| {{#Wiki_filter:AR 01320221 Report Aff Fac: Byron AR Type: CR Status: APPROVED Aff Unit: 02 Owed To: ACAPALL Due Date: 02/29/2012 Aff System: CB Event Date: 01/30/2012 CR 4/D Disc Date: 01/30/2012 LevellClass: | | {{#Wiki_filter:AR 01320221 Report Aff Fac: Byron AR Type: CR Status: APPROVED Aff Unit: 02 Owed To: ACAPALL Due Date: 02/29/2012 Aff System: CB Event Date: 01/30/2012 CR 4/D Disc Date: 01/30/2012 LevellClass: |
| How H02 Orig Date: 01/30/2012 Discovered: | | How H02 Orig Date: 01/30/2012 Discovered: |
| WR/PIMS Equip Tag: 2CB025-I/A | | WR/PIMS Equip Tag: 2CB025-I/A - IAV - AOV HTR 21-24 BYPASS AR: ISOL VLV Action Request Details |
| -IAV -AOV HTR 21-24 BYPASS AR: ISOL VLV Action Request Details | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| 2CB025 AIR LEAK (b)(6)Description Originator: | | 2CB025 AIR LEAK (b)(6) |
| Supv Contacted Condition | | Description Originator: Supv Contacted Condition |
|
| |
|
| == | | == Description:== |
| Description:== | | : 1) Describe the leak: |
| : 1) Describe the leak: Air leak to 2CB025 valve likely a result of severe water hammer from plant trip If answer to Question 2 is a Pressure Boundary -STOP and IMMEDIATELY CONTACT the Shift Manager.2) Component point of leakage: Pressure Boundary: | | Air leak to 2CB025 valve likely a result of severe water hammer from plant trip If answer to Question 2 is a Pressure Boundary - STOP and IMMEDIATELY CONTACT the Shift Manager. |
| Pipe Wall/Fitting/Weld:( ) Valve/Pump Body:(x) Vessel Wall:( )Mechanical Joint: Bolted Connection:( ) Threaded Connection:( ) Valve packing:( ) Pump Seal:( ) Fitting:(Other: 3) Does Insulation or other interference have to be removed to positively idenitfy all sources of leakage? Describe what has to be removed: Nothing ( x ) or 4) What is the leaking fluid (boric acid, water, oil, steam, air or chemical)?: | | : 2) Component point of leakage: |
| Air 5) Leak Significance
| | Pressure Boundary: Pipe Wall/Fitting/Weld:( ) Valve/Pump Body:(x) Vessel Wall:( ) |
| -= T wh th" Freedom Of Vft'd B = Impacting personnel safety ( )C = Degraded; requiring repairs ( x D = Housekeeping impact E = Environmental impact 6) Classify leakage (best guess): 1 = Inactive 2 = <1 drop/ 5 min, weeping 3 = steady drip / small stream 4 = < 0.1 gpm 5 = > 0.1 gpm Leak Rate Classification | | Mechanical Joint: Bolted Connection:( ) Threaded Connection:( ) Valve packing:( ) Pump Seal:( ) Fitting:( |
| = -5 Estimated accumulated fluid = <1 gallon ( ) >1 gallon ( ) >5 gallon N/A 7) For a leaking pipe or difficult to locate leak provide a description of the leak location, or identify an upstream reference component, i.e., valve, etc.U2 TB, 426' outside of Chemistry Office If the leak Is not captured by a plant-fluid-collection system, IMMEDIATELY CONTACT the Operations Shift Manager or Shift Supervisor. | | Other: |
| | : 3) Does Insulation or other interference have to be removed to positively idenitfy all sources of leakage? Describe what has to be removed: |
| | Nothing ( x ) or |
| | : 4) What is the leaking fluid (boric acid, water, oil, steam, air or chemical)?: Air |
| | : 5) Leak Significance |
| | -= T*mmn wh th" Freedom Of Vft'd |
| | |
| | B= Impacting personnel safety ( ) |
| | C = Degraded; requiring repairs ( x D = Housekeeping impact E= Environmental impact |
| | : 6) Classify leakage (best guess): |
| | 1 = Inactive 2 = <1 drop/ 5 min, weeping 3 = steady drip / small stream 4 = < 0.1 gpm 5 = > 0.1 gpm Leak Rate Classification = -5 Estimated accumulated fluid = <1 gallon ( ) >1 gallon ( ) >5 gallon N/A |
| | : 7) For a leaking pipe or difficult to locate leak provide a description of the leak location, or identify an upstream reference component, i.e., |
| | valve, etc. |
| | U2 TB, 426' outside of Chemistry Office If the leak Is not captured by a plant-fluid-collection system, IMMEDIATELY CONTACT the Operations Shift Manager or Shift Supervisor. |
| : 8) If the leaking liquid or steam is not entering the plant-fluid-collection system, describe where it is going or is gathering. | | : 8) If the leaking liquid or steam is not entering the plant-fluid-collection system, describe where it is going or is gathering. |
| The concern is the leak may contain tritium or hazardous chemicals and may enter the soil, surface water, or ground water.N/A Leak is entering the plant fluid collection system ( )Yes ( )No OR If No, fluid is collecting or going to: N/A 9) Is the leak impinging any electrical equipment ( )Yes ( x )No If yes, identify the component(s) and initiate a separate IR for evaluation of the equipment. | | The concern is the leak may contain tritium or hazardous chemicals and may enter the soil, surface water, or ground water. |
| : 10) Identify any target (sprayed or dripped on) component(s), i.e., components that are affected by the leakage (use targets EPN or a detailed component description. | | N/A Leak is entering the plant fluid collection system ( )Yes ( )No OR If No, fluid is collecting or going to: N/A |
| Include walls, floors grating, valve stems, etc.)and describe any visible effects of the leakage on the target component(s)(e.g., rusting, corrosion, pitting, or stalactites): | | : 9) Is the leak impinging any electrical equipment ( )Yes ( x )No If yes, identify the component(s) and initiate a separate IR for evaluation of the equipment. |
| N/A Items 11 and 13 apply to Boric Acid Leaks Only: 11) Quantify boric acid deposits: M nIr n- A -m,, sinn/ ) I -t-hinn 1 fancnnnn I Heavy accumulation( ) Component encased in boric acid(12) Boric Acid deposit color: White Fresh( ) Brown( ) Tan with evidence of corrosion(13) Was the leakage found on a component that was under going an ASME Section XI pressure test (VT-2)? __ Yes __ No Immediate actions taken: Consider the following as appropriate: | | : 10) Identify any target (sprayed or dripped on) component(s), i.e., |
| | components that are affected by the leakage (use targets EPN or a detailed component description. Include walls, floors grating, valve stems, etc.) |
| | and describe any visible effects of the leakage on the target component(s) |
| | (e.g., rusting, corrosion, pitting, or stalactites): |
| | N/A Items 11 and 13 apply to Boric Acid Leaks Only: |
| | : 11) Quantify boric acid deposits: |
| | M n-nIr A -m,, sinn/ ) I - t-hinn 1 fancnnnnI |
| | |
| | Heavy accumulation( ) Component encased in boric acid( |
| | : 12) Boric Acid deposit color: |
| | White Fresh( ) Brown( ) Tan with evidence of corrosion( |
| | : 13) Was the leakage found on a component that was under going an ASME Section XI pressure test (VT-2)? __ Yes __ No Immediate actions taken: |
| | Consider the following as appropriate: |
| Is a leak catch container installed? | | Is a leak catch container installed? |
| Actions initiated to mitigate safety concerns?If a potentially flammable liquid, e.g., Fryquel EHC or oil, impinges on a potentially hot pipe or is absorbed by insulation, then determine if mitigating actions are required to reduce the risk of fire. Fyrquel absorbed by pipe insulation on hot pipes has been shown to cause fires.Recommended Actions: NOTIFY the Shift Manager of the condition. | | Actions initiated to mitigate safety concerns? |
| Operations evaluation of leaks should consider: (1) The potential for a leak to enter the soil, surface water, ground water etc.(2) If leakage is from a pressure boundary what is the ASME Class (3) If the leaking component is ASME Class 2 or 3 is it a moderate energy leak (max operating pressure < 200psig, and max operating temperature | | If a potentially flammable liquid, e.g., Fryquel EHC or oil, impinges on a potentially hot pipe or is absorbed by insulation, then determine if mitigating actions are required to reduce the risk of fire. Fyrquel absorbed by pipe insulation on hot pipes has been shown to cause fires. |
| <275 degrees F).Moderate Energy ( )YES ( )NO Operable Basis: Reportable Basis: Functionality Basis: Assignments Assign #: Q1 Assigned Status: AWAIT/C To: Aff Fac: Byron Prim Grp: ACAPALL Due Date: 02/04/2012 Assign Type: TRKG Sec Grp: Orig Due Date: Priority: Schedule Ref: | | Recommended Actions: |
| | NOTIFY the Shift Manager of the condition. |
| | Operations evaluation of leaks should consider: |
| | (1) The potential for a leak to enter the soil, surface water, ground water etc. |
| | (2) If leakage is from a pressure boundary what is the ASME Class (3) If the leaking component is ASME Class 2 or 3 is it a moderate energy leak (max operating pressure < 200psig, and max operating temperature <275 degrees F). |
| | Moderate Energy ( )YES ( )NO Operable Basis: |
| | Reportable Basis: |
| | Functionality Basis: |
| | Assignments Assign #: Q1 Assigned Status: AWAIT/C To: |
| | Aff Fac: Byron Prim Grp: ACAPALL Due Date: 02/04/2012 Assign Type: TRKG Sec Grp: Orig Due Date: |
| | Priority: |
| | Schedule Ref: |
| | |
| Unit Condition: | | Unit Condition: |
| Subject/Description: | | Subject/Description: 2CB025 AIR LEAK}} |
| 2CB025 AIR LEAK}} | |
Similar Documents at Byron |
---|
Category:Report
MONTHYEARBYRON 2024-0054, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-10-24024 October 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed BW230054, EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood2023-11-17017 November 2023 EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood ML23321A0462023-11-17017 November 2023 Attachment 2: MDMP Deviation Form RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 BYRON 2022-0071, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment2022-10-13013 October 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-071, License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds2022-06-0707 June 2022 License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld2021-05-12012 May 2021 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping BYRON 2020-0085, 10 CFR 50.59 Summary Report2020-12-10010 December 2020 10 CFR 50.59 Summary Report BYRON 2020-0084, 10 CFR 72.48 Evaluation Summary Report2020-12-10010 December 2020 10 CFR 72.48 Evaluation Summary Report ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20195B1592020-07-10010 July 2020 Attachment 1 - Description and Assessment ML20195B1622020-06-30030 June 2020 Attachment 11 - SG-SGMP-17-25-NP, Revision 1, Foreign Object Limits Analysis for the Byron and Braidwood Unit 2 Steam Generators June 2020 ML20195B1612020-06-25025 June 2020 Attachment 6 - Intertek Report No. Aim 200510800-2Q-1(NP), Byron Unit 2 Operational Assessment Addressing Deferment of B2R22 Steam Generator Tube Examinations to B2R23, April 2022 ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 ML18192C1522018-07-18018 July 2018 Review of Fall 2017 Steam Generator Tube Inservice Inspection Report ML17355A5612017-12-21021 December 2017 Ltr. 12/21/17 Response to Disputed Non-Cited Violation Documented in Byron Station, Units 1 and 2 - Evaluations of Changes, Tests, and Experiments Baseline Inspection Report 05000454/2017009; 05000455/2017009 (DRS-N.Feliz-Adorno) RS-17-048, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2017-04-0707 April 2017 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16344A0062016-12-0909 December 2016 10 CFR 72.48 Evaluation Summary of Biennial Report of Changes, Tests, or Experiments, Performed RS-17-039, Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations.2016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17360A1742016-10-0707 October 2016 Attachment 6: Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations (Non-Proprietary) ML16356A0202016-10-0707 October 2016 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations ML17170A1472016-10-0707 October 2016 Areva, 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations ML17095A2692016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations RS-16-122, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML16236A2082016-08-23023 August 2016 Report of Backfit Appeal Review Panel ML16214A1992016-08-11011 August 2016 An Assessment of Core Damage Frequency for Byron/Braidwood Backit Appeal Review RS-16-088, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-07-15015 July 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-16-073, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2016-04-0707 April 2016 Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds2016-03-15015 March 2016 Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds RS-15-267, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-11-30030 November 2015 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML15187A3042015-11-19019 November 2015 NRC Record of Decision for the License Renewal Application for Byron, Units 1 and 2 RS-15-072, Comments on the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 542015-02-12012 February 2015 Comments on the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 54 RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application2014-12-15015 December 2014 Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14128A5562014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14178B2222014-06-24024 June 2014 Technical Review of TIA 2013-02, Single Spurious Assumptions for Braidwood and Byron Stations Safe-Shutdown Methodology ML14085A5332014-05-29029 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14120A0392014-04-24024 April 2014 Units 1 & 2 - License Amendment Request to Install New Low Degraded Voltage Relays & Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses BYRON 2014-0040, Pressure and Temperature Limits Report (PTLR) Revised for Negative Pressure Application During Reactor Coolant System Vacuum Fill2014-03-27027 March 2014 Pressure and Temperature Limits Report (PTLR) Revised for Negative Pressure Application During Reactor Coolant System Vacuum Fill ML14079A4232014-03-12012 March 2014 Enclosure 1, Byron Nuclear Generating Station, Flood Hazard Reevaluation Report, Revision 0 BW140017, Clarification of Licensing Basis Assumptions for a Natural Circulation Cooldown Event2014-03-0404 March 2014 Clarification of Licensing Basis Assumptions for a Natural Circulation Cooldown Event RS-14-082, ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report2014-02-27027 February 2014 ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report 2024-05-28
[Table view] Category:Miscellaneous
MONTHYEARRS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed ML23321A0462023-11-17017 November 2023 Attachment 2: MDMP Deviation Form BW230054, EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood2023-11-17017 November 2023 EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood RS-22-071, License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds2022-06-0707 June 2022 License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML18192C1522018-07-18018 July 2018 Review of Fall 2017 Steam Generator Tube Inservice Inspection Report ML17355A5612017-12-21021 December 2017 Ltr. 12/21/17 Response to Disputed Non-Cited Violation Documented in Byron Station, Units 1 and 2 - Evaluations of Changes, Tests, and Experiments Baseline Inspection Report 05000454/2017009; 05000455/2017009 (DRS-N.Feliz-Adorno) RS-17-048, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2017-04-0707 April 2017 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16344A0062016-12-0909 December 2016 10 CFR 72.48 Evaluation Summary of Biennial Report of Changes, Tests, or Experiments, Performed RS-17-039, Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations.2016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17095A2692016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations ML17170A1472016-10-0707 October 2016 Areva, 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations RS-16-122, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML16236A2082016-08-23023 August 2016 Report of Backfit Appeal Review Panel ML16214A1992016-08-11011 August 2016 An Assessment of Core Damage Frequency for Byron/Braidwood Backit Appeal Review RS-16-088, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-07-15015 July 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-16-073, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2016-04-0707 April 2016 Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML15187A3042015-11-19019 November 2015 NRC Record of Decision for the License Renewal Application for Byron, Units 1 and 2 RS-15-072, Comments on the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 542015-02-12012 February 2015 Comments on the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 54 RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application2014-12-15015 December 2014 Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application ML14128A5562014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14085A5332014-05-29029 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14120A0392014-04-24024 April 2014 Units 1 & 2 - License Amendment Request to Install New Low Degraded Voltage Relays & Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses BW140017, Clarification of Licensing Basis Assumptions for a Natural Circulation Cooldown Event2014-03-0404 March 2014 Clarification of Licensing Basis Assumptions for a Natural Circulation Cooldown Event ML13225A5952013-12-17017 December 2013 Interim Staff Evaluation Related to Integrated Plan in Response to Order EA-12-049(Mitigation Strategies) ML13182A0312013-07-0303 July 2013 Transmittal of Final Byron Station, Unit 2, Accident Sequence Precursor Analysis IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee OI 3-2010-034, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee2013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee RS-12-162, Company, Llc’S 180-Day Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Company, Llc’S 180-Day Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12341A1652012-11-0707 November 2012 Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 3 of 3 ML12341A1662012-11-0707 November 2012 Enclosure 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Byron Station, Unit 2, Report No: 12Q0108.20-R-002, Revision 1 RS-12-161, Q0108.20-R-002, Rev. 1, Seismic Walkdown Checklist (Swc). Part 1 of 22012-11-0707 November 2012 Q0108.20-R-002, Rev. 1, Seismic Walkdown Checklist (Swc). Part 1 of 2 ML12341A1612012-11-0707 November 2012 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Byron Station, Unit 1, Report No. 12Q0108.20-R-001, Revision 1 ML12341A1642012-11-0707 November 2012 Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 2 of 3 ML12341A1632012-11-0707 November 2012 Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 1 of 3 RS-12-161, Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 3 of 32012-11-0707 November 2012 Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 3 of 3 RS-12-161, Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 2 of 32012-11-0707 November 2012 Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 2 of 3 2024-05-28
[Table view] |
Text
AR 01320221 Report Aff Fac: Byron AR Type: CR Status: APPROVED Aff Unit: 02 Owed To: ACAPALL Due Date: 02/29/2012 Aff System: CB Event Date: 01/30/2012 CR 4/D Disc Date: 01/30/2012 LevellClass:
How H02 Orig Date: 01/30/2012 Discovered:
WR/PIMS Equip Tag: 2CB025-I/A - IAV - AOV HTR 21-24 BYPASS AR: ISOL VLV Action Request Details
Subject:
2CB025 AIR LEAK (b)(6)
Description Originator: Supv Contacted Condition
Description:
- 1) Describe the leak:
Air leak to 2CB025 valve likely a result of severe water hammer from plant trip If answer to Question 2 is a Pressure Boundary - STOP and IMMEDIATELY CONTACT the Shift Manager.
- 2) Component point of leakage:
Pressure Boundary: Pipe Wall/Fitting/Weld:( ) Valve/Pump Body:(x) Vessel Wall:( )
Mechanical Joint: Bolted Connection:( ) Threaded Connection:( ) Valve packing:( ) Pump Seal:( ) Fitting:(
Other:
- 3) Does Insulation or other interference have to be removed to positively idenitfy all sources of leakage? Describe what has to be removed:
Nothing ( x ) or
- 4) What is the leaking fluid (boric acid, water, oil, steam, air or chemical)?: Air
- 5) Leak Significance
-= T*mmn wh th" Freedom Of Vft'd
B= Impacting personnel safety ( )
C = Degraded; requiring repairs ( x D = Housekeeping impact E= Environmental impact
- 6) Classify leakage (best guess):
1 = Inactive 2 = <1 drop/ 5 min, weeping 3 = steady drip / small stream 4 = < 0.1 gpm 5 = > 0.1 gpm Leak Rate Classification = -5 Estimated accumulated fluid = <1 gallon ( ) >1 gallon ( ) >5 gallon N/A
- 7) For a leaking pipe or difficult to locate leak provide a description of the leak location, or identify an upstream reference component, i.e.,
valve, etc.
U2 TB, 426' outside of Chemistry Office If the leak Is not captured by a plant-fluid-collection system, IMMEDIATELY CONTACT the Operations Shift Manager or Shift Supervisor.
- 8) If the leaking liquid or steam is not entering the plant-fluid-collection system, describe where it is going or is gathering.
The concern is the leak may contain tritium or hazardous chemicals and may enter the soil, surface water, or ground water.
N/A Leak is entering the plant fluid collection system ( )Yes ( )No OR If No, fluid is collecting or going to: N/A
- 9) Is the leak impinging any electrical equipment ( )Yes ( x )No If yes, identify the component(s) and initiate a separate IR for evaluation of the equipment.
- 10) Identify any target (sprayed or dripped on) component(s), i.e.,
components that are affected by the leakage (use targets EPN or a detailed component description. Include walls, floors grating, valve stems, etc.)
and describe any visible effects of the leakage on the target component(s)
(e.g., rusting, corrosion, pitting, or stalactites):
N/A Items 11 and 13 apply to Boric Acid Leaks Only:
- 11) Quantify boric acid deposits:
M n-nIr A -m,, sinn/ ) I - t-hinn 1 fancnnnnI
Heavy accumulation( ) Component encased in boric acid(
- 12) Boric Acid deposit color:
White Fresh( ) Brown( ) Tan with evidence of corrosion(
- 13) Was the leakage found on a component that was under going an ASME Section XI pressure test (VT-2)? __ Yes __ No Immediate actions taken:
Consider the following as appropriate:
Is a leak catch container installed?
Actions initiated to mitigate safety concerns?
If a potentially flammable liquid, e.g., Fryquel EHC or oil, impinges on a potentially hot pipe or is absorbed by insulation, then determine if mitigating actions are required to reduce the risk of fire. Fyrquel absorbed by pipe insulation on hot pipes has been shown to cause fires.
Recommended Actions:
NOTIFY the Shift Manager of the condition.
Operations evaluation of leaks should consider:
(1) The potential for a leak to enter the soil, surface water, ground water etc.
(2) If leakage is from a pressure boundary what is the ASME Class (3) If the leaking component is ASME Class 2 or 3 is it a moderate energy leak (max operating pressure < 200psig, and max operating temperature <275 degrees F).
Moderate Energy ( )YES ( )NO Operable Basis:
Reportable Basis:
Functionality Basis:
Assignments Assign #: Q1 Assigned Status: AWAIT/C To:
Aff Fac: Byron Prim Grp: ACAPALL Due Date: 02/04/2012 Assign Type: TRKG Sec Grp: Orig Due Date:
Priority:
Schedule Ref:
Unit Condition:
Subject/Description: 2CB025 AIR LEAK