4 High Voltage Failure 5 Check Source Failure 6 Low Flow 7 Particulate Filter Failure 8 End of Particulate Filter Roll 9 High Pressure Trip Value Exceeded 10 Low Pressure Trip Value Exceeded 11 High Temperature Trip Value Exceeded 12 Low Temperature Trip Value Exceeded 13 High Delta Pressure (Moving Filter Channel Only) Trip Value Exceeded 14 Low Delta Pressure (Moving Filter Channel Only) Trip Value Exceeded 15 Reserved (High Flow on Some Monitors) 16 Tern Cue:
Comments:
Page 9 of 15
 
PERFORMANCE INFORMATION JPM Number:
~  STEP    J              PERFORMANCE                                      STANDARD CRITICAL rf/N)
I GRAD.EJ (S/~)
: 15.                          NOTE
: 1. IF failure code "1" exists on" Channel 1"   Examinee reads and acknowledges note              N and channel is updating plant conditions,     on resetting failure codes, and potential the monitor can be restored to service if     differences in output readings of channels.
failure codes are reset.
: 2. Channels 1 and 2 are gaseous channels.
Channels 3, 4, and 5 are particulate channels. Therefore the output readings for channels 1, 2 compared to channels 3, 4, 5 could be sianificantlv different.
Cue:
Comments:
: 16.      2.3 CHECK if monitor detector "Channel 1"     Examinee states that monitor detector is updating plant conditions, i.e. dynamic     "Channel 1" is updating plant conditions,        y indication update once per second.            i.e. dynamic indication update once per second.
Cue Comments:
: 17.      2.4 PRESS "DSP" "3" "23" "ENT' to check       Examinee states that "DSP" "3" "23" "ENT" if monitor detector "Channel 3" is indicating monitor detector "Channel 3" is indicating        y plant conditions, i.e. is a static indication plant conditions, i.e. is a static indication and will not update once per second and        and will not update once per second and should not read O.                             does not read O.
Cue:
Comments:
Page 10 of 15
 
PERFORMANCE INFORMATION JPM Number:
GRADE STEP                  PERFORMANCE                                STANDARD    ~----        ----
(S/U)
: 18.      2.5 IDENTIFY any Main Board Rad Monitor IExaminee identifies that VENT STACK alarms.                                 RADMONITOR HI/FAIL (C-06/07, A-12)       N alarm is lit.
Cue:
Comments:
19.
Cue:
Comments:
: 20.         5. IF any of the following exist:
_ Failure codes exist other than No.1,  Examinee states that this step is not    y "Detector Failure"                      applicable due to only No.1, "Detector
_ "Channel 1" is not updating plant      Failure" indicated, and both "Channel 1" conditions                              and "Channel 3" indicating plant
_ "Channel 3" is not indicating plant   conditions.
conditions PERFORM the following:
conditions PERFORM the following:
_ CONSULT I&C or System Engineer for corrective action. Generate CR. Page 11 of 15 PERFORMANCE JPM Number: PERFORMANCE 21 . 5. OBTAIN key #82 and CLEAR failure codes at RIC-8168 as follows: 5.1 TURN key switch to "ENABLE." 5.2 PRESS "FTN" "1" "07" "ENT." 5.3 CHECK "EQUIP FAIL" lamp not lit. IF lamp is lit, Go To step 5.6. 5.4 PRESS "ACS" "1/1 "ENT" to activate Channel 1 check source and CHECK indication increases.
_ CONSULT I&C or System Engineer for corrective action.
5.5 CHECK Main Board Rad Monitor alarms have cleared. 5.6 TURN kev switch to "DISABLE." Comments:
Generate CR.
: 22. NOTE If RM-8168 fails, Unit 2 stack gaseous monitor, RM-8132B, is the alternate radiation monitor to be used (preplanned . alternate method), Cue: STANDARD Examinee obtains key #82 Examinee verifies key switch in "ENABLE" Examinee presses "FTN" "1" "07" "ENT." Examinee states that "EQUIP FAIL" lamp is still lit and goes to step 5.6. y y y Examinee turns key switch to "DISABLE." y Examinee reads and acknowledges note about RM-8132B being that alternate radiation monitor . N
Cue:
__________________________________________________________________________________Page 12 of 15 PERFORMANCE JPM Number: CRITICAL GRADE STEP PERFORMANCE STANDARD mO'/N) (S/ljL_ 24. I 7. IF equipment failure did not clear, PERFORM the following:
Comments:
7.1 To ensure Unit 2 stack gaseous monitor, RM-8132B is not being purged, PLACE "STACK GAS EFFLUENT PURGE Examinee places "STACK GAS EFFLUENT PURGE VALVE, RV-8132," in "DISABLE" (C-101). y VALVE, RV-8132," in "DISABLE" (C-101). Cue: Comments:
  ------
Page 11 of 15
 
PERFORMANCE INFORMATION JPM Number:
STEP                      PERFORMANCE                                   STANDARD 21 .       5. OBTAIN key #82 and CLEAR failure       Examinee obtains key #82                y codes at RIC-8168 as follows:
5.1 TURN key switch to "ENABLE."         Examinee verifies key switch in "ENABLE" y 5.2 PRESS "FTN" "1" "07" "ENT."
Examinee presses "FTN" "1" "07" "ENT."  y 5.3 CHECK "EQUIP FAIL" lamp not lit. IF lamp is lit, Go To step 5.6.
5.4 PRESS "ACS" "1/1 "ENT" to activate   Examinee states that "EQUIP FAIL" lamp Channel 1 check source and CHECK         is still lit and goes to step 5.6.
indication increases.
5.5 CHECK Main Board Rad Monitor y
alarms have cleared.                     Examinee turns key switch to "DISABLE."
5.6 TURN kev switch to "DISABLE."
Comments:
22.
: 23.                           NOTE If RM-8168 fails, Unit 2 stack gaseous   Examinee reads and acknowledges note    N monitor, RM-8132B, is the alternate      about RM-8132B being that alternate radiation monitor to be used (preplanned radiation monitor.
1-----
              . alternate method),
Cue:
Com~e~n~ts~:~IL- __________________________________________________________________________________~
Page 12 of 15
 
PERFORMANCE INFORMATION JPM Number:
CRITICAL     GRADE STEP                   PERFORMANCE                               STANDARD                 mO'/N)     (S/ljL_
: 24. I 7. IF equipment failure did not clear, PERFORM the following:
Examinee places "STACK GAS                y 7.1 To ensure Unit 2 stack gaseous     EFFLUENT PURGE VALVE, RV-8132," in monitor, RM-8132B is not being purged, "DISABLE" (C-101).
PLACE "STACK GAS EFFLUENT PURGE VALVE, RV-8132," in "DISABLE" (C-101).
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
____ Page 13 of 15 JPM Number: JPM-S9.1 Rev. __-'0'--__ VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly_
                                                                                          $TQ~~1JJlI~iY*____
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
Page 13 of 15
20 Actual Time to Complete (minutes):
 
JPM Work Practice Evaluation:
JPM Number:                     JPM-S9.1                           Rev. _ _-'0'--__
Overall Result of JPM: SAT SAT UNSAT UNSAT NA (circle one) (circle one) During the TPE, the trainee Evaluation* . performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
VERIFICATION OF JPM COMPLETION Title:
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices.
Date Performed:
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Student:
Page 14 of 15 JPM Number:
Evaluator:
Rev. ___0=--__ STUDENT HANDOUT Initial Conditions: The Unit Supervisor has directed you to carry out actions in response to "VENT STACK RADMONITOR HI/FAIL"( C-06/07, A-12) alarm. Initiating Cues: Unit-2 is in Mode 1 at 100% power You are the BOP operator. "VENT STACK RADMONITOR HI/FAIL" ( C-06/07, A-12) alarm has come in a few moments ago while you were out of the Control Room. The RO has obtained ARP 2590E-061, and has turned over this alarm response to you. Page 15 of 15
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly_ If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
-------JOB PERFORMANCE MEASURE APPROVAL SHEET I. ..IPM Title: JPM Number: JPM-013 Revision:
Time Critical Task?       Yes             No   X
                              -
Validated Time (minutes):                   20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                 SAT          UNSAT            NA        (circle one)
Overall Result of JPM:                       SAT         UNSAT                     (circle one)
During the TPE, the trainee                                                     Evaluation* .
performed the task correctly and in accordance with procedure                   Pass I Fail usage and adherence requirements.
never put anyone's safety at risk.                                             Pass I Fail never put equipment reliability at risk.                                       Pass I Fail never violated radiological work practices.                                     Pass I Fail demonstrated effective use of event-free human performance tools.               Pass I Fail Areas for Improvement/Comments:
Page 14 of 15
 
JPM Number:                 JPM-S9.1                          Rev. ___0=--__
STUDENT HANDOUT Initial Conditions:
* The Unit Supervisor has directed you to carry out actions in response to "VENT STACK RADMONITOR HI/FAIL"( C-06/07, A-12) alarm.
Initiating Cues:
* Unit-2 is in Mode 1 at 100% power
* You are the BOP operator.
                    * "VENT STACK RADMONITOR HI/FAIL" ( C-06/07, A-12) alarm has come in a few moments ago while you were out of the Control Room.
* The RO has obtained ARP 2590E-061, and has turned over this alarm response to you.
Page 15 of 15
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I.   ..IPM Title:
JPM Number:               JPM-013                 Revision:
                                                                  -------
6/1 II. Initiated:
6/1 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date 2006. Reviewed:
Marc R. Pucel                         02/01/11 Developer                             Date 2006.         Reviewed:
2006. Approved:
2006.         Approved:
N/A Cognizant Plant Supervisor (optional)
N/A Cognizant Plant Supervisor (optional)             Date z-{s;r ,
Date z-{s;r , Nuclear Training Supervisor date Page 1 of 13 JOB PERFORMANCE  
Nuclear Training Supervisor                   date Page 1 of 13
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 6/0 11/19/2010 Minor admin changes to JPM to reflect minor procedure 6/1 i change (OP 2302A) and standards I Page 2 of 13
OF CHANGES:
-----------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format     6/0 11/19/2010   Minor admin changes to JPM to reflect minor procedure     6/1 i             change (OP 2302A) and standards I
--------JPM Number: Rev. 6/1 JOB PERFORMANCE MEASURE WORKSHEET (continued)
Page 2 of 13
Facility:
 
MP2 Examinee:
JPM Number:                                                                                                                                ~IPM-013                                                                                                                                                                                                                                                          Rev. - - 6/1                              ---
JPM Number: Rev. __..:..:6/...,;.1
JOB PERFORMANCE MEASURE WORKSHEET (continued)
__
Facility:      MP2                                                                                                                          Examinee:
..*t* *.*.J..".*
                                                                                                                                                                                                                  ------------------
* ..*n**..*.*.O**.*.*
JPM Number:                                                                                                                                   JPM-013                                                                                                                                                                                                                                                                                      Rev. _ _. :. :6/.. ,;.1_ _
..*.**a...o......................................." .*.......
Task Title:       ;.<'.i:)
f...**ili."*.*J*.**.i*.***.**.n**.*.*.*.*.***g*****.*.**
                      *.~...*.*.*
.. S.* ***c**** ....i.*; **.* .**..**.....  
                            *.*..*. CI,lJ.,
......*.*i::..*.*.**....*.......*..*.." .*..*.Ii.*.. *.*.'* *.*.*.. .** * ......*..*...".:*.;.;..
                                  *..........
....*.*.* ..........
t*        *.*.**.****** **.I*
*** **.I* .. .....* ...**.* .............*
                                        *.*.J..".*             ..*n*
'....*.*o.*'.n':.**.".:...**  
                                                                  ..*..*.*.O**.*.*.
* .........................*...*
_ ..'*..** .....* ...**.
'*.*.*.* .*.*.*.'.*.*. M ..i ..*.*.***.........#!'f!.* ..*.*.***...*.t*.
a...."W                          ". . . . . . .'*. . ~.~
' .. .. * ;.Task Title: i:) CI,lJ., _ ..' ."W
o ..*. . . . . . . . . . . .1!'".I;~JJi\;;        .*....... f.. *ili."*.*J*.**.i*.***.**.n**.*.*.*.*.***g*****.*.**       . '.' .\Ih,*J;;W'ml!l~*i:)
_ .. '.'
                                                                                                                                                                                                                                      ....i.;*. . .
System: Control Element Drive System (CEDS) Time Critical Task: Yes No x Validated Time (minutes):
_ .. S.*.e****c*****.*o.*'.n':.**.".:...**       #**.*!
20 Task No.(s): NUTIMS Applicable To: SRO X RO X PEO KIA No. -A. 408 KIA Rating __3_.7_/3......_4Method of Simulated Performance:
                                                                                                                                                                                                                                                        .**..**.....
X Actual Classroom:
                                                                                                                                                                                                                                                          ' f !.... i::
Simulator:
                                                                                                                                                                                                                                                                  *...*.*
In-Plant: ---Task At the completion of this JPM, the examinee has successfully started the CEDM MG set and paralleled it with the "8" MG set. Reguired Materials OP-2302A, Section 4.7 (pen and ink changes required) (procedures, equipment, etc.): General  
                                                                                                                                                                                                                                                                    '* . *.*..**. . *.*.". . . . . *. *'. *..
                                                                                                                                                                                                                                                                                                              .*.*.*.*
I ..i*..** .
                                                                                                                                                                                                                                                                                                                            ...
                                                                                                                                                                                                                                                                                                                            *' *.*.*
                                                                                                                                                                                                                                                                                                                                * . *.*.'
                                                                                                                                                                                                                                                                                                                                      .. .**. *.*.
                                                                                                                                                                                                                                                                                                                                              * * ...
                                                                                                                                                                                                                                                                                                                                                    ;. M*..*...".:.i*.;.;.~*.**.*..*.*..*.*.***e... ..";":\\~8h,;**'*Y' **.~4f~~~;i;r
                                                                                                                                                                                                                                                                                                                                                      . . .                                         *.t*.. . . . . . . . . . . . . . " . ' . " . " . . "vi/Wi" System:       Control Element Drive System (CEDS)
Time Critical Task:                                             Yes                                                                                 No                                                         x Validated Time (minutes):                                                                                                                                     20 Task No.(s):                               NUTIMS #001-01-019 Applicable To:                                                           SRO                                                                 X                                                           RO                   X                                                                                       PEO                                                                         X KIA No.                                                             -A. 408                                                                                                                                                                                                                                                                                                                               KIA Rating _ _3_.7_/3......_4__
Method of Testing:
Simulated Performance: - -X- -                                                                                                                                                                                    Actual Performance:
                                                                                                                                                                                                                                                                                                                                                                                                          ----
Location:
Classroom:                                                                                                           Simulator:                                                                                                                                                                                                       In-Plant:                                                                           X
                ---                                                                                                                                                                                   ---                                                                                                                                                                                                  ----'-'-
Task Standards:                                                                                                At the completion of this JPM, the examinee has successfully started the '~" CEDM MG set and paralleled it with the "8" MG set.
Reguired Materials                                                                                     OP-2302A, Section 4.7 (pen and ink changes required)
(procedures, equipment, etc.):
General  


==References:==
==References:==
OP 2302A, "Control Element Drive System"
                                                                                                                      * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 13
JPM Number:                          "IPM-013                            Rev.
                                                                              - - -6/1- - -
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initial Conditions:
* The plant is preparing for startup.
* The "B" CEDM MG set has been placed in service with its load contactor closed.
* All TCBs are open except TCB-9, which is closed.
* Both Voltage droop circuits are on.
* In-plant loads are powered from the RSST.
* No maintenance has been performed on "A" or "B" CEDM MG sets.
Initiating Cues:
* The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set.
Simulator
* NIA Requirements:
                                  * *
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the examinee states what hislher simulated action/observation would be, read the appropriate "Cue".
: 3. Ifnecessary, question the examinee for details of simulated actions/observations (i.e. "What are you looking at?" or "\\Inat are you observing?").
: 4. Under NO circumstances must the examinee be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
Page 4 of 13
PERFORMANCE INFORMATION JPM Number:                JPM-013                                                                                                          Rev.. 6/1 ST                                            PERFORMANCE                                                      STANDARD
                                                                                                                                          $~A~r.TIMS:,. _ _ __
: 1.                                                      CAUTION If bus 24C and 24D are not receiving power                                          I Examinee reads and acknowledges the        N from the same source, (not at the same                                                Caution.
frequency), the CEDM MG set outputs cannot be paralleled due to the potential I difference in motor speeds.
:/h "~"A<A/ffd"",!j-V'A,A"~"",%L.,>,>"d\"",,,"_;< i"A_ ", " . *, ' <.'.'A~C  , . ",l*,
Cue:
Comments:
2.
Cue:
Comments:
: 3.        4.7.2 PERFORM applicable action:                                                      Examinee progresses to step 4.7.3.          y
* IF starting "A" CEDM MG second, Go To step 4.7.3.
* IF starting "8" CEDM MG second, Go I------+I~.=    ...,..,..T-.,o steD 4.7.4.
Cue:
Comments:
4.
Cue:
Comments:
Page 5 of 13
PERFORMANCE INFORMATION JPM Number:            JPM-013                                                                                              Rev..      6/1
:,. '
1 St~~ii1g!~Htr}t!?~f:~lIeURg:tS~Ga~q;;GF'J1)r{nM&sect;~$et~:p4;;,>;:""
STEP                                PERFORMANCE                                              STANDARD
: 5.        4.7.3 IF starting "A" CEDM MG second,                            Examinee states that they would place                y PERFORM the following:                                          "MG-A" handswitch to "START" or request that it be done by someone in the Control
: a. PLACE "MG-A" to "START" (C-04).                            I Room.
                                                                              . -- _ . .                                  I                I Cue: I ' ,"..' k , ' .. '" ~ ** '1i> ""='~""'>'''''''' ~~"trnl~"hri:t-"''':In:ci&'3th~ breakerJinform the examinee that it h'asbeen closed.
indication that would be seen based on the Comments:
: 6.        b. PLACE "A" CEDM MG "MOTOR INPUT"                              Examinee states that they close MG motor              y breaker to "ON" (top left of C-30).                              supply breaker by taking handle on top left of C-30 to "ON".
Cue:
Comments:
: 7.        c. PLACE "A" CEDM MG "INCOMING                                  Examinee states that they place                      y GENERATOR" synchronizing selector                                synchronizing selector switch on C-29 in switch to "LOCAL."                                              "LOCAL".
Cue:
Comments:
: 8.                                                                        Examinee states that they press "MOTOR                y ON" pushbutton for 4-5 sec.
Cue:
Comments:
: 9.                                                                        Examinee states that they have released the "MOTOR ON" Dushbutton.
Cue:
Comments:
Page 6 of 13
PERFORMANCE INFORMATION JPM Number:        JPM-013                                                                                Rev.. 6/1 STEP                                      PERFORMANCE                      STANDARD 1 O. I f. ALLOW MG set to come up to rated                Examinee states that the "red" indicating      N speed (red "LOCAL" "MOTOR ON" light, lit).      light above the "Motor On" pushbutton should light when the MG set is at rated
          , ,
speed.
                    """,:",,:,"*,.,.,3:k u ,> '
Cue:
Comments:
11 .
Cue:
Comments:
: 12.        h. WHEN 142 to 158 seconds have lapsed          Examinee states that they are waiting and      N after starting MG set AND within 2 second        listening for 142 to 158 seconds after of the red 'MOTOR ON' light lighting,            starting MG set AND within 2 seconds of LISTEN for audible clunk (indicates starting    the red 'MOTOR ON' light lighting, for winding de-energized).                            audible clunk (indicates starting winding Comments:
13.
Cue:
Comments:
Page 7 of 13
PERFORMANCE INFORMATION JPM Number:      JPM-013                                                                                Rev.. 6/1 STEP                    PERFORMANCE                                    STANDARD
: 14.      j. Using "LOCAL" "GEN VOLTAGE                  Examinee states that voltage is already at          N ADJUSTMENT" switch, ADJUST                    240 VAC and no adjustment is necessary.
            "GENERATOR VOLTS" as close as ble to 240 volts.
Cue:
Comments: I The voltage indication was given in the previous step. However, If the examinee feels it must be adjusted, have them demonstrate how by pointing to the applicableI volt meter and where the needle should be for proper I  ~
indication.
I    ~---I
: 15.                            NOTE Closing "GENERATOR OUTPUT" breaker            Examinee reads and acknowledges the                N does not energize the bus.                    Note.
Cue:
Comments:
: 16. I k. PLACE "A" CEDM MG "GENERATOR                Examinee states that they close MG Set              y OUTPUT" breaker to "ON."                      Output breaker by taking handle on bottom ht of C-29 to "ON".
Cue:
Comments:
Page 8 of 13
PERFORMANCE INFORMATION JPM Number:      JPM-013                                                                            Rev.. 6/1 STEP                    PERFORMANCE                                  STANDARD
: 17.                          NOTE
: 1. If other MG set is not loaded, the speed I Examinee reads and acknowledges the            N of each machine is very close to each      Note.
other and the synchroscope may not be rotating.
: 2. The object of the following steps is to have the synchroscope at or very near the 12 o'clock position and nearly stationary and the voltages of both machines set at or near 240 VAC.
Cue:
Comments:
: 18.      I. IF synchroscope is not at 12 o'clock and      1) Examinee states that they are turning      y not rotating, PERFORM the following to get          the "REMOTE" "GEN VOLTAGE the synchroscope to move:                          ADJUSTMENT" switch to raise the
: 1) Using "REMOTE" "GEN VOLTAGE                      "REMOTE" ("B" CEDM MG)
ADJUSTMENT" switch, RAISE                      "GENERATOR VOLTS" to 250 VAC.
                "REMOTE" ("B" CEDM MG)                      2) Examinee states that they are turning "GENERATOR VOLTS" to 250 VAC.                  the "LOCAL" "GEN VOLTAGE
: 2) Using "LOCAL" "GEN VOLTAGE                      ADJUSTMENT" switch to lower the ADJUSTMENT" switch, LOWER                      "LOCAL" ("A" CEDM MG)
                "LOCAL" ("An CEDM MG)                          "GENERATOR VOLTS" to 235 VAC.
                "GENERATOR VOLTS" to 235 VAC.
Cue:
Comments:
Page 9 of 13
PERFORMANCE INFORMATION JPM Number:                    JPM-013                                                                                                                                                            Rev.. 6/1 STEP                                        PERFORMANCE                                                                                                        STANDARD
: 19. I m. WHEN synchroscope is at the 12 o'clock                                                                                        1) Examinee states that they are turning                  Y position, ADJUST both MG set output                                                                                              the "REMOTE" "GEN VOLTAGE voltages to 240 VAC. (The synchroscope                                                                                            ADJUSTMENT" switch to lower the should be nearly stationary.)                                                                                                    "REMOTE" ("8" CEDM MG)
                                                                                                                                                "GENERATOR VOLTS" to 240 VAC.
: 2) Examinee states that they are turning the "LOCAL" "GEN VOLTAGE ADJUSTMENT" switch to raise the "LOCAL" ("A" CEDM MG)
                                                                                                                                                "GENERATOR ,VOLTS"                    to 240 VAC.
t ,...      ..~~. '~M'~"" "      _"_'_H,~,'_' J'.{~V'.'1(%,:;;;W:P;%SL$L,,,,,",-,_9      ' ,.  . ,., "H ,>. t!:v.Mt~hZC.,,&b      h_""~22t2t!M&,, *    ,.'L;;:#",~, _ j Cue:
Comments:
: 20. I n. PRESS and HOLD "LOCAL" "LOAD ON". I Examinee states that they press the "A"                                                                                                              Y CEDM MG set "LOAD ON" button until the L,,,,~,,,,,!,,,,,.,,,,."h ****. '.                    """'~h!:,!.",",va>>",*","".""""_T,_,,,,,_.
A.*:~OAD ON"li~.~t is Cue:
Comments:
21.
Cue:
Comments:
Page 10 of 13


OP 2302A, "Control Element Drive System" * * *
PERFORMANCE INFORMATION JPM Number:       JPM-013                                                                         Rev.. 6/1 STEP   L              PERFORMANCE                                  STANDARD n  _ - - -                 , - ,     , - - ,
* READ TO THE EXAMINEE * * *
: 22.       p. PLACE "A" CEDM MG "INCOMING            Examinee states that they turn the GENERATOR" synchronizing selector          synchronizing selector switch to "OFF."
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
t-------hL~A,_
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
switch to "OFF."
Page 3 of 13 
Cue:
------JPM Number:
Comments: I If performing this JPM with either MG set operating. TERMINA TE the JPM after the completion of this step.
Rev. 6/1 JOB PERFORMANCE MEASURE WORKSHEET (continued)
If performing this JPM with both MG sets secured and permission has been granted to open the cabinet, continue the JPM to normal comDletion.
Initial Conditions: The plant is preparing for startup. The "B" CEDM MG set has been placed in service with its load contactor closed. All TCBs are open except TCB-9, which is closed. Both Voltage droop circuits are on. In-plant loads are powered from the RSST. No maintenance has been performed on "A" or "B" CEDM MG sets. Initiating Cues: The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set. Simulator NIA Requirements: * *
: 23. I q. PRESS and RELEASE "RESET," (back     I Examinee opens the back door of C-29             N of C-29).                                 and states that they would press the reset button.
* NOTES TO EVALUATOR
Cue:
* * *
Comments:
* Critical steps for this JPM are indicated by checking "Y". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the examinee states what hislher simulated action/observation would be, read the appropriate "Cue". Ifnecessary, question the examinee for details of simulated actions/observations (i.e. "What are you looking at?" or "\\Inat are you observing?"). Under NO circumstances must the examinee be allowed to manipulate any devices during the performance ofthis JPM (in-plant only). Page 4 of 13 PERFORMANCE JPM Number: Rev.. 6/1 ST STANDARD
24.
____ 1 CAUTION If bus 24C and 24D are not receiving power I Examinee reads and acknowledges the N from the same source, (not at the same Caution. frequency), the CEDM MG set outputs cannot be paralleled due to the potential I difference in motor speeds. :/h i"A_ ", " .*,' , . ",l*,
Cue:
: 2.
Comments:
: 3. 4.7.2 PERFORM applicable action: Examinee progresses to step y IF starting "A" CEDM MG second, To step IF starting "8" CEDM MG second, Go
...,..,..T-.,o steD
: 4.
Page 5 of 13 PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP 5. Cue: Comments:
: 6. Cue: Comments:
: 7. Cue: Comments:
: 8. Cue: Comments:
: 9. Cue: Comments:
:,. ' 1 STANDARD 4.7.3 IF starting "A" CEDM MG Examinee states that they would place y PERFORM the "MG-A" handswitch to "START" or that it be done by someone in the a. PLACE "MG-A" to "START" Room.--_ . . I I I I ' ,"..'k,'.. '" ** '1i>
breakerJinform the examinee that it h'asbeen closed. b. PLACE "A" CEDM MG "MOTOR INPUT" breaker to "ON" (top left of C-30). c. PLACE "A" CEDM MG "INCOMING GENERATOR" synchronizing selector switch to "LOCAL." indication that would be seen based on the Examinee states that they close MG motor y supply breaker by taking handle on top left of C-30 to "ON". y Examinee states that they place synchronizing selector switch on C-29 in "LOCAL". y Examinee states that they press "MOTOR ON" pushbutton for 4-5 sec. Examinee states that they have released the "MOTOR ON" Dushbutton.
Page 6 of 13 PERFORMANCE JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD 1 O. I f. ALLOW MG set to come up to rated speed (red "LOCAL" "MOTOR ON" light, lit). , , """,:",,:,"*,.,.,3:k u ,> ' Cue: Comments:
11 . Examinee states that the "red" indicating light above the "Motor On" pushbutton should light when the MG set is at rated speed. N Cue: Comments:
: 12. h. WHEN 142 to 158 seconds have lapsed after starting MG set AND within 2 second of the red 'MOTOR ON' light lighting, LISTEN for audible clunk (indicates starting winding de-energized).
Examinee states that they are waiting and listening for 142 to 158 seconds after starting MG set AND within 2 seconds of the red 'MOTOR ON' light lighting, for audible clunk (indicates starting winding N Comments:
: 13. Cue: Comments:
Page 7 of 13 PERFORMANCE JPM Number: Rev.. 6/1 STEP STANDARD j. Using "LOCAL" "GEN VOLTAGE Examinee states that voltage is already at N ADJUSTMENT" switch, ADJUST 240 VAC and no adjustment is necessary. "GENERATOR VOLTS" as close as ble to 240 volts. Cue: Comments:
I The voltage indication was given in the previous step. However, If the examinee feels it must be adjusted, have them demonstrate how by pointing to the applicable volt meter and where the needle should be for proper indication.
: 15. NOTE I I I Closing "GENERATOR OUTPUT" breaker does not energize the bus. Examinee reads and acknowledges the Note. N Cue: Comments: 1 6 . I k. PLACE "A" CEDM MG "GENERATOR OUTPUT" breaker to "ON." Examinee states that they close MG Set Output breaker by taking handle on bottom ht of C-29 to "ON". y Cue: Comments:
Page 8 of 13 PERFORMANCE JPM Number: Rev.. 6/1 STEP 17. Cue: Comments:
: 18. Cue:
STANDARD NOTE If other MG set is not loaded, the speed I Examinee reads and acknowledges the N of each machine is very close to each Note. other and the synchroscope may not be rotating. The object of the following steps is to have the synchroscope at or very near the 12 o'clock position and nearly stationary and the voltages of both machines set at or near 240 VAC. I. IF synchroscope is not at 12 o'clock and 1) Examinee states that they are turning y not rotating, PERFORM the following to get the "REMOTE" "GEN VOLTAGE the synchroscope to move: ADJUSTMENT" switch to raise the 1) Using "REMOTE" "GEN VOLTAGE "REMOTE" ("B" CEDM MG) ADJUSTMENT" switch, RAISE "GENERATOR VOLTS" to 250 "REMOTE" ("B" CEDM MG) 2) Examinee states that they are "GENERATOR VOLTS" to 250 VAC. the "LOCAL" "GEN 2) Using "LOCAL" "GEN VOLTAGE ADJUSTMENT" switch to lower the ADJUSTMENT" switch, LOWER "LOCAL" ("A" CEDM MG) "LOCAL" ("An CEDM MG) "GENERATOR VOLTS" to 235 VAC. "GENERATOR VOLTS" to 235 VAC. Comments:
Page 9 of 13 PERFORMANCE JPM Number: Rev.. 6/1 STEP STANDARD I m. WHEN synchroscope is at the 12 o'clock 1) Examinee states that they are turning Y position, ADJUST both MG set output the "REMOTE" "GEN VOL TAGE voltages to 240 VAC. (The synchroscope ADJUSTMENT" switch to lower the should be nearly stationary.) "REMOTE" ("8" CEDM MG) "GENERATOR VOLTS" to 240 VAC. Examinee states that they are turning the "LOCAL" "GEN VOLTAGE ADJUSTMENT" switch to raise the "LOCAL" ("A" CEDM MG) "GENERATOR VOLTS" to 240 VAC. t "
' ,. . ,., "H ,>. * ,
_j Cue: Comments:
: 20. I n. PRESS and HOLD "LOCAL" "LOAD ON". I Examinee states that they press the "A" Y CEDM MG set "LOAD ON" button until the is
****. '.
Cue: Comments:
: 21. Cue: Comments:
Page 10 of 13 PERFORMANCE JPM Number: Rev.. 6/1 STEP STANDARDn _ ---, -, , --, p. PLACE "A" CEDM MG "INCOMING Examinee states that they turn GENERATOR" synchronizing selector synchronizing selector switch to switch to Cue: Comments:
I If performing this JPM with either MG set operating.
TERMINA TE the JPM after the completion of this step. If performing this JPM with both MG sets secured and permission has been granted to open the cabinet, continue the JPM to normal comDletion. I q.PRESS and RELEASE "RESET," (back I Examinee opens the back door of C-29 of C-29). and states that they would press the
: 24.
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
S.TPP Page 11 of 13 JPM Number: JPM-013 Rev. __...:.c6/,-1
S.TPP 11IfJJ~:
__ VERIFICATION OF JPM COMPLETION Date For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Page 11 of 13
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
 
20 Actual Time to Complete (minutes):
JPM Number:                     JPM-013                           Rev. _ _...:.c6/,-1_ _
JPM Work Practice Evaluation:
VERIFICATION OF JPM COMPLETION Title:
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
Date Performed:
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices.
Student:
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Evaluator:
Page 12 of 13
For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
..IPM Number: Rev. __
Time Critical Task?       Yes             No   X
__ STUDENT Initial Conditions: The plant is preparing for startup. The "B" CEDM MG set has been placed in service with its load contactor closed. All TCBs are open except TCB-9. which is closed. Both voltage droop circuits are on. In-plant loads are powered from the RSST. No maintenance has been performed on "A" or "S" CEDM MG sets. Initiating Cues: The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set. Page 13 of 13 JOB PERFORMANCE MEASURE APPROVAL SHEET JPM Title: JPM Number: JPM-124 Revision:
                              -
4/0 Initiated:
Validated Time (minutes):                   20 Actual Time to Complete (minutes):
Marc R. 02/01/11 Date Reviewed:
JPM Work Practice Evaluation:                 SAT         UNSAT             NA           (circle one)
P;&p/Technical Revie Da e Approved:
Overall Result of JPM:                       SAT         UNSAT                         (circle one) the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure usage                 Pass I Fail and adherence requirements.
Cognizant Plant Supervisor Date 2J&#xa5;1 1 Nuclear Training Date Page 1 of 8 JOB PERFORMANCE MEASURE  
never put anyone's safety at risk.                                                 Pass I Fail never put equipment reliability at risk.                                           Pass I Fail never violated radiological work practices.                                         Pass I Fail demonstrated effective use of event-free human performance tools.                   Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
 
..IPM Number:                 JPM-013                            Rev. _ _.:::..:6/~1 _ _
STUDENT HANDOUT Initial Conditions:
* The plant is preparing for startup.
* The "B" CEDM MG set has been placed in service with its load contactor closed.
* All TCBs are open except TCB-9. which is closed.
* Both voltage droop circuits are on.
* In-plant loads are powered from the RSST.
* No maintenance has been performed on "A" or "S" CEDM MG sets.
Initiating Cues:
* The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set.
Page 13 of 13
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-124                 Revision:   4/0 II. Initiated:
Marc R. Pucel                          02/01/11 Developer                            Date III. Reviewed:
Technical Revie    r P;&p/ Da e IV. Approved:
Cognizant Plant Supervisor (optional)              Date Nuclear Training Supervisor 2J&#xa5;11  Date Page 1 of 8
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE  
OF CHANGES:
..... "'...."'-317 Update JPM to include HUP evaluations and new format Page 2 of 8
All & DATE                     DESCRIPTION                       REV/CHANGE
-------------------
..... "'...."'-317 Update JPM to include HUP evaluations and new format Page 2 of 8
--------------------JPM Number: JPM-124 Rev. __
 
__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                          JPM-124                              Rev. _ _....:.;4/~0_ _
Facility:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
MP2 Examinee:
Facility:      MP2                  Examinee:
JPM Number: Rev. 4/0 Task System: Service Time Critical Task: Yes No x Validated Time (minutes): Task No.(s.): __________Applicable To: SRO X RO X KIA No. 076 A4.02 KIA Rating __2_.6_/2_._6Method of Simulated Performance:
                                                -------------------
X Actual Classroom:
JPM Number:                           JPM-124                                   Rev. - - 4/0   ---
Simulator:
Task Title:
In-Plant: ---Task At the completion of this JPM, the examinee will have placed 2-SW-3.2A in manual operation and closed the valve. Required Materials OP 2326A Attachment 3" Manual Operation of 2-SW-3.2A and (procedures, equipment.
System:       Service Water Time Critical Task:     Yes ---- No           x Validated Time (minutes):                 15 Task No.(s.): _ _ _ _ _ _ _ _ _ __
etc.): SW-3.2B" General  
Applicable To:           SRO         X       RO     X       PEO - - -
KIA No.               076 A4.02               KIA Rating _ _2_.6_/2_._6__
Method of Testing:
Simulated Performance: - -X- -                  Actual Performance:
                                                                        ----
Location:
Classroom: - - - -                Simulator:                   In-Plant: --=-=-
X
                                              ---
Task Standards:                    At the completion of this JPM, the examinee will have placed 2-SW-3.2A in manual operation and closed the valve.
Required Materials               OP 2326A Attachment 3" Manual Operation of 2-SW-3.2A and 2 (procedures, equipment. etc.):   SW-3.2B" General  


==References:==
==References:==
OP 2326A Service Water
                                  * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
JPM Number:                                    24                          Rev. _ _....:.:4/'-=0_ _
            .JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
* You have been directed to take manual control and close 2-SW-3.2A per OP 2326A, Attachment 3
* The examiner will act as the US as needed.
Initial Conditions:
* The plant has tripped due to a LOCA.
* A SIAS was automatically actuated.
                        *  "8" Service Water Supply to TBCCW Heat Exchangers, 2-SW-3.2A, failed to close on the SIAS signal, and will NOT close from the Control Room.
Simulator
* N/A Requirements:
                                  -It -It -It NOTES TO EVALUATOR -It    -It -It-lt
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
: 3. Ifnecessary, question the student for details of simulated actions/observations (Le. "What an~ you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 8
PERFORMANCE INFORMATION JPM Number:
STEP                      PERFORMANCE                                STANDARD
: 1.        OP 2326A Attachment 3
: 1. To place valve in manual, PERFORM the  Examinee identifies 2-SW-3.2A and          N following:                                documents valve number and function on 1.1 DOCUMENT valve number and function    top of Attachment 3 (OP 2326A).
I ~, ~.. of this Attachment Cue:
Comments:
2.
Cue:
Comments:
: 3.      I 1.3 OPEN operating cylinder equalizing    Examinee opens operating cylinder          y valve.                                    equalizing valve for 2-SW-3.2A by taking the valve to the counter-clockwise direction.
Cue:
Comments:
: 4.        1.4 To align slot in shaft with T-handle I Examinee aligns slot in shaft with T-handle y mechanism, OPERATE manual handwheel.      mechanism with the use of the manual handwheel.
Cue:
Comments:
Page 5 of 8


OP 2326A Service Water * * *
PERFORMANCE INFORMATION JPM Number:
* READ TO THE EXAMINEE * * *
GRADE STEP                                 PERFORMANCE                                     STANDARD                                                 JS/U}
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 5.      1.5 ENGAGE T-handle mechanism in valve                 Examinee ENGAGE's T-handle                                 y shaft.                                                 mechanism in valve shaft for 2-SW-3.2A.
You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Cue:
Page 3 of 8 JPM Number: Rev. __....:.:4/'-=0
Comments:
__ .JOB PERFORMANCE MEASURE WORKSHEET (continued)
: 6.                                          NOTE The following are reverse acting valves:                Examinee reads and acknowledges note.                     N
Initiating Cues: You have been directed to take manual control and close 2-SW-3.2A per OP 2326A, Attachment 3
_ 2-SW-3.2B, 'A' SERVICE WATER HEADER TO TBCCW HEAT EXCHANGERS"
* The examiner will act as the US as needed. Initial Conditions: The plant has tripped due to a LOCA. A SIAS was automatically actuated. "8" Service Water Supply to TBCCW Heat Exchangers, 2-SW-3.2A, failed to close on the SIAS signal, and will NOT close from the Control Room. Simulator N/A Requirements: -It -It -It -It-lt NOTES TO EVALUATOR -It Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". Ifnecessary, question the student for details of simulated actions/observations (Le. "What you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 8 PERFORMANCE JPM Number: 1 OP 2326A Attachment 3 1. To place valve in manual, PERFORM the following:
_ 2-SW-3.2A, 'B' SERVICE WATER HEADER TO TBCCW HEAT I--_ _ _-+I.,,:;;~~;;;..X:.,:C..;,..H~J\NGERS" Cue:
1.1 DOCUMENT valve number and function I of this Attachment Cue: Comments:
Comments:
: 2. Cue: Comments: 3 I 1.3 OPEN operating cylinder equalizing valve. Cue: Comments: 1.4 To align slot in shaft with T-handle mechanism, OPERATE manual handwheel.
: 7.      1.6 POSITION valve as directed by SM or                 Examinee closes 2-SW-3.2A by operating                     y US:                                                     handwheel in counterclockwise direction to
Cue: Comments:
_ To close valve, OPERATE handwheel in                   its limit of travel.
STANDARD Examinee identifies 2-SW-3.2A and documents valve number and function on top of Attachment 3 (OP 2326A). N Examinee opens operating cylinder equalizing valve for 2-SW-3.2A by taking the valve to the counter-clockwise direction.
counterclockwise direction.
y I Examinee aligns slot in shaft with T-handle mechanism with the use of the manual handwheel.
_ To open valve, OPERATE handwheel in 1------1 clockwise direction.
y Page 5 of 8 PERFORMANCE JPM Number: GRADE STEP PERFORMANCE STANDARD JS/U} 1.5 ENGAGE T-handle mechanism in valve Examinee ENGAGE's T-handle shaft. mechanism in valve shaft for The following are reverse acting Examinee reads and acknowledges note. N _ 2-SW-3.2B, 'A' SERVICE WATER HEADER TO TBCCW HEAT EXCHANGERS" _ 2-SW-3.2A , 'B' SERVICE WATER HEADER TO TBCCW HEAT I--___1.6 POSITION valve as directed by SM or Examinee closes 2-SW-3.2A by operating US: handwheel in counterclockwise direction _ To close valve, OPERATE handwheel in its limit of counterclockwise
Cue:
_ To open valve, OPERATE handwheel clockwise 1------1 Cue: TERMINATION CUE: The evaluation for this JPM is concluded. " .. "';/ <'" / ,
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 6 of 8 JPM Number: JPM-124 Rev. __....:.:4/....::.0
                                                                                                                " .. "';/ <'" S:;<U'/~;///// / ,
__ VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
                                                                                                              ,~Pl1ME::
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
Page 6 of 8
15 Actual Time to Complete (minutes):
 
JPM Work Practice Evaluation:
JPM Number:                     JPM-124                           Rev. _ _....:.:4/....::.0_ _
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) During the TPE, the trainee Evaluation  
VERIFICATION OF JPM COMPLETION Title:
.. performed the task correctly and in accordance with procedure Pass 1 Fail usage and adherence requirements.
Date Performed:
never put anyone's safety at risk. Pass / Fail never put equipment reliability at risk. Pass I Fail never violated radioloQical work practices.
Student:
Pass / Fail demonstrated effective use of event-free human performance too Pass / Fail Areas for Improvement/Comments:
Evaluator:
Page 7 of 8 JPM Number: Rev. __:....:4/:....:0
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
__ Initial Conditions:
Time Critical Task?       Yes             No     X
Initiating Cues: STUDENT You have been directed to take manual control and close 2-SW-3.2A per OP 2326A, Attachment 3 The examiner will act as the US as needed. The plant has tripped due to a LOCA. A SIAS was automatically actuated. "B" Service Water Supply to TBCCW Heat Exchangers, 2-SW-3.2A, failed to close on the SIAS signal, and will NOT close from the Control Room. Page 8 of 8 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: JPM Number: ..IPM-P2.2 Revision: II. Initiated:
                              -
Marc R. Pucel Developer 02/01/11 Date III. Reviewed:
Validated Time (minutes):                     15 Actual Time to Complete (minutes):
ReVier IV. Approved:
JPM Work Practice Evaluation:                 SAT         UNSAT           NA                 (circle one)
Cognizant Plant Supervisor (optional)
Overall Result of JPM:                         SAT         UNSAT                             (circle one)
Date "'"" Nuclear Training Supervisor Date Page 1 of 13 JOB PERFORMANCE MEASURE  
During the TPE, the trainee                                                         Evaluation         ..
performed the task correctly and in accordance with procedure                           Pass 1 Fail usage and adherence requirements.
never put anyone's safety at risk.                                                     Pass /   Fail never put equipment reliability at risk.                                               Pass I   Fail never violated radioloQical work practices.                                             Pass /   Fail demonstrated effective use of event-free human performance too                         Pass /   Fail Areas for Improvement/Comments:
Page 7 of 8
 
JPM Number:                   JPM-124                            Rev. _ _:....:4/:....:0_ _
STUDENT HANDOUT Initial Conditions:
* You have been directed to take manual control and close 2-SW-3.2A per OP 2326A, Attachment 3
* The examiner will act as the US as needed.
Initiating Cues:
* The plant has tripped due to a LOCA.
* A SIAS was automatically actuated.
                    * "B" Service Water Supply to TBCCW Heat Exchangers, 2-SW-3.2A, failed to close on the SIAS signal, and will NOT close from the Control Room.
Page 8 of 8
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               ..IPM-P2.2               Revision: --::-
II. Initiated:
Marc R. Pucel                         02/01/11 Developer                            Date III. Reviewed:
T~chnical ReVier IV. Approved:
Cognizant Plant Supervisor (optional)             Date
          "'""   Nuclear Training Supervisor                     Date Page 1 of 13
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13
OF CHANGES:
-------------------------
All & DATE                   DESCRIPTION                       REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format Page 2 of 13
------------------------JPM Number: JPM-P2.2 Rev. ___0=--__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                          JPM-P2.2                                                      Rev. ___0=--__
MP2 Examinee:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
...IPM Number:
Facility:        MP2                  Examinee:
Rev. ___0"-__ Task Title: System: Instrument Air Time Critical Task: Yes No x Validated Time (minutes):
                                                    -------------------------
__2_0___ Task No.(s): __________
. .IPM Number:                       JPM-P2.2                                                           Rev. ___0"-__
_ Applicable To: SRO X RO X PEO KIA No. 065 M1.04 KIA Rating _---C::.3..:....:.5:..:..../3=-::.-"-4
Task Title:
__ Method of Simulated Performance:
System:         Instrument Air Time Critical Task:         Yes             No     x Validated Time (minutes):               __    2_0_ __
X Actual Classroom:
Task No.(s): _ _ _ _ _ _ _ _ _ __
Simulator:
Applicable To:             SRO       X         RO     X             PEO
In-Plant: Task At the completion of this JPM, the examinee will have aligned a backup air supply to 2-CH-517, 2-CH-518, and 2-CH-619 per EOP 2541 Appendix 40. Required Materials EOP 2541 Appendix 40, "Aligning Backup Instrument Air" (procedures.
                                                                                          ----
etc.): General  
KIA No.               065 M1.04                 KIA Rating _---C::.3..:....:.5:..:..../3=-::.-"-4_ _
Method of Testing:
Simulated Performance:             X             Actual Performance:
                                  -----                                                            ----
Location:
Classroom:                       Simulator:                             In-Plant: - -X- -
                  ----                            ---
Task Standards:                    At the completion of this JPM, the examinee will have aligned a backup air supply to 2-CH-517, 2-CH-518, and 2-CH-619 per EOP 2541 Appendix 40.
Required Materials               EOP 2541 Appendix 40, "Aligning Backup Instrument Air" (procedures. I~quipment. etc.):
General  


==References:==
==References:==
EOP 2541 "Standard Appendixes"
                                    * * 'It
* READ TO THE EXAMINEE * * * 'It I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 13
JPM Number:                                                                Rev. ___0=---__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
* You have been directed to align Backup Instrument Air to 2-CH-517, 2-CH-51B, and 2-CH-519 per EOP 2541 Appendix 40 Initial Conditions:
* Unit-2 was manually tripped due to low Instrument Air header pressure Simulator
* N/A Requirements:
                                * *
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the perfonnance of this JPM (in-plant only).
Page 4 of 13
PERFORMANCE INFORMATION JPM Number:
CRITICAL                GRADE STEP                    PERFORMANCE                                                                  STANDARD                          (YiNL                (&sect;lU)
                                                                                                                              ~:$i~ij1":*ili":~iii'i,i~f;.,--;_ __
: 1.                                                                                  Examinee refers to EOP 2541 Attachment I 40-A to C                                              !lIil"I~IJ\';~<~'i~ iIlli nltiiJJi"'~""
Comments:
: 2.                          NOTE                                                      Examinee reads and acknowledges note                N The next step places Backup Air Supply System in service for the following: (-5' Aux Bldg near letdown HX room)
_ CH-517, Auxiliary spray valve
_ CH-518, Charging header to loop 2A CH-519, Charging header to loop 1A
_ EB-88, RM-8123 inboard supply EB-89. RM-8262 inboard s Cue:
Comments:
: 3.      5. IF placing backup air in service for Charging and Sampling System isolation                                      Examinee adjusts IA-591 backup air                  y valves, PERFORM the following: (-5' Aux                                      PCV to minimum by turning the valve Bldg near letdown HX room)                                                  counterclockwise.
: a. ADJUST IA-591, backup air PCV to minimum. (full counterclockwise)
                                      ,:;;;:;z:;;;;:< ,m >1-" <8tW '"" tf:JtkJ ",;, "
Cue:
Comments:
Page 5 of 13
PERFORMANCE INFORMATION JPM Number:
CRITICALi GRADEl STEP                    PERFORMANCE                I                STANDARD                  {yIN}    (S/U) I
: 4.        b. Slowly OPEN IA-603, "MASTER STOP". I Examinee slowly opens IA-603, "MASTER        y STOP" by taking the valve handle in the counterclockwise direction to a hard Cue:
Comments:
: 5.      I c. OPEN IA-590, master stop.              Examinee opens IA-590, master stop by        y taking the valve handle in the counterclockwise direction to a hard Cue:
Comments:
: 6.        d. ADJUST IA-591, backup air PCV          Examinee adjusts IA-591, backup air PCV      y clockwise and ESTABLISH 100 psig outlet  clockwise to establish 100 psig outlet pressure.                                pressure as read on the downstream regulator Cue:
Comments:
: 7.        e. UNLOCK and OPEN IA-566, master        Examinee unlocks and opens IA-566,          y stop.                                    master stop by taking the valve handle in the counterclockwise direction to a hard sto Cue:
Comments:
8.
Cue:
Comments:
Page 6 of 13
PERFORMANCE INFORMATION JPM Number:
STEP                      PERFORMANCE                                      STANDARD
: 9.        g. Slowly OPEN IA-595, master stop.            Examinee slowly opens IA-595, master    y stop by taking the valve handle in the counterclockwise direction to a hard Cue:
Comments:
: 10.        h. MONITOR backup air bottle pressure          Examinee states that backup air bottle  N every [[estimated NRC review hours::4 hours]].                                  pressure will be monitored every [[estimated NRC review hours::4 hours]] and is Dresentlv - 990 Cue:
Comments:
: 11.                              NOTE Approximately 50 psi of air is required to      Examinee reads and acknowledges note. N cycle a valve. If the supply of air bottles is limited, the Shift Manager or TSC may elect
              ...~o chanae air bottles at a lower 1--------11,..,,:
Cue:
Page 7 of 13
PERFORMANCE INFORMATION JPM Number:
STEP                    PERFORMANCE                                  STANDARD
: 12.      i. WHEN pressure lowers to less than 1000 psig OR is expected to fall below  Examinee determines that swing backup            N 1000 psig before the next pressure      air supply is available and is not supplying check, PERFORM ONE of the following:    AC-15, 20, 12, and 47.
_ IF swing backup air supply is available    Examinee refers to step 6 for aligning          N AND not supplying AC-15, 20,12,47,      swing backup air supply to Charging and Refer To step 6, and ALIGN swing        Sampling System valves inside backup air supply to Charging and        Containment.
Sampling System valves inside Containment.
REPLACE QA air bottle Com                                                          air to AC-15, 20,12, and 47. Use cue above.
Page 8 of 13
PERFORMANCE INFORMATION JPM Number:
STEP                                                          PERFORMANCE                                                STANDARD
: 13. I The next step places swing backup air                                                      I Examinee reads and acknowledges note.      I N supply in service for the following sets of valves:
_ Charging and Sampling System Valves Inside Containment:
_ CH-517, Auxiliary spray valve
_ CH-518, Charging header to loop 2A
_ CH-519, Charging header to loop 1A,
_ EB-88, RM-8123 inboard supply, EB-89, RM-8262 inboard s t;",,~," """0"""",,,.,*. ".0*-1,"
Cue:
Comments:
: 14. 16. IF placing swing backup air station in service for Charging and Sampling System,                                                      Examinee adjusts IA-886, "BtU AIR PCV"      Y PERFORM the following:                                                                        to minimum by taking regulator handle full
: a. ADJUST IA-886, "BtU AIR PCV" to                                                            counterclockwise.
minimum. (full counterclockwise) (14'6" Aux Bldg near MCC B61 1'"''B_"..a'ffibffi~~pA'''''''''''''''''0"",h0'''
Cue:
Comments:
: 15.        b. Slowly OPEN IA-885, air bottle                                                              Examinee slowly opens IA-885, air bottle    y "MASTER STOP".                                                                                "MASTER STOP" by taking the valve (14'6" Aux Bldg near MCC B61 )                                                                handle counterclockwise to a hard stop.
[,,""                    ~ ,"''-'" ~"'.'/"/Y<Y. ****,., '!!r,,~,...;,d\'!U'!.i:':,~ ',,"
Cue:
Comments:
Page 9 of 13
PERFORMANCE INFORMATION JPM Number:
STEP                                          PERFORMANCE                                                                                                                STANDARD
: 16. I c. OPEN IA-88?, "REGULATOR ISOL FOR                                                                              Examinee opens IA-88?, "REGULATOR                                                                Y BtU IA", (14'6" Aux Bldg near MCC B61)                                                                          ISOL FOR BtU IAn by taking the valve I ..*",.      ..      ~ ",;;                                                        " "'Yh" ,'.,',"',~." ,1 handle
                                                                                                                                ",","
counterclockwise to a hard
                                                                                                                                                                        ~",A" Cue:
Comments:
1 7. I d. ADJUST IA-886,"BtU AIR PCV"                                                                                    Examinee adjusts IA-886,"BtU AIR PCV'                                                            Y clockwise and ESTABLISH 100 psig outlet                                                                        clockwise and establishes 100 psig outlet pressure. (14'6" Aux Bldg near MCC B61)                                                                        Pressure as indicated on the downstream Cue:
I..~ce.' **. ' *** ,="'..'''..      >1" .. %'"  UV ..**"", .**
Comments:
1 8.        e. Slowly OPEN IA-889, "MANIFOLD                                                                                Examinee slowly opens IA-889, ISOLATION FOR BtU AIR CYLINDER                                                                                  "MANIFOLD ISOLATION FOR BtU AIR                                                                  Y C-3C". (14'6" Aux Bldg near MCC B61)                                                                            CYLINDER C-3C" by taking the valve handle counterclockwise to a hard I** S.... M .d . ' ,    ,., ".'ffi " , ,. """  cc " . k.    *                                              '_0'_, _,.::,"/N/""",_",,""",,,,', "'//Mo,                    ,~ _, ft.,*,. .' " __,__,,,,w,y,,, ,"" ""
Cue:
Comments:
1 9.        f. Slowly OPEN IA-910, "BtU                                                                                    Examinee slowly opens IA-910, "BtU                                                              Y AIR SWING BOTTLE MANIFOLD STOP                                                                                  AIR SWING BOTTLE MANIFOLD STOP VALVE". (14'6" Aux Bldg near MCC B61)                                                                          VALVEil by taking the valve handle counterclockwise to a hard I,                                            '    "  S$.C!IJ>, . 'nM"ad:',~,                          t",.,,_ .".                            b , ** ,,;;;:  f,,*S/>
Cue:
Comments:
: 20. I g. CLOSE IA-595, master stop.
(-5' Aux Bldg near letdown HX room)
IExaminee closes IA-595, master stop by                                                                  Y taking the valve handle clockwise to a Comments:
Page 10 of 13


EOP 2541 "Standard Appendixes" * * 'It
PERFORMANCE INFORMATION JPM Number:
* READ TO THE EXAMINEE * * * 'It I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
STEP                     PERFORMANCE                                                         STANDARD
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
: 21.     h. CLOSE IA-603, "MASTER STOP". (-5'      Examinee closes IA-603, "MASTER                                 y Aux Bldg near letdown HX room)            STOP" by taking the valve handle clockwise to a hard stop.                                               I
Page 3 of 13 JPM Number: Rev. ___0=---__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
                                                          ~~",;:<'W;;,,.",";:-":'1~1~i Ar ' , J,:",:t~:b" ->iMP            "'AX,,,,
Initiating Cues: You have been directed to align Backup Instrument Air to 2-CH-517, 2-CH-51B, and 2-CH-519 per EOP 2541 Appendix 40 Initial Conditions: Unit-2 was manually tripped due to low Instrument Air header pressure Simulator N/A Requirements: * *
Cue:
* NOTES TO EVALUATOR * * *
Comments:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read appropriate If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the perfonnance of this JPM (in-plant only). Page 4 of 13 PERFORMANCE JPM Number: CRITICAL GRADE STEP PERFORMANCE STANDARD (YiNL (&sect;lU)
: 22.     i. IF at any time during this evolution, Examinee reads and acknowledges this Containment isolation is required,       step and states that this step will be left CLOSE IA-566, master                     open and used if required.
___ 1 Examinee refers to EOP 2541 Attachment I 40-A to i Illi Comments: NOTE Examinee reads and acknowledges note The next step places Backup Air System in service for following:
Comments:
(-5' Aux Bldg near letdown _ CH-517, Auxiliary spray _ CH-518, Charging header to loop CH-519, Charging header to loop 1A _ EB-88, RM-8123 inboard supply EB-89. RM-8262 inboard s Cue: Comments: 5. IF placing backup air in service Charging and Sampling System isolation Examinee adjusts IA-591 backup air valves, PERFORM the following:
23.
(-5' PCV to minimum by turning the Bldg near letdown HX counterclockwise.
Com TERMINATION CUE: The evaluation for this JPM is concluded.
: a. ADJUST IA-591, backup PCV to minimum. (full
,:;;;:;z:;;;;:<
>1-" <8tW tf:JtkJ ",;, " ,m Comments:
Page 5 of 13 I PERFORMANCE JPM Number: CRITICALi GRADEl STEP PERFORMANCE I STANDARD {yIN} (S/U) b. Slowly OPEN IA-603, "MASTER STOP". I Examinee slowly opens IA-603, "MASTER STOP" by taking the valve handle in counterclockwise direction to a Cue: Comments: 5 I c. OPEN IA-590, master stop. Examinee opens IA-590, master stop by taking the valve handle in counterclockwise direction to a Cue: Comments: d. ADJUST IA-591, backup air PCV Examinee adjusts IA-591, backup air PCV clockwise and ESTABLISH 100 psig outlet clockwise to establish 100 psig pressure.
pressure as read on the Comments:
: 7. e. UNLOCK and OPEN IA-566, Examinee unlocks and opens IA-566, y master stop by taking the valve handle the counterclockwise direction to a Cue: Comments:
: 8. Cue: Comments:
Page 6 of 13 PERFORMANCE JPM Number: PERFORMANCE
: 9. g. Slowly OPEN IA-595, master stop. Cue: Comments: h. MONITOR backup air bottle pressure every [[estimated NRC review hours::4 hours]]. Cue: Comments: 1 1 . NOTE Approximately 50 psi of air is required to cycle a valve. If the supply of air bottles is limited, the Shift Manager or TSC may elect 1--------11,..,,:
...chanae air bottles at a lower Cue: STANDARD Examinee slowly opens IA-595, master stop by taking the valve handle in the counterclockwise direction to a hard y Examinee states that backup air bottle pressure will be monitored every [[estimated NRC review hours::4 hours]] and is Dresentlv
-990 N Examinee reads and acknowledges note. N Page 7 of 13 PERFORMANCE JPM Number: PERFORMANCE i. WHEN pressure lowers to less than 1000 psig OR is expected to fall below 1 000 psig before the next pressure check, PERFORM ONE of the following:
_ IF swing backup air supply is available AND not supplying AC-15, 20,12,47, Refer To step 6, and ALIGN swing backup air supply to Charging and Sampling System valves inside Containment.
REPLACE QA air bottle Com Examinee determines that swing backup N air supply is available and is not supplying AC-15, 20, 12, and 47. Examinee refers to step 6 for aligning N swing backup air supply to Charging and Sampling System valves inside Containment.
air to AC-15, 20,12, and 47. Use cue above. Page 8 of 13 PERFORMANCE JPM Number: STEP PERFORMANCE STANDARD 13. I The next step places swing backup air supply in service for the following sets of I Examinee reads and acknowledges note. I N valves: _ Charging and Sampling System Valves Inside Containment:
_ CH-517, Auxiliary spray valve _ CH-518, Charging header to loop 2A _ CH-519, Charging header to loop 1A, _ EB-88, RM-8123 inboard supply, EB-89, RM-8262 inboard s
"""0"""",,,.,*. ".0*-1," Cue: Comments:
: 14. 16. IF placing swing backup air station in service for Charging and Sampling System, PERFORM the following:
: a. ADJUST IA-886, "BtU AIR PCV" to Examinee adjusts IA-886, "BtU AIR PCV" to minimum by taking regulator handle full counterclockwise.
Y minimum. (full counterclockwise)
(14'6" Aux Bldg near MCC B61 1'"''B_"..
Cue: Comments:
: 15. b. Slowly OPEN IA-885, air bottle Examinee slowly opens IA-885, air bottle y "MASTER STOP". "MASTER STOP" by taking the valve (14'6" Aux Bldg near MCC B61 ) handle counterclockwise to a hard stop. [,,"" Cue: ,"''-'"
****,., ...
',," Comments:
Page 9 of 13 PERFORMANCE JPM Number: STEP PERFORMANCE STANDARD 16. Cue: I c. OPEN IA-88?, "REGULATOR ISOL FOR BtU IA", (14'6" Aux Bldg near MCC B61) I ..*",. .. ",;; " "'Yh"
,1 Examinee opens IA-88?, "REGULATOR ISOL FOR BtU IAn by taking the valve handle counterclockwise to a hard ",","
Y Comments:
1 7. Cue: I d. ADJUST IA-886,"BtU AIR PCV" clockwise and ESTABLISH 100 psig outlet pressure.
(14'6" Aux Bldg near MCC B61) I....
**. ' *** ,="'..'''.. >1" .. %'" UV ..**"",.** Examinee adjusts IA-886,"BtU AIR PCV' clockwise and establishes 100 psig outlet Pressure as indicated on the downstream Y Comments:
1 8. Cue: e. Slowly OPEN IA-889, "MANIFOLD ISOLATION FOR BtU AIR CYLINDER C-3C". (14'6" Aux Bldg near MCC B61) I ** S....M.d .', ,.,".'ffi " , ,. """ cc ". k.
* Examinee slowly opens IA-889, "MANIFOLD ISOLATION FOR BtU AIR CYLINDER C-3C" by taking the valve handle counterclockwise to a hard '_0'_, _,.::,"/N/""",_",,""",,,,', "'//Mo, _, ft.,*,. .' "__,__,,,,w,y,,, ,"" "" Y Comments:
1 9. f. Slowly OPEN IA-910, "BtU AIR SWING BOTTLE MANIFOLD STOP Examinee slowly opens IA-910, "BtU AIR SWING BOTTLE MANIFOLD STOP Y Cue: VALVE". (14'6" Aux Bldg near MCC B61) I, ' " S$.C!IJ>, .
VAL VEil by taking the valve handle counterclockwise to a hard t",.,,_ .". b, ** ,,;;;: f,,*S/> Comments:
: 20. I g. CLOSE IA-595, master stop. (-5' Aux Bldg near letdown HX room) I Examinee closes IA-595, master stop by taking the valve handle clockwise to a Y Comments:
Page 10 of 13 PERFORMANCE JPM Number: STEP STANDARD h. CLOSE IA-603, "MASTER STOP". (-5' Examinee closes IA-603, "MASTER y Aux Bldg near letdown HX STOP" by taking the valve handle clockwise to a hard stop. I A r',
->iMP "'AX,,,,i. IF at any time during this evolution, Examinee reads and acknowledges Containment isolation is required, step and states that this step will be CLOSE IA-566, master open and used if Comments:
: 23. Com TERMINATION CUE: The evaluation for this JPM is concluded.
S]QRtl1N1E:
S]QRtl1N1E:
Page 11 of 13
Page 11 of 13
--JPM Number: JPM-P2.2 Rev. ___0___ VERIFICATION OF JPM COMPLETION Title: Date Performed:
 
Student: Evaluator:
JPM Number:                     JPM-P2.2                           Rev. ___0_ __
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
VERIFICATION OF JPM COMPLETION Title:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
Date Performed:
20 Actual Time to Complete (minutes):
Student:
JPM Work Practice Evaluation:
Evaluator:
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
never put anyone's safety at risk. Pass I never put equipment reliability at risk. Pass I never violated radiological workpractices.
Time Critical Task?       Yes             No   X
Pass I demonstrated effective use of event-free human performance tools. Pass I Areas for Improvement/Comments:
                              --
Page 12 of 13 i JPM Number: JPM-P2.2 Rev. __-'--__ STUDENT Initial Conditions:
Validated Time (minutes):                   20 Actual Time to Complete (minutes):
* You have been directed to align Backup Instrument Air to 2-CH-517, 2-CH-518, and 2-CH-519 per EOP 2541 Appendix 40. Initiating Cues:
JPM Work Practice Evaluation:                 SAT         UNSAT           NA       (circle one)
Overall Result of JPM:                       SAT         UNSAT                     (circle one)
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure                   Pass I Fail usage and adherence requirements.
never put anyone's safety at risk.                                             Pass I Fail        i never put equipment reliability at risk.                                       Pass I Fail never violated radiological workpractices.                                     Pass I Fail demonstrated effective use of event-free human performance tools.               Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
 
JPM Number:                 JPM-P2.2                         Rev. _ _-'--_ _
STUDENT HANDOUT Initial Conditions:
* You have been directed to align Backup Instrument Air to 2-CH-517, 2-CH-518, and 2-CH-519 per EOP 2541 Appendix 40.
Initiating Cues:
* Unit-2 was manually tripped due to low Instrument Air header pressure.
* Unit-2 was manually tripped due to low Instrument Air header pressure.
Page 13 of 13 Appendix Scenario Outline Form ES-D-1 Facility:
Page 13 of 13
MP2 Scenario No.: ES11 Ll1 Op-Test Examiners:
 
__________
Appendix D                          Scenario Outline                         Form ES-D-1 Facility:   MP2           Scenario No.: ES11 Ll1                   Op-Test No.:_1"---_
Operators:
Examiners: _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ _ __
_________Initial Conditions:
Initial Conditions: 100% power, MOL, Eg. Xe., 9.2 ppm Boron SG8D @ 40 gpm per SG, 24E aligned to 24C, "8" TBCCW Pimp is OOS for motor repairs.
100% power, MOL, Eg. Xe., 9.2 ppm Boron SG8D @ 40 gpm per SG, 24E aligned to 24C, "8" TBCCW Pimp is OOS for motor repairs. Turnover:
Turnover: 100% power, MOL, Eg. Xe., 9.2 ppm Boron, blend ratio: 70:1, SGBD @ 25 gpm per SG, 24E aligned to 24C, "8" RBCCW Pump OOS for motor repairs. no other equipment OOS and no surveillance in progress or due.
100% power, MOL, Eg. Xe., 9.2 ppm Boron, blend ratio: 70:1, SGBD @ 25 gpm per SG, 24E aligned to 24C, "8" RBCCW Pump OOS for motor repairs. no other equipment OOS and no surveillance in progress or due. Event I Malf. Event Event Description No. No. Type* 1 N/A N I Swap from "A" to "B" RBCCW Pump 2 RX11D I i #2 SG Alternate steam flow transmitter 3 RD0368 C CEA #28 to slip 35 steps into the core. 4 N/A R Downpower to < 70% power for CEA i (All) RP24D i I "D" CTMT pressure transmitter failure (TS) I (RO/S) 6 FW33 M
Event No.
* Loss of vacuum with failure of Turbine Low Vacuum Trip TC10A (All) Manual reactor trip with loss of both Main Feed Pumps FW30A C Degradation/loss of the "A" AFW Pump FW20A (BOP/S) Overspeed trip of the Turbine Driven Aux Feed Pump FW20C i 8 1 M Bus 24D i (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D, 38 of 39 SEG#ES11L11 Rev;_O_ SITE: I Millstone Power Station PROGRAM: Unit 2 LOIT NRC Exam Simulator  
I Malf.
#1 I Title I COURSE: I ESllLIl i Total Time 11.[[estimated NRC review hours::5 hours]] Prepared R.1. Printed Reviewed by: Jgh't".( t.,
No.
iv.
Event Type*
Printed Name Reviewed by:
Event Description 1       N/A         N     ISwap from "A" to "B" RBCCW Pump (TS)
Printed Name Approved by: 1'"'
(BOP/S) 2     RX11D           I   i #2 SG Alternate steam flow transmitter failure (BOP/S) 3     RD0368         C       CEA #28 to slip 35 steps into the core. (TS)
{-fL-" 1 _ i >  
(RO/S) 4       N/A         R       Downpower to < 70% power for CEA recovery i   (All)   (Reactivity) i 5      RP24D   I I     "D" CTMT pressure transmitter failure (TS)
,''-.., Printed Name Simulator Exercise Guide Job Page 1 of 27 I i I Course #: NA
(RO/S) 6       FW33         M
"". 12/7/10 Instructo S
* Loss of vacuum with failure of Turbine Low Vacuum Trip TC10A         (All)   Manual reactor trip with loss of both Main Feed Pumps 7      FW30A         C       Degradation/loss of the "A" AFW Pump FW20A     (BOP/S) Overspeed trip of the Turbine Driven Aux Feed Pump FW20C   i 8     ED05D    1     M       Bus 24D Fault i
Date aJA&#xa5;J Simulator Development Checklist Instructor I Simulat Checklist Signature Date '(( 2/4/11 i "-/ Training I bate I
(All)
------------------------------------------------------------------
*      (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D, 38 of 39
--------------------------------------------------------------
 
Simulator Exercise Guide Job Page 2 of 27 SEG# ES11L11 Rev;--,,-O
Simulator Exercise Guide Job Aid                                  Page 1 of 27 SEG#ES11L11   Rev;_O_
__ Goal of Training: Evaluate the licensees' ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions. Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions.
SITE:     I Millstone Power Station                                                                                     I PROGRAM:               Unit 2 LOIT NRC Exam I Title                  Simulator #1 I COURSE:               I ESllLIl                                                             I Course #: NA                i i Total Time           11.[[estimated NRC review hours::5 hours]] (C,&#xa9;~'\1
To include: 1) Ability of the crew to perform crew-dependent (and time-critical) tasks. Ability of the crew to: Understandlinterpret annunciators/alarms, plant/systems response Diagnose events/conditions based on signals/readings Comply with/use procedures, Technical Specifications, and TRIVI Perform control board operations Properly communicate information/proper crew interactions Practice Reactivity Management
                                                                  ~.-" "".
Prepared by:                R.1. Ashey Printed Name
                                                                !~(j~      Instructo  S  SIgnature 12/7/10 Date Reviewed by:   Jgh't".( t.,   er;'h/+l)lIi~ iv.           ~~~vh                                        aJA&#xa5;J (Optional)                  Printed Name                       Simulator Development Checklist                Date Instructor Signature I
Reviewed by:
(Optional)                  Printed Name                     Simulat ~r ~lidation Checklist Signature          Date
( '(,~~,
i Approved by:         1'"'~ i~~i {-fL-"
_ i   > i,~',('
1    ,''-.., ~
                                                                    "-/
                                                                                          ~
2/4/11 bate Printed Name                                  Training Supervisor              I I
 
Simulator Exercise Guide Job Aid                                Page 2 of 27 SEG# ES11L11       Rev;--,,-O_ _
Goal of Training:       a) Evaluate the licensees' ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.
b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:
: 1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
: 2) Ability of the crew to:
* Understandlinterpret annunciators/alarms, plant/systems response
* Diagnose events/conditions based on signals/readings
* Comply with/use procedures, Technical Specifications, and TRIVI
* Perform control board operations
* Properly communicate information/proper crew interactions
* Practice Reactivity Management
* Make conservative decisions.
* Make conservative decisions.
: 3) Ability of each individual to: Respond and correctly interpret annunciators Correctly diagnose events Properly interpret integrated system response Comply with and use Technical SpecificationslTRM Comply with and use procedures Properly perform control board operations Demonstrate responsible attitude Properly communicate information and interact with rest of crew Leadership skills required to effectively manage the evolutions Provide adequate overview where required Learning Objectives:
: 3) Ability of each individual to:
NA NA Prerequisites:
* Respond and correctly interpret annunciators
N/A Training Resources:
* Correctly diagnose events
2 booth instructors, 3 NRC Examiners SEG# ES11l11  
* Properly interpret integrated system response
* Comply with and use Technical SpecificationslTRM
* Comply with and use procedures
* Properly perform control board operations
* Demonstrate responsible attitude
* Properly communicate information and interact with rest of crew
* Leadership skills required to effectively manage the evolutions
* Provide adequate overview where required Learning Objectives:     NA
                      ------------------------------------------------------------------
Tasks:                  NA Prerequisites:           N/A
                      --------------------------------------------------------------
Training Resources:     2 booth instructors, 3 NRC Examiners
 
Simulator Exercise Guide Job Aid                    Page 3 of 27 SEG# ES11l11         Rev; --,,-0_ _


==References:==
==References:==
OP 2330A, RBCCW System ARP 2590D-064, SG level Setpoint Deviation Hilla ARP 2590A-084, CTMT Pres Hi D RE Curve and Data Book AOP 2556, CEA Malfunctions AOP 2575, Rapid Downpower EOP 2525, Standard Post Trip Actions EOP 2537, Loss of All Feedwater Commitments:              N/A Evaluation Method:
Operating Experience:
Plant/Simulator differences that may affect the scenario:      None Related PRA              Core Damage Frequency: 0.98 Information:              LERF: 1.00 Important Components: 24E aligned to 24C TDAFP out for bearing replacement "A" and "B" RBCCW Pumps must be swapped for maintenance.


Commitments:
Simulator Exercise Guide Job Aid                               Page 4 of 27 SEG#_-=ES"'-'1-'-'1L:.w11'--_ _ Rev; _0_
Evaluation Method: Operating Experience:
INITIAL CONDITIONS:
Plant/Simulator differences that may affect the scenario:
Related PRA Information:
Simulator Exercise Guide Job Aid Page 3 of 27 Rev; --,,-0__ OP 2330A, RBCCW ARP 2590D-064, SG level Setpoint Deviation ARP 2590A-084, CTMT Pres Hi RE Curve and Data AOP 2556, CEA AOP 2575, Rapid EOP 2525, Standard Post Trip EOP 2537, Loss of All N/A None Core Damage Frequency: LERF: Important Components:
24E aligned to TDAFP out for bearing "A" and "B" RBCCW Pumps must be swapped for Simulator Exercise Guide Job Aid Page 4 of 27 SEG#_-=ES"'-'1-'-'1L:.w11'--
__ Rev; _0_ INITIAL CONDITIONS:
* 100% power EOL. (IC-171)
* 100% power EOL. (IC-171)
* 24E aligned to 24C
* 24E aligned to 24C
* The "B" RBCCW Pump has just been restored from coupling alignment.  
* The "B" RBCCW Pump has just been restored from coupling alignment.
* "A" and "B" RBCCW Pumps must be swapped to allow maintenance to complete vibration testing. The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
*     "A" and "B" RBCCW Pumps must be swapped to allow maintenance to complete vibration testing.
Scenario Summary.,;, The crew will take the shift with the unit at 100% power, 24E aligned to 24C, The Crew will initially be directed to swap from "A" RBCCW Pump to "B" RBCCW Pump supplying Facility 1 for preventative maintenance on the "A" RBCCW Pump. The US will brief the crew and the BOP will perform the evolution.
The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
The US will log into TSAS 3.7.4.1 during the pump swap. After the "B" RBCCW Pump is started and the US logs out of TSAS 3.7.4.1, the alternate steam flow transmitter for #2 SG will start to fail low. Feed flow to #2 SG will trend down. The SPO must diagnose the problem and deselect the failed transmitter. (Prior to deselecting the failed transmitter, the examinee may place the #2 FRV and both main feed pump speed controllers in 'manual' to control S/G level.) Shortly after restoring  
Scenario Summary.,;,
#2 S/G level control to automatic, a CEA will slip to -145 steps. The BOP should lower Turbine load to match Reactor power. The crew will enter AOP 2556, CEA Malfunctions.
The crew will take the shift with the unit at 100% power, 24E aligned to 24C, The Crew will initially be directed to swap from "A" RBCCW Pump to "B" RBCCW Pump supplying Facility 1 for preventative maintenance on the "A" RBCCW Pump. The US will brief the crew and the BOP will perform the evolution. The US will log into TSAS 3.7.4.1 during the pump swap.
As a result of the slipped CEA, the crew will enter AOP 2575, Rapid Downpower, and reduce power to ,::70%. During the down power, the "0" Containment pressure transmitter will gradually fail high. The US will enter TSAS 3.3,1,1, Table 3.3-1, Action 2, and TSAS 3.3.2.1, Table 3.3-3, Action 2, and direct the RO to bypass the appropriate channels of RPS (CTMT High Pressure) and ESAS (CTMT High Pressure and HighlHigh Pressure).
After the "B" RBCCW Pump is started and the US logs out of TSAS 3.7.4.1, the alternate steam flow transmitter for #2 SG will start to fail low. Feed flow to #2 SG will trend down. The SPO must diagnose the problem and deselect the failed transmitter. (Prior to deselecting the failed transmitter, the examinee may place the #2 FRV and both main feed pump speed controllers in 'manual' to control S/G level.)
After the crew has taken the appropriate actions for the failed Containment pressure transmitter, Condenser Vacuum will rapidly degrade. Because the low vacuum Turbine trip will NOT actuate, the crew should immediately trip the Reactor prior to reaching 7.5" HG Backpressure and perform EOP 2525. Shortly after the trip, "A" Aux Feed Pump will degrade. The pump will trip within a few minutes (if not manually secured) requiring the BOP to start the Turbine Driven Aux Feed Pump. Shortly after the TOAFP is started, it will trip on overspeed and cannot be restored.
Shortly after restoring #2 S/G level control to automatic, a CEA will slip to -145 steps. The BOP should lower Turbine load to match Reactor power. The crew will enter AOP 2556, CEA Malfunctions.
After EOP 2525 is complete, Bus 240 will fault resulting in a loss of the only remaining Aux Feed Pump. The crew will rediagnose and enter EOP 2537, Loss of All Feedwater.
As a result of the slipped CEA, the crew will enter AOP 2575, Rapid Downpower, and reduce power to
This will require lowering S/G pressure enough to initiate Condensate flow for heat removal. The scenario will end when adequate Condensate flow is established to both S/Gs. CT-1 (SPTA-5):
,::70%.
Manually shut down the When Condenser Vacuum exceeds 7.5" Hg backpressure, the Turbine will fail to automatically trip. The must be manually tripped to prevent an automatic trip on low Steam Generator CT-2 (LOAF-4):
During the down power, the "0" Containment pressure transmitter will gradually fail high. The US will enter TSAS 3.3,1,1, Table 3.3-1, Action 2, and TSAS 3.3.2.1, Table 3.3-3, Action 2, and direct the RO to bypass the appropriate channels of RPS (CTMT High Pressure) and ESAS (CTMT High Pressure and HighlHigh Pressure).
Establish a Primary to Secondary Heat Main Feed flow (from Condensate) is restored prior to reaching 70 inches wide range level in either S/G Once-Thru-Cooling initiated with less than or equal to 70 inches in either S/G and level NOT being Simulator Exercise Guide Job Page 5 of 27 SEG#'_-,=,E",,-S1w.
After the crew has taken the appropriate actions for the failed Containment pressure transmitter, Condenser Vacuum will rapidly degrade. Because the low vacuum Turbine trip will NOT actuate, the crew should immediately trip the Reactor prior to reaching 7.5" HG Backpressure and perform EOP 2525.
1.!=lLl..!-1
Shortly after the trip, "A" Aux Feed Pump will degrade. The pump will trip within a few minutes (if not manually secured) requiring the BOP to start the Turbine Driven Aux Feed Pump. Shortly after the TOAFP is started, it will trip on overspeed and cannot be restored.
--, Rev;_O_ ENSURE TRex Workstation is operating. VERIFY the most current approved training load is loaded. RESET to IC-30 If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC. As needed, RESET Computer Terminals (At Power displays if 100% power IC). ENSURE SG blowdown values in PPC Plant Calorimetric are reset. ENSURE RCS Leak Rate is reset in PPC. ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14). If necessary (Le., exams), ADVANCE chart recorders ENSURE the appropriate Protected Train placard is hung ("B" TRAIN PROTECTED). ENSURE appropriate signs are in place on simulator doors. ENSURE procedures designated for use during the scenario are clear of previous place keeping marks. If necessary, ENSURE Simulator fidelity items cleared. ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper). If required, OVERRIDE annunciators that will be lit long-term in the Control Room. ENTER Initial Malfunctions I liDs I Remote Functions. PLACE Simulator to RUN. If placing Equipment ODS, then PERFORM necessary switch manipulations and HANG appropriatl9 tags, as required for the following: PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
After EOP 2525 is complete, Bus 240 will fault resulting in a loss of the only remaining Aux Feed Pump.
Simulator Exercise Guide 'Dominiont<
The crew will rediagnose and enter EOP 2537, Loss of All Feedwater. This will require lowering S/G pressure enough to initiate Condensate flow for heat removal.
FLOOR INSTRUCTOR INiTIAL CONDiTIONS: IC-171 Mode: 1 Burnup:EOl Power: 99.8% Boron: (CB): 9.2 ppm Temperature:
The scenario will end when adequate Condensate flow is established to both S/Gs.
Tave 569&deg;F Pressure:
CT-1 (SPTA-5): Manually shut down the Reactor.
2250 psia Xenon: Stable, at equilibrium Rods: ARO Generator:
When Condenser Vacuum exceeds 7.5" Hg backpressure, the Turbine will fail to automatically trip. The Plant must be manually tripped to prevent an automatic trip on low Steam Generator Level.
888 Mwe SIMULATOR SETUP: As necessary, PERFORM I.V. of Initial Malfunctions Ili0s I Remote Functions entered. TURNOVER:
CT-2 (LOAF-4): Establish a Primary to Secondary Heat Sink.
PERFORM the crew turnover (Turnover Sheet) with the SM. Crew must swap "A" and "B" RBCCW Pumps for maintenance.
Main Feed flow (from Condensate) is restored prior to reaching 70 inches wide range level in either S/G OR Once-Thru-Cooling initiated with less than or equal to 70 inches in either S/G and level NOT being restored.
Job Aid BOOTH INSTRUCTOR ENTER or VERIFY the Initial Malfunctions 1II0s I Remote Functions are loaded on the appropriate Schedule.
 
COMPLETE Simulator Setup Checklist Page 6 of 27 STUDENTS I N/A N/A SM brief crew on plant conditions and any major equipment OOS. (All) Walk down control boards and let US know when they are ready.
Simulator Exercise Guide Job Aid                              Page 5 of 27 SEG#'_-,=,E",,-S1w.1.!=lLl..! - , Rev;_O_
Simulator Exercise Guide Job Page 7 of 27 SEG# ES11L11 Rev;_O__ FLOOR INSTRUCTOR
o        ENSURE TRex Workstation is operating.
: 1. Swap From "A If to "B" RBCCW Pump BOOTH INSTRUCTOR Perform actions as directed.
o        VERIFY the most current approved training load is loaded.
If dispatched, report that SIAS/LNP ACTUATION SIGNAL HS 9119D is in BLOCK, Event 7: CCR06 -0, Close 2-RB-3A Event 8: CCR40 -NORM, Place "B" RBCCW Pump SIAS/LNP Actuation Hand Switch in 'Normal', Event 9: CCR06 -100, Open 2-RB-3A Acknowledge the direction and report that RBCCW Rad Monitors flows are normal. STUDENTS Normal EvolutionlTechSpec US Directs/BOP Performs:
o        RESET to IC-30 o        If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.
Swap "A" and "B" RBCCW Pumps per OP 2330A, RBCCW System, Section 4.2. BOP: Verify "B" RBCCW Pump is properly aligned with the SIAS/LNP ACTUATION SIGNAL HS 9119D in BLOCK. Verify RB-251A, AlB RBCCW Pump X-Tie Valve, is open on C-06. Ensure US logs into TSAS 3.7.3.1. Start "B" RBCCW Pump. Check "B" RBCCW Pump SIAS/LNP Start Manually Blocked annunciator is lit on C-0617, Check "B" RBCCW Pump for normal running amps and discharge pressure. Direct a PEa to close 2-RB-3A, "A" RBCCW Pump Discharge Stop. a Stop "AU RBCCW Pump. Verify "A" RBCCW Header High Flow annunciator is clear. Direct a PEa to place "B" RBCCW Pump SIAS/LNP Actuation Hand Switch in 'Normal'.
o        As needed, RESET Computer Terminals (At Power displays if 100% power IC).
a Verify "B" RBCCW Pump SIAS/LNP Start Manually Blocked annunciator clears. Verify US exits TSAS 3.7.3.1. Direct a PEa to open 2-RB-3A, "A" RBCCW Pump Discharge Stop. Verify "A" RBCCW Header flow is between 6,000 and 7,300 gpm on C-05. Direct a PEa to verify the appropriate Rad Monitor flow locally.
o        ENSURE SG blowdown values in PPC Plant Calorimetric are reset.
Simulator Exercise Guide Job Page 8 of 27 SEG# ES11L11 Rev;_O__ Event 1: RX11 D -100% with a Ramp Time of I BOP: 300 seconds, #2 Steam Generator Alternate Recognizes a difference the #2 Main and Steam Flow Transmitter Failure. Alternate Steam Flow Transmitters TM1, AE1
o        ENSURE RCS Leak Rate is reset in PPC.
* Observe #2 S/G level rising. May observe S/G Level Deviation HilLa annunciator on C-OS. Reports to the US that the #2 Alternate Steam flow Transmitter appears to be failing high. US: Directs BOP to deselect the #2 Alternate Steam Flow Transmitter (Select Main Steam Flow Transmitter) or, If necessary, directs the BOP to place #2 Main Feed Reg valve in Manual and both Main Feed Pump speeds in manual to restore and maintain #2 SlG level to the normal band. References ARP 26900-064, SG level Setpoint Deviation Hilla.
o        ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).
Simulator Exercise Guide Job Aid SEG# ES11L11 Rev;_O__ FLOOR INSTRUCTOR BOOTH INSTRUCTOR Page 9 of 27 STUDENTS BOP:
o        If necessary (Le., exams), ADVANCE chart recorders o        ENSURE the appropriate Protected Train placard is hung ("B" TRAIN PROTECTED).
o        ENSURE appropriate signs are in place on simulator doors.
o        ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.
o        If necessary, ENSURE Simulator fidelity items cleared.
o        ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).
o        If required, OVERRIDE annunciators that will be lit long-term in the Control Room.
o        ENTER Initial Malfunctions I liDs I Remote Functions.
o        PLACE Simulator to RUN.
o        If placing Equipment ODS, then PERFORM necessary switch manipulations and HANG appropriatl9 tags, as required for the following:
o        PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
 
Simulator Exercise Guide
'Dominiont<
Job Aid                                  Page 6 of 27 FLOOR INSTRUCTOR                          BOOTH INSTRUCTOR                                      STUDENTS
: 1. INiTIAL CONDiTIONS:                   ENTER or VERIFY the Initial Malfunctions 1II0s I N/A
* IC-171                           I Remote Functions are loaded on the appropriate Schedule.
* Mode: 1
* Burnup:EOl
* Power: 99.8%
* Boron: (CB): 9.2 ppm
* Temperature: Tave 569&deg;F
* Pressure: 2250 psia
* Xenon: Stable, at equilibrium
* Rods: ARO
* Generator: 888 Mwe N/A
: 2. SIMULATOR SETUP:                     COMPLETE Simulator Setup Checklist o  As necessary, PERFORM I.V. of Initial Malfunctions Ili0s I Remote Functions entered.
: 3. TURNOVER: PERFORM the crew turnover                                                   SM brief crew on plant conditions and any major (Turnover Sheet) with the SM.                                                         equipment OOS. (All) Walk down control boards and let US know when they are ready.
* Crew must swap "A" and "B" RBCCW Pumps for maintenance.
 
Simulator Exercise Guide Job Aid                         Page 7 of 27 SEG#  ES11L11      Rev;_O__
FLOOR INSTRUCTOR                    BOOTH INSTRUCTOR                                STUDENTS
: 1. Swap From "A to "B" RBCCW Pump If Normal EvolutionlTechSpec US Directs/BOP Performs: Swap "A" and "B" RBCCW Pumps per OP 2330A, RBCCW System, Section 4.2.
Perform actions as directed.              BOP:
If dispatched, report that SIAS/LNP
* Verify "B" RBCCW Pump is properly aligned ACTUATION SIGNAL HS 9119D is in BLOCK,       with the SIAS/LNP ACTUATION SIGNAL HS 9119D in BLOCK.
* Verify RB-251A, AlB RBCCW Pump X-Tie Valve, is open on C-06.
* Ensure US logs into TSAS 3.7.3.1.
* Start "B" RBCCW Pump.
o Check "B" RBCCW Pump SIAS/LNP Start Manually Blocked annunciator is lit on C-0617, a Check "B" RBCCW Pump for normal running amps and discharge pressure.
Event 7: CCR06 - 0, Close 2-RB-3A
* Direct a PEa to close 2-RB-3A, "A" RBCCW Pump Discharge Stop.
a Stop "AU RBCCW Pump.
Verify "A" RBCCW Header High Flow annunciator is clear.
Event 8: CCR40 - NORM, Place "B" RBCCW
* Direct a PEa to place "B" RBCCW Pump Pump SIAS/LNP Actuation Hand Switch in      SIAS/LNP Actuation Hand Switch in
                                  'Normal',                                   'Normal'.
a Verify "B" RBCCW Pump SIAS/LNP Start Manually Blocked annunciator clears.
* Verify US exits TSAS 3.7.3.1.
Event 9: CCR06 - 100, Open 2-RB-3A
* Direct a PEa to open 2-RB-3A, "A" RBCCW Pump Discharge Stop.
* Verify "A" RBCCW Header flow is between 6,000 and 7,300 gpm on C-05.
Acknowledge the direction and report that
* Direct a PEa to verify the appropriate Rad RBCCW Rad Monitors flows are normal.        Monitor flow locally.
 
Simulator Exercise Guide Job Aid                              Page 8 of 27 SEG# ES11L11 Rev;_O__
Event 1: RX11 D - 100% with a Ramp Time of I BOP:
300 seconds, #2 Steam Generator Alternate Steam Flow Transmitter Failure.
* Recognizes a difference the #2 Main and Alternate Steam Flow Transmitters TM1, AE1
* Observe #2 S/G level rising.
* May observe S/G Level Deviation HilLa annunciator on C-OS.
* Reports to the US that the #2 Alternate Steam flow Transmitter appears to be failing high.
US:
* Directs BOP to deselect the #2 Alternate Steam Flow Transmitter (Select Main Steam Flow Transmitter) or, o If necessary, directs the BOP to place
                                                                          #2 Main Feed Reg valve in Manual and both Main Feed Pump speeds in manual to restore and maintain #2 SlG level to the normal band.
* References ARP 26900-064, SG level Setpoint Deviation Hilla.
 
Simulator Exercise Guide Job Aid                      Page 9 of 27 SEG# ES11L11    Rev;_O__
FLOOR INSTRUCTOR   BOOTH INSTRUCTOR                           STUDENTS BOP:
* Deselects the #2 S/G Alternate Steam Flow Transmitter on C-OS.
* Deselects the #2 S/G Alternate Steam Flow Transmitter on C-OS.
* If necessary, takes manual control of #2 Main Feed Reg Valve and place both Main Feed Pump Speed Controls in manual. a Restores and maintains  
* If necessary, takes manual control of #2 Main Feed Reg Valve and place both Main Feed Pump Speed Controls in manual.
#2 SlG level in normal band. a When normal level has been restored, returns #2 Main Feed Reg valve and Main Feed pump Speed control to automatic.
a Restores and maintains #2 SlG level in normal band.
Simulator Exercise Guide Job Page 10 of 27 SEG# ES11L11 Rev; Event 2: RD0368 -35 Steps, CEA #68 (Group 7) slips to 145 steps TM2,AE2 When I&C assistance is requested, state that you will begin troubleshooting immediately.
a     When normal level has been restored, returns #2 Main Feed Reg valve and Main Feed pump Speed control to automatic.
RO: Observes the following on C-04: a CEA DROPPED NIS Annunciator a White light for CEA #68 is lit (red light out) CEAPDS Monitor indicates that CEA #68 is misaligned.
 
a CEA GR DEV BKiUP annunciator. Reports that CEA #68 has slipped to 145 steps. BOP: Lowers Turbine load to match Reactor power and stabilize RCS temperature.
Simulator Exercise Guide Job Aid                            Page 10 of 27 SEG# ES11L11 Rev; Event 2: RD0368 - 35 Steps, CEA #68 (Group   RO:
RO: Monitors RCS temperature, Pressurizer pressure, and Pressurizer level. US: Enters TSAS 3.1.3.1, action a.1. Requests I&C assistance. Enters AOP 2556, CEA Malfunctions and directs required actions.
: 7) slips to 145 steps
Simulator Exercise Guide Job Page 11 of 27 SEG# ES11L11 Rev;_O__ FLOOR BOOTH STUDENTS BOP: Prints NSSS Data Sheet and Incore Operability Report form PPC. Notifies Reactor Engineering. Monitors d T Power on RPS. As required, toggles Dropped Rod Reset switches on RPS to clear Dropped Rod LEDs.
* Observes the following on C-04:
Simulator Exercise Guide Job Page 12 of 27 SEG# ES11L11 Rev;_O__ US: Directs entry into AOP 2575 Rapid Downpower for power reduction to <70% in <1 hour. Performs Focus Brief for Trip Criteria and RCS Temperature Control. Directs or makes required notifications.
TM2,AE2                                          a CEA DROPPED NIS Annunciator a White light for CEA #68 is lit (red light out) o CEAPDS Monitor indicates that CEA
RO: Commences Forcing Pressurizer Sprays: Closes all Backup Heater Breakers Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia). US: Refers to Reactor Engineering Curve and Data Book and determine that Reactivity Plan, 11 is appropriate for the down power.
                                                                      #68 is misaligned.
Simulator Exercise Guide Job Page 13 of 27 SEG# ES11L11 Rev;_O__ FLOOR INSTRUCTOR BOOTH STUDENTS Commences Boration form the RWST (the crew may opt to Borate from the BAST): Ensures at least one Charging Pump is running. Ensures VCT Makeup Bypass, CH-196, is closed. Ensures RWST to Charging Suction, 192, is open. Closes VCT Outlet Isolation, CH-501 Checks Charging flow is appropriate.
a CEA GR DEV BKiUP annunciator.
* Starts an additional Charging Pump and  
* Reports that CEA #68 has slipped to 145 steps.
--------------4-------------------+-
BOP:
....
Lowers Turbine load to match Reactor power and stabilize RCS temperature.
Charging and Letdown. BOP: Reduces Turbine load using the LOAD LIMIT POT. Maintains Tc within 1&deg;F of program. Maintains 50-150 MVARs Crew: Maintains parameters within the prescribed limits of Attachment 1, Rapid Downpower Parameters.
RO:
BOP: When power is between 80 and 85%, stops one of the three Condensate Pumps.
Monitors RCS temperature, Pressurizer pressure, and Pressurizer level.
Simulator Exercise Guide Job Page 14 of 27 SEG# ES11L11 Rev;_O__ The crew may temporarily stop the downpower to address the failed instrument.
US:
Event 3: RP24D -100%, with a Ramp Time of I RO: 160 seconds. "D" Containment pressure Observes and reports CTMT PRES HI D transmitter fails high. annunciator on C-01 TM3,AE4 Reports value and trend of all Containment pressure indications and determines that Channel "D" appears to have failed high. RO: Closes RWST to Charging Suction, CH-19, if the US directs the downpower to be temporarily stopped to address the failed instrument.
* Enters TSAS 3.1.3.1, action a.1.
BOP: Maintains RCS temperature on program, if the US directs the downpower to be temporarily stopped to address the failed instrument.
When I&C assistance is requested, state that
US: Refers to ARP 2590A-084.
* Requests I&C assistance.
CTMT PRES HI D and/or ARP 2590C-048 (C-01). CTMT HI PRES TRIP CH D (C-04) Directs RO (or BOP) to obtain appropriate keys and bypass Channel "D" Containment Pressure on RPS and ESAS. Logs into TSAS 3.3.1.1. Table 3.3-1, and 3.3.2.1. Table 3.3-3. Contacts I&C for troubleshooting and repairs.
you will begin troubleshooting immediately.
Simulator Exercise Guide Job Page 15 of 27 SEG# ES11 Ll1 Rev;_O__ FLOOR INSTRUCTOR BOOTH STUDENTS RO (or BOP): Obtains bypass keys for Channel "D" RPS and ESAS Containment Pressure. Bypasses Channel "D" RPS and ESAS Containment Pressure.
* Enters AOP 2556, CEA Malfunctions and directs required actions.
us: If the downpower were temporarily halted, directs the RO and BOP to commence the downpower as previously performed.
 
Simulator Exercise Guide Job Page 16 of 27 SEG# ES11L11 Rev;_O__ CT-1 (SPT A-5): Manually shut down the Event 4: FW33 -100%. Condenser Vacuum Reactor. rapidly degrades.
Simulator Exercise Guide Job Aid                      Page 11 of 27 SEG# ES11L11   Rev;_O__
The plant must be manually tripped prior to TC10A -Fail. The Main Turbine fails to trip on an automatic Reactor trip on low S/G level low Condenser Vacuum. (Inserted during initial due to loss of Main Feed Pumps setup) TM4, MA1, CT1 RO/BOP:
FLOOR INSTRUCTOR  BOOTH INSTRUCTOR                          STUDENTS BOP:
* Observes and reports annunciators and indications associated with a rapidly degrading Condenser Vacuum
* Prints NSSS Data Sheet and Incore Operability Report form PPC.
* When directed, manually trips the Reactor and commences actions of EOP 2525, Standard Post Trip Actions. US: Queries RO and BOP on the status of Safety Functions as delineated in EOP 2525: Reactivity Control (RO) Status of the Reactor Maintenance of Vital Auxiliaries (BOP) Status of the Turbine Status of Electrical Buses Status of SW & RBCCW Check one facility of CRAC operating (RO) RCS Inventory Control (RO) Pzr level & Subcooled margin (SCM), value & trend RCS Pressure Control (RO) Pzr pressure, value & trend Core Heat Removal (RO) RCP status Loop delta-T T H Subcooling Margin RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS T c value and trend Simulator Exercise Guide Job Page 17 of 27 SEG# ES11L11 Re\l;_O__ FLOOR BOOTH STUDENTS a S/G levels, value and oRCS Subcooling Containment (CTMT) Isolation (RO) a Radmonitors inside CTMT, outside CTMT, steam a CTMT pressure <1 CTMT Temperature  
* Notifies Reactor Engineering.
& Pressure Control (RO) CTMT temperature and pressure value and trend RO: Performs associated actions of EOP 2525 and reports results when queried: RX tripped All CEAs inserted SUR negative and power lowering BOP: Performs associated actions of EOP 2525 and reports results when queried: Value and trend of S/G pressures Closes MSIVs. Value and trend of T c Adjusts ADVs to maintain on the lower end of 880-920 psig. Value and trend of S/G levels Commence feeding S/Gs with 'A' and 'B' AFW pump, S/G level band 40-70%. (Main Feed Pumps tripped) Subcooling value / CET temperature Simulator Exercise Guide Job Page 18 of 27 SEG# ES11L11 Rev;_D__ FLOOR INSTRUCTOR BOOTH STUDENTS RO: Continues with associated actions of EOP 2525 and reports results when queried: Rad monitors inside CTMT not going up or in alarm Rad monitors outside CTMT not going up or in alarm Steam Plant Rad monitors not in alarm or going up Value and trend of CTMT temperature and pressure BOP: Continue with Subsequent Actions: Closes MSIVs due to condenser NOT being available Opens HD-1 06, Subcooling Valve Stops both Heater Drains Pumps Closes MFW pump mini flow Recirc(s}, FW-36NB If AFAS has actuated (alarms on C-04), then places both Override hand switches in Pull-To-Lock and controls Aux Feed flow rate Secures all but one Condensate Pump Checks IA Header pressure is >90 psig and stable. US: Query RO & BOP regarding the status of EOP 2525 subsequent actions.
* Monitors d T Power on RPS.
Simulator Exercise Guide Job Page 19 of 27 SEG# ES11L11 Rev;_O__ FLOOR INSTRUCTOR BOOTH STUDENTS RO/BOP: When asked, report that Subsequent Actions are complete and verified.
* As required, toggles Dropped Rod Reset switches on RPS to clear Dropped Rod LEDs.
US: At the completion of EOP 2525, Diagnostic Flow Chart, determines that the trip is uncomplicated and goes to EOP 2526, Reactor Trip Recovery. Places Master Silence Switch in NORM.
 
Simulator Exercise Guide Job Page 20 of 27 SEG# ES11L11 Rev;_O__ Event 5: FW30A -100%, with a Ramp Time of 270 seconds. "A" Aux Feed Pump degrades over the next 4.5 minutes. FW20A -Trip, with a 6 minute delay. "Au Aux Feed Pump trips 1.5 minutes after it is degraded.
Simulator Exercise Guide Job Aid                      Page 12 of 27 SEG# ES11L11 Rev;_O__
Event 29: FW20C -TRIP, When the TDAFP speed reaches 500 rpm, the pump will trip. (Inserted during Initial setup.) TM5, EM1 If a PEO is dispatched to determine the problem with the "Au Aux Feed Pump and/or the TDAFP: If the "Au Aux Feed Pump still running, report that there is a very loud screeching noise that appears to be coming from the outboard motor bearing. If the "Au Aux Feed Pump NOT running, report that the breaker is in the trip-free position and the outboard motor bearing is extremely hot. The trip mechanism latch on the Steam Admission Valve for the TDAFP is broken and cannot be fixed for several hours. BOP: Observes lowing Aux Feed flow or S/G levels continuing to lower with 2 Motor Driven Aux Feed Pumps running. Trips "Au Aux Feed Pump or observes "N Aux Feed Pump is tripped. Reports loss of liN Aux Feed Pump to the US. If directed, dispatches a PEO to determine the cause of the pump trip. Starts the Turbine Driven Auxiliary Feed Pump. Observes annunciator and indications of a trip of the TDAFP. Reports the loss of the TDAFP to the US. Closes the steam inlet valve to the TDAFP.
AE3                          US:
Simulator Exercise Guide Job Page 21 of 27 Rev;_O__ Event 6: ED05D -Trip. Bus 24D trips on fault BOP: resulting in a complete loss of all feedwater. Observes annunciators associated with the TM6, EM2, MA2, EU1 loss of Bus 24D on C-OB and reports the loss of Bus 24D to the US. When directed or when recommended, trips "B" DIG. Event 10: CVR11 -22E, When directed, Place US: "B" Charging Pump on Facility 1. USing the Diagnostic Flow Chart, determine that Loss of All Feedwater has occurred. Enters EOP 2537, Loss of All Feedwater. When (If) deemed necessary, dispatches a PEO to swap the "B" Charging Pump to Facility 1. Safety Function Status Checks are normally US: performed by the Shift Technical Advisor.
* Directs entry into AOP 2575 Rapid Downpower for power reduction to <70% in
* Directs that Safety Function Status Checks Classifications are generally performed by the be performed.
                                                      <1 hour.
Shift
* Performs Focus Brief for Trip Criteria and RCS Temperature Control.
* Classifies event as a General Interest, Echo due to the plant trip_ RO: When directed by the US: Stops all Reps Places TIC-4165, Steam Dump Tavg Controller, in manual and closed. Places Pressurizer Spray Controllers in manual and closed.
* Directs or makes required notifications.
Simulator Exercise Guide Job Page 22 of 27 SEG# ES11L11 FLOOR BOOTH INSTRUCTOR If dispatched to determine if any Aux Feed Pump can be started, as necessary, report that: The "A" Aux Feedwater Pump outboard motor bearing is still very hot and discolored, The pump will NOT rotate by hand. The TDAFP overs peed trip mechanism is broken and cannot be repaired until new parts are ordered or manufactured (at least 4-[[estimated NRC review hours::6 hours]]) Bus 24D has significant damage caused by an internal phase to phase short. When (If) dispatched to locally open CNM-2, inform the Control Room that you'll do your best, but it will likely take at least an hour to complete.
RO:
STUDENTS BOP: Determines that both S/G levels are greater than 70" (Wide Range) and reports value and trend to US. Using various indications, determines that the loss of all feedwater was NOT caused by a Main or Aux Feed Line break. When directed by the US, performs actions to conserve S/G inventory: Closes MS-220A and B, Blowdown Isolation Valves. Closes MS-191A and B, S/G Sample Isolation valves. Attempts to restore feedwater to at least one S/G. Determines that at least on Pump is Determines both Main Feed Discharge Valves, FW-38A and B, Closes both Main Feed Pump Valves, FW-36A and I Observes CPF Bypass Valve, CNM-2, is deenergized (closed) and dispatches a PEO to manually open CNM-2.
* Commences Forcing Pressurizer Sprays:
* Opens both Main Feed Reg Bypass Valves, FW-41 A and B. If MSI actuates, pushes the MSI OVRD push buttons, then opens the Feed Reg Valve Bypass Valves. Determines both Main Feed Air Check Valves, FW-SA and B, are in open SEG# ES11L11 Rev;_O__ CT-2 (LOAF-4):
o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).
Establish a Primary to CT2 Secondary Heat Sink. Main Feed flow (from Condensate) is restored prior to reaching 70 inches wide range level in either SIG OR Cooling initiated with less than or equal to 70 inches in either SIG and level NOT being restored.
US:
The US will likely direct the RO to prepare for Once-Thru-Cooling prior to reaching 70 inches in either S/G. Simulator Exercise Guide Job Aid BOOTH INSTRUCTOR Page 23 of 27 STUDENTS RO: During the subsequent cooldown and when permitted: blocks SIAS blocks MSI commences Emergency Boration BOP: Using the Steam Dumps to the Condenser, initiates a cooldown at the maximum contro"able rate to establish feed flow from Condensate to the Steam Generators (approximately 550 psig in the S/Gs) Controls feed flow to establish and maintain 40-70% in both S/Gs. US: If either SIG level lowers to 70 inches and level is NOT being restored, directs the crew to initiate Once-Thru-Cooling. When Once-Thru-Cooling has been initiated, enters EOP 2540, Functional Recovery.
Refers to Reactor Engineering Curve and Data Book and determine that Reactivity Plan, RE-G 11 is appropriate for the down power.
RO: Trips aI/ Proporlional Heaters. Places all Backup Heaters in Pull-To-Lock. Initiates both facilities of SIAS. Verifies "A" HPSI Pump is running. Verifies all HPSllnjection valves are open. Ensures at least "A" Charging Pump is running. Obtains keys and opens both PORVs.
 
Simulator Exercise Guide Job Aid Page 24 of 27 SEG# ES11L11 Rev; _0_ FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS Opens both SCENARIO END: At the discretion of the lead
Simulator Exercise Guide Job Aid                              Page 13 of 27 SEG#   ES11L11     Rev;_O__
FLOOR INSTRUCTOR                       BOOTH INSTRUCTOR                                  STUDENTS Commences Boration form the RWST (the crew may opt to Borate from the BAST):
* Ensures at least one Charging Pump is running.
* Ensures VCT Makeup Bypass, CH-196, is closed.
* Ensures RWST to Charging Suction, CH 192, is open.
* Closes VCT Outlet Isolation, CH-501
* Checks Charging flow is appropriate.
* Starts an additional Charging Pump and j----~~_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - + -.... b~l~nces Charging and Letdown.
BOP:
Reduces Turbine load using the LOAD LIMIT POT.
* Maintains Tc within 1&deg;F of program.
* Maintains 50-150 MVARs Crew:
Maintains parameters within the prescribed limits of Attachment 1, Rapid Downpower Parameters.
BOP:
When power is between 80 and 85%, stops one of the three Condensate Pumps.
 
Simulator Exercise Guide Job Aid                            Page 14 of 27 SEG#     ES11L11           Rev;_O__
Event 3: RP24D -100%, with a Ramp Time of I RO:
160 seconds. "D" Containment pressure Observes and reports CTMT PRES HI D transmitter fails high.
annunciator on C-01 TM3,AE4
* Reports value and trend of all Containment pressure indications and determines that Channel "D" appears to have failed high.
The crew may temporarily stop the downpower                                            RO:
to address the failed instrument.
Closes RWST to Charging Suction, CH-19, if the US directs the downpower to be temporarily stopped to address the failed instrument.
BOP:
Maintains RCS temperature on program, if the US directs the downpower to be temporarily stopped to address the failed instrument.
US:
* Refers to ARP 2590A-084. CTMT PRES HI D and/or ARP 2590C-048 (C-01). CTMT HI PRES TRIP CH D (C-04)
* Directs RO (or BOP) to obtain appropriate keys and bypass Channel "D" Containment Pressure on RPS and ESAS.
* Logs into TSAS 3.3.1.1. Table 3.3-1, and 3.3.2.1. Table 3.3-3.
* Contacts I&C for troubleshooting and repairs.
 
Simulator Exercise Guide Job Aid                        Page 15 of 27 SEG# ES11 Ll1   Rev;_O__
FLOOR INSTRUCTOR   BOOTH INSTRUCTOR                            STUDENTS RO (or BOP):
* Obtains bypass keys for Channel "D" RPS and ESAS Containment Pressure.
* Bypasses Channel "D" RPS and ESAS Containment Pressure.
us:
If the downpower were temporarily halted, directs the RO and BOP to commence the downpower as previously performed.
 
Simulator Exercise Guide Job Aid                                  Page 16 of 27 SEG#     ES11L11       Rev;_O__
CT-1 (SPT A-5): Manually shut down the     Event 4: FW33 - 100%. Condenser Vacuum         RO/BOP:
Reactor.                                   rapidly degrades.
The plant must be manually tripped prior to
* Observes and reports annunciators and TC10A - Fail. The Main Turbine fails to trip on     indications associated with a rapidly an automatic Reactor trip on low S/G level low Condenser Vacuum. (Inserted during initial     degrading Condenser Vacuum due to loss of Main Feed Pumps setup)
* When directed, manually trips the Reactor TM4, MA1, CT1                                       and commences actions of EOP 2525, Standard Post Trip Actions.
US:
Queries RO and BOP on the status of Safety Functions as delineated in EOP 2525:
* Reactivity Control (RO) o Status of the Reactor
* Maintenance of Vital Auxiliaries (BOP) o Status of the Turbine o Status of Electrical Buses o Status of SW & RBCCW o Check one facility of CRAC operating (RO)
* RCS Inventory Control (RO) o Pzr level & Subcooled margin (SCM),
value & trend
* RCS Pressure Control (RO) o Pzr pressure, value & trend
* Core Heat Removal (RO) o RCP status o Loop delta-T o T H Subcooling Margin
* RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS T c value and trend
 
Simulator Exercise Guide Job Aid                      Page 17 of 27 SEG# ES11L11   Re\l;_O__
FLOOR INSTRUCTOR    BOOTH INSTRUCTOR                          STUDENTS a S/G levels, value and trend oRCS Subcooling Margin
* Containment (CTMT) Isolation (RO) a Radmonitors inside CTMT, outside CTMT, steam plant a CTMT pressure <1 psig
* CTMT Temperature & Pressure Control (RO)
* CTMT temperature and pressure value and trend RO:
Performs associated actions of EOP 2525 and reports results when queried:
* RX tripped
* All CEAs inserted
* SUR negative and power lowering BOP:
Performs associated actions of EOP 2525 and reports results when queried:
* Value and trend of S/G pressures
* Closes MSIVs.
* Value and trend of T c
* Adjusts ADVs to maintain on the lower end of 880-920 psig.
* Value and trend of S/G levels
* Commence feeding S/Gs with 'A' and 'B' AFW pump, S/G level band 40-70%. (Main Feed Pumps tripped)
* Subcooling value / CET temperature
 
Simulator Exercise Guide Job Aid                      Page 18 of 27 SEG# ES11L11   Rev;_D__
FLOOR INSTRUCTOR   BOOTH INSTRUCTOR                          STUDENTS RO:
Continues with associated actions of EOP 2525 and reports results when queried:
* Rad monitors inside CTMT not going up or in alarm
* Rad monitors outside CTMT not going up or in alarm
* Steam Plant Rad monitors not in alarm or going up
* Value and trend of CTMT temperature and pressure BOP:
Continue with Subsequent Actions:
* Closes MSIVs due to condenser NOT being available
* Opens HD-1 06, Subcooling Valve
* Stops both Heater Drains Pumps
* Closes MFW pump mini flow Recirc(s},
FW-36NB
* If AFAS has actuated (alarms on C-04),
then places both Override hand switches in Pull-To-Lock and controls Aux Feed flow rate
* Secures all but one Condensate Pump
* Checks IA Header pressure is >90 psig and stable.
US:
Query RO & BOP regarding the status of EOP 2525 subsequent actions.
 
Simulator Exercise Guide Job Aid                      Page 19 of 27 SEG# ES11L11   Rev;_O__
FLOOR INSTRUCTOR   BOOTH INSTRUCTOR                          STUDENTS RO/BOP:
When asked, report that Subsequent Actions are complete and verified.
US:
* At the completion of EOP 2525, Diagnostic Flow Chart, determines that the trip is uncomplicated and goes to EOP 2526, Reactor Trip Recovery.
* Places Master Silence Switch in NORM.
 
Simulator Exercise Guide Job Aid                                Page 20 of 27 SEG# ES11L11 Rev;_O__
Event 5: FW30A - 100%, with a Ramp Time of       BOP:
270 seconds. "A" Aux Feed Pump degrades Observes lowing Aux Feed flow or S/G levels over the next 4.5 minutes.
continuing to lower with 2 Motor Driven Aux FW20A - Trip, with a 6 minute delay. "Au Aux     Feed Pumps running.
Feed Pump trips 1.5 minutes after it is degraded.
* Trips "Au Aux Feed Pump or observes "N Aux Feed Pump is tripped.
Event 29: FW20C - TRIP, When the TDAFP
* Reports loss of liN Aux Feed Pump to the speed reaches 500 rpm, the pump will trip.           US.
(Inserted during Initial setup.)
* If directed, dispatches a PEO to TM5, EM1                                             determine the cause of the pump trip.
* Starts the Turbine Driven Auxiliary Feed Pump.
If a PEO is dispatched to determine the problem
* Observes annunciator and indications of with the "Au Aux Feed Pump and/or the TDAFP:         a trip of the TDAFP.
* Reports the loss of the TDAFP to the US.
* If the "Au Aux Feed Pump still running, report that there is a very loud screeching
* Closes the steam inlet valve to the noise that appears to be coming from the       TDAFP.
outboard motor bearing.
* If the "Au Aux Feed Pump NOT running, report that the breaker is in the trip-free position and the outboard motor bearing is extremely hot.
* The trip mechanism latch on the Steam Admission Valve for the TDAFP is broken and cannot be fixed for several hours.
 
Simulator Exercise Guide Job Aid                              Page 21 of 27 Rev;_O__
Event 6: ED05D - Trip. Bus 24D trips on fault  BOP:
resulting in a complete loss of all feedwater.
* Observes annunciators associated with the TM6, EM2, MA2, EU1                                loss of Bus 24D on C-OB and reports the loss of Bus 24D to the US.
* When directed or when recommended, trips "B" DIG.
Event 10: CVR11 - 22E, When directed, Place    US:
                                              "B" Charging Pump on Facility 1.
* USing the Diagnostic Flow Chart, determine that Loss of All Feedwater has occurred.
* Enters EOP 2537, Loss of All Feedwater.
* When (If) deemed necessary, dispatches a PEO to swap the "B" Charging Pump to Facility 1.
Safety Function Status Checks are normally                                                    US:
performed by the Shift Technical Advisor.
* Directs that Safety Function Status Checks Classifications are generally performed by the                                                     be performed.
Shift Manager.
* Classifies event as a General Interest, Echo due to the plant trip_
RO:
When directed by the US:
* Stops all Reps
* Places TIC-4165, Steam Dump Tavg Controller, in manual and closed.
* Places Pressurizer Spray Controllers in manual and closed.
 
Simulator Exercise Guide Job Aid                                        Page 22 of 27 SEG# ES11L11    Rev;~O_
FLOOR INSTRUCTOR              BOOTH INSTRUCTOR                                                STUDENTS If dispatched to determine if any Aux Feed              BOP:
Pump can be started, as necessary, report that:
* Determines that both S/G levels are greater
* The "A" Aux Feedwater Pump outboard                      than 70" (Wide Range) and reports value motor bearing is still very hot and                      and trend to US.
discolored, The pump will NOT rotate by
* Using various indications, determines that hand.                                                   the loss of all feedwater was NOT caused
* The TDAFP overs peed trip mechanism is                  by a Main or Aux Feed Line break.
broken and cannot be repaired until new
* When directed by the US, performs actions parts are ordered or manufactured (at least              to conserve S/G inventory:
4-[[estimated NRC review hours::6 hours]])                                              o Closes MS-220A and B, Blowdown
* Bus 24D has significant damage caused by                     Isolation Valves.
an internal phase to phase short.                        o Closes MS-191A and B, S/G Sample Isolation valves.
o Attempts to restore feedwater to at least one S/G.
* Determines that at least on Condensate Pump is running.
* Determines both Main Feed Pump Discharge Valves, FW-38A and B, are open.
* Closes both Main Feed Pump Min-Flow Valves, FW-36A and B.
* When (If) dispatched to locally open CNM-2,       I
* Observes CPF Bypass Valve, CNM-2, is inform the Control Room that you'll do your             deenergized (closed) and dispatches a PEO best, but it will likely take at least an hour to       to manually open CNM-2.
complete.                                         I
* Opens both Main Feed Reg Bypass Valves, FW-41 A and B.
o If MSI actuates, pushes the MSI OVRD push buttons, then opens the Feed Reg Valve Bypass Valves.
* Determines both Main Feed Air Assist Check Valves, FW-SA and B, are in the open position.
 
Simulator Exercise Guide Job Aid                        Page 23 of 27 SEG#      ES11L11          Rev;_O__
BOOTH INSTRUCTOR                              STUDENTS RO:
During the subsequent cooldown and when permitted:
* blocks SIAS
* blocks MSI
* commences Emergency Boration CT-2 (LOAF-4): Establish a Primary to           CT2                          BOP:
Secondary Heat Sink.
Using the Steam Dumps to the Condenser, Main Feed flow (from Condensate) is initiates a cooldown at the maximum restored prior to reaching 70 inches wide range level in either SIG OR Once-Thru                                      contro"able rate to establish feed flow from Condensate to the Steam Generators Cooling initiated with less than or equal to (approximately 550 psig in the S/Gs) 70 inches in either SIG and level NOT being restored.
* Controls feed flow to establish and maintain 40-70% in both S/Gs.
The US will likely direct the RO to prepare for                             US:
Once-Thru-Cooling prior to reaching 70 inches in either S/G.
* If either SIG level lowers to 70 inches and level is NOT being restored, directs the crew to initiate Once-Thru-Cooling.
* When Once-Thru-Cooling has been initiated, enters EOP 2540, Functional Recovery.
RO:
* Trips aI/ Proporlional Heaters.
* Places all Backup Heaters in Pull-To-Lock.
* Initiates both facilities of SIAS.
* Verifies "A" HPSI Pump is running.
* Verifies all HPSllnjection valves are open.
* Ensures at least "A" Charging Pump is running.
* Obtains keys and opens both PORVs.
 
Simulator Exercise Guide Job Aid                          Page 24 of 27 SEG#      ES11L11          Rev; _0_
FLOOR INSTRUCTOR                          BOOTH INSTRUCTOR                              STUDENTS BOP:
Opens both ADVs.
SCENARIO END: At the discretion of the lead
* When directed, FREEZE simulator.
* When directed, FREEZE simulator.
evaluator, the simulator will be placed in
evaluator, the simulator will be placed in
* Inform the crew that the evaluation is FREEZE. complete.
* Inform the crew that the evaluation is FREEZE.                                       complete.
--------------------------------, Dominion Simulator Exercise Guide Job Aid Page 25 of 27 SEG# ES10Ll1 Rev; _0_ Delay Ramp I Event I Severity I Final I Relative Description Time Time Trigger Or Value Value Order MALFUNCTIONS TC10A, Failure of the Main Turbine to trip on low vacuum. NA NA NA NA NA 1 FW20C, The TOAFP trips shortly after being started. NA NA 29 NA NA 1 RX11 0, #2 S/G Alternate Steam Flow Transmitter failure. NA 300 sec. 1 100 100 5 R00368, CEA #68 slips to 145 steps. NA NA 2 35 145 6 RP240, "0" Containment Pressure Transmitter fails high. NA 160 sec. 3 100 100 7 FW33, Condenser Vacuum rapidly degrades.
 
NA NA 4 7.5 7.5 8 FW30A, "A" Aux Feed Pump degrades.
,    Dominion                                                    Simulator Exercise Guide Job Aid                            Page 25 of 27 SEG# ES10Ll1                      Rev; _0_
NA 270 sec. 5 100 100 9 FW20A, "A" Aux Feed Pump trips 360 sec. NA 5 NA NA 10 E0050, Bus 240 trips on fault resulting in a loss of all feedwater.
Delay          Ramp  I Event I Severity I                Final        IRelative Description                                        Time          Time    Trigger Or Value                  Value            Order MALFUNCTIONS
NA NA 6 NA NA 11 REMOTE FUNCTIONS CCR06, Close 2-RB-3A NA NA 7 0 0 2 CCR40, Place "B" RBCCW Pump SIAS/LNP Actuation Hand Switch in 'Normal'.
                                                                                                                              -~        ~--~~ ~~-- ~    -----
NA NA 8 NORM NORM 3 CCR06, Open 2-RB-3A NA NA 9 100 100 4 CVR11. Place "B" Charging Pump on Facility 1. I NA NA 10 22E 22E 12 OVERRIDES I
TC10A, Failure of the Main Turbine to trip on low vacuum.                                      NA              NA    NA            NA                  NA              1 FW20C, The TOAFP trips shortly after being started.                                             NA               NA     29            NA                   NA             1
(JjjJ" Dominion'*
                                                                                                                                -------
Simulator Exercise Guide Job Aid Page 26 of 27 SEG# ES10Ll1 Rev; _0_ Mark with an "X" Yes or No for any of the following.
RX11 0, #2 S/G Alternate Steam Flow Transmitter failure.                                       NA       300 sec.       1           100                 100             5 R00368, CEA #68 slips to 145 steps.                                                             NA               NA       2           35                 145             6 RP240, "0" Containment Pressure Transmitter fails high.                                         NA         160 sec.       3           100                 100             7 FW33, Condenser Vacuum rapidly degrades.                                                       NA               NA     4             7.5                 7.5             8 FW30A, "A" Aux Feed Pump degrades.                                                             NA         270 sec.       5           100                 100             9
If the answer is No, include an explanation after the item. Yes No The desired initial condition(s) could be achieved.
                                                                                                                                                                ------- -
o All malfunctions and other instructor interface items were functional and responded to o support the simulator Scenario. All malfunctions and other instructor interface items were initiated in the same sequence o described within the simulator scenario. All applicable acceptance criteria were met for procedures that were used to support the o simulator scenario. During the simulator scenario, observed changes corresponded to expected plant o response. Did the scenario satisfy the learning or examination objectives without any significant o simulator performance issues, or deviations from the approved scenario sequence? The simulator is capable of being used to satisfy learning or examination objectives without o exceptions, significant performance discrepancies, or deviation from the approved scenario sequence.
FW20A, "A" Aux Feed Pump trips                                                               360 sec.           NA       5           NA                   NA             10
Any identified Critical Tasks possesses the following elements o (NUREG-1021  
                                                                                              ~----~~~~- -------
): Essential to safety with adverse consequences or Cue(s) prompt the Operator to respond. Defined and measurable performance indicators. Performance feedback.
E0050, Bus 240 trips on fault resulting in a loss of all feedwater.                             NA               NA       6           NA                   NA             11 REMOTE FUNCTIONS
The use of "N/A" is allowed for item 8 only if this is NOT an Discrepancies noted (Check "none" or list items in comments None 125::1 Comments:
                                                                                                                                                      -----
Validator:
CCR06, Close 2-RB-3A                                                                             NA               NA       7             0                   0             2 CCR40, Place "B" RBCCW Pump SIAS/LNP Actuation Hand Switch in 'Normal'.                         NA               NA       8       NORM                 NORM               3 CCR06, Open 2-RB-3A                                                                             NA               NA       9           100                 100             4 CVR11. Place "B" Charging Pump on Facility 1.                                               I   NA               NA     10           22E                 22E             12 OVERRIDES I
Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
 
Simulator Exercise Guide Job Aid Page 27 of 27 SEG# ES10Ll1 Rev; _0_ SIMULATOR TRAINING SHIFT TURNOVER REPORT DATE-TIME PREPARED Today 0515 Unit Supervisor
-
('NIGHT" PLANT Mode: 1 Rx Megawatts:
(JjjJ"Dominion'*
Thermal: 2698 MWTH PZR Electric:
SEG# ES10Ll1                        Rev; _0_
888 MWe RCS RCS Leakage: Identified:
Simulator Exercise Guide Job Aid                                   Page 26 of 27 Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.
0.015 gpm Protected Train/Facility:
Yes     No
TRAIN Unidentified:
: 1. The desired initial condition(s) could be achieved.                                                       o
0.036 DatelTime:
: 2. All malfunctions and other instructor interface items were functional and responded to                   o support the simulator Scenario.
Toda I Active Tracking Records and Action I LCO Action Date Time in LCO Action Requirement Time Left I ! None 2-U-AIL, See AIL for 00 Compensatory Actions I Temp Logs Watch Open Date Class Reason Reason Position 2-CH-507.
: 3. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
RCP bleedoff relief isolation.
o
is closed on C02. This is due to relief CH-199 leaking by into the PDT. ARP C-1 0 for Bleedoff flow high 7/05/08 ODM RO directs closing CH-507. ARP 8-10 directs opening CH-507. (>280#). OP-2301C-001 has been modified for this valve to be CLOSED. I PLANT SYSTEMS System I CROSS UNIT SYSTEM U3 Power to 24E I 34A aligned to SURVEILLANCES I EVOLUTIONS IN OP 2204 I Steady State REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES I SPREAD SHEET FOR ADDITIONAL Current Rod Height ARO@ Xenon Trend Current Boron 9.2 Boron Pot Setting I Blend Ratio 70 to 1 Appendix Scenario Outline Form ES-D-1 Facility:
: 4. All applicable acceptance criteria were met for procedures that were used to support the simulator scenario.
MP2 Scenario No.: ES11 Ll3 Op-Test No.:_3=--_---i1 Examiners:
o
___________
: 5. During the simulator scenario, observed changes corresponded to expected plant response.
Operators:
o
_________ Initial Conditions:
: 6. Did the scenario satisfy the learning or examination objectives without any significant simulator performance issues, or deviations from the approved scenario sequence?
100% power. MOL. Eg. Xe .. 9.2 ppm Boron SGBD @ gpm. Bus 24E is aligned to Bus 24C. TDAFP is OOS for bearing Turnover:
o
100% power, MOL, Eg. Xe., 9.2 ppm Boron, blend ratio: SGBD @ 40 gpm per S/G, Bus 24E aligned to Bus 24C, TDAFP is OOS bearing replacement.
: 7. The simulator is capable of being used to satisfy learning or examination objectives without exceptions, significant performance discrepancies, or deviation from the approved scenario o
In TSAS 3.7.1.2a and TRM Table 7.1.15-1, ACTIONS *and b.2 for fire areas R-3, R-11. R-16 and R-17. Event Malf. Event Event No. No. Type* 1 SW9A C "Au Service Water Pump degrading performance. (TS). (BOPfS) (Swap Service Water Pumps.) 2 RX03B I Failure of in-service Pressurizer Pressure transmitter (ROfS) 3 CH07 C Non-Vital Bus 22B is lost develops due to a seismic event ED06B (BOP/S) 4 RC04 C Small RCS Leak develops. (TS) (ROfS) 5 NfA R Plant shutdown due to RCS leak (All) 6 RC04 M Small Break LOCA requiring a Reactor trip. Failure of ED06B (All) automatic Reactor trip and manual trip push buttons Loss RP04A, of Actuation Cabinet 6 on the trip. B,C,D RP27B 7 MS01B I M Excess Steam Demand in Containment on #2 SfG after * (BOPfS) the trip RH06A C Failure of "AU Containment Spray Pump to start on CSAS (ROfS) * (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D. 38 of 39 Simulator Exercise Guide Dominion" Job Page 1 of 32 SEG# ES11 Ll3 I SITE: I Millstone Power Station PROGRAM: Unit 2 LOIT NRC Exam Simulator Exam #3 COURSE: I Course #: NA Total Time hours Prepared R.J. 1110/2011 Printed N amc Il1Structor's lignature Date Reviewed by: Idkl"-t L Printed Name Instructor Signature Reviewed (Optional)
sequence.
Printed Name latr\Validation Checklist Signature Approved by:  
: 8. Any identified Critical Tasks possesses the following elements (NUREG-1021 ):
\4  
o
".\ Printed Training Supervisor  
* Essential to safety with adverse consequences or significant degradation,
'<\//,'-. I LI '
* Cue(s) prompt the Operator to respond.
Simulator Exercise Guide Job Page 2 of 32 SEG# ES11L13 Rev; --,,-0__ Goal of Training: Evaluate the licensees' ability. as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions. Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions.
* Defined and measurable performance indicators.
To include: 1) Ability of the crew to perform crew-dependent (and time-critical) tasks. Ability of the to: Understand/interpret annunciators/alarms, plant/systems response Diagnose events/conditions based on signals/readings Comply with/use procedures.
* Performance feedback.
Technical Specifications, and TRIVI Perform control board operations Properly communicate information/proper crew interactions Practice Reactivity Management
The use of "N/A" is allowed for item 8 only if this is NOT an evaluated scenario.
Discrepancies noted (Check "none" or list items in comments field)                                      None     125::1 Comments:
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
 
Simulator Exercise Guide Job Aid                                     Page 27 of 27 SEG# ES10Ll1                       Rev; _0_
SIMULATOR TRAINING SHIFT TURNOVER REPORT DATE-TIME                                 PREPARED BY Today 0515                         Unit Supervisor ('NIGHT" Shift PLANT STATUS:
Mode: 1                                                           Rx Power:
Megawatts: Thermal:       2698 MWTH                           PZR Pressure:
Electric:     888 MWe                               RCS T-AVE:
RCS Leakage: Identified: 0.015 gpm                         Protected Train/Facility:   TRAIN B Unidentified: 0.036 gpm DatelTime: Toda 0015 Active Tracking Records and Action Statements                                                                              I E_quipmentlReason                                                                                                          I LCO         Action   Date   Time in LCO                     Action Requirement                       Time Left I
  ! None 2-U-AIL, See AIL for details None 00 Compensatory Actions I Temp Logs Watch Open Date       Class Reason                                     Reason Position 2-CH-507. RCP bleedoff relief isolation. is closed on C02. This is due to relief CH-199 leaking by into the PDT. ARP C-1 0 for Bleedoff flow high 7/05/08                 ODM                                                                                       RO directs closing CH-507. ARP 8-10 directs opening CH-507. (>280#).
OP-2301C-001 has been modified for this valve to be CLOSED.
I PLANT SYSTEMS APe System     I                                                   Notes CROSS UNIT SYSTEM STATUS U3 Power to 24E       I 34A aligned to 24E SURVEILLANCES I EVOLUTIONS IN PROGRESS OP 2204         I Steady State Operation REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES I SPREAD SHEET FOR ADDITIONAL INFO)
Current Rod Height ARO@ 180 Xenon Trend Stable Current Boron 9.2 ppm Boron Pot Setting I Blend Ratio 70 to 1 (corrected)
 
Appendix D                            Scenario Outline                       Form ES-D-1 Facility:   MP2             Scenario No.: ES11 Ll3                 Op-Test No.:_3=--_---i1 Examiners: _ _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ __
Initial Conditions: 100% power. MOL. Eg. Xe .. 9.2 ppm Boron SGBD @ 40 gpm. Bus 24E is aligned to Bus 24C. TDAFP is OOS for bearing replacement.
Turnover: 100% power, MOL, Eg. Xe., 9.2 ppm Boron, blend ratio: 70:1 SGBD @ 40 gpm per S/G, Bus 24E aligned to Bus 24C, TDAFP is OOS for bearing replacement. In TSAS 3.7.1.2a and TRM Table 7.1.15-1, ACTIONS b.1
* and b.2 for fire areas R-3, R-11. R-16 and R-17.
Event     Malf.       Event                         Event Description No.       No. Type*
1     SW9A           C     "Au Service Water Pump degrading performance. (TS).
(BOPfS)   (Swap Service Water Pumps.)
2     RX03B           I     Failure of in-service Pressurizer Pressure transmitter (ROfS) 3       CH07         C     Non-Vital Bus 22B is lost develops due to a seismic event ED06B     (BOP/S) 4       RC04         C     Small RCS Leak develops. (TS)
(ROfS) 5       NfA         R     Plant shutdown due to RCS leak (All) 6       RC04         M     Small Break LOCA requiring a Reactor trip. Failure of ED06B         (All)   automatic Reactor trip and manual trip push buttons Loss RP04A,               of Actuation Cabinet 6 on the trip.
B,C,D RP27B 7     MS01B I       M     Excess Steam Demand in Containment on #2 SfG after
                    * (BOPfS)   the trip 8      RH06A         C     Failure of "AU Containment Spray Pump to start on CSAS (ROfS)
  *       (N)ormal, (R)eactivity, (I)nstrument, (C)omponent,     (M)ajor Appendix D. 38 of 39
 
~
ifijJ~ Dominion" Simulator Exercise Guide Job Aid                                Page 1 of 32 SEG#     ES11 Ll3     Rev;~
I SITE: I Millstone Power Station PROGRAM:             Unit 2 LOIT NRC Exam Title                Simulator Exam #3 COURSE:               ESllLI3                                        I Course #: NA Total Time           1.[[estimated NRC review hours::5 hours]] Prepared by:            R.J.                                                       1110/2011 Printed N amc             Il1Structor's lignature           Date Reviewed by:     Idkl"-t L Cfl11m1n5 ~\
(Optional)              Printed Name Instructor Signature Reviewed by:
(Optional)               Printed Name       ~im latr\Validation Checklist Signature   Date Approved by:     ---!-tL~A \4 ~~ e",.~ ". ~ \     ~}--
Printed Name                Training Supervisor
                                                          '<\//
                                                            ,'- .
I '
LI
 
Simulator Exercise Guide Job Aid                                Page 2 of 32 SEG# ES11L13       Rev; --,,-0_ _
Goal of Training:       a) Evaluate the licensees' ability. as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.
b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:
: 1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
: 2) Ability of the ~ to:
* Understand/interpret annunciators/alarms, plant/systems response
* Diagnose events/conditions based on signals/readings
* Comply with/use procedures. Technical Specifications, and TRIVI
* Perform control board operations
* Properly communicate information/proper crew interactions
* Practice Reactivity Management
* Make conservative decisions.
* Make conservative decisions.
: 3) Ability of each individual to: Respond and correctly interpret annunciators Correctly diagnose events Properly interpret integrated system response Comply with and use Technical SpecificationslTRM Comply with and use procedures Properly perform control board operations Demonstrate responsible attitude Properly communicate information and interact with rest of crew Leadership skills required to effectively manage the evolutions Provide adequate overview where required Learning Objectives:
: 3) Ability of each individual to:
NA NA Prerequisites:
* Respond and correctly interpret annunciators
N/A Training Resources:
* Correctly diagnose events
1 lead simulator (floor) instructor, 1 booth instructor Simulator Exercise Guide Job Aid Page 3 of 32 SEG# ES11 Ll3 Rev; _0,,--__
* Properly interpret integrated system response
* Comply with and use Technical SpecificationslTRM
* Comply with and use procedures
* Properly perform control board operations
* Demonstrate responsible attitude
* Properly communicate information and interact with rest of crew
* Leadership skills required to effectively manage the evolutions
* Provide adequate overview where required Learning Objectives:     NA Tasks:                  NA Prerequisites:           N/A Training Resources:     1 lead simulator (floor) instructor, 1 booth instructor
 
Simulator Exercise Guide Job Aid                         Page 3 of 32 SEG# ES11 Ll3       Rev; _0,,--_ _


==References:==
==References:==
ARP 2590E-029, SW PUMP A STNR TROUBLE AOP 2565, Loss of Service Water OP 2326A, Service Water System ARP 25908-212, PZR PRESSURE SELECTED CHANNEL DEVIATION HIILO Millstone 2 Technical Specifications AOP 2562, Earthquake AOP 2568 Reactor Coolant System Leak AOP 2575, Rapid Downpower EOP 2525, Standard Post Trip Actions EOP Loss of Coolant Accident EOP 2540, Functional Recovery EOP 2540, Functional Recovery of Containment Temperature and Pressure Control EOP 2540C1, Functional Recovery of RCS Inventory Control EOP 2540D, Functional Recovery of RCS Heat Removal Commitments:            N/A Evaluation Method:
Operating Experience:
Plant/Simulator          None differences that may affect the scenario:
Related PRA              Core Damage Freguency: 0.98 Information:            LERF: 1.00 Important Components: 24E aligned to 24C TDAFP out for bearing replacement


Commitments:
Simulator Exercise Guide Job Aid                                 Page 4 of 32 SEG#_---==:ES"-1.1..\.l:1L:l-"13"---_ Rev;_O_
Evaluation Method: Operating Experience:
INITIAL CONDITIONS:
Plant/Simulator differences that may affect the scenario:
Related PRA Information:
ARP 2590E-029, SW PUMP A STNR TROUBLE AOP 2565, Loss of Service Water OP 2326A, Service Water System ARP 25908-212, PZR PRESSURE SELECTED CHANNEL DEVIATION HIILO Millstone 2 Technical Specifications AOP 2562, Earthquake AOP 2568 Reactor Coolant System Leak AOP 2575, Rapid Downpower EOP 2525, Standard Post Trip Actions EOP Loss of Coolant Accident EOP 2540, Functional Recovery EOP 2540, Functional Recovery of Containment Temperature and Pressure Control EOP 2540C1, Functional Recovery of RCS Inventory Control EOP 2540D, Functional Recovery of RCS Heat Removal N/A None Core Damage Freguency:
0.98 LERF: 1.00 Important Components:
24E aligned to 24C TDAFP out for bearing replacement Simulator Exercise Guide Job Aid Page 4 of 32 SEG#_---==:ES"-1.1..\.l:1 L:l-"13"---_
Rev;_O_ INITIAL CONDITIONS:
* 100% power EOL.
* 100% power EOL.
* 24E aligned to 24C
* 24E aligned to 24C
* The TDAFP is OOS for a bearing replacement and is not expected back until mid day tomorrow.
* The TDAFP is OOS for a bearing replacement and is not expected back until mid day tomorrow.
* In TSAS 3.7.1.2.a and TRM Table 7.1.15-1, Actions b.1 and b.2 for Fire Areas R-3, R-11, R-16, and R-17. The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
* In TSAS 3.7.1.2.a and TRM Table 7.1.15-1, Actions b.1 and b.2 for Fire Areas R-3, R-11, R-16, and R-17.
Scenario Summary: The crew will take the shift with the unit at 100% power and 24E aligned to 24C. The Turbine Driven Aux. Feed Pump is out of service for bearing replacement.
The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
Shortly after the crew takes the shift, the "A" Service Water Pump will begin to degrade requirill9 the crew to swap to the "B" Service Water Pump. While swapping Service Water Pumps the US will enter TSAS 3.7.4.1. After the Service Water Pumps are swapped, the Channel "Y" Pressurizer Pressure transmitter will fail low causing RCS presslJre to rise. The crew will swap to Channel "X". (Prior to swapping to Channel "X", the crew may take manual control of pressurizer pressure components.)
Scenario Summary:
When RCS pressure is back to 2250 psia and stable, a seismic event will result in a loss of Non-Vital 480 Volt Bus 22B. The crew should enter AOP 2503B and take action to cross-tie Bus 22B with Bus 22A. When the Non-Vital Buses are cross-tied, a small RCS leak will develop. The Crew will attempt to determine the location of the leak while the US enters TSAS 3.4.6.2, and AOP 2575, Rapid Downpower.
The crew will take the shift with the unit at 100% power and 24E aligned to 24C. The Turbine Driven Aux. Feed Pump is out of service for bearing replacement.
The downpower rate will be determined and the appropriate Reactivity Plan will be selected.
Shortly after the crew takes the shift, the "A" Service Water Pump will begin to degrade requirill9 the crew to swap to the "B" Service Water Pump. While swapping Service Water Pumps the US will enter TSAS 3.7.4.1.
After the Service Water Pumps are swapped, the Channel "Y" Pressurizer Pressure transmitter will fail low causing RCS presslJre to rise. The crew will swap to Channel "X". (Prior to swapping to Channel "X", the crew may take manual control of pressurizer pressure components.)
When RCS pressure is back to 2250 psia and stable, a seismic event will result in a loss of Non-Vital 480 Volt Bus 22B. The crew should enter AOP 2503B and take action to cross-tie Bus 22B with Bus 22A.
When the Non-Vital Buses are cross-tied, a small RCS leak will develop. The Crew will attempt to determine the location of the leak while the US enters TSAS 3.4.6.2, and AOP 2575, Rapid Downpower. The downpower rate will be determined and the appropriate Reactivity Plan will be selected.
During the down power, the RCS leak will degrade to where it exceeds charging pump capacity (Small Break LOCA) and eventually trigger an automatic reactor trip (if not manual performed).
During the down power, the RCS leak will degrade to where it exceeds charging pump capacity (Small Break LOCA) and eventually trigger an automatic reactor trip (if not manual performed).
The automatic (or manual) reactor trip will not occur, even when the trip push buttons are pressed, requiring the crew to trip the CEDM MG sets to initiate a reactor trip. The crew will enter EOP 2525, Standard Post Trip Actions. On the trip, ESAS Actuation Cabinet 6 deenergizes resulting in a failure of all Facility 2 ESAS components from automatically actuating to their accident conditions.
The automatic (or manual) reactor trip will not occur, even when the trip push buttons are pressed, requiring the crew to trip the CEDM MG sets to initiate a reactor trip. The crew will enter EOP 2525, Standard Post Trip Actions. On the trip, ESAS Actuation Cabinet 6 deenergizes resulting in a failure of all Facility 2 ESAS components from automatically actuating to their accident conditions.
Line 1,672: Line 4,293:
When Containment Spray is actuated, the "B" Containment Spray Pump will NOT automatically start. The crew will start the "A" and/or the "B" Containment Spray Pump(s) to maintain Containment Integrity.
When Containment Spray is actuated, the "B" Containment Spray Pump will NOT automatically start. The crew will start the "A" and/or the "B" Containment Spray Pump(s) to maintain Containment Integrity.
The scenario will end when at least one Containment Spray Pump is running and the crew has prioritized the Safety Functions for performance.
The scenario will end when at least one Containment Spray Pump is running and the crew has prioritized the Safety Functions for performance.
CT1 (LOCA-11):
CT1 (LOCA-11): Perform a plant cooldown. A plant cooldown must be initiated within one hour following an unisolable LOCA at a rate of greater than 40&deg;F/hr.
Perform a plant cooldown.
CT2 (CTPC-1): Maintain Containment Temperature and Pressure Control. Establish greater than or equal to 1300 gpm Containment Spray flow from at least one Containment Spray Pump prior to reaching 51 psig Containment Pressure.
A plant cooldown must be initiated within one hour following an unisolable LOCA at a rate of greater than 40&deg;F/hr. CT2 (CTPC-1):
CT3 (ESDE-6): Isolate the Affected S/G. AFW to the faulted (#2) SG is isolated within :s30 minutes of MSI actuation on an ESDE.
Maintain Containment Temperature and Pressure Control. Establish greater than or equal to 1300 gpm Containment Spray flow from at least one Containment Spray Pump prior to reaching 51 psig Containment Pressure.
 
CT3 (ESDE-6):
Simulator Exercise Guide Job Aid                                Page 5 of 32 SEG#_--=ES"-!.1...!.-"1L",,13,--_ Rev;_O_
Isolate the Affected S/G. AFW to the faulted (#2) SG is isolated within :s30 minutes of MSI actuation on an ESDE.
o        ENSLIRE TRex Workstation is operating.
Simulator Exercise Guide Job Page 5 of 32 SEG#_--=ES"-!.1...!.-"1 L",,13,--_
o        VERIFY the most current approved training load is loaded.
Rev;_O_ ENSLIRE TRex Workstation is operating. VERIFY the most current approved training load is loaded. RESET to IC-173 If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC. As needed, RESET Computer Terminals (At Power displays if 100% power IC). ENSURE SG blowdown values in PPC Plant Calorimetric are reset. ENSURE Leak Rate is reset in PPC. ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14). If necessary (Le., exams), ADVANCE chart recorders ENSURE the appropriate Protected Train placard is hung (A TRAIN PROTECTED). ENSURE appropriate signs are in place on simulator doors. ENSURE procedures designated for use during the scenario are clear of previous place keeping marks. If necessary, ENSURE Simulator fidelity items cleared. ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper). If required, OVERRIDE annunciators that will be lit long-term in the Control Room. ENTER Initial Malfunctions I II0s I Remote Functions. PLACE Simulator to RUN. If placing Equipment OOS, then PERFORM necessary switch manipulations and HANG appropriate tags, as required for the following: PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
o        RESET to IC-173 o        If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.
Simulator Exercise ..'Dominion'" Job Page 6 of 32 FLOOR INSTRUCTOR BOOTH STUDENTS 1. INITIAL CONDITIONS:
o        As needed, RESET Computer Terminals (At Power displays if 100% power IC).
ENTER or VERIFY the following Initial IC-173 Malfunctions I I/0s I Remote  
o        ENSURE SG blowdown values in PPC Plant Calorimetric are reset.
*
o        ENSURE I~CS Leak Rate is reset in PPC.
o        ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).
o        If necessary (Le., exams), ADVANCE chart recorders o        ENSURE the appropriate Protected Train placard is hung (A TRAIN PROTECTED).
o        ENSURE appropriate signs are in place on simulator doors.
o        ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.
o        If necessary, ENSURE Simulator fidelity items cleared.
o        ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).
o        If required, OVERRIDE annunciators that will be lit long-term in the Control Room.
o        ENTER Initial Malfunctions I II0s I Remote Functions.
o        PLACE Simulator to RUN.
o        If placing Equipment OOS, then PERFORM necessary switch manipulations and HANG appropriate tags, as required for the following:
o        PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
 
'Dominion'"
Simulator Exercise Guide                                                  .
Job Aid                        Page 6 of 32 FLOOR INSTRUCTOR                                   BOOTH INSTRUCTOR                                STUDENTS
: 1. INITIAL CONDITIONS:                           ENTER or VERIFY the following Initial N/A
* IC-173                                     Malfunctions I I/0s I Remote Functions
* Mode: 1
* Mode: 1
* Burnup:EOL
* Burnup:EOL
* Power: 99.8%
* Power: 99.8%
* Boron: (CB): ppm
* Boron: (CB): ppm
* Temperature:
* Temperature: Tave 569 F
Tave 569 F
* Pressure: 2250 psia
* Pressure:
2250 psia
* Xenon: Stable, at equilibrium
* Xenon: Stable, at equilibrium
* Rods: ARO
* Rods: ARO
* Generator:
* Generator: 888 Mwe
888 Mwe 2. SIMULATOR COMPLETE Simulator Setup Checklist NIA As necessary, PERFORM I.V. of Initial Malfunctions I II0s I Remote
: 2. SIMULATOR SETUP:                                COMPLETE Simulator Setup Checklist     NIA As necessary, PERFORM I.V. of Initial Malfunctions I II0s I Remote           Anl'Ar~lr!
                                      ~~~~~---------------------------------+--------------------------------~
: 3. PRE*SCENARIO:
: 3. PRE*SCENARIO:
BRIEF the crew on of this session 4. TURNOVER:
BRIEF the crew on           of this session
PERFORM the crew SM brief crew on plant conditions and any major (Turnover Sheet) with the equipment OOS. (All) Walk down boards and let US know when they are No shift briefing is required or SEG# ES11L13 Rev;_O__ FLOOR INSTRUCTOR Observe degraded performance of itA" Service Water Pump and swap to "B" Service Water Pump. Simulator Exercise Guide Job Aid BOOTH INSTRUCTOR Event 1: SW09A -Ramp to 100% over 240 seconds, "A" Service Water Strainer clogs. TM1, AE1 When dispatched to determine the cause of the low "A" Service Water Header flow, report that the "A" Service Water Strainer DIP is 28 psid and getting worse. The strainer motor is rotating, but the strainer is NOT rotating.
: 4. TURNOVER: PERFORM the crew turnover                                                  SM brief crew on plant conditions and any major (Turnover Sheet) with the US.                                                        equipment OOS. (All) Walk down control boards and let US know when they are ready.
Report that Sodium Hypochlorite is secured to the "A" Service Water Pump. Page 7 of 32 STUDENTS Technical Specification BOP: Observes and reports indications associated with degrading flow on "A" Service Water header. Observes and reports SW PUMP A STNR TROUBLE annunciator on C-06/7 US: Refers to ARP 2590E-029 (CA-4 on C-06/7) If High RBCCW or TBCCW header temperature annunciator are received, refers to ARP 2590E-048 (D-8 on 06/7) or 2590E-015 (DA-2 on C-06/7) Determines that "A" Service Water Header flow is lowering. Dispatches a PEO to the Intake Structure to determine the cause. Directs the PEO to stop Soduim Hypochlorite to the "A" Service Water Pump. Refers to OP 2326A and directs the BOP to Start "B" Service Water Pump on Facility 1 and secure "A" Service Water Pump. Enters and exits TSAS 3.7.4.1 as directed by procedure. Makes notifications for assistance.
No shift briefing is required or recommended.
Simulator Exercise Guide '" Job Page 8 of 32 SEG# ES11 Ll3 Rev;_O__ FLOOR BOOTH Report that "B" SW is operating properly.
 
Event 7: When directed to vent the "B" SW Pump Strainer, insert an 1/0 for SW PUMP B STNR TROUBLE, CA-4 on C-06/7. Allow the 1/0 to remain in for 2 minutes, then delete the 1/0. Event 8: When directed, insert Remote Function SWR31 in NORM, to place HS-6484A (on A502), SIAS/LNP Actuation Signal Hand Switch, in the NORMAL position.
Simulator Exercise Guide                                                          ..
Job Aid                              Page 7 of 32 SEG#   ES11L13       Rev;_O__
FLOOR INSTRUCTOR                         BOOTH INSTRUCTOR                                      STUDENTS
: 1. Observe degraded performance of itA"                                               Technical Specification Service Water Pump and swap to "B" Service Water Pump.
Event 1: SW09A - Ramp to 100% over 240         BOP:
seconds, "A" Service Water Strainer clogs.
Observes and reports indications associated TM1, AE1                                      with degrading flow on "A" Service Water header.
* Observes and reports SW PUMP A STNR TROUBLE annunciator on C-06/7 US:
* Refers to ARP 2590E-029 (CA-4 on C-06/7) o If High RBCCW or TBCCW header temperature annunciator are received, refers to ARP 2590E-048 (D-8 on C 06/7) or 2590E-015 (DA-2 on C-06/7)
* Determines that "A" Service Water Header flow is lowering.
When dispatched to determine the cause of the
* Dispatches a PEO to the Intake Structure to low "A" Service Water Header flow, report that    determine the cause.
the "A" Service Water Strainer DIP is 28 psid      o Directs the PEO to stop Soduim and getting worse. The strainer motor is              Hypochlorite to the "A" Service Water rotating, but the strainer is NOT rotating.            Pump.
* Refers to OP 2326A and directs the BOP to Report that Sodium Hypochlorite is secured to      Start "B" Service Water Pump on Facility 1 the "A" Service Water Pump.                        and secure "A" Service Water Pump.
* Enters and exits TSAS 3.7.4.1 as directed by procedure.
* Makes notifications for assistance.
 
Simulator Exercise Guide Job Aid                                    Page 8 of 32
                                                                                                                            '"
SEG# ES11 Ll3   Rev;_O__
FLOOR INSTRUCTOR              BOOTH INSTRUCTOR                                          STUDENTS BOP:
* Verifies that the "Bn Service Water Pump is properly aligned to Facility 1:
o Bus 24E is being supplied by Bus 24C o "B" SW Pump is in Pull-To-Lock o A502, "B" SW Pump breaker is racked up.
o SW-97B. Dis X-Tie, is closed.
o SW-97A, Dis X-Tie, is open.
o HS-6484A (on A502), SIAS/LNP Actuation Signal Hand Switch, is in BLOCK.
* Dispatches a PEO to secure Sodium Hypochlorite to the "An Service Water Pump and to observe proper start of "B" SW Pump
* Informs the US to log into TSAS 3.7.4.1.
(already in Action Statement)
* Starts "B" Service Water Pump.
* Checks SW Pump B SIAS/LNP Start Manually Blocked annunciator alarms.
* Stops "An SW Pump.
Report that "B" SW         is operating properly. !. Observes proper operation of "B" SW Pump.
Event 7: When directed to vent the "B" SW
* Directs PEO to vent the "B" SW Pump Pump Strainer, insert an 1/0 for SW PUMP B             Strainer.
STNR TROUBLE, CA-4 on C-06/7. Allow the
* Places "A" SW Pump in Pull-To-Lock.
1/0 to remain in for 2 minutes, then delete the
* Directs a PEO to place HS-6484A (on 1/0.                                                   A502), SIAS/LNP Actuation Signal Hand Event 8: When directed, insert Remote                 Switch, in the NORMAL position.
Function SWR31 in NORM, to place HS-6484A         I
* Checks SW Pump B SIAS/LNP Start (on A502), SIAS/LNP Actuation Signal Hand             Manually Blocked annunciator is clear.
Switch, in the NORMAL position.                  I
* Informs US to exit TSAS 3.7.4.1.
Report when each directed action is complete.
Report when each directed action is complete.
STUDENTS BOP: Verifies that the "Bn Service Water Pump is properly aligned to Facility 1: Bus 24E is being supplied by Bus 24C "B" SW Pump is in Pull-To-Lock A502, "B" SW Pump breaker is racked up. SW-97B. Dis X-Tie, is closed. SW-97A, Dis X-Tie, is open. HS-6484A (on A502), SIAS/LNP Actuation Signal Hand Switch, is in BLOCK. Dispatches a PEO to secure Sodium Hypochlorite to the "An Service Water Pump and to observe proper start of "B" SW Pump Informs the US to log into TSAS (already in Action Starts "B" Service Water Pump. Checks SW Pump B SIAS/LNP Manually Blocked annunciator Stops "An SW Pump. Observes proper operation of "B" SW Pump. Directs PEO to vent the "B" SW Places "A" SW Pump in Pull-To-Lock. Directs a PEO to place HS-6484A A502), SIAS/LNP Actuation Signal Switch, in the NORMAL
* Directs a PEO to restore Sodium Hypochlorite to the "B" SW Pump.
* Checks SW Pump B SIAS/LNP Start Manually Blocked annunciator is clear. I
 
* Informs US to exit TSAS 3.7.4.1. Directs a PEO to restore Hypochlorite to the "B" SW Simulator Exercise Guide Job Aid SEG# ES11 Ll3 Rev;_O__ FLOOR INSTRUCTOR BOOTH INSTRUCTOR
Simulator Exercise Guide                                                 ,
Job Aid                         Page 9 of 32 SEG#     ES11 Ll3       Rev;_O__
FLOOR INSTRUCTOR                     BOOTH INSTRUCTOR                               STUDENTS
: 2. Failure of Channel Y Pressurizer pressure transmitter.
: 2. Failure of Channel Y Pressurizer pressure transmitter.
Event 2: RX03B -Ramp to 1500 over 400 seconds, Channel Y Pressurizer Pressure transmitter gradually fails low. TM2, AE2 , Page 9 of 32 RO: Observes RCS pressure rising. Observes Pressurizer Pressure Deviation Hilla annunciator. Reports rising Pressurizer pressure to the US. US: Obtains ARP 2590B-212, Pzr Pressure Selected Channel Deviation Hilla (D-37 on C-2/3) and lor Pressurizer Ch Y Pres Hilla (D-39 on C-02/3) Makes notifications for assistance and troubleshooting. Refers to (does NOT enter) TSAS 3.2.6, 3.3.3.5, and 3.3.3.8. (Only one channel is required to be OPERABLE.)
Event 2: RX03B - Ramp to 1500 over 400 RO:
RO: Observes all Pressurizer pressure channels and determines that Channel Y is failing. When directed, shifts Pressure control to Channel x. Verifies proper operation of Pressurizer pressure control system.
seconds, Channel Y Pressurizer Pressure transmitter gradually fails low.
Simulator Exercise Guide Job Page 10 of 32 SEG# ES11 Ll3 Rev;_O__ 3. Seismic Event Resulting in a Loss of Non-Vita14BO Volt Bus 22B. Event 3: CH07 -Insert, Seismic event. Event 3: ED068 -TRIP, Loss of Non-Vital Bus 22B. Immediately after entering the seismic event malfunction, call the Control Room and report Significant vibration in the Turbine Building lasting several seconds. TM3. AE3 If requested, report accelerometer reading is 0.03g ZPA. Report NO damage indicated anywhere.
* Observes RCS pressure rising.
When dispatched, report that tie breaker A204 is open with NO target drops. All other conditions are normal. Crew: Observes numerous component high vibration annunciators and receives a report of a seismic event. Seismic Event annunciator and white flag event BOP: Observes and reports numerous annunciators and indications associated with the loss of Vital Bus 22B. US: Enters AOP 2562, Earthquake. Queries the RO and BOP on Dispatches PEOs to determine any References ARP 2590F-065, 480B 22AJB/C/D VOLTS LO, and enters 2503B, Loss of Non-Vital 480 VAC
* Observes Pressurizer Pressure Deviation TM2, AE2                                    Hilla annunciator.
* Directs BOP to place equipment in service requires to support plant operation. I
* Reports rising Pressurizer pressure to the US.
* Directs BOP to ensure a fault is NOT indicated on Bus 22B. Directs a PEO to determine the cause of the breaker trip. Directs BOP to perform applicable steps to cross-tie Bus 22B with 22A. Requests assistance form Simulator Exercise Guide "' Job Page 11 of 32 SEG# ES11 Ll3 Rev;_O__ FLOOR BOOTH INSTRUCTOR If dispatched, report that 22A-1T-2 Ammeter Phase B (Ammeter above B0111 cubicle) is reading 850 amps. STUDENTS BOP: From available indications, determines that Bus 22B does NOT have a fault. Checks Bus 22A voltage between 435 and 525 Volts. Ensures the following breakers are open: A204, 24B/22B Feeder Breaker 2) B0209, 22B Supply breaker
US:
: 2) B0111, 22A122B Tie Breaker (22A-1T-2) Places (or requests RO to place) Group 1 and Group 2 Pressurizer Backup Heaters in Pull-To-Lock. Places Sync Selector Switch, 22A122B in CL TIEITRIP B. Closes B0111 , 22A122B Tie Breaker 1T-2) Places Sync Selector Switch, 22A122B in OFF. Checks Bus 22B voltage between 435 and 525 volts. Checks current on Bus 22A is less than 1,800 amps. If current on Bus 22A is greater than 1,600 amps, dispatches a PEa to verify local current reading is less than 1,600 amps. When (If) directed, Caution Tag Group 1 and Group 2 Pressurizer Backup Heaters.
* Obtains ARP 2590B-212, Pzr Pressure Selected Channel Deviation Hilla (D-37 on C-2/3) and lor Pressurizer Ch Y Pres Hilla (D-39 on C-02/3)
Simulator Exercise Guide Job Page 12 of 32 SEG# ES11L13 Rev;_O__ FLOOR BOOTH INSTRUCTOR
* Makes notifications for assistance and troubleshooting.
: 4. .*Unisolable ReS Leak Develops.
* Refers to (does NOT enter) TSAS 3.2.6, 3.3.3.5, and 3.3.3.8. (Only one channel is required to be OPERABLE.)
Event 4: RC04 -2% with a Ramp Time of 90 seconds and a 120 second delay; 14 gpm RCS leak. TM4,AE4 STUDENTS Technical Specification RO/BOP: Observes and reports: Charging and Letdown flow mismatch PPC Sump leak rate alarm RCS Leak Rate Rising annunciator on 06/7 Containment Sump level rising US: Enter AOP 2568, Reactor Coolant System Leak. Queries the RO and BOP on Plant conditions. Determines that RCS leakage exceeds 10 gpm and enters TSAS 3.4.6.2. Determines that leak does NOT exceed the capacity of the Charging system. ( Reactor trip is NOT required) When Containment Sump level reaches 100%, logs into TSAS 3.3.3.8 and 3.4.6.1. RO: When requested.
RO:
reports the status of: Pressurizer level Pressurizer pressure RCS leak rate Simulator Exercise .. Job Page 13 of 32 SEG# ES11L13 Rev;_O__ FLOOR INSTRUCTOR BOOTH STUDENTS Rapid Downpower due to ReS leak. Reactivity Manipulation US: Directs to RO and BOP to attempt to determine the location of the RCS leak. Enters AOP 2575, Rapid Downpower Performs Focus Brief on Trip Criteria and RCS Temperature Control. Requests SMIST A to make required notifications. (Unusual Event, One) Directs RO to initiate forcing sprays and to insert Group 7 CEAs 10 steps (while maintaining Reactivity oversight). Determines that Reactivity Plan 13, 14, or 15 should be used. Directs RO and BOP to coordinate a rapid down power. RO: Initiates Forcing Sprays: Closes all Backup Heater Breakers Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia). Inserts Group 7 CEAs to 170 steps and observes applicable parameters. Initiates Boration from the RWST: Ensures at least one Charging Pump is operating. Ensures CH-196, VCT Makeup Bypass, is closed. Ensures CH-504, RWST to Charging Suction, is Simulator Exercise Guide Job Page 14 of 32 SEG# ES11 Ll3 Rev;_O__ FLOOR BOOTH INSTRUCTOR The US may direct Boration to be accomplished from the BAST to allow for easier makeup to VCT. Boration from the BAST method) is in STUDENTS a Opens CH-192, RWST Isolation.
* Observes all Pressurizer pressure channels and determines that Channel Y is failing.
a Closes CH-501, VCT Outlet. a Starts a second Charging Pump. If Boration is from the BAST: a Ensures the Makeup Flow switch is in the DILUTE a Ensues FC-210X, Primary Water Flow controller, is set to "0". a Ensures CH-S12, Makeup Valves Stop, is closed. a Ensures CH-196, VCT Makeup Bypass, is closed. a EnsuresCH-192, RWST Isolation, is closed. Ensures FC-210Y,Boric Acid Flow controller, is set to the predetermined flow rate. a Opens CH-S04, RWST to Charging Suction. a Place Makeup Mode Sel switch in MAN. Starts the selected Boric Acid and verifies discharge pressure is greater than 98 psig. Opens CH 196, VCT Makeup Bypass. As required, refers to attachment and performs actions to maintain VCT level in the desired band. BOP: Reduces Turbine load to follow Reactor power to maintain Tc on program using the Load Limit Pot.
* When directed, shifts Pressure control to Channel x.
SEG# ES11L13 Rev;_O__ FLOOR INSTRUCTOR RCS leak rapidly degrades to a small Break LOCA and a failure of the Reactor to automatically or manually trip. Simulator Exercise Guide Job Aid BOOTH Event 5: RC04 -25% with a ramp time of 270 seconds. Small break LOCA (175 gpm) requiring a Reactor trip. RP04A, B, C and 0 -FAIL; Failure of all Reactor Trip push buttons. RP27B -FAIL. Failure of all RPS Channels to process a Reactor trip ES04F -Deenergize.
* Verifies proper operation of Pressurizer pressure control system.
Actuation Cabinet 6 deenergizes.
 
TM5, MA1 Page 15 of 32 RO: Observes lowering Pressurizer level and pressure which exceeds Charging capacity and informs the US. Starts 3 rd Charging Pump. US: Directs the crew to manually trip the Reactor and perform EOP 2525. Standard Post Trip Actions. Queries RO and BOP on the status of Safety Functions as delineated in EOP 2525: Reactivity Control (RO) Status of the Reactor Maintenance of Vital Auxiliaries
Simulator Exercise Guide                                                             ~
{BOP} Status of the Turbine Status of Electrical Buses Status of SW & RBCCW Check one facility of CRAC operating (RO) RCS Inventory Control (RO) Pzr level & Subcooled margin (SCM), value & trend Simulator Exercise Guide Job Page 16 of 32 SEG# ES11L13 Rev;_O__ FLOOR INSTRUCTOR BOOTH STUDENTS RCS Pressure Control (RO) o Pzr pressure, value & trend Core Heat Removal (RO) o RCP status o Loop delta-T o T H Subcooling Margin RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS T c value and trend o S/G levels, value and trend oRCS Subcooling Margin Containment (CTMT) Isolation (RO) oRad monitors inside CTMT, outside CTMT, steam plant o CTMT pressure <1 psig CTMT Temperature  
Job Aid                                    Page 10 of 32 SEG#   ES11 Ll3       Rev;_O__
& Pressure Control (RO) CTMT temperature and pressure value and trend. RO: Presses all four Reactor Trip push buttons on C-04 and immediately realizes the Reactor did NOT trip. Opens both CEDM MG feeder breakers. Reactor has tripped, power is lowering, SUR is negative, all CEAs are inserted.
: 3. Seismic Event Resulting in a Loss of Non-Vita14BO Volt Bus 22B.
Simulator Exercise Guide Job Aid Page 17 of 32 ,. SEG# ES11L13 Rev;_O__ FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP: Perform associated actions of EOP 2525 and report results when queried:
Event 3: CH07 -Insert, Seismic event.             Crew:
* Turbine tripped, stop valves are closed, 8T & 9T are open, Megawatts are zero
Event 3: ED068 - TRIP, Loss of Non-Vital Bus       Observes numerous component high vibration 22B.                                               annunciators and receives a report of a seismic event.
Seismic Event annunciator and white flag on Immediately after entering the seismic event event recorder.
malfunction, call the Control Room and report Significant vibration in the Turbine Building     BOP:
lasting several seconds.
Observes and reports numerous annunciators TM3. AE3                                           and indications associated with the loss of Non Vital Bus 22B.
US:
If requested, report accelerometer reading is
* Enters AOP 2562, Earthquake.
0.03g ZPA.
* Queries the RO and BOP on Plant conditions.
Report NO damage indicated anywhere.
* Dispatches PEOs to determine any plant damage.
* References ARP 2590F-065, 480B BUS 22AJB/C/D VOLTS LO, and enters AOP 2503B, Loss of Non-Vital 480 VAC Bus 22B.
When dispatched, report that tie breaker A204 is I
* Directs BOP to place equipment in service open with NO target drops. All other conditions        requires to support plant operation.
are normal.                                     I
* Directs BOP to ensure a fault is NOT indicated on Bus 22B.
* Directs a PEO to determine the cause of the breaker trip.
* Directs BOP to perform applicable steps to cross-tie Bus 22B with 22A.
* Requests assistance form Maintenance Department.
 
Simulator Exercise Guide
                                                                                                                    "'
Job Aid                            Page 11 of 32 SEG# ES11 Ll3   Rev;_O__
FLOOR INSTRUCTOR              BOOTH INSTRUCTOR                                 STUDENTS BOP:
* From available indications, determines that Bus 22B does NOT have a fault.
* Checks Bus 22A voltage between 435 and 525 Volts.
* Ensures the following breakers are open:
o A204, 24B/22B Feeder Breaker (24B4 2) o    B0209, 22B Supply breaker (24B4-1X3 2) o B0111, 22A122B Tie Breaker (22A-1T-2)
* Places (or requests RO to place) Group 1 and Group 2 Pressurizer Backup Heaters in Pull-To-Lock.
* Places Sync Selector Switch, 22A122B in CL TIEITRIP B.
* Closes B0111 , 22A122B Tie Breaker (22A 1T-2)
* Places Sync Selector Switch, 22A122B in OFF.
* Checks Bus 22B voltage between 435 and 525 volts.
* Checks current on Bus 22A is less than 1,800 amps.
If dispatched, report that 22A-1T-2 Ammeter
* If current on Bus 22A is greater than 1,600 Phase B (Ammeter above B0111 cubicle) is      amps, dispatches a PEa to verify local reading 850 amps.                              current reading is less than 1,600 amps.
* When (If) directed, Caution Tag Group 1 and Group 2 Pressurizer Backup Heaters.
 
Simulator Exercise Guide Job Aid                            Page 12 of 32 SEG#     ES11L13       Rev;_O__
FLOOR INSTRUCTOR                  BOOTH INSTRUCTOR                                 STUDENTS
: 4. .*Unisolable ReS Leak Develops.                                           Technical Specification Event 4: RC04 - 2% with a Ramp Time of 90 RO/BOP:
seconds and a 120 second delay; 14 gpm Observes and reports:
RCS leak.
* Charging and Letdown flow mismatch TM4,AE4
* PPC Sump leak rate alarm
* RCS Leak Rate Rising annunciator on C 06/7
* Containment Sump level rising US:
* Enter AOP 2568, Reactor Coolant System Leak.
* Queries the RO and BOP on Plant conditions.
* Determines that RCS leakage exceeds 10 gpm and enters TSAS 3.4.6.2.
* Determines that leak does NOT exceed the capacity of the Charging system. ( Reactor trip is NOT required)
* When Containment Sump level reaches 100%, logs into TSAS 3.3.3.8 and 3.4.6.1.
RO:
When requested. reports the status of:
* Pressurizer level
* Pressurizer pressure
* RCS leak rate
 
Simulator Exercise Guide                                                ..
Job Aid                      Page 13 of 32 SEG#   ES11L13     Rev;_O__
FLOOR INSTRUCTOR         BOOTH INSTRUCTOR                            STUDENTS
: 5. Rapid Downpower due to ReS leak.                         Reactivity Manipulation US:
* Directs to RO and BOP to attempt to determine the location of the RCS leak.
* Enters AOP 2575, Rapid Downpower o Performs Focus Brief on Trip Criteria and RCS Temperature Control.
o Requests SMISTA to make required notifications. (Unusual Event, Delta One) o Directs RO to initiate forcing sprays and to insert Group 7 CEAs 10 steps (while maintaining Reactivity oversight).
o Determines that Reactivity Plan RE-G 13, 14, or 15 should be used.
o Directs RO and BOP to coordinate a rapid down power.
RO:
* Initiates Forcing Sprays:
o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).
* Inserts Group 7 CEAs to 170 steps and observes applicable parameters.
* Initiates Boration from the RWST:
o Ensures at least one Charging Pump is operating.
o Ensures CH-196, VCT Makeup Bypass, is closed.
o Ensures CH-504, RWST to Charging Suction, is
 
Simulator Exercise Guide Job Aid                                  Page 14 of 32 SEG# ES11 Ll3   Rev;_O__
FLOOR INSTRUCTOR              BOOTH INSTRUCTOR                                         STUDENTS a    Opens CH-192, RWST Isolation.
a     Closes CH-501, VCT Outlet.
a Starts a second Charging Pump.
The US may direct Boration to be accomplished  I. If Boration is from the BAST:
from the BAST to allow for easier makeup to the      a Ensures the Makeup Flow Selector VCT. Boration from the BAST (alternate                    switch is in the DILUTE position.
method) is in italics.                              a Ensues FC-210X, Primary Makeup Water Flow controller, is set to "0".
a Ensures CH-S12, Makeup Valves Stop, is closed.
a Ensures CH-196, VCT Makeup Bypass, is closed.
a EnsuresCH-192, RWST Isolation, is closed.
a Ensures FC-210Y,Boric Acid Flow controller, is set to the predetermined flow rate.
a   Opens CH-S04, RWST to Charging Suction.
a Place Makeup Mode Sel switch in MAN.
a Starts the selected Boric Acid and verifies discharge pressure is greater than 98 psig.
a Opens CH 196, VCT Makeup Bypass.
a As required, refers to attachment and performs actions to maintain VCT level in the desired band.
BOP:
Reduces Turbine load to follow Reactor power to maintain Tc on program using the Load Limit Pot.
 
Simulator Exercise Guide Job Aid                              Page 15 of 32 SEG#   ES11L13         Rev;_O__
FLOOR INSTRUCTOR                             BOOTH INSTRUCTOR                                  STUDENTS
: 6. RCS leak rapidly degrades to a small Break LOCA and a failure of the Reactor to automatically or manually trip.
Event 5: RC04 - 25% with a ramp time of 270 RO:
seconds. Small break LOCA (175 gpm) requiring a Reactor trip.
* Observes lowering Pressurizer level and pressure which exceeds Charging capacity RP04A, B, C and 0 - FAIL; Failure of all         and informs the US.
rd Reactor Trip push buttons.
* Starts 3 Charging Pump.
RP27B - FAIL. Failure of all RPS Channels to process a Reactor trip ES04F - Deenergize. Actuation Cabinet 6 deenergizes.
TM5, MA1 US:
Directs the crew to manually trip the Reactor and perform EOP 2525. Standard Post Trip Actions.
Queries RO and BOP on the status of Safety Functions as delineated in EOP 2525:
* Reactivity Control (RO) o Status of the Reactor
* Maintenance of Vital Auxiliaries {BOP}
o Status of the Turbine o Status of Electrical Buses o Status of SW & RBCCW o Check one facility of CRAC operating (RO)
* RCS Inventory Control (RO) o Pzr level & Subcooled margin (SCM),
value & trend
 
Simulator Exercise Guide                                               ~
Job Aid                      Page 16 of 32 SEG# ES11L13   Rev;_O__
FLOOR INSTRUCTOR   BOOTH INSTRUCTOR                          STUDENTS
* RCS Pressure Control (RO) o Pzr pressure, value & trend
* Core Heat Removal (RO) o RCP status o Loop delta-T o T H Subcooling Margin
* RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS T c value and trend o S/G levels, value and trend oRCS Subcooling Margin
* Containment (CTMT) Isolation (RO) oRad monitors inside CTMT, outside CTMT, steam plant o CTMT pressure <1 psig
* CTMT Temperature & Pressure Control (RO)
* CTMT temperature and pressure value and trend.
RO:
* Presses all four Reactor Trip push buttons on C-04 and immediately realizes the Reactor did NOT trip.
* Opens both CEDM MG feeder breakers.
* Reactor has tripped, power is lowering, SUR is negative, all CEAs are inserted.
 
Simulator Exercise Guide                                                 ,.
Job Aid                       Page 17 of 32 SEG# ES11L13   Rev;_O__
FLOOR INSTRUCTOR   BOOTH INSTRUCTOR                             STUDENTS BOP:
Perform associated actions of EOP 2525 and report results when queried:
* Turbine tripped, stop valves are closed, 8T
                                                      & 9T are open, Megawatts are zero
* All electrical buses energized
* All electrical buses energized
* Two Facilities of SW and RBCCWoperating RO: Performs associated actions of EOP 2525 and report results when queried:
* Two Facilities of SW and RBCCWoperating RO:
Performs associated actions of EOP 2525 and report results when queried:
* Control Room Air Conditioning Status
* Control Room Air Conditioning Status
* Pressurizer level value and trend
* Pressurizer level value and trend
* Pressurizer pressure value and trend o PORVs and Spray Valves are closed o When RCS pressure is less than 1750 psia, then SIAS, CIAS, and EBFAS have actuated on Facility 1 only. o After SIAS actuates, one RCP in each loop is secured. o If Pressurizer pressure lowers to minimum NPSH, then all RCPs are secured.
* Pressurizer pressure value and trend o PORVs and Spray Valves are closed o When RCS pressure is less than 1750 psia, then SIAS, CIAS, and EBFAS have actuated on Facility 1 only.
* Observes and reports numerous annunciators associated with ESAS on 01. *
o After SIAS actuates, one RCP in each loop is secured.
* Number of RCPs operating o Value and trend of loop Delta-T o Value and trend of subcooling If no RCPs operating, T AVG controller, 4165 in manual/closed Simulator Exercise Guide " Job Page 18 of 32 SEG# ES11L13 Rev:_O__ FLOOR INSTRUCTOR BOOTH STUDENTS BOP: Performs associated actions of EOP 2525 and reports results when queried: Value and trend of S/G pressures Value and trend of T c Value and trend of S/G levels Subcooling value! CET temperature RO: Continues with associated actions of EOP 2525 and reports results when queried: Reports Rad Monitors inside CTMT not going up or in alarm Reports Rad Monitors outside CTMT not going up or in alarm Reports Steam Plant Rad Monitors not in alarm or going up Reports Value and trend of CTMT temperature and pressure. Starts Containment Aux Recirc Fans and PIR Fans.
o If Pressurizer pressure lowers to minimum NPSH, then all RCPs are secured.
Simulator Exercise Guide Job Aid SEG# ES11113 Rev;_O__ FLOOR BOOTH INSTRUCTOR Page 19 of 32 STUDENTS BOP: Continue with Subsequent Actions: Opens HD-106, Subcooling Valve Stops both Heater Drains Pumps Secures all but one Condensate Pump Secures one Main Feed Pump Closes FW-42A and B, Main Feed Block Valves Ensure both Main Feed Reg Bypass Valves are throttled to 40% Closes FW-38A or B, associated Main Feed Pump Discharge Valve Checks IA Header pressure is >90 and US: Query RO & BOP regarding the status of EOP 2525 subsequent actions. RO/BOP: When asked, report that Subsequent Actions are complete and verified.
* Observes and reports numerous annunciators associated with ESAS on C 01.
Simulator Exercise Guide Job Page 20 of 32 SEG# ES11L13 Rev;_O__ FLOOR BOOTH STUDENTS US: At the completion of EOP 2525, Diagnostic Flow Chart, determines that a LOCA inside Containment has occurred and goes to EOP 2532, Loss of Coolant Accident. Places Master Silence Switch in NORM. Notes the need for the SM to complete FAP06-002, classify the event as an Alert, Charlie-1, and make appropriate notifications. Directs the RO and BOP: Ensure SIAS Actuation Optimize Safety Injection Monitor for RCP trip criteria. Perform actions to isolate the LOCA, if possible. Determine LOCA location. Place H2 Analyzers in operation. Ensure CIAS. When appropriate, ensure CSAS. Check fA pressure>
* Number of RCPs operating o Value and trend of loop Delta-T o Value and trend of subcooling
90 psig and stable. Align Condenser Air Removal. Initiate a controlled cooldown.
* If no RCPs operating, TAVG controller, TIC 4165 in manual/closed
Simulator Exercise Guide Job Aid SEG# ES11L13 Rev;_O__ FLOOR BOOTH INSTRUCTOR CSAS will actuate shortly after the steam line break is inserted.
 
CT1 (LOCA-11)
Simulator Exercise Guide Job Aid                      Page 18 of 32
Perform a plant cooldown.
                                                                                                "
A plant cooldown must be initiated within one hour following an unisolable LOCA at a rate of greater than 40&deg;F/hr. Page 21 of 32 STUDENTS RO: When Pressurizer pressure lowers to 1714 psia, ensures SIAS has actuated. Ensures one complete train of CRAC is in Recirc. Ensures Safety Injection flow is within the SI Flow Curve. Ensures two RCPs are tripped within 5 minutes after SIAS or all RCPs are secured if below minimum NPSH. Attempts to isolate the LOCA (UnisolabJe) Checks for LOCA outside Containment (LOCA is inside Containment) When time permits, places H2 Analyzers in service. Determines that Containment pressure has NOT exceeded 4.42 psig; therefore.
SEG# ES11L13   Rev:_O__
MSI and CSAS have NOT actuated. When Containment pressure is greater than 9.48 psig, determines that Facility 2 CSAS did not actuate (Loss of Actuation Cabinet 6) and that "A" Containment Spray Pump did not automatically start. BOP: Verifies IA pressure is greater than 90 psig. Aligns Condenser Air Removal to Unit 2 Stack. Crew: Initiates a controlled cooldown.
FLOOR INSTRUCTOR   BOOTH INSTRUCTOR                          STUDENTS BOP:
Simulator Exercise Guide Job Page 22 of 32 SEG# ES11L13 Rev;_O__ FLOOR BOOTH INSTRUCTOR Excess Steam Demand in Containment on #2 Steam Generator Event 6: MS01 B -2.5% ramped in over 240 seconds, Excess Steam Demand on #2 S/G (0.475 #m/hr). TM6, MA2, EM1 EU1,EC1 BOP: Observes and reports Lowering S/G pressures, S/G levels, RCS temperature, and other parameters associated with an Excess Steam Demand event. US: Acknowledges reports(s) and enters Diagnostic Flow Chart, then enters EOP 2540 Functional Recovery due to more than one major event. Notes the need for the SM to complete FAP06-002, determine that the event remains an Alert, Charlie-1, and make appropriate notifications. Open the Safety Function Tracking Page and enter EOP entry time. Return alarm silence to normal RO:
Performs associated actions of EOP 2525 and reports results when queried:
* If PZR press. < 1714 psia, ensures: Only 1 RCP/loop running Secured RCP Spray vlv. closed
* Value and trend of S/G pressures
* If RCP NPSH lost, ensure: All RCPs are secured TIC-4165 in manual and closed Both spray valves are in manual and closed.
* Value and trend of T c
Simulator Exercise Guide '" Job Aid Page 23 of 32 SEG# ES11L13 Rev;_O__ FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP: Directs Chemistry to obtain samples of both SGs, frisk the samples, report frisk results, and analyze the samples for activity and Boron.
* Value and trend of S/G levels
Simulator Exercise Guide Job Page 24 of 32 SEG# ES11L13 Rev;_O__ Failure of"A" Containment to start on CSAS. This malfunction will occur when Containment RH06A, TRIP, Failure of "A" CS Pump to start pressure exceeds 9.48 psig. The crew will on CSAS. (Initial Conditions) continue to take the actions of EOP 2540 prior TM7, EM2, to and after the malfunction.
* Subcooling value! CET temperature RO:
CT2 (CTPC-1):
Continues with associated actions of EOP 2525 and reports results when queried:
Maintain Containment Temperature and Pressure Control. Establish greater than or equal to 1300 gpm Containment Spray flow from at least one Containment Spray Pump prior to reaching 51 psig Containment Pressure.
* Reports Rad Monitors inside CTMT not going up or in alarm
RO: Observes and reports actuation of Facility 1 CSAS and the failure of the "A" Containment Spray Pump to start. US: Directs RO to start either uN or "S" Containment Spray Pump. Determines that the Safety Function Status Checks for CTPC-3 are NOT met and enters EOP 2540F, Functional Recovery of Containment Temperature.
* Reports Rad Monitors outside CTMT not going up or in alarm
RO: Starts "S" Containment Spray Pump and the associated Containment Spray header flow is greater than or equal to 1300 gpm. Verifies Containment Temperature and Pressure Control acceptance criteria is met: At least 2 CAR Fans operating in Slow Speed. At least one Containment Spray Header delivering at least 1300 gpm. Containment pressure less than 51 psig.
* Reports Steam Plant Rad Monitors not in alarm or going up
Simulator Exercise Guide .. SEG# ES11L13 Rev;_O__ Job Aid Page 25 of 32 FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS US: *
* Reports Value and trend of CTMT temperature and pressure.
* Directs placing H2 analyzers in service . Identifies Success paths to be used . US: Identifies Success Paths to be used. Note: These success paths and order of priority are based on the conditions seen during the scenario validation.
* Starts Containment Aux Recirc Fans and PIR Fans.
A different path and priorities may be applicable due to the timing of operator mitigating actions. Safety Function RC-1 DC-1 AC-1 Path CEA Insertion DC Power RSST I Met? Yes Yes Yes I Priority 5 6 7 IC-2 SI Yes 2 PC-1 Subcooled Yes 4 HR-2 S I Operati ng Yes 3 (2) CI-1 CTPC-3 Isolated CARs [Emerg.] Yes Yes 8 4 (3) Ee2 US: Identifies CTPC-3, CARs (Emerg.), as the first priority and enters EOP 2540F, Containment Temperature and Pressure Control.
 
Simulator Exercise Guide " Job Page 26 of 32 SEG# ES11U3 Rev;_O__ FLOOR INSTRUCTOR BOOTH STUDENTS RO: Ensures all four CAR Coolers are operating in slow speed with adequate RBCCW flow. Performed earlier as a Critical
Simulator Exercise Guide Job Aid                       Page 19 of 32 SEG# ES11113   Rev;_O__
* Ensure CSAS has actuated with at least one Containment Spray Header flow greater than 1300 gpm. Ensures both Containment Aux Recirc Fans are operating. Ensures both PIR Fans are operating. Reviews Containment Spray termination criteria. Verifies CTPC-3 Acceptance Criteria are satisfied:
FLOOR INSTRUCTOR  BOOTH INSTRUCTOR                           STUDENTS BOP:
a At least two CAR Fans running in slow speed. a At least one Containment Spray header is delivering at least 1300 gpm. a Containment pressure is less than 51 psig. US: Identifies IC-2, SI, as the next Safety Function priority and enters EOP 2540C1, Functional Recovery of RCS Inventory Control.
Continue with Subsequent Actions:
Simulator Exercise .. Job Page 27 of 32 SEG# ES11L13 Rev;_O__ FLOOR BOOTH INSTRUCTOR When dispatched, report that the SI Room Sump Pump breakers are open and there is no leakage. STUDENTS RO: Ensures SIAS, CIAS, and EBFAS have properly actuated. Checks Safety Injection flow meets the SI Flow Curve. Determines that RCS pressure is NOT preventing adequate SI flow. Ensures both facilities of RBCCW and Service Water are in service. Performs actions to conserve RCS Inventory. (Isolates various non-essential components.) Reviews HPSI throttle/stop criteria and determines that HPSI cannot be throttled or stopped. Reviews LPSI stop criteria and determines that LPSI may be stopped. Requests assistance for filling the RWST. Observes Containment Sump level is rising. Determines that SItCS Pump Minflow valves, SI-651 and 652, must be placed in OPER when RWST level lowers to 20%. Determines that SRAS must be initiated when RWST level lowers to less than 9%. Reviews SRAS supplemental actions. Reviews HPSI Pump post SRAS performance criteria. Dispatches a PEa to open SI Room Sump Pump Breakers and monitor for leakage. Verifies that IC-2 Acceptance Criteria are met: HPSI flow is within the SI Flow Curve. Vessel level is >7%.
* Opens HD-106, Subcooling Valve
* Stops both Heater Drains Pumps
* Secures all but one Condensate Pump
* Secures one Main Feed Pump o Closes FW-42A and B, Main Feed Block Valves o Ensure both Main Feed Reg Bypass Valves are throttled to 40%
o Closes FW-38A or B, associated Main Feed Pump Discharge Valve
* Checks IA Header pressure is >90 psig and stable.
US:
Query RO & BOP regarding the status of EOP 2525 subsequent actions.
RO/BOP:
When asked, report that Subsequent Actions are complete and verified.
 
Simulator Exercise Guide Job Aid                      Page 20 of 32 SEG# ES11L13   Rev;_O__
FLOOR INSTRUCTOR  BOOTH INSTRUCTOR                            STUDENTS US:
* At the completion of EOP 2525, Diagnostic Flow Chart, determines that a LOCA inside Containment has occurred and goes to EOP 2532, Loss of Coolant Accident.
* Places Master Silence Switch in NORM.
* Notes the need for the SM to complete EPI FAP06-002, classify the event as an Alert, Charlie-1, and make appropriate notifications.
* Directs the RO and BOP:
o Ensure SIAS Actuation o Optimize Safety Injection o Monitor for RCP trip criteria.
o Perform actions to isolate the LOCA, if possible.
o Determine LOCA location.
o Place H2 Analyzers in operation.
o Ensure CIAS.
o When appropriate, ensure CSAS.
o Check fA pressure> 90 psig and stable.
o Align Condenser Air Removal.
o Initiate a controlled cooldown.
 
Simulator Exercise Guide Job Aid                       Page 21 of 32 SEG#       ES11L13       Rev;_O__
FLOOR INSTRUCTOR                  BOOTH INSTRUCTOR                             STUDENTS RO:
* When Pressurizer pressure lowers to 1714 psia, ensures SIAS has actuated.
o Ensures one complete train of CRAC is in Recirc.
* Ensures Safety Injection flow is within the SI Flow Curve.
* Ensures two RCPs are tripped within 5 minutes after SIAS or all RCPs are secured if below minimum NPSH.
* Attempts to isolate the LOCA (UnisolabJe)
* Checks for LOCA outside Containment (LOCA is inside Containment)
* When time permits, places H2 Analyzers in service.
CSAS will actuate shortly after the steam line
* Determines that Containment pressure has break is inserted.
NOT exceeded 4.42 psig; therefore. MSI and CSAS have NOT actuated.
* When Containment pressure is greater than 9.48 psig, determines that Facility 2 CSAS did not actuate (Loss of Actuation Cabinet
: 6) and that "A" Containment Spray Pump did not automatically start.
BOP:
* Verifies IA pressure is greater than 90 psig.
* Aligns Condenser Air Removal to Unit 2 Stack.
CT1 (LOCA-11) Perform a plant cooldown.                                Crew:
A plant cooldown must be initiated within                              Initiates a controlled cooldown.
one hour following an unisolable LOCA at a rate of greater than 40&deg;F/hr.
 
Simulator Exercise Guide Job Aid                          Page 22 of 32 SEG#   ES11L13     Rev;_O__
FLOOR INSTRUCTOR                      BOOTH INSTRUCTOR                                 STUDENTS
: 7. Excess Steam Demand in Containment on #2 Steam Generator Event 6: MS01 B - 2.5% ramped in over 240 BOP:
seconds, Excess Steam Demand on #2 S/G Observes and reports Lowering S/G pressures, (0.475 #m/hr).
S/G levels, RCS temperature, and other TM6, MA2, EM1                            parameters associated with an Excess Steam Demand event.
EU1,EC1                                  US:
* Acknowledges reports(s) and enters Diagnostic Flow Chart, then enters EOP 2540 Functional Recovery due to more than one major event.
* Notes the need for the SM to complete EPI FAP06-002, determine that the event remains an Alert, Charlie-1, and make appropriate notifications.
* Open the Safety Function Tracking Page and enter EOP entry time.
* Return alarm silence to normal RO:
* If PZR press. < 1714 psia, ensures:
o Only 1 RCP/loop running o Secured RCP Spray vlv. closed
* If RCP NPSH lost, ensure:
o All RCPs are secured o TIC-4165 in manual and closed o Both spray valves are in manual and closed.
 
Simulator Exercise Guide
                                                                                                    '"
Job Aid                     Page 23 of 32 SEG# ES11L13   Rev;_O__
FLOOR INSTRUCTOR   BOOTH INSTRUCTOR                         STUDENTS BOP:
Directs Chemistry to obtain samples of both SGs, frisk the samples, report frisk results, and analyze the samples for activity and Boron.
 
Simulator Exercise Guide Job Aid                                Page 24 of 32 SEG#     ES11L13         Rev;_O__
: 8. Failure of "A" Containment to start on CSAS.
This malfunction will occur when Containment   RH06A, TRIP, Failure of "A" CS Pump to start RO:
pressure exceeds 9.48 psig. The crew will     on CSAS. (Initial Conditions)
Observes and reports actuation of Facility 1 continue to take the actions of EOP 2540 prior TM7, EM2,                                   CSAS and the failure of the "A" Containment to and after the malfunction.
Spray Pump to start.
US:
* Directs RO to start either uN or "S" Containment Spray Pump.
* Determines that the Safety Function Status Checks for CTPC-3 are NOT met and enters EOP 2540F, Functional Recovery of Containment Temperature.
CT2 (CTPC-1): Maintain Containment                                                          RO:
Temperature and Pressure Control.
* Starts "S" Containment Spray Pump and the Establish greater than or equal to 1300 gpm                                                    associated Containment Spray header flow Containment Spray flow from at least one                                                        is greater than or equal to 1300 gpm.
Containment Spray Pump prior to reaching
* Verifies Containment Temperature and 51 psig Containment Pressure.                                                                  Pressure Control acceptance criteria is met:
o At least 2 CAR Fans operating in Slow Speed.
o At least one Containment Spray Header delivering at least 1300 gpm.
o Containment pressure less than 51 psig.
 
Simulator Exercise Guide                                                     ..
Job Aid                      Page 25 of 32 SEG#     ES11L13       Rev;_O__
FLOOR INSTRUCTOR                     BOOTH INSTRUCTOR                           STUDENTS US:
* Directs placing H2 analyzers in service .
* Identifies Success paths to be used .
US:
Identifies Success Paths to be used.
Note:                                                                         Safety            Path      I Met? IPriority Function These success paths and order of priority are based on the conditions seen during                                       RC-1        CEA Insertion    Yes        5 the scenario validation. A different path DC-1          DC Power        Yes        6 and priorities may be applicable due to the timing of operator mitigating actions.                                   AC-1             RSST         Yes       7 IC-2               SI         Yes       2 PC-1         Subcooled       Yes       4 HR-2         S I Operati ng   Yes     3 (2)
CI-1           Isolated      Yes        8
                                                                                                                  ,~~~.
CTPC-3         CARs [Emerg.]     Yes     4 (3)
Ee2                         US:
Identifies CTPC-3, CARs (Emerg.), as the first priority and enters EOP 2540F, Containment Temperature and Pressure Control.
 
Simulator Exercise Guide                                                 "
Job Aid                      Page 26 of 32 SEG#     ES11U3           Rev;_O__
FLOOR INSTRUCTOR           BOOTH INSTRUCTOR                            STUDENTS RO:
* Ensures all four CAR Coolers are operating in slow speed with adequate RBCCW flow.
Performed earlier as a Critical Task.
* Ensure CSAS has actuated with at least one Containment Spray Header flow greater than 1300 gpm.
* Ensures both Containment Aux Recirc Fans are operating.
* Ensures both PIR Fans are operating.
* Reviews Containment Spray termination criteria.
* Verifies CTPC-3 Acceptance Criteria are satisfied:
a   At least two CAR Fans running in slow speed.
a At least one Containment Spray header is delivering at least 1300 gpm.
a Containment pressure is less than 51 psig.
US:
Identifies IC-2, SI, as the next Safety Function priority and enters EOP 2540C1, Functional Recovery of RCS Inventory Control.
 
Simulator Exercise Guide                                                          ..
Job Aid                              Page 27 of 32 SEG# ES11L13   Rev;_O__
FLOOR INSTRUCTOR            BOOTH INSTRUCTOR                                     STUDENTS RO:
* Ensures SIAS, CIAS, and EBFAS have properly actuated.
* Checks Safety Injection flow meets the SI Flow Curve.
o Determines that RCS pressure is NOT preventing adequate SI flow.
* Ensures both facilities of RBCCW and Service Water are in service.
* Performs actions to conserve RCS Inventory. (Isolates various non-essential components.)
* Reviews HPSI throttle/stop criteria and determines that HPSI cannot be throttled or stopped.
* Reviews LPSI stop criteria and determines that LPSI may be stopped.
* Requests assistance for filling the RWST.
* Observes Containment Sump level is rising.
* Determines that SItCS Pump Minflow valves, SI-651 and 652, must be placed in OPER when RWST level lowers to 20%.
* Determines that SRAS must be initiated when RWST level lowers to less than 9%.
* Reviews SRAS supplemental actions.
* Reviews HPSI Pump post SRAS performance criteria.
When dispatched, report that the SI Room
* Dispatches a PEa to open SI Room Sump Sump Pump breakers are open and there is no    Pump Breakers and monitor for leakage.
leakage.
* Verifies that IC-2 Acceptance Criteria are met:
o HPSI flow is within the SI Flow Curve.
o Vessel level is >7%.
 
Simulator Exercise Guide
* Job Aid                      Page 28 of 32 SEG# ES11 Ll3  Rev;_O__
FLOOR INSTRUCTOR      BOOTH INSTRUCTOR                            STUDENTS US:
* Continues to assess Safety Functions up to and including EOP 25400, Functional Recovery of RCS Heat Removal.
* Directs RO and BOP to:
o    Ensure at least one complete facility of SIAS, CIAS, EBFAS, MSI, and CSAS have actuated.
o    Ensure one complete facility of CRAC is operating in RECIRC.
o Verify single phase Safety Injection flow is adequate.
o Verify subcooling.
o Align Condenser Air Removal.
* Determines SGTR did NOT occur.
* Determines ESD did occur and that #2 S/G is the most affected.
* Directs BOP to perform actions of Appendix EU2 11, ESDE Response.
RO:
Ensures MSI has actuated and at least one train of MSI has properly actuated (all MSI components are in their accident condition on C-01X).
 
Simulator Exercise Guide Job Aid                                  Page 29 of 32 SEG#      ES11L13          Rev;_O__
FLOOR INSTRUCTOR                                BOOTH INSTRUCTOR                                          STUDENTS BOP:
Isolates #2 S/G:
* Ensues MS-64B, #2 MSIV, is closed.
* Ensures MS-65B, #2 MSIV Bypass, is closed.
* Ensures #2 ADV controller is in Manual and closed.
* Places ADV Quick Open Permissive switch in OFF.
* Closes FW-41B, #2 Main Feed Reg Valve Bypass Valve.
* Ensures FW-42B, #2 Main Feed Block Valve, is closed.
* Places FW-5B, Main Feed Air Assist Check Valve switch in CLOSE.
* Dispatches a PEO to unlock and close Event 9: When dispatched, insert Remote Disconnect for MS-202, #2 Main Steam Function MSR13, RI. Close the disconnect for Supply to the TDAFP. (May be performed MS-202, #2 Main Steam Supply to the TDAFP.
earlier)
* Ensures MS-220B, #2 S/G Blowdown Isolation, is closed.
* Ensures both Aux Feed OVERRIDE/MAN/START/RESET hand switches are in Pull-To-Lock.
CT3 (ESDE-6): AFW to the faulted (#2) SG is
* Closes FW-43B, #2 Aux Feed Reg Valve.
isolated within ~30 minutes of MSI actuation
* Places hand switch for FW-12B, #2 Aux on an ESDE.                                                                                            Feed Air Assist Check Valve, in CLOSE.
* Ensures MS-65B, #2 Main Steam Leg Low Point Drain, is closed.
* Ensures Main Steam Safety Valves are closed.
SCENARIO END: When #2 S/G is isolated or at the discretion of the lead evaluator, direct the I When directed, inform the crew that the scenario is complete and place the simulator in FREEZE.
simulator to be placed in FREEZE.
 
'DOlllinion'"
Simulator Exercise Guide                                                                ,
Job Aid                        Page 30 of 32 SEG# ES11L13                      Rev; _0_
Description Deiay Time Ramp Time I Event  I  Severity Trigger Or Value I Value Final IRelative Order MALFUNCTIONS RP04A. Failure of #1 Reactor Trip Push Button                                          NA          NA      NA            NA      NA          6 RP04B. Failure of #2 Reactor Trip Push Button                                          NA          NA      NA            NA      NA          6
                                                                                                                      ~ ----
RP04C, Failure of #3 Reactor Trip Push Button                                          NA          NA      NA            NA      NA          6 RP04D, Failure of #4 Reactor Trip Push Button                                          NA          NA      NA            NA      NA          6 f-RP27B, Automatic RPS Trip Failure (ATWS)                                                NA          NA      NA            NA      NA          6 RH06A, Failure of "A" CS Pump to start.                                                NA          NA      NA            NA      NA          10 SW10, uN SW Pump Degrades.                                                              NA      240 sec.      1        100%      100%          1
                                                                                    -                    ---
RX03B, Channel Y Pressurizer Pressure transmitter fails low                            NA      400 sec.      2            0%      0%          4 CH07, Seismic Event                                                                    NA          NA        3            NA      NA          5
                                                                                                  --      - - - - - c-----
RC04, 14 gpm RCS Leak.                                                                  NA      90 sec.      3            2%      2%          6 f------
ED16B, Loss of VA-20                                                                    NA          NA        4            NA      NA          7
---
RC04, Small Break LOCA (175 gpm)                                                        NA      270 sec.      6          25%      25%          8 ES04F, Actuation Cabinet 6 Deenergizes.                                                NA          NA        6            NA      NA          8
                                                                                                                                    ---
MS01 B, ESD on #2 S/G inside Containment                                                NA      240 sec.      7            2.5      2.5        9 REMOTE FUNCTIONS SWR31 , Place HS-6484A in Normal.                                                                    NA      NA        NORM        NORM          2 MSR13, Close the disconnect for MS-202                                                              NA      NA            RI        RI        11 OVERRIDES Annunciator CA-4 on C-06/7, SW PUMP STNR TROUBLE                                        NA          NA        5            ON      OFF          3
 
"
Simulator Exercise Guide
Simulator Exercise Guide
* Job Page 28 of 32 SEG# ES11 Ll3 Rev;_O__ FLOOR INSTRUCTOR BOOTH STUDENTS US: Continues to assess Safety Functions up to and including EOP 25400, Functional Recovery of RCS Heat Removal. Directs RO and BOP to: Ensure at least one complete facility of SIAS, CIAS, EBFAS, MSI, and CSAS have actuated. Ensure one complete facility of CRAC is operating in RECIRC. Verify single phase Safety Injection flow is adequate. Verify subcooling. Align Condenser Air Removal. Determines SGTR did NOT occur. Determines ESD did occur and that #2 S/G is the most affected. Directs BOP to perform actions of Appendix EU2 11, ESDE Response.
'Dominion'"
RO: Ensures MSI has actuated and at least one train of MSI has properly actuated (all MSI components are in their accident condition on C-01X).
Job Aid                                   Page 31 of 32 SEG# ES11U3                        Rev; _0__
Simulator Exercise Guide Job Aid SEG# ES11L13 Rev;_O__ FLOOR BOOTH INSTRUCTOR Event 9: When dispatched, insert Remote Function MSR13, RI. Close the disconnect for MS-202, #2 Main Steam Supply to the TDAFP. CT3 (ESDE-6):
Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.
AFW to the faulted (#2) SG is isolated within minutes of MSI actuation on an ESDE. SCENARIO END: When #2 S/G is isolated or at I When directed, inform the crew that the scenario the discretion of the lead evaluator, direct the is complete and place the simulator in FREEZE. simulator to be placed in FREEZE. Page 29 of 32 STUDENTS BOP: Isolates #2 S/G: Ensues MS-64B, #2 MSIV, is closed. Ensures MS-65B, #2 MSIV Bypass, is closed. Ensures #2 ADV controller is in Manual and closed. Places ADV Quick Open Permissive switch in OFF. Closes FW-41B, #2 Main Feed Reg Valve Bypass Valve. Ensures FW-42B, #2 Main Feed Block Valve, is closed. Places FW-5B, Main Feed Air Assist Check Valve switch in CLOSE. Dispatches a PEO to unlock and close Disconnect for MS-202, #2 Main Steam Supply to the TDAFP. (May be performed earlier) Ensures MS-220B, #2 S/G Blowdown Isolation, is closed. Ensures both Aux Feed OVERRIDE/MAN/START/RESET hand switches are in Pull-To-Lock. Closes FW-43B, #2 Aux Feed Reg Valve. Places hand switch for FW-12B, #2 Aux Feed Air Assist Check Valve, in CLOSE. Ensures MS-65B, #2 Main Steam Leg Low Point Drain, is closed. Ensures Main Steam Safety Valves are closed. 
Yes     No
--------------Simulator Exercise Guide ,'DOlllinion'" Job Aid Page 30 of 32 SEG# ES11L13 Rev; _0_ Deiay Ramp I Event I Severity I Final I Relative Description Time Time Trigger Or Value Value Order MALFUNCTIONS RP04A. Failure of #1 Reactor Trip Push Button NA NA NA NA NA 6 RP04B. Failure of #2 Reactor Trip Push Button NA NA NA NA NA 6 RP04C, Failure of #3 Reactor Trip Push Button NA NA NA NA NA 6 RP04D, Failure of #4 Reactor Trip Push Button NA NA NA NA NA 6 RP27B, Automatic RPS Trip Failure (ATWS) NA NA NA NA NA 6 RH06A, Failure of "A" CS Pump to start. NA NA NA NA NA 10 SW10, uN SW Pump Degrades.
: 1. The desired initial condition(s) could be achieved.                                                       D
NA 240 sec. 1 100% 100%
: 2. All malfunctions and other instructor interface items were functional and responded to                   D support the simulator Scenario.
1 RX03B, Channel Y Pressurizer Pressure transmitter fails low NA 400 sec. 2 0% 0% 4 CH07, Seismic Event NA NA 3 NA NA 5 -------c-----RC04, 14 gpm RCS Leak. NA 90 sec. 3 2% 2% 6 f------ED16B, Loss of VA-20 NA NA 4 NA NA 7 RC04, Small Break LOCA (175 gpm) NA 270 sec. 6 25% 25% 8 ES04F, Actuation Cabinet 6 Deenergizes.
: 3. All malfunctions and other instructor interface items were initiated in the same sequence                 D described within the simulator scenario.
NA NA 6 NA NA 8 MS01 B, ESD on #2 S/G inside Containment NA 240 sec. 7 2.5 2.5 9 REMOTE FUNCTIONS SWR31 , Place HS-6484A in Normal. NA NA NORM NORM 2 MSR13, Close the disconnect for MS-202 NA NA RI RI 11 OVERRIDES Annunciator CA-4 on C-06/7, SW PUMP STNR TROUBLE NA NA 5 ON OFF 3 
: 4. All applicable acceptance criteria were met for procedures that were used to support the                 D simulator scenario.
" Simulator Exercise Guide 'Dominion'" Job Page 31 of 32 SEG# Rev; _0 __ Mark with an "X" Yes or No for any of the following.
: 5. During the simulator scenario, observed changes corresponded to expected plant                           D response.
If the answer is No, include an explanation after the item. Yes No The desired initial condition(s) could be achieved.
: 6. Did the scenario satisfy the learning or examination objectives without any significant                   D simulator performance issues, or deviations from the approved scenario sequence?
D All malfunctions and other instructor interface items were functional and responded to D support the simulator Scenario. All malfunctions and other instructor interface items were initiated in the same sequence D described within the simulator scenario. All applicable acceptance criteria were met for procedures that were used to support the D simulator scenario. During the simulator scenario, observed changes corresponded to expected plant D response. Did the scenario satisfy the learning or examination objectives without any significant D simulator performance issues, or deviations from the approved scenario sequence? The simulator is capable of being used to satisfy learning or examination objectives without D exceptions, significant performance discrepancies, or deviation from the approved scenario sequenCE!.
: 7. The simulator is capable of being used to satisfy learning or examination objectives without             D exceptions, significant performance discrepancies, or deviation from the approved scenario sequenCE!.
Any identified Critical Tasks possesses the following elements D (NUREG-1 021): Essential to safety with adverse consequences or Cue(s) prompt the Operator to respond. Defined and measurable performance indicators. Performance feedback.
: 8. Any identified Critical Tasks possesses the following elements                                           D (NUREG-1 021):
The use of "N/A" is allowed for item 8 only if this is NOT an Discrepancies noted (Check "none" or list items in comments None Comments:
* Essential to safety with adverse consequences or significant degradation,
Validator:
* Cue(s) prompt the Operator to respond.
Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
* Defined and measurable performance indicators.
... Simulator Exercise Guide ifiJjjJJ&#xa5;Dominion'" Job Aid Page 32 of 32 SEG# ES11 Ll3 Rev; _0_ SIMULATOR TRAINING SHIFT TURNOVER REPORT DATE-TIME PREPARED BY Today 0515 Unit Supervisor I"NIGHT" Shift PLANT STATUS: Mode: 1 Megawatts:
* Performance feedback.
Thermal: 2698 lVIWTH PZR Electric:
The use of "N/A" is allowed for item 8 only if this is NOT an evaluated scenario.
888 MWe RCS RCS Leakage: Identified:
Discrepancies noted (Check "none" or list items in comments field)                                      None     ~
0.015 gpm Protected Unidentified:
Comments:
0.036 gpm DatelTime:
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Toda 0015 Active Tracking Records and Action Statements Equipment/Reason LCO Action Date Time in LCO Action Requirement Time Left 3.7.1.2 a Today [[estimated NRC review hours::4 hours]] Restore to OPERABLE within 7 days. 6d, 20 hrs TRM Table 15.1 b.1 and b.2 Today [[estimated NRC review hours::4 hours]] Establish a roving watch. Ensure FUNCTIONALITY of Fire Detection and Suppression systems for Fire Areas R-3, R-11, R-17 and R-17. 59 d, 20 hrs 2-U-AIL, See AIL for details None OD Compensatory Actions I Temp Logs WatchOpen Date Class Reason Reason Position 2-CH-507, RCP bleedoff relief isolation, is closed on C02. This is due to relief CH-199 leaking by into the PDT. ARP C-10 for Bleedoffflow high 7/05108 ODM RO directs closing CH-507. ARP B-10 directs opening CH-507, (>280#). OP-2301 C-001 has been modified for this valve to be CLOSED. I PLANT SYSTEMS APe Notes System I CROSS UNIT SYSTEM STATUS U3 Power to 24E J 34A aligned to 24E SURVEILLANCES I EVOLUTIONS IN PROGRESS OP 2204 I Steady State Operation REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES J SPREAD SHEET FOR ADDITIONAL INFO) Current Rod H A Xenon Trend Stable Current Boron 9.2 ppm Boron Pot Setting I Blend Ratio 70 to 1 (corrected)
 
Appendix Scenario Outline Form ES-O-1 Facility:
...
MP2 Scenario No.: ES11 Ll4 Op-Test No. :_1..:.....-_
.,~
Examiners:
ifiJjjJJ&#xa5;Dominion'"
__________
SEG# ES11 Ll3                         Rev; _0_
Operators:
Simulator Exercise Guide Job Aid                                    Page 32 of 32 SIMULATOR TRAINING SHIFT TURNOVER REPORT DATE-TIME                                 PREPARED BY Today 0515                         Unit Supervisor I"NIGHT" Shift PLANT STATUS:
__________ Initial Conditions:
Mode: 1                                                           RxPower:
45% power, BOl, Eg. Xe., $ ppm Boron SGSD @ $ gpm SG, 24E aligned to 24D, "A" Main Feed Water Pump in Turnover:
Megawatts: Thermal:       2698 lVIWTH                           PZR Pressure:
45% power. BOl, Eg. Xe .* $ ppm Boron, blend ratio: $:1, SGBD @ $ gpm per SG, 24E aligned to 24D, "A" Main Feed Water Pump in service. waiting for 'B' Main Feed Water Pump to come back from Maintenance, no other equipment OOS and no surveillance in progress or due. Event Malt. Event Event No. No. 1 N/A CH08C C CRAC Filter Fan "A", F-32A, trips. (TS) (BOP/S) 3 CW04C C Main Condenser tube leak in the "C" water 5 6 7 8 * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M}ajor Appendix D, 38 of 39 Scenario Summary: The crew will take the shift with the unit at approximately 50% power with the direction to hold power here until the "B" Main Feedwater Pump is returned from Maintenance.
Electric:     888 MWe                                 RCS T-AVE:
Once the crew has the watch, the Control Room Air Conditioning (CRAC) Radiation Monitor will spike, causing the ventilation system to shift into recirculation mode. Per ARP 2590A-159, the crew should verify proper operation of the CRAC system and discuss returning the system to normal operation.
RCS Leakage: Identified:       0.015 gpm                   Protected Train/Facility:
Before this action is taken, a PEO will report that the belt for CRACS Filter Fan, F32A, is broken. This will require the crew to secure Facility 1 CRAC and ensure Facility 2 CRAC is operating as required per OP 2315A, Control Room Air Conditioning System. The US will enter TSAS 3.7.6.1 a for an inoperable train of CRAC and call MaintenanceIWork Planning to repair the fan belt. While the work order for fan F32A is being generated, a seawater leak will develop in the "C" Waterbox.
Unidentified: 0.036 gpm DatelTime: Toda 0015 Active Tracking Records and Action Statements Equipment/Reason LCO       Action     Date     Time in LCO                     Action Requirement                     Time Left 3.7.1.2               a     Today         [[estimated NRC review hours::4 hours]]       Restore to OPERABLE within 7 days.                     6d, 20 hrs Establish a roving watch. Ensure FUNCTIONALITY TRM Table 7.1     b.1 and Today         [[estimated NRC review hours::4 hours]]       of Fire Detection and Suppression systems for Fire     59 d, 20 hrs 15.1                b.2 Areas R-3, R-11, R-17 and R-17.
2-U-AIL, See AIL for details None OD Compensatory Actions I Temp Logs Watch Open Date       Class Reason                                     Reason Position 2-CH-507, RCP bleedoff relief isolation, is closed on C02. This is due to relief CH-199 leaking by into the PDT. ARP C-10 for Bleedoffflow high 7/05108                   ODM                                                                                       RO directs closing CH-507. ARP B-10 directs opening CH-507, (>280#).
OP-2301 C-001 has been modified for this valve to be CLOSED.
I PLANT SYSTEMS APe System     I                                                   Notes CROSS UNIT SYSTEM STATUS U3 Power to 24E       J34A aligned to 24E SURVEILLANCES I EVOLUTIONS IN PROGRESS OP 2204         I Steady State Operation REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES J SPREAD SHEET FOR ADDITIONAL INFO)
Current Rod H           A Xenon Trend Stable Current Boron 9.2 ppm Boron Pot Setting I Blend Ratio         70 to 1 (corrected)
 
Appendix 0                          Scenario Outline                     Form ES-O-1 Facility:   MP2         Scenario No.: ES11 Ll4                   Op-Test No. :_1..:.....-_
Examiners: _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ _ __
Initial Conditions: 45% power, BOl, Eg. Xe., $ ppm Boron SGSD @ $ gpm per SG, 24E aligned to 24D, "A" Main Feed Water Pump in service.
Turnover: 45% power. BOl, Eg. Xe .* $ ppm Boron, blend ratio: $:1, SGBD @ $ gpm per SG, 24E aligned to 24D, "A" Main Feed Water Pump in service. waiting for 'B' Main Feed Water Pump to come back from Maintenance, no other equipment OOS and no surveillance in progress or due.
Event     Malt.     Event                           Event Description No.       No.       Type*
1       N/A   ~
I~--r-----                    ~+-----------------------------~I CH08C         C       CRAC Filter Fan "A", F-32A, trips. (TS)
(BOP/S) 3     CW04C         C       Main Condenser tube leak in the "C" water box.
(BOP/S) 4
* 5 II    6 7
8
    *       (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M}ajor Appendix D, 38 of 39
 
ES11L14 Scenario Summary:
The crew will take the shift with the unit at approximately 50% power with the direction to hold power here until the "B" Main Feedwater Pump is returned from Maintenance.
Once the crew has the watch, the Control Room Air Conditioning (CRAC) Radiation Monitor will spike, causing the ventilation system to shift into recirculation mode. Per ARP 2590A-159, the crew should verify proper operation of the CRAC system and discuss returning the system to normal operation. Before this action is taken, a PEO will report that the belt for CRACS Filter Fan, F32A, is broken. This will require the crew to secure Facility 1 CRAC and ensure Facility 2 CRAC is operating as required per OP 2315A, Control Room Air Conditioning System. The US will enter TSAS 3.7.6.1 a for an inoperable train of CRAC and call MaintenanceIWork Planning to repair the fan belt.
While the work order for fan F32A is being generated, a seawater leak will develop in the "C" Waterbox.
The crew will enter AOP 2516, Condenser Tube Leak, and isolate "C" Waterbox.
The crew will enter AOP 2516, Condenser Tube Leak, and isolate "C" Waterbox.
While "C" Waterbox is being isolated, Channel "Y" Pressurizer level transmitter will fail high causing Pressurizer pressure and level to lower. The crew will either take manual control of Pressurizer level (Letdown flow) or will swap to Channel "X". When level is restored to setpoint and control is back in automatic. the "A" Condenser Steam Dump Valve will open slightly due to a failure of its C-05 controller output. The Crew must transfer control of the steam dump to the Foxboro IA Control System in order to re-close the valve. Once the "A" Steam Dump is re-closed, the Turbine System Engineer will call to inform the crew that the "A" Main Feedwater Pump should be shut down as soon as possible due to abnormal noise coming from the pump turbine. This will force the crew into AOP 2575, Emergency Downpower, and commence a plant shut down. Once plant power has been lowered about 10%, Bus 24C will deenergize (bus fault), requiring a manual plant trip. The crew will enter EOP 2525, Standard Post Trip Actions. On the trip, a LOCA will develop due to a rupture of the "A" RCP Seal Cooler. During the performance of EOP 2525, a manual or automatic SIAS will be initiated and the "A" DG will be emergency tripped due to the fault on 24C (Loss of Service Water to the EDG). After entry into EOP 2532, Loss of Coolant Accident, the "C" HPSI Pump will trip and not restart. The crew will recognize that safety injection flow is inadequate and start the "B" HPSI Pump. The scenario will end after the crew isolates the intersystem LOCA and initiates a controlled cooldown.
While "C" Waterbox is being isolated, Channel "Y" Pressurizer level transmitter will fail high causing Pressurizer pressure and level to lower. The crew will either take manual control of Pressurizer level (Letdown flow) or will swap to Channel "X".
CT-1 (LOCA-9):
When Pressuriz~~r level is restored to setpoint and control is back in automatic. the "A" Condenser Steam Dump Valve will open slightly due to a failure of its C-05 controller output. The Crew must transfer control of the steam dump to the Foxboro IA Control System in order to re-close the valve.
Manually establish the required minimum safety injection Restore a running HPSI pump within 30 minutes of entry into EOP CT-2 (LOCA-3) Establish CTMT Isolate CTMT by closing at least one isolation valve at each CT-2 (LOCA-6) Isolate RCS Isolate or attempt to isolate locations that may be the source of the loss of CT-3 (LOCA-3):
Once the "A" Steam Dump is re-closed, the Turbine System Engineer will call to inform the crew that the "A" Main Feedwater Pump should be shut down as soon as possible due to abnormal noise coming from the pump turbine. This will force the crew into AOP 2575, Emergency Downpower, and commence a plant shut down.
Initiate a plant A plant cooldown at a rate of greater than 40&deg;F/hr should be initiated within one hour, following unisolable LOCA, until the condenser steam dump valves or ADVs are full Simulator Exercise Guide'Dominion*'
Once plant power has been lowered about 10%, Bus 24C will deenergize (bus fault), requiring a manual plant trip. The crew will enter EOP 2525, Standard Post Trip Actions. On the trip, a LOCA will develop due to a rupture of the "A" RCP Seal Cooler.
Job Aid Page 1 of 29 SEG# ES10Ll4 (SpareL-Rev;_O_ SITE: I Millstone Power Station PROGRAM: Unit 2 LOIT NRC Exam Title Simulator  
During the performance of EOP 2525, a manual or automatic SIAS will be initiated and the "A" DG will be emergency tripped due to the fault on 24C (Loss of Service Water to the EDG).
#4 (Original Spare) COURSE: ESIOLI4 I Course #: NA Total Time 1.[[estimated NRC review hours::5 hours]] Prepared by: Robert L. Cimmino, Jr. 09/13/11 Printed Name Instructor's Signature Date Reviewed by: (Optional)
After entry into EOP 2532, Loss of Coolant Accident, the "C" HPSI Pump will trip and not restart. The crew will recognize that safety injection flow is inadequate and start the "B" HPSI Pump.
Printed Name Simulator Development Checklist Date Instructor Signature Reviewed by: (Optional)
The scenario will end after the crew isolates the intersystem LOCA and initiates a controlled cooldown.
Printed Name Simulator Validation Checklist Signature Date Approved by: Printed Name Training Supervisor Date Simulator Exercise Guide Job Page 2 of 29 SEG# ES10Ll4 (Spare) Rev: __--lO..0__ Goal of Training: Evaluate the licensees' ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions. Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions.
CT-1 (LOCA-9): Manually establish the required minimum safety injection flow.
To include: 1) Ability of the crew to perform crew-dependent (and time-critical) tasks. Ability of the crew to: Understand/interpret annunciators/alarms, plant/systems response Diagnose events/conditions based on signals/readings Comply with/use procedures, Technical Specifications, and TRM Perform control board operations Properly communicate information/proper crew interactions Practice Reactivity Management
Restore a running HPSI pump within 30 minutes of entry into EOP 2532.
CT-2 (LOCA-3) Establish CTMT Isolation.
Isolate CTMT by closing at least one isolation valve at each penetration.
CT-2 (LOCA-6) Isolate RCS Leakage.
Isolate or attempt to isolate locations that may be the source of the loss of coolant.
CT-3 (LOCA-3): Initiate a plant cooldown.
A plant cooldown at a rate of greater than 40&deg;F/hr should be initiated within one hour, following an unisolable LOCA, until the condenser steam dump valves or ADVs are full open.
 
Simulator Exercise Guide
'Dominion*'
Job Aid                                 Page 1 of 29 SEG#     ES10Ll4 (SpareL-       Rev;_O_
SITE:       I Millstone Power Station PROGRAM:               Unit 2 LOIT NRC Exam Title                   Simulator #4 (Original Spare)
COURSE:                 ESIOLI4                                             I Course #: NA Total Time               1.[[estimated NRC review hours::5 hours]] Prepared by:           Robert L. Cimmino, Jr.                                               09/13/11 Printed Name                   Instructor's Signature           Date Reviewed by:
(Optional)                 Printed Name             Simulator Development Checklist         Date Instructor Signature Reviewed by:
(Optional)                 Printed Name           Simulator Validation Checklist Signature   Date Approved by:
Printed Name                     Training Supervisor             Date
 
Simulator Exercise Guide Job Aid                                Page 2 of 29 SEG# ES10Ll4 (Spare) Rev: _ _--lO..0_ _
Goal of Training:       a) Evaluate the licensees' ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.
b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:
: 1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
: 2) Ability of the crew to:
* Understand/interpret annunciators/alarms, plant/systems response
* Diagnose events/conditions based on signals/readings
* Comply with/use procedures, Technical Specifications, and TRM
* Perform control board operations
* Properly communicate information/proper crew interactions
* Practice Reactivity Management
* Make conservative decisions.
* Make conservative decisions.
: 3) Ability of each individual to: Respond and correctly interpret annunciators Correctly diagnose events Properly interpret integrated system response Comply with and use Technical SpecificationslTRM Comply with and* use procedures Properly perform control board operations Demonstrate responsible attitude Properly communicate information and interact with rest of crew Leadership skills required to effectively manage the evolutions Provide adequate overview where required Learning Objectives:
: 3) Ability of each individual to:
NA NA Prerequisites:
* Respond and correctly interpret annunciators
N/A Training Resources:
* Correctly diagnose events
1 lead simulator (floor) instructor, 1 booth instructor SEG# ES10Ll4 (Spare)  
* Properly interpret integrated system response
* Comply with and use Technical SpecificationslTRM
* Comply with and* use procedures
* Properly perform control board operations
* Demonstrate responsible attitude
* Properly communicate information and interact with rest of crew
* Leadership skills required to effectively manage the evolutions
* Provide adequate overview where required Learning Objectives:   NA Tasks:                  NA Prerequisites:         N/A Training Resources:     1 lead simulator (floor) instructor, 1 booth instructor
 
Simulator Exercise Guide Job Aid                Page 3 of 29 SEG# ES10Ll4 (Spare) Rev: _ _----"-0_ _


==References:==
==References:==
ARP 2590A-159, CRACS in Auto Recirc Mode ARP 25900-067, C Hotwell Cond Hi AOP 2516, Condenser Tube Leak ARP 25908-217, Pressurizer CH Y Level HI/LO ARP 25900-041, Condensate Pump Trouble EOP 2525, Standard Post Trip Actions EOP 2532, Loss of Coolant Accident Plant Technical Specifications Commitments:            N/A Evaluation Method:      NRC License Examiner Observation Operating Experience:  N/A Plant/Simulator        None differences that may affect the scenario:
Related PRA            Core Damage Frequency: 0.98 Information:            LERF: 1.00 Important Components: 24E aligned to 24C


Commitments:
Simulator Exercise Guide Job Aid                                 Page 4 of 29 SEG#       ES10Ll4 (Spare) Rev; _0_
Evaluation Method: Operating Experience:
INITIAL CONDITIONS:
Plant/Simulator differences that may affect the scenario:
Related PRA Information:
Simulator Exercise Guide Job Aid Page 3 of 29 Rev: __----"-0__ ARP 2590A-159, CRACS in Auto Recirc ARP 25900-067, C Hotwell Cond AOP 2516, Condenser Tube ARP 25908-217, Pressurizer CH Y Level ARP 25900-041, Condensate Pump EOP 2525, Standard Post Trip EOP 2532, Loss of Coolant Plant Technical N/A NRC License Examiner Observation N/A None Core Damage Frequency: LERF: Important Components:
24E aligned to Simulator Exercise Guide Job Aid Page 4 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ INITIAL CONDITIONS:
* 46% power BOL.
* 46% power BOL.
* 24E aligned to 24C with "An & "B" Condensate Pumps operating.
* 24E aligned to 24C with "An & "B" Condensate Pumps operating.
* Plant startup with "A" Main Feed Pump in service. * "A" Emergency Diesel Generator out of service for PMs. The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
* Plant startup with "A" Main Feed Pump in service.
Scenario Summary: The crew will take the shift with the unit at approximately 45% power with the direction to hold power here until the "B" Main Feedwater Pump is returned from Maintenance.
*   "A" Emergency Diesel Generator out of service for PMs.
Once the crew has the watch, the Control Room Air Conditioning (CRAC) Radiation Monitor will fail high, causing the ventilation system to shift into recirculation mode. Five seconds after starting, the "A" Filter Fan, F32A, will trip due to a broken belt. Per ARP 2590A-159, the crew should verify proper operation of the CRAC system and note the loss of the filter fan. This will require the crew to secure Facility 1 CRAC and ensure Facility 2 CRAC is operating as required per ARP 2590A-159.
The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
The US will enter TSAS 3.7.6.1 a for an inoperable train of CRAC, TSAS 3.3.3.1 for the failed rad monitor, and call MaintenanceIWork Planning for the needed equipment repairs. While the work order for fan F32A is being generated, a seawater leak will develop in the "C" Waterbox.
Scenario Summary:
The crew will take the shift with the unit at approximately 45% power with the direction to hold power here until the "B" Main Feedwater Pump is returned from Maintenance.
Once the crew has the watch, the Control Room Air Conditioning (CRAC) Radiation Monitor will fail high, causing the ventilation system to shift into recirculation mode. Five seconds after starting, the "A" Filter Fan, F32A, will trip due to a broken belt. Per ARP 2590A-159, the crew should verify proper operation of the CRAC system and note the loss of the filter fan. This will require the crew to secure Facility 1 CRAC and ensure Facility 2 CRAC is operating as required per ARP 2590A-159. The US will enter TSAS 3.7.6.1 a for an inoperable train of CRAC, TSAS 3.3.3.1 for the failed rad monitor, and call MaintenanceIWork Planning for the needed equipment repairs.
While the work order for fan F32A is being generated, a seawater leak will develop in the "C" Waterbox.
Chemistry will report the leak and the crew will enter AOP 2516, Condenser Tube Leak, and isolate "C" Waterbox.
Chemistry will report the leak and the crew will enter AOP 2516, Condenser Tube Leak, and isolate "C" Waterbox.
After "C" Waterbox is isolated, Channel "Y" Pressurizer level transmitter will fail high causing Pressurizer level and pressure to lower. The crew will either take manual control of Pressurizer level (Letdown flow) and swap to swap to Channel "X" level control, or immediately swap level control channels.
After "C" Waterbox is isolated, Channel "Y" Pressurizer level transmitter will fail high causing Pressurizer level and pressure to lower. The crew will either take manual control of Pressurizer level (Letdown flow) and swap to swap to Channel "X" level control, or immediately swap level control channels.
Once Pressurizer level is restored to automatic control, the "A" Condensate Pump motor winding temperatures will rise abnormally high, causing a control board trouble alarm and applicable PPC alarms. The Crew must start the "B" Condensate Pump and secure the "A" Condensate Pump before the "An trips on high current/overload.
Once Pressurizer level is restored to automatic control, the "A" Condensate Pump motor winding temperatures will rise abnormally high, causing a control board trouble alarm and applicable PPC alarms.
When the "A" Condensate Pump problem has been mitigated, the Turbine System Engineer will call to inform the crew that the "A" Main Feedwater Pump should be shut down as soon as possible due to abnormal noise corning from the pump turbine. This will force the crew into AOP 2575, Emergency Downpower, and commence a plant shut down. Once plant power has been lowered by approximately 10%, a major fault will occur on bus 24A causing bus 24C to de-energize and force a manual plant trip. During the performance of EOP 2525, Standard Post Trip Actions, the "A" RCP seal cooler will rupture, resulting in an Intersystem, Small-Break LOCA. After entry into EOP 2532, Loss of Coolant Accident, the "c n HPSI Pump will trip and not restart. The crew will recognize that safety injection flow is inadequate and the need to start a Facility 1 HPSI Pump. This will require either bus 24C be re-energized from the RSST, or 24E be re-energized from Unit 3. The scenario will end after the crew isolates the intersystem LOCA and initiates a controlled cooldown.
The Crew must start the "B" Condensate Pump and secure the "A" Condensate Pump before the "An trips on high current/overload.
Simulator Exercise Guide Job Aid Page 5 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ Critical CT-1 (LOCA-9):
When the "A" Condensate Pump problem has been mitigated, the Turbine System Engineer will call to inform the crew that the "A" Main Feedwater Pump should be shut down as soon as possible due to abnormal noise corning from the pump turbine. This will force the crew into AOP 2575, Emergency Downpower, and commence a plant shut down.
Manually establish the required minimum safety injection Restore a running HPSI pump within 30 minutes of entry into EOP CT-2 (LOCA-3) Establish CTMT Isolate CTMT by closing at least one isolation valve at each and/or CT-2 (LOCA-6) Isolate RCS Isolate or attempt to isolate locations that may be the source of the loss of CT-3 (LOCA-3):
Once plant power has been lowered by approximately 10%, a major fault will occur on bus 24A causing bus 24C to de-energize and force a manual plant trip. During the performance of EOP 2525, Standard Post Trip Actions, the "A" RCP seal cooler will rupture, resulting in an Intersystem, Small-Break LOCA.
Initiate a plant A plant cooldown at a rate of greater than 40&deg;F/hr should be initiated within one hour, following an LOCA, until the condenser steam dump valves or ADVs are full Simulator Exercise Guide Job Page 6 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ ENSURE TRex Workstation is operating. VERIFY the most current approved training load is loaded. RESET to IC-83 (-45% power, BOL) If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC. As needed, RESET Computer Terminals (At Power displays if 100% power IC). ENSURE SG blowdown values in PPC Plant Calorimetric are reset. ENSURE RCS Leak Rate is reset in PPC. ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14). ADVANCE chart recorders. ENSURE the appropriate Protected Train placard is hung (A TRAIN PROTECTED). ENSURE appropriate signs are in place on simulator doors. ENSURE procedures designated for use during the scenario are clear of previous place keeping marks. If necessary, ENSURE Simulator fidelity items cleared. ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper). If required, OVERRIDE annunciators that will be lit long-term in the Control Room. ENTER Initial Malfunctions
n After entry into EOP 2532, Loss of Coolant Accident, the "c HPSI Pump will trip and not restart. The crew will recognize that safety injection flow is inadequate and the need to start a Facility 1 HPSI Pump. This will require either bus 24C be re-energized from the RSST, or 24E be re-energized from Unit 3.
/ II0s I Remote Functions. PLACE Simulator to RUN. If placing Equipment OOS, then PERFORM necessary switch manipulations and appropriate tags, as required for the a "A" and "c" Condensate Pumps running and "B" Condensate Pump in standby. o 24E aligned to 24C. o "A" EDG OOS. o "Bn Main Feedwater Pump OOS. PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
The scenario will end after the crew isolates the intersystem LOCA and initiates a controlled cooldown.
Simulator Exercise Guide -* iiil v DominIOn FLOOR INSTRUCTOR INITIAL CONDITIONS: IC-18 Mode: 1 Burnup:MOL Power: 45% Boron: (CB): XXX ppm Temperature:
 
Tave 563&deg;F Pressure:
Simulator Exercise Guide Job Aid                                 Page 5 of 29 SEG#       ES10Ll4 (Spare) Rev; _0_
2250 psia Xenon: Increasing Rods: Gp 7 at 165 Generator:
Critical Tasks CT-1 (LOCA-9): Manually establish the required minimum safety injection flow.
405 MWe SIMULATOR SETUP: As necessary.
Restore a running HPSI pump within 30 minutes of entry into EOP 2532.
PERFORM I.V. of Initial Malfunctions 1II0s I Remote Functions entered. PRE*SCENARIO: BRIEF the crew on purpose of this session and REVIEW objectives (if necessary). lE this is the first simulator scenario of the week, THEN REVIEW the Plant/Simulator Differences List with the crew. TURNOVER:
CT-2 (LOCA-3) Establish CTMT Isolation.
PERFORM the crew turnover (Turnover Sheet) with the SM. Provide crew with partially completed OP 2204 and brief on existing conditions.
Job Aid BOOTH INSTRUCTOR ENTER or VERIFY the following Initial Malfunctions 1II0s I Remote Functions:
N/A CI CI CI CI Ensure 24E aligned to 24C. Ensure "A" & "C" Condensate Pumps are running and "B" is in standby. "An Main Feedwater Pump tagged out. "A" EDG tagged out. EGR17 (RO) "A" EDG Bkr. tagged out. EGR12 (CLOSED) "An EDG Air Start isol. COMPLETE Simulator Setup Checklist N/A Page 7 of 29 STUDENTS Review Log keeping responsibilities per the Gold Standard Book. page 23 & 24. US brief crew on plant conditions and any major equipment OOS. (All) Walk down control boards and let US know when they are ready. No shift briefing is required or recommended.
Simulator Exercise Guide Job Page 8 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ flflCi{ity1 C;R.AC Shifts to Recirculation'>
Mode/With Loss of Fan F-32A CRAC Facility 1 Radiation Monitor fails low, causing the system to shift to Recirculation Mode. Shortly after this occurs, the Filter Fan, F-32A, will trip due to broken fan belts overloading the motor. creY/has the
'JiscrAtionofthe Lea(l.Examlner
*. .' Event 1: RM010 -100% RM-9799A fails high, causing "An Train of CRAC to shift to "Recirc." mode. Event 1: CH08C -ON (5 second delay) CHHS8006_1 (NG) (5 second delay) F-32A green light out CHHS8006_1 (NR) (5 second delay) F-32A red light out If requested, call as a PEO to report fan F-32A belts have failed and appear to have caused the fan to trip. TM1, AE1 RO: I Observe "C.RA.C.S.
IN AUTO RECIRC MODE" annunciator (C-40) on C01 and Facility 1 CRAC has shifted to recirc. mode. Reports observation to US. US: Enters Automatic CRACS transfers to recirculation Directs the RO to verify Facility 1 operating as designed in recirculation mode. RO: Per ARP 2590A-159 Verifies Facility 1 CRAC has shifted recirculation PLACE "NORM/RECIRC MODE, HS-8346" AND "NORM/RECIRC MODE, HS-8359" switches in "RECIR" (C-2SA and C-25B). Check damper positions. Verify both Filter Fans running. Notes F-32A not running or tripped. Reports observation to US. US: Per ARP 2590A-159 Receive report of F-32A failure. Direct RO to secure Fac. 1 CRAC and start Fac. 2 CRAC per OP-2315A, Control Room Air Conditioning System. Enters TSAS 3.7.6.1a.;
One train ofCRAC inoperable.
Simulator Exercise Guide Job Page 9 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ FLOOR INSTRUCTOR BOOTH STUDENTS RO: Per ARP 2S90A-1S9 Per OP-231 SA. shifts from Fac. 1 to Fac. 2 CRAC operating.
5.1. VERIFY "CRACS SPL Y FAN F21 B. 8010" and "CRACS EXH FAN F31B, 8000" running (C-2SB). 5.2. CHECK "F-21 B, EXH DMPR. HV-203B" and "F-31 B, EXH DMPR, HV-206B" open (C-2SB). 5.3. VERIFY "CRACS SPLY FAN F21A. 8009" and "CRACS EXH FAN F31A. 8001" not running (C-2SA). 5.4. CHECK "F-21A. EXH DMPR. HV-203A" and "F-31A, EXH DMPR, HV-206A" closed (C-2SA). 5.5. CHECK "F-32B EXH DMPR, HV-212B," indicates open (red light lit) (C-25B). Verifies one complete train (Fac. 2) of CRAC operating.
The crew may attempt to return CRAC to US/RO: Per ARP 2590A-1S9 "NORMAL" but will be unable to with the Receives report; Fac. 2 CRAC in service. failed rad monitor. Notes probable failure of RM-9799A and enters TSAS 3.3.3.1. Action 16; Control Room Isolation Rad Monitor inoperable. Makes required notifications for troubleshooting and repairs.
Simulator Exercise Guide Job Page 10 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ 2. Condenser Tube Leak in the "c" Water Box. Event 2: CW04C -10 gpm (100%) Main Condenser tube leak in the "cn water box. When the Demin System Trouble alarm comes in, call as Chemistry and report indication of a tube leak in "C n Water Box. TM2, AE2 If necessary, call as the SM and remind the US that the PPC conductivity screen will not update with rising conductivity.
If Chemistry samples are requested, inform US samples have already confirmed "c" water box has a tube leak. BOP: Observe "CONDENSATE DEMIN SYSTEM TROUBLE" annunciator (A-16) on C05. Reports observation to US. Utilize the ARP for "C" HOTWELL COND LEVEL HI annunciator (BA-17) on C05. (Hotwell conductivity recorders will already be pegged high with all alarms active due to the low power level). US: AOP 2516, Condenser Tube Leak Notes actions under ARP 2590D-061 under Chemistry jurisdiction. Enters ARP-2590D-067, HOTWELL COND LEVEL HI (C05, BA-17), go to AOP 2516. Enters AOP-2516, Condenser Tube Leak. N/A Notes CPF demins. are operating in Amine form, references OP-2316A, Main Steam System, and directs BOP to secure SG blowdown.
BOP: Per OP-2316A, closes MS-220A & -220B and MS-145A &-145B Verifies PPC indicates zero blowdown flow. Reports completion to US. US: Determines "C" water box should be isolated and references AOP-2516, section 6.0. Isolate "C" Water Box SEG# ES10Ll4 (Spare) Rev; _0_ FLOOR INSTRUCTOR Simulator Exercise Guide Job Aid BOOTH INSTRUCTOR Event 8: FWR53 (CLOSE) "C" condenser air isolation.
CWR04A (CLOSE) "C* water box outlet inlet VP-9C us not When valves linked to Event 8 have their demand position, inform the crew all PEO actions are It is not necessary to actually start a 2SJAE or the Mechanical Vacuum Page 11 of 29 STUDENTS AOP 2516 Condenser Tube leak 6.1-6.3 N/A Directs the BOP to stop the "C* Circ. Pump BOP: Per AOP-2516, secures "C" Circ. Pump by tripping or lowering VFD. US: Directs the BOP to perform the following: Close CW-11 F, "C" water box inlet. Monitor RBCCW & TBCCW temperatures. Ensure CW-11C, *C" water box outlet open. US (or BOP): Directs a PEO to: Close AR-1C, condenser "C" isolation stop. 6.10 Close VP-1C & -1G, "C" water box outlet & inlet stops. Open VP-9C, *C" water box inlet vent. 6.12 (Crew/BOP)
Monitor condenser vacuum. 6.13 Deenergize cathodic protection.
6.14 (BOP) When directed, close CW-11C.
Simulator Exercise Guide Job Page 12 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ 3. The ARP assumes only one charging pump is running. Therefore, when level control is transferred to Channel 'X', the 2 nd charging pump will restart automatically, unless the charging pump control switches have been changed from the initial setup of two running pumps.
for #2 are cOR,Jpltieted.
discretion.
Exarniner,initiate
#3. Event 3: RX04B -85% (300 second ramp) Channel "Y" Pressurizer Level transmitter fails high over a period of five minutes. TM3.AE3 I RO:
* Observes and reports any of the following: Letdown flow rising. Pressurizer backup heaters energized. Level controller output rising. Actual level dropping (may not be diagnosed at this time). PRESSURIZER CH Y LEVEL HIILO annunciator (A-39) on C02-3 (delayed).
US: Enters ARP-2590B-217, annunciator A-39. Notes indicated level is high. Backup charging pump has stopped. Letdown flow is at maximum (128 gpm) Verifies TAVGIT REF recorder and Foxboro IIA indicate normal (RRS is not the problem).
US: Directs and the RO performs the following:
8.1 SHIFT "LTDN FLOW CNTL, HIC-110" "MAN" 8.2 Adjust "L TDN CNTL. HIC-11 0" to stabilize Pressurizer level and Letdown flow. 8.3 Commence forcing PZR sprays (in setup) 8.4 SHIFT PZR level control to channel "X". 8.5 RESTORE Letdown to automatic.
RO: (Restoring Letdown flow to automatic) Adjust bias to "0". Shift HIC-110" back to "AUTO." Adjust bias to restore PZR level Shift Pressurizer heater control SW" to channel SEG# ES10Ll4 (Spare) Rev; _0_ FLOOR INSTRUCTOR itA" Condensate Pump High Motor Winding Temperature.
Simulator Exercise Guide Job Aid BOOTH INSTRUCTOR WhenHIC-110 is back in automatic, or at the. discretion of the Lead Examiner; initiate #4. Event 4: FW23 -100% The "An Condensate Pump motor winding temperature will begin to rise abnormally high, causing control board and PPC alarms. TM4, AE4 Event 9: FW23 -0% (ramp 5 minutes) When "A" Condensate pump is secured, trigger Event 9 to ramp down high temp. Page 13 of 29 BOP/Crew: Observe "A" Condensate Pump high motor winding alarms on PPC MON 2. Observe "CONDENSATE PUMP TROUBLE" alarm A-11 on C05 US/BOP: Enters ARP-2590D-041, annunciator A-11, CONDENSATE PUMP TROUBLE. Notes "An Condensate Pump not tripped. Notes "An Condensate Pump amps not high Notes "An Condensate Pump motor winding temperature high and rising on the PPC. US -Directs "B" Condensate Pump be started. US -Directs "A" Condensate Pump be secured. BOP Starts the "Bn Condensate Pump. Secures the "An Condensate Pump and places it in Pull-To-Lock. Observes Condensate Header pressure.
Simulator Exercise Guide Job Page 14 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ 'Rapid Downpowerdue to failing SGFP. The US may not use a predetermined reactivity plan due to the existing power level not directly matching any existing plant generated by RE. In this case, reactivity thumbrules should be used. The US may direct Boration to be accomplished from the BAST to aI/ow for easier makeup to the VeT. Borafion from the BAST (alternate method) is in italics. When <S'Co.,d.pump is runnh\9; or atthe L;ead:Exarniner; initiate #5. Call as Turbine Engineer and inform the crew that the "An SG Feed Pump (SGFP) is making unusual noises and should be shut down as soon as possible.
It is not necessary to trip the pump at this time. TM5, AE5 US: Enters AOP 2575, Rapid Downpower Performs Focus Brief on Trip Criteria and RCS Temperature Control. Requests SMISTA to make required notifications. Directs RO to initiate forcing sprays and to insert Group 7 CEAs 10 steps (while maintaining Reactivity oversight) Determines which Reactivity Plan, RE-G-13, -14, or -15 may be used. Directs RO and BOP to coordinate a rapid down power per the chosen plan. RO: Initiates Forcing Sprays: (if not already) Closes all Backup Heater Breakers Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia). Inserts Group 7 CEAs 10 steps and observes applicable parameters. Initiates Boration from the RWST: Ensures at least one Charging Pump is operating. Ensures CH-196, VCT Bypass, is Ensures CH-504, RWST to Charging Suction, is open. Opens CH-192, RWST Isolation. Closes CH-501, VCT Outlet. Starts a second Charaina Simulator Exercise Guide Job Page 15 of 29 SEG# ES10Ll4 (Spare) Rev; _0__ FLOOR INSTRUCTOR BOOTH STUDENTS RO (alternate boration method): If Boration is from the BAST: Ensures the Makeup Flow Selector switch is in the DILUTE position. Ensues FC-210X, Primary Makeup Water Flow controller, is set to "0". Ensures CH-S12, Makeup Valves Stop, is closed. Ensures CH-196, VCT Makeup Bypass, is closed. EnsuresCH-192, RWST Isolation.
is closed. Ensures FC-210Y,Boric Acid Flow controller, is set to the predetermined flow rate. Opens CH-S04, RWST to Charging Suction. Place Makeup Mode Sel switch in MAN. Starts the selected Boric Acid and verifies discharge pressure is greater than 98 psig. Opens CH 196, VCT Makeup Bypass. As required, refers to attachment and performs actions to maintain VCT level in the desired band. BOP: Reduces Turbine load to follow Reactor power to maintain Tc on program using the Load Limit Pot.
Rev;_O_ FLOOR INSTRUCTOR Loss of Vital Bus 24C; Manual Plant Trip. LOCA.lnitiates on the Plant Trip. Simulator Exercise Guide Job Aid BOOTH INSTRUCTOR When
"'10%, orat the disereti()ll:oftheJ
..ea.dExaminer, initiate #6. Event 6: ED05A -ON Causes a fault on vital bus 24A which results in the following: NSST to 24A trips on the bus fault, deenergizing 24A and all non-Vital 4160/480 VAC power (unrecoverable). 24C deenergizes causing Fac. 1 ESAS UV The UV locks out the RSST to 24C. Because "A" EDG is OOS. 24C and all Vital 4160/480 VAC power remain deenergized. 24C can be recovered, but not in time to prevent a required plant trip. TM6, MA1 Event 6: (+2 minutes) RC20B 308 gpm (56%) On the trip. a rupture will occur in the "An RCP seal cooler. resulting in a Small Break LOCA. TM7, MA2 Page 16 of 29 Directs the crew to manually trip the Reactor and perform EOP 2525. Standard Post Actions. Queries RO and BOP on the status of Safety Functions as delineated in Eap 2525: Reactivity Control (RO) Status of the Reactor Maintenance of Vital Auxiliaries (BOP) Status of the Turbine Status of Electrical Buses Status of SW & RBCCW Check one facility of CRAC operating (RO) RCS Inventory Control (RO) Pzr level &Subcooled margin (SCM), value &trend RCS Pressure Control (RO) Pzr pressure, value & trend Core Heat Removal (RO) RCP status Loop delta-T T H Subcooling Margin RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS T c value and trend o S/G levels, value and oReS Subcooling Simulator Exercise Guide Job Aid SEG# ES10Ll4 (Spare) Rev; _0_ FLOOR BOOTH INSTRUCTOR Page 17 of 29 STUDENTS Containment (CTMT) Isolation (RO) Radmonitors inside CTMT, outside CTMT, steam plant CTMT pressure <1 psig CTMT Temperature
& Pressure Control (RO) CTMT temperature and pressure value and trend RO: Presses all four Reactor Trip push buttons on C-04 and verifies the Reactor trips. Reactor has tripped, power is lowering, SUR is negative, all CEAs are inserted.
BOP: Perform associated actions of EOP 2525 and report results when queried: Turbine tripped, stop valves are closed, 8T & 9T are open, Megawatts are zero All electrical buses energized except for 24A and 24C (UA" EDG 005). Facilities 2 SW and RBCCW operating.
RO: Performs associated actions of EOP 2525 and report results when queried: Control Room Air Conditioning Status Pressurizer level value and trend PZR level lowering, all available charging pumps running, letdown flow at minimum.
Simulator Exercise Guide Job Aid SEG# ES10Ll4 (Spare) Rev; FLOOR BOOTH INSTRUCTOR The remaining RCPs may be secured when the crew recognizes the leak in the "8" RCP Seal Cooler. Page 18 of 29 STUDENTS RO: Pressurizer pressure value and trend PORVs and Spray Valves are closed When RCS pressure is less than 1714 psia, then SIAS, CIAS, and EBFAS have actuated (only Facility 2 powered). "A" & "C" RCPs secured due to no RBCCW flow on loss of 24C. If Pressurizer pressure lowers to minimum NPSH, then all Reps are secured.
* Number of RCPs operating Value and trend of loop Delta-T Value and trend of subcooling If no RCPs operating, T AVG controller,TIC-4165 in manual/closed BOP: Performs associated actions of EOP 2525 and reports results when queried: Value and trend of S/G pressures Operates steam dumps, as necessary, to control RCS T AVG* Value and trend of T c Value and trend of S/G levels Subcooling value / CET temperatures Simulator Exercise Guide Job Page 19 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ FLOOR INSTRUCTOR BOOTH STUDENTS RO: Continues with associated actions of EOP 2525 and reports results when queried: Rad monitors: Inside CTMT; not going up or in alarm Outside CTMT; RM-6038, RBCCW going up and/or in alarm. US/BOP/RO:
RBCCW Surge Tank level rising Steam Plant; not going up or in alarm. CTMT temperature/pressure rising slowly. 2 CAR Fans and "B" Aux Circ. Fan running in slow. Starts "B" PIR Fan. BOP: Continue with Subsequent Actions: Opens HD-106, Subcooling Valve Stops both Heater Drains Pumps Secures all but one Condensate Pump Verifies Main Feed Pump operating. Closes FW-42B, Main Feed Block Valve. Ensure both Main Feed Reg Bypass Valves are throttled to 40% Checks IA Header pressure is >90 psig and stable. US: Query RO & BOP regarding the status of EOP 2525 subsequent actions.
Simulator Exercise Guide Job Aid SEG# ES10Ll4(Sparel Rev; _0_ FLOOR BOOTH INSTRUCTOR Page 20 of 29 STUDENTS RO/BOP: When asked, report that Subsequent Actions are complete and verified.
US: At the completion of EOP 2525, Diagnostic Flow Chart, determines that a LOCA inside Containment has occurred and goes to EOP 2532, Loss of Coolant Accident. Places Master Silence Switch in NORM. Notes the need for the SM to complete FAP06-002, classify the event as an Alert, Charlie-1, and make appropriate notifications.
Simulator Exercise Guide Job Page 21 of 29 SEG# ES10Ll4 (Spare) Rev; LosS of High Once EOP 2532 discretion of the Event 7: RC208 550 gpm US: Raise the severity of the "8" RCP Seal o Cooler tube rupture to maximum. o o Event 27 (RCS Pres < 1600 psia): SI04C -ON I 0 Initiate a trip of the "C" HPSI Pump when RCS pressure drops below 1600 psia, causing the loss of the only running High Pressure Safety Injection Pump. TM8, EM1 o o Enters EOP 2532, Loss Of Coolant Accident Directs performance of SFSC Directs Chemistry sample S/Gs Directs SM to classify the event Opens Place keeper and ENTER the EOP entry time Ensures the master silence switch is in "NORMAL" US/BOP: Opens both SG sample valves. Directs Chemistry to do the following: Sample both SGs. Frisk the samples. Report frisk results. Analyze samples for boron and activity.
RO: Check SIAS, CIAS and EBFAS actuation. Check adequate Safety Injection flow. Notes "e" HPSI pump has tripped. May attempt restart of "C" HPSI Pump. Reports "A" & "8" HPSI pumps have no power. 24C or 24E must be restored.
Simulator Exercise Guide Job Page 22 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ When "B" charging pump is swapped to 22F it will automatically start due to the already existing SIAS start signal. If energizing 24C from the RSST, this section will be used. Event 10: CVR 11 22FWhen directed, swap "B: charging pump to 22F. There will not be any safety injection flow from the HPSI pump until RCS pressure drops below 1250 psia. If the crew desires to energizing 24E from Unit 3 and requests power, give permission to take power up to the applicable limit. Unit 3 is not experiencing any power challenges and is operating normally.
RO: Directs PEO to swap "B" Charging pump power to Facility 2 (22F). Takes "B" Charging Pump out of "Pull-To-Lock". Verifies "B" Charging Pump running. US: Acknowledges "CO HPSI pump lost (no SI) and "A" & "B" HPSI pump without power. Directs 24C be reenergized by the RSST or Unit 3. RO/BOP: Appendix 23-B Energizing 24C from the RSST ' Verifies RSST energized on C-08. Checks for faults on 24C. Note: the fault on 24A may be seen as a fault on 24C and cause the crew to abandon efforts to restore 24C. If so, they should proceed to restore power to 24E from Unit 3 (following). Ensures breakers A304, A305 and A312 are open. (A305 would be closed on setup). Ensures A702 is closed. Put synch switch for A302 to "ON". Gets key #26 from cabinet and places all four ESAS "UV BUS A3" in "INHIBIT". Presses "UV RESET" button on Cabinet 5.
Simulator Exercise Guide Job Page 23 of 29 SEG# ES10ll4 (Spare) Rev; _0_ CT-1 (LOCA-9):
Manually establish the required minimum safety injection flow. Restore a running HPSI pump within 30 minutes of entry into EOP 2532. If energizing 24E from Unit 3, this section will be used. CT-1 (LOCA-9):
Manually establish the required minimum safety injection flow. Restore a running HPSI pump within 30 minutes of entry into EOP 2532. Appendix 23-B, Energizing 24C from the "A" RBCCW and SW pumps in P-T-L. Both AFW Override switches in P-T-L. 10. Override off "A" HPSI, LPSI and CS pumps. 11. Close A302 to energize 24C. Start the "A" HPSI pump and verify adequate US: Verifies SI flow Appendix 23-N, Energizing 24E from Unit Checks no faults on 24E. Verifies 24E supply from Unit 3 has voltage. "B" HPSI, SW and RBCCW pumps off. Ensure A305 and A408 are open. Verifies permission granted from Unit 3. Put synch switch for A305 to "ON" and check "INCOMING" voltage. Close A305 to energize 24E. Check voltage indicated on "RUNNING". Put synch switch for A305 to "OFF". Start the "B" HPSI pump and verify adequate US: Verifies SI flow BOP: Verifies switchgear room cooling. RO: Stop RCPs as necessary (may have been secured earlier if NPSH was lost).
Simulator Exercise Guide Job Page 24 of 29 SEG# ES10Ll4 (Spare) Rev: _0_ D Place PZR spray controller(s) in manual and close. D Place HIC-4165 in manual and close. RO/BOP: Verifies PORVs closed, letdown isolated, RCS sample valves closed. Notes indication of leakage into RBCCW RM-6038, RBCCW Rad. Monitor, rising. RBCCW Surge Tank level rising (C06) US: Directs any operating RCPs be secured. Directs RBCCW CTMT Header Isolation Valves be closed. BOP: Stops the operating RCPs. Places associated pressurizer spray valve controller RC-100E or RC-100F in manual and closed. Places TIC-4165, steam dump TAVG controller, in manual and closed.
SEG# ES10Ll4 (Spare) Rev; _0_ FLOOR INSTRUCTOR CT-2 (LOCA-3) Establish CTMT Isolation.
Isolate CTMT by closing at least one isolation valve at each penetration.
Isolate CTMT by closing at least one isolation valve at each penetration.
and/or CT-2 (LOCA-6) Isolate RCS Leakage. Isolate or attempt to isolate locations that may be the source of the loss of coolant. Note: As a minimum, RB-30.1 Band must be CT-3 (LOCA-3):
and/or CT-2 (LOCA-6) Isolate RCS Leakage.
Initiate a plant A plant cooldown at a rate of greater 40&deg;F/hr should be initiated within one following an unisolable LOCA, until condenser steam dump valves or ADVs full Simulator Exercise Guide Job Aid BOOTH INSTRUCTOR Event 11: 05A1A2S9 CLOSE 05A1AS12 CLOSE if directed to close RB-30.1 A and RB-37.1 locally, trigger Event Then do the following to close the Open the "Insight" window. In "Insight", open the file "johnccrbvalves.tis" . Set the values for both valves to "0.0". Note: The Crew may need to continue to monitor indications to ensure the LOeA has been redirected into CTMT. Page 25 of 29 STUDENTS BOP: Q Closes Fac. 1 RBCCW CTMT header isolation valves: RB-30.1A, RB-37.2A.
Isolate or attempt to isolate locations that may be the source of the loss of coolant.
o If 24C has not been restored, directs a PEO to close the valves locally. Q Closes Fac. 2 RBCCW CTMT header isolation valves: RB-30.1B and RB-37.2B.
CT-3 (LOCA-3): Initiate a plant cooldown.
Q Verifies LOCA is no longer outside Q Directs/places hydrogen analyzer in Crew: Verifies SIAS, CIAS, EBFAS, MSI, CRACS, CAR fan operation, as necessary. Q Verifies adequate instrument air US: Directs Crew initiate a controlled cool down and depressurization of RCS. Q Initiates a plant cool Opens steam dump valves. Establishes 40 -100 &deg;F/hr cool down.
A plant cooldown at a rate of greater than 40&deg;F/hr should be initiated within one hour, following an unisolable LOCA, until the condenser steam dump valves or ADVs are full open.
Simulator Exercise Guide Job Page 26 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ RO: Depressurizes RCS (as necessary) using Auxiliary Spray Flow. The scenario may be terminated once a plant I Restore simulator references/procedures.
 
Crew: cooldown has been initiated, or at the discretion Standby for questions from Examiners.
Simulator Exercise Guide Job Aid                                Page 6 of 29 SEG# ES10Ll4 (Spare)  Rev; _0_
of the Lead Examiner.
o ENSURE TRex Workstation is operating.
o VERIFY the most current approved training load is loaded.
o RESET to IC-83 (-45% power, BOL) o If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.
o As needed, RESET Computer Terminals (At Power displays if 100% power IC).
o ENSURE SG blowdown values in PPC Plant Calorimetric are reset.
o ENSURE RCS Leak Rate is reset in PPC.
o ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).
o ADVANCE chart recorders.
o ENSURE the appropriate Protected Train placard is hung (A TRAIN PROTECTED).
o ENSURE appropriate signs are in place on simulator doors.
o ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.
o If necessary, ENSURE Simulator fidelity items cleared.
o ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).
o If required, OVERRIDE annunciators that will be lit long-term in the Control Room.
o ENTER Initial Malfunctions / II0s I Remote Functions.
o PLACE Simulator to RUN.
o If placing Equipment OOS, then PERFORM necessary switch manipulations and HANG appropriate tags, as required for the following:
a  "A" and  "c" Condensate Pumps running and "B" Condensate Pump in standby.
o  24E aligned to 24C.
o  "A" EDG OOS.
o  "Bn Main Feedwater Pump OOS.
o PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
 
iiilv DominIOn
-
* Simulator Exercise Guide Job Aid                           Page 7 of 29 FLOOR INSTRUCTOR                                BOOTH INSTRUCTOR                                   STUDENTS
: 1. INITIAL CONDITIONS:                            ENTER or VERIFY the following Initial      N/A
* IC-18                                    Malfunctions 1II0s I Remote Functions:
* Mode: 1                                  CI  Ensure 24E aligned to 24C.
* Burnup:MOL                                CI  Ensure "A" & "C" Condensate Pumps
* Power: 45%                                    are running and "B" is in standby.
* Boron: (CB): XXX ppm                      CI  "An Main Feedwater Pump tagged out.
* Temperature: Tave 563&deg;F                  CI  "A" EDG tagged out.
* Pressure: 2250 psia                          EGR17 (RO) "A" EDG Bkr. tagged out.
EGR12 (CLOSED) "An EDG Air Start isol.
* Xenon: Increasing
* Rods: Gp 7 at 165
* Generator: 405 MWe
: 2. SIMULATOR SETUP:                                                                          N/A COMPLETE Simulator Setup Checklist CI As necessary. PERFORM I.V. of Initial Malfunctions 1II0s I Remote Functions entered.
: 3. PRE*SCENARIO:                                                                            Review Log keeping responsibilities per the Gold Standard Book. page 23 & 24.
CI BRIEF the crew on purpose of this session and REVIEW objectives (if necessary).
D  lE this is the first simulator scenario of the week, THEN REVIEW the Plant/Simulator Differences List with the crew.
: 4. TURNOVER: PERFORM the crew turnover                                                      US brief crew on plant conditions and any major (Turnover Sheet) with the SM.                                                            equipment OOS. (All) Walk down control boards and let US know when they are ready.
D  Provide crew with partially completed No shift briefing is required or recommended.
OP 2204 and brief on existing conditions.
 
Simulator Exercise Guide Job Aid                                  Page 8 of 29 SEG#      ES10Ll4 (Spare)  Rev; _0_
flflCi{ity1 C;R.AC Shifts to Recirculation'>              creY/has the watch.~ndatthe/./
Mode/With Loss of Fan F-32A                  'JiscrAtionofthe Lea(l.Examlner*. ~rdtl~te ~1. .'
CRAC Facility 1 Radiation Monitor fails low,    Event 1: RM010 - 100%                                RO:
causing the system to shift to Recirculation RM-9799A fails high, causing "An Train of CRAC    I
* Observe "C.RA.C.S. IN AUTO RECIRC Mode. Shortly after this occurs, the Filter to shift to "Recirc." mode.                              MODE" annunciator (C-40) on C01 and Fan, F-32A, will trip due to broken fan belts overloading the motor.                                                                                  Facility 1 CRAC has shifted to recirc. mode.
* Reports observation to US.
US:
* Enters ARP-2590A-159, Automatic Function:
CRACS transfers to recirculation mode.
* Directs the RO to verify Facility 1 operating as designed in recirculation mode.
Event 1: CH08C - ON (5 second delay)                RO: Per ARP 2590A-159 CHHS8006_1 (NG) (5 second delay)                    1. Verifies Facility 1 CRAC has shifted to F-32A green light out                                    recirculation mode.
: 1. PLACE "NORM/RECIRC MODE, HS-8346" CHHS8006_1 (NR) (5 second delay)
AND "NORM/RECIRC MODE, HS-8359" F-32A red light out switches in "RECIR" (C-2SA and C-25B).
If requested, call as a PEO to report fan F-32A      2. Check damper positions.
belts have failed and appear to have caused the      3. Verify both Filter Fans running. Notes F-32A fan to trip.                                            not running or tripped.
* Reports observation to US.
TM1, AE1                                            US: Per ARP 2590A-159
* Receive report of F-32A failure.
* Direct RO to secure Fac. 1 CRAC and start Fac. 2 CRAC per OP-2315A, Control Room Air Conditioning System.
* Enters TSAS 3.7.6.1a.; One train ofCRAC inoperable.
 
Simulator Exercise Guide Job Aid                      Page 9 of 29 SEG#      ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR            BOOTH INSTRUCTOR                            STUDENTS RO: Per ARP 2S90A-1S9
: 5. Per OP-231 SA. shifts from Fac. 1 to Fac. 2 CRAC operating.
5.1. VERIFY "CRACS SPL Y FAN F21 B. HS 8010" and "CRACS EXH FAN F31B, HS 8000" running (C-2SB).
5.2. CHECK "F-21 B, EXH DMPR. HV-203B" and "F-31 B, EXH DMPR, HV-206B" open (C-2SB).
5.3. VERIFY "CRACS SPLY FAN F21A. HS 8009" and "CRACS EXH FAN F31A. HS 8001" not running (C-2SA).
5.4. CHECK "F-21A. EXH DMPR. HV-203A" and "F-31A, EXH DMPR, HV-206A" closed (C-2SA).
5.5. CHECK "F-32B EXH DMPR, HV-212B,"
indicates open (red light lit) (C-25B).
: 9. Verifies one complete train (Fac. 2) of CRAC operating.
The crew may attempt to return CRAC to                          US/RO: Per ARP 2590A-1S9 "NORMAL" but will be unable to with the failed rad monitor.
* Receives report; Fac. 2 CRAC in service.
: 12. Notes probable failure of RM-9799A and enters TSAS 3.3.3.1. Action 16; Control Room Isolation Rad Monitor inoperable.
* Makes required notifications for troubleshooting and repairs.
 
Simulator Exercise Guide Job Aid                                  Page 10 of 29 SEG#    ES10Ll4 (Spare) Rev; _0_
: 2. Condenser Tube Leak (s~awa(~r) in the "c" Water Box.
Event 2: CW04C -10 gpm (100%)                    BOP:
Main Condenser tube leak in the  "cn water box.
* Observe "CONDENSATE DEMIN SYSTEM TROUBLE" annunciator (A-16) on C05.
When the Demin System Trouble alarm comes in, call as Chemistry and report
* Reports observation to US.
indication of a tube leak in "C n Water Box.
* Utilize the ARP for "C" HOTWELL COND LEVEL HI annunciator (BA-17) on C05.
TM2, AE2                                            (Hotwell conductivity recorders will already be pegged high with all alarms active due to the low power level).
If necessary, call as the SM and remind the      US: AOP 2516, Condenser Tube Leak US that the PPC conductivity screen will not update with rising conductivity.
* Notes actions under ARP 2590D-061 under Chemistry jurisdiction.
* Enters ARP-2590D-067, HOTWELL COND LEVEL HI (C05, BA-17), go to AOP 2516.
* Enters AOP-2516, Condenser Tube Leak.
3.1 N/A 3.2 Notes CPF demins. are operating in Amine form, references OP-2316A, Main Steam System, and directs BOP to secure SG blowdown.
BOP:
* Per OP-2316A, closes MS-220A & -220B and MS-145A & -145B
* Verifies PPC indicates zero blowdown flow.
* Reports completion to US.
If Chemistry samples are requested, inform      US:
US samples have already confirmed "c" 3.5 Determines "C" water box should be water box has a tube leak.
isolated and references AOP-2516, section 6.0. Isolate "C" Water Box
 
Simulator Exercise Guide Job Aid                              Page 11 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR                    BOOTH INSTRUCTOR                                    STUDENTS AOP 2516 Condenser Tube leak 6.1-6.3 N/A 6.4 Directs the BOP to stop the "C* Circ. Pump BOP:
6.4 Per AOP-2516, secures "C" Circ. Pump by tripping or lowering VFD.
US: Directs the BOP to perform the following:
6.5 Close CW-11 F, "C" water box inlet.
6.6 Monitor RBCCW & TBCCW temperatures.
6.8 Ensure CW-11C, *C" water box outlet open.
Event 8:                                    US (or BOP): Directs a PEO to:
FWR53 (CLOSE) "C" condenser air isolation. 6.9    Close AR-1C, condenser "C" isolation stop.
CWR04A (CLOSE) "C* water box outlet and inlet stops.                                6.10  Close VP-1C & -1G, "C" water box outlet &
VP-9C us not modeled.                              inlet stops.
6.11  Open VP-9C, *C" water box inlet vent.
When valves linked to Event 8 have reached  6.12  (Crew/BOP) Monitor condenser vacuum.
their demand position, inform the crew that  6.13  Deenergize cathodic protection.
all PEO actions are completed.
6.14  (BOP) When directed, close CW-11C.
nd It is not necessary to actually start a 2 SJAE or the Mechanical Vacuum Pumps.
 
Simulator Exercise Guide Job Aid                                      Page 12 of 29 SEG#      ES10Ll4 (Spare)  Rev; _0_
: 3.                                            Wn~rl.*actiqn~* for #2 are cOR,Jpltieted. or<~tthe discretion. Qf~!:le~ead. Exarniner,initiate #3.
Event 3: RX04B - 85% (300 second ramp)            I RO:
* Observes and reports any of the following:
Channel "Y" Pressurizer Level transmitter fails high over a period of five minutes.
* Letdown flow rising.
* Pressurizer backup heaters energized.
TM3.AE3
* Level controller output rising.
* Actual level dropping (may not be diagnosed at this time).
* PRESSURIZER CH Y LEVEL HIILO annunciator (A-39) on C02-3 (delayed).
US: Enters ARP-2590B-217, annunciator A-39.
: 3. Notes indicated level is high.
: a. Backup charging pump has stopped.
: b. Letdown flow is at maximum (128 gpm)
: 5. Verifies TAVGIT REF recorder and Foxboro IIA indicate normal (RRS is not the problem).
The ARP assumes only one charging pump is                                                          US: Directs and the RO performs the following:
running. Therefore, when level control is nd transferred to Channel 'X', the 2 charging                                                        8.1 SHIFT "LTDN FLOW CNTL, HIC-110" to pump will restart automatically, unless the                                                            "MAN" (C-02).
charging pump control switches have been                                                          8.2 Adjust "LTDN CNTL. HIC-11 0" to stabilize changed from the initial setup of two running                                                          Pressurizer level and Letdown flow.
pumps.                                                                                            8.3 Commence forcing PZR sprays (in setup) 8.4 SHIFT PZR level control to channel "X".
8.5 RESTORE Letdown to automatic.
RO: (Restoring Letdown flow to automatic) 8.5.1 Adjust bias to "0".
8.5.2 Shift HIC-110" back to "AUTO."
8.5.3 Adjust bias to restore PZR level to setpoint.
8.5.4 Shift Pressurizer heater control "SEL SW" to channel "X".
 
Simulator Exercise Guide Job Aid                                Page 13 of 29 SEG#    ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR                    BOOTH INSTRUCTOR                                      STUDENTS
: 4. itA" Condensate Pump High Motor WhenHIC-110 is back in automatic, or at the.
Winding Temperature.            discretion of the Lead Examiner; initiate #4.
Event 4: FW23 - 100%                            BOP/Crew:
The "An Condensate Pump motor winding
* Observe "A" Condensate Pump high motor temperature will begin to rise abnormally high,    winding alarms on PPC MON 2.
causing control board and PPC alarms.
* Observe "CONDENSATE PUMP TM4, AE4                                          TROUBLE" alarm A-11 on C05 US/BOP:
* Enters ARP-2590D-041, annunciator A-11, CONDENSATE PUMP TROUBLE.
: 1. Notes "An Condensate Pump not tripped.
: 2. Notes "An Condensate Pump amps not high
: 3. Notes "An Condensate Pump motor winding temperature high and rising on the PPC.
* US - Directs "B" Condensate Pump be started.
* US - Directs "A" Condensate Pump be secured.
BOP Event 9: FW23 - 0% (ramp 5 minutes)
* Starts the "Bn Condensate Pump.
When "A" Condensate pump is secured,
* Secures the "An Condensate Pump and trigger Event 9 to ramp down high temp.            places it in Pull-To-Lock.
* Observes Condensate Header pressure.
 
Simulator Exercise Guide Job Aid                                Page 14 of 29 SEG#      ES10Ll4 (Spare)  Rev; _0_
    'Rapid Downpowerdue to failing SGFP.          When <S'Co.,d.pump is runnh\9; or atthe di~~retion oft~e L;ead:Exarniner; initiate #5.
Call as Turbine Engineer and inform the crew  US:
that the "An SG Feed Pump (SGFP) is making unusual noises and should be shut
* Enters AOP 2575, Rapid Downpower o Performs Focus Brief on Trip Criteria down as soon as possible. It is not necessary to trip the pump at this time.                and RCS Temperature Control.
o Requests SMISTA to make required TM5, AE5                                                notifications.
o Directs RO to initiate forcing sprays and to insert Group 7 CEAs 10 steps (while maintaining Reactivity oversight)
The US may not use a predetermined reactivity o    Determines which Reactivity Plan, plan due to the existing power level not directly RE-G-13, -14, or -15 may be used.
matching any existing plant generated by RE. In o Directs RO and BOP to coordinate a this case, reactivity thumbrules should be used.
rapid down power per the chosen plan.
RO:
* Initiates Forcing Sprays: (if not already) o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).
* Inserts Group 7 CEAs 10 steps and observes applicable parameters.
The US may direct Boration to be accomplished
* Initiates Boration from the RWST:
o Ensures at least one Charging Pump from the BAST to aI/ow for easier makeup to the is operating.
VeT. Borafion from the BAST (alternate o Ensures CH-196, VCT Makeup method) is in italics.
Bypass, is closed.
o Ensures CH-504, RWST to Charging Suction, is open.
o Opens CH-192, RWST Isolation.
o Closes CH-501, VCT Outlet.
o Starts a second Charaina Pum~.
 
Simulator Exercise Guide Job Aid                        Page 15 of 29 SEG# ES10Ll4 (Spare) Rev; _0__
FLOOR INSTRUCTOR        BOOTH INSTRUCTOR                              STUDENTS RO (alternate boration method):
* If Boration is from the BAST:
o Ensures the Makeup Flow Selector switch is in the DILUTE position.
o    Ensues FC-210X, Primary Makeup Water Flow controller, is set to "0".
o    Ensures CH-S12, Makeup Valves Stop, is closed.
o Ensures CH-196, VCT Makeup Bypass, is closed.
o    EnsuresCH-192, RWST Isolation. is closed.
o Ensures FC-210Y,Boric Acid Flow controller, is set to the predetermined flow rate.
o Opens CH-S04, RWST to Charging Suction.
o Place Makeup Mode Sel switch in MAN.
o Starts the selected Boric Acid and verifies discharge pressure is greater than 98 psig.
o    Opens CH 196, VCT Makeup Bypass.
o As required, refers to attachment and performs actions to maintain VCT level in the desired band.
BOP:
Reduces Turbine load to follow Reactor power to maintain Tc on program using the Load Limit Pot.
 
Simulator Exercise Guide Job Aid                                Page 16 of 29 SEG#                    Rev;_O_
FLOOR INSTRUCTOR                                BOOTH INSTRUCTOR                                      STUDENTS
: 6. Loss of Vital Bus 24C; Manual Plant Trip. When po~i~l()wered.by "'10%, orat the LOCA.lnitiates on the Plant Trip.        disereti()ll:oftheJ..ea.dExaminer, initiate #6.
Event 6: ED05A - ON Causes a fault on vital bus 24A which results in Directs the crew to manually trip the Reactor the following:                                  and perform EOP 2525. Standard Post Actions.
* NSST to 24A trips on the bus fault, deenergizing 24A and all non-Vital 4160/480 Queries RO and BOP on the status of Safety VAC power (unrecoverable).                  Functions as delineated in Eap 2525:
* 24C deenergizes causing Fac. 1 ESAS UV
* Reactivity Control (RO)
* The UV locks out the RSST to 24C.              o Status of the Reactor
* Because "A" EDG is OOS. 24C and all Vital
* Maintenance of Vital Auxiliaries (BOP) 4160/480 VAC power remain deenergized.
o Status of the Turbine
* 24C can be recovered, but not in time to prevent a required plant trip.                  o Status of Electrical Buses o Status of SW & RBCCW TM6, MA1 o Check one facility of CRAC operating Event 6: (+2 minutes) RC20B 308 gpm (56%)              (RO)
On the trip. a rupture will occur in the "An RCP
* RCS Inventory Control (RO) seal cooler. resulting in a Small Break LOCA.        o Pzr level & Subcooled margin (SCM),
value & trend TM7, MA2
* RCS Pressure Control (RO) o Pzr pressure, value & trend
* Core Heat Removal (RO) o RCP status o Loop delta-T o T H Subcooling Margin
* RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS Tc value and trend o S/G levels, value and trend oReS Subcooling Margin
 
Simulator Exercise Guide Job Aid                      Page 17 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR        BOOTH INSTRUCTOR                            STUDENTS
* Containment (CTMT) Isolation (RO) o Radmonitors inside CTMT, outside CTMT, steam plant o CTMT pressure <1 psig
* CTMT Temperature & Pressure Control (RO) o CTMT temperature and pressure value and trend RO:
* Presses all four Reactor Trip push buttons on C-04 and verifies the Reactor trips.
* Reactor has tripped, power is lowering, SUR is negative, all CEAs are inserted.
BOP:
Perform associated actions of EOP 2525 and report results when queried:
* Turbine tripped, stop valves are closed, 8T
                                                          & 9T are open, Megawatts are zero
* All electrical buses energized except for 24A and 24C (UA" EDG 005).
* Facilities 2 SW and RBCCW operating.
RO:
Performs associated actions of EOP 2525 and report results when queried:
* Control Room Air Conditioning Status
* Pressurizer level value and trend o PZR level lowering, all available charging pumps running, letdown flow at minimum.
 
Simulator Exercise Guide Job Aid                        Page 18 of 29 SEG#      ES10Ll4 (Spare) Rev; FLOOR INSTRUCTOR                BOOTH INSTRUCTOR                            STUDENTS RO:
* Pressurizer pressure value and trend o PORVs and Spray Valves are closed o When RCS pressure is less than 1714 psia, then SIAS, CIAS, and EBFAS have actuated (only Facility 2 powered).
o "A" & "C" RCPs secured due to no The remaining RCPs may be secured when RBCCW flow on loss of 24C.
the crew recognizes the leak in the "8" RCP Seal Cooler.                                                              o If Pressurizer pressure lowers to minimum NPSH, then all Reps are secured.
* Number of RCPs operating o Value and trend of loop Delta-T o Value and trend of subcooling
* If no RCPs operating, T AVG controller,TIC-4165 in manual/closed BOP:
Performs associated actions of EOP 2525 and reports results when queried:
* Value and trend of S/G pressures
* Operates steam dumps, as necessary, to control RCS T AVG *
* Value and trend of T c
* Value and trend of S/G levels
* Subcooling value / CET temperatures
 
Simulator Exercise Guide Job Aid                      Page 19 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR        BOOTH INSTRUCTOR                          STUDENTS RO:
Continues with associated actions of EOP 2525 and reports results when queried:
* Rad monitors:
o Inside CTMT; not going up or in alarm o Outside CTMT; RM-6038, RBCCW going up and/or in alarm.
US/BOP/RO: RBCCW Surge Tank level rising o Steam Plant; not going up or in alarm.
* CTMT temperature/pressure rising slowly.
o  2 CAR Fans and "B" Aux Circ. Fan running in slow.
o  Starts "B" PIR Fan.
BOP:
Continue with Subsequent Actions:
* Opens HD-106, Subcooling Valve
* Stops both Heater Drains Pumps
* Secures all but one Condensate Pump
* Verifies Main Feed Pump operating.
o Closes FW-42B, Main Feed Block Valve.
o Ensure both Main Feed Reg Bypass Valves are throttled to 40%
* Checks IA Header pressure is >90 psig and stable.
US:
Query RO & BOP regarding the status of EOP 2525 subsequent actions.
 
Simulator Exercise Guide Job Aid                      Page 20 of 29 SEG# ES10Ll4(Sparel Rev; _0_
FLOOR INSTRUCTOR      BOOTH INSTRUCTOR                            STUDENTS RO/BOP:
When asked, report that Subsequent Actions are complete and verified.
US:
* At the completion of EOP 2525, Diagnostic Flow Chart, determines that a LOCA inside Containment has occurred and goes to EOP 2532, Loss of Coolant Accident.
* Places Master Silence Switch in NORM.
* Notes the need for the SM to complete EPI FAP06-002, classify the event as an Alert, Charlie-1, and make appropriate notifications.
 
Simulator Exercise Guide Job Aid                            Page 21 of 29 SEG#    ES10Ll4 (Spare)  Rev;
: 1. LosS of High Pressure6afety/((1ject;on~ Once EOP 2532 discretion of the Event 7: RC208 550 gpm (100%)                US:
Raise the severity of the "8" RCP Seal        o  Enters EOP 2532, Loss Of Coolant Accident Cooler tube rupture to maximum.
o  Directs performance of SFSC o  Directs Chemistry sample S/Gs Event 27 (RCS Pres < 1600 psia): SI04C - ON I 0  Directs SM to classify the event Initiate a trip of the "C" HPSI Pump when RCS pressure drops below 1600 psia, causing the o  Opens Place keeper and ENTER the EOP entry time loss of the only running High Pressure Safety Injection Pump.                              o  Ensures the master silence switch is in "NORMAL" TM8, EM1 US/BOP:
o  Opens both SG sample valves.
o  Directs Chemistry to do the following:
o  Sample both SGs.
o  Frisk the samples.
o  Report frisk results.
o  Analyze samples for boron and activity.
RO:
o  Check SIAS, CIAS and EBFAS actuation.
o  Check adequate Safety Injection flow.
o  Notes  "e" HPSI pump has tripped.
o  May attempt restart of "C" HPSI Pump.
o  Reports "A" & "8" HPSI pumps have no power. 24C or 24E must be restored.
 
Simulator Exercise Guide Job Aid                                Page 22 of 29 SEG#      ES10Ll4 (Spare)  Rev; _0_
RO:
Event 10: CVR 11 22F When "B" charging pump is swapped to 22F it will automatically start due to the already IWhen directed, swap "B: charging pump to 22F.
o  Directs PEO to swap "B" Charging pump power to Facility 2 (22F).
existing SIAS start signal.                                                                        o  Takes "B" Charging Pump out of "Pull-To-Lock".
o  Verifies "B" Charging Pump running.
There will not be any safety injection flow    US:
from the HPSI pump until RCS pressure drops below 1250 psia.                         o  Acknowledges "CO HPSI pump lost (no SI) and "A" & "B" HPSI pump without power.
o  Directs 24C be reenergized by the RSST or Unit 3.
If energizing 24C from the RSST, this            If the crew desires to energizing 24E from    RO/BOP:
section will be used.                           Unit 3 and requests power, give permission    Appendix 23-B Energizing 24C from the RSST to take power up to the applicable limit. Unit                '
3 is not experiencing any power challenges    1. Verifies RSST energized on C-08.
and is operating normally.                    2. Checks for faults on 24C.
Note: the fault on 24A may be seen as a fault on 24C and cause the crew to abandon efforts to restore 24C. If so, they should proceed to restore power to 24E from Unit 3 (following).
: 3. Ensures breakers A304, A305 and A312 are open. (A305 would be closed on setup).
: 4. Ensures A702 is closed.
: 5. Put synch switch for A302 to "ON".
: 6. Gets key #26 from cabinet and places all four ESAS "UV BUS A3" in "INHIBIT".
: 7. Presses "UV RESET" button on Cabinet 5.
 
Simulator Exercise Guide Job Aid                      Page 23 of 29 SEG#      ES10ll4 (Spare) Rev; _0_
RO/BOP:
Appendix 23-B, Energizing 24C from the RSST
: 8.  "A" RBCCW and SW pumps in P-T-L.
: 9. Both AFW Override switches in P-T-L.
: 10. Override off "A" HPSI, LPSI and CS pumps.
: 11. Close A302 to energize 24C.
CT-1 (LOCA-9): Manually establish the                                RO:
required minimum safety injection flow.
Restore a running HPSI pump within 30                                Start the "A" HPSI pump and verify adequate SI.
minutes of entry into EOP 2532.                                      US: Verifies SI flow adequate.
If energizing 24E from Unit 3, this section                          RO/BOP:
will be used.                                                        Appendix 23-N, Energizing 24E from Unit 3
: 1. Checks no faults on 24E.
: 2. Verifies 24E supply from Unit 3 has voltage.
: 3.  "B" HPSI, SW and RBCCW pumps off.
: 4. Ensure A305 and A408 are open.
: 5. Verifies permission granted from Unit 3.
: 6. Put synch switch for A305 to "ON" and check "INCOMING" voltage.
: 7. Close A305 to energize 24E.
: 8. Check voltage indicated on "RUNNING".
: 9. Put synch switch for A305 to "OFF".
CT-1 (LOCA-9): Manually establish the                                RO:
required minimum safety injection flow.
Restore a running HPSI pump within 30                                Start the "B" HPSI pump and verify adequate 51.
minutes of entry into EOP 2532.                                      US: Verifies SI flow adequate.
BOP:
o  Verifies switchgear room cooling.
RO:
o  Stop RCPs as necessary (may have been secured earlier if NPSH was lost).
 
Simulator Exercise Guide Job Aid                      Page 24 of 29 SEG# ES10Ll4 (Spare) Rev: _0_
D  Place PZR spray controller(s) in manual and close.
D  Place HIC-4165 in manual and close.
RO/BOP:
D  Verifies PORVs closed, letdown isolated, RCS sample valves closed.
D  Notes indication of leakage into RBCCW o  RM-6038, RBCCW Rad. Monitor, rising.
o  RBCCW Surge Tank level rising (C06)
US:
D  Directs any operating RCPs be secured.
D  Directs RBCCW CTMT Header Isolation Valves be closed.
BOP:
D  Stops the operating RCPs.
D  Places associated pressurizer spray valve controller RC-100E or RC-100F in manual and closed.
D  Places TIC-4165, steam dump TAVG controller, in manual and closed.
 
Simulator Exercise Guide Job Aid                              Page 25 of 29 SEG#      ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR                              BOOTH INSTRUCTOR                                    STUDENTS CT-2 (LOCA-3) Establish CTMT Isolation.      Event 11: 05A1A2S9 CLOSE                      BOP:
Isolate CTMT by closing at least one 05A1AS12 CLOSE                  Q   Closes Fac. 1 RBCCW CTMT header isolation valve at each penetration.
isolation valves: RB-30.1A, RB-37.2A.
and/or                    if directed to close RB-30.1 A and RB-37.1 A CT-2 (LOCA-6) Isolate RCS Leakage.          locally, trigger Event 11.                        o   If 24C has not been restored, directs a Isolate or attempt to isolate locations that Then do the following to close the valves:            PEO to close the valves locally.
may be the source of the loss of coolant. 1. Open the "Insight" window.
Q   Closes Fac. 2 RBCCW CTMT header
: 2. In "Insight", open the file Note: As a minimum, RB-30.1 Band RB-37.2B                                                      isolation valves: RB-30.1B and RB-37.2B.
must be closed.                                  "johnccrbvalves.tis" .
: 3. Set the values for both valves to "0.0".
Note: The Crew may need to continue to        US/CREW:
monitor indications to ensure the LOeA has Q   Verifies LOCA is no longer outside CTMT.
been redirected into CTMT.
US/CREW:
Q   Directs/places hydrogen analyzer in service.
Crew:
Verifies SIAS, CIAS, EBFAS, MSI, CRACS, CAR fan operation, as necessary.
US/BOP:
Q   Verifies adequate instrument air pressure.
US:
Directs Crew initiate a controlled cool down and depressurization of RCS.
CT-3 (LOCA-3): Initiate a plant cooldown.                                                  BOP:
A plant cooldown at a rate of greater than 40&deg;F/hr should be initiated within one hour,                                              Q   Initiates a plant cool down.
following an unisolable LOCA, until the                                                        o    Opens steam dump valves.
condenser steam dump valves or ADVs are full open.                                                                                    o    Establishes 40 -100 &deg;F/hr cool down.
 
Simulator Exercise Guide Job Aid                          Page 26 of 29 SEG#     ES10Ll4 (Spare) Rev; _0_
RO:
IJ  Depressurizes RCS (as necessary) using Auxiliary Spray Flow.
The scenario may be terminated once a plant       I Restore simulator references/procedures. Crew:
cooldown has been initiated, or at the discretion                                           Standby for questions from Examiners.
of the Lead Examiner.
 
Simulator Exercise Guide
'Dominion"'
'Dominion"'
Simulator Exercise Guide Job Aid Page 27 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ Description MALFUNCTIONS RM010 -Rad. Monitor RM-9799A on CRAC, fails CHOSC -CRAC Filter Fan "A", F-32A, CW04C -Main Condenser tube leak in the "C" water RX04B -Ch. 'V' Pressurizer Level transmitter, LT-110Y, fails to 2350 FW23 -"A" Condensate Pump Motor Winding Temperature High. ED05C -Major fault on bus 24A (loss of Facility One 4160/480 VAC). RC20A; Seal Cooler Rupture in RCP "An (2 minute delay) RC20A; Seal Cooler Rupture in RCP "A" (Increase in severity)
Job Aid                     Page 27 of 29 SEG# ES10Ll4 (Spare)           Rev; _0_
SI04C -'c' HPSI Pump trip. REMOTE FUNCTIONS EGR12 -"A" EDG Air Start Valves () EGR17 -"A" EDG Breaker () OVERRIDES I Event Trigger NA 0 NA 0 0 NA 300 NA 0 NA 0 6 2 min. 0 6 NA 0 7 NA 0 27 I Severity I Final I Or Value Value 0.1 mr/Hr I (0%) NA 1 2 10gpm (100%) 3 2350 psia I (85%) ON I 4 5 ON 6 308 gpm (56%) 7 550 gpm (100%) 8 ON 9 0
I        I Event Severity    I  Final IRelative Description                                                     Trigger Or Value      Value    Order MALFUNCTIONS RM010 - Rad. Monitor RM-9799A on CRAC, fails low.                                      NA        0          1    0.1 mr/Hr  I            1 (0%)
Simulator Exercise Guide 'Dominion'" Job Page 28 of 29 ES10Ll4 (Spare) Rev; _0_ Mark with an "X" Yes or No for any of the following.
CHOSC - CRAC Filter Fan "A", F-32A, trips                                              NA        0          2        NA                  2 CW04C - Main Condenser tube leak in the "C" water box.                                          0          3      10gpm                  3 (100%)
If the answer is No, include an explanation after the item. Yes No The desired initial condition(s) could be achieved.
RX04B - Ch. 'V' Pressurizer Level transmitter, LT-110Y, fails to 2350 psia.            NA      300        4    2350 psia I        I  4 (85%)
o All malfunctions and other instructor interface items were functional and responded to o support the simulator Scenario. All malfunctions and other instructor interface items were initiated in the same sequence o described within the simulator scenario. All applic;able acceptance criteria were met for procedures that were used to support the o simulator scenario. During the simulator scenariO, observed changes corresponded to expected plant o response. Did the scenario satisfy the learning or examination objectives without any significant o simulator performance issues, or deviations from the approved scenario sequence? The simulator is capable of being used to satisfy learning or examination objectives without o exceptions, significant performance discrepancies, or deviation from the approved scenario sequence.
FW23 - "A" Condensate Pump Motor Winding Temperature High.                             NA      0          5        ON                  5 ED05C - Major fault on bus 24A (loss of Facility One 4160/480 VAC).                   NA        0          6        ON                  6 RC20A; Seal Cooler Rupture in RCP "An (2 minute delay)                               2 min. 0          6    308 gpm                7 (56%)
Any identified Critical Tasks possesses the following elements o (NUREG-1 021): Essential to safety with adverse consequences or
RC20A; Seal Cooler Rupture in RCP "A" (Increase in severity)                          NA      0          7    550 gpm                8 (100%)
SI04C - 'c' HPSI Pump trip.                                                             NA      0          27        ON                  9 REMOTE FUNCTIONS
                                                                                                                        ~~~EDI EGR12 - "A" EDG Air Start Valves ()                                                                                                       0 EGR17 - "A" EDG Breaker ()                                                                                                               0 OVERRIDES
 
Simulator Exercise Guide
'Dominion'"
Job Aid                                  Page 28 of 29 SEG# ES10Ll4 (Spare)               Rev; _0_
Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.
Yes     No
: 1. The desired initial condition(s) could be achieved.                                                       o
: 2. All malfunctions and other instructor interface items were functional and responded to                   o support the simulator Scenario.
: 3. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
o
: 4. All applic;able acceptance criteria were met for procedures that were used to support the simulator scenario.
o
: 5. During the simulator scenariO, observed changes corresponded to expected plant response.
o
: 6. Did the scenario satisfy the learning or examination objectives without any significant                   o simulator performance issues, or deviations from the approved scenario sequence?
: 7. The simulator is capable of being used to satisfy learning or examination objectives without exceptions, significant performance discrepancies, or deviation from the approved scenario o
sequence.
: 8. Any identified Critical Tasks possesses the following elements (NUREG-1 021):
o
* Essential to safety with adverse consequences or significant degradation,
* Cue(s) prompt the Operator to respond.
* Cue(s) prompt the Operator to respond.
* Defined and measurable performance indicators.
* Defined and measurable performance indicators.
* Performance The use of uN/A" is allowed for item 8 only if this is NOT an Discrepancies noted (Check "none" or list items in comments None [8J Comments:
* Performance feedback.
Validator:
The use of uN/A" is allowed for item 8 only if this is NOT an evaluated scenario.
Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Discrepancies noted (Check "none" or list items in comments field)                                      None     [8J Comments:
Simulator Exercise Guide Job Aid Page 29 of 29 SEG# ES10Ll4 (Spare) Rev; _0_ SIMULATOR TRAINING SHIFT TURNOVER REPORT DATEnTIME Toda:i 0515 I PREPARED BY Unit SUl2ervisor I"NIGHT" Shift I SHIFT 18:00 -06:00 PLANT STATUS: Mode: 1 Rx Power: 45% Megawatts:
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Thermal: 1215 MWTH PZR Pressure:
 
2?50 psia Electric:
Simulator Exercise Guide Job Aid                                   Page 29 of 29 SEG# ES10Ll4 (Spare)                 Rev; _0_
405 MWe RCS T-AVE: sa3degF RCS Leakage: Identified:
SIMULATOR TRAINING SHIFT TURNOVER REPORT DATEnTIME                                 PREPARED BY Toda:i 0515 PLANT STATUS:
0.015 gpm Protected Train/Facility:
I         Unit SUl2ervisor I"NIGHT" Shift         I           SHIFT 18:00 - 06:00 Mode: 1                                                         Rx Power:     45%
TRAIN Unidentified:
Megawatts: Thermal:           1215 MWTH                           PZR Pressure:   2?50 psia Electric:     405 MWe                             RCS T-AVE:     sa3degF RCS Leakage: Identified:         0.015 gpm                 Protected Train/Facility:   TRAIN Unidentified: 0.036 gpm DatelTime: Today 0015 Active Tracking Records and Action Statements Equipment/Reason LCO           ~ Action I Date I Time in LCO     I             Action Requirement Time Left 2-U-AIL, See AIL for details I       I                 I                                                 I 00 Compensatory Actions I Temp Logs Watch Open Date         Class Reason                                   Reason Position PLANT SYSTEMS APC System                                                           Notes I CROSS UNIT SYSTEM STATUS U3 Power to 24E         I 34A aligned to 24E SURVEILLANCES f EVOLUTIONS IN PROGRESS OP 2204           I Steady State Operation at 45% power.
0.036 gpm DatelTime:
REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES f SPREAD SHEET FOR ADDITIONAL INFO)
Today 0015 Active Tracking Records and Action Statements Equipment/Reason LCO Action I Date I Time in LCO I Action Requirement Time Left 2-U-AIL, See AIL for details I I I I 00 Compensatory Actions I Temp Logs Watch Open Date Class Reason Reason Position PLANT SYSTEMS APC System Notes I CROSS UNIT SYSTEM STATUS U3 Power to 24E I 34A aligned to 24E SURVEILLANCES f EVOLUTIONS IN OP 2204 I Steady State Operation at 45% REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES f SPREAD SHEET FOR ADDITIONAL INFO) Current Rod Height ARO@165 Xenon Trend Rising Current Boron 700 ppm Boron Pot Setting f Blend Ratio to 1 (corrected)}}
Current Rod Height     ARO@165 Xenon Trend     Rising Current Boron     700 ppm Boron Pot Setting f Blend Ratio         to 1 (corrected)}}

Revision as of 10:48, 12 November 2019

Draft Operating Exam (Sections a, B, and C) (Folder 2)
ML113500251
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/03/2011
From: Armstrong L
Operations Branch I
To: Peter Presby
Operations Branch I
JACKSON D RGN-I/DRS/OB/610-337-5306
Shared Package
ML102850247 List:
References
U01834
Download: ML113500251 (332)


Text

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

~IPM Number: JPM-A1.1R Revision: -~-

0 II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

~~ ec mea eVlewer IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 10

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 10

JPM Number: JPM-A1.1R Rev. ___0::....-.__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-A1.1R Rev. ____O~__

Task Title:

System: Auxiliary Feedwater Time Critical Task: Yes

--

No x Validated Time (minutes): 25 Task No.(s):

Applicable To: SRO RO X PEO

--- ---

KIA No. 2.2.13 KIA Rating _---...:4.;;;...1:..:..../4..:..;;*.;;;..3_ _

Method of Testing:

Simulated Performance: Actual Performance: X


----=-.;-

Location:

Classroom: X Simulator: - - - In-Plant:


-----

Task Standards: At the completion of this JPM, examinee determines the required configuration of system components to provide boundary isolation for maintenance on 2-FW-BB.

Required Materials

  • 25203-26005 SH.3 (Condensate Storage and Aux Feed).

(procedures. equipment. etc.):

  • 25203-30005 (Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C, 24D (A3, A4>>
  • OP 2322-001.
  • Blank clearance section form.

I

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job erformance measure will be satisfied. You ma use an a roved reference materials Page 3 of 10

JPM Number: JPM-A1.1R Rev. ___0_ __

JOB PERFORMANCE MEASURE WORKSHEET (continued) normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Initiating Cues:

  • Determine the proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-88. "8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.

Initial Conditions:

  • Unit-2 is in Mode 5 for a refueling outage.
  • The Work Control SRO has asked for your help determining a proper clearance boundary and tag type (color) for an emergent inspection of 2-FW-88 ("8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve).
  • There is evidence that this valve may be leaking by, and the Maintenance Department will be performing a seating surface and general condition inspection.

Simulator

  • Not applicable.

Requirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 10

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

,,~II~Jj'~"AA,I. '

~H~"ttif.11';"I~1 _____

1. Obtain the required material for Examinee determines and requests the N determination of clearance boundary. required material for determination of clearance boundary.
  • P&ID 25203-26005 SH.3 (Condensate Storage and Aux Feed).
  • P&ID25203-30005 (Single Line Meter

& Relay Diagram 4.16KV Emerg.

Buses 24C, 24D)

  • Aux Feed Valve line-upr OP 2322-001

Page 5 of 10

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

2. (OP-AA-200 3.2.2g). Examinee establishes a clearance ESTABLISH the tagging sequence. WHEN boundary with the following components procedural guidance exists, THEN the and sequencing. (See attached Answer procedure takes precedence over the Key) normal sequence of isolation. The normal sequence of isolation is as follows:

POSITION control switch

  • Examinee CAUTION tags "P9B-HS N (HANDSWITCH FOR "B" AUXILAIRY FEEDWATER PUMP" control switch indicating that the breaker is racked down
  • REMOVE power from component(s)
  • Examinee removes power from "B" y MDAFP by "RACKING DOWN" 4160VAC breaker (A406).

Cue:

Comments:

Page 6 of 10

PERFORMANCE INFORMATION JPM Number: JPM-A1.1R STEP PERFORMANCE STANDARD

3.
  • ISOLATE component/system from high ISOLATE component/system from high pressure side to low pressure side pressure side to low pressure side by Danger Tagging "CLOSED":

2-FW-9B (liB" AUX FEED DISCHARGE y STOP VALVE) 2-FW-S2C ("B" AUX FEED y*

RECIRCULATION STOP VALVE) 2-CN-29B ( "B" AUX FEED PUMP y*

SUCTION ISOLATION) 2-FIRE-94B (liB" AUX FEED PUMP y*

EMERGENCY FIRE WATER SUPPLY VALVE)

  • The exact sequence of suction side/recirculation alignment is NOTcritical. However, the discharge stop must be closed first.

Page 7 of 10

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

4.
  • OPEN drain valve(s) Examinee tags open one or both of the following drain valves and one or both of OPEN vent valve(s) the following vent valves:

2-CN-332 ( "8" AUX FEED PUMP y*

SUCTION HEADER DRAIN) 2-CN 331 ("8" AUX FEED PUMP y*

DISCHARGE HEADER DRAIN VALVE) 2-CN-330 (U8" AUX FEED PUMP CASING I Y*

VENT VALVE) 2-CN-329 ("8" AUX FEED PUMP CASING I y*

VENT VALVE)

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

Page 8 of 10

JPM Number: JPM-A1.1R Rev. ___0=---__

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

--

Validated Time (minutes): 25 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

DuringthQTPEt"tnetraineQ * ~. .L'",' . .**., .,. . ' > , *..... ". "*..*

'''.'

. . *'. . . . . . >;!;i,~,EvaIUatlon;* . .......,.

performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

, never put anyone's safety at risk. Pass I Fail never ~ut equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 9 of 10

JPM Number: JPM-A1.1R Rev.

- - -o - -

STUDENT HANDOUT Initiating Cues:

  • Determine the proper safety clearance boundary for an inspection and possible repairireplacement of 2-FW-88, "8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.

Initial Conditions:

  • Unit-2 is in Mode 5 for a refueling outage.
  • The Work Control SRO has asked for your help determining a proper clearance boundary and tag type (color) for an emergent inspection of 2-FW-88 ("8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve).
  • There is evidence that this valve may be leaking by, and the Maintenance Department will be performing a seating surface and general condition inspection.

Page 10 of 10

Section Coversheet Millstone Station Tagout: 2C1.9 Section: 2322X00-002A 03/20/111935 Component to be Worked 2-FW-SB 2_TB _00106_ AFRV AREA_

Notes:

Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructions! Cautions:

Additional Information:

25203-26005 SH.31 Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C/24D (A3,A4)

Section Attributes:

Work Order List:

Number! Equipment ID Description 2-FW-SB Perform Check Valve Inspection Section Verification:

Status Description Name Verification Date Prepared Prepc3r~d By:

Approved Appr()vedBy:

Authorized Authorized By:

Work Released Work Released By:

To Clear Authorize Tags to clear:

System Restored Restoration Complete lPM-Al.1R

~Page1of3

ANSWER KEY Section Coversheet Millstone Station Tagout: 2C19 Section: 2322X00-002A 03/20/111935 Tag Tag Equipment PIa Placement Place. 1st Ver, PIa Restoration As Left Rest. 1st Rest. 2nd Serial Type Seq :Configuration Verif Req :Seq~~,!~!iJ~!a~i~!I____ _ Configuration Verif Verif

  • Equipment Description ~-------------

No.

  • Equipment Location
  • Notes Time/Date
  • Notes Time/DateTIme/Date Yellow P9B-HS III 1 iN/A 5N/A N/A
  • HANDSWITCH FOR "B" ~- -BREA~E; RACKED AUXIUARY FEEDWATER PUMP "DOWN

... 2_CB _03606= CNTRl RM COS Red A 406 2 :RACKED DOWN 4 RACKED UP RACKED UP

... 2_TB

~~R_BUS24D Red 2-FW-9B 3 CLOSED 3 OPEN OPEN

  • "B" AUX FEED PUMP DISCHARGE STOP VALVE AFWRM IV 4 :CLOSED 2 :OPEN OPEN
  • "B" AUX FEED PUMP REORCULATION STOP VALVE

,,* 2_TB _OO106...ABOVE~B~AFP

'*r2*-CN~*****c"",c. "**~********y.*.**k",~".*,*Y**~"i' '!****.l\l 4 fCLOSED 2 OPEN OPEN i * "B" AUX .FEED PUMP SUCTION ISOLATION

~qRJ2~~~~RM

~ed 4 iCLOSED 2 :CLOSED CLOSED

  • "B" AUX FEED PUMP EMERGENCY .

FIRE WATER VALVE Red 1 CLOSED CLOSED

  • "B"AUX FEED ,PUMP CASING VENT VALVE
  • ANSWER KEY Page 2 of3

ANSWER KEY 2-CN-329 IV 5 OPEN/UNCAPPED 1 CLOSED CLOSED

  • tV 5 OPEN/UNCAPPED 1 .CLOSED CLOSED
  • "B" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE *

'* 2_TB _00106_

Red 2-CN-332 IV ! 5 ~OPEN/UNCAPPED 1 CLOSED CLOSED

  • "B"AUX FEED PUMP SUCTION HEADER DRAIN *
  • Note: only one vent and one drain is required to be open to provide proper venting and draining.

ANSWER KEY Page30f3

JOB PERFORMANCE MEASURE APPROVAL SHEET I. ..'PM Title:

JPM Number: ,JPM-A2R Revision: _---..:O=--_

II. Initiated:

Marc R. Pucel 02/04/11 Developer Date III. Reviewed:

~ch1:;;2 IV. Approved:

Cognizant Plant Supervisor (optional) Date Page 1 of 11

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 11

JPM Number: JPM-A2R Rev. 0

--- --

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


~-------------------

JPM Number: JPM-A2R Rev. ___O~__

Task Title:

System: Equipment Control Time Critical Task: Yes No x Validated Time (minutes): 15 Task No.(s): _ _ _ _ _ _ _ _ _ _ __

Applicable To: SRO RO X PEO

--- ---

KIA No. 2.2.37 KIA Rating _--:;;.3,;;..;;.6:..:.../4,.;.:.*.:;;..6_ _

Method of Testing:

Simulated Performance: Actual Performance:


- -X- -

Location:

Classroom: X Simulator: In-Plant:


'-- ---- ----

Task Standards: At the completion of this JPM the examinee will have successfully determined SFP Heatup Rate and time to reach 150°F.

Required Materials OU-M2-201 Section 3.2, " Heatup Calculations" (procedures, equipment. etc.): OU-M2-201 Attachment 3, " Millstone Unit 2 SFP Time to 150°F Calculation" General

References:

OU-M2-201 "Shutdown Safety Assessment Checklist"

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 11

JPM Number: JPM-A2R Rev. ___0_ __

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit Initial Conditions:
  • Unit-2 is in day 12 of a refueling outage.
  • Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
  • Unit-2 has just experienced a Station Blackout
  • Present Spent Fuel Pool temperature as read on TR-7030 is 93F.

Simulator

  • N/A Requirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, A!:L. critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. Ifnecessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 11

PERFORMANCE INFORMATION JPM Number:

CRIT.ICAL I GRADE I STEP I PERFORMANCE STANDARD I (YIN) (§/U)

    • S**"AQ,~;i:I* .M*e",

';;'l~i_;:~!;':'.": ~t£&i!;;/i;N;.,.,Y"}* _ _ __

Page 5 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

1. NOTE: The SSA Checklist or Heatup I Examinee reads and acknowledges notes N Calculations may be completed by any licensed Operator (except the on-duty SM) or the STA using, at a minimum, the main control board system status.

NOTE: Systems planned to be removed from service in the next 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> may be assumed to be out of service, and, therefore, not credited.

NOTE: Attachment 4 through Attachment 8 provide further guidance while performing SSA Checklist. NOTE: SSA Checklists are completed as follows:- Daily* Prior to removing any equipment required to support the KSFs unless daily review already assumed equipment is out of service

  • Equipment available to support the KSFs unexpectedly becomes unavailable
  • Prior to performing plant MODE changes when shutdown
  • A system/component is restored to available status and is desired to either immediately credit the system/component for Shutdown Risk or it is more than six hours until the next SSA Checklist is to be Cue:

Comments:

Page 6 of 11

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP

_ ..... -_.. -_... - ..... -_ _

... ... - --.-- -.--.-- -

.. .. ....

PERFORMANCE

- - - . - - - - - - - --.-.- ------

... .. .. ..

STANDARD-

- - -... - - ... .... --.-..- - . - - -

_(V/N) _(§Ll!l__

2. I 3.2 Heatup Calculations 3.2.1 IF a Time to Core Boil determination Examinee determines that this step is not N is desired, THEN PERFORM the applicable.

following:

a. REFER to Attachment 2, Millstone Unit 2 RCS Time to Boil Calculation, and FOLLOW instructions.
b. RECORD results on Attachment 2.

3.2.2 IF a time to reach 150°F SFP design Examinee refers to Attachment 3, N temperature determination is desired Millstone Unit 2 SFP Time to 150°F THEN PERFORM the following: Calculation.

a. REFER to Attachment 3, Millstone Unit 2 SFP Time to 150°F Calculation, and FOLLOW instructions.
b. RECORD results on Attachment 3.
3. NOTE: SFP temperature should be I Examinee reads and acknowledges note. N obtained from TR-7030 pt 1. Otherwise, portable dip probe may be used (if TR-7030 is unavailable). If SFP temperature is expected to increase, a SFP temperature of up to 5°F greater than the current SFP temperature can be used to bound

. expected conditions.

1-------

Cue:

Comments:

Page 7 of 11

PERFORMANCE INFORMATION JPM Number: JPM-A2R STEP PERFORMANCE STANDARD

4. Instructions: Examinee records 12 days after shutdown y
1. Record time after reactor shutdown (in on Attachment 3 days), and current SFP temperature (OF). y Examinee records current Spent Fuel pool temperature of 93F to 98F on Attachment 3

Cue:

Comments:

5. Examinee refers to Table 1 to obtain SFP N Heatup Rate Cue:

Comments:

6. Table 1 SFP Heatup Rates Examinee reads and acknowledges note N NOTE: When using this table, the more conservative value should be used, so interpolation is not necessary (i.e., on the 23rd day shutdown, use day 20 heatup rate).

Cue:

Comments:

Page 8 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD (nn) c-- _)

7. Record SFP Heatup Rate Examinee records a SFP Heatup Rate of y 17.7 F/Hr based on End-of-Cycle Core Offload using Time from Shutdown (days) of 10 days on Attachment 3.

Cue:

Comments:

8. 3. Calculate and record SFP Time to 150°F Examinee performs the following Calculation: calculation to determine SFP temperature

=

SFP Time to 150°F {(150°F - SFP to 150F:

Temperature (OF>> / SFP Heatup Rate (OF/hour) J =

SFP Time to 150°F {(150°F - SFP Temperature rF)) / SFP Heatup Rate (OF/hour) ]

y Cue:

Comments:

9.

Cue:

TERMINATION CUE: The evaluation for this JPM is concluded.

JsreitlME:

-""-",.. " " . _ . , , - , - - -

Page 9 of 11

JPM Number: Rev. ___0,--__

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes

-

No X Validated Time (minutes): 15 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

! During the TPE. the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for ImprovemenUComments:

Page 10 of 11

JPM Number: JPM-A2R Rev. _ _-,0,-__

STUDENT HANDOUT Initial Conditions:

  • The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit.

Initiating Cues:

  • Unit-2 is in day 12 of a refueling outage.
  • Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
  • Unit-2 has just experienced a Station Blackout.
  • Present Spent Fuel Pool temperature as read on TR-7030 is 93F.

Page 11 of 11

Calculation:

SFP Time to 150°F= {(150"F-SFP Temperature(OF)/ SFP Heatup Rate (OF/Hour)}

Time From SFP SFP Heatup Shutdown Temperature Rate SFP Time to . . .

Date/Time (Days) (OF) (OF/hour) 150 OF Today/now 12 93 17.7 Today/now 12 98 17.7 JPIVl"A~Answer Key

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A3R Revision: 0

--

II. Initiated:

Marc R. Pucei 02/01/11 Developer Date III. Reviewed:

IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor bate Page 1 of 8

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

I All & DATE DESCRIPTION REV/CHANGE I 2006-317 Update JPM to include HUP evaluations and new format I

I I

Page 2 of 8

JPM Number: JPM-A3R Rev.

--- o --

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-A3R Rev. ___.....;0"---__

Task Title:

System: Radiation Protection Time Critical Task: Yes No x Validated Time (minutes):

Task No.(s):

Applicable To: SRO - - - - RO X PEO - - - -

KIA No. 2.3.7 KIA Rating ___ 3_.5_/3_.6___

Method of Testing:

Simulated Performance:


Actual Performance:

- -X- -

Location:

Classroom: X Simulator: ----- In-Plant:

-- - ------

Task Standards: At the completion of this JPM, the examinee has determined all of the radiological requirements for entering the CLRW filter skid area to assist The Radwaste Coordinator Required Materials Health Physics Survey Map (procedures. equipment. etc.): Operations blanket RWP General

References:

  • '* *
  • READ TO THE EXAMINEE '* '* '*
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

.JPM Number: JPM-A3R Rev. ___0,--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues: State the radiological requirements for entering this area. Include in your discussion:

  • Which RWP task Gob step) is appropriate for this assignment
  • Highest loose contamination level in the work area
  • Protective clothing required in the work area
  • Highest general area radiation level in the work area
  • Dose rate alarm setting
  • Maximum time that the operator can remain at the filter skid without exceeding any dose limit The examiner will act as Health Physics (HP) for any related questions.

Initial Conditions:

  • You are the BOP operator.
  • Unit-2 is at 80%
  • You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid
  • The operator has 450 mrem of annual dose exposure remaining Simulator N/A Requirements:

'* '* '* NOTES TO EVALUATOR '* '* '* '*

1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. Ifnecessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD siTAR~nuE~

",nh ,~"-:;,, ,J;;7""'-'~___C_'_> _ _ __

1. Which RWP task Gob step) is appropriate Examinee states that the appropriate RWP for this assignment task ( job step) for this assignment is y Job Steo1 Cue:

Comments:

2. I Highest loose contamination level in the Examinee states that the highest loose work area contamination level in the work area is y 22000 DPM/100cm2 Cue:

Comments:

3. I Protective clothing required in the work Examinee states that the protective area clothing required in the work area is "Full y PC's" (consisting of Cotton liners, Booties, Coveralls, Shoe covers, Rubber gloves, Cue:

Comments:

4.

Cue:

Comments:

5.

Cue:

Comments:

Page 5 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

6. Maximum time that the operator can remain Examinee states that the maximum at the filter skid without exceeding any dose allowed stay time at the filter skid without limit exceedina anv dose limit is 4.5 hrs Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

)iST~,P~11N1E:

Page 6 of 8

JPM Number: JPM-A3R Rev.

- - -

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X Validated Time (minutes): 15 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work gractices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 7 of 8

JPM Number: ..IPM-A3R Rev. ___0,,--__

STUDENT HANDOUT Initial Conditions: State the radiological requirements for entering this area. Include in your discussion:

  • Which RWP task Gob step) is appropriate for this assignment
  • Highest loose contamination level in the work area
  • Protective clothing required in the work area
  • Highest general area radiation level in the work area
  • Dose rate alarm setting
  • Maximum time that the operator can remain at the filter skid without exceeding any dose limit The examiner will act as Health Physics (HP) for any related questions.

Initiating Cues:

  • You are the BOP operator.
  • Unit-2 is at 80%
  • You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid
  • The operator is has 450 mrem of annual dose exposure remaining Page 8 of 8

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A4R Revision: -~-

0 II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor

~Ilate Page 1 of 11

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 12

JPM Number: JPM-A4R Rev. ___0_ __

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-A4R Rev. _ _--'0'--__

System: Reactivity Control Time Critical Task: Yes No X

-

Validated Time (minutes): 25 Task No.(s):

Applicable To: SRO RO - - X PEO KIA No. 055-EK 3.02 KIA Rating 4.3/4.6 Method of Testing:

Simulated Performance:


Actual Performance:

- -X- -

Location:

Classroom: X Simulator: In-Plant:

--'-- ---- ----

Task Standards: At the completion of this JPM the examinee will have successfully determined whether SDM is being satisfied for a postulated SBO event.

Required Materials EOP 2530" Station Blackout" (procedures. equipment. etc.): EOP 2541, Appendix 17 "Shutdown Margin" "Reactor Engineering Curve and Data Book ( Cycle 20)

General

References:

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 12

JPM Number: JPM-A4R Rev. ___0,---__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied.
  • Additionally, if it is determined that SDM is not being satisfied, calculate the amount of boric acid that must be added to the RCS.
  • Document data used and values calculated.

Inilial Conditions:

  • Unit-2 has experienced a plant trip with a concurrent Station Blackout one half hour ago.
  • Unit-2 had been operating at 100% power for one month prior to the trip.
  • The crew is performing EOP 2530.
  • Power is just being restored to Unit-2 from the SBO Diesel.
  • Tavg is being maintained at 530F.
  • Chemistry has determined present RCS Boron concentration to be 770 ppm.
  • Present Core Burnup is 5000 MWD/MTU.

Simulator

  • N/A Reg uirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 12

PERFORMANCE INFORMATION JPM Number: JPM-A4R

'~tm\i~~§tlttQiWl'ijfl~~

STEP PERFORMANCE I STANDARD l CRITICALl (YIN)

GRADEl (S/U) I i:$l'liR,Tl'fttlF\ic_ _ __

1. EOP 2530 Step 30. CHECK Shutdown Examinee reads EOP 2530 Step 30 and N Margin is satisfied. Refer To Appendix 17, determines that he/she needs to refer to "Shutdown Margin." Appendix 17 to determine Shutdown Comm
2. EOP 2541, Appendix 17 Examinee refers to EOP 2541, Appendix N
1. IF desired to calculate required shutdown 17 to calculate required shutdown boron boron concentration, PERFORM concentration.

Attachment 17-A, Shutdown Boron Concentration."

Comments:

3. Attachment 17A Required Shutdown Boron Examinee reads and acknowledges note Concentration about initial and subsequent calculations N NOTE ofSOM.

The initial calculation is used to determine that SOM is met at the current conditions.

The subsequent calculation determines if SOM will be met for anticipated


'

, temperatures when coolina down the RCS.

Comments:

4.

Comments:

Page 5 of 12

PERFORMANCE INFORMATION JPM Number: JPM-A4R lIeletlmii":'+.(tutd_iIilttlll*.**!fO\\I1~J~-i)53.iiIIJ'~B';*';"Blcickaut~;5~

.... ".. '.' .**.*. .*It_.. L.lI,......___ *.d""*. ii .** .... lm-k.*... _____ . . .;. &~_."'i'___."J!t!LJi'1x..........__ . . .<_. .

STEP PERFORMANCE STANDARD (Y

5. I 2. RECORD the current RCS TAVE. I Examinee records current RCS TAVE as Y 530F from Initial Conditions.

'" "

Cue:

Comments:

6. 13. RECORD core burnup from ONE of the following: Examinee records core burnup as Y

_ "CVBURNUP" (PPC) 5000 MWD/MTU as given in Initial

_ Control Room Daily Surveillance Conditions.

_ Reactor Engineering MWD/MTU I 'u" ." " ..... _. u._....-." . ..,"".MhW....*. _ .**,,~. __ .~. ,

Cue:

Comments:

7. 14. Refer To the applicable curve in Reactor Engineering Curve and Data Book and Examinee uses "1.0% Shutdown Boron N DETERMINE the required shutdown boron Concentration vs. Moderator Temperature" concentration for the core burnup and the (RE-B-02) and determines the required current T AVE as follows: shutdown boron concentration for the core burnup and the current TAVE as -790.71
a. IF directed to this Appendix by SBO or I ppm Functional Recovery EOPs use "1.0%

Shutdown Boron Concentration vs.

Moderator Temperature" (RE-B-02)

Examinee states that there is no indication

_IF more than one CEA is not fully that more than one CEA is not fully inserted, INCREASE the required inserted and that this step is not shutdown boron concentration 350 ppm per applicable.

l ~."",,;u

  • greater than one,
    • , ."e" """,""v;-;-.">:.," """""""k4",:."",,,,,,,,.+: .- '",,-,,"

not fully inserted .

"'~'Y""?/k;;;;;;L'b_AA ;; .d""*,,,. -.' """'" 2!L"""",&,/..:.'"

Cue:

Comments:

Page 6 of 12

PERFORMANCE INFORMATION JPM Number: JPM-A4R STEP PERFORMANCE STANDARD

8. I b.IF directed to this Appendix by any other Examinee states that this step is not N EOP use "3.6% Shutdown Boron applicable.

Concentration vs. Moderator Temperature" (RE-B-01 )

_IF any CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per CEA not fully inserted.

td.....,." ... ~ **. ,.* '"

Cue:

Comments:

9. 5. RECORD the required shutdown boron Examinee records the required shutdown y concentration and the TAVE for which it boron concentration and the TAVE for was calculated. which it was calculated.

ppm -790.71 ppm of L., >J ' _,

Cue:


Comments:

10. I 6. DETERMINE Inverse Boron Worth at Examinee determines Inverse Boron Y present core burnup. Refer To Reactor Worth at present core burnup (5000 Engineering Curve and Data Book. (RE-F- MWD/MTU ) as -116.8 IBW 02)

MWD/MTU (step 3.)

IBW

,(, ,'P"~ ,,;;

--,,,

Cue:

Comments:

Page 7 of 12

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

11. 7. DETERMINE smallest xenon reactivity Examinee determines smallest xenon N worth expected within the time frame being reactivity worth expected within the time evaluated. Refer To ANY of the following: frame being evaluated by use of "Reactor

_ "Xenon-Samarium Post Trip Engineering Curve and Data Book (RE-C Report" 01)" as 2.669 XRW (range 2.65 to 2.67).

_ Reactor Engineering Curve and Data Book (RE-C-01 )

_ "XENON-SAMARIUM DEMAND" program on PPC Reactor ~n ...inoo..in...

Cue:

Comments:

12.

Cue:

Comments: -

13. 9.CALCULATE Boron Equivalent of Xenon Examinee calculates Boron Equivalent of y Reactivity Worth (BE of XRW) as follows: Xenon Reactivity Worth (BE of XRW) as follows:

(2.65-2.67) (309-311.9) 2.669 116.8 311.7 Xenon X Inverse  ::; Boron Equivalent Xenon X Inverse  ::; Boron Equivalent Reactivity Worth Boron Worth of Xenon Reactivity Worth Boron Worth of Xenon Reactivity Worth Reactivity Worth (Range of 3.09-311.9)

Cue:

Comments:

Page 8 of 12

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

14. 10. CALCULATE Xenon Corrected Examinee calculates Xenon Corrected Required Shutdown Boron Required Shutdown Boron (309-311.9)

Required Shutdown Boron Equivalent = -790.71 311.7 y Boron Concentration of Xenon Reactivity Required Shutdown Boron Equivalent Worth Boron Concentration ofXenon Reactivity Worth Xenon Corrected Required Shutdown Boron Concentration 479.0 (478-481)

Xenon Corrected Required Shutdown Boron Concentration C

Comments:

I 15. 111. Record ANY of th-e following: Examinee records RCS boron sample y RCS boron concentration at the time of the results obtained from Chemistry 770 ppm reactor trip ppm at time of Rx trip from Chemistry sample ( Initial Conditions)

RCS boron sample results obtained from from Chern Cue:

Comments:

16. 12. CHECK RCS boron concentration Examinee determines that RCS boron y greater than Xenon Corrected Required concentration is greater than Xenon Shutdown Boron concentration. Corrected Required Shutdown Boron concentration. ,

,',",,,,j"';; ,."Zi, Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

Page 9 of 12

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD Page 10 of 12

JPM Number: JPM-A4R Rev. _ _-'0'--__

VERIFICATION OF JPM COMPLETION Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 25 Actual Time to Complete (minutes):

..'PM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 11 of 12

JPM Number: JPM-A4R Rev. - - - 0 --

STUDENT HANDOUT Initial Conditions:

  • The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SOM is being satisfied.
  • Additionally, if it is determined that SOM is not being satisfied, calculate the amount of boric acid that must be added to the RCS Initiating Cues:
  • Unit-2 has experienced a plant trip with a concurrent Station Blackout one half hour ago.
  • Unit-2 had been operating at 100% power for one month prior to the trip.
  • The crew is performing EOP 2530.
  • Power is just being restored to Unit-2 from the SBO Diesel.
  • Tavg is being maintained at 530F.
  • Chemistry has determined present RCS Boron concentration to be 770 ppm.
  • Present Core Burnup is 5000 MWO/MTU.

Page 12 of 12

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A1.1S Revision: 0

--'--

II. Initiated:

R. J. Ashey 11/30/2011 Developer Date III. Reviewed: ~

~*IR* ec mca eVI er IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 8

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 11/30/2011 Created JPM for LOIT 2011 NRC Exam 010 Page 2 of 8

Facility: MP-2 Examinee:


. .IPM Number: JPM-A1.1S Rev. o Task Title:

System: Conduct of Operations Time Critical Task: Yes No N

-

Validated Time (minutes): 15 Task No.(s): N/A Applicable To: SRO X RO - - PEO

--

KJA No. 2.1.7 KJA Rating _ _4_.4_/4_._7__

Method of Testing:

Simulated Performance: X Actual Performance:

---'---- ---

Location:

Classroom: X Simulator: In-Plant: - - -


'--- ----

Task Standards: At the completion of this JPM, the SRO will determine the appropriate Action Level for an RCS leak and determine the appropriate actions that must be taken.

Reguired Materials C OP 200.15, RCS Leakage Trending and Investigation (procedures, equipment. etc.>: OPS Form 2619A-001, Control Room Daily Surveillance, MODES 1 & 2 General

References:

C OP 200.15, RCS Leakage Trending and Investigation OPS Form 2619A-001, Control Room Daily Surveillance, MODES 1 & 2

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

Initiating Cues:

Initial Conditions:

  • You are the Night Crew Shift Manager.
  • The plant is in MODE 1 and stable at 100% power.
  • The crew began its 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift at 1800
  • The latest ReS Leak Rate has been determined has been entered into the Operation Trending database. (See attached graphs)
  • The present RCS leak rate calculation has been confirmed.
  • All input parameters have been evaluated and are valid.

Simulator N/A Reguirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in~plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

!,i l'_;?'l_______

c

1. Examinee reviews the attached graphs and y obtains C OP 200.15, RCS Leakage Trending and Investiaatior Cue:

Comments:

2. Section 4.1 Examinee determines from Initial Conditions N Step 4.1.1 If leakage is PRESSURE that NO PRESSURE BOUNDARY LEAKAGE BOUNDARY LEAKAGE, exists and this step is NOT applicable.

perform the following:

a. Refer to Technical specification 3.4.6.2 for ACTIONS.

Comme Page 5 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

3. Step 4.1.2
  • Examinee determines that NO seven (7) N If any of the following Action Level 1 day rolling average of daily RCS limits are exceeded, Go To Section 4.2 UNIDENTIFIED LEAKAGE rates is
  • One seven (7) day rolling average of greater than 1.0; therefore, this does NOT daily RCS UNIDENTIFIED require entry into Action Level 1.

LEAKAGE rates greater than 1.0

  • Examinee determines that, the last nine y gpm, consecutive RCS UNIDENTIFIED
  • Nine (9) consecutive daily RCS LEAKAGE rates are greater than the IDENTIFIED LEAKAGE rates greater baseline mean.

than the baseline mean. o Examinee determines that Action y Level 1 is applicable.

  • Examinee oroceeds to Section 4.2.

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

Page 6 of 8

JPM Number: JPM-A1.1S Rev.

--- a --

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

--

Validated Time (minutes): 15 Actual Time to Complete (minutes):

Overall Result of JPM: SAT UNSAT (circle one)

Page 7 of 8

JPM I\lumber: JPM-A1.1S Rev. ___0,,--__

STUDENT HANDOUT Initiating Cues:

Initial Conditions:

  • You are the Night Crew Shift Manager.
  • The plant is in MODE 1 and stable at 100% power.
  • The crew began its 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift at 1800
  • The latest RCS Leak Rate has been determined has been entered into the Operation Trending database. (See attached graphs)
  • The present RCS leak rate calculation has been confirmed.
  • All input parameters have been evaluated and are valid.

Page 8 of 8

Training Use Only Unit 2 ReS Unidentified Leakage 0.12 0.10 0.08 0.06 0.04

!:

Il. 0.02

(!)

0.00 !

-o~t\t\. " \1-\.

~\.\.

,,\1-'0

~\.\. 1-\t>.\\.\. ~\\.');

~\.\. 'b\\.\.

.">'

<,\\.\.

I'}; '?\

t>.\\.\. \.\.\\.\.

-0.04

-0.06

-0.08

-0.10

-+- Unidentified Leakage Rate -II-- Unidentified Leakage 90 Day Average

- . - Unidentified Leakage Alert Level 2 (90 Day Average + 2 StDev) ~ Unidentified Leakage Alert Level 3 (90 Day Average + 3StDev)

~Unidentified Leakage 7 Day Average

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A1.2S Revision: 0

--

II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

Technical Reviewer IV. Approved:

Cognizant Plant Supervisor (optional) Date

\..../Nuclear Training Supervisor Page 1 of 8

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006*317 Update JPM to include HUP evaluations and new format Page 2 of 8

JPM Number: JPM-A1.2S Rev. ___0=--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-A1.2S Rev.

--- o --

Task Title:

System: Auxiliary Feedwater Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s):

Applicable To: SRO X RO PEO - - -

---

KIA No. 2.2.14 KIA Rating _ _ 3._9/_4_.3_ _

Method of Testing:

Simulated Performance: Actual Performance: - -X- -


Location:

Classroom: - - X - Simulator: - - - In-Plant: - - - - -

Task Standards: At the completion of this JPM, the examinee will determine whether the Tag Clearance can be approved and authorized and if not, why.

Reguired Materials

  • The following P&ID's available: (25203-26005 SH.3/

(procedures. equipment. etc.): Condensate Storage and Aux Feed). 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4),

and 25203-29008 SH 26 ( Seal & Manifold Piping)

  • OP 2322-001 General

References:

  • OP-M-200 (Equipment Clearance)
  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

JPM Number: ~IPM-A1.2S Rev. _ _--"-0_ __

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • Your task is to review, approve. and authorize the attached Tag Clearance Sheet.

Initial Conditions:

  • Unit-2 is in Mode 5
  • Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.

Simulator

  • N/A Requirements:
  • *
  • NO"rES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y" . For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number: Rev..

',J.iH,. ".'.';:!'" '.:B.*. 'i,:. ,,' i i. ' d*.*.

~.eaf:~J1lceoun. a I

I STEP 1 PERFORMANCE STANDARD CRITICAL (YIN)

GRADE (S/U)

S'fART~filE:

1. OP-AA-200 "Equipment Clearance" Examinee reviews the completed Tagging Record for accuracy and completeness, 3.2.3c. REVIEW the completed Tagging using controlled drawings:

Record for accuracy and completeness, (25203-26005 SH.31 Condensate Storage referencing controlled documents as N and Aux Feed) For fluid systems.

necessary. The reviewing SRO or designee (25203-30005 Single Line Meter & Relay shall:

Diagram 4.16KV Emerg. 8uses 24C,24D

  • ENSURE that the tag-out is adequate for (A3,A4)) for electrical isolation.

the tasks and hazards involved. y Examinee identifies that the incorrect 4160 VAC breaker ( A307) is Danger

  • ENSURE that the proper sequence of Tagged and that the correct breaker component alignment and tag placement is (A406) is required to be Danger Tagged specified.

"Racked Down"

  • ENSURE that the appropriate entries Examinee identifies that 2-FIRE-948. "8" y have been made in the comment section of AUX FEED PUMP EMERGENCY FIRE the Tagging Record. WATER SUPPLY VALVE" has been incorrectly omitted from the tagging sheet.
  • DETERMINE if support is required from This alternate suction for the "8" Auxiliary Maintenance Personnel to execute the tag Feed Pump is required to be Danger out. Tagged "Closed" Examinee determines that this tag y clearance cannot be approved or authorized as written.

Examinee may desire to tag open only one casing vent valve (2-CN-329 or 2-CN-330). Additionally, examinee may desire to tag open only one header drain valve (2-CN-331 or 2-CN-332). At least one casing vent valve and one header drain valve must be tagged open. Examinee may desire to tag open the motor heater breaker for "8" MDAFW pump. This is not required.

Page 5 of 8

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) (§ll,JJ_

TERMINATION CUE: The evaluation for this JPM is concluded.

iSTOP'tfME".'"

,'" " '" 0'/ _ _ __

Page 6 of 8

JPM Number: JPM-A1.2S Rev. ___0.0...-__

VERIFICATION OF JPM COMPLETION Title: ApprQveancFAUthorize a Clearance Boundary Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes -

No X Validated Time (minutes): 20 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass / Fail Areas for Improvement/Comments:

Page 7 of 8

JPM Number: JPM-A1 Rev. ___0,--__

STUDENT HANDOUT Initiating Cues:

  • Your task is to review, approve, and authorize the attached Tag Clearance Sheet.

Initial Conditions:

  • Unit-2 is in Mode 5
  • Mechanical Maintenance wilt be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.

Page 8 of 8

Section *Coversheet Millstone Station Tagout: 2C19 Section: 2322X00-002A 03/20/111935 Component to be Worked 2-FW-8B 2_TB _00106_ AFRV AREA_

Notes:

Reason Tagged 2-FW-8B CHECK VALVE INSPECTION Instructions/Cautions:

Additional Information:

25203-26005 SH.3/ Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Re!ay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)

Section Attributes:

Work Order List:

Number / Equipment ID Description 2-FW-8B Perform Check Valve Inspection Section Verification:

Status Description Name Verification Date Prepared Prepared By: "Qualified Operator" "This Morning" Approved Approved By:

Authorized Authorizedf?y:

Work Released Work Released By:

To Clear Authori:ze Tags to clear:

System Restored Restoration Complete AN!

Page1of3

ANSWER KEY Section Coversheet Millstone Station ragout: 2C19 Section: 2322X00-OO2A 03/20/111935 Tag Tag ;Equipment Ver Pia Placement Place. 1st Ver: Pia Restoration As left Rest. 1st Rest. 2nd Serial Type * --- --- - -- ---------------- Req Seq Configuration Verif Req ;Seq~l!~iI~~tion Configuration Verif Verif No. '", Equipment Description

  • Notes Time/Date
  • Notes Time/DateTime/Date
  • Equipment Location Yellow P9B-HS IV 1 N/A 4 N/A
  • HANDSWITCH fOR "BII

'" 2_CB _03606_ CNTRL RM COS Red A 406 2 RACKED DOWN 3 RACKED UP RACKED UP


TI------------...,

'" 238 _OS606_UPR_ for "B" AFW Pump SWG~BUS24D

~," l<',." '""-".' .,'

Red 2-FW-98 'IV 3 CLOSED 'OPEN OPEN

  • "8" AUX FEED PUMP DISCHARGE STOP VALVE
  • ,.//:c~<<.<.,.,.,..""A.,.... "'."A"""'.',,'., ,,,",,".w., ,,, '"'"'.

Red . IV 3 CLOSED , 2 OPEN OPEN

  • "BII AUX FEED PUMP RECIRCULATION STOP VALVE 00106_ABOVE "8"AFP ,

-,~"",:,¥,,,:,,,, ""';"R~-'~"":"' ~~~,~"""~""'~,.'w+,~~, "~~ ~." ,~"V "

Red 2-CN-29B IV 3 CLOSED 2 OPEN OPEN

  • "B" AUX FEED PUMP SUCTION ISOLATION
  • 2_TB _00106_AFW RM Red 2-FIRE-94B ;N 3 CLOSED This is an alternate 2 CLOSED nOSED

'" "B" AUX FEED PUMP EMERGENCY 'OIl suction that must be FIRE WATER SUPPLY VALVE  : tagged

'" 2_TB Red 2-CN-330 [OPEN/UNCAPPED 1 CLOSED CLOSED
  • "B" AUX FEED PUMP CASING VENT VALVE

'" 2_TB 00106_

ANSWER KEY Page2of3

ANSWER KEY Red 2-CN-329 IV 4 OPEN/UNCAPPED 1 CLOSED CLOSED

  • "BTl AUX FEED PUMP CASING VENT VALVE
  • 2_TB _00106_

Red 2-CN-331 IV 4 OPENjUNCAPPED CLOSED

  • "BTl AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE
  • 23B Red 2-CN-332 IV 4 OPEN/UNCAPPED 1 CLOSED CLOSED
  • "B" AUX FEED PUMP SUCTION HEADER DRAIN
  • 2_TB _00106_

ANSWER KEY Page30f3

JOB PERFORMANCE MEASURE APPROVAL SHEET L JPM Title:

JPM Number: "IPM-A2S Revision: --"-

0 II. Initiated:

Robert L. Cimmino, Jr. 02/03/11 Developer Date III. Reviewed:

Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 7

,

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 02/03/11 Created .JPM for LOIT 2011 NRC Exam 010 Page 2 of 7

JPM Number: JPM-A2S Rev. 010 JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.
  • CEA Pulse Counting, the Backup Scanner and the Core Mimic all tracked motion as designed.
  • I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input from CEA #1 is not capable of tracking any CEA motion at this time.
  • I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C05, needs to replaced with a spare from the warehouse.
  • Testing and replacement will take approximately six hours.
  • Perform the Administrative duties of the US for this malfunction.

Initial Conditions:

  • You are the on-shift US.
  • The plant is at 100% power, having just completed Control Valve Testing.
  • Group 7 CEAs were inserted 10 steps for power control, but have all just been fully withdrawn, as indicated by the Core Mimic.

Simulator N/A Reg uirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" ot "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 7

JPM Number: JPM-A2S Rev. _ _.::.;.01-.:;.0_ _

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP-2 Examinee:


. .IPM Number: JPM-A2S Rev. °


Task Title:

System: Administrative Time Critical Task: Yes

-- No x Validated Time (minutes): _-,-1.;;;..5_ __

Task No.(s): _ _ _ _ _ _ _ _ __

Applicable To: SRO X RO _ __ PEO _ __

KIA No. 2.2.40 KIA Rating _--=..:3.:....:.;4/.....:.4.:...;...7_ _

Method of Testing:

Simulated Performance: - -X- - Actual Performance:

- -X- -

Location:

Classroom: X Simulator: - - - In-Plant:

-- - ------

Task Standards: At the completion of this JPM, the SRO should analyze the given conditions and state the required Tech. Spec. entry and surveillance.

Reguired Materials

  • Plant Technical Specifications Manual (procedures, equipment etc.):
  • SP-2619A-001; Control Room Daily Surveillance, Mode 1 & 2 General

References:

  • Plant Technical Specifications Manual
  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 7

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

~~~iS'i"[

~~~~~tm,,_ _ _

1. Given a copy of the plant Technical Examinee reviews the following:

Specifications Manual and, if requested,

  • A copy of the plant Technical N AOP-2556, CEA Malfunctions: Specifications Manual
  • Review the Initial Conditions and If requested:

Initiating Cue.

  • Review Tech. Specs. and, as needed, Malfunctions and/or SP-2619A-001, AOP-2556 for any required entries and Control Room Daily Surveillance.

additional surveillance reauirements.

Cue:

Comments:

2. Explain the necessary Tech. Spec. entry
  • During the review of the plant requirements and the Tech. Spec. Technical Specifications Manual, the y surveillance that must be performed. examinee should state the need to enter into Tech. Spec. 3.1.3.1B (B. 1 or B.2), 3.1.3.1C and perform required actions.
  • The examinee should also state the y need to record CEA Position Indication at least once every four (4) hours.

Cue:

Comments: I The examinee may note that Tech. Spec. 3.1.3.6.D applies. This input is not a Critical item because the requirements of this TS is less restrictive than the Critical required TS. However, the examinee should NOT log into Tech. Spec. 3.1.3.3 or 3.0.3 as they are NOT applicable with the Backup Scanner operating as designed.

TERMINATION CUE: The evaluation for this JPM is concluded.

il':ift~'~l~'"

'j19JE~_A~' - - - - -

Page 5 of 7

JPM Number: JPM-A2S Rev. - - - 0 --

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

Overall Result of JPM: SAT UNSAT (circle one)

Page 6 of 7

..IPM Number: JPM-A2S Rev . - - - o --

STUDENT HANDOUT Initiating Cues:

  • As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.
  • CEA Pulse Counting, the Backup Scanner and the Core Mimic all tracked motion as designed.
  • I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input from CEA #1 is not capable of tracking any CEA motion at this time.
  • I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C05, needs to replaced with a spare from the warehouse.
  • Testing and replacement will take approximately six hours.
  • Perform the Administrative duties of the US for this malfunction.

Initial Conditions:

  • You are the on-shift US.
  • The plant is at 100% power, having just completed Control Valve Testing.
  • Group 7 CEAs were inserted 10 steps for power control, but have all just been fully withdrawn, as indicated by the Core Mimic.

Page 7 of 7

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A3S Revision: 0

---::.-

II. Initiated:

~~Robert L. Cimmino, Jr.

Developer 02/03/11 Date III. Reviewed:

Technical eviewer IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 8

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 12/07/10 Created JPM for LOIT 2011 NRC Exam 010 Page 2 of 8

JPM Number: JPM-A3S Rev.

- - -010- - -

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP-2 Examinee:


JPM Number: JPM-A3S Rev. o


Task Title:

System: Administrative Time Critical Task: Yes No x Validated Time (minutes): _--.:..'-=5____

Task No.(s):

Applicable To: SRO X RO _ __ PEO _ __

KIA No. 2.3.12 KIA Rating __~3...;.;;.2;;:.../3';;";'.;....7 _ _

Method of Testing:

Simulated Performance: X Actual Performance:


.:..~-

- -X- -

Location:

Classroom: X Simulator: In-Plant:


----- ------

Task Standards: At the completion of this JPM, the SRO should analyze the given conditions and designate which PEO should perform each of the two specified tasks, based on the radiological concerns of each.

Required Materials If requested, RPM 5.2.2; Basic Radiation Worker Responsibilities.

(procedures, equipment. etc.):

General

References:

  • RPM 5.2.2; Basic Radiation Worker Responsibilities
  • Radiation Worker CBT
  • * *
  • READ TO THE EXAMINEE'" '" '" '"

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

JPM Number: JPM-A3S Rev. _ _..:...01..:...0_ _

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • Determine which PEO (#1 or #2) you are going to direct to perform the task of clearing the tag-out and perform the initial valve lineup and which PEO you are going to assign to perform the required valve lineup Independent Verification.

Initial Conditions:

  • You are the Work Control SRO.
  • The plant has been shut down to repair a leak in the CVCS Regenerative Heat Exchanger.
  • The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.
  • The following additional conditions exist:
  • The area is at the minimum radiation level to meet the required posting.
  • All valves on the valve lineup are in the posted area.
  • There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
  • PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
  • PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure.
  • It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
  • It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification. It will take PEO #2 approximately 25 minutes of stay time to perform the same task.

Simulator_ N/A Reg uirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number: JPM-A3S Rev. 0 STEP PERFORMANCE STANDARD I~Y~iiil~~~

~ .... .

,I~ ~j§l....-'_ __
1.
  • Review the Initial Conditions and
  • PEa #1 only has 400 mR of exposure N Initiating Cue. left and PEa #2 has 850 mR of
  • Using known exposure rate in the area, exposure left.

calculate the maximum available stay

  • Based on available stay time, decide mRlhr.

which PEa must perform each task.

  • Therefore, based on the available exposure for each PEa and the N expected radiation levels at the job site, the maximum stay time for PEa
  1. 1 is approximately 24 minutes.

(400 mR /1000 mRlhr.

  • 60 min/hr. =

24 minutes)

And 51 minutes for PEa #2 (850 mR 11000 mRlhr

  • 60 min/hr. =

51 Cue:

Comments:

Page 5 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

2.
  • PEO #1 does not have enough Based on the calculated stay times for y exposure left to clear the tags and each PEO and the individual task time perform the initial valve lineup. requirements, PEO #2 is assigned to clear the tags and perform the initial valve
  • PEO #2 has enough exposure to clear lineup, while PEO #1 is assigned to the tags and perform the initial valve perform the valve lineup Independent lineup. Then, PEO #1 will have enough Verification.

exposure left to perform the valve lineup Independent Verification.

The examinee may also state the following, but it is not required:

  • PEO #2 does not have enough exposure left to perform both tasks, clearing the tagout and performing both valve lineups (this would also not meet the "Independent Verification" Administrative Reauirements ..

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

_(tIlllJ!~)I,--! ___

Page 6 of 8

JPM Number: JPM-A3S Rev. 0

--- --

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

Overall Result of ..IPM: SAT UNSAT (circle one)

Areas for Improvement/Comments:

Page 7 of 8

JPM Number: JPM-A3S Rev. ___0_ __

STUDENT HANDOUT Initiating Cues:

  • Determine which PEO (#1 or #2) you are going to direct to perform the task of clearing the tag-out and perform the initial valve lineup and which PEO you are going to assign to perform the required valve lineup Independent Verification.

Initial Conditions:

  • You are the Work Control SRO.
  • The plant has been shut down to repair a leak in the eves Regenerative Heat Exchanger.
  • The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.
  • The following additional conditions exist:
  • The area is at the minimum radiation level to meet the required posting.
  • All valves on the valve lineup are in the posted area.
  • There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
  • PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
  • PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure.
  • It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
  • It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification.

It will take PEO #2 approximately 25 minutes of stay time to perform the same task.

Page 8 of 8

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

. .IPM Number: JPM-A4S Revision: - - 0 -

II. Initiated:

R. J. Ashey 01/20/2011 Developer Date Ill. Reviewed:

/J/pr) J)

T echmcal Revi r J Date IV. Approved:

Cognizant Plant Supervisor (optional) Date II(

- NUClear Training Supervisor Date Page 1 of 11

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 01/20/2011 Create for use on LOIT-2011 NRC Exam 0 Page 2 of 11

JPM Number: JPM- Rev. _ _ _ __

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP-2 Examinee:

JPM Number: JPM-A4S Rev. o Task Title:

System: Emergency Plan Time Critical Task: Yes X No Validated Time (minutes): 30 minutes Task No.(s): NUTIMS #000-05-205 Applicable To: SRO X RO PEO

--

KIA No. 2.4.41 KIA Rating 2.9/4.6 Method of Testing:

Simulated Performance: Actual Performance: X Location:

Classroom: X Simulator: X In-Plant: X Task Standards: At the completion of this JPM, the examinee has correctly classified the proposed event and provided the appropriate Protective Action Recommendation.

Required Materials

  • MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action (procedures, equipment etc.): Levels
  • MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
  • MP-26-EPI-FAP06, Classification and PARs General

References:

  • MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels
  • MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
  • MP-26-EPI-FAP06, Classification and PARs
  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 11

JPM Number: JPM- Rev.


JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiatinq Cues:

  • You are the on-duty SM.
  • Your task is to determine the final NRC classification and state posture code for the event described on the attached form. In addition, determine any Protective Action Recommendations (PARs).

Initial Conditions: See attached form.

Simulator N/A Requirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

1. MP-26-EPI-FAP06, Step 2.1, Event The examinee obtains Millstone 2 MP N Classification based on EAL Tables EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Obtain MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Cue:

Comments: I Time starts when the examinee obtains the required procedures

2. I Perform the initia.1 c.lassifica~i?n for this event, per the eXisting conditions.

Itechnique, Based on a "top to bottom, left to right' the examinee will determine Y

that this event is classified as a GENERAL EMERGENCY, State Posture Code, ALPHA.

Cue:

Comments:

3. MP-26-EPI-FAP06, Step 2.4.1 Examinee obtains: N For Control Room PARs, Refer To EPI
  • MP-26-EPI-FAP06, Classification and FAP06-005, "Control Room Protective PARs Action recommendations" and determine the proper PAR.
  • MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.

Cue:

Comments:

Page 5 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

4. MP*26*FAP06*005 (Flowchart) NO Are All Three Fission Product Barriers Examinee determines that all 3 Fission Y Lost? Product Barriers are NOT lost
  • FCB3 (Loss)
  • RCS Barrier RCB2 (Loss)
  • CNB2 (Potential Loss)

Cue:

Comments:

5. Does Containment Radiation Exceed Table INO 1 Values? Examinee determines that Table 1 values Y are NOT exceeded.

Cue:

Comments:

6. Do 5 Mile doses Exceed Table 2 Values? YES Examinee determines from the provided Y IDA Form that Table 2 values are exceeded.

Cue:

Comments:

7. Is there a Release in Progress? NO Examinee determines that there is NOT a Y release in progress Cue:

Comments:

Page 6 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

8. Check the appropriate wind direction from
  • Examinee observes wind direction N the 142 ft. level for zone(s) to evacuate: table and checks 139 0 -154 0
  • A and Band C and Lyme in D.
  • Examinee determines from the wind Y direction table that Zones to be Evacuated include A and Band C and Lyme in D.

Cue:

Comments:

9.
  • Shelter all other zones.
  • Examinee determines that all other Y zones must be sheltered.
  • Recommend state officials implement
  • Examinee determines that actual dose Y Potassium Iodide (KI) strategy for is equal to or greater than 5 REM general public. thyroid (CDE)at site boundary and recommends state officials implement Potassium Iodide (KI) strategy for the general public.

Cue:

Comments: I The classification is a GENERAL EMERGENCY, ALPHA, based on either OG1 or loss of all three barriers (BG1) on the Barrier Failure Reference Table (FCB3, RCB2, and CNB2)

The PAR should state, "Evacuate zones A and Band C and Lyme in D. Shelter all other zones. " Additionally, recommend state officials implement Potassium Iodine (KI) strategy for the general public.

TERMINATION CUE: The evaluation for this JPM is concluded.

_.mA~ii!!y;fI~

~~_~_~l!~,-, ______

Page 7 of 11

JPM Number: JPM-A4S Rev.

--- o --

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes X No

--'

Validated Time (minutes): 30 Actual Time to Complete (minutes):

Overall Result of JPM: SAT UNSAT (circle one)

Areas for Improvement/Comments:

Page 8 of 11

JPM Number: JPM-A4S Rev. - - - 0 --

STUDENT HANDOUT Initiating Cues:

  • You are the on-duty SM.
  • Your task is to determine the final NRC classification and state posture code for the event described on the attached form. In addition, determine any Protective Action Recommendations (PARs), if applicable.

Initial Conditions: See attached form.

NRC Classification: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

State Posture Code: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

PAR: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Page 9 of 11

JPIVI Number: JPM-A4S Rev. _ _..;;...O_ _

Initiating Cue: Plant is at 100% power. "B" Containment Spray pump has seized during a surveillance run. The pump is presently tagged out for repair. Wind speed is 16 mph from 142°.

CRI[la'<<l*p~AN;r,SARAMc"
l"ERSjj*i., ~
" .c: .,:
_: -_::-:r .:.:' ~;,'~'~\:i:':)"~:" 'j")!'::'{: ;.: :-:" ..-;--: __:_:,_.' - '. ---:- ".,,", ,<-::::. ~:.+/-" ,',:~,~,:,,,,) \: ,:\ -.--.:,-:-: :::.:-::: :-,:- : ;-:-':--..'.. -:.:-: -.-: '.':- -: . :-: : -: - :-:' :-~

.*:~~t~\ ..

TIME INFORMATION SOURCE 0

  • EOP 2525 is commenced.

14min. EOP 2525 is complete, the following conditions exist: RO/BOP

  • Reactor is tripped.
  • Turbine is tripped.
  • Buses 24A, 24B, and 24C are deenergized. (The RSST is deenergized and "An DIG will !\lOT start.)
  • Bus 240 is energized by its associated DIG.
  • Buses 25A, 25B are deenergized.
  • Both D.C. Buses are energized.
  • Facility 2 SW and RBCCW pumps are running.
  • Pressurizer level is 0%.
  • Head level is 61 % and stable.
  • RCS subcooling is 2°F and slowly lowering.
  • Pressurizer pressure is 527 psia and lowering.
  • SIAS, CIAS, EBFAS, MSI, and CSAS have actuated and available components are in their accident condition.
  • S/G pressures are 840 psia and stable.
  • Tave is 470 0 F and slowly lowering.
  • AFW flow to both S/Gs at approximately 300 gpm each.
  • SG levels are 46% and rising.
  • Containment pressure is 42 psig and rising.
  • Refuel Bridge and Personnel Access Rad Monitors are slowly rising, but NOT in alarm.
  • CTMT gas and particulate Rad Monitors are in alarm, but are lowering.
  • All other Rad Monitors are below their respective alarm setpoints.

21 min.

  • Pressurizer pressure is 321 psia and lowering. RO
  • "B" LPSI Pump discharge pressure indicates between 0 and 10 psig.
  • "B" LPSI Pump is secured due to lack of 'flow and abnormally low discharge pressure.

Page 10 of 11

JPM Number: JPM-A4S Rev. ___0_ __

38 min. The following conditions exist:: RO/BOP

  • Power has NOT been restored to Facility 1.
  • Facility 2 SW and RBCCW pumps are still operating normally.
  • Pressurizer level is 0%.
  • Head level is 0% on both channels.
  • RWST level is 37% and lowering.
  • CET subcooling is -116 of and becoming more negative.
  • Pressurizer pressure is 19 psia and stable.
  • SIAS, CIAS, EBFS and MSI, and CSAS are verified to the extent possible.
  • S/G pressures are 832 psia and stable.
  • 0 CETs are 342 F and slowly rising.
  • AFW is being supplies to both S/Gs at approximately 200 gpm each.
  • SG levels are 65% and stable.
  • Containment pressure is 2 psig and lowering.
  • Refuel Bridge and Personnel Access Rad Monitors are in alarm.
  • CTMT gas and particulate Rad Monitors are in alarm.
  • RM-8240 and 8241, CTMT High Range Rad Monitors, are reading 450 Rlhr and slowly rising
  • Steam Plant Rad Monitors are elevated, but NOT in alarm.
  • The MP2 Kaman Vent Monitor, RM 8168, is reading 100 J.lCi/cc and rising.
  • Several other Rad Monitors outside Containment are in alarm or elevated.

Page 11 of 11

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-S1.1 Revision: -~-

0 II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

Odjsj;;

~.~ echmca ReViewer ~ 'Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 19

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format P~ge 2 of 19

"IPM Number: JPM-S1.1 Rev. ___0'--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-S1.1 Rev. ____0'--__

Task Title: Align Charging Discharge Path System: CVCS Time Critical Task: Yes No X Validated Time (minutes): 20 Task No.(s):

Applicable To: SRO X RO X PEO KJA No. 004 A4.18 KJA Rating 4.3/4.1 Method of Testing:

Simulated Performance: -----=-.:.....---

X Actual Performance:


Location:

Classroom: Simulator: X In-Plant:


--....::....::...- -----

Task Standards: At the completion of this JPM the examinee will determine that the normal Charging flow path is not available and will align Charging to Emergency Borate through the '~" HPSI Header (Alternate Charging Flow Path).

Required Materials ARP 2590B-057 " CHARGING FLOW LO" (procedures. equipment. etc.): AOP 2512 " Loss of All Charging" General

References:

AOP 2512" Loss of All Charging"

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 19

JPM Number: JPM-S1.1 Rev. - - - -

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • You are the Reactor Operator. Respond to all alarms Initial Conditions:
  • Unit-2 is at 100% power, all rods out. No equipment out of service.

Simulator

  • IC- 30 Requirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 19

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

~t:~R1ii;~JrfE: _ _ __

1. Observe and respond to "CHARGING Examinee observes annuciator on C-02/03 y FLOW LO" (C-02/03,A-15) Examinee refers to ARP 25908-057 for N "CHARGING FLOW LO" (C-02/03,A-15 Cue:

Comments: I Examinee may recommend securing charging and letdown due to observed closure of 2-CH-429, low charging header flow and/or hioh charoino header oressure to orotect the olant equipment.

2. I If requested, secure charging and letdown I Examinee secures charging and letdown N by placing all charging pump hand switches in "PULL-TO-LOCK" and closing the following: (C-02)

"LTDN ISOL, CH-515" "LTDN ISOL. CH-516" Cu Comments:

Page 5 of 19

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

3. I CAUTION Examinee reads and acknowledges N
1. Prior to starting a standby pump, caution.

consider if charging flow low was caused by gas intrusion.[SOER 97-1, Potential Loss of High Pressure Injection and Charging Capability From Gas Intrusion"].

2. Charging flow transmitter, FT-212, is unreliable at low RCS pressure << 1000 I psi). "/'",,,2, Cue:

Comments:

4. 11. IF gas intrusion intrusion was indicated, I Examinee observes no change in VCT I N PERFORM the following: I level , determines that gas intrusion is not 1.1 PLACE all charging pump hand indicated, and that this step is not switches in "PULL-TO-LOCK." applicable.

1.2 CLOSE the following: (C-02) 1.2.1 "LTON ISOL, CH-515" 1.2.2 "LTON ISOL, CH-516" 1.3 Go To AOP 2512, "Loss of

~k~,~~r,.qi~hg*lI.

Cue:

Comments:

5. I 2. As necessary, START another charging Examinee determines that it is not N pump and PLACE affected charging pump necessary to start another charging pump switch in "PULL TO LOCK" (C-02). and that this steo is not aoolicable.

Cue:

Comments:

Page 6 of 19

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

6. I 3. IF charging flow is restored to normal by Examinee determines that this step is not N shifting operating charging pumps, SEND applicable.

operators to ensure piping integrity for pump which developed low flow and SUBMIT Trouble Report to Maintenance Department to investigate possible degradation of charging pump or discharge relief valve malfunction.

L" ,,"!?k """""" """",,

Cue:

Comments:

7. I 4. IF "A" or "C" charging pump is the affected pump, as necessary, PERFORM IExaminee states that this step is not N necessary.

the following:

4.1 IF available, Refer To OP 2304E, "Charging Pumps," and PERFORM applicable actions to align "B" charging pump, to serve as applicable facility OPERABLE charging pump.

4.2 IF "B" charging pump is not available AND "A" or "cn charging pump is made inoperable, LOG entry into appropriate TIS LCO ACTION Statements --><-- .,.,- ,- .' -.~;v_,," A in SM Cue:

Comments:

8. 5. IF "CHG HDR FLOW" is less than 40 Examinee goes to AOP 2512, N gpm (C-02/3, F-212), Go To AOP 2512, "Loss of All Charging."

"Loss of All Ch---'-- "

L Cue:

Comments:

Page 7 of 19

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) l~!~)

9. 3.0 Assessment of Loss of All Charging NOTE
1. If charging flow cannot be established I Examinee reads and acknowledges note. I N prior to Pressurizer level lowering to 10%

below programmed value (less than 55%

PZR level at Tavg of 561.5 F), the RX must be tripped and actions to establish HPSI flow initiated.

2. If the SM/US believe attempts to restore charging will be unsuccessful then the decision to trip the RX should not be delayed.
3. Following a reactor trip, this procedure will be performed in parallel with EOP 2526, "Reactor Trip Recovery" and OP 2207, "Plant Cooldown"
4. Power reduction should not be attempted with a loss of Charging as inventory continues to be lost and the potential for I-_ _ _--II.,...,,::.~IAS on Cue:

Comments:

Page 8 of 19

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE I STANDARD CRITICAL (YIN)

I GRADE (S/U) 1

10. 3.1 IF PZR level lowers to 10% below Examinee notes that this step is not N programmed value or Charging restoration required now but will keep this step open.

is determined unlikely, PERFORM the following:

a. ENSURE the reactor is tripped.
b. ENSURE EOP 2525, "Standard Post Trip Actions" are completed.
c. IF desired, CONTINUE this procedure in parallel with EOPs.
d. To Restore PZR level using HPSI, Refer To Section 8, "Restoration of PZR Level HPSI" Cue:

Comments:

11 . 3.2 Refer To RAC 14, "Non-Emergency Examinee requests that the US/8M N Station Events" and CLASSIFY the event determine reportability/classification under "Any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to shutdown the reactor and maintain it in a safe shutdown condition."

10CFR50 Cue:

Comments:

Page 9 of 19

PERFORMANCE INFORMATION JPM Number:

I STEP I PERFORMANCE I STANDARD CRITICAL (Y"~)

GRADE (S/U)

12. 3.3 INITIATE forcing sprays, and Examinee initiates forcing sprays by N MONITOR PZR pressure. placing backup heaters to on and the lowering automatic setpoint on the controlling channel pressure controller to I maintain RCS pressure at - 2500 psi.

~;<",,';"VA<;,,"'*',,;, ,/'" 'U',l' "~J::1i:!H:<;,.';77i~:j,n<x;,t'~;~BiL;it;~?h\-;,i.2:t;lHH ;'0 Cue:

Comments:

Page 10 of 19

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

13. 3.4 CHECK charging flowpath as Examinee checks charging flowpath by follows: observing:

Suction aligned from one of Suction aligned from one of the following the following: by red OPEN indication "VCT OUT ISOL CH-501" open N

_"VCT OUT ISOL CH-501" "BA ISOL CH-514" OR N

_ "BA ISOL CH-514" OR

_ "GRAV FD (SOL BAST A, CH-509",

_ "GRAV FD ISOL BAST A, CH-509", OR N OR "GRAV FD ISOL BAST B, CH-508"

_"GRAV FD ISOL BAST B, CH-508" N

_ "RWST ISOL, CH-192" and "RWST TO CHGSUCT, CH-504", open - "RWST ISOL, CH-192" and "RWST TO N CHGSUCT, CH-504", open Charging header isolation valves open: Charging header isolation valves open:

"CHG HDR ISOL, CH-429" N "CHG ISOL, CH-518" OR "CHG ISOL, CH-518" OR N "CHG ISOL, CH-519" "CHG ISOL, CH-519" y

Examinee notes that "CHG HDR ISOL, CH-429" is closed by green CLOSE indication

_ NO indication of blockage in either the _ NO indication of blockage in either the N

suction or discha suction or discharge flowpath A "1~

~

  • .=0,t~,~~,-C--~.~0~~7dAA~A~.~-C=

Cue:

Comments:

Page 11 of 19

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP PERFORMANCE ------

STANDARD (Y'l~L (~l~

14 . I 3.4.1 PERFORM the following:

Examinee places all charging pump

a. PLACE all charging pump handswitches handswitches in "PULL-TO-LOCK." Y in "PULL-TO-LOCK."
b. CLOSE Examinee closes the following valves by
  • "LTDN ISOL, CH-S1S" rotating their handswitches to the CLOSE
  • "LTDN ISOL, CH-S16" (C-02) direction
c. WHEN VCT level rises to 86% or as WHEN VCT level rises to 86% or as N desired, PLACE letdown divert switch, desired, examinee places letdown divert "L TON DIVERT CH-SOO to "RWS" position. switch, "LTON DIVERT CH-SOO to "RWS" position.

Cue:

Comments: I

  • Only one of these valves are required to be closed to isolate letdown

'--_ _ _---',g!!arging pump handswitches may have already placed in "PULL-TO-LOCK" Page 12 of 19

PERFORMANCE INFORMATION JPM Number:

I STEP PERFORMANCE STANDARD CRITICAL (yIN)

GRADE (SIU)

15. I d. Refer To the following TS/TRM LCOs and DETERMINE Examinee requests that the US/SM refer N applicability: to the listed TSITRM LCOs and TRM 3.1.2.2 DETERMINE applicability:

TRM 3.1.2.4 TRM 7.1.1

_ TS 3.5.2.a (if PZR press> 1750 psia)

_ TS 3.5.3.a (if PZR press < 1750 psia)

TS 3.0.3 h, ",,,,,",,,,><, ", ,

Cue:

Comments:

1 6. I e. Refer To the applicable section and PERFORM applicable actions. IExaminee refers to Section 5.0, Discharge Section 4.0, "Suction Flowpath I Flowpath Restoration" due to observed I N Restoration" closure of "CHG HDR ISOL, CH-429" Section 5.0, Discharge Flowpath Restoration" L~~>

Section 7 Cue:

Comments:

17. I NOTE N

If the normal charging flowpath is lost and cannot be reestablished, a plant shutdown IExaminee reads and acknowledges note is necessary. While shutting down, pressurizer level can be maintained by charging into the RCS through the alternate fl Cue:

Comments:

Page 13 of 19

PERFORMANCE INFORMATION JPM Number:

I CRITICAL I GRADE STEP PERFORMANCE I STANDARD (YIN) (S/U)

18. I S.1 IF the normal charging path is not available, ESTABLISH alternate charging f10wpath as follows: I Examinee ensures that the flowing valves are closed:
a. ENSURE the following are closed:{C-02).

"LTDN ISOL, CH-S1S" "LTDN ISOL, CH-51S" N "LTDN ISOL, CH-S16" "LTDN ISOL, CH-516" N Cue:

I..".

Comments:

19. IUt>: ENSURE letdown flow has stopped as IExaminee ensures letdown flow has N indicated on "LTDN FLOW, FI-202" (C-02). stopped by observing no flow on "LTDN FI-202" Comments:

2 O.

Cue:

Comments:

21. I d. Refer To the following TSITRM LCOs and DETERMINE applicability: Examinee requests that the US/SM refer N TS 3.0.3 to the listed TSITRM LCOs and TRM 3.1.2.2 DETERMINE applicability:

TRM 7.1.1 TS 3.5.2.a, if PZR press> 17S0 psia L~<.T~,,~;~:~:a, .i!. ~?l3e.~e:.~s~.17S.o C

Page 14 of 19

PERFORMANCE INFORMATION JPM Number:

CRITICAL I GRADE I STEP PERFORMANCE I STANDARD (YIN) (§[!J~

22. e. OBTAIN key #39 from Operations key Examinee obtains key #39 from y locker and CLOSE "HPSI HDR A STOP, Operations key locker and closes "HPSI SI-656" (C-01). HDR A STOP, SI-656" 1------11="' u' Cue:

Comments:

23. f. OPEN both of the following Examinee requests plant operator to open valves (14'6" AB Boronometer Room): the following valves:

_ CH-340, "CHARGING PUMP CH-340, "CHARGING PUMP y DISCHARGE TO HPSI HEADER" DISCHARGE TO HPSI HEADER" y

_ CH-440, "CHARGING PUMP _ CH-440, "CHARGING PUMP DISCHARGE TO HPSI HEADER" DISCHARGE TO HPSI HEADER"

'v vL "",0\%

Cue:

Comments:

24. g. CLOSE the following HPSI Examinee closes the following valves by injection valves (C-01): taking their handswitches to the "CLOSE" direction and observing a green CLOSE light:

y

- "LOOP 1A, SI-617" - "LOOP 1A , SI-617"

- "LOOP 1B, SI-627" y "LOOP 1B, SI-627"

- "LOOP 2B , SI-647" "LOOP 2B, SI-647" y Cue:

Co~me~n~ts~:~I____________________________________________________________________________________~

Page 15 of 19

PERFORMANCE INFORMATION JPM Number: Rev..

STEP PERFORMANCE STANDARD

25. I h. ENSURE "LOOP 2A, SI-637," is open I Examinee ensures "LOOP 2A. SI-637." is N (C-01 ).

Cue:

Comments:

26. I i. OBTAI N Key #50 from Operation Key Examinee obtains Key #50 from Operation I N Locker and UNLOCK and CLOSE Key Locker and unlocks and closes "CHG HDR ISOL, CH-429" (C-02). "CHG HDR ISOL, CH-429" by rotating the key counter-clockwise and observing a reen CLOSE lioht.

L""", """d"""",",,",3* J.J. ' L.:':"L."3" Cue:

Comments: Examinee may state that this valve was

27. NOTE

~,,~~~~~..I .~_~ ____ *** :11 .... _ ~ .... _~ n-,.n I~ **_1 I Examinee reads and acknowledges note.

N Page 16 of 19

PERFORMANCE INFORMATION JPM Number:

I STEP I PERFORMANCE 1 STANDARD 1 CRITICAL (YIN)

GRADE (S/U)

28. j. IF desired, ALIGN charging Examinee aligns the charging pump suction to RWST as follows (C-02): pump suction to RWST as follows:
1) CLOSE "VCT MAKEUP BYPASS, CH Verifies "VCT MAKEUP BYPASS, CH 196." N 196." closed by green CLOSE indication.
2) OPEN "RWST TO CHG SUCT, CH-504." Verifies "RWST TO CHG SUCT, CH-504" N
3) OPEN "RWST ISOL, CH-192." open by red OPEN light
4) CLOSE "VCT OUT ISOL, CH-501."
5) Refer To AOP 2575, "Rapid Opens "RWST ISOL, CH-192" by rotating Down power, .. and SELECT borate from the Y its handswitch clockwise and observing a RWST red OPEN light.

Closes "VCT OUT ISOL, CH-501" by Y rotating its handswitch counter-clockwise and observing a green CLOSE light.

Examinee states that he/she will refer to AOP 2575, "Rapid Downpower," and N SELECT borate from the RWST Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

,STQRJ;gME~~***

",,,,,, "'<kdn,~' ' _ _ __

Page 17 of 19

JPM Number: JPM-S1.1 Rev. _ _-,,-0_ _

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No --,

-

Validated Time (minutes): 20 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

Areas for Improvement/Comments:

Page 18 of 19

JPM Number: JPM-S1.1 Rev. _ _....:...O_ _

STUDENT HANDOUT Initial Conditions:

  • You are the Reactor Operator. Respond to all alarms Initiating Cues:
  • Unit-2 is at 100% power, all rods out. No equipment out of service.

Page 19 of 19

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-S4s.1 Revision: ----=--

0 II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

~~3/; J echnical Reviewer ~

IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 12

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

DESCRIPTION REV/CHANGE de HUP evaluations and new format Page 2 of 12

JPM Number: JPM-S4s.1 Rev. _ _.....;0=--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-S4s.1 Rev. ___0=--__

Task Title:

System: Foxboro IA Time Critical Task: Yes

-

No x Validated Time (minutes): 20 Task No.(s):

Applicable To: SRO RO X PEO

- - --

KIA No. 041 A4.06 KIA Rating _--""-2..;......9'-'-'3"-._1__

Method of Testing:

Simulated Performance: Actual Performance: X


---"-"'--

Location:

Classroom: - - - Simulator: X In-Plant:

-"-=-- ----

Task Standards: At the completion of this JPM, the examinee will attempt to operate the #2 ADV from C-05 and determine that the controller is failed.

The examinee will take manual control of #2 ADV from the Foxboro Controller.

Required Materials EOP 2528 (Step 29)

(procedures. equipment. etc.):

OP 2386 " Reactor Regulating System" General

References:

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 12

JPM Number: JPM-S4s.1 Rev. _ _ _ 0_ __

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • You have been directed to commence an RCS cooldown per Step 29 of EOP 2528 at a controlled cooldown rate of between 40 to 50 F/hr.

using both Steam Generators.

Initial Conditions:

  • Due to a small steam leak in the 38'-6" West Enclosure Building. the Shift Manager has restricted access to this area.
  • Plant management has decided that the plant will go to MODE 5 to repair this steam leak.

Simulator

  • IC-152 Requirements:
  • Instructor to act as RO to address alarms 1< 1< 1< NOTES TO EVALUATOR 1< 1<
  • 1<
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue" .
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 12

PERFORMANCE INFORMATION JPM Number: JPM- S4s.1 Rev..

tt!1~:tlm0tJ("~;M~1(~ t1t'\r::~ge:- ::f"'" 1'le"'\~di:Z;\ ,~\ ' :8,':1':14; \", tS(i': ,:;

g~~r~%~I%%~, 0~li{~v~~Qn+t;
Q ,\,' 1!;'.Y:(1( , J!;\i!;i>;it; / ,

STEP PERFORMANCE STANDARD

~TARTTIME:

1. EOP 2528 Examinee refers to EOP 2528 N Loss Of Offsite Power/Loss of Loss Of Offsite Power/Loss of Cue:

Comments: ! Instructor will act as RO to acknowled

2. I NOTE Examinee reads and acknowledges note N Technical Specification cooldown rates on cooldown rate limits.

should be observed during the cooldown.

The cooldown rates are as follows:

1. RCS TC greater than 220 F the cooldown rate is 100 F/hr.
2. RCS TC less than or equal to 220 F the cooldown rate is 50 F/hr.

Cue:

Comments:

3. I Perform Controlled Cooldown Examinee initiates a cooldown of the RCS y using both ADV's per step 29.1 due to the
29. INITIATE a controlled cooldown using condenser and steam dumps not the steam dumps to establish shutdown available.

cooling entry conditions.

29.1 INITIATE a controlled cooldown using the ADVs to establish shutdown cooling entry conditions.

t" _,, ,Y',_"" ,"~. 0',,) ",aM>.,~ ,~, ",<<.w§.<<~, ~ '" "" ",,,,4~'~,,.*c, "

Cue:

Comments: I Once examinee has commenced an RCS cooldown using both ADV's, trigger malfunction RX20D to 0% to fail PIC 4224 to the Foxboro IA.

Page 5 of 12

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDAR'-=-=D=---__ __J

4. #2 ADV fails closed Examinee observes the following: y*
  • #2 ADV red OPEN light is not lit
  • The cooldown rate lowers Cue Comments:

5.

Cue:

Comments: I The examinee may determine that the #2 ADV can be successfully operated from C-21. If he/she chooses to rm this success oath. then oroceed to JPM Steo 19 Page 6 of 12

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

6. I 4.1.2 Manual Operation
a. PUSH the "AIM" button until "M" is Examinee pushes the "M" on "ATMOS N DUMP CTRL PIC 4224" in order to take manual control of 2-MS-190B N
b. PRESS "SEL" button until cursor Examinee presses "SELl! button on appears above output (right hand bar "ATMOS DUMP CTRL PIC 4224" until graph). cursor appears above output.
c. USING "up" and "down" buttons, ADJUST output as desired. Examinee raises output on "ATMOS N DUMP CTRL PIC 4224" in order to open 2-MS-190B 3th""

Cue:

Comments:

7.

Cue:

Comments:

8.

Controlling from the Foxboro screen results Examinee reads and acknowledges note N in the setpoint of the controller failing high on controller setpoint failure.

such that the valve will close or remain I---------+"L closed.

Cue:

Comments:


Page 7 of 12

PERFORMANCE INFORMATION JPM Number: JPM- S4s.1 Rev.. 0 l STEP PERFORMANCE I STANDARD CRITICAL (YIN)

GRADE (S/U) 4.5.1 SELECT "Change Env" (Foxboro Examinee selects "Change Env" on the controls PPC PPC Foxboro screen.

I ' c" ",,,,,,Xc.,.'" '

Cue:

Comments:


10.

Cue:

Comments:

11 .

Cue:

Comments:

12.

Cue:

Comments:

13.

Cue:

Comments:

14. 4.5.6 OBSERVE the "NORMAL" button Examinee observes the "NORMAL" button N changed to "BYPASSED." changed to "BYPASSED" for controller PIC-4224 on the PPC Foxboro screen. ,'

Cue:

Comments:

Page 8 of 12

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

15. I 4.5.7 To take manual control SELECT I Examinee selects "MANit for controller Y PIC-4224 on the PPC Foxboro screen.

I. '

Cue:

Comments:

16. 4.5.8 CHECK "MAN" button changes from Examinee checks "MAN" button changes N grey to red. from grey to red for controller PIC-4224 on the PPC Foxboro screen.

Cue:

Comments:

17.

Cue:

Comments:

18. I 4.5.9 USING up and down buttons, I Examinee adjusts controller PIC-4224 Y ADJUST controller output as desired. output as desired on the PPC Foxboro I screen to continue plant cooldown .

h 'y,'",,:L~" ,,~ ", ,,,{$'84@\ J.' ,/t. ,Q".Zkl""N" \i" ,< .",,,~" ,L*A.*,<'!'h",)$",;Z;;:;S;,f ZYLy",k.9>>A''' " AN'A'/~

  • Cue:

Comments:

19.

Cue:

Comments:

20. I Place #2 ADV controller HIC 4224 in IExaminee locates and places "HIC 4224" Y manual control in the "MAN" position and establishes L,J, communication with the Control Room Cue:

Page 9 of 12

PERFORMANCE INFORMATION JPM Number:

GRADE STEP PERFORMANCE STANDARD (S/U)

21. Operate #2 ADV controller in manual to Examinee rotates control knob to open y open #2 ADV #2 ADV to continue cooldown and maintain #2 S/G pressure approximately ual to #1 S/G

,.....-..,..-,.....--:-~

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

§,TOPTIME:

Page 10 of 12

JPM Number: JPM- S4s.1 Rev. _ _-'0"--__

VERIFICATION OF JPM COMPLETION

'~; ,(

+" (;;;

Title: ) J < ;

H///";:""

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No

-- ---

Validated Time (minutes): 20 Actual Time to Complete (minutes):

..IPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.

never put anyone's safety at risk. Pass / Fail never put equipment reliability at risk. Pass / Fail never violated radiological work practices. Pass / Fail demonstrated effective use of event-free human performance tools. Pass / Fail Areas for Improvement/Comments:

Page 11 of 12

JPM Number: JPM- S4s.1 Rev. - - - 0 --

STUDENT HANDOUT Initial Conditions:

  • You have been directed to commence an RCS cooldown per Step 29 of EOP 2528 at a controlled cooldown rate of between 40 to 50 F/hr.

using both Steam Generators.

Initiating Cues:

  • Due to a small steam leak in the 38'-6" West Enclosure Building, the Shift Manager has restricted access to this area.
  • Plant management has decided that the plant will go to MODE 5 to repair this steam leak.

Page 12 of 12

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Containment Isolatiori due to Fuel Handfing Acciaeht' . .

"IPM Number: "IPM-S5.1 Revision: - - 0 -

II. Initiated:

Marc R. Puce! 02/01/11 Developer Date III. Reviewed:

Tec IcalReviewer AJ)~/;/

Dat IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 10

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 10

~IPM Number: JPM-S5.1 Rev. ___0,,---__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-S5.1 Rev. ___0,,---__

System: Containment Time Critical Task: Yes No X Validated Time (minutes): 15 Task No.(s):

Applicable To: SRO -X- RO - -X- - PEa KIA No. 103 A2.04 KIA Rating 3.5/3.6 Method of Testing:

Simulated Performance: Actual Performance: X


----

Location:

Classroom: Simulator: - - X - In-Plant:

--- -----

Task Standards: At the completion of this JPM, the examinee will take the required actions in the Control Room to isolate Containment due to a Fuel Handling Accident.

Required Materials OP 2315A "Control Room Air Conditioning System" (procedures. equipment. etc.): AOP 2557 " Fuel Handling Accident" General

References:

OP 2315A "Control Room Air Conditioning System" AOP 2557 " Fuel Handling Accident"

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simUlate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 10

JPM Number: ..... I\II_.~'C> 1 Rev. - - - 0 --

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • You are the RO. Respond to all alarms or direction as normal.

Initial Conditions:

  • Unit-2 is in a Refueling outage with fuel movement occurring in Containment.

Simulator

  • IC-153 Reguirements:
  • Train "An CRACS is operating in "NORMAL" mode.
  • Containment purge valves are open to maintain containment habitability.
  • Mon 1 (SDC). Mon 2 (STR). Mon 3 ( PAY)
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 10

PERFORMANCE INFORMATION JPM Number: JPM-S5.1 e~i"r'l

'9t1ildj STEP PERFORMANCE I STANDARD CRITICAL C(t~)

I G(RA~E I StU StART TIME: - - - -

1. Millstone Unit 2 Examinee states that the Fuel Handling N Fuel Handling Accident AOP 2577 Accident ( AOP 2577) procedure has idance for this event Cue:

Comments:

2.

Cue:

Comments:

3. 3.1 REQUEST Health Physics Examinee requests Health Physics N Department perform the following: Department perform the following:

_ Evacuate personnel from SG primary _ Evacuate personnel from SG primary sides and loop areas sides and loop areas

_ Coordinate an evacuation of personnel in _ Coordinate an evacuation of personnel containment . I .in containment Cue:

Comments:

4.

Cue:

Comments:

Page 5 of 10

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

5. 3.3 ANNOUNCE the following over plant Examinee announces the following over page system: plant page system:

y "Attention all personnel, a fuel handling "Attention all personnel, a fuel accident has occurred inside Unit 2 handling accident has occurred inside containment. All personnel evacuate Unit 2 Unit 2 containment. All personnel containment." evacuate Unit 2 containment."

Cue:

Comments:

6. I 3.4 IF purging of containment is in Examinee closes the following by rotating progress, their switches to the "CLOSE" position and VERIFY the following are closed: verifying by green" CLOSE" light

_ AC-4, Containment Outboard indication only that the dampers are Isolation Damper closed:

_ AC-5, Containment Inboard _ AC-4, Containment Outboard Y Isolation Damper Isolation Damper

_ AC-6, Containment Inboard _ AC-5, Containment Inboard y Isolation Damper Isolation Damper

_ AC-7. Containment Outboard _ AC-6, Containment Inboard y Isolation Damper Isolation Damper

_ AC-7, Containment Outboard Isolation Dam Cue:

Comments:

7.

Cue:

Comments:

Page 6 of 10

PERFORMANCE INFORMATION JPM Number: JPM-S5.1 Rev.. _0_

i cot1tatnmen(,'sGlatiot{dU6"fO~Fi.Jel

, ' "~'ecce " '" ",,' " ' ' ' ' ' ' ' ' " " " " " " " " " " " """ '" ,',' " , '" "

Hahdlrn~:jl!cci8ehf

" , ' ,"',,,' g" ,',', ""'"

STEP PERFORMANCE STANDARD

8. _3.6 VERIFY at least one train of Examinee verifies "A" train of CRACS in CRACS operating in recirculation mode. the recirculation mode by:

(C25) Starting "CRACS FL TR FANF-32A" by Facility 1 rotating its handswitch to the "ON" y

_ HV-203A, Fan F-21A exhaust damper is position.

open. Examinee verifies:

_ Fan F-21A, supply fan is running. y

_HV-203A, Fan F-21A exhaust damper is

_ HV-206A, Fan F-31A exhaust damper is open by red "OPEN" light lit only.

open. y

_ Fan F-21A, supply fan is running by red

_ Fan F-31A, exhaustfan is running.

"ON" light lit only.

_ HV-212A, Fan F-32A exhaust damper is open. _ HV-206A, Fan F-31A exhaust damper is y

_ Fan F-32A, filter fan is running. open by red "OPEN" light lit only.

_ HV-202, minimum fresh air damper is _ Fan F-31A, exhaustfan is running by red y closed. "ON" light lit only.

y

_ HV-207, cable vault exhaust damper is _HV-212A, Fan F-32A exhaust damper is closed. open by red "OPEN" light lit only.

_ Fan F-32A, filter fan is running by red y

_ HV-208, exhaust air damper is closed.

"ON" light lit only.

_ HV-202, minimum fresh air damper is y closed by green "CLOSE" light lit only.

_ HV-207, cable vault exhaust damper is y closed by green "CLOSE" light lit only.

_ HV-208, exhaust air damper is closed by y green "CLOSE" light lit only.

Cue: h.f~,$~iitlJ,d'~Yd~li~,tRlml!rOP ~31S~ fc)(.pla~!rfg ~~cs'Iij";f~~ir*ulation'mod~tharid;hJli!lherOP ~~'5A.

Comments: I Examinee will observe that both HV -207 and HV-208 remain open if handswitches "NORM/RECIRC MODE, HS 8346" and "NORM/RECIRC MODE, HS-8359" are not placed in "RECIRC". Examinee may refer to OP 2315A for placing CRACS in recirculation mode which provides direction for placing "NORM/RECIRC MODE, HS-8346" and "NORM/RECIRC MODE, HS-8359" in "RECIRC" thus allowing HV-207 and HV-208 to go closed Page 7 of 10

PERFORMANCE INFORMATION JPM Number: 1 STEP PERFORMANCE STAND=A~R~D~________~~~__~.......... L~~~

TERMINATION CUE: The evaluation for this JPM is concluded.

~t6PTIME!

Page 8 of 10

"IPM Number: JPM-S5.1 Rev. _ _--::..._ _

VERIFICATION OF JPM COMPLETION Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes -

No X Validated Time (minutes): 15 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 9 of 10

JPM Number: JPM-S5.1 Rev. ___0,,---__

STUDENT HANDOUT Initial Conditions:

  • You are the RO. Respond to all alarms or direction as normal Initiating Cues:
  • Unit-2 is in a Refueling outage with fuel movement occurring in Containment.

Page 10 of 10

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Actuation Test of Various ESF Co~ponent§! F~,ci!inl,t;l'.....

';:<;AM-515} ~ Monthly i;.. ** ." ' , , { ..' \\!.;;'~~Ii/'

JPM Number: JPM-S7.1 Revision: - - 0 II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

IV. Approved:

Cognizant Plant Supervisor (optional) Date 6~N~c,~~~~or ~IIDate Page 1 of 13

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13

..IPM Number: JPM-S7.1 Rev. ___0'--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM-S7.1 Rev. - - - - -

JPM Number:

Task Title:

° System:

Time Critical Task: Yes

--

No x Validated Time (minutes):

Task No.(s): _ _ _ _ _ _ _ _ _ __

Applicable To: SRO X RO X PEO

---

KIA No. 013 A4.03 KIA Rating _----'4..:...;.5;..:-14..:......___

7 _

Method of Testing:

Simulated Performance: Actual Performance:

- -X- - ----

Location:

Classroom:

---

Simulator:


X In-Plant: - - - -

Task Standards: At the completion of this JPM, the examinee will have performed the required actions to test actuation of ESAS component AM-515, per surveillance procedure SP 2604T.

Required Materials SP 2604T " Actuation Tests of Various ESF Components" (procedures, eqUipment, etc.): SP 2604T-001 "Actuation Tests of Various ESF Components Facility 1)

General

References:

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 13

JPM Number: JPM-S7.1 o Rev. - - - - - -

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • You have been assigned to perform SP 2604T, (Section 4.1) Testing Actuation Module, AM515 for monthly surveillance testing.

Initial Conditions:

  • Unit-2 is at 100% power, ARO
  • You are the BOP operator
  • A second licensed operator is available to assist you.

Simulator

  • IC-30 or IC-20 Reguirements:
  • An instructor to act as the second licensed operator as required.
  • *
  • NOTES TO EVALUATOR '* '* '* *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What ar~: you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

~iSFAtiil~rfiMEt'_ _ __

,"""',"""',',""",,i',"',,,"

1. I SP 2604T (4.1) INSTRUCTIONS 4.1 Testing Actuation Module, AM515 Examinee reads and acknowledges note N NOTE about expected alarms for test of AM515.

The following alarms may be received during the performance of this section:

"ESAS COMPONENT UNDER TEST FAILURE" (C-01 B41)

_ "SIAS OR UV ACTUATION SIG CH 1 TRIP" (C-01 A34)

_ "CONT PRESS HI A" (C-01 A21)

"CTMT AIR RECIRC FAN A VIBRATION HI" (C-01 A4)

"CTMT AIR RECIRC FAN C VIBRATION HIli (C-01 C4)

"SIAS CH 1 TROUBLE" Cue:

Comments:

Page 5 of 13

PERFORMANCE INFORMATION JPM Number: JPM-S7.1 Rev.. 0

, .~ .... ,,*!fii!p{;lIl_i;:lIf+.;.;.t:,<r\ j. . * "!'!;.ii:.:m.,i,S*C1d~~'i**'~.*~.I"*:ii: i tJ : iF '" "I'~i 1 ( A'M'" ~:.\5I,@~~~'1.IIUIII~~§iII!i!!i!I :,~ , jh:~'i!!<

. ' .jj:'i:~ , , ! .. ! ~h ,~,p~'iVanQUS~;;t=i1iP!>~ro ~,~Iil~n S!, ,aCI t , '. ,c;y: It ,: ,YJmY~I1\"; 10J11,. "$'j;!,ji~li;ii:;';i':::: iii!i:!;i!ii!i!i!,tl!1il;>,~; "f" '_ttl' '\i,,<

CRITICAL GRADE I STEP I PERFORMANCE I STANDARD <YIN) (SM

2. 4.1.1 VERIFY the following: Examinee verifies initial equipment N

_ "A" Service Water Pump is operating OR alignments are met by verifying:

hand switch P5A, "A" Service Water Pump is operating by "SERVICE WATER PPA," is in "PULL TO amp indication and red operating light LOCK" (C-06) OR hand switch P5A, "SERVICE WATER

_ "F-14A, CAR FAN A," and "F-14C, CAR PP A," is in "PULL TO LOCK" (C-06)

FAN C," are operating in fast speed (C-01)

No boration or dilution to VCT or charging "F-14A, CAR FAN A," and "F-14C, CAR pumps in progress FAN C," are operating in fast speed by red light indication (C-01).

No boration or dilution to VCT or charging Cue:

Comments:

3* I C AUT ION I Examinee reads and acknowledges N PMW or boric acid flow may commence if caution statement.

the respective controllers are not in manual closed or set to "0" when CH-196, "VCT I--------j MAKEUP BYP Cue:

Comments:

4. 4.1.2 VERIFY "FC-21OX PRI MAKEUP Examinee verifies that FC-21 OX and FC Y WTR FLOW CONTROLLER" and "FC 210Y meet one of the following conditions:

210Y SA MAKEUP FLOW CONTROLLER," In manual mode and set fully closed are each in one of the following conditions: _Integrator set for "0" manual mode and set fully closed ntegrator set for "0" I., ' ,L.!~,=.","",.'M"dlh ***h","~.A" Cue:

Comments:

Page 6 of 13

PERFORMANCE INFORMATION JPM Number: JPM-S7.1 L..ScT..E

... P PERFORMANCE STAND=-::.A-=.R-=.=D'--_ _ _------'

5. Examinee opens CH-196, "VCT MAKEUP y BYPASS,"

~

Cue:

Comments:

6. 4.1.4 Depending on current condition, Examinee determines that SIAS is not y PERFORM applicable action: "Blocked" (*pzr pressure greater than or equal to 1,850 psia), and checks a""1/5"

_IF SIAS is not "Blocked" (*pzr pressure lights or bistable "TRIP" lights not lit for greater than or equal to 1,850 psia), SIAS, CIAS, EBFAS, CSAS, or SG on CHECK all "1/5" lights or bistable "TRIP" Facility 1 and Facility 2 ESAS actuation lights not lit for SIAS, CIAS, EBFAS, CSAS, and sensor cabinets.

or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.

_IF SIAS is "Blocked" (pressurizer pressure less than 1,850 psia) CHECK all lower "1/5" lights (from containment pressure input) not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.

_ MSI is "Blocked" (SG pressure less than 700 psia) all lower "1/5" lights (from containment pressure input) not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor 1------\

. cabinets.

Cue:

Comments:

Page 7 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

7. 4.1.5 PLACE "S-501, TEST PERMISSIVE IExaminee places "S-501, TEST SWITCH," in 'TEST SIAS" (ESAS actuation PERMISSIVE SWITCH," in "TEST SIAS" 1----

. cabinet Cue:

Comments:

8.

Cue:

Comments:

9.

Cue:

Comments:

1 O. NOTE N

1. When the next step is performed, many Examinee reads and acknowledges note "1/5" lights illuminate on the actuation about 1/5 lights and requirement for modules. additional person requirement for test
2. Due to the distance between bistable, initiation.

BA101, and actuation module, AM 515, two uired to initiate the test.

Cue:

Comments:

Page 8 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE I STANDARD

  • l CRITICAL (YIN)

I GRADE (S/U)

11. 4.1.8 PRESS and HOLD "TRIP TEST" Examinee either performs or directs y button on bistable, BA 101. (ESAS Sensor pressing and holding of "TRIP TEST" Cabinet 'A') button on bistable, BA101 at ESAS Sensor Cabinet 'A'.

Cue:

Comments:

12.

Cue:

Comments:

13. 4.1.10 To initiate start signal, PRESS lower Examinee either performs or directs the Y "1/5" "TEST" button on actuation module, pressing of lower "1/5" "TEST" button on AM515 (ESAS actuation cabinet 5). actuation module, AM515 on ESAS actuation cabinet 5.

Cue:

Comments:

14. I 4.1.11 RELEASE "TRIP TEST" button on Examinee either performs or directs the Y bistable BA 101. releasing of "TRIP TEST" button on bistable BA101.

Cue:

Comments:

Page 9 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

15. I 4.1.12 OBSERVE the following and INITIAL Examinee observes and initials for proper Y for the "Results" on SP 2604T-001: actuation of equipment on SP 2604T-001

_ Actuation module, AM515, red "TRIP" by observing:

light is lit (ESAS actuation cabinet 5)

_ "F-14A, CAR FAN A," shifted to slow F-14A slow speed red light lit.

speed (C-01)

F-14C slow speed red light lit.

"F-14C, CAR FAN C," shifted to slow speed (C-01) CH-196 green light lit.

_ "CH-196, VCT MAKEUP BYPASS,"

L, closed n ,d ,

Cue:

Comments:

16. I 4.1.13 PLACE the following switches to IExaminee places "F-14A, CAR FAN A" Y "START LOW/PULL TO LOCK" (C-01): and "F-14C, CAR FAN Cit switches to

-

"F-14A CAR FAN An I

I "START LOW/PULL TO LOCK.

CARFANC" Cue:

Comments:

17. 14.1.14 PRESS "ACTUATION RESET SIAS" IExaminee presses "ACTUATION RESET Y button (ESAS Actuation Cabinet 5). SIAS" button at ESAS Actuation Cabinet Comments:
18. I 4.1.15 PRESS red "TRIP" light on bistable, Examinee presses red "TRIP" light on Y BA 101. (ESAS Sensor Cabinet'A') bistable, BA 101. (ESAS Sensor Cabinet

'Af).

Cue:

Comments: r"'E;~~inee may note that red "TRIP" Ii Page 10 of 13

PERFORMANCE INFORMATION JPM Number:

I STEP I PERFORMANCE I STANDARD CRITICAL (YIN)

GRADE (StU)

19. 4.1 .16 PLACE "5-102, TRIP TEST" switch Examinee places "5-102, TRIP TEST" y in "OPERATE." (ESAS Sensor Cabinet 'A') switch in "OPERATE." On ESAS Sensor Cabinet 'A'.

Cue:

Comments:

20. 4.1.17 PLACE "5-501, TEST PERMISSIVE Examinee places "S-501, TEST y SWITCH" in "OPERATE." (ESAS actuation PERMISSIVE SWITCH" in "OPERATE."

cabinet 5) on ESAS actuation cabinet 5.

1-------1 Cue:

Comments:

21 . 4.1.18 PRESS red "AT I FAULT PRESS TO Examinee presses red "ATI FAULT y RESET" light. (ESAS actuation cabinet 5) PRESS TO RESET" light on ESAS actuation cabinet 5.

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

'~§'1Qft,~tMe~~i~;l. ' - - - -

Page 11 of 13

..IPM Number: 1 Rev. ___0_ __

VERIFICATION OF JPM COMPLETION Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee .. Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 12 of 13

JPM Number: JPM-S7.1 Rev. ___0:.....-__

STUDENT HANDOUT Initial Conditions:

  • You have been assigned to perform SP 2604T, (Section 4.1) Testing Actuation Module, AM515 for monthly surveillance testing.

Initiating Cues:

  • Unit-2 is at 100% power, ARO
  • You are the BOP operator
  • A second licensed operator is available to assist you.

Page 13 of 13

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: ManLJalBlendedMakeLJp to. volum~ CO(llrol*Tabf(<afllted)

JPM Number: JPM-S2.1 Revision: 0


=--

II. Initiated:

R. Pucel 02/01/11 Developer Date III. Reviewed:

~)Js/J/

I Da(e IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 15

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 15

JPM Number: Rev. ___0=--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-S2. Rev. _ _--'0'--__

Task Title:

System: _C-'--'-V-'-C-=.S_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Time Critical Task: Yes No X Validated Time (minutes): 20 Task No.(s):

Applicable To: SRO X RO X PEO KIA No. 004 A4.07 KIA Rating 3.9/3.7 Method of Testing:

Simulated Performance: X Actual Performance:


'--- ---

Location:

Classroom: Simulator: X In-Plant:

--- -'-'-- ----

Task Standards: At the completion of this JPM, the examinee will initiate a blended makeup to the VCT, determine that the PMW Flow Control Valve failed open, and terminate the blended makeup to prevent a Boron Dilution event.

Required Materials

  • Section 4.9, OP 2304C, Manual Blended Make Up to VCT (procedures, equipment. etc.):
  • Section 4.21, OP 2304C, Maintaining VCT Level and Pressure During Normal Operation
  • ARP 2590C-060" PMW FLOW HI/LO" General

References:

OP 2304C" Make Up (Boration and Dilution) Portion of eves"

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simUlate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normall available in the Control Room, includin 10 s. Make all written re orts, oral Page 3 of 15

JPM Number: JPM-S2.1 Rev. _ _--'-_ __

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • You have been directed to perform a blended makeup to the VCT to raise level 2%

Initial Conditions:

  • The current blend ratio is 9:1 (corrected for Boron-10 depletion) calculated using "An BAST
  • The piping to the VCT is currently at blend concentration (no requirement for adjusting for water in the piping).

Simulator

  • IC-30 Requirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 15

PERFORMANCE INFORMATION JPM Number:

I I STEP PERFORMANCE J STANDARD CRITICAL (YIN)

GRADE (S/U) i~TART"Tjli~t; _ _ __

1. 4.9 Manual Blended Make Up to VCT Examinee refers to 4.21, "Maintaining VCT N 4.9.1 Refer To Section 4.21, "Maintaining Level and Pressure During Normal VCT Level and Pressure During Normal Operation," and determines that during Operation," and PERFORM applicable this manual blend that no VCT high level actions. rameters will be exceeded.

Cue:

Comments:

2. CAUTION Examinee reads and acknowledges N
1. Manual make up must be monitored caution statement.

closely as there is no automatic shutoff on Examinee notes that the initial conditions a high level in the VCT. explain that the amount and effects of

2. When calculating the amount of boric PMW in the pipe have been considered, acid required for neutral blend, the amount as well as the effects of Boron-10 and effects of PMW in the pipe must be depletion.

considered.

3. When calculating the ratio of boric acid to PMW, the effects of Boron-10 depletion

_ _ _-Il=,.!l1ust be considered.

Cue:

Comments:

Page 5 of 15

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

3. 4.9.2 VERIFY the following (C-02): Examinee notes that red "ON" indicating N

_ PMW is available (indicating lights for is lit for runnina PMW pump.

PMW transfer pumps).

Examinee notes red "ON" lit for running

_ WHEN blend will be injected into the Charging pump and -44 gpm indicated for RCS, at least one charging pump running. charging header flow "F-212".

Cue:

Comments:

4. 4.9.3 Refer To OP 2208, "Reactivity Examinee notes that initial conditions have N Calculations" or PPC and DETERMINE provided a blend ratio, corrected for required ratio of boric acid flow to PMW Boron-10 depletion.

Boron-10 donloti r-------~~~~~~~

Cue:

Comments:

5. I 4.9.4 VERIFY the following are closed: Examinee verifies the following valves N closed by their green "CLOSE" lights lit CH-512, "MAKEUP VLV STOP," (C-04) only:

_ CH-196, "VCT MAKEUP BYPASS," (C02) CH-512, "MAKEUP VLV STOP," (C-04)

_ CH-192, "RWST ISOL," (C-02) CH-196, "VCT MAKEUP BYPASS,"(C02)

CH-192, "RWST ISOL,"

Cue:

Comments:

6.

Cue:

Comments:

Page 6 of 15

PERFORMANCE INFORMATION JPM Number: o STEP PERFORMANCE STANDARD

7. 4.9.6 DETERMINE total gallons required to Examinee determines that an addition of N make desired level change as follows: 68 gallons are required to raise VCT level Desired level change in % x 34 gallons = 2%

l Tot~! ...~~II,~ns. f~!"Q'J~(~\:~~e .~o/~.lev~l. ... ........v ... I Cue:

Comments:

Page 7 of 15

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

8. 4.9.7 RESET "PRI MAKEUP WTR FLOW Examinee resets "PRI MAKEUP WTR CONTROLLER FC-21 OX" and "BORIC FLOW CONTROLLER FC-21 OX" to 0 total ACID FLOW CONTROLLER FC-210Y" to 0 gallons by performing the following:

total gallons by performing the following (C 04): a. CHECK "RlL" light indicates "L" N

a. CHECK "RlL" light indicates "L." (FC-21OX )
b. IF a manual leak rate determination is in b. determines that a manual leak rate N progress AND flow controller totalizers are determination is not in progress AND flow being used to track RCS makeup, controller totalizers are not being used to PERFORM the following: track RCS makeup, and that this step is
1) PRESS "SEL" button until "PMW not applicable.

TOTAL" or "BA TOTAL" is displayed. c. PRESS "SEL" button and HOLD until Y

2) OBSERVE total gallons added. display indicates "TOTAL RST." (FC
3) Refer To SP 2602A-001, "Manual RCS 210X)

Leak Rate Determination," and RECORD d. PRESS "RlL" button to transfer to "Rn Y total gallons added. mode to reset totalizer (FC-21 OX).

c. PRESS "SEL" button and HOLD until e. PRESS "RlL" button to transfer to "L" y

display indicates "TOTAL RST." mode (FC-21 OX).

d. PRESS "RIL" button to transfer to "R" f. PRESS "SEL" button and HOLD until y

mode to reset totalizer. controller number (FC-21 OX) total gallons

e. PRESS "RlL" button to transfer to "L" is displayed.

mode.

f. PRESS "SEL" button and HOLD until controller number (FC-21OX or FC-210Y) total gallons is displayed.

Cue:

Comments:

Page 8 of 15

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

8. 4.9.7 Examinee resets "BORIC ACID FLOW (cont) CONTROLLER FC-210Y" to 0 total gallons by performing the following:

N

a. CHECK "RlL" light indicates "L" (FC 210Y)
b. determines that a manual leak rate N determination is not in progress AND flow controller totalizers are not being used to track RCS makeup, and that this step is not applicable.
c. PRESS "SEL" button and HOLD until y

display indicates 'TOTAL RST." (FC 210Y)

d. PRESS "RILl! button to transfer to URn y mode to reset totalizer (FC-21 OY).
e. PRESS "RILl! button to transfer to "L" y mode (FC-210Y).
f. PRESS "SEL" button and HOLD until controller number (FC-210Y) total gallons y is displayed.

Cue:

I I ~1;;>, -c Comments:

--

9.

Cue:

Comments:

Page 9 of 15

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

10. NOTE Examinee reads and acknowledges note N Boric acid flow rates of greater than 30 gpm for Boric Acid flow limitations.

.h "',,:z "":",',,:,,",,.?~, " '. ,ACiD ' "

but are not to be exceeded .

,,,".LA}, : ":",,~.£:,.;.,.,, , ZC" "d"*'m," ,_ ,C<<, t Cue:

Comments:

11. I 4.9.9 ADJUST automatic setpoint of "PRI Examinee adjusts automatic setpoint of MAKEUP WTR FLOW CONTROLLER FC "PRI MAKEUP WTR FLOW 210X" and "BORIC ACID FLOW CONTROLLER FC-21 OX" as follows CONTROLLER FC-210Y" as follows (C04): (C04):
a. VERIFY "AM" is lit. a. VERIFY "AM" is lit. N
b. PRESS "SEL" button until cursor b. PRESS "SEL" button until cursor Y appears above setpoint (left hand bar appears above setpoint (left hand bar graph). graph).
c. Using "up" and "down" buttons, ADJUST c. Using "up" and "down" buttons, y setpoint to desired flow rate. ADJUST setpoint to desired flow rate to

, maintain proper blend ratio.

kYL ,-'-'", k', "<C/'U",",","",/;",, ;*,,*:,,:,,>>§dL ,,_ _",*,*_*,,,,h,,,,,,,t -"<"'" """",:;;.."-~,, -,'-".h"0"',,","'" ,L,'- ;

Cue:

Comments:

11 . 4.9.9 Examinee adjusts automatic setpoint of (cont) "BORIC ACID FLOW CONTROLLER FC 210Y"as follows (C04):

N

a. VERIFY "AM" is lit.

y

b. PRESS "SEL" button until cursor appears above setpoint (left hand bar graph).
c. Using "up" and "down" buttons, y ADJUST setpoint to desired flow rate to maintain proper blend ratio.

,.,,,,,' ... ,_ -;,'.-0-,-."<.-, . _,,"',",.,":.

I

/-",.i ""

Cue:

Page 10 of 15

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) {SM

12. I 4.9.10 PLACE "MAKEUP MODE SEL" in IExaminee places "MAKEUP MODE SEL" I Y "MANUAL" (C-04). in "MANUAL" I,d,,,,",,, ,."" ' c', ""'~M""L.j;;;",;

Cue:

Comments:

1 3. 14.9.11 START one boric acid pump (C-02). I Examinee starts "An boric acid pump by Y

_ P-19A, "BA PP A" placing its handswitch to "START' P-19B, "BA PP B" 1",,,:[;,

Cue:

Comments:

14. 14.9.12 VERIFY the following: Examinee verifies "An boric acid pump N

_ Boric acid pump starts (C-02) starts by observing its red running light lit.

_ Boric acid pump develops discharge Examinee verifies "An boric acid pump pressure of at least 98 psig, indicated "PP develops pressure of at least 98 psig.

A DIS PRES, PI-206" or "PP B DIS PRES, indicated "PP A DIS PRES, PI-206".

I""

PI-208" <<,i,,,S Cue:

Comments:

15. 1 NOTE I Examinee reads and acknowledges note. I N When CH-512, "MAKEUP VLV STOP," is opened, the "M" part of the "AM" light will extinguish, indicating the controller is activated.

I,Ll", n ,. .wh', ~~,

Cue


Comments:

Page 11 of 15

PERFORMANCE INFORMATION JPM Number: JPM-S2.1 STEP PERFORMANCE STANDARD

16. 4.9.13 OPEN CH-512 (C-04). Y Cue:

Comments: I Examinee may announce expected "PMW FLOW HIILO" (C-04, BB-8) and "BA MAKEUP FLOW HI/LO" 9C-04,BA

8) flow alarms prior to, (or after receiving alarm) upon initiating blend flow. It is expected that the ARP's for these alarms will be referenced.
17. I 4.9.14 VERIFY flows have stabilized at I Examinee verifies flows have stabilized at N setpoint of flow controllers (C-04). setpoint of flow controllers FC-210X and FC-210Y by observing output of controller andlor FR-210 for flow values .'.

Cue:

Comments:

1 8. 4.9.15 MONITOR VCT level and pressure Examinee monitors VCT level and Y as indicated on the following: (C-02 or pressure, by observing a PPC trend, PPC). computer trend recorder UR-243(C-04),

_ "VCT PRES, PI-225" and/or "VCT PRES, PI-225" and "VCT "VCT LVL. LI-226" LVL, LI-226"(C-02/03)

Cue:

Comments:

19. I ARP 2590C-060 Examinee refers to ARP for PMW FLOW Y AUTOMATIC FUNCTIONS HIILO" (C-04, 88-8) and takes corrective 1-------1-1 1. None actions.

Cue:

Comments:

Page 12 of 15

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

20. 2. CHECK flow rate on "PRI MAKEUP WTR Examinee determines that indicated flow is I Y FLOW, FC-21 OX," within 10 gpm of greater than 10 gpm from setpoint.

nt (C-O Cue:

Comments:

21. I 3. IF desired to terminate PMW flow, PERFORM the following:

IExaminee determines that it is desired to terminate flow and:

3.1 PLACE "PRI MAKEUP WTR FLOW, 3.1 Places "PRI MAKEUP WTR FLOW, FC-21 OX," to "MANUAL." Y*

FC-21 OX," to "MANUAL."

3.2 ADJUST "PRI MAKEUP WTR FLOW, 3.2 Adjusts "PRI MAKEUP WTR FLOW, FC-21 OX," to zero output. FC-21 OX," to zero output. y*

3.3 VERIFY 2-CH-196, "VCT MAKEUP 3.3 Verifies 2-CH-196, "VCT MAKEUP BYPASS," closed. BYPASS," closed by ensuring green N 3.4 VERIFY 2-CH-512, "MAKEUP VLV "close" light only lit.

STOP," closed. 3.4 Verifies 2-CH-512, "MAKEUP VLV Y*

STOP," closed by placing valve handswitch in close and ensuring green "close" light only lit.

  • A combination of steps 3.1 and 3.2 or step 3.4 alone will have the desired effect of securing the blended makeup to th~ VCT. The JPM is complete when the blended makeup is secured.

TERMINATION CUE: The evaluation for this JPM is concluded.

'iS1l0R~TIM;E~'"

'~L,'. ."4",,,,', :~'_Oi',_"" ,'.,,',,;:~/> _ _ __

Page 13 of 15

JPM Number: JPM-S2.1 Rev. - - - - -

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes -

No X Validated Time (minutes): 20 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

Areas for Improvement/Comments:

Page 14 of 15

JPM Number: JPM-S2.1 Rev. ___0_ __

STUDENT HANDOUT Initial Conditions:

  • You have been directed to perform a blended makeup to the VCT to raise level 2%

Initiating Cues:

  • The current blend ratio is 9:1 (corrected for Boron-10 depletion) calculated using "A" BAST
  • The piping to the VCT is currently at blend concentration (no requirement for adjusting for water in the piping).

Page 15 of 15

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-S6.1 Revision: _~O=---_

II. Initiated:

Marc R. 02/01/11 Developer Date III. Reviewed:

echnical RevIewer IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 13

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13

JPM Number: JPM-S6.1 Rev. °


JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-S6.1 Rev. ___0'--__

Task Title:

System: AC Electrical Distribution Time Critical Task: Yes No x Validated Time (minutes): _-=2:..=;.0_ __

Task No.(s): _ _ _ _ _ _ _ _ _ __

Applicable To: SRO X RO X PEO

---

KIA No. 062 A2.05 KIA Rating _ _2_.9_/3_._3__

Method of Testing:

Simulated Performance: -----=--=-- X Actual Performance:

---

Location:

Classroom: Simulator: X In-Plant:

--- -- - ----

Task Standards: At the completion of this JPM, the examinee will attempt to restore power to Bus 24C from the RSST. The RSST supply breaker will fail to close and the examinee will restore power to Bus 24C from Unit 3.

Required Materials EOP 2541, Appendix 23 (procedures. equipment. etc.): Attachment 23-B," Energizing 4.16 kV Bus 24C From the RSST" Attachment 23-N," Energizing 4.16 kV Bus 24E From Unit 3" General

References:

EOP 2541, Appendix 23

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral re orts, alarm acknowled ments, and 10 entries as if the evolution was actuall bein Page 3 of 13

JPM Number: 1 Rev. - - -o- - -

JOB PERFORMANCE MEASURE WORKSHEET (continued) reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Initiating Cues:

  • The Unit Supervisor has directed you to repower Bus 24C from the RSST so that a Service Water Pump can be restored to Facility 1.

Initial Conditions:

  • Unit-2 is in Mode 3 after experiencing a plant trip.
  • All SPTA's of EOP 2525 have been carried out.
  • Bus 24C failed to transfer to the RSST on the plant trip.
  • There are no faults indicated on Bus 24C
  • "A" EDG is out of service for maintenance Simulator
  • IC-154 Reguirements:
  • ED17A, EGR12,EGRI7
  • 1/0 06A1A556 [RSST TO 24C(A302) TRIP]
  • Tag breaker A312 and START/STOP switch
  • Additional operator to address board alarms 1< 1< 1< NOTES TO EVALUATOR 1< 1< * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).

Page 4 of 13

PERFORMANCE INFORMATION JPM Number:

l STEP I PERFORMANCE STANDARD CRITICALi (YIN)

GRADE (S/U)

\;~~I'ttl.l.i;;"Y____

1. EOP 2541, Appendix 23 Examinee states that he/she will choose N Attachment 23-B," Energizing 4.16 kV Bus EOP 2541, Appendix 23 (Attachment 23 24C From the RSST" B) "Energizing 4.16 kV Bus 24C From the RSST" ~......,....,...........,

Cue:

Comments:

--~------------~~=------------,,----------------------------.--------,-------~

2. NOTE Examinee reads and acknowledges note N The following may indicate a fault on 4.16 for fault indications on Bus 24C.

kV Bus 24C:

_ Annunciator "DIESEL GEN 12U BKR TRIP" lit (A-3~, C08)

_ Annunciator "DIESEL GEN 12U BKR CLOSING CKT BLOCKED" lit (C-36, C08)

Annunciator "4KV BUS 24A1C TIE BKR A304 TRIP" lit (A-10, C08)

Annunciator "4KV BUS 24C/E TIE BKR 1j\~g~c:!:~fl'litJ-ti&l;'::'-~~ (

Cue:

Comments:

3.

Cue:

Comments:

Page 5 of 13

PERFORMANCE INFORMATION JPM Number: JPM-S6.1 Rev.. 0 liM>j.**l'.*'(' '*

i~g;.: . *::~. . ..l...tt\;;J~%'lill'l*

'J**\g.~ C!<.'*l'h~"~,,,.lljZ.ll.'i!b.*.*jj'n.

  • ~&.!o!~\..!:i I.****' 'It~~'.I/:"\.JgOln uau.

...*. "em. *m.'o. *N.'W~t~*.*.c.">.*.I'

'liit.'A. I.' . . .

  • 11~~~[!~lO . "",C!Si.*2'0jj~\lf~";'(.il*.'~.).:./.

f't~'*'rjJQU,~~q.;jf S~.,'.i.'.).'" ",', . *j~.t~j?;;

1..7
::; / .., . c . '

.J'~Jts:JL*;

STEP PERFORMANCE STANDARD

4. 2. CHECK that no fault indications are Examinee notes that: N present for 4.16 kV Bus 24C. _"DIESEL GEN 12U BKR TRIP"(A-30, C08)

_ "DIESEL GEN 12U BKR CLOSING CKT BLOCKED" (C-36, C08),

_"4KV BUS 24NC TIE BKR A304 TRIP" (A-10, C08)

"4KV BUS 24C/E TIE BKR A305 TRIP"(B-10, C08) are not lit and determines that no fault exists on Bus;;;.,.;;;;...;.,..;;;...;.~=~=-

24C.

Cue:

Comments:

5. 3. ENSURE ALL of the following Examinee ensures all of the following N breakers are open (C-08): breakers are open (C-08):

_A304, "24N24C TIE BKR, 24C-1T-2" A304, "24N24C TIE BKR, 24C-1T-2"

_ A305, "24C/24E TIE BKR, 24C-2T-2" _ A305, "24C/24E TIE BKR, 24C-2T-2" A312, "DG A FDR BKR, 15G-12U-2" _A312, "DG A FOR BKR, 15G-12U-2" by observing either green "OPEN" light, or no ht lit ( racked down )for each breaker. I .

Cue:

Comments:

6. 4. ENSURE A702, "RSS FOR BKR, Examinee notes by red "CLOSE" light that 22S3-2-2", is closed. (C-08) A702, "RSS FOR BKR, 22S3-2-2", is closed. (C-08 Cue:

Comments:

Page 6 of 13

PERFORMANCE INFORMATION JPM Number:

CRITICAL f STEP 1 PERFORMANCE I STANDARD (YIN)

GRADE (S/U)

7. NOTE Due to the "Dead Bus" state of 4.16 kV Bus I Examinee reads and acknowledges note. N 24C, the 1--------1 Cue:

Comments:

8. 5. PLACE "SYN SW, 22S3-24C-2 Examinee states that the synchroscope is N (A302)" to "ON" and CHECK not moving.

"INCOMING" voltage indicated. (C-08)

Y Examinee places "SYN SW, 22S3-24C-2 (A302)" to "ON" and checks "INCOMING" indicated on

9. 6. PLACE ALL four "UV BUS A3" Examinee obtains (4) "UV BUS A3" y channel bypass keyswitches to the channel bypass keys ( key 26) and installs "INHIBIT" position. (Key 26) them in "UV BUS A3" locations on all (4)

(ESF Sensor Cabinets) ESF sensor cabinets. Examinee rotates the kevs to the "INHIBIT' Cue:

Comments:

10.

Page 7 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD 11 . 8. PLACE 80TH of the following control Examinee rotates the following control y switches in "PULL TO LOCK": switches to the left places in "PULL TO

_ Service Water Pump A LOCK" RBCCW Pump A _ Service Water Pump A RBCCWPumcA Cue:

Comments:

12. I 9. PLACE BOTH SG Auto Aux Feed Examinee places both S/G Override Switches in "PULL TO LOCK." "OVERI DE/MAN/START RESET" Cue:

Comments:

13. 10. OVERRIDE ALL of the following Examinee overrides the following control N control switches to prevent an switches by to prevent an inadvertent inadvertent automatic start: automatic start:

_HPSI Pump A _HPSI Pump A

_LPSI Pump A LPSI Pump A Containment S Containment Cue:

Comments:

14.

Cue:

Comments: I Student should recommend success path of energizing bus Bus 24E from Unit-3.This will allow energizing "8" Service Water Pu_m~p_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _---,

Page 8 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

15. Attachment 23-N Energizing 4.16 kV Bus dent refers to Attachment 23-N for 24E From Unit 3 4.16 kV Bus 24E From Unit 1------1 ~~~~~==~~--==~

Cue:

Comments:

1 6. NOTE Examinee reads and acknowledges note N The following may indicate a fault on 4.16 for fault indications on Bus 24E.

kV Bus 24E:

_ Annunciator "4KV BUS 24E/34B TIE BKR A505 TRIP" lit (A-9, C08)

_ Annunciator "4KV BUS 24C/E TIE BKR A305 TRIP" lit (B-10, C08)

Annunciator "4KV BUS 24D/E TIE BKR TRIP" lit Cue:

Comments:

17. 1.CHECK that no fault indications are Examinee notes that: N present for 4.16 kV Bus 24E. "4KV BUS 24E/34B TIE BKR A505 TRIP" (A-9, C08)

_ "4KV BUS 24C/E TIE BKR A305 TRIP" (B-10, C08)

_ "4KV BUS 24D/E TIE BKR A408 TRIP" (D-10, C08) lights are not lit, indicating no faults on bus 24E.

Cue:

Comments:

Page 9 of 13

PERFORMANCE INFORMATION JPM Number: JPM-S6.1 Rev.. o lfig,,_

STEP PERFORMANCE STANDARD

18. I 2. ENSURE 4.16 kV Bus 24E "SPLY VOLTS" voltage is indicated.

IExaminee verifies Bus 24E "SPLY N VOLTS" indicate -4200 VAC Ie .-', A, XL~_ ,,' ~_~- .--,.@,b.,

Cue:

Comments:

19. 3. ENSURE ALL of the following load Examinee verifies by green "OPEN" or no N breakers on 4.16 kV Bus 24E are open: light indication that the following load

_ A502, "SERVICE WTR PUMP B" breakers on 4.16 kV Bus 24E are open:

- A503 , "HPSI PUMP Bit _ A502, "SERVICE WTR PUMP B"

- A504 , "RBCCW PUMP B" - A503 , "HPSI PUMP B" "RBCCW PUMP B" Comments:

2 O. 4. ENSURE ALL of the following breakers Examinee ensures that the following N are open: breakers are open by observing green

_ A305, "24C/24E TIE BKR, 24C-2T-2" "OPEN" light indication only, or no light

_ A408, "24D/24E TIE BKR, 24D-2T-2" indication for the breaker:

A305, "24C/24E TIE BKR, 24C-2T-2" l... . .,M,.;,:,," ,-,

A408 "24D/24E

"""X_N:;YS4b;;",,~, _,L-*

TIE BKR. 24D-2T-2"

.:& ,v",'""

Cue:

Comments:

21. I 5. REQUEST permission from Unit 3 Shift Examinee either states that he/she will call I N Manager or Unit Supervisor to energize Unit-3, or calls the booth operator and Unit 2 4.16 kV Bus 24E from Unit 3 4.16 kV requests from Unit-3 SM/US permission to Bus 34A134B. energize 24E from Unit-3.

Cue:

Comments:

Page 10 of 13

PERFORMANCE INFORMATION JPM Number:

S_cT.EP

<---__ PERFORMANCE STANDARD

22. NOTE Examinee reads and acknowledges note. N Due to the "Dead Bus" state of 4.16 kV Bus 24E, the svnchroscooe will not move.

Cue:

Comments:


~-

23. 6. PLACE "SYN SEl SW, 34B-24E-2 Examinee places "SYN SEl SW, 34B (A505)" to "ON" and CHECK "INCOMING" 24E-2 (A505)" to "ON" and checks

~_ ' voltage indicated. "INCOMING" voltaae indicated.

Cue:

Comments:

24. Y Cue:

Comments:

25.

Cue:

Comments:

26.

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

Page 11 of 13

JPM Number: JPM-S6.1 Rev. ___0,--__

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes

-

No X Validated Time (minutes): 20 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

  • During the TPE, the trainee Evaluation
  • performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 12 of 13

JPM Number: JPM-S6.1 Rev. ___0=--__

STUDENT HANDOUT Initial Conditions:

  • The Unit Supervisor has directed you to repower Bus 24C from the RSST so that a Service Water Pump can be restored to Facility 1.

Initiating Cues:

  • Unit-2 is in Mode 3 after experiencing a plant trip.
  • All SPTA's of EOP 2525 have been carried out.
  • Bus 24C failed to transfer to the RSST on the plant trip.
  • There are no faults indicated on Bus 24C
  • "An EDG is out of service for maintenance Page 13 of 13

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-S3.1 Revision: 0

--=-

II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 18

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 18

JPM Number: JPM-S3.1 Rev. ___0=--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-S3.1 Rev. _ _-'0=--__

Task Title:

System:

Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s): _ _ _ __

Applicable To: SRO RO _X__ PEO _ _


KIA No. A4.07 KIA Rating ___4_.4_/4_._4__

Method of Testing:

Simulated Performance:


X Actual Performance: -----=--='----

Location:

Classroom: Simulator: X In-Plant:

---

--- -=--

Task Standards: At the completion of this JPM, the examinee will raise #1 SIT level by 2% using the '~" HPSI Pump.

Required Materials OP 23060 Section 4.1, " Raising SIT Level" (procedures. equipment. etc.): OP 23060 Section 4.2, " Reducing SIS Loop High Pressure After Filling SIT" General

References:

OP 23060 Safety Injection Tanks, RCS >1750 psi ARP 2590A-040 "SAFETY INJECTION TANK 1 PRES LO"

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 18

JPM Number: JPM-S3.1 Rev. ___0,---__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • You have been directed to fill #1 SIT to a final level of -58% using P41-A ("A" HPSI Pump) to makeup for some known leakage back to the Primary Drain Tank.

Initial Conditions: * #1 SIT level is 56.7%

  • Sampling of the #1 SIT is not required.

Simulator

  • IC-151 Requirements: * #1 SIT level is 56.7%
  • "SAFETY INJECTION TANK 1 PRES LO" (C-01lD-10)
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at'!" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).

Page 4 of 18

PERFORMANCE INFORMATION JPM Number: o CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) (S/U}_I

.ii$TARII~E'::!J;;

, ...."".,~[~.1l!J .... ,,~_ __

1. I OP 23060 4.1 Raising SIT Level Examinee notes that cause of level N 4.1.1 IF the cause of the SIT level reduction change is known and that this step is not is unknown, Refer To SP 2604Z and required.

PERFORM applicable steps to confirm the associated SIS header to Loop piping penetration(s) full. (UT Points 15, 16, 17, or Page 5 of 18

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

2. 4.1.2 DETERMINE desired SIT(s) level using one of the following criteria: Examinee determines that sampling is not N

_ IF sampling is not required, do not fill required as given in initial conditions, and greater than 58.8% (alarm C-01 59%) that desired stop level is < 58.8% (alarm C-0159%)

_IF sampling is required, do not fill greater than 59.6% (PPC high alarm 59.7%) the following alarms are expected (C-01):

SAFETY INJECTION TANK 1 LEVEL HI" (A-10)

_ SAFETY INJECTION TANK 2 LEVEL HI" (A-11 )

SAFETY INJECTION TANK 3 LEVEL HI" (A-12)

_ SAFETY INJECTION TANK 4 LEVEL HI" (A-13)

Cue:

Comments:

Page 6 of 18

PERFORMANCE INFORMATION JPM Number:

GRADE I STEP I PERFORMANCE I STANDARD CRITICAL (YIN) (S/U)

3. NOTE
1. The facility one Header Stop (2-SI-656) I Examinee reads and acknowledges note. N is the only HPSI HDR Stop that can be opened with the DIP caused by having a running HPSI Pump. The HPSI HDR Stop must be closed, prior to starting a HPSI Pump, to prevent the pressure wave, which will cause perturbations in the downstream piping and valves.
2. The following alarms are expected after reopening 2-SI-656:

_ SIS TO LOOP 1A PRESS HI, (C-01, window A-14)

_ SIS TO LOOP 1B PRESS HI, (C-01, window B-14)

_ SIS TO LOOP 2A PRESS HI, (C-01, window C-14)

SIS TO LOOP 2B PRESS HI. (C-01, Cue:

Comments:

4.

Cue:

Comments:

Page 7 of 18

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

5. 4.1.4 CLOSE 2-SI-656 "HPSI HDR A Examinee closes 2-SI-656 "HPSI HDR A STOP." STOP" by rotating its keyswitch to the y CLOSE direction and verifies closed by I Jeen CLOSE light lit on J.",)/),Lh Cue:

Comments:

6. 4.1.5 WHEN HPSI pump is started, CHECK Examinee notes and acknowledges the following (C-01): expected pump starting parameters. N

_ Motor amperage 20 to 30 amps

_ Nominal discharge pressure 1250 to 1300 1-------1

, psi Comments:

7. 4.1.6 START one of the following HPSI Examinee starts "P-41A, HPSI PP A" as pumps (C-01). directed by initiating cue by taking its y

- "P-41A, HPSI PP A" handswitch in the clockwise direction and IF aligned to Facility 1, "P-418, HPSI PP verifies by light, amp, and/or discharge 8" pressure that the pump is running.

Cue:

Comments:

8. 4.1.7 WAIT 10 seconds. After 10 second wait, examinee opens 4.1.8 OPEN 2-SI-656 "HPSI HDR A 2-SI-656 "HPSI HDR A STOP" by rotating y STOP." its keyswitch to the open direction and I observinq its red OPEN Iiaht lit.

~~~~

Cue:

Comments: I Page 8 of 18

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

9. I 4.1.9 LOG out of TSAS 3.5.2.a. I Examinee informs US to log out of TSAS N Comments:
10. I CAUTION I Examinee reads and acknowledges Recirculation header must not be subjected caution. N to pressure above 300 psig as indicated on "RECIRC HDR PRESS, PI-30S."

NOTE When raising pressure during reactor I Examinee reads and acknowledges note. N startup before containment reaches operating temperature, SIT pressure should be limited to 220 psig to allow for thermal l:)(el:l.nsio~:.

Cue:

Comments:

11 . I 4.1.10 IF filling SIT 1, PERFORM the Examinee opens "SI-611, FILL & DRN" by following (C-01): rotating its handswitch to the open y

a. OPEN "SI-611. FILL & DRN." direction and observing its red OPEN light lit.

Cue:

Comments:

12 . I b. THROTTLE open "SI-618, HDR-1A CK Examinee throttles open "SI-618, HDR-1A VLV LKG DRN STOP" not to exceed 300 CK VLV LKG DRN STOP" not to exceed y psig, indicated on "PI-305, RECIRC HDR 300 psig, indicated on "PI-30S, RECIRC PRESS." HDR PRESS" usina its control knob.

Page 9 of 18

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

13. c. WHEN any of the following occur, CLOSE SI-618: Examinee closes SI-618 after filling to y

_ "L311 SI TK 1 LVL" at desired level (PPC) -58% and < 58.8% (alarm C-01 59%) by

_ "P311 SI TK 1 PRESS" pressure 225 psig rotating its control knob and observing its (PPC) green CLOSE light

_ "PI-311, SIT 1 PRESS" pressure 225 psig PPC SIT high level alarm (59.7%

'¥ '" r ,,,Ali """ .. ",' ~"k,,,,,,,, h/

Cue:

Comments:

1 4. I d. CLOSE "SI-611, FILL & DRN." Examinee closes "SI-611, FILL & DRN" by y rotating its handswitch to the close direction and observing its green CLOSE t

Cue:

Comments:

15. 4.1.11 IF filling SIT 2, PERFORM the Examinee notes that these steps are not following (C-01): required, and N/A's these steps. N 4.1.12 IF filling SIT 3, PERFORM the following (C-01):

4.1.13 IF filling SIT 4, PERFORM the followina (C-01 Cue:

Comments:

Page 10 of 18

PERFORMANCE INFORMATION JPM Number: JPM-S3.1 CRITICAL I GRADE f STEP PERFORMANCE I STANDARD ('(IN) (S/lJ)

16. 4.1.14IF no longer required, STOP HPSI Examinee stops "P-41A, HPSI PP A" by y pump (C-01). rotating its handswitch to the counter clockwise direction.

Cue:

Comments:

17. 4.1.15 IF any SIT fill was terminated due to 1 Examinee states that this step is not N pressure limit AND it is desired to continued applicable filling, Refer To Section 4.5 to vent Cue:

Comments:

Page 11 of 18

PERFORMANCE INFORMATION JPM Number: 1 CRITICAL GRADE STEP I PERFORMANCE STANDARD (YIN) (S/U)

18. 4.1.16 Refer To one ofthe following and Examinee states or attempts to perform RECORD new SIT level and if applicable, the following administrative actions prior to boron concentration. proceeding.

_ SP 2619A-001, "Control Room Daily N Refers to SP 2619A-001, "Control Room Surveillance, Modes 1 and 2" Daily Surveillance, Modes 1 and 2" and

_ SP 2619A-002, "Control Room Daily records new SIT level and if applicable, Surveillance, Modes 3 and 4" boron concentration.

4.1.17 UPDATE applicable control board marker reference level(s). Update applicable control board marker reference level(s).

4.1.18 CHANGE applicable PPC temporary high alarm limit(s) for new reference Change SIT#1 PPC temporary high alarm level(s). limit(s) for new reference IQ\Ij:"lf~

Cue:

Comments:

19.

Examinee reads and acknowledges N caution.

Cue:

Comments:

Page 12 of 18

PERFORMANCE INFORMATION JPM Number:

I STEP PERFORMANCE STANDARD CRITICAL (yIN)

GRADE (S/U)

20. 4.1.19 Go To Section 4.2 to lower SIS loop I Examinee goes to Section 4.2 to lower SIS N pressure to clear annunciator.

L . , ....... *'e'**** , . . .*. J * ..*.* A .

  • u .d **.*

Cue:

Comments: ----

21 . 4.2.1 IF "SIS TO LOOP 1A PRESS HI," (A Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C "SIS TO LOOP 1A PRESS HI" alarm:

01 ):

a. OPEN "SI-611, FILL & DRN." a. OPEN "SI-611, FILL & DRN" by rotating
b. CRACK open "SI-618, HDR-1A CK VLV N its switch to the "OPEN" direction and LKG DRN STOP." observing the red OPEN light lit
c. WHEN "P319 SIS TO LOOP 1A PRES," b. CRACK open "SI-618, HDR-1B CK VLV N (PPC) indicates 225 to 275 psig, CLOSE LKG DRN STOP" by rotating its knob and the following: observing the valve open by needle
1) "SI-618, HDR-1A CK VLV LKG DRN indication and red OPEN light indication STOP" c. WHEN "P319 SIS TO LOOP 1B PRES,"
2) "SI-611, FILL & DRN" (PPC) indicates 225 to 275 psig, CLOSE the following:
1) "SI-618, HDR-1 B CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication
2) "SI-611, FILL & DRN" by rotating its N

switch to the "CLOSE" direction and "hc>",r\linrt the green CLOSE licht lit

~

Cue:

Comments:

Page 13 of 18

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP I PERFORMANCE STANDARD (YIN) (S/U)

22. 4.2.2 IF "SIS TO LOOP 1B PRESS HI," (B Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C "SIS TO LOOP 1B PRESS HI" alarm:

01 ):

a. OPEN "SI-621, FILL & DRN." a. OPEN "SI-621, FILL & DRN" by rotating
b. CRACK open "SI-628, HDR-1 B CK VLV N its switch to the "OPEN" direction and LKG DRN STOP." observing the red OPEN light lit
c. WHEN "P329 SIS TO LOOP 1B PRES," b. CRACK open "SI-628, HDR-1B CK VLV N (PPC) indicates 225 to 275 psig, CLOSE LKG DRN STOP" by rotating its knob and the following: observing the valve open by needle
1) "SI-628, HDR-1B CK VLV LKG DRN indication and red OPEN light indication STOP" c. WHEN "P329 SIS TO LOOP 1B PRES,"
2) "SI-621, FILL & DRN" (PPC) indicates 225 to 275 psig, CLOSE the following:
1) "SI-628, HDR-1 B CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N
2) "SI-621, FILL & DRN" by rotating its switch to the "CLOSE" direction and observino the oreen CLOSE lioht lit Cue:

Commen_ts_:~I ______________________________________________________________________________~

Page 14 of 18

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

23. 4.2.3 IF "S[S TO LOOP 2A PRESS HI," (C Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C "SIS TO LOOP 2A PRESS HI" alarm:

01):

a. OPEN "SI-631, FILL & DRN" a. OPEN "SI-631, FILL & DRN" by rotating
b. CRACK open "SI-638, HDR-2A CK VLV N its switch to the "OPEN" direction and LKG DRN STOP." observing the red OPEN light lit
c. WHEN "P339 SIS TO LOOP 2A PRES," b. CRACK open "SI-638, HDR-1B CK VLV N (PPC) indicates 225 to 275 psig, CLOSE LKG DRN STOP" by rotating its knob and the following: observing the valve open by needle
1) "SI-638, HDR-2A CK VLV LKG DRN indication and red OPEN light indication STOP" c. WHEN "P339 SIS TO LOOP 1B PRES,"
2) "SI-631, FILL & DRN" (PPC) indicates 225 to 275 psig, CLOSE the following:
1) "SI-638, HDR-1B CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N
2) "SI-631, FILL & DRN" by rotating its switch to the "CLOSE" direction and observina the areen CLOSE light lit

~

Cue:

Comment-s-:+1-'-'--"--"--"--'-'--'------'-=""-'

Page 15 of 18

PERFORMANCE INFORMATION JPM Number:

PERFORMANCE STANDARD

24. 4.2.4 IF "SIS TO LOOP 28 PRESS HI," (D Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C "SIS TO LOOP 28 PRESS HI" alarm:

01):

a. OPEN "SI-641, FILL & DRN" a. OPEN "SI-641, FILL & DRN" by rotating
b. CRACK open "SI-648, HDR-28 CK VLV N its switch to the "OPEN" direction and LKG DRN STOP." observing the red OPEN light lit
c. WHEN "P349 SIS TO LOOP 28 PRES," b. CRACK open "SI-648, HDR-18 CK VLV N (PPC) indicates 225 to 275 psig, CLOSE LKG DRN STOP" by rotating its knob and the following: observing the valve open by needle
1) "SI-648, HDR-2B CK VLV LKG DRN indication and red OPEN light indication STOP" c. WHEN "P349 SIS TO LOOP 18 PRES,"
2) "SI-641, FILL & DRN" (PPC) indicates 225 to 275 psig, CLOSE the following:

1} "SI-648, HDR-18 CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N

2) "SI-641, FILL & DRN" by rotating its switch to the "CLOSE" direction and the areen CLOSE liaht lit

~---r-r:-,.,-l ""

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

'~$'F~ej[IM]t!:

Page 16 of 18

JPM Number: JPM-S3.1 Rev. - - - - -

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No

- --

Validated Time (minutes): 20 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall RE~sult of JPM: SAT UNSAT (circle one)

Areas for Improvement/Comments:

Page 17 of 18

JPM Number: JPM-S3.1 Rev. _ _-"O_ _

STUDENT HANDOUT Initial Conditions:

  • You have been directed to fill #1 SIT to a final level of -58% using
  • P41-A ("An HPSI Pump) to makeup for some known leakage back to the Primary Drain Tank.

Initiating Cues: * #1 SIT level is 56.7%

  • Sampling of the #1 SIT is not required.

Page 18 of 18

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-S9.1 Revision: 0

--=-

II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

Technical Reviewer IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor ~il' Date Page 1 of 15

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 15

JPM Number: JPM-S9.1 Rev. _ _......;0=--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-S9.1 Rev. - - - - o- - -

System: Radiation Monitoring Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s):

Applicable To: SRO X RO X PEO - -

KIA No. 071 A4.25 KIA Rating _-=3.=2/:...=3=.2:....-_

Method of Testing:

Simulated Performance: Actual Performance: - -X- -


Location:

Classroom: Simulator: X In-Plant:

--- -'-- ----

Task Standards: At the completion of this JPM, the examinee will determine that the Vent Stack Radiation Monitor, RM8268, has failed and will take the appropriate actions for the failed Radiation Monitor.

Required Materials ARP 2590E-061 "VENT STACK RADMONITOR HI/FAIL" (procedures. equipment. etc.):

General

References:

ARP 2590E-061 "VENT STACK RADMONITOR HI/FAIL"

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 15

JPM Number: JPM-S9.1 Rev. - - - o --

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • The Unit Supervisor has directed you to carry out actions in response to "VENT STACK RADMONITOR HI/FAIL (C-06/07, A-12) alarm.

Initial Conditions:

  • Unit-2 is in Mode 1 at 100% power
  • You are the BOP operator.
  • "VENT STACK RADMONITOR HI/FAIL" (C-06/07. A-12) alarm has come in a few moments ago while you were out of the Control Room.
  • The RO has obtained ARP 2590E-061. and has turned over this alarm response to you.

Simulator

  • 1/0 RIC-8168 "EQUIP FAIL" light on.

Reguirements: * "VENT STACK RADMONITOR HI/FAIL" (C-06/07. A-12) alarm window lit.

  • *
  • NOTES TO EVALUATOR'" * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the pe:rformance of this JPM (in-plant only).

Page 4 of 15

PERFORMANCE INFORMATION JPM Number:

I I STEP I PERFORMANCE STANDARD CRITICAL (YIN)

GRADE (S/U)

sfliftf.J1I!11E~lII
. . - - - -
1. VENT STACK RADMONITOR HI/FAIL Examinee refers to ARP 2590E-061 for

, (C-06/07, A-12) 'C-OB/07. A-12) 1-------+

Cue:

Comments:

2. AUTOMATIC FUNCTIONS ALARA Examinee reads and acknowledges N To prevent contaminating low range stack ALARA note.

activity monitor during high radiation condition. ouraina is desirable.

Cue:

Comments:

3. 1. If red "HIGH" light is lit AND "STACK Examinee states that red "HIGH" light is N GAS EFFLUENT PURGE VALVE, not RV-8132," is in "ENABLE," purging of Unit 2 stack gaseous monitor, RM-8132B, is

--~--f-,.I,initiated (C-101)'

Cue:

Comments:

4. 1. IF high radiation condition exists, Examinee states that a high radiation N PERFORM the following: condition does not exist and that this step 1.1 Refer To MP-26-EPI-FAP06, is not applicable.

"Classification and PARs" and DETERMINE reportability.

1.2 MONITOR Unit 2 stack discharge 1--------1;,6 activity (C-101 Cue:

Comments:

Page 5 of 15

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

5. I NOTE Tech Spec 3.3.3.1, Radiation Monitoring I Examinee reads and acknowledges note N Table 3.3-6 Instrument 2.C requires about required operable channels.

channel 1 or channel 2 Noble Gas to be OPERABLE.

ILeA.***""."", .*,.,.,.~U Cue:

Comments:

6. 12. DETERMINE if equipment failure exists as follows: Examinee presses "TEST LT CK" Y 2.1 PERFORM the following to verify pushbutton.

display indication (C-101): Examinee verifies LED display indicates all I 2.1.1 PRESS 'TEST LT CK" pushbutton. N 8's and all lamps are lit.

2.1.2 VERIFY LED display indicates a/l 8's Examinee states that this step is not and all lamps are lit. applicable. N Cue:

Comments:

7. I ARP 2590E-061 NOTE Examinee reads and acknowledges note N Failure codes are displayed in scientific E about failure code display notation.

notation, e.g. 1.00EOO=1, 4.00EOO=4, 1.20E01 =12. etc.

Cue:

Comments:

Page 6 of 15

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

8. 12.2 At RIC-8168, CHECK for the following Examinee observes and states that the Y failure conditions: "EQUIP FAIL" lamp is 2.2.1 "EQUIP FAIL" lamp lit y 2.2.2 CHECK for channel 1 failure codes Examinee presses "DSP" "1" "30" "ENT."

as follows:

a. PRESS "DSP" "1" "30" "ENT." y Examinee obtains CODE FAILURE value
b. OBTAIN CODE FAILURE value. of "1.00EOO" for Channel 1.

Cue:

Comments:

9. I2.2.3 CHECK for channel 2 failure codes as I Examinee presses "DSP" "2" "30" "ENT." Y follows:
a. PRESS "DSP" "2" "30" "ENT." Examinee obtains CODE FAILURE value y

,--

b. OBTAIN CODE FAILURE value. of "O.OOEOO" for Channel 2.

Cue:

Comments:

10. 12.2.4 CHECK for channel 3 failure codes as I Examinee presses "DSP" "3" "30" "ENT." Y follows:
a. PRESS "DSP" "3" "30" "ENT." Examinee obtains CODE FAILURE value y
b. OBTAIN CODE FAILURE value. of "O.OOEOO" for Channel 2.

Cue:

Comments:

11 . 12.2.5 CHECK for channel 4 failure codes as I Examinee presses "DSP" "4" "30" "ENT." Y follows:

a. PRESS "DSP" "4" "30" "ENT." Examinee obtains CODE FAILURE value y
b. OBTAIN CODE FAILURE value. of "O.OOEDO" for Channel 4.

Cue:

Comments:

Page 7 of 15

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP PERFORMANCE STANDARD n (YIN) (S/U)_

12. 2.2.6 CHECK for channel 5 failure codes as I Examinee presses "DSP" "5" "30" "ENT," Y follows:
a. PRESS "DSP" "5" "30" "ENT," IExaminee obtains CODE FAILURE value Y

. b. OBTAIN CODE FAILURE value. of "O.OOEOa" for Channel 5.

I---~---i Cue:

Comments:

13. 2.2.7 IF any CODE FAILURE Table display Examinee refers to CODE FAILURE Table "numbers" are indicated, to identify failure.

I---~~--i' REFER to Table 1 to id Cue:

Comments:

Page 8 of 15

PERFORMANCE INFORMATION JPM Number:

~ l CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) (S/U) 1 4. I Table 1, Channel Failure Codes:

o No Failure Examinee identifies "Detector Failure" for Y 1 Detector Failure Channel 1.

2 Detector Saturation 3 Motor Failure 4 High Voltage Failure 5 Check Source Failure 6 Low Flow 7 Particulate Filter Failure 8 End of Particulate Filter Roll 9 High Pressure Trip Value Exceeded 10 Low Pressure Trip Value Exceeded 11 High Temperature Trip Value Exceeded 12 Low Temperature Trip Value Exceeded 13 High Delta Pressure (Moving Filter Channel Only) Trip Value Exceeded 14 Low Delta Pressure (Moving Filter Channel Only) Trip Value Exceeded 15 Reserved (High Flow on Some Monitors) 16 Tern Cue:

Comments:

Page 9 of 15

PERFORMANCE INFORMATION JPM Number:

~ STEP J PERFORMANCE STANDARD CRITICAL rf/N)

I GRAD.EJ (S/~)

15. NOTE
1. IF failure code "1" exists on" Channel 1" Examinee reads and acknowledges note N and channel is updating plant conditions, on resetting failure codes, and potential the monitor can be restored to service if differences in output readings of channels.

failure codes are reset.

2. Channels 1 and 2 are gaseous channels.

Channels 3, 4, and 5 are particulate channels. Therefore the output readings for channels 1, 2 compared to channels 3, 4, 5 could be sianificantlv different.

Cue:

Comments:

16. 2.3 CHECK if monitor detector "Channel 1" Examinee states that monitor detector is updating plant conditions, i.e. dynamic "Channel 1" is updating plant conditions, y indication update once per second. i.e. dynamic indication update once per second.

Cue Comments:

17. 2.4 PRESS "DSP" "3" "23" "ENT' to check Examinee states that "DSP" "3" "23" "ENT" if monitor detector "Channel 3" is indicating monitor detector "Channel 3" is indicating y plant conditions, i.e. is a static indication plant conditions, i.e. is a static indication and will not update once per second and and will not update once per second and should not read O. does not read O.

Cue:

Comments:

Page 10 of 15

PERFORMANCE INFORMATION JPM Number:

GRADE STEP PERFORMANCE STANDARD ~---- ----

(S/U)

18. 2.5 IDENTIFY any Main Board Rad Monitor IExaminee identifies that VENT STACK alarms. RADMONITOR HI/FAIL (C-06/07, A-12) N alarm is lit.

Cue:

Comments:

19.

Cue:

Comments:

20. 5. IF any of the following exist:

_ Failure codes exist other than No.1, Examinee states that this step is not y "Detector Failure" applicable due to only No.1, "Detector

_ "Channel 1" is not updating plant Failure" indicated, and both "Channel 1" conditions and "Channel 3" indicating plant

_ "Channel 3" is not indicating plant conditions.

conditions PERFORM the following:

_ CONSULT I&C or System Engineer for corrective action.

Generate CR.

Cue:

Comments:


Page 11 of 15

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD 21 . 5. OBTAIN key #82 and CLEAR failure Examinee obtains key #82 y codes at RIC-8168 as follows:

5.1 TURN key switch to "ENABLE." Examinee verifies key switch in "ENABLE" y 5.2 PRESS "FTN" "1" "07" "ENT."

Examinee presses "FTN" "1" "07" "ENT." y 5.3 CHECK "EQUIP FAIL" lamp not lit. IF lamp is lit, Go To step 5.6.

5.4 PRESS "ACS" "1/1 "ENT" to activate Examinee states that "EQUIP FAIL" lamp Channel 1 check source and CHECK is still lit and goes to step 5.6.

indication increases.

5.5 CHECK Main Board Rad Monitor y

alarms have cleared. Examinee turns key switch to "DISABLE."

5.6 TURN kev switch to "DISABLE."

Comments:

22.

23. NOTE If RM-8168 fails, Unit 2 stack gaseous Examinee reads and acknowledges note N monitor, RM-8132B, is the alternate about RM-8132B being that alternate radiation monitor to be used (preplanned radiation monitor.

1-----

. alternate method),

Cue:

Com~e~n~ts~:~IL- __________________________________________________________________________________~

Page 12 of 15

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP PERFORMANCE STANDARD mO'/N) (S/ljL_

24. I 7. IF equipment failure did not clear, PERFORM the following:

Examinee places "STACK GAS y 7.1 To ensure Unit 2 stack gaseous EFFLUENT PURGE VALVE, RV-8132," in monitor, RM-8132B is not being purged, "DISABLE" (C-101).

PLACE "STACK GAS EFFLUENT PURGE VALVE, RV-8132," in "DISABLE" (C-101).

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

$TQ~~1JJlI~iY*____

Page 13 of 15

JPM Number: JPM-S9.1 Rev. _ _-'0'--__

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly_ If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 20 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation* .

performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 14 of 15

JPM Number: JPM-S9.1 Rev. ___0=--__

STUDENT HANDOUT Initial Conditions:

  • The Unit Supervisor has directed you to carry out actions in response to "VENT STACK RADMONITOR HI/FAIL"( C-06/07, A-12) alarm.

Initiating Cues:

  • Unit-2 is in Mode 1 at 100% power
  • You are the BOP operator.
  • "VENT STACK RADMONITOR HI/FAIL" ( C-06/07, A-12) alarm has come in a few moments ago while you were out of the Control Room.
  • The RO has obtained ARP 2590E-061, and has turned over this alarm response to you.

Page 15 of 15

JOB PERFORMANCE MEASURE APPROVAL SHEET I. ..IPM Title:

JPM Number: JPM-013 Revision:


6/1 II. Initiated:

Marc R. Pucel 02/01/11 Developer Date 2006. Reviewed:

2006. Approved:

N/A Cognizant Plant Supervisor (optional) Date z-{s;r ,

Nuclear Training Supervisor date Page 1 of 13

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 6/0 11/19/2010 Minor admin changes to JPM to reflect minor procedure 6/1 i change (OP 2302A) and standards I

Page 2 of 13

JPM Number: ~IPM-013 Rev. - - 6/1 ---

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-013 Rev. _ _. :. :6/.. ,;.1_ _

Task Title:  ;.<'.i:)

  • .~...*.*.*
  • .*..*. CI,lJ.,
  • ..........

t* *.*.**.****** **.I*

  • .*.J..".* ..*n*

..*..*.*.O**.*.*.

_ ..'*..** .....* ...**.

a...."W ". . . . . . .'*. . ~.~

o ..*. . . . . . . . . . . .1!'".I;~JJi\;; .*....... f.. *ili."*.*J*.**.i*.***.**.n**.*.*.*.*.***g*****.*.** . '.' .\Ih,*J;;W'ml!l~*i:)

....i.;*. . .

_ .. S.*.e****c*****.*o.*'.n':.**.".:...** #**.*!

.**..**.....

' f !.... i::

  • ...*.*

'* . *.*..**. . *.*.". . . . . *. *'. *..

.*.*.*.*

I ..i*..** .

...

  • ' *.*.*
  • . *.*.'

.. .**. *.*.

  • * ...
. M*..*...".
.i*.;.;.~*.**.*..*.*..*.*.***e... ..";":\\~8h,;**'*Y' **.~4f~~~;i;r

. . . *.t*.. . . . . . . . . . . . . . " . ' . " . " . . "vi/Wi" System: Control Element Drive System (CEDS)

Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s): NUTIMS #001-01-019 Applicable To: SRO X RO X PEO X KIA No. -A. 408 KIA Rating _ _3_.7_/3......_4__

Method of Testing:

Simulated Performance: - -X- - Actual Performance:


Location:

Classroom: Simulator: In-Plant: X

--- --- ----'-'-

Task Standards: At the completion of this JPM, the examinee has successfully started the '~" CEDM MG set and paralleled it with the "8" MG set.

Reguired Materials OP-2302A, Section 4.7 (pen and ink changes required)

(procedures, equipment, etc.):

General

References:

OP 2302A, "Control Element Drive System"

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 13

JPM Number: "IPM-013 Rev.

- - -6/1- - -

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initial Conditions:

  • The plant is preparing for startup.
  • The "B" CEDM MG set has been placed in service with its load contactor closed.
  • All TCBs are open except TCB-9, which is closed.
  • Both Voltage droop circuits are on.
  • In-plant loads are powered from the RSST.
  • No maintenance has been performed on "A" or "B" CEDM MG sets.

Initiating Cues:

  • The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set.

Simulator

  • NIA Requirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the examinee states what hislher simulated action/observation would be, read the appropriate "Cue".
3. Ifnecessary, question the examinee for details of simulated actions/observations (i.e. "What are you looking at?" or "\\Inat are you observing?").
4. Under NO circumstances must the examinee be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).

Page 4 of 13

PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 ST PERFORMANCE STANDARD

$~A~r.TIMS:,. _ _ __

1. CAUTION If bus 24C and 24D are not receiving power I Examinee reads and acknowledges the N from the same source, (not at the same Caution.

frequency), the CEDM MG set outputs cannot be paralleled due to the potential I difference in motor speeds.

/h "~"A<A/ffd"",!j-V'A,A"~"",%L.,>,>"d\"",,,"_;< i"A_ ", " . *, ' <.'.'A~C , . ",l*,

Cue:

Comments:

2.

Cue:

Comments:

3. 4.7.2 PERFORM applicable action: Examinee progresses to step 4.7.3. y
  • IF starting "A" CEDM MG second, Go To step 4.7.3.
  • IF starting "8" CEDM MG second, Go I------+I~.= ...,..,..T-.,o steD 4.7.4.

Cue:

Comments:

4.

Cue:

Comments:

Page 5 of 13

PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1

,. '

1 St~~ii1g!~Htr}t!?~f:~lIeURg:tS~Ga~q;;GF'J1)r{nM§~$et~:p4;;,>;:""

STEP PERFORMANCE STANDARD

5. 4.7.3 IF starting "A" CEDM MG second, Examinee states that they would place y PERFORM the following: "MG-A" handswitch to "START" or request that it be done by someone in the Control
a. PLACE "MG-A" to "START" (C-04). I Room.

. -- _ . . I I Cue: I ' ,"..' k , ' .. '" ~ ** '1i> ""='~""'>''' ~~"trnl~"hri:t-":In:ci&'3th~ breakerJinform the examinee that it h'asbeen closed.

indication that would be seen based on the Comments:

6. b. PLACE "A" CEDM MG "MOTOR INPUT" Examinee states that they close MG motor y breaker to "ON" (top left of C-30). supply breaker by taking handle on top left of C-30 to "ON".

Cue:

Comments:

7. c. PLACE "A" CEDM MG "INCOMING Examinee states that they place y GENERATOR" synchronizing selector synchronizing selector switch on C-29 in switch to "LOCAL." "LOCAL".

Cue:

Comments:

8. Examinee states that they press "MOTOR y ON" pushbutton for 4-5 sec.

Cue:

Comments:

9. Examinee states that they have released the "MOTOR ON" Dushbutton.

Cue:

Comments:

Page 6 of 13

PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD 1 O. I f. ALLOW MG set to come up to rated Examinee states that the "red" indicating N speed (red "LOCAL" "MOTOR ON" light, lit). light above the "Motor On" pushbutton should light when the MG set is at rated

, ,

speed.

""",:",,:,"*,.,.,3:k u ,> '

Cue:

Comments:

11 .

Cue:

Comments:

12. h. WHEN 142 to 158 seconds have lapsed Examinee states that they are waiting and N after starting MG set AND within 2 second listening for 142 to 158 seconds after of the red 'MOTOR ON' light lighting, starting MG set AND within 2 seconds of LISTEN for audible clunk (indicates starting the red 'MOTOR ON' light lighting, for winding de-energized). audible clunk (indicates starting winding Comments:

13.

Cue:

Comments:

Page 7 of 13

PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD

14. j. Using "LOCAL" "GEN VOLTAGE Examinee states that voltage is already at N ADJUSTMENT" switch, ADJUST 240 VAC and no adjustment is necessary.

"GENERATOR VOLTS" as close as ble to 240 volts.

Cue:

Comments: I The voltage indication was given in the previous step. However, If the examinee feels it must be adjusted, have them demonstrate how by pointing to the applicableI volt meter and where the needle should be for proper I ~

indication.

I ~---I

15. NOTE Closing "GENERATOR OUTPUT" breaker Examinee reads and acknowledges the N does not energize the bus. Note.

Cue:

Comments:

16. I k. PLACE "A" CEDM MG "GENERATOR Examinee states that they close MG Set y OUTPUT" breaker to "ON." Output breaker by taking handle on bottom ht of C-29 to "ON".

Cue:

Comments:

Page 8 of 13

PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD

17. NOTE
1. If other MG set is not loaded, the speed I Examinee reads and acknowledges the N of each machine is very close to each Note.

other and the synchroscope may not be rotating.

2. The object of the following steps is to have the synchroscope at or very near the 12 o'clock position and nearly stationary and the voltages of both machines set at or near 240 VAC.

Cue:

Comments:

18. I. IF synchroscope is not at 12 o'clock and 1) Examinee states that they are turning y not rotating, PERFORM the following to get the "REMOTE" "GEN VOLTAGE the synchroscope to move: ADJUSTMENT" switch to raise the
1) Using "REMOTE" "GEN VOLTAGE "REMOTE" ("B" CEDM MG)

ADJUSTMENT" switch, RAISE "GENERATOR VOLTS" to 250 VAC.

"REMOTE" ("B" CEDM MG) 2) Examinee states that they are turning "GENERATOR VOLTS" to 250 VAC. the "LOCAL" "GEN VOLTAGE

2) Using "LOCAL" "GEN VOLTAGE ADJUSTMENT" switch to lower the ADJUSTMENT" switch, LOWER "LOCAL" ("A" CEDM MG)

"LOCAL" ("An CEDM MG) "GENERATOR VOLTS" to 235 VAC.

"GENERATOR VOLTS" to 235 VAC.

Cue:

Comments:

Page 9 of 13

PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD

19. I m. WHEN synchroscope is at the 12 o'clock 1) Examinee states that they are turning Y position, ADJUST both MG set output the "REMOTE" "GEN VOLTAGE voltages to 240 VAC. (The synchroscope ADJUSTMENT" switch to lower the should be nearly stationary.) "REMOTE" ("8" CEDM MG)

"GENERATOR VOLTS" to 240 VAC.

2) Examinee states that they are turning the "LOCAL" "GEN VOLTAGE ADJUSTMENT" switch to raise the "LOCAL" ("A" CEDM MG)

"GENERATOR ,VOLTS" to 240 VAC.

t ,... ..~~. '~M'~"" " _"_'_H,~,'_' J'.{~V'.'1(%,:;;;W:P;%SL$L,,,,,",-,_9 ' ,. . ,., "H ,>. t!:v.Mt~hZC.,,&b h_""~22t2t!M&,, * ,.'L;;:#",~, _ j Cue:

Comments:

20. I n. PRESS and HOLD "LOCAL" "LOAD ON". I Examinee states that they press the "A" Y CEDM MG set "LOAD ON" button until the L,,,,~,,,,,!,,,,,.,,,,."h ****. '. """'~h!:,!.",",va>>",*","".""""_T,_,,,,,_.

A.*:~OAD ON"li~.~t is Cue:

Comments:

21.

Cue:

Comments:

Page 10 of 13

PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP L PERFORMANCE STANDARD n _ - - - , - , , - - ,

22. p. PLACE "A" CEDM MG "INCOMING Examinee states that they turn the GENERATOR" synchronizing selector synchronizing selector switch to "OFF."

t-------hL~A,_

switch to "OFF."

Cue:

Comments: I If performing this JPM with either MG set operating. TERMINA TE the JPM after the completion of this step.

If performing this JPM with both MG sets secured and permission has been granted to open the cabinet, continue the JPM to normal comDletion.

23. I q. PRESS and RELEASE "RESET," (back I Examinee opens the back door of C-29 N of C-29). and states that they would press the reset button.

Cue:

Comments:

24.

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

S.TPP 11IfJJ~:

Page 11 of 13

JPM Number: JPM-013 Rev. _ _...:.c6/,-1_ _

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 20 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one) the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 12 of 13

..IPM Number: JPM-013 Rev. _ _.:::..:6/~1 _ _

STUDENT HANDOUT Initial Conditions:

  • The plant is preparing for startup.
  • The "B" CEDM MG set has been placed in service with its load contactor closed.
  • All TCBs are open except TCB-9. which is closed.
  • Both voltage droop circuits are on.
  • In-plant loads are powered from the RSST.
  • No maintenance has been performed on "A" or "S" CEDM MG sets.

Initiating Cues:

  • The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set.

Page 13 of 13

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-124 Revision: 4/0 II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

Technical Revie r P;&p/ Da e IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor 2J¥11 Date Page 1 of 8

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE

..... "'...."'-317 Update JPM to include HUP evaluations and new format Page 2 of 8

JPM Number: JPM-124 Rev. _ _....:.;4/~0_ _

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-124 Rev. - - 4/0 ---

Task Title:

System: Service Water Time Critical Task: Yes ---- No x Validated Time (minutes): 15 Task No.(s.): _ _ _ _ _ _ _ _ _ __

Applicable To: SRO X RO X PEO - - -

KIA No. 076 A4.02 KIA Rating _ _2_.6_/2_._6__

Method of Testing:

Simulated Performance: - -X- - Actual Performance:


Location:

Classroom: - - - - Simulator: In-Plant: --=-=-

X

---

Task Standards: At the completion of this JPM, the examinee will have placed 2-SW-3.2A in manual operation and closed the valve.

Required Materials OP 2326A Attachment 3" Manual Operation of 2-SW-3.2A and 2 (procedures, equipment. etc.): SW-3.2B" General

References:

OP 2326A Service Water

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

JPM Number: 24 Rev. _ _....:.:4/'-=0_ _

.JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • You have been directed to take manual control and close 2-SW-3.2A per OP 2326A, Attachment 3
  • The examiner will act as the US as needed.

Initial Conditions:

  • The plant has tripped due to a LOCA.
  • A SIAS was automatically actuated.
  • "8" Service Water Supply to TBCCW Heat Exchangers, 2-SW-3.2A, failed to close on the SIAS signal, and will NOT close from the Control Room.

Simulator

  • N/A Requirements:

-It -It -It NOTES TO EVALUATOR -It -It -It-lt

1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. Ifnecessary, question the student for details of simulated actions/observations (Le. "What an~ you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

1. OP 2326A Attachment 3
1. To place valve in manual, PERFORM the Examinee identifies 2-SW-3.2A and N following: documents valve number and function on 1.1 DOCUMENT valve number and function top of Attachment 3 (OP 2326A).

I ~, ~.. of this Attachment Cue:

Comments:

2.

Cue:

Comments:

3. I 1.3 OPEN operating cylinder equalizing Examinee opens operating cylinder y valve. equalizing valve for 2-SW-3.2A by taking the valve to the counter-clockwise direction.

Cue:

Comments:

4. 1.4 To align slot in shaft with T-handle I Examinee aligns slot in shaft with T-handle y mechanism, OPERATE manual handwheel. mechanism with the use of the manual handwheel.

Cue:

Comments:

Page 5 of 8

PERFORMANCE INFORMATION JPM Number:

GRADE STEP PERFORMANCE STANDARD JS/U}

5. 1.5 ENGAGE T-handle mechanism in valve Examinee ENGAGE's T-handle y shaft. mechanism in valve shaft for 2-SW-3.2A.

Cue:

Comments:

6. NOTE The following are reverse acting valves: Examinee reads and acknowledges note. N

_ 2-SW-3.2B, 'A' SERVICE WATER HEADER TO TBCCW HEAT EXCHANGERS"

_ 2-SW-3.2A, 'B' SERVICE WATER HEADER TO TBCCW HEAT I--_ _ _-+I.,,:;;~~;;;..X:.,:C..;,..H~J\NGERS" Cue:

Comments:

7. 1.6 POSITION valve as directed by SM or Examinee closes 2-SW-3.2A by operating y US: handwheel in counterclockwise direction to

_ To close valve, OPERATE handwheel in its limit of travel.

counterclockwise direction.

_ To open valve, OPERATE handwheel in 1------1 clockwise direction.

Cue:

TERMINATION CUE: The evaluation for this JPM is concluded.

" .. "';/ <'" S:;<U'/~;///// / ,

,~Pl1ME::

Page 6 of 8

JPM Number: JPM-124 Rev. _ _....:.:4/....::.0_ _

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation ..

performed the task correctly and in accordance with procedure Pass 1 Fail usage and adherence requirements.

never put anyone's safety at risk. Pass / Fail never put equipment reliability at risk. Pass I Fail never violated radioloQical work practices. Pass / Fail demonstrated effective use of event-free human performance too Pass / Fail Areas for Improvement/Comments:

Page 7 of 8

JPM Number: JPM-124 Rev. _ _:....:4/:....:0_ _

STUDENT HANDOUT Initial Conditions:

  • You have been directed to take manual control and close 2-SW-3.2A per OP 2326A, Attachment 3
  • The examiner will act as the US as needed.

Initiating Cues:

  • The plant has tripped due to a LOCA.
  • A SIAS was automatically actuated.
  • "B" Service Water Supply to TBCCW Heat Exchangers, 2-SW-3.2A, failed to close on the SIAS signal, and will NOT close from the Control Room.

Page 8 of 8

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: ..IPM-P2.2 Revision: --::-

II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

T~chnical ReVier IV. Approved:

Cognizant Plant Supervisor (optional) Date

"'"" Nuclear Training Supervisor Date Page 1 of 13

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13

JPM Number: JPM-P2.2 Rev. ___0=--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


. .IPM Number: JPM-P2.2 Rev. ___0"-__

Task Title:

System: Instrument Air Time Critical Task: Yes No x Validated Time (minutes): __ 2_0_ __

Task No.(s): _ _ _ _ _ _ _ _ _ __

Applicable To: SRO X RO X PEO


KIA No. 065 M1.04 KIA Rating _---C::.3..:....:.5:..:..../3=-::.-"-4_ _

Method of Testing:

Simulated Performance: X Actual Performance:


----

Location:

Classroom: Simulator: In-Plant: - -X- -


---

Task Standards: At the completion of this JPM, the examinee will have aligned a backup air supply to 2-CH-517, 2-CH-518, and 2-CH-619 per EOP 2541 Appendix 40.

Required Materials EOP 2541 Appendix 40, "Aligning Backup Instrument Air" (procedures. I~quipment. etc.):

General

References:

EOP 2541 "Standard Appendixes"

  • * 'It
  • READ TO THE EXAMINEE * * * 'It I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 13

JPM Number: Rev. ___0=---__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initiating Cues:

  • You have been directed to align Backup Instrument Air to 2-CH-517, 2-CH-51B, and 2-CH-519 per EOP 2541 Appendix 40 Initial Conditions:
  • Unit-2 was manually tripped due to low Instrument Air header pressure Simulator
  • N/A Requirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the perfonnance of this JPM (in-plant only).

Page 4 of 13

PERFORMANCE INFORMATION JPM Number:

CRITICAL GRADE STEP PERFORMANCE STANDARD (YiNL (§lU)

~:$i~ij1":*ili":~iii'i,i~f;.,--;_ __

1. Examinee refers to EOP 2541 Attachment I 40-A to C !lIil"I~IJ\';~<~'i~ iIlli nltiiJJi"'~""

Comments:

2. NOTE Examinee reads and acknowledges note N The next step places Backup Air Supply System in service for the following: (-5' Aux Bldg near letdown HX room)

_ CH-517, Auxiliary spray valve

_ CH-518, Charging header to loop 2A CH-519, Charging header to loop 1A

_ EB-88, RM-8123 inboard supply EB-89. RM-8262 inboard s Cue:

Comments:

3. 5. IF placing backup air in service for Charging and Sampling System isolation Examinee adjusts IA-591 backup air y valves, PERFORM the following: (-5' Aux PCV to minimum by turning the valve Bldg near letdown HX room) counterclockwise.
a. ADJUST IA-591, backup air PCV to minimum. (full counterclockwise)

,:;;;:;z:;;;;:< ,m >1-" <8tW '"" tf:JtkJ ",;, "

Cue:

Comments:

Page 5 of 13

PERFORMANCE INFORMATION JPM Number:

CRITICALi GRADEl STEP PERFORMANCE I STANDARD {yIN} (S/U) I

4. b. Slowly OPEN IA-603, "MASTER STOP". I Examinee slowly opens IA-603, "MASTER y STOP" by taking the valve handle in the counterclockwise direction to a hard Cue:

Comments:

5. I c. OPEN IA-590, master stop. Examinee opens IA-590, master stop by y taking the valve handle in the counterclockwise direction to a hard Cue:

Comments:

6. d. ADJUST IA-591, backup air PCV Examinee adjusts IA-591, backup air PCV y clockwise and ESTABLISH 100 psig outlet clockwise to establish 100 psig outlet pressure. pressure as read on the downstream regulator Cue:

Comments:

7. e. UNLOCK and OPEN IA-566, master Examinee unlocks and opens IA-566, y stop. master stop by taking the valve handle in the counterclockwise direction to a hard sto Cue:

Comments:

8.

Cue:

Comments:

Page 6 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

9. g. Slowly OPEN IA-595, master stop. Examinee slowly opens IA-595, master y stop by taking the valve handle in the counterclockwise direction to a hard Cue:

Comments:

10. h. MONITOR backup air bottle pressure Examinee states that backup air bottle N every 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br />. pressure will be monitored every 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> and is Dresentlv - 990 Cue:

Comments:

11. NOTE Approximately 50 psi of air is required to Examinee reads and acknowledges note. N cycle a valve. If the supply of air bottles is limited, the Shift Manager or TSC may elect

...~o chanae air bottles at a lower 1--------11,..,,:

Cue:

Page 7 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

12. i. WHEN pressure lowers to less than 1000 psig OR is expected to fall below Examinee determines that swing backup N 1000 psig before the next pressure air supply is available and is not supplying check, PERFORM ONE of the following: AC-15, 20, 12, and 47.

_ IF swing backup air supply is available Examinee refers to step 6 for aligning N AND not supplying AC-15, 20,12,47, swing backup air supply to Charging and Refer To step 6, and ALIGN swing Sampling System valves inside backup air supply to Charging and Containment.

Sampling System valves inside Containment.

REPLACE QA air bottle Com air to AC-15, 20,12, and 47. Use cue above.

Page 8 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

13. I The next step places swing backup air I Examinee reads and acknowledges note. I N supply in service for the following sets of valves:

_ Charging and Sampling System Valves Inside Containment:

_ CH-517, Auxiliary spray valve

_ CH-518, Charging header to loop 2A

_ CH-519, Charging header to loop 1A,

_ EB-88, RM-8123 inboard supply, EB-89, RM-8262 inboard s t;",,~," """0"""",,,.,*. ".0*-1,"

Cue:

Comments:

14. 16. IF placing swing backup air station in service for Charging and Sampling System, Examinee adjusts IA-886, "BtU AIR PCV" Y PERFORM the following: to minimum by taking regulator handle full
a. ADJUST IA-886, "BtU AIR PCV" to counterclockwise.

minimum. (full counterclockwise) (14'6" Aux Bldg near MCC B61 1'"B_"..a'ffibffi~~pA''''''''''''0"",h0

Cue:

Comments:

15. b. Slowly OPEN IA-885, air bottle Examinee slowly opens IA-885, air bottle y "MASTER STOP". "MASTER STOP" by taking the valve (14'6" Aux Bldg near MCC B61 ) handle counterclockwise to a hard stop.

[,,"" ~ ,"-'" ~"'.'/"/Y<Y. ****,., '!!r,,~,...;,d\'!U'!.i:':,~ ',,"

Cue:

Comments:

Page 9 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

16. I c. OPEN IA-88?, "REGULATOR ISOL FOR Examinee opens IA-88?, "REGULATOR Y BtU IA", (14'6" Aux Bldg near MCC B61) ISOL FOR BtU IAn by taking the valve I ..*",. .. ~ ",;; " "'Yh" ,'.,',"',~." ,1 handle

",","

counterclockwise to a hard

~",A" Cue:

Comments:

1 7. I d. ADJUST IA-886,"BtU AIR PCV" Examinee adjusts IA-886,"BtU AIR PCV' Y clockwise and ESTABLISH 100 psig outlet clockwise and establishes 100 psig outlet pressure. (14'6" Aux Bldg near MCC B61) Pressure as indicated on the downstream Cue:

I..~ce.' **. ' *** ,="'.... >1" .. %'" UV ..**"", .**

Comments:

1 8. e. Slowly OPEN IA-889, "MANIFOLD Examinee slowly opens IA-889, ISOLATION FOR BtU AIR CYLINDER "MANIFOLD ISOLATION FOR BtU AIR Y C-3C". (14'6" Aux Bldg near MCC B61) CYLINDER C-3C" by taking the valve handle counterclockwise to a hard I** S.... M .d . ' , ,., ".'ffi " , ,. """ cc " . k. * '_0'_, _,.::,"/N/""",_",,""",,,,', "'//Mo, ,~ _, ft.,*,. .' " __,__,,,,w,y,,, ,"" ""

Cue:

Comments:

1 9. f. Slowly OPEN IA-910, "BtU Examinee slowly opens IA-910, "BtU Y AIR SWING BOTTLE MANIFOLD STOP AIR SWING BOTTLE MANIFOLD STOP VALVE". (14'6" Aux Bldg near MCC B61) VALVEil by taking the valve handle counterclockwise to a hard I, ' " S$.C!IJ>, . 'nM"ad:',~, t",.,,_ .". b , ** ,,;;;: f,,*S/>

Cue:

Comments:

20. I g. CLOSE IA-595, master stop.

(-5' Aux Bldg near letdown HX room)

IExaminee closes IA-595, master stop by Y taking the valve handle clockwise to a Comments:

Page 10 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

21. h. CLOSE IA-603, "MASTER STOP". (-5' Examinee closes IA-603, "MASTER y Aux Bldg near letdown HX room) STOP" by taking the valve handle clockwise to a hard stop. I

~~",;:<'W;;,,.",";:-":'1~1~i Ar ' , J,:",:t~:b" ->iMP "'AX,,,,

Cue:

Comments:

22. i. IF at any time during this evolution, Examinee reads and acknowledges this Containment isolation is required, step and states that this step will be left CLOSE IA-566, master open and used if required.

Comments:

23.

Com TERMINATION CUE: The evaluation for this JPM is concluded.

S]QRtl1N1E:

Page 11 of 13

JPM Number: JPM-P2.2 Rev. ___0_ __

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

--

Validated Time (minutes): 20 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.

never put anyone's safety at risk. Pass I Fail i never put equipment reliability at risk. Pass I Fail never violated radiological workpractices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 12 of 13

JPM Number: JPM-P2.2 Rev. _ _-'--_ _

STUDENT HANDOUT Initial Conditions:

  • You have been directed to align Backup Instrument Air to 2-CH-517, 2-CH-518, and 2-CH-519 per EOP 2541 Appendix 40.

Initiating Cues:

  • Unit-2 was manually tripped due to low Instrument Air header pressure.

Page 13 of 13

Appendix D Scenario Outline Form ES-D-1 Facility: MP2 Scenario No.: ES11 Ll1 Op-Test No.:_1"---_

Examiners: _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ _ __

Initial Conditions: 100% power, MOL, Eg. Xe., 9.2 ppm Boron SG8D @ 40 gpm per SG, 24E aligned to 24C, "8" TBCCW Pimp is OOS for motor repairs.

Turnover: 100% power, MOL, Eg. Xe., 9.2 ppm Boron, blend ratio: 70:1, SGBD @ 25 gpm per SG, 24E aligned to 24C, "8" RBCCW Pump OOS for motor repairs. no other equipment OOS and no surveillance in progress or due.

Event No.

I Malf.

No.

Event Type*

Event Description 1 N/A N ISwap from "A" to "B" RBCCW Pump (TS)

(BOP/S) 2 RX11D I i #2 SG Alternate steam flow transmitter failure (BOP/S) 3 RD0368 C CEA #28 to slip 35 steps into the core. (TS)

(RO/S) 4 N/A R Downpower to < 70% power for CEA recovery i (All) (Reactivity) i 5 RP24D I I "D" CTMT pressure transmitter failure (TS)

(RO/S) 6 FW33 M

  • Loss of vacuum with failure of Turbine Low Vacuum Trip TC10A (All) Manual reactor trip with loss of both Main Feed Pumps 7 FW30A C Degradation/loss of the "A" AFW Pump FW20A (BOP/S) Overspeed trip of the Turbine Driven Aux Feed Pump FW20C i 8 ED05D 1 M Bus 24D Fault i

(All)

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D, 38 of 39

Simulator Exercise Guide Job Aid Page 1 of 27 SEG#ES11L11 Rev;_O_

SITE: I Millstone Power Station I PROGRAM: Unit 2 LOIT NRC Exam I Title Simulator #1 I COURSE: I ESllLIl I Course #: NA i i Total Time 11.5 hours0.208 days <br />0.0298 weeks <br />0.00685 months <br /> (C,©~'\1

~.-" "".

Prepared by: R.1. Ashey Printed Name

!~(j~ Instructo S SIgnature 12/7/10 Date Reviewed by: Jgh't".( t., er;'h/+l)lIi~ iv. ~~~vh aJA¥J (Optional) Printed Name Simulator Development Checklist Date Instructor Signature I

Reviewed by:

(Optional) Printed Name Simulat ~r ~lidation Checklist Signature Date

( '(,~~,

i Approved by: 1'"'~ i~~i {-fL-"

_ i > i,~',('

1 ,-.., ~

"-/

~

2/4/11 bate Printed Name Training Supervisor I I

Simulator Exercise Guide Job Aid Page 2 of 27 SEG# ES11L11 Rev;--,,-O_ _

Goal of Training: a) Evaluate the licensees' ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.

b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:

1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
2) Ability of the crew to:
  • Understandlinterpret annunciators/alarms, plant/systems response
  • Diagnose events/conditions based on signals/readings
  • Comply with/use procedures, Technical Specifications, and TRIVI
  • Perform control board operations
  • Properly communicate information/proper crew interactions
  • Practice Reactivity Management
  • Make conservative decisions.
3) Ability of each individual to:
  • Correctly diagnose events
  • Properly interpret integrated system response
  • Comply with and use Technical SpecificationslTRM
  • Comply with and use procedures
  • Properly perform control board operations
  • Demonstrate responsible attitude
  • Properly communicate information and interact with rest of crew
  • Leadership skills required to effectively manage the evolutions
  • Provide adequate overview where required Learning Objectives: NA

Tasks: NA Prerequisites: N/A


Training Resources: 2 booth instructors, 3 NRC Examiners

Simulator Exercise Guide Job Aid Page 3 of 27 SEG# ES11l11 Rev; --,,-0_ _

References:

OP 2330A, RBCCW System ARP 2590D-064, SG level Setpoint Deviation Hilla ARP 2590A-084, CTMT Pres Hi D RE Curve and Data Book AOP 2556, CEA Malfunctions AOP 2575, Rapid Downpower EOP 2525, Standard Post Trip Actions EOP 2537, Loss of All Feedwater Commitments: N/A Evaluation Method:

Operating Experience:

Plant/Simulator differences that may affect the scenario: None Related PRA Core Damage Frequency: 0.98 Information: LERF: 1.00 Important Components: 24E aligned to 24C TDAFP out for bearing replacement "A" and "B" RBCCW Pumps must be swapped for maintenance.

Simulator Exercise Guide Job Aid Page 4 of 27 SEG#_-=ES"'-'1-'-'1L:.w11'--_ _ Rev; _0_

INITIAL CONDITIONS:

  • 100% power EOL. (IC-171)
  • 24E aligned to 24C
  • The "B" RBCCW Pump has just been restored from coupling alignment.
  • "A" and "B" RBCCW Pumps must be swapped to allow maintenance to complete vibration testing.

The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.

Scenario Summary.,;,

The crew will take the shift with the unit at 100% power, 24E aligned to 24C, The Crew will initially be directed to swap from "A" RBCCW Pump to "B" RBCCW Pump supplying Facility 1 for preventative maintenance on the "A" RBCCW Pump. The US will brief the crew and the BOP will perform the evolution. The US will log into TSAS 3.7.4.1 during the pump swap.

After the "B" RBCCW Pump is started and the US logs out of TSAS 3.7.4.1, the alternate steam flow transmitter for #2 SG will start to fail low. Feed flow to #2 SG will trend down. The SPO must diagnose the problem and deselect the failed transmitter. (Prior to deselecting the failed transmitter, the examinee may place the #2 FRV and both main feed pump speed controllers in 'manual' to control S/G level.)

Shortly after restoring #2 S/G level control to automatic, a CEA will slip to -145 steps. The BOP should lower Turbine load to match Reactor power. The crew will enter AOP 2556, CEA Malfunctions.

As a result of the slipped CEA, the crew will enter AOP 2575, Rapid Downpower, and reduce power to

,::70%.

During the down power, the "0" Containment pressure transmitter will gradually fail high. The US will enter TSAS 3.3,1,1, Table 3.3-1, Action 2, and TSAS 3.3.2.1, Table 3.3-3, Action 2, and direct the RO to bypass the appropriate channels of RPS (CTMT High Pressure) and ESAS (CTMT High Pressure and HighlHigh Pressure).

After the crew has taken the appropriate actions for the failed Containment pressure transmitter, Condenser Vacuum will rapidly degrade. Because the low vacuum Turbine trip will NOT actuate, the crew should immediately trip the Reactor prior to reaching 7.5" HG Backpressure and perform EOP 2525.

Shortly after the trip, "A" Aux Feed Pump will degrade. The pump will trip within a few minutes (if not manually secured) requiring the BOP to start the Turbine Driven Aux Feed Pump. Shortly after the TOAFP is started, it will trip on overspeed and cannot be restored.

After EOP 2525 is complete, Bus 240 will fault resulting in a loss of the only remaining Aux Feed Pump.

The crew will rediagnose and enter EOP 2537, Loss of All Feedwater. This will require lowering S/G pressure enough to initiate Condensate flow for heat removal.

The scenario will end when adequate Condensate flow is established to both S/Gs.

CT-1 (SPTA-5): Manually shut down the Reactor.

When Condenser Vacuum exceeds 7.5" Hg backpressure, the Turbine will fail to automatically trip. The Plant must be manually tripped to prevent an automatic trip on low Steam Generator Level.

CT-2 (LOAF-4): Establish a Primary to Secondary Heat Sink.

Main Feed flow (from Condensate) is restored prior to reaching 70 inches wide range level in either S/G OR Once-Thru-Cooling initiated with less than or equal to 70 inches in either S/G and level NOT being restored.

Simulator Exercise Guide Job Aid Page 5 of 27 SEG#'_-,=,E",,-S1w.1.!=lLl..! - , Rev;_O_

o ENSURE TRex Workstation is operating.

o VERIFY the most current approved training load is loaded.

o RESET to IC-30 o If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.

o As needed, RESET Computer Terminals (At Power displays if 100% power IC).

o ENSURE SG blowdown values in PPC Plant Calorimetric are reset.

o ENSURE RCS Leak Rate is reset in PPC.

o ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).

o If necessary (Le., exams), ADVANCE chart recorders o ENSURE the appropriate Protected Train placard is hung ("B" TRAIN PROTECTED).

o ENSURE appropriate signs are in place on simulator doors.

o ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.

o If necessary, ENSURE Simulator fidelity items cleared.

o ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).

o If required, OVERRIDE annunciators that will be lit long-term in the Control Room.

o ENTER Initial Malfunctions I liDs I Remote Functions.

o PLACE Simulator to RUN.

o If placing Equipment ODS, then PERFORM necessary switch manipulations and HANG appropriatl9 tags, as required for the following:

o PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).

Simulator Exercise Guide

'Dominiont<

Job Aid Page 6 of 27 FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

1. INiTIAL CONDiTIONS: ENTER or VERIFY the Initial Malfunctions 1II0s I N/A
  • IC-171 I Remote Functions are loaded on the appropriate Schedule.
  • Mode: 1
  • Burnup:EOl
  • Power: 99.8%
  • Boron: (CB): 9.2 ppm
  • Temperature: Tave 569°F
  • Pressure: 2250 psia
  • Xenon: Stable, at equilibrium
  • Rods: ARO
  • Generator: 888 Mwe N/A
2. SIMULATOR SETUP: COMPLETE Simulator Setup Checklist o As necessary, PERFORM I.V. of Initial Malfunctions Ili0s I Remote Functions entered.
3. TURNOVER: PERFORM the crew turnover SM brief crew on plant conditions and any major (Turnover Sheet) with the SM. equipment OOS. (All) Walk down control boards and let US know when they are ready.
  • Crew must swap "A" and "B" RBCCW Pumps for maintenance.

Simulator Exercise Guide Job Aid Page 7 of 27 SEG# ES11L11 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

1. Swap From "A to "B" RBCCW Pump If Normal EvolutionlTechSpec US Directs/BOP Performs: Swap "A" and "B" RBCCW Pumps per OP 2330A, RBCCW System, Section 4.2.

Perform actions as directed. BOP:

If dispatched, report that SIAS/LNP

  • Verify "B" RBCCW Pump is properly aligned ACTUATION SIGNAL HS 9119D is in BLOCK, with the SIAS/LNP ACTUATION SIGNAL HS 9119D in BLOCK.
  • Verify RB-251A, AlB RBCCW Pump X-Tie Valve, is open on C-06.
  • Ensure US logs into TSAS 3.7.3.1.

o Check "B" RBCCW Pump SIAS/LNP Start Manually Blocked annunciator is lit on C-0617, a Check "B" RBCCW Pump for normal running amps and discharge pressure.

Event 7: CCR06 - 0, Close 2-RB-3A

  • Direct a PEa to close 2-RB-3A, "A" RBCCW Pump Discharge Stop.

a Stop "AU RBCCW Pump.

o Verify "A" RBCCW Header High Flow annunciator is clear.

Event 8: CCR40 - NORM, Place "B" RBCCW

  • Direct a PEa to place "B" RBCCW Pump Pump SIAS/LNP Actuation Hand Switch in SIAS/LNP Actuation Hand Switch in

'Normal', 'Normal'.

a Verify "B" RBCCW Pump SIAS/LNP Start Manually Blocked annunciator clears.

  • Verify US exits TSAS 3.7.3.1.

Event 9: CCR06 - 100, Open 2-RB-3A

  • Direct a PEa to open 2-RB-3A, "A" RBCCW Pump Discharge Stop.
  • Verify "A" RBCCW Header flow is between 6,000 and 7,300 gpm on C-05.

Acknowledge the direction and report that

  • Direct a PEa to verify the appropriate Rad RBCCW Rad Monitors flows are normal. Monitor flow locally.

Simulator Exercise Guide Job Aid Page 8 of 27 SEG# ES11L11 Rev;_O__

Event 1: RX11 D - 100% with a Ramp Time of I BOP:

300 seconds, #2 Steam Generator Alternate Steam Flow Transmitter Failure.

  • Recognizes a difference the #2 Main and Alternate Steam Flow Transmitters TM1, AE1
  • Observe #2 S/G level rising.
  • May observe S/G Level Deviation HilLa annunciator on C-OS.
  • Reports to the US that the #2 Alternate Steam flow Transmitter appears to be failing high.

US:

  • Directs BOP to deselect the #2 Alternate Steam Flow Transmitter (Select Main Steam Flow Transmitter) or, o If necessary, directs the BOP to place
  1. 2 Main Feed Reg valve in Manual and both Main Feed Pump speeds in manual to restore and maintain #2 SlG level to the normal band.
  • References ARP 26900-064, SG level Setpoint Deviation Hilla.

Simulator Exercise Guide Job Aid Page 9 of 27 SEG# ES11L11 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

  • Deselects the #2 S/G Alternate Steam Flow Transmitter on C-OS.
  • If necessary, takes manual control of #2 Main Feed Reg Valve and place both Main Feed Pump Speed Controls in manual.

a Restores and maintains #2 SlG level in normal band.

a When normal level has been restored, returns #2 Main Feed Reg valve and Main Feed pump Speed control to automatic.

Simulator Exercise Guide Job Aid Page 10 of 27 SEG# ES11L11 Rev; Event 2: RD0368 - 35 Steps, CEA #68 (Group RO:

7) slips to 145 steps
  • Observes the following on C-04:

TM2,AE2 a CEA DROPPED NIS Annunciator a White light for CEA #68 is lit (red light out) o CEAPDS Monitor indicates that CEA

  1. 68 is misaligned.

a CEA GR DEV BKiUP annunciator.

  • Reports that CEA #68 has slipped to 145 steps.

BOP:

Lowers Turbine load to match Reactor power and stabilize RCS temperature.

RO:

Monitors RCS temperature, Pressurizer pressure, and Pressurizer level.

US:

  • Enters TSAS 3.1.3.1, action a.1.

When I&C assistance is requested, state that

  • Requests I&C assistance.

you will begin troubleshooting immediately.

  • Enters AOP 2556, CEA Malfunctions and directs required actions.

Simulator Exercise Guide Job Aid Page 11 of 27 SEG# ES11L11 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

  • Prints NSSS Data Sheet and Incore Operability Report form PPC.
  • Notifies Reactor Engineering.
  • Monitors d T Power on RPS.
  • As required, toggles Dropped Rod Reset switches on RPS to clear Dropped Rod LEDs.

Simulator Exercise Guide Job Aid Page 12 of 27 SEG# ES11L11 Rev;_O__

AE3 US:

  • Directs entry into AOP 2575 Rapid Downpower for power reduction to <70% in

<1 hour.

  • Performs Focus Brief for Trip Criteria and RCS Temperature Control.
  • Directs or makes required notifications.

RO:

  • Commences Forcing Pressurizer Sprays:

o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).

US:

Refers to Reactor Engineering Curve and Data Book and determine that Reactivity Plan, RE-G 11 is appropriate for the down power.

Simulator Exercise Guide Job Aid Page 13 of 27 SEG# ES11L11 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS Commences Boration form the RWST (the crew may opt to Borate from the BAST):

  • Ensures at least one Charging Pump is running.
  • Ensures VCT Makeup Bypass, CH-196, is closed.
  • Ensures RWST to Charging Suction, CH 192, is open.
  • Checks Charging flow is appropriate.
  • Starts an additional Charging Pump and j----~~_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - + -.... b~l~nces Charging and Letdown.

BOP:

Reduces Turbine load using the LOAD LIMIT POT.

  • Maintains Tc within 1°F of program.
  • Maintains 50-150 MVARs Crew:

Maintains parameters within the prescribed limits of Attachment 1, Rapid Downpower Parameters.

BOP:

When power is between 80 and 85%, stops one of the three Condensate Pumps.

Simulator Exercise Guide Job Aid Page 14 of 27 SEG# ES11L11 Rev;_O__

Event 3: RP24D -100%, with a Ramp Time of I RO:

160 seconds. "D" Containment pressure Observes and reports CTMT PRES HI D transmitter fails high.

annunciator on C-01 TM3,AE4

  • Reports value and trend of all Containment pressure indications and determines that Channel "D" appears to have failed high.

The crew may temporarily stop the downpower RO:

to address the failed instrument.

Closes RWST to Charging Suction, CH-19, if the US directs the downpower to be temporarily stopped to address the failed instrument.

BOP:

Maintains RCS temperature on program, if the US directs the downpower to be temporarily stopped to address the failed instrument.

US:

  • Refers to ARP 2590A-084. CTMT PRES HI D and/or ARP 2590C-048 (C-01). CTMT HI PRES TRIP CH D (C-04)
  • Directs RO (or BOP) to obtain appropriate keys and bypass Channel "D" Containment Pressure on RPS and ESAS.
  • Logs into TSAS 3.3.1.1. Table 3.3-1, and 3.3.2.1. Table 3.3-3.
  • Contacts I&C for troubleshooting and repairs.

Simulator Exercise Guide Job Aid Page 15 of 27 SEG# ES11 Ll1 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO (or BOP):

  • Obtains bypass keys for Channel "D" RPS and ESAS Containment Pressure.
  • Bypasses Channel "D" RPS and ESAS Containment Pressure.

us:

If the downpower were temporarily halted, directs the RO and BOP to commence the downpower as previously performed.

Simulator Exercise Guide Job Aid Page 16 of 27 SEG# ES11L11 Rev;_O__

CT-1 (SPT A-5): Manually shut down the Event 4: FW33 - 100%. Condenser Vacuum RO/BOP:

Reactor. rapidly degrades.

The plant must be manually tripped prior to

  • Observes and reports annunciators and TC10A - Fail. The Main Turbine fails to trip on indications associated with a rapidly an automatic Reactor trip on low S/G level low Condenser Vacuum. (Inserted during initial degrading Condenser Vacuum due to loss of Main Feed Pumps setup)
  • When directed, manually trips the Reactor TM4, MA1, CT1 and commences actions of EOP 2525, Standard Post Trip Actions.

US:

Queries RO and BOP on the status of Safety Functions as delineated in EOP 2525:

  • Reactivity Control (RO) o Status of the Reactor
  • Maintenance of Vital Auxiliaries (BOP) o Status of the Turbine o Status of Electrical Buses o Status of SW & RBCCW o Check one facility of CRAC operating (RO)
  • RCS Inventory Control (RO) o Pzr level & Subcooled margin (SCM),

value & trend

  • RCS Pressure Control (RO) o Pzr pressure, value & trend
  • Core Heat Removal (RO) o RCP status o Loop delta-T o T H Subcooling Margin
  • RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS T c value and trend

Simulator Exercise Guide Job Aid Page 17 of 27 SEG# ES11L11 Re\l;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS a S/G levels, value and trend oRCS Subcooling Margin

  • Containment (CTMT) Isolation (RO) a Radmonitors inside CTMT, outside CTMT, steam plant a CTMT pressure <1 psig
  • CTMT Temperature & Pressure Control (RO)
  • CTMT temperature and pressure value and trend RO:

Performs associated actions of EOP 2525 and reports results when queried:

  • RX tripped
  • SUR negative and power lowering BOP:

Performs associated actions of EOP 2525 and reports results when queried:

  • Value and trend of S/G pressures
  • Value and trend of T c
  • Adjusts ADVs to maintain on the lower end of 880-920 psig.
  • Value and trend of S/G levels
  • Commence feeding S/Gs with 'A' and 'B' AFW pump, S/G level band 40-70%. (Main Feed Pumps tripped)
  • Subcooling value / CET temperature

Simulator Exercise Guide Job Aid Page 18 of 27 SEG# ES11L11 Rev;_D__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:

Continues with associated actions of EOP 2525 and reports results when queried:

  • Rad monitors inside CTMT not going up or in alarm
  • Rad monitors outside CTMT not going up or in alarm
  • Steam Plant Rad monitors not in alarm or going up
  • Value and trend of CTMT temperature and pressure BOP:

Continue with Subsequent Actions:

  • Closes MSIVs due to condenser NOT being available
  • Opens HD-1 06, Subcooling Valve
  • Stops both Heater Drains Pumps
  • Closes MFW pump mini flow Recirc(s},

FW-36NB

  • If AFAS has actuated (alarms on C-04),

then places both Override hand switches in Pull-To-Lock and controls Aux Feed flow rate

  • Secures all but one Condensate Pump
  • Checks IA Header pressure is >90 psig and stable.

US:

Query RO & BOP regarding the status of EOP 2525 subsequent actions.

Simulator Exercise Guide Job Aid Page 19 of 27 SEG# ES11L11 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO/BOP:

When asked, report that Subsequent Actions are complete and verified.

US:

  • At the completion of EOP 2525, Diagnostic Flow Chart, determines that the trip is uncomplicated and goes to EOP 2526, Reactor Trip Recovery.
  • Places Master Silence Switch in NORM.

Simulator Exercise Guide Job Aid Page 20 of 27 SEG# ES11L11 Rev;_O__

Event 5: FW30A - 100%, with a Ramp Time of BOP:

270 seconds. "A" Aux Feed Pump degrades Observes lowing Aux Feed flow or S/G levels over the next 4.5 minutes.

continuing to lower with 2 Motor Driven Aux FW20A - Trip, with a 6 minute delay. "Au Aux Feed Pumps running.

Feed Pump trips 1.5 minutes after it is degraded.

  • Trips "Au Aux Feed Pump or observes "N Aux Feed Pump is tripped.

Event 29: FW20C - TRIP, When the TDAFP

  • Reports loss of liN Aux Feed Pump to the speed reaches 500 rpm, the pump will trip. US.

(Inserted during Initial setup.)

  • If directed, dispatches a PEO to TM5, EM1 determine the cause of the pump trip.
  • Starts the Turbine Driven Auxiliary Feed Pump.

If a PEO is dispatched to determine the problem

  • Observes annunciator and indications of with the "Au Aux Feed Pump and/or the TDAFP: a trip of the TDAFP.
  • Reports the loss of the TDAFP to the US.
  • If the "Au Aux Feed Pump still running, report that there is a very loud screeching
  • Closes the steam inlet valve to the noise that appears to be coming from the TDAFP.

outboard motor bearing.

  • If the "Au Aux Feed Pump NOT running, report that the breaker is in the trip-free position and the outboard motor bearing is extremely hot.
  • The trip mechanism latch on the Steam Admission Valve for the TDAFP is broken and cannot be fixed for several hours.

Simulator Exercise Guide Job Aid Page 21 of 27 Rev;_O__

Event 6: ED05D - Trip. Bus 24D trips on fault BOP:

resulting in a complete loss of all feedwater.

  • Observes annunciators associated with the TM6, EM2, MA2, EU1 loss of Bus 24D on C-OB and reports the loss of Bus 24D to the US.
  • When directed or when recommended, trips "B" DIG.

Event 10: CVR11 - 22E, When directed, Place US:

"B" Charging Pump on Facility 1.

  • USing the Diagnostic Flow Chart, determine that Loss of All Feedwater has occurred.
  • When (If) deemed necessary, dispatches a PEO to swap the "B" Charging Pump to Facility 1.

Safety Function Status Checks are normally US:

performed by the Shift Technical Advisor.

  • Directs that Safety Function Status Checks Classifications are generally performed by the be performed.

Shift Manager.

  • Classifies event as a General Interest, Echo due to the plant trip_

RO:

When directed by the US:

  • Stops all Reps
  • Places TIC-4165, Steam Dump Tavg Controller, in manual and closed.
  • Places Pressurizer Spray Controllers in manual and closed.

Simulator Exercise Guide Job Aid Page 22 of 27 SEG# ES11L11 Rev;~O_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS If dispatched to determine if any Aux Feed BOP:

Pump can be started, as necessary, report that:

  • Determines that both S/G levels are greater
  • The "A" Aux Feedwater Pump outboard than 70" (Wide Range) and reports value motor bearing is still very hot and and trend to US.

discolored, The pump will NOT rotate by

  • Using various indications, determines that hand. the loss of all feedwater was NOT caused
  • The TDAFP overs peed trip mechanism is by a Main or Aux Feed Line break.

broken and cannot be repaired until new

  • When directed by the US, performs actions parts are ordered or manufactured (at least to conserve S/G inventory:

4-6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />) o Closes MS-220A and B, Blowdown

  • Bus 24D has significant damage caused by Isolation Valves.

an internal phase to phase short. o Closes MS-191A and B, S/G Sample Isolation valves.

o Attempts to restore feedwater to at least one S/G.

  • Determines that at least on Condensate Pump is running.
  • Determines both Main Feed Pump Discharge Valves, FW-38A and B, are open.
  • Closes both Main Feed Pump Min-Flow Valves, FW-36A and B.
  • When (If) dispatched to locally open CNM-2, I
  • Observes CPF Bypass Valve, CNM-2, is inform the Control Room that you'll do your deenergized (closed) and dispatches a PEO best, but it will likely take at least an hour to to manually open CNM-2.

complete. I

  • Opens both Main Feed Reg Bypass Valves, FW-41 A and B.

o If MSI actuates, pushes the MSI OVRD push buttons, then opens the Feed Reg Valve Bypass Valves.

  • Determines both Main Feed Air Assist Check Valves, FW-SA and B, are in the open position.

Simulator Exercise Guide Job Aid Page 23 of 27 SEG# ES11L11 Rev;_O__

BOOTH INSTRUCTOR STUDENTS RO:

During the subsequent cooldown and when permitted:

  • blocks MSI
  • commences Emergency Boration CT-2 (LOAF-4): Establish a Primary to CT2 BOP:

Secondary Heat Sink.

Using the Steam Dumps to the Condenser, Main Feed flow (from Condensate) is initiates a cooldown at the maximum restored prior to reaching 70 inches wide range level in either SIG OR Once-Thru contro"able rate to establish feed flow from Condensate to the Steam Generators Cooling initiated with less than or equal to (approximately 550 psig in the S/Gs) 70 inches in either SIG and level NOT being restored.

  • Controls feed flow to establish and maintain 40-70% in both S/Gs.

The US will likely direct the RO to prepare for US:

Once-Thru-Cooling prior to reaching 70 inches in either S/G.

  • If either SIG level lowers to 70 inches and level is NOT being restored, directs the crew to initiate Once-Thru-Cooling.
  • When Once-Thru-Cooling has been initiated, enters EOP 2540, Functional Recovery.

RO:

  • Trips aI/ Proporlional Heaters.
  • Places all Backup Heaters in Pull-To-Lock.
  • Initiates both facilities of SIAS.
  • Verifies "A" HPSI Pump is running.
  • Verifies all HPSllnjection valves are open.
  • Ensures at least "A" Charging Pump is running.
  • Obtains keys and opens both PORVs.

Simulator Exercise Guide Job Aid Page 24 of 27 SEG# ES11L11 Rev; _0_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

Opens both ADVs.

SCENARIO END: At the discretion of the lead

  • When directed, FREEZE simulator.

evaluator, the simulator will be placed in

  • Inform the crew that the evaluation is FREEZE. complete.

, Dominion Simulator Exercise Guide Job Aid Page 25 of 27 SEG# ES10Ll1 Rev; _0_

Delay Ramp I Event I Severity I Final IRelative Description Time Time Trigger Or Value Value Order MALFUNCTIONS

-~ ~--~~ ~~-- ~ -----

TC10A, Failure of the Main Turbine to trip on low vacuum. NA NA NA NA NA 1 FW20C, The TOAFP trips shortly after being started. NA NA 29 NA NA 1


RX11 0, #2 S/G Alternate Steam Flow Transmitter failure. NA 300 sec. 1 100 100 5 R00368, CEA #68 slips to 145 steps. NA NA 2 35 145 6 RP240, "0" Containment Pressure Transmitter fails high. NA 160 sec. 3 100 100 7 FW33, Condenser Vacuum rapidly degrades. NA NA 4 7.5 7.5 8 FW30A, "A" Aux Feed Pump degrades. NA 270 sec. 5 100 100 9


-

FW20A, "A" Aux Feed Pump trips 360 sec. NA 5 NA NA 10

~----~~~~- -------

E0050, Bus 240 trips on fault resulting in a loss of all feedwater. NA NA 6 NA NA 11 REMOTE FUNCTIONS


CCR06, Close 2-RB-3A NA NA 7 0 0 2 CCR40, Place "B" RBCCW Pump SIAS/LNP Actuation Hand Switch in 'Normal'. NA NA 8 NORM NORM 3 CCR06, Open 2-RB-3A NA NA 9 100 100 4 CVR11. Place "B" Charging Pump on Facility 1. I NA NA 10 22E 22E 12 OVERRIDES I

-

(JjjJ"Dominion'*

SEG# ES10Ll1 Rev; _0_

Simulator Exercise Guide Job Aid Page 26 of 27 Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.

Yes No

1. The desired initial condition(s) could be achieved. o
2. All malfunctions and other instructor interface items were functional and responded to o support the simulator Scenario.
3. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.

o

4. All applicable acceptance criteria were met for procedures that were used to support the simulator scenario.

o

5. During the simulator scenario, observed changes corresponded to expected plant response.

o

6. Did the scenario satisfy the learning or examination objectives without any significant simulator performance issues, or deviations from the approved scenario sequence?

o

7. The simulator is capable of being used to satisfy learning or examination objectives without exceptions, significant performance discrepancies, or deviation from the approved scenario o

sequence.

8. Any identified Critical Tasks possesses the following elements (NUREG-1021 ):

o

  • Essential to safety with adverse consequences or significant degradation,
  • Cue(s) prompt the Operator to respond.
  • Defined and measurable performance indicators.
  • Performance feedback.

The use of "N/A" is allowed for item 8 only if this is NOT an evaluated scenario.

Discrepancies noted (Check "none" or list items in comments field) None 125::1 Comments:

Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.

Simulator Exercise Guide Job Aid Page 27 of 27 SEG# ES10Ll1 Rev; _0_

SIMULATOR TRAINING SHIFT TURNOVER REPORT DATE-TIME PREPARED BY Today 0515 Unit Supervisor ('NIGHT" Shift PLANT STATUS:

Mode: 1 Rx Power:

Megawatts: Thermal: 2698 MWTH PZR Pressure:

Electric: 888 MWe RCS T-AVE:

RCS Leakage: Identified: 0.015 gpm Protected Train/Facility: TRAIN B Unidentified: 0.036 gpm DatelTime: Toda 0015 Active Tracking Records and Action Statements I E_quipmentlReason I LCO Action Date Time in LCO Action Requirement Time Left I

! None 2-U-AIL, See AIL for details None 00 Compensatory Actions I Temp Logs Watch Open Date Class Reason Reason Position 2-CH-507. RCP bleedoff relief isolation. is closed on C02. This is due to relief CH-199 leaking by into the PDT. ARP C-1 0 for Bleedoff flow high 7/05/08 ODM RO directs closing CH-507. ARP 8-10 directs opening CH-507. (>280#).

OP-2301C-001 has been modified for this valve to be CLOSED.

I PLANT SYSTEMS APe System I Notes CROSS UNIT SYSTEM STATUS U3 Power to 24E I 34A aligned to 24E SURVEILLANCES I EVOLUTIONS IN PROGRESS OP 2204 I Steady State Operation REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES I SPREAD SHEET FOR ADDITIONAL INFO)

Current Rod Height ARO@ 180 Xenon Trend Stable Current Boron 9.2 ppm Boron Pot Setting I Blend Ratio 70 to 1 (corrected)

Appendix D Scenario Outline Form ES-D-1 Facility: MP2 Scenario No.: ES11 Ll3 Op-Test No.:_3=--_---i1 Examiners: _ _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ __

Initial Conditions: 100% power. MOL. Eg. Xe .. 9.2 ppm Boron SGBD @ 40 gpm. Bus 24E is aligned to Bus 24C. TDAFP is OOS for bearing replacement.

Turnover: 100% power, MOL, Eg. Xe., 9.2 ppm Boron, blend ratio: 70:1 SGBD @ 40 gpm per S/G, Bus 24E aligned to Bus 24C, TDAFP is OOS for bearing replacement. In TSAS 3.7.1.2a and TRM Table 7.1.15-1, ACTIONS b.1

  • and b.2 for fire areas R-3, R-11. R-16 and R-17.

Event Malf. Event Event Description No. No. I Type*

1 SW9A C "Au Service Water Pump degrading performance. (TS).

(BOPfS) (Swap Service Water Pumps.)

2 RX03B I Failure of in-service Pressurizer Pressure transmitter (ROfS) 3 CH07 C Non-Vital Bus 22B is lost develops due to a seismic event ED06B (BOP/S) 4 RC04 C Small RCS Leak develops. (TS)

(ROfS) 5 NfA R Plant shutdown due to RCS leak (All) 6 RC04 M Small Break LOCA requiring a Reactor trip. Failure of ED06B (All) automatic Reactor trip and manual trip push buttons Loss RP04A, of Actuation Cabinet 6 on the trip.

B,C,D RP27B 7 MS01B I M Excess Steam Demand in Containment on #2 SfG after

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D. 38 of 39

~

ifijJ~ Dominion" Simulator Exercise Guide Job Aid Page 1 of 32 SEG# ES11 Ll3 Rev;~

I SITE: I Millstone Power Station PROGRAM: Unit 2 LOIT NRC Exam Title Simulator Exam #3 COURSE: ESllLI3 I Course #: NA Total Time 1.5 hours0.208 days <br />0.0298 weeks <br />0.00685 months <br /> Prepared by: R.J. 1110/2011 Printed N amc Il1Structor's lignature Date Reviewed by: Idkl"-t L Cfl11m1n5 ~\

(Optional) Printed Name Instructor Signature Reviewed by:

(Optional) Printed Name ~im latr\Validation Checklist Signature Date Approved by: ---!-tL~A \4 ~~ e",.~ ". ~ \ ~}--

Printed Name Training Supervisor

'<\//

,'- .

I '

LI

Simulator Exercise Guide Job Aid Page 2 of 32 SEG# ES11L13 Rev; --,,-0_ _

Goal of Training: a) Evaluate the licensees' ability. as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.

b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:

1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
2) Ability of the ~ to:
  • Understand/interpret annunciators/alarms, plant/systems response
  • Diagnose events/conditions based on signals/readings
  • Comply with/use procedures. Technical Specifications, and TRIVI
  • Perform control board operations
  • Properly communicate information/proper crew interactions
  • Practice Reactivity Management
  • Make conservative decisions.
3) Ability of each individual to:
  • Correctly diagnose events
  • Properly interpret integrated system response
  • Comply with and use Technical SpecificationslTRM
  • Comply with and use procedures
  • Properly perform control board operations
  • Demonstrate responsible attitude
  • Properly communicate information and interact with rest of crew
  • Leadership skills required to effectively manage the evolutions
  • Provide adequate overview where required Learning Objectives: NA Tasks: NA Prerequisites: N/A Training Resources: 1 lead simulator (floor) instructor, 1 booth instructor

Simulator Exercise Guide Job Aid Page 3 of 32 SEG# ES11 Ll3 Rev; _0,,--_ _

References:

ARP 2590E-029, SW PUMP A STNR TROUBLE AOP 2565, Loss of Service Water OP 2326A, Service Water System ARP 25908-212, PZR PRESSURE SELECTED CHANNEL DEVIATION HIILO Millstone 2 Technical Specifications AOP 2562, Earthquake AOP 2568 Reactor Coolant System Leak AOP 2575, Rapid Downpower EOP 2525, Standard Post Trip Actions EOP Loss of Coolant Accident EOP 2540, Functional Recovery EOP 2540, Functional Recovery of Containment Temperature and Pressure Control EOP 2540C1, Functional Recovery of RCS Inventory Control EOP 2540D, Functional Recovery of RCS Heat Removal Commitments: N/A Evaluation Method:

Operating Experience:

Plant/Simulator None differences that may affect the scenario:

Related PRA Core Damage Freguency: 0.98 Information: LERF: 1.00 Important Components: 24E aligned to 24C TDAFP out for bearing replacement

Simulator Exercise Guide Job Aid Page 4 of 32 SEG#_---==:ES"-1.1..\.l:1L:l-"13"---_ Rev;_O_

INITIAL CONDITIONS:

  • 100% power EOL.
  • 24E aligned to 24C
  • The TDAFP is OOS for a bearing replacement and is not expected back until mid day tomorrow.
  • In TSAS 3.7.1.2.a and TRM Table 7.1.15-1, Actions b.1 and b.2 for Fire Areas R-3, R-11, R-16, and R-17.

The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.

Scenario Summary:

The crew will take the shift with the unit at 100% power and 24E aligned to 24C. The Turbine Driven Aux. Feed Pump is out of service for bearing replacement.

Shortly after the crew takes the shift, the "A" Service Water Pump will begin to degrade requirill9 the crew to swap to the "B" Service Water Pump. While swapping Service Water Pumps the US will enter TSAS 3.7.4.1.

After the Service Water Pumps are swapped, the Channel "Y" Pressurizer Pressure transmitter will fail low causing RCS presslJre to rise. The crew will swap to Channel "X". (Prior to swapping to Channel "X", the crew may take manual control of pressurizer pressure components.)

When RCS pressure is back to 2250 psia and stable, a seismic event will result in a loss of Non-Vital 480 Volt Bus 22B. The crew should enter AOP 2503B and take action to cross-tie Bus 22B with Bus 22A.

When the Non-Vital Buses are cross-tied, a small RCS leak will develop. The Crew will attempt to determine the location of the leak while the US enters TSAS 3.4.6.2, and AOP 2575, Rapid Downpower. The downpower rate will be determined and the appropriate Reactivity Plan will be selected.

During the down power, the RCS leak will degrade to where it exceeds charging pump capacity (Small Break LOCA) and eventually trigger an automatic reactor trip (if not manual performed).

The automatic (or manual) reactor trip will not occur, even when the trip push buttons are pressed, requiring the crew to trip the CEDM MG sets to initiate a reactor trip. The crew will enter EOP 2525, Standard Post Trip Actions. On the trip, ESAS Actuation Cabinet 6 deenergizes resulting in a failure of all Facility 2 ESAS components from automatically actuating to their accident conditions.

During the performance of EOP 2525, a small steam line break in Containment will occur. The crew will diagnose the 2 events and transition to EOP 2540, Functional Recovery.

When Containment Spray is actuated, the "B" Containment Spray Pump will NOT automatically start. The crew will start the "A" and/or the "B" Containment Spray Pump(s) to maintain Containment Integrity.

The scenario will end when at least one Containment Spray Pump is running and the crew has prioritized the Safety Functions for performance.

CT1 (LOCA-11): Perform a plant cooldown. A plant cooldown must be initiated within one hour following an unisolable LOCA at a rate of greater than 40°F/hr.

CT2 (CTPC-1): Maintain Containment Temperature and Pressure Control. Establish greater than or equal to 1300 gpm Containment Spray flow from at least one Containment Spray Pump prior to reaching 51 psig Containment Pressure.

CT3 (ESDE-6): Isolate the Affected S/G. AFW to the faulted (#2) SG is isolated within :s30 minutes of MSI actuation on an ESDE.

Simulator Exercise Guide Job Aid Page 5 of 32 SEG#_--=ES"-!.1...!.-"1L",,13,--_ Rev;_O_

o ENSLIRE TRex Workstation is operating.

o VERIFY the most current approved training load is loaded.

o RESET to IC-173 o If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.

o As needed, RESET Computer Terminals (At Power displays if 100% power IC).

o ENSURE SG blowdown values in PPC Plant Calorimetric are reset.

o ENSURE I~CS Leak Rate is reset in PPC.

o ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).

o If necessary (Le., exams), ADVANCE chart recorders o ENSURE the appropriate Protected Train placard is hung (A TRAIN PROTECTED).

o ENSURE appropriate signs are in place on simulator doors.

o ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.

o If necessary, ENSURE Simulator fidelity items cleared.

o ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).

o If required, OVERRIDE annunciators that will be lit long-term in the Control Room.

o ENTER Initial Malfunctions I II0s I Remote Functions.

o PLACE Simulator to RUN.

o If placing Equipment OOS, then PERFORM necessary switch manipulations and HANG appropriate tags, as required for the following:

o PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).

'Dominion'"

Simulator Exercise Guide .

Job Aid Page 6 of 32 FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

1. INITIAL CONDITIONS: ENTER or VERIFY the following Initial N/A
  • IC-173 Malfunctions I I/0s I Remote Functions
  • Mode: 1
  • Burnup:EOL
  • Power: 99.8%
  • Boron: (CB): ppm
  • Temperature: Tave 569 F
  • Pressure: 2250 psia
  • Xenon: Stable, at equilibrium
  • Rods: ARO
  • Generator: 888 Mwe
2. SIMULATOR SETUP: COMPLETE Simulator Setup Checklist NIA As necessary, PERFORM I.V. of Initial Malfunctions I II0s I Remote Anl'Ar~lr!

~~~~~---------------------------------+--------------------------------~

3. PRE*SCENARIO:

BRIEF the crew on of this session

4. TURNOVER: PERFORM the crew turnover SM brief crew on plant conditions and any major (Turnover Sheet) with the US. equipment OOS. (All) Walk down control boards and let US know when they are ready.

No shift briefing is required or recommended.

Simulator Exercise Guide ..

Job Aid Page 7 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

1. Observe degraded performance of itA" Technical Specification Service Water Pump and swap to "B" Service Water Pump.

Event 1: SW09A - Ramp to 100% over 240 BOP:

seconds, "A" Service Water Strainer clogs.

Observes and reports indications associated TM1, AE1 with degrading flow on "A" Service Water header.

  • Observes and reports SW PUMP A STNR TROUBLE annunciator on C-06/7 US:
  • Refers to ARP 2590E-029 (CA-4 on C-06/7) o If High RBCCW or TBCCW header temperature annunciator are received, refers to ARP 2590E-048 (D-8 on C 06/7) or 2590E-015 (DA-2 on C-06/7)

When dispatched to determine the cause of the

  • Dispatches a PEO to the Intake Structure to low "A" Service Water Header flow, report that determine the cause.

the "A" Service Water Strainer DIP is 28 psid o Directs the PEO to stop Soduim and getting worse. The strainer motor is Hypochlorite to the "A" Service Water rotating, but the strainer is NOT rotating. Pump.

  • Enters and exits TSAS 3.7.4.1 as directed by procedure.
  • Makes notifications for assistance.

Simulator Exercise Guide Job Aid Page 8 of 32

'"

SEG# ES11 Ll3 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

  • Verifies that the "Bn Service Water Pump is properly aligned to Facility 1:

o Bus 24E is being supplied by Bus 24C o "B" SW Pump is in Pull-To-Lock o A502, "B" SW Pump breaker is racked up.

o SW-97B. Dis X-Tie, is closed.

o SW-97A, Dis X-Tie, is open.

o HS-6484A (on A502), SIAS/LNP Actuation Signal Hand Switch, is in BLOCK.

  • Informs the US to log into TSAS 3.7.4.1.

(already in Action Statement)

  • Checks SW Pump B SIAS/LNP Start Manually Blocked annunciator alarms.
  • Stops "An SW Pump.

Report that "B" SW is operating properly. !. Observes proper operation of "B" SW Pump.

Event 7: When directed to vent the "B" SW

  • Directs PEO to vent the "B" SW Pump Pump Strainer, insert an 1/0 for SW PUMP B Strainer.

STNR TROUBLE, CA-4 on C-06/7. Allow the

  • Places "A" SW Pump in Pull-To-Lock.

1/0 to remain in for 2 minutes, then delete the

  • Directs a PEO to place HS-6484A (on 1/0. A502), SIAS/LNP Actuation Signal Hand Event 8: When directed, insert Remote Switch, in the NORMAL position.

Function SWR31 in NORM, to place HS-6484A I

  • Checks SW Pump B SIAS/LNP Start (on A502), SIAS/LNP Actuation Signal Hand Manually Blocked annunciator is clear.

Switch, in the NORMAL position. I

  • Informs US to exit TSAS 3.7.4.1.

Report when each directed action is complete.

  • Directs a PEO to restore Sodium Hypochlorite to the "B" SW Pump.

Simulator Exercise Guide ,

Job Aid Page 9 of 32 SEG# ES11 Ll3 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

2. Failure of Channel Y Pressurizer pressure transmitter.

Event 2: RX03B - Ramp to 1500 over 400 RO:

seconds, Channel Y Pressurizer Pressure transmitter gradually fails low.

  • Observes RCS pressure rising.
  • Observes Pressurizer Pressure Deviation TM2, AE2 Hilla annunciator.
  • Reports rising Pressurizer pressure to the US.

US:

  • Obtains ARP 2590B-212, Pzr Pressure Selected Channel Deviation Hilla (D-37 on C-2/3) and lor Pressurizer Ch Y Pres Hilla (D-39 on C-02/3)
  • Makes notifications for assistance and troubleshooting.
  • Refers to (does NOT enter) TSAS 3.2.6, 3.3.3.5, and 3.3.3.8. (Only one channel is required to be OPERABLE.)

RO:

  • Observes all Pressurizer pressure channels and determines that Channel Y is failing.
  • When directed, shifts Pressure control to Channel x.
  • Verifies proper operation of Pressurizer pressure control system.

Simulator Exercise Guide ~

Job Aid Page 10 of 32 SEG# ES11 Ll3 Rev;_O__

3. Seismic Event Resulting in a Loss of Non-Vita14BO Volt Bus 22B.

Event 3: CH07 -Insert, Seismic event. Crew:

Event 3: ED068 - TRIP, Loss of Non-Vital Bus Observes numerous component high vibration 22B. annunciators and receives a report of a seismic event.

Seismic Event annunciator and white flag on Immediately after entering the seismic event event recorder.

malfunction, call the Control Room and report Significant vibration in the Turbine Building BOP:

lasting several seconds.

Observes and reports numerous annunciators TM3. AE3 and indications associated with the loss of Non Vital Bus 22B.

US:

If requested, report accelerometer reading is

0.03g ZPA.

  • Queries the RO and BOP on Plant conditions.

Report NO damage indicated anywhere.

  • Dispatches PEOs to determine any plant damage.
  • References ARP 2590F-065, 480B BUS 22AJB/C/D VOLTS LO, and enters AOP 2503B, Loss of Non-Vital 480 VAC Bus 22B.

When dispatched, report that tie breaker A204 is I

  • Directs BOP to place equipment in service open with NO target drops. All other conditions requires to support plant operation.

are normal. I

  • Directs BOP to ensure a fault is NOT indicated on Bus 22B.
  • Directs a PEO to determine the cause of the breaker trip.
  • Directs BOP to perform applicable steps to cross-tie Bus 22B with 22A.
  • Requests assistance form Maintenance Department.

Simulator Exercise Guide

"'

Job Aid Page 11 of 32 SEG# ES11 Ll3 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

  • From available indications, determines that Bus 22B does NOT have a fault.
  • Checks Bus 22A voltage between 435 and 525 Volts.
  • Ensures the following breakers are open:

o A204, 24B/22B Feeder Breaker (24B4 2) o B0209, 22B Supply breaker (24B4-1X3 2) o B0111, 22A122B Tie Breaker (22A-1T-2)

  • Places (or requests RO to place) Group 1 and Group 2 Pressurizer Backup Heaters in Pull-To-Lock.
  • Places Sync Selector Switch, 22A122B in CL TIEITRIP B.
  • Closes B0111 , 22A122B Tie Breaker (22A 1T-2)
  • Places Sync Selector Switch, 22A122B in OFF.
  • Checks Bus 22B voltage between 435 and 525 volts.
  • Checks current on Bus 22A is less than 1,800 amps.

If dispatched, report that 22A-1T-2 Ammeter

  • If current on Bus 22A is greater than 1,600 Phase B (Ammeter above B0111 cubicle) is amps, dispatches a PEa to verify local reading 850 amps. current reading is less than 1,600 amps.
  • When (If) directed, Caution Tag Group 1 and Group 2 Pressurizer Backup Heaters.

Simulator Exercise Guide Job Aid Page 12 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

4. .*Unisolable ReS Leak Develops. Technical Specification Event 4: RC04 - 2% with a Ramp Time of 90 RO/BOP:

seconds and a 120 second delay; 14 gpm Observes and reports:

RCS leak.

  • Charging and Letdown flow mismatch TM4,AE4
  • Containment Sump level rising US:
  • Queries the RO and BOP on Plant conditions.
  • Determines that RCS leakage exceeds 10 gpm and enters TSAS 3.4.6.2.
  • Determines that leak does NOT exceed the capacity of the Charging system. ( Reactor trip is NOT required)
  • When Containment Sump level reaches 100%, logs into TSAS 3.3.3.8 and 3.4.6.1.

RO:

When requested. reports the status of:

  • Pressurizer level
  • Pressurizer pressure

Simulator Exercise Guide ..

Job Aid Page 13 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

5. Rapid Downpower due to ReS leak. Reactivity Manipulation US:
  • Directs to RO and BOP to attempt to determine the location of the RCS leak.
  • Enters AOP 2575, Rapid Downpower o Performs Focus Brief on Trip Criteria and RCS Temperature Control.

o Requests SMISTA to make required notifications. (Unusual Event, Delta One) o Directs RO to initiate forcing sprays and to insert Group 7 CEAs 10 steps (while maintaining Reactivity oversight).

o Determines that Reactivity Plan RE-G 13, 14, or 15 should be used.

o Directs RO and BOP to coordinate a rapid down power.

RO:

  • Initiates Forcing Sprays:

o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).

  • Inserts Group 7 CEAs to 170 steps and observes applicable parameters.
  • Initiates Boration from the RWST:

o Ensures at least one Charging Pump is operating.

o Ensures CH-196, VCT Makeup Bypass, is closed.

o Ensures CH-504, RWST to Charging Suction, is

Simulator Exercise Guide Job Aid Page 14 of 32 SEG# ES11 Ll3 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS a Opens CH-192, RWST Isolation.

a Closes CH-501, VCT Outlet.

a Starts a second Charging Pump.

The US may direct Boration to be accomplished I. If Boration is from the BAST:

from the BAST to allow for easier makeup to the a Ensures the Makeup Flow Selector VCT. Boration from the BAST (alternate switch is in the DILUTE position.

method) is in italics. a Ensues FC-210X, Primary Makeup Water Flow controller, is set to "0".

a Ensures CH-S12, Makeup Valves Stop, is closed.

a Ensures CH-196, VCT Makeup Bypass, is closed.

a EnsuresCH-192, RWST Isolation, is closed.

a Ensures FC-210Y,Boric Acid Flow controller, is set to the predetermined flow rate.

a Opens CH-S04, RWST to Charging Suction.

a Place Makeup Mode Sel switch in MAN.

a Starts the selected Boric Acid and verifies discharge pressure is greater than 98 psig.

a Opens CH 196, VCT Makeup Bypass.

a As required, refers to attachment and performs actions to maintain VCT level in the desired band.

BOP:

Reduces Turbine load to follow Reactor power to maintain Tc on program using the Load Limit Pot.

Simulator Exercise Guide Job Aid Page 15 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

6. RCS leak rapidly degrades to a small Break LOCA and a failure of the Reactor to automatically or manually trip.

Event 5: RC04 - 25% with a ramp time of 270 RO:

seconds. Small break LOCA (175 gpm) requiring a Reactor trip.

  • Observes lowering Pressurizer level and pressure which exceeds Charging capacity RP04A, B, C and 0 - FAIL; Failure of all and informs the US.

rd Reactor Trip push buttons.

  • Starts 3 Charging Pump.

RP27B - FAIL. Failure of all RPS Channels to process a Reactor trip ES04F - Deenergize. Actuation Cabinet 6 deenergizes.

TM5, MA1 US:

Directs the crew to manually trip the Reactor and perform EOP 2525. Standard Post Trip Actions.

Queries RO and BOP on the status of Safety Functions as delineated in EOP 2525:

  • Reactivity Control (RO) o Status of the Reactor
  • Maintenance of Vital Auxiliaries {BOP}

o Status of the Turbine o Status of Electrical Buses o Status of SW & RBCCW o Check one facility of CRAC operating (RO)

  • RCS Inventory Control (RO) o Pzr level & Subcooled margin (SCM),

value & trend

Simulator Exercise Guide ~

Job Aid Page 16 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

  • RCS Pressure Control (RO) o Pzr pressure, value & trend
  • Core Heat Removal (RO) o RCP status o Loop delta-T o T H Subcooling Margin
  • RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS T c value and trend o S/G levels, value and trend oRCS Subcooling Margin
  • Containment (CTMT) Isolation (RO) oRad monitors inside CTMT, outside CTMT, steam plant o CTMT pressure <1 psig
  • CTMT Temperature & Pressure Control (RO)
  • CTMT temperature and pressure value and trend.

RO:

  • Presses all four Reactor Trip push buttons on C-04 and immediately realizes the Reactor did NOT trip.
  • Opens both CEDM MG feeder breakers.
  • Reactor has tripped, power is lowering, SUR is negative, all CEAs are inserted.

Simulator Exercise Guide ,.

Job Aid Page 17 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

Perform associated actions of EOP 2525 and report results when queried:

  • Turbine tripped, stop valves are closed, 8T

& 9T are open, Megawatts are zero

  • All electrical buses energized
  • Two Facilities of SW and RBCCWoperating RO:

Performs associated actions of EOP 2525 and report results when queried:

  • Control Room Air Conditioning Status
  • Pressurizer level value and trend
  • Pressurizer pressure value and trend o PORVs and Spray Valves are closed o When RCS pressure is less than 1750 psia, then SIAS, CIAS, and EBFAS have actuated on Facility 1 only.

o After SIAS actuates, one RCP in each loop is secured.

o If Pressurizer pressure lowers to minimum NPSH, then all RCPs are secured.

  • Number of RCPs operating o Value and trend of loop Delta-T o Value and trend of subcooling
  • If no RCPs operating, TAVG controller, TIC 4165 in manual/closed

Simulator Exercise Guide Job Aid Page 18 of 32

"

SEG# ES11L13 Rev:_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

Performs associated actions of EOP 2525 and reports results when queried:

  • Value and trend of S/G pressures
  • Value and trend of T c
  • Value and trend of S/G levels
  • Subcooling value! CET temperature RO:

Continues with associated actions of EOP 2525 and reports results when queried:

  • Reports Rad Monitors inside CTMT not going up or in alarm
  • Reports Rad Monitors outside CTMT not going up or in alarm
  • Reports Steam Plant Rad Monitors not in alarm or going up
  • Reports Value and trend of CTMT temperature and pressure.
  • Starts Containment Aux Recirc Fans and PIR Fans.

Simulator Exercise Guide Job Aid Page 19 of 32 SEG# ES11113 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

Continue with Subsequent Actions:

  • Opens HD-106, Subcooling Valve
  • Stops both Heater Drains Pumps
  • Secures all but one Condensate Pump
  • Secures one Main Feed Pump o Closes FW-42A and B, Main Feed Block Valves o Ensure both Main Feed Reg Bypass Valves are throttled to 40%

o Closes FW-38A or B, associated Main Feed Pump Discharge Valve

  • Checks IA Header pressure is >90 psig and stable.

US:

Query RO & BOP regarding the status of EOP 2525 subsequent actions.

RO/BOP:

When asked, report that Subsequent Actions are complete and verified.

Simulator Exercise Guide Job Aid Page 20 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS US:

  • At the completion of EOP 2525, Diagnostic Flow Chart, determines that a LOCA inside Containment has occurred and goes to EOP 2532, Loss of Coolant Accident.
  • Places Master Silence Switch in NORM.
  • Notes the need for the SM to complete EPI FAP06-002, classify the event as an Alert, Charlie-1, and make appropriate notifications.
  • Directs the RO and BOP:

o Ensure SIAS Actuation o Optimize Safety Injection o Monitor for RCP trip criteria.

o Perform actions to isolate the LOCA, if possible.

o Determine LOCA location.

o Place H2 Analyzers in operation.

o Ensure CIAS.

o When appropriate, ensure CSAS.

o Check fA pressure> 90 psig and stable.

o Align Condenser Air Removal.

o Initiate a controlled cooldown.

Simulator Exercise Guide Job Aid Page 21 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:

  • When Pressurizer pressure lowers to 1714 psia, ensures SIAS has actuated.

o Ensures one complete train of CRAC is in Recirc.

  • Ensures Safety Injection flow is within the SI Flow Curve.
  • Ensures two RCPs are tripped within 5 minutes after SIAS or all RCPs are secured if below minimum NPSH.
  • Attempts to isolate the LOCA (UnisolabJe)
  • Checks for LOCA outside Containment (LOCA is inside Containment)
  • When time permits, places H2 Analyzers in service.

CSAS will actuate shortly after the steam line

  • Determines that Containment pressure has break is inserted.

NOT exceeded 4.42 psig; therefore. MSI and CSAS have NOT actuated.

  • When Containment pressure is greater than 9.48 psig, determines that Facility 2 CSAS did not actuate (Loss of Actuation Cabinet
6) and that "A" Containment Spray Pump did not automatically start.

BOP:

  • Verifies IA pressure is greater than 90 psig.
  • Aligns Condenser Air Removal to Unit 2 Stack.

CT1 (LOCA-11) Perform a plant cooldown. Crew:

A plant cooldown must be initiated within Initiates a controlled cooldown.

one hour following an unisolable LOCA at a rate of greater than 40°F/hr.

Simulator Exercise Guide Job Aid Page 22 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

7. Excess Steam Demand in Containment on #2 Steam Generator Event 6: MS01 B - 2.5% ramped in over 240 BOP:

seconds, Excess Steam Demand on #2 S/G Observes and reports Lowering S/G pressures, (0.475 #m/hr).

S/G levels, RCS temperature, and other TM6, MA2, EM1 parameters associated with an Excess Steam Demand event.

EU1,EC1 US:

  • Acknowledges reports(s) and enters Diagnostic Flow Chart, then enters EOP 2540 Functional Recovery due to more than one major event.
  • Notes the need for the SM to complete EPI FAP06-002, determine that the event remains an Alert, Charlie-1, and make appropriate notifications.
  • Open the Safety Function Tracking Page and enter EOP entry time.
  • Return alarm silence to normal RO:
  • If PZR press. < 1714 psia, ensures:

o Only 1 RCP/loop running o Secured RCP Spray vlv. closed

o All RCPs are secured o TIC-4165 in manual and closed o Both spray valves are in manual and closed.

Simulator Exercise Guide

'"

Job Aid Page 23 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

Directs Chemistry to obtain samples of both SGs, frisk the samples, report frisk results, and analyze the samples for activity and Boron.

Simulator Exercise Guide Job Aid Page 24 of 32 SEG# ES11L13 Rev;_O__

8. Failure of "A" Containment to start on CSAS.

This malfunction will occur when Containment RH06A, TRIP, Failure of "A" CS Pump to start RO:

pressure exceeds 9.48 psig. The crew will on CSAS. (Initial Conditions)

Observes and reports actuation of Facility 1 continue to take the actions of EOP 2540 prior TM7, EM2, CSAS and the failure of the "A" Containment to and after the malfunction.

Spray Pump to start.

US:

  • Determines that the Safety Function Status Checks for CTPC-3 are NOT met and enters EOP 2540F, Functional Recovery of Containment Temperature.

CT2 (CTPC-1): Maintain Containment RO:

Temperature and Pressure Control.

Containment Spray Pump prior to reaching

  • Verifies Containment Temperature and 51 psig Containment Pressure. Pressure Control acceptance criteria is met:

o At least 2 CAR Fans operating in Slow Speed.

o At least one Containment Spray Header delivering at least 1300 gpm.

o Containment pressure less than 51 psig.

Simulator Exercise Guide ..

Job Aid Page 25 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS US:

  • Directs placing H2 analyzers in service .
  • Identifies Success paths to be used .

US:

Identifies Success Paths to be used.

Note: Safety Path I Met? IPriority Function These success paths and order of priority are based on the conditions seen during RC-1 CEA Insertion Yes 5 the scenario validation. A different path DC-1 DC Power Yes 6 and priorities may be applicable due to the timing of operator mitigating actions. AC-1 RSST Yes 7 IC-2 SI Yes 2 PC-1 Subcooled Yes 4 HR-2 S I Operati ng Yes 3 (2)

CI-1 Isolated Yes 8

,~~~.

CTPC-3 CARs [Emerg.] Yes 4 (3)

Ee2 US:

Identifies CTPC-3, CARs (Emerg.), as the first priority and enters EOP 2540F, Containment Temperature and Pressure Control.

Simulator Exercise Guide "

Job Aid Page 26 of 32 SEG# ES11U3 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:

  • Ensures all four CAR Coolers are operating in slow speed with adequate RBCCW flow.

Performed earlier as a Critical Task.

  • Ensures both Containment Aux Recirc Fans are operating.
  • Ensures both PIR Fans are operating.
  • Verifies CTPC-3 Acceptance Criteria are satisfied:

a At least two CAR Fans running in slow speed.

a At least one Containment Spray header is delivering at least 1300 gpm.

a Containment pressure is less than 51 psig.

US:

Identifies IC-2, SI, as the next Safety Function priority and enters EOP 2540C1, Functional Recovery of RCS Inventory Control.

Simulator Exercise Guide ..

Job Aid Page 27 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:

  • Ensures SIAS, CIAS, and EBFAS have properly actuated.
  • Checks Safety Injection flow meets the SI Flow Curve.

o Determines that RCS pressure is NOT preventing adequate SI flow.

  • Performs actions to conserve RCS Inventory. (Isolates various non-essential components.)
  • Reviews HPSI throttle/stop criteria and determines that HPSI cannot be throttled or stopped.
  • Reviews LPSI stop criteria and determines that LPSI may be stopped.
  • Requests assistance for filling the RWST.
  • Observes Containment Sump level is rising.
  • Determines that SItCS Pump Minflow valves, SI-651 and 652, must be placed in OPER when RWST level lowers to 20%.
  • Determines that SRAS must be initiated when RWST level lowers to less than 9%.
  • Reviews SRAS supplemental actions.
  • Reviews HPSI Pump post SRAS performance criteria.

When dispatched, report that the SI Room

  • Dispatches a PEa to open SI Room Sump Sump Pump breakers are open and there is no Pump Breakers and monitor for leakage.

leakage.

  • Verifies that IC-2 Acceptance Criteria are met:

o HPSI flow is within the SI Flow Curve.

o Vessel level is >7%.

Simulator Exercise Guide

  • Job Aid Page 28 of 32 SEG# ES11 Ll3 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS US:

  • Continues to assess Safety Functions up to and including EOP 25400, Functional Recovery of RCS Heat Removal.

o Ensure at least one complete facility of SIAS, CIAS, EBFAS, MSI, and CSAS have actuated.

o Ensure one complete facility of CRAC is operating in RECIRC.

o Verify single phase Safety Injection flow is adequate.

o Verify subcooling.

o Align Condenser Air Removal.

  • Determines SGTR did NOT occur.
  • Determines ESD did occur and that #2 S/G is the most affected.
  • Directs BOP to perform actions of Appendix EU2 11, ESDE Response.

RO:

Ensures MSI has actuated and at least one train of MSI has properly actuated (all MSI components are in their accident condition on C-01X).

Simulator Exercise Guide Job Aid Page 29 of 32 SEG# ES11L13 Rev;_O__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:

Isolates #2 S/G:

  • Ensues MS-64B, #2 MSIV, is closed.
  • Ensures MS-65B, #2 MSIV Bypass, is closed.
  • Ensures #2 ADV controller is in Manual and closed.
  • Places ADV Quick Open Permissive switch in OFF.
  • Closes FW-41B, #2 Main Feed Reg Valve Bypass Valve.
  • Ensures FW-42B, #2 Main Feed Block Valve, is closed.
  • Places FW-5B, Main Feed Air Assist Check Valve switch in CLOSE.
  • Dispatches a PEO to unlock and close Event 9: When dispatched, insert Remote Disconnect for MS-202, #2 Main Steam Function MSR13, RI. Close the disconnect for Supply to the TDAFP. (May be performed MS-202, #2 Main Steam Supply to the TDAFP.

earlier)

  • Ensures MS-220B, #2 S/G Blowdown Isolation, is closed.
  • Ensures both Aux Feed OVERRIDE/MAN/START/RESET hand switches are in Pull-To-Lock.

CT3 (ESDE-6): AFW to the faulted (#2) SG is

  • Closes FW-43B, #2 Aux Feed Reg Valve.

isolated within ~30 minutes of MSI actuation

  • Places hand switch for FW-12B, #2 Aux on an ESDE. Feed Air Assist Check Valve, in CLOSE.
  • Ensures MS-65B, #2 Main Steam Leg Low Point Drain, is closed.

SCENARIO END: When #2 S/G is isolated or at the discretion of the lead evaluator, direct the I When directed, inform the crew that the scenario is complete and place the simulator in FREEZE.

simulator to be placed in FREEZE.

'DOlllinion'"

Simulator Exercise Guide ,

Job Aid Page 30 of 32 SEG# ES11L13 Rev; _0_

Description Deiay Time Ramp Time I Event I Severity Trigger Or Value I Value Final IRelative Order MALFUNCTIONS RP04A. Failure of #1 Reactor Trip Push Button NA NA NA NA NA 6 RP04B. Failure of #2 Reactor Trip Push Button NA NA NA NA NA 6

~ ----

RP04C, Failure of #3 Reactor Trip Push Button NA NA NA NA NA 6 RP04D, Failure of #4 Reactor Trip Push Button NA NA NA NA NA 6 f-RP27B, Automatic RPS Trip Failure (ATWS) NA NA NA NA NA 6 RH06A, Failure of "A" CS Pump to start. NA NA NA NA NA 10 SW10, uN SW Pump Degrades. NA 240 sec. 1 100% 100% 1

- ---

RX03B, Channel Y Pressurizer Pressure transmitter fails low NA 400 sec. 2 0% 0% 4 CH07, Seismic Event NA NA 3 NA NA 5

-- - - - - - c-----

RC04, 14 gpm RCS Leak. NA 90 sec. 3 2% 2% 6 f------

ED16B, Loss of VA-20 NA NA 4 NA NA 7

---

RC04, Small Break LOCA (175 gpm) NA 270 sec. 6 25% 25% 8 ES04F, Actuation Cabinet 6 Deenergizes. NA NA 6 NA NA 8

---

MS01 B, ESD on #2 S/G inside Containment NA 240 sec. 7 2.5 2.5 9 REMOTE FUNCTIONS SWR31 , Place HS-6484A in Normal. NA NA NORM NORM 2 MSR13, Close the disconnect for MS-202 NA NA RI RI 11 OVERRIDES Annunciator CA-4 on C-06/7, SW PUMP STNR TROUBLE NA NA 5 ON OFF 3

"

Simulator Exercise Guide

'Dominion'"

Job Aid Page 31 of 32 SEG# ES11U3 Rev; _0__

Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.

Yes No

1. The desired initial condition(s) could be achieved. D
2. All malfunctions and other instructor interface items were functional and responded to D support the simulator Scenario.
3. All malfunctions and other instructor interface items were initiated in the same sequence D described within the simulator scenario.
4. All applicable acceptance criteria were met for procedures that were used to support the D simulator scenario.
5. During the simulator scenario, observed changes corresponded to expected plant D response.
6. Did the scenario satisfy the learning or examination objectives without any significant D simulator performance issues, or deviations from the approved scenario sequence?
7. The simulator is capable of being used to satisfy learning or examination objectives without D exceptions, significant performance discrepancies, or deviation from the approved scenario sequenCE!.
8. Any identified Critical Tasks possesses the following elements D (NUREG-1 021):
  • Essential to safety with adverse consequences or significant degradation,
  • Cue(s) prompt the Operator to respond.
  • Defined and measurable performance indicators.
  • Performance feedback.

The use of "N/A" is allowed for item 8 only if this is NOT an evaluated scenario.

Discrepancies noted (Check "none" or list items in comments field) None ~

Comments:

Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.

...

.,~

ifiJjjJJ¥Dominion'"

SEG# ES11 Ll3 Rev; _0_

Simulator Exercise Guide Job Aid Page 32 of 32 SIMULATOR TRAINING SHIFT TURNOVER REPORT DATE-TIME PREPARED BY Today 0515 Unit Supervisor I"NIGHT" Shift PLANT STATUS:

Mode: 1 RxPower:

Megawatts: Thermal: 2698 lVIWTH PZR Pressure:

Electric: 888 MWe RCS T-AVE:

RCS Leakage: Identified: 0.015 gpm Protected Train/Facility:

Unidentified: 0.036 gpm DatelTime: Toda 0015 Active Tracking Records and Action Statements Equipment/Reason LCO Action Date Time in LCO Action Requirement Time Left 3.7.1.2 a Today 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> Restore to OPERABLE within 7 days. 6d, 20 hrs Establish a roving watch. Ensure FUNCTIONALITY TRM Table 7.1 b.1 and Today 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> of Fire Detection and Suppression systems for Fire 59 d, 20 hrs 15.1 b.2 Areas R-3, R-11, R-17 and R-17.

2-U-AIL, See AIL for details None OD Compensatory Actions I Temp Logs Watch Open Date Class Reason Reason Position 2-CH-507, RCP bleedoff relief isolation, is closed on C02. This is due to relief CH-199 leaking by into the PDT. ARP C-10 for Bleedoffflow high 7/05108 ODM RO directs closing CH-507. ARP B-10 directs opening CH-507, (>280#).

OP-2301 C-001 has been modified for this valve to be CLOSED.

I PLANT SYSTEMS APe System I Notes CROSS UNIT SYSTEM STATUS U3 Power to 24E J34A aligned to 24E SURVEILLANCES I EVOLUTIONS IN PROGRESS OP 2204 I Steady State Operation REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES J SPREAD SHEET FOR ADDITIONAL INFO)

Current Rod H A Xenon Trend Stable Current Boron 9.2 ppm Boron Pot Setting I Blend Ratio 70 to 1 (corrected)

Appendix 0 Scenario Outline Form ES-O-1 Facility: MP2 Scenario No.: ES11 Ll4 Op-Test No. :_1..:.....-_

Examiners: _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ _ __

Initial Conditions: 45% power, BOl, Eg. Xe., $ ppm Boron SGSD @ $ gpm per SG, 24E aligned to 24D, "A" Main Feed Water Pump in service.

Turnover: 45% power. BOl, Eg. Xe .* $ ppm Boron, blend ratio: $:1, SGBD @ $ gpm per SG, 24E aligned to 24D, "A" Main Feed Water Pump in service. waiting for 'B' Main Feed Water Pump to come back from Maintenance, no other equipment OOS and no surveillance in progress or due.

Event Malt. Event Event Description No. No. Type*

1 N/A ~

I~--r----- ~+-----------------------------~I CH08C C CRAC Filter Fan "A", F-32A, trips. (TS)

(BOP/S) 3 CW04C C Main Condenser tube leak in the "C" water box.

(BOP/S) 4

  • 5 II 6 7

8

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M}ajor Appendix D, 38 of 39

ES11L14 Scenario Summary:

The crew will take the shift with the unit at approximately 50% power with the direction to hold power here until the "B" Main Feedwater Pump is returned from Maintenance.

Once the crew has the watch, the Control Room Air Conditioning (CRAC) Radiation Monitor will spike, causing the ventilation system to shift into recirculation mode. Per ARP 2590A-159, the crew should verify proper operation of the CRAC system and discuss returning the system to normal operation. Before this action is taken, a PEO will report that the belt for CRACS Filter Fan, F32A, is broken. This will require the crew to secure Facility 1 CRAC and ensure Facility 2 CRAC is operating as required per OP 2315A, Control Room Air Conditioning System. The US will enter TSAS 3.7.6.1 a for an inoperable train of CRAC and call MaintenanceIWork Planning to repair the fan belt.

While the work order for fan F32A is being generated, a seawater leak will develop in the "C" Waterbox.

The crew will enter AOP 2516, Condenser Tube Leak, and isolate "C" Waterbox.

While "C" Waterbox is being isolated, Channel "Y" Pressurizer level transmitter will fail high causing Pressurizer pressure and level to lower. The crew will either take manual control of Pressurizer level (Letdown flow) or will swap to Channel "X".

When Pressuriz~~r level is restored to setpoint and control is back in automatic. the "A" Condenser Steam Dump Valve will open slightly due to a failure of its C-05 controller output. The Crew must transfer control of the steam dump to the Foxboro IA Control System in order to re-close the valve.

Once the "A" Steam Dump is re-closed, the Turbine System Engineer will call to inform the crew that the "A" Main Feedwater Pump should be shut down as soon as possible due to abnormal noise coming from the pump turbine. This will force the crew into AOP 2575, Emergency Downpower, and commence a plant shut down.

Once plant power has been lowered about 10%, Bus 24C will deenergize (bus fault), requiring a manual plant trip. The crew will enter EOP 2525, Standard Post Trip Actions. On the trip, a LOCA will develop due to a rupture of the "A" RCP Seal Cooler.

During the performance of EOP 2525, a manual or automatic SIAS will be initiated and the "A" DG will be emergency tripped due to the fault on 24C (Loss of Service Water to the EDG).

After entry into EOP 2532, Loss of Coolant Accident, the "C" HPSI Pump will trip and not restart. The crew will recognize that safety injection flow is inadequate and start the "B" HPSI Pump.

The scenario will end after the crew isolates the intersystem LOCA and initiates a controlled cooldown.

CT-1 (LOCA-9): Manually establish the required minimum safety injection flow.

Restore a running HPSI pump within 30 minutes of entry into EOP 2532.

CT-2 (LOCA-3) Establish CTMT Isolation.

Isolate CTMT by closing at least one isolation valve at each penetration.

CT-2 (LOCA-6) Isolate RCS Leakage.

Isolate or attempt to isolate locations that may be the source of the loss of coolant.

CT-3 (LOCA-3): Initiate a plant cooldown.

A plant cooldown at a rate of greater than 40°F/hr should be initiated within one hour, following an unisolable LOCA, until the condenser steam dump valves or ADVs are full open.

Simulator Exercise Guide

'Dominion*'

Job Aid Page 1 of 29 SEG# ES10Ll4 (SpareL- Rev;_O_

SITE: I Millstone Power Station PROGRAM: Unit 2 LOIT NRC Exam Title Simulator #4 (Original Spare)

COURSE: ESIOLI4 I Course #: NA Total Time 1.5 hours0.208 days <br />0.0298 weeks <br />0.00685 months <br /> Prepared by: Robert L. Cimmino, Jr. 09/13/11 Printed Name Instructor's Signature Date Reviewed by:

(Optional) Printed Name Simulator Development Checklist Date Instructor Signature Reviewed by:

(Optional) Printed Name Simulator Validation Checklist Signature Date Approved by:

Printed Name Training Supervisor Date

Simulator Exercise Guide Job Aid Page 2 of 29 SEG# ES10Ll4 (Spare) Rev: _ _--lO..0_ _

Goal of Training: a) Evaluate the licensees' ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.

b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:

1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
2) Ability of the crew to:
  • Understand/interpret annunciators/alarms, plant/systems response
  • Diagnose events/conditions based on signals/readings
  • Comply with/use procedures, Technical Specifications, and TRM
  • Perform control board operations
  • Properly communicate information/proper crew interactions
  • Practice Reactivity Management
  • Make conservative decisions.
3) Ability of each individual to:
  • Correctly diagnose events
  • Properly interpret integrated system response
  • Comply with and use Technical SpecificationslTRM
  • Comply with and* use procedures
  • Properly perform control board operations
  • Demonstrate responsible attitude
  • Properly communicate information and interact with rest of crew
  • Leadership skills required to effectively manage the evolutions
  • Provide adequate overview where required Learning Objectives: NA Tasks: NA Prerequisites: N/A Training Resources: 1 lead simulator (floor) instructor, 1 booth instructor

Simulator Exercise Guide Job Aid Page 3 of 29 SEG# ES10Ll4 (Spare) Rev: _ _----"-0_ _

References:

ARP 2590A-159, CRACS in Auto Recirc Mode ARP 25900-067, C Hotwell Cond Hi AOP 2516, Condenser Tube Leak ARP 25908-217, Pressurizer CH Y Level HI/LO ARP 25900-041, Condensate Pump Trouble EOP 2525, Standard Post Trip Actions EOP 2532, Loss of Coolant Accident Plant Technical Specifications Commitments: N/A Evaluation Method: NRC License Examiner Observation Operating Experience: N/A Plant/Simulator None differences that may affect the scenario:

Related PRA Core Damage Frequency: 0.98 Information: LERF: 1.00 Important Components: 24E aligned to 24C

Simulator Exercise Guide Job Aid Page 4 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

INITIAL CONDITIONS:

  • 46% power BOL.
  • 24E aligned to 24C with "An & "B" Condensate Pumps operating.
  • Plant startup with "A" Main Feed Pump in service.

The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.

Scenario Summary:

The crew will take the shift with the unit at approximately 45% power with the direction to hold power here until the "B" Main Feedwater Pump is returned from Maintenance.

Once the crew has the watch, the Control Room Air Conditioning (CRAC) Radiation Monitor will fail high, causing the ventilation system to shift into recirculation mode. Five seconds after starting, the "A" Filter Fan, F32A, will trip due to a broken belt. Per ARP 2590A-159, the crew should verify proper operation of the CRAC system and note the loss of the filter fan. This will require the crew to secure Facility 1 CRAC and ensure Facility 2 CRAC is operating as required per ARP 2590A-159. The US will enter TSAS 3.7.6.1 a for an inoperable train of CRAC, TSAS 3.3.3.1 for the failed rad monitor, and call MaintenanceIWork Planning for the needed equipment repairs.

While the work order for fan F32A is being generated, a seawater leak will develop in the "C" Waterbox.

Chemistry will report the leak and the crew will enter AOP 2516, Condenser Tube Leak, and isolate "C" Waterbox.

After "C" Waterbox is isolated, Channel "Y" Pressurizer level transmitter will fail high causing Pressurizer level and pressure to lower. The crew will either take manual control of Pressurizer level (Letdown flow) and swap to swap to Channel "X" level control, or immediately swap level control channels.

Once Pressurizer level is restored to automatic control, the "A" Condensate Pump motor winding temperatures will rise abnormally high, causing a control board trouble alarm and applicable PPC alarms.

The Crew must start the "B" Condensate Pump and secure the "A" Condensate Pump before the "An trips on high current/overload.

When the "A" Condensate Pump problem has been mitigated, the Turbine System Engineer will call to inform the crew that the "A" Main Feedwater Pump should be shut down as soon as possible due to abnormal noise corning from the pump turbine. This will force the crew into AOP 2575, Emergency Downpower, and commence a plant shut down.

Once plant power has been lowered by approximately 10%, a major fault will occur on bus 24A causing bus 24C to de-energize and force a manual plant trip. During the performance of EOP 2525, Standard Post Trip Actions, the "A" RCP seal cooler will rupture, resulting in an Intersystem, Small-Break LOCA.

n After entry into EOP 2532, Loss of Coolant Accident, the "c HPSI Pump will trip and not restart. The crew will recognize that safety injection flow is inadequate and the need to start a Facility 1 HPSI Pump. This will require either bus 24C be re-energized from the RSST, or 24E be re-energized from Unit 3.

The scenario will end after the crew isolates the intersystem LOCA and initiates a controlled cooldown.

Simulator Exercise Guide Job Aid Page 5 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

Critical Tasks CT-1 (LOCA-9): Manually establish the required minimum safety injection flow.

Restore a running HPSI pump within 30 minutes of entry into EOP 2532.

CT-2 (LOCA-3) Establish CTMT Isolation.

Isolate CTMT by closing at least one isolation valve at each penetration.

and/or CT-2 (LOCA-6) Isolate RCS Leakage.

Isolate or attempt to isolate locations that may be the source of the loss of coolant.

CT-3 (LOCA-3): Initiate a plant cooldown.

A plant cooldown at a rate of greater than 40°F/hr should be initiated within one hour, following an unisolable LOCA, until the condenser steam dump valves or ADVs are full open.

Simulator Exercise Guide Job Aid Page 6 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

o ENSURE TRex Workstation is operating.

o VERIFY the most current approved training load is loaded.

o RESET to IC-83 (-45% power, BOL) o If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.

o As needed, RESET Computer Terminals (At Power displays if 100% power IC).

o ENSURE SG blowdown values in PPC Plant Calorimetric are reset.

o ENSURE RCS Leak Rate is reset in PPC.

o ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).

o ADVANCE chart recorders.

o ENSURE the appropriate Protected Train placard is hung (A TRAIN PROTECTED).

o ENSURE appropriate signs are in place on simulator doors.

o ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.

o If necessary, ENSURE Simulator fidelity items cleared.

o ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).

o If required, OVERRIDE annunciators that will be lit long-term in the Control Room.

o ENTER Initial Malfunctions / II0s I Remote Functions.

o PLACE Simulator to RUN.

o If placing Equipment OOS, then PERFORM necessary switch manipulations and HANG appropriate tags, as required for the following:

a "A" and "c" Condensate Pumps running and "B" Condensate Pump in standby.

o 24E aligned to 24C.

o "A" EDG OOS.

o "Bn Main Feedwater Pump OOS.

o PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).

iiilv DominIOn

-

  • Simulator Exercise Guide Job Aid Page 7 of 29 FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
1. INITIAL CONDITIONS: ENTER or VERIFY the following Initial N/A
  • IC-18 Malfunctions 1II0s I Remote Functions:
  • Mode: 1 CI Ensure 24E aligned to 24C.
  • Burnup:MOL CI Ensure "A" & "C" Condensate Pumps
  • Power: 45% are running and "B" is in standby.
  • Boron: (CB): XXX ppm CI "An Main Feedwater Pump tagged out.
  • Temperature: Tave 563°F CI "A" EDG tagged out.
  • Pressure: 2250 psia EGR17 (RO) "A" EDG Bkr. tagged out.

EGR12 (CLOSED) "An EDG Air Start isol.

  • Xenon: Increasing
  • Rods: Gp 7 at 165
  • Generator: 405 MWe
2. SIMULATOR SETUP: N/A COMPLETE Simulator Setup Checklist CI As necessary. PERFORM I.V. of Initial Malfunctions 1II0s I Remote Functions entered.
3. PRE*SCENARIO: Review Log keeping responsibilities per the Gold Standard Book. page 23 & 24.

CI BRIEF the crew on purpose of this session and REVIEW objectives (if necessary).

D lE this is the first simulator scenario of the week, THEN REVIEW the Plant/Simulator Differences List with the crew.

4. TURNOVER: PERFORM the crew turnover US brief crew on plant conditions and any major (Turnover Sheet) with the SM. equipment OOS. (All) Walk down control boards and let US know when they are ready.

D Provide crew with partially completed No shift briefing is required or recommended.

OP 2204 and brief on existing conditions.

Simulator Exercise Guide Job Aid Page 8 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

flflCi{ity1 C;R.AC Shifts to Recirculation'> creY/has the watch.~ndatthe/./

Mode/With Loss of Fan F-32A 'JiscrAtionofthe Lea(l.Examlner*. ~rdtl~te ~1. .'

CRAC Facility 1 Radiation Monitor fails low, Event 1: RM010 - 100% RO:

causing the system to shift to Recirculation RM-9799A fails high, causing "An Train of CRAC I

  • Observe "C.RA.C.S. IN AUTO RECIRC Mode. Shortly after this occurs, the Filter to shift to "Recirc." mode. MODE" annunciator (C-40) on C01 and Fan, F-32A, will trip due to broken fan belts overloading the motor. Facility 1 CRAC has shifted to recirc. mode.
  • Reports observation to US.

US:

  • Enters ARP-2590A-159, Automatic Function:

CRACS transfers to recirculation mode.

  • Directs the RO to verify Facility 1 operating as designed in recirculation mode.

Event 1: CH08C - ON (5 second delay) RO: Per ARP 2590A-159 CHHS8006_1 (NG) (5 second delay) 1. Verifies Facility 1 CRAC has shifted to F-32A green light out recirculation mode.

1. PLACE "NORM/RECIRC MODE, HS-8346" CHHS8006_1 (NR) (5 second delay)

AND "NORM/RECIRC MODE, HS-8359" F-32A red light out switches in "RECIR" (C-2SA and C-25B).

If requested, call as a PEO to report fan F-32A 2. Check damper positions.

belts have failed and appear to have caused the 3. Verify both Filter Fans running. Notes F-32A fan to trip. not running or tripped.

  • Reports observation to US.

TM1, AE1 US: Per ARP 2590A-159

  • Receive report of F-32A failure.
  • Direct RO to secure Fac. 1 CRAC and start Fac. 2 CRAC per OP-2315A, Control Room Air Conditioning System.
  • Enters TSAS 3.7.6.1a.; One train ofCRAC inoperable.

Simulator Exercise Guide Job Aid Page 9 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO: Per ARP 2S90A-1S9

5. Per OP-231 SA. shifts from Fac. 1 to Fac. 2 CRAC operating.

5.1. VERIFY "CRACS SPL Y FAN F21 B. HS 8010" and "CRACS EXH FAN F31B, HS 8000" running (C-2SB).

5.2. CHECK "F-21 B, EXH DMPR. HV-203B" and "F-31 B, EXH DMPR, HV-206B" open (C-2SB).

5.3. VERIFY "CRACS SPLY FAN F21A. HS 8009" and "CRACS EXH FAN F31A. HS 8001" not running (C-2SA).

5.4. CHECK "F-21A. EXH DMPR. HV-203A" and "F-31A, EXH DMPR, HV-206A" closed (C-2SA).

5.5. CHECK "F-32B EXH DMPR, HV-212B,"

indicates open (red light lit) (C-25B).

9. Verifies one complete train (Fac. 2) of CRAC operating.

The crew may attempt to return CRAC to US/RO: Per ARP 2590A-1S9 "NORMAL" but will be unable to with the failed rad monitor.

  • Receives report; Fac. 2 CRAC in service.
12. Notes probable failure of RM-9799A and enters TSAS 3.3.3.1. Action 16; Control Room Isolation Rad Monitor inoperable.
  • Makes required notifications for troubleshooting and repairs.

Simulator Exercise Guide Job Aid Page 10 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

2. Condenser Tube Leak (s~awa(~r) in the "c" Water Box.

Event 2: CW04C -10 gpm (100%) BOP:

Main Condenser tube leak in the "cn water box.

  • Observe "CONDENSATE DEMIN SYSTEM TROUBLE" annunciator (A-16) on C05.

When the Demin System Trouble alarm comes in, call as Chemistry and report

  • Reports observation to US.

indication of a tube leak in "C n Water Box.

  • Utilize the ARP for "C" HOTWELL COND LEVEL HI annunciator (BA-17) on C05.

TM2, AE2 (Hotwell conductivity recorders will already be pegged high with all alarms active due to the low power level).

If necessary, call as the SM and remind the US: AOP 2516, Condenser Tube Leak US that the PPC conductivity screen will not update with rising conductivity.

  • Notes actions under ARP 2590D-061 under Chemistry jurisdiction.
  • Enters ARP-2590D-067, HOTWELL COND LEVEL HI (C05, BA-17), go to AOP 2516.

3.1 N/A 3.2 Notes CPF demins. are operating in Amine form, references OP-2316A, Main Steam System, and directs BOP to secure SG blowdown.

BOP:

  • Per OP-2316A, closes MS-220A & -220B and MS-145A & -145B
  • Verifies PPC indicates zero blowdown flow.
  • Reports completion to US.

If Chemistry samples are requested, inform US:

US samples have already confirmed "c" 3.5 Determines "C" water box should be water box has a tube leak.

isolated and references AOP-2516, section 6.0. Isolate "C" Water Box

Simulator Exercise Guide Job Aid Page 11 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS AOP 2516 Condenser Tube leak 6.1-6.3 N/A 6.4 Directs the BOP to stop the "C* Circ. Pump BOP:

6.4 Per AOP-2516, secures "C" Circ. Pump by tripping or lowering VFD.

US: Directs the BOP to perform the following:

6.5 Close CW-11 F, "C" water box inlet.

6.6 Monitor RBCCW & TBCCW temperatures.

6.8 Ensure CW-11C, *C" water box outlet open.

Event 8: US (or BOP): Directs a PEO to:

FWR53 (CLOSE) "C" condenser air isolation. 6.9 Close AR-1C, condenser "C" isolation stop.

CWR04A (CLOSE) "C* water box outlet and inlet stops. 6.10 Close VP-1C & -1G, "C" water box outlet &

VP-9C us not modeled. inlet stops.

6.11 Open VP-9C, *C" water box inlet vent.

When valves linked to Event 8 have reached 6.12 (Crew/BOP) Monitor condenser vacuum.

their demand position, inform the crew that 6.13 Deenergize cathodic protection.

all PEO actions are completed.

6.14 (BOP) When directed, close CW-11C.

nd It is not necessary to actually start a 2 SJAE or the Mechanical Vacuum Pumps.

Simulator Exercise Guide Job Aid Page 12 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

3. Wn~rl.*actiqn~* for #2 are cOR,Jpltieted. or<~tthe discretion. Qf~!:le~ead. Exarniner,initiate #3.

Event 3: RX04B - 85% (300 second ramp) I RO:

  • Observes and reports any of the following:

Channel "Y" Pressurizer Level transmitter fails high over a period of five minutes.

  • Letdown flow rising.
  • Pressurizer backup heaters energized.

TM3.AE3

  • Level controller output rising.
  • Actual level dropping (may not be diagnosed at this time).
  • PRESSURIZER CH Y LEVEL HIILO annunciator (A-39) on C02-3 (delayed).

US: Enters ARP-2590B-217, annunciator A-39.

3. Notes indicated level is high.
a. Backup charging pump has stopped.
b. Letdown flow is at maximum (128 gpm)
5. Verifies TAVGIT REF recorder and Foxboro IIA indicate normal (RRS is not the problem).

The ARP assumes only one charging pump is US: Directs and the RO performs the following:

running. Therefore, when level control is nd transferred to Channel 'X', the 2 charging 8.1 SHIFT "LTDN FLOW CNTL, HIC-110" to pump will restart automatically, unless the "MAN" (C-02).

charging pump control switches have been 8.2 Adjust "LTDN CNTL. HIC-11 0" to stabilize changed from the initial setup of two running Pressurizer level and Letdown flow.

pumps. 8.3 Commence forcing PZR sprays (in setup) 8.4 SHIFT PZR level control to channel "X".

8.5 RESTORE Letdown to automatic.

RO: (Restoring Letdown flow to automatic) 8.5.1 Adjust bias to "0".

8.5.2 Shift HIC-110" back to "AUTO."

8.5.3 Adjust bias to restore PZR level to setpoint.

8.5.4 Shift Pressurizer heater control "SEL SW" to channel "X".

Simulator Exercise Guide Job Aid Page 13 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

4. itA" Condensate Pump High Motor WhenHIC-110 is back in automatic, or at the.

Winding Temperature. discretion of the Lead Examiner; initiate #4.

Event 4: FW23 - 100% BOP/Crew:

The "An Condensate Pump motor winding

  • Observe "A" Condensate Pump high motor temperature will begin to rise abnormally high, winding alarms on PPC MON 2.

causing control board and PPC alarms.

  • Observe "CONDENSATE PUMP TM4, AE4 TROUBLE" alarm A-11 on C05 US/BOP:
  • Enters ARP-2590D-041, annunciator A-11, CONDENSATE PUMP TROUBLE.
1. Notes "An Condensate Pump not tripped.
2. Notes "An Condensate Pump amps not high
3. Notes "An Condensate Pump motor winding temperature high and rising on the PPC.
  • US - Directs "B" Condensate Pump be started.
  • US - Directs "A" Condensate Pump be secured.

BOP Event 9: FW23 - 0% (ramp 5 minutes)

  • Starts the "Bn Condensate Pump.

When "A" Condensate pump is secured,

  • Secures the "An Condensate Pump and trigger Event 9 to ramp down high temp. places it in Pull-To-Lock.
  • Observes Condensate Header pressure.

Simulator Exercise Guide Job Aid Page 14 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

'Rapid Downpowerdue to failing SGFP. When <S'Co.,d.pump is runnh\9; or atthe di~~retion oft~e L;ead:Exarniner; initiate #5.

Call as Turbine Engineer and inform the crew US:

that the "An SG Feed Pump (SGFP) is making unusual noises and should be shut

  • Enters AOP 2575, Rapid Downpower o Performs Focus Brief on Trip Criteria down as soon as possible. It is not necessary to trip the pump at this time. and RCS Temperature Control.

o Requests SMISTA to make required TM5, AE5 notifications.

o Directs RO to initiate forcing sprays and to insert Group 7 CEAs 10 steps (while maintaining Reactivity oversight)

The US may not use a predetermined reactivity o Determines which Reactivity Plan, plan due to the existing power level not directly RE-G-13, -14, or -15 may be used.

matching any existing plant generated by RE. In o Directs RO and BOP to coordinate a this case, reactivity thumbrules should be used.

rapid down power per the chosen plan.

RO:

  • Initiates Forcing Sprays: (if not already) o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).
  • Inserts Group 7 CEAs 10 steps and observes applicable parameters.

The US may direct Boration to be accomplished

  • Initiates Boration from the RWST:

o Ensures at least one Charging Pump from the BAST to aI/ow for easier makeup to the is operating.

VeT. Borafion from the BAST (alternate o Ensures CH-196, VCT Makeup method) is in italics.

Bypass, is closed.

o Ensures CH-504, RWST to Charging Suction, is open.

o Opens CH-192, RWST Isolation.

o Closes CH-501, VCT Outlet.

o Starts a second Charaina Pum~.

Simulator Exercise Guide Job Aid Page 15 of 29 SEG# ES10Ll4 (Spare) Rev; _0__

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO (alternate boration method):

  • If Boration is from the BAST:

o Ensures the Makeup Flow Selector switch is in the DILUTE position.

o Ensues FC-210X, Primary Makeup Water Flow controller, is set to "0".

o Ensures CH-S12, Makeup Valves Stop, is closed.

o Ensures CH-196, VCT Makeup Bypass, is closed.

o EnsuresCH-192, RWST Isolation. is closed.

o Ensures FC-210Y,Boric Acid Flow controller, is set to the predetermined flow rate.

o Opens CH-S04, RWST to Charging Suction.

o Place Makeup Mode Sel switch in MAN.

o Starts the selected Boric Acid and verifies discharge pressure is greater than 98 psig.

o Opens CH 196, VCT Makeup Bypass.

o As required, refers to attachment and performs actions to maintain VCT level in the desired band.

BOP:

Reduces Turbine load to follow Reactor power to maintain Tc on program using the Load Limit Pot.

Simulator Exercise Guide Job Aid Page 16 of 29 SEG# Rev;_O_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

6. Loss of Vital Bus 24C; Manual Plant Trip. When po~i~l()wered.by "'10%, orat the LOCA.lnitiates on the Plant Trip. disereti()ll:oftheJ..ea.dExaminer, initiate #6.

Event 6: ED05A - ON Causes a fault on vital bus 24A which results in Directs the crew to manually trip the Reactor the following: and perform EOP 2525. Standard Post Actions.

  • NSST to 24A trips on the bus fault, deenergizing 24A and all non-Vital 4160/480 Queries RO and BOP on the status of Safety VAC power (unrecoverable). Functions as delineated in Eap 2525:
  • 24C deenergizes causing Fac. 1 ESAS UV
  • Reactivity Control (RO)
  • The UV locks out the RSST to 24C. o Status of the Reactor
  • Because "A" EDG is OOS. 24C and all Vital
  • Maintenance of Vital Auxiliaries (BOP) 4160/480 VAC power remain deenergized.

o Status of the Turbine

  • 24C can be recovered, but not in time to prevent a required plant trip. o Status of Electrical Buses o Status of SW & RBCCW TM6, MA1 o Check one facility of CRAC operating Event 6: (+2 minutes) RC20B 308 gpm (56%) (RO)

On the trip. a rupture will occur in the "An RCP

  • RCS Inventory Control (RO) seal cooler. resulting in a Small Break LOCA. o Pzr level & Subcooled margin (SCM),

value & trend TM7, MA2

  • RCS Pressure Control (RO) o Pzr pressure, value & trend
  • Core Heat Removal (RO) o RCP status o Loop delta-T o T H Subcooling Margin
  • RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS Tc value and trend o S/G levels, value and trend oReS Subcooling Margin

Simulator Exercise Guide Job Aid Page 17 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS

  • Containment (CTMT) Isolation (RO) o Radmonitors inside CTMT, outside CTMT, steam plant o CTMT pressure <1 psig
  • CTMT Temperature & Pressure Control (RO) o CTMT temperature and pressure value and trend RO:
  • Reactor has tripped, power is lowering, SUR is negative, all CEAs are inserted.

BOP:

Perform associated actions of EOP 2525 and report results when queried:

  • Turbine tripped, stop valves are closed, 8T

& 9T are open, Megawatts are zero

  • All electrical buses energized except for 24A and 24C (UA" EDG 005).
  • Facilities 2 SW and RBCCW operating.

RO:

Performs associated actions of EOP 2525 and report results when queried:

  • Control Room Air Conditioning Status
  • Pressurizer level value and trend o PZR level lowering, all available charging pumps running, letdown flow at minimum.

Simulator Exercise Guide Job Aid Page 18 of 29 SEG# ES10Ll4 (Spare) Rev; FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:

  • Pressurizer pressure value and trend o PORVs and Spray Valves are closed o When RCS pressure is less than 1714 psia, then SIAS, CIAS, and EBFAS have actuated (only Facility 2 powered).

o "A" & "C" RCPs secured due to no The remaining RCPs may be secured when RBCCW flow on loss of 24C.

the crew recognizes the leak in the "8" RCP Seal Cooler. o If Pressurizer pressure lowers to minimum NPSH, then all Reps are secured.

  • Number of RCPs operating o Value and trend of loop Delta-T o Value and trend of subcooling
  • If no RCPs operating, T AVG controller,TIC-4165 in manual/closed BOP:

Performs associated actions of EOP 2525 and reports results when queried:

  • Value and trend of S/G pressures
  • Operates steam dumps, as necessary, to control RCS T AVG *
  • Value and trend of T c
  • Value and trend of S/G levels
  • Subcooling value / CET temperatures

Simulator Exercise Guide Job Aid Page 19 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:

Continues with associated actions of EOP 2525 and reports results when queried:

  • Rad monitors:

o Inside CTMT; not going up or in alarm o Outside CTMT; RM-6038, RBCCW going up and/or in alarm.

US/BOP/RO: RBCCW Surge Tank level rising o Steam Plant; not going up or in alarm.

  • CTMT temperature/pressure rising slowly.

o 2 CAR Fans and "B" Aux Circ. Fan running in slow.

o Starts "B" PIR Fan.

BOP:

Continue with Subsequent Actions:

  • Opens HD-106, Subcooling Valve
  • Stops both Heater Drains Pumps
  • Secures all but one Condensate Pump
  • Verifies Main Feed Pump operating.

o Closes FW-42B, Main Feed Block Valve.

o Ensure both Main Feed Reg Bypass Valves are throttled to 40%

  • Checks IA Header pressure is >90 psig and stable.

US:

Query RO & BOP regarding the status of EOP 2525 subsequent actions.

Simulator Exercise Guide Job Aid Page 20 of 29 SEG# ES10Ll4(Sparel Rev; _0_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO/BOP:

When asked, report that Subsequent Actions are complete and verified.

US:

  • At the completion of EOP 2525, Diagnostic Flow Chart, determines that a LOCA inside Containment has occurred and goes to EOP 2532, Loss of Coolant Accident.
  • Places Master Silence Switch in NORM.
  • Notes the need for the SM to complete EPI FAP06-002, classify the event as an Alert, Charlie-1, and make appropriate notifications.

Simulator Exercise Guide Job Aid Page 21 of 29 SEG# ES10Ll4 (Spare) Rev;

1. LosS of High Pressure6afety/((1ject;on~ Once EOP 2532 discretion of the Event 7: RC208 550 gpm (100%) US:

Raise the severity of the "8" RCP Seal o Enters EOP 2532, Loss Of Coolant Accident Cooler tube rupture to maximum.

o Directs performance of SFSC o Directs Chemistry sample S/Gs Event 27 (RCS Pres < 1600 psia): SI04C - ON I 0 Directs SM to classify the event Initiate a trip of the "C" HPSI Pump when RCS pressure drops below 1600 psia, causing the o Opens Place keeper and ENTER the EOP entry time loss of the only running High Pressure Safety Injection Pump. o Ensures the master silence switch is in "NORMAL" TM8, EM1 US/BOP:

o Opens both SG sample valves.

o Directs Chemistry to do the following:

o Sample both SGs.

o Frisk the samples.

o Report frisk results.

o Analyze samples for boron and activity.

RO:

o Check SIAS, CIAS and EBFAS actuation.

o Check adequate Safety Injection flow.

o Notes "e" HPSI pump has tripped.

o May attempt restart of "C" HPSI Pump.

o Reports "A" & "8" HPSI pumps have no power. 24C or 24E must be restored.

Simulator Exercise Guide Job Aid Page 22 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

RO:

Event 10: CVR 11 22F When "B" charging pump is swapped to 22F it will automatically start due to the already IWhen directed, swap "B: charging pump to 22F.

o Directs PEO to swap "B" Charging pump power to Facility 2 (22F).

existing SIAS start signal. o Takes "B" Charging Pump out of "Pull-To-Lock".

o Verifies "B" Charging Pump running.

There will not be any safety injection flow US:

from the HPSI pump until RCS pressure drops below 1250 psia. o Acknowledges "CO HPSI pump lost (no SI) and "A" & "B" HPSI pump without power.

o Directs 24C be reenergized by the RSST or Unit 3.

If energizing 24C from the RSST, this If the crew desires to energizing 24E from RO/BOP:

section will be used. Unit 3 and requests power, give permission Appendix 23-B Energizing 24C from the RSST to take power up to the applicable limit. Unit '

3 is not experiencing any power challenges 1. Verifies RSST energized on C-08.

and is operating normally. 2. Checks for faults on 24C.

Note: the fault on 24A may be seen as a fault on 24C and cause the crew to abandon efforts to restore 24C. If so, they should proceed to restore power to 24E from Unit 3 (following).

3. Ensures breakers A304, A305 and A312 are open. (A305 would be closed on setup).
4. Ensures A702 is closed.
5. Put synch switch for A302 to "ON".
6. Gets key #26 from cabinet and places all four ESAS "UV BUS A3" in "INHIBIT".
7. Presses "UV RESET" button on Cabinet 5.

Simulator Exercise Guide Job Aid Page 23 of 29 SEG# ES10ll4 (Spare) Rev; _0_

RO/BOP:

Appendix 23-B, Energizing 24C from the RSST

8. "A" RBCCW and SW pumps in P-T-L.
9. Both AFW Override switches in P-T-L.
10. Override off "A" HPSI, LPSI and CS pumps.
11. Close A302 to energize 24C.

CT-1 (LOCA-9): Manually establish the RO:

required minimum safety injection flow.

Restore a running HPSI pump within 30 Start the "A" HPSI pump and verify adequate SI.

minutes of entry into EOP 2532. US: Verifies SI flow adequate.

If energizing 24E from Unit 3, this section RO/BOP:

will be used. Appendix 23-N, Energizing 24E from Unit 3

1. Checks no faults on 24E.
2. Verifies 24E supply from Unit 3 has voltage.
3. "B" HPSI, SW and RBCCW pumps off.
4. Ensure A305 and A408 are open.
5. Verifies permission granted from Unit 3.
6. Put synch switch for A305 to "ON" and check "INCOMING" voltage.
7. Close A305 to energize 24E.
8. Check voltage indicated on "RUNNING".
9. Put synch switch for A305 to "OFF".

CT-1 (LOCA-9): Manually establish the RO:

required minimum safety injection flow.

Restore a running HPSI pump within 30 Start the "B" HPSI pump and verify adequate 51.

minutes of entry into EOP 2532. US: Verifies SI flow adequate.

BOP:

o Verifies switchgear room cooling.

RO:

o Stop RCPs as necessary (may have been secured earlier if NPSH was lost).

Simulator Exercise Guide Job Aid Page 24 of 29 SEG# ES10Ll4 (Spare) Rev: _0_

D Place PZR spray controller(s) in manual and close.

D Place HIC-4165 in manual and close.

RO/BOP:

D Verifies PORVs closed, letdown isolated, RCS sample valves closed.

D Notes indication of leakage into RBCCW o RM-6038, RBCCW Rad. Monitor, rising.

o RBCCW Surge Tank level rising (C06)

US:

D Directs any operating RCPs be secured.

D Directs RBCCW CTMT Header Isolation Valves be closed.

BOP:

D Stops the operating RCPs.

D Places associated pressurizer spray valve controller RC-100E or RC-100F in manual and closed.

D Places TIC-4165, steam dump TAVG controller, in manual and closed.

Simulator Exercise Guide Job Aid Page 25 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS CT-2 (LOCA-3) Establish CTMT Isolation. Event 11: 05A1A2S9 CLOSE BOP:

Isolate CTMT by closing at least one 05A1AS12 CLOSE Q Closes Fac. 1 RBCCW CTMT header isolation valve at each penetration.

isolation valves: RB-30.1A, RB-37.2A.

and/or if directed to close RB-30.1 A and RB-37.1 A CT-2 (LOCA-6) Isolate RCS Leakage. locally, trigger Event 11. o If 24C has not been restored, directs a Isolate or attempt to isolate locations that Then do the following to close the valves: PEO to close the valves locally.

may be the source of the loss of coolant. 1. Open the "Insight" window.

Q Closes Fac. 2 RBCCW CTMT header

2. In "Insight", open the file Note: As a minimum, RB-30.1 Band RB-37.2B isolation valves: RB-30.1B and RB-37.2B.

must be closed. "johnccrbvalves.tis" .

3. Set the values for both valves to "0.0".

Note: The Crew may need to continue to US/CREW:

monitor indications to ensure the LOeA has Q Verifies LOCA is no longer outside CTMT.

been redirected into CTMT.

US/CREW:

Q Directs/places hydrogen analyzer in service.

Crew:

Q Verifies SIAS, CIAS, EBFAS, MSI, CRACS, CAR fan operation, as necessary.

US/BOP:

Q Verifies adequate instrument air pressure.

US:

Q Directs Crew initiate a controlled cool down and depressurization of RCS.

CT-3 (LOCA-3): Initiate a plant cooldown. BOP:

A plant cooldown at a rate of greater than 40°F/hr should be initiated within one hour, Q Initiates a plant cool down.

following an unisolable LOCA, until the o Opens steam dump valves.

condenser steam dump valves or ADVs are full open. o Establishes 40 -100 °F/hr cool down.

Simulator Exercise Guide Job Aid Page 26 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

RO:

IJ Depressurizes RCS (as necessary) using Auxiliary Spray Flow.

The scenario may be terminated once a plant I Restore simulator references/procedures. Crew:

cooldown has been initiated, or at the discretion Standby for questions from Examiners.

of the Lead Examiner.

Simulator Exercise Guide

'Dominion"'

Job Aid Page 27 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

I I Event Severity I Final IRelative Description Trigger Or Value Value Order MALFUNCTIONS RM010 - Rad. Monitor RM-9799A on CRAC, fails low. NA 0 1 0.1 mr/Hr I 1 (0%)

CHOSC - CRAC Filter Fan "A", F-32A, trips NA 0 2 NA 2 CW04C - Main Condenser tube leak in the "C" water box. 0 3 10gpm 3 (100%)

RX04B - Ch. 'V' Pressurizer Level transmitter, LT-110Y, fails to 2350 psia. NA 300 4 2350 psia I I 4 (85%)

FW23 - "A" Condensate Pump Motor Winding Temperature High. NA 0 5 ON 5 ED05C - Major fault on bus 24A (loss of Facility One 4160/480 VAC). NA 0 6 ON 6 RC20A; Seal Cooler Rupture in RCP "An (2 minute delay) 2 min. 0 6 308 gpm 7 (56%)

RC20A; Seal Cooler Rupture in RCP "A" (Increase in severity) NA 0 7 550 gpm 8 (100%)

SI04C - 'c' HPSI Pump trip. NA 0 27 ON 9 REMOTE FUNCTIONS

~~~EDI EGR12 - "A" EDG Air Start Valves () 0 EGR17 - "A" EDG Breaker () 0 OVERRIDES

Simulator Exercise Guide

'Dominion'"

Job Aid Page 28 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.

Yes No

1. The desired initial condition(s) could be achieved. o
2. All malfunctions and other instructor interface items were functional and responded to o support the simulator Scenario.
3. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.

o

4. All applic;able acceptance criteria were met for procedures that were used to support the simulator scenario.

o

5. During the simulator scenariO, observed changes corresponded to expected plant response.

o

6. Did the scenario satisfy the learning or examination objectives without any significant o simulator performance issues, or deviations from the approved scenario sequence?
7. The simulator is capable of being used to satisfy learning or examination objectives without exceptions, significant performance discrepancies, or deviation from the approved scenario o

sequence.

8. Any identified Critical Tasks possesses the following elements (NUREG-1 021):

o

  • Essential to safety with adverse consequences or significant degradation,
  • Cue(s) prompt the Operator to respond.
  • Defined and measurable performance indicators.
  • Performance feedback.

The use of uN/A" is allowed for item 8 only if this is NOT an evaluated scenario.

Discrepancies noted (Check "none" or list items in comments field) None [8J Comments:

Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.

Simulator Exercise Guide Job Aid Page 29 of 29 SEG# ES10Ll4 (Spare) Rev; _0_

SIMULATOR TRAINING SHIFT TURNOVER REPORT DATEnTIME PREPARED BY Toda:i 0515 PLANT STATUS:

I Unit SUl2ervisor I"NIGHT" Shift I SHIFT 18:00 - 06:00 Mode: 1 Rx Power: 45%

Megawatts: Thermal: 1215 MWTH PZR Pressure: 2?50 psia Electric: 405 MWe RCS T-AVE: sa3degF RCS Leakage: Identified: 0.015 gpm Protected Train/Facility: TRAIN Unidentified: 0.036 gpm DatelTime: Today 0015 Active Tracking Records and Action Statements Equipment/Reason LCO ~ Action I Date I Time in LCO I Action Requirement I Time Left 2-U-AIL, See AIL for details I I I I 00 Compensatory Actions I Temp Logs Watch Open Date Class Reason Reason Position PLANT SYSTEMS APC System Notes I CROSS UNIT SYSTEM STATUS U3 Power to 24E I 34A aligned to 24E SURVEILLANCES f EVOLUTIONS IN PROGRESS OP 2204 I Steady State Operation at 45% power.

REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES f SPREAD SHEET FOR ADDITIONAL INFO)

Current Rod Height ARO@165 Xenon Trend Rising Current Boron 700 ppm Boron Pot Setting f Blend Ratio to 1 (corrected)