{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                              NUCLEAR REGULATORY COMMISSION
  September 10, 2013  
                                              REGION II
Mr. Tom E. Tynan Vice President  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                    ATLANTA, GEORGIA 30303-1257
                                      September 10, 2013
Mr. Tom E. Tynan
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT:        VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED
                OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301
Dear Mr. Tynan:
In a telephone conversation on August 28, 2013, between Mr. John Acree, Nuclear Operations
Training Supervisor and Ms. Amanda Toth, Operations Engineer, arrangements were made for
the administration of licensing examinations at Vogtle. The operating test is scheduled to be
administered during the weeks of May 12, 2014 and May 19, 2014. The written examination is
scheduled to be administered the week of May 26, 2014. The on-site preparatory week is
scheduled for the week of April 14, 2014.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by February 24, 2014. Ms. Amanda Toth provided a written examination outline to your
staff in August 2013. The operating test and the supporting reference materials identified in
Attachment 3 to ES-201 will be due by March 24, 2014. The written examination will be due by
March 31, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.


Southern Nuclear Operating Company, Inc.  
T. Tynan                                      2
Vogtle Electric Generating Plant
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).


7821 River Road
T. Tynan                                      3
Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail:
Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov)
                                              Sincerely,
                                              /RA: Malcolm T. Widmann for/
                                              Mark E. Franke, Chief
                                                Operations Branch 2
                                                Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
cc: Distribution via Listserv


Waynesboro, GA 30830
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301


_ML13254A211________________ x     SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
Dear Mr. Tynan:
OFFICE             RII:DRS       RII:DRS
In a telephone conversation on August 28, 2013, between Mr. John Acree, Nuclear Operations
SIGNATURE         RA             VIA EMAIL
Training Supervisor and Ms. Amanda Toth, Oper
NAME               TOTH           BACON
ations Engineer, arrangements were made for the administration of licensing examinations at Vogtle.  The operating test is scheduled to be
DATE                   9/ /2013       9/ /2013     9/ /2013       9/ /2013     9/ /2013     9/ /2013     9/ /2013
administered during the weeks of May 12, 2014 and May 19, 2014.  The written examination is scheduled to be administered the week of May 26, 2014.  The on-site preparatory week is scheduled for the week of April 14, 2014.
E-MAIL COPY?         YES   NO     YES     NO   YES   NO     YES     NO     YES   NO     YES   NO     YES   NO
 
       
Letter to Tom E. Tynan from Mark E. Franke dated September 10, 2013.
As agreed during the telephone conversation, your staff will prepare both the operating test and
SUBJECT:       VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
              OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301
"Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss
DISTRIBUTION:
with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas)
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 24, 2014.  Ms. Amanda Toth prov
OE Mail (email address if applicable)
ided a written examination outline to your staff in August 2013.  The operating test and the supporting reference materials identified in
RIDSNRRDIRS
Attachment 3 to ES-201 will be due by March 24, 2014. The written examination will be due by March 31, 2014.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
PUBLIC
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
 
outline, examination, and test before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use. 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. 
T. Tynan 2
  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
 
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date.  If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the
Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information.  Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
 
T. Tynan 3
  Thank you for your cooperation in this matter.  Mr. Acree has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov)  Sincerely,
/RA: Malcolm T. Widmann for/
Mark E. Franke, Chief      Operations Branch 2
      Division of Reactor Safety
 
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
cc: Distribution via Listserv 
 
_ML13254A211________________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS     SIGNATURE RA VIA EMAIL     NAME TOTH BACON     DATE 9/   /2013 9/   /2013 9/   /2013 9/   /2013 9/   /2013 9/   /2013 9/   /2013 E-MAIL COPY?     YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO    
  Letter to Tom E. Tynan from Mark E. Franke dated September 10, 2013.  
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301  
  DISTRIBUTION
: C. Evans, RII EICS (Part 72 Only)  
L. Douglas, RII EICS (Linda Douglas) OE Mail (email address if applicable) RIDSNRRDIRS  
 
PUBLIC  
RidsNrrPMVogtle Resource
RidsNrrPMVogtle Resource
}}
}}

Latest revision as of 14:40, 4 November 2019

Notification of Licensed Operator Initial Examination 05000424-14-301 and 05000425-14-301
ML13254A211
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/10/2013
From: Mark Franke
Division of Reactor Safety II
To: Tynan T
Southern Nuclear Operating Co
References
ER-14-301
Download: ML13254A211 (5)


See also: IR 05000424/2014301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

September 10, 2013

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301

Dear Mr. Tynan:

In a telephone conversation on August 28, 2013, between Mr. John Acree, Nuclear Operations

Training Supervisor and Ms. Amanda Toth, Operations Engineer, arrangements were made for

the administration of licensing examinations at Vogtle. The operating test is scheduled to be

administered during the weeks of May 12, 2014 and May 19, 2014. The written examination is

scheduled to be administered the week of May 26, 2014. The on-site preparatory week is

scheduled for the week of April 14, 2014.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by February 24, 2014. Ms. Amanda Toth provided a written examination outline to your

staff in August 2013. The operating test and the supporting reference materials identified in

Attachment 3 to ES-201 will be due by March 24, 2014. The written examination will be due by

March 31, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outline, examination, and test before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

T. Tynan 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

T. Tynan 3

Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail:

Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov)

Sincerely,

/RA: Malcolm T. Widmann for/

Mark E. Franke, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

cc: Distribution via Listserv

_ML13254A211________________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RA VIA EMAIL

NAME TOTH BACON

DATE 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Letter to Tom E. Tynan from Mark E. Franke dated September 10, 2013.

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301