ML13190A270: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 9, 2013 EA-13-125 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 9, 2013 EA-13-125 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: NextEra Energy Point Beach, LLC Name of Facility: Point Beach Nuclear Plant Docket Nos: 50-266; 50-301 Date and Time: Monday, July 22, 2013 1:00 p.m. - 4:00 p.m. (Central Daylight Time) | ||
Location of Meeting: U.S. Nuclear Regulatory Commission Region III Office Suite 210 2443 Warrenville Road Lisle, IL 60532-4352 Purpose of Meeting: This is a meeting between the U.S. Nuclear Regulatory Commission (NRC) and NextEra Energy Point Beach, LLC, to discuss the significance associated with an apparent violation of 10 CFR Part 50, Appendix B, Criterion V for the failure to have a procedure appropriate to the circumstances to address external flooding as described in the Final Safety Analysis Report. The apparent violation is discussed in Inspection Report 05000266/2013011 and 05000301/2013011 and the preliminary significance appears to be of substantial safety significance (Yellow). | |||
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security. | |||
Meeting Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. | |||
Interested members of the public can participate in this meeting via a toll-free audio teleconference by calling 1-888-567-7133, listen for the prompt to key in the passcode 8785176, an operator will be available to facilitate the call. | |||
Notice of Significant Licensee Meeting NRC Attendees: A. Boland, Acting Regional Administrator, RIII S. Orth, Enforcement/Investigations Officer, RIII M. Rubic, Acting Regional Counsel, RIII S. Reynolds, Director, Division of Reactor Projects, RIII J. Cameron, Chief, Branch 6, Division of Reactor Projects, RIII L. Kozak, Senior Reactor Analyst, RIII D. Betancourt-Roldan, Acting Senior Resident Inspector, Point Beach Others as designated Licensee Attendees: L. Meyer, Site Vice President R. Wright, Plant Manager Others as designated Note: Seating may be limited and will be available on a first-come basis. Attendance at this meeting hosted by NRC personnel, other than those listed above, should be made known to John Rutkowski at 630-829-9730 by close of business July 15, 2013. This step will ensure that sufficient copies of meeting materials are available. | |||
Notice of Significant | |||
NRC Attendees: A. Boland, Acting Regional Administrator, RIII | |||
Licensee Attendees: L. Meyer, Site Vice President R. Wright, Plant Manager Others as designated | |||
Note: Seating may be limited and will be available on a first-come basis. Attendance at this meeting hosted by NRC personnel, other than those listed above, should be made known to John Rutkowski at 630-829-9730 by close of business July 15, 2013. This step will ensure that sufficient copies of meeting materials are available. | |||
NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. | NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. | ||
Because meetings are sometimes canceled or rescheduled, as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact. Meeting Contacts: John Rutkowski (630) 829-9730 John.Rutkowski@nrc.gov | Because meetings are sometimes canceled or rescheduled, as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact. | ||
Meeting Contacts: John Rutkowski (630) 829-9730 John.Rutkowski@nrc.gov Jakob Steffes (630) 829-9563 Jakob.Steffes@nrc.gov Approved by: _ /RA/ __________________ | |||
Jamnes Cameron, Chief Branch 6 Division of Reactor Projects | |||
Notice of Significant Licensee Meeting DISTRIBUTION: | |||
Vivian Campbell, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrPMPointBeach Resource RidsNrrDorlLpl3-1 Resource Steven Reynolds, Director, Division of Reactor Projects, RIII Gary Shear, Director, Division of Reactor Safety, RIII Kenneth OBrien, Deputy Director, Division of Reactor Projects, RIII Patrick Louden, Deputy Director, Division of Reactor Safety, RIII Steven Orth, Enforcement/Investigations Officer, RIII Patricia Lougheed, Senior Enforcement Specialist, RIII Jamnes Cameron, DRP Branch Chief Diana Betancourt-Roldan, Acting SRI, Point Beach Nuclear Plant Nick Hilton, Enforcement Branch Chief, Office of Enforcement Lauren Casey, Enforcement Specialist, Office of Enforcement Mandy Halter, Enforcement Coordinator, Performance Assessment Branch, NRR DRS Branch Chiefs: | |||
Robert Daley David Hills AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, Public Affairs, RIII Prema Chandrathil, Public Affairs, RIII Tammy Tomczak, ORA Patricia Buckley, ORA Marjorie Zerth, DRP OEMAIL Resource OEWEB Resource PMNS | |||
Notice of Significant Licensee Meeting NRC Attendees: A. Boland, Acting Regional Administrator, RIII S. Orth, Enforcement/Investigations Officer, RIII M. Rubic, Acting Regional Counsel, RIII S. Reynolds, Director, Division of Reactor Projects, RIII J. Cameron, Chief, Branch 6, Division of Reactor Projects, RIII L. Kozak, Senior Reactor Analyst, RIII D. Betancourt-Roldan, Acting Senior Resident Inspector, Point Beach Others as designated Licensee Attendees: L. Meyer, Site Vice President R. Wright, Plant Manager Others as designated Note: Seating may be limited and will be available on a first-come basis. Attendance at this meeting hosted by NRC personnel, other than those listed above, should be made known to John Rutkowski at 630-829-9730 by close of business July 15, 2013. This step will ensure that sufficient copies of meeting materials are available. | |||
Notice of Significant | |||
Licensee Attendees: L. Meyer, Site Vice President R. Wright, Plant Manager Others as designated | |||
Note: Seating may be limited and will be available on a first-come basis. Attendance at this meeting hosted by NRC personnel, other than those listed above, should be made known to John Rutkowski at 630-829-9730 by close of business July 15, 2013. This step will ensure that sufficient copies of meeting materials are available. | |||
NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. | NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. | ||
Because meetings are sometimes canceled or rescheduled, as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact. | Because meetings are sometimes canceled or rescheduled, as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact. | ||
Meeting Contacts: John Rutkowski (630) 829-9730 John.Rutkowski@nrc.gov | Meeting Contacts: John Rutkowski (630) 829-9730 John.Rutkowski@nrc.gov Jakob Steffes (630) 829-9563 Jakob.Steffes@nrc.gov Approved by: _ /RA/ __________________ | ||
Jamnes Cameron, Chief Branch 6 Division of Reactor Projects DOCUMENT NAME: G:\DRP\1-Secy\Point Beach-Notice of Public Meeting - Regulatory Conference 7.22.13.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME JSteffes:mz JCameron by JCameron DATE 07/09/13 07/09/13 OFFICIAL RECORD COPY}} | |||
Jakob Steffes | |||
/RA/ | |||
DATE |
Revision as of 16:14, 4 November 2019
ML13190A270 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 07/09/2013 |
From: | Jamnes Cameron NRC/RGN-III/DRP/B6 |
To: | |
References | |
EA-13-125 | |
Download: ML13190A270 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 9, 2013 EA-13-125 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: NextEra Energy Point Beach, LLC Name of Facility: Point Beach Nuclear Plant Docket Nos: 50-266; 50-301 Date and Time: Monday, July 22, 2013 1:00 p.m. - 4:00 p.m. (Central Daylight Time)
Location of Meeting: U.S. Nuclear Regulatory Commission Region III Office Suite 210 2443 Warrenville Road Lisle, IL 60532-4352 Purpose of Meeting: This is a meeting between the U.S. Nuclear Regulatory Commission (NRC) and NextEra Energy Point Beach, LLC, to discuss the significance associated with an apparent violation of 10 CFR Part 50, Appendix B, Criterion V for the failure to have a procedure appropriate to the circumstances to address external flooding as described in the Final Safety Analysis Report. The apparent violation is discussed in Inspection Report 05000266/2013011 and 05000301/2013011 and the preliminary significance appears to be of substantial safety significance (Yellow).
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.
Meeting Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Interested members of the public can participate in this meeting via a toll-free audio teleconference by calling 1-888-567-7133, listen for the prompt to key in the passcode 8785176, an operator will be available to facilitate the call.
Notice of Significant Licensee Meeting NRC Attendees: A. Boland, Acting Regional Administrator, RIII S. Orth, Enforcement/Investigations Officer, RIII M. Rubic, Acting Regional Counsel, RIII S. Reynolds, Director, Division of Reactor Projects, RIII J. Cameron, Chief, Branch 6, Division of Reactor Projects, RIII L. Kozak, Senior Reactor Analyst, RIII D. Betancourt-Roldan, Acting Senior Resident Inspector, Point Beach Others as designated Licensee Attendees: L. Meyer, Site Vice President R. Wright, Plant Manager Others as designated Note: Seating may be limited and will be available on a first-come basis. Attendance at this meeting hosted by NRC personnel, other than those listed above, should be made known to John Rutkowski at 630-829-9730 by close of business July 15, 2013. This step will ensure that sufficient copies of meeting materials are available.
NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting.
Because meetings are sometimes canceled or rescheduled, as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.
Meeting Contacts: John Rutkowski (630) 829-9730 John.Rutkowski@nrc.gov Jakob Steffes (630) 829-9563 Jakob.Steffes@nrc.gov Approved by: _ /RA/ __________________
Jamnes Cameron, Chief Branch 6 Division of Reactor Projects
Notice of Significant Licensee Meeting DISTRIBUTION:
Vivian Campbell, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrPMPointBeach Resource RidsNrrDorlLpl3-1 Resource Steven Reynolds, Director, Division of Reactor Projects, RIII Gary Shear, Director, Division of Reactor Safety, RIII Kenneth OBrien, Deputy Director, Division of Reactor Projects, RIII Patrick Louden, Deputy Director, Division of Reactor Safety, RIII Steven Orth, Enforcement/Investigations Officer, RIII Patricia Lougheed, Senior Enforcement Specialist, RIII Jamnes Cameron, DRP Branch Chief Diana Betancourt-Roldan, Acting SRI, Point Beach Nuclear Plant Nick Hilton, Enforcement Branch Chief, Office of Enforcement Lauren Casey, Enforcement Specialist, Office of Enforcement Mandy Halter, Enforcement Coordinator, Performance Assessment Branch, NRR DRS Branch Chiefs:
Robert Daley David Hills AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, Public Affairs, RIII Prema Chandrathil, Public Affairs, RIII Tammy Tomczak, ORA Patricia Buckley, ORA Marjorie Zerth, DRP OEMAIL Resource OEWEB Resource PMNS
Notice of Significant Licensee Meeting NRC Attendees: A. Boland, Acting Regional Administrator, RIII S. Orth, Enforcement/Investigations Officer, RIII M. Rubic, Acting Regional Counsel, RIII S. Reynolds, Director, Division of Reactor Projects, RIII J. Cameron, Chief, Branch 6, Division of Reactor Projects, RIII L. Kozak, Senior Reactor Analyst, RIII D. Betancourt-Roldan, Acting Senior Resident Inspector, Point Beach Others as designated Licensee Attendees: L. Meyer, Site Vice President R. Wright, Plant Manager Others as designated Note: Seating may be limited and will be available on a first-come basis. Attendance at this meeting hosted by NRC personnel, other than those listed above, should be made known to John Rutkowski at 630-829-9730 by close of business July 15, 2013. This step will ensure that sufficient copies of meeting materials are available.
NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting.
Because meetings are sometimes canceled or rescheduled, as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.
Meeting Contacts: John Rutkowski (630) 829-9730 John.Rutkowski@nrc.gov Jakob Steffes (630) 829-9563 Jakob.Steffes@nrc.gov Approved by: _ /RA/ __________________
Jamnes Cameron, Chief Branch 6 Division of Reactor Projects DOCUMENT NAME: G:\DRP\1-Secy\Point Beach-Notice of Public Meeting - Regulatory Conference 7.22.13.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME JSteffes:mz JCameron by JCameron DATE 07/09/13 07/09/13 OFFICIAL RECORD COPY