{{#Wiki_filter:December 10, 2013 by Electronic Information Exchange Administrative Judge Alex S. Karlin Administrative Judge Nicholas G. Trikouros Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel  
{{#Wiki_filter:December 10, 2013 by Electronic Information Exchange Administrative Judge Alex S. Karlin Administrative Judge Nicholas G. Trikouros Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
 
Docket Nos. 50-275-LR and 50-323-LR RE: Status Report
U.S. Nuclear Regulatory Commission Two White Flint North  
 
11545 Rockville Pike Mail Stop: T-3F23  
 
Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
Docket Nos. 50-275-LR and 50-323-LR RE: Status Report  


==Dear Administrative Judges:==
==Dear Administrative Judges:==
As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to 3D seismic studies for Diablo Canyon Power
Plant (DCPP) and the coastal zone consistency certification associated with NRC license renewal for DCPP. 
The schedule for the seismic work has changed since PG&E's last submittal on November 12, 2013. The Ocean Bottom Seismometer equipment repair and adjustment has been completed. PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available. PG&E wishes to assure the Licensing Board that it is making every effort to minimize the extent of the delay in the NRC li cense renewal process.
Executed in accord with 10 CFR 2.304(d),
    /s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company
77 Beale St., B30A
San Francisco, CA  94105
(415) 973-9809 jklm@pge.com
    /s/ signed electronically by David A. Repka Winston & Strawn LLP
1700 K Street, NW
Washington, DC  20006
(202) 282-5726
drepka@winston.com


cc:  Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)  
As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to 3D seismic studies for Diablo Canyon Power Plant (DCPP) and the coastal zone consistency certification associated with NRC license renewal for DCPP.
The schedule for the seismic work has changed since PG&Es last submittal on November 12, 2013. The Ocean Bottom Seismometer equipment repair and adjustment has been completed.
PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available.
PG&E wishes to assure the Licensing Board that it is making every effort to minimize the extent of the delay in the NRC license renewal process.
Executed in accord with 10 CFR 2.304(d),
                                                /s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com


Pacific Gas and Electric Company Updated Best Estimate Sc hedule for Seismic Studies Description of Activity Prior Estimate New Estimate Shoreline Fault Submit Final Report to the NRC  January 2011(a) January 2011(a) NRC Review Complete  October 12, 2012(a) October 12, 2012(a) Ocean Bottom Seismometer Study Permit Application Submitted to California State Lands Commission (CSLC) May 6, 2011 (a) May 6, 2011 (a) Permits Issued  May 2013(a) May 2013 (a) OBS System Installed August 2013(a) August 2013(a) OBS Equipment Repair and Adjustment November 2013 November 2013 (a) 2D/3D Low Energy Marine Studies Permits Issued N/A N/A Surveys Complete October 2012 (a) October 2012 (a) Data Processing and Interpretation Complete October 2013 (a) October 2013 (a) 2D Onshore High Energy Studies Permit Pre-Application Meeting  May 4, 2011 (a) May 4, 2011 (a) Use Permits Issued  Not Required  Not Required  Surveys Complete  December 2011 (a) and December 2012 (a) December 2011 (a) and December 2012 (a) Data Processing and Interpretation Complete June 2014 June 2014 3D High Energy Marine Studies Permit Application Submitted to CSLC  April 29, 2011 (a)  April 29, 2011 (a)  CSLC Environmental Impact Report Scoping Meeting July 21, 2011 (a) July 21, 2011 (a) Permits Denied November 14, 2012 (a) November 14, 2012 (a) Issue Final Seismic Report to the NRC and ASLB June 2014 June 2014 CZMA or Coastal Consistency File Coastal Development Permit  TBD  TBD  Coastal Consistency Issued TBD TBD  Note: (a) - Actual Date Completed
                                            /s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)


SF:349580.1}}
Pacific Gas and Electric Company Updated Best Estimate Schedule for Seismic Studies Description of Activity                        Prior Estimate        New Estimate Shoreline Fault Submit Final Report to the NRC                                January 2011(a)      January 2011(a)
NRC Review Complete                                          October 12, 2012(a)  October 12, 2012(a)
Ocean Bottom Seismometer Study Permit Application Submitted to California State Lands        May 6, 2011(a)      May 6, 2011(a)
Commission (CSLC)
Permits Issued                                                May 2013(a)          May 2013(a)
OBS System Installed                                          August 2013(a)      August 2013(a)
OBS Equipment Repair and Adjustment                          November 2013        November 2013(a) 2D/3D Low Energy Marine Studies Permits Issued                                                N/A                  N/A Surveys Complete                                              October 2012(a)      October 2012(a)
Data Processing and Interpretation Complete                  October 2013(a)      October 2013(a) 2D Onshore High Energy Studies Permit Pre-Application Meeting                                May 4, 2011(a)      May 4, 2011(a)
Use Permits Issued                                            Not Required        Not Required Surveys Complete                                              December 2011(a) and December 2011(a) and December 2012(a)    December 2012(a)
Data Processing and Interpretation Complete                  June 2014            June 2014 3D High Energy Marine Studies Permit Application Submitted to CSLC                          April 29, 2011(a)    April 29, 2011(a)
CSLC Environmental Impact Report Scoping Meeting              July 21, 2011(a)    July 21, 2011(a)
Permits Denied                                                November 14, 2012(a) November 14, 2012(a)
Issue Final Seismic Report to the NRC and ASLB                June 2014            June 2014 CZMA or Coastal Consistency File Coastal Development Permit                              TBD                  TBD Coastal Consistency Issued                                    TBD                  TBD (a)
Note:      - Actual Date Completed SF:349580.1}}

Latest revision as of 10:32, 4 November 2019

December 2013 Seismic Study Update Letter
ML13344B204
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/10/2013
From: Post J, Repka D
Pacific Gas & Electric Co, Winston & Strawn, LLP
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BS01, RAS 25390
Download: ML13344B204 (3)


Text

December 10, 2013 by Electronic Information Exchange Administrative Judge Alex S. Karlin Administrative Judge Nicholas G. Trikouros Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE: Status Report

Dear Administrative Judges:

As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to 3D seismic studies for Diablo Canyon Power Plant (DCPP) and the coastal zone consistency certification associated with NRC license renewal for DCPP.

The schedule for the seismic work has changed since PG&Es last submittal on November 12, 2013. The Ocean Bottom Seismometer equipment repair and adjustment has been completed.

PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available.

PG&E wishes to assure the Licensing Board that it is making every effort to minimize the extent of the delay in the NRC license renewal process.

Executed in accord with 10 CFR 2.304(d),

/s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com

/s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)

Pacific Gas and Electric Company Updated Best Estimate Schedule for Seismic Studies Description of Activity Prior Estimate New Estimate Shoreline Fault Submit Final Report to the NRC January 2011(a) January 2011(a)

NRC Review Complete October 12, 2012(a) October 12, 2012(a)

Ocean Bottom Seismometer Study Permit Application Submitted to California State Lands May 6, 2011(a) May 6, 2011(a)

Commission (CSLC)

Permits Issued May 2013(a) May 2013(a)

OBS System Installed August 2013(a) August 2013(a)

OBS Equipment Repair and Adjustment November 2013 November 2013(a) 2D/3D Low Energy Marine Studies Permits Issued N/A N/A Surveys Complete October 2012(a) October 2012(a)

Data Processing and Interpretation Complete October 2013(a) October 2013(a) 2D Onshore High Energy Studies Permit Pre-Application Meeting May 4, 2011(a) May 4, 2011(a)

Use Permits Issued Not Required Not Required Surveys Complete December 2011(a) and December 2011(a) and December 2012(a) December 2012(a)

Data Processing and Interpretation Complete June 2014 June 2014 3D High Energy Marine Studies Permit Application Submitted to CSLC April 29, 2011(a) April 29, 2011(a)

CSLC Environmental Impact Report Scoping Meeting July 21, 2011(a) July 21, 2011(a)

Permits Denied November 14, 2012(a) November 14, 2012(a)

Issue Final Seismic Report to the NRC and ASLB June 2014 June 2014 CZMA or Coastal Consistency File Coastal Development Permit TBD TBD Coastal Consistency Issued TBD TBD (a)

Note: - Actual Date Completed SF:349580.1