{{#Wiki_filter:N%NIAGARA Li MOHAWK NUCLEAR ENGINEERING DISPOSITION COVER SHEET ATTAI.'HMENT L Page 1 (Next~a.Total~Last~A NINE MILE POINT NUCLEAR STATION TiUe EDG FUEL OIL TANK REPLACEMENT Unit (1, 2 or 0=Both): Caiouhtion No.S20.6-YD-TANK01 Originator CARMEN R.AGOSTA A Discipline:
{{#Wiki_filter:~
STRUCTURAL Rev Disp 00 00B Date 7/8/97 (Sub)System(s)82 Design Change No.NA Index No.S20.6 Approver Date Superceded Document(s):
ATTAI.'HMENT L
NONE NMPC Acceptance/Date:
        % NIAGARA                                                                                Page 1 (Next~a.
/I/A DescripUon of Change TANK-82<3 WAS EVALUATED USING THE GENERIC IMPLEMENTATION PROCEDURE (GIP)SCREENING EVALUATION WORK SHEETS (SEWS).THE EVALUATION REFERENCED THIS CALCULATION.
N Li      MOHAWK DISPOSITION COVER SHEET                                                    Total NUCLEAR ENGINEERING                                                                            Last ~A NINE MILE POINT NUCLEAR STATION                 Unit (1, 2 or 0=Both):                       Discipline: STRUCTURAL TiUe                                                          Caiouhtion No.                         Rev        Disp EDG FUEL OIL TANKREPLACEMENT                                  S20.6-YD-TANK01                         00          00B Originator CARMEN R. AGOSTA         A                     Date 7/8/97 (Sub) System(s)                                     Index No.
82                                                  S20.6 Design Change No.                                                Approver                                     Date NA NMPC Acceptance/Date:       /I/A Superceded Document(s):      NONE DescripUon of Change TANK-82<3 WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.
ResoluUon ADD THE 82-43 SEWS TO THIS CALCULATION.
ResoluUon ADD THE 82-43 SEWS TO THIS CALCULATION.
Cross Reference change(s):
Cross Reference change(s):
NONE Confirmation Required (Yes/No): Yes Final Issue Status File Location Operations Acceptance See Page(s): (APP/FIO/VOI): APP (Gale/Hold):Gale Req'd.(Yes/No): Yes Evaluation Number(s)/Revision: NR Copy of Applicability Review Attached (Yes/N/R)?N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION Component ID(s)/EPN(s)/Line Number(s):
NONE Confirmation Required (Yes / No ): Yes     Final Issue Status             File Location         Operations Acceptance See Page(s):                               ( APP / FIO / VOI): APP       (Gale / Hold):Gale   Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR                             Component ID(s) / EPN(s) / Line Number(s):
TANK42M TANK42M 9708070i42 9707$i PDR ADOC(t('5000220 P, s PDR J FORMAT If NET)ES48+0340  
Copy of Applicability Review Attached (Yes / N/R)? N/R         TANK42M TANK42M Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION P,
9708070i42 PDR 9707$
ADOC(t('5000220 s
i PDR                   J FORMAT If NET) ES48+0340


N T NIAGARA 4 MOHAWK NUCLEAR ENGINEERING CALCULATION CONTINUATION SHEET Page Z.(Next~Nine Mile Point Nuclear Station OriIIlnator te f7 ef.Unit: 1 Checker/Date
T NIAGARA N 4 MOHAWK NUCLEAR ENGINEERING Nine Mile Point Nuclear Station CALCULATIONCONTINUATIONSHEET Unit: 1 Page (Next Disposition: 00B
@4os Caiculation No.S20.6-YD-TANK01 Disposition:
                                                                                                              ~Z.
00B Reviston 00 PURPOSE: Document the Screening Evaluation Work Sheets (SEWS)for the DG FUEL OIL STORAGE TANK 4103, EQUIPMENT NUMBER 82-43.This SEWS has been prepared as part of the commitment to use the SQUG (GIP)methodology to document the seismic adequacy of SSEL components.
OriIIlnator te                  Checker/Date                         Caiculation No.                       Reviston f7                          @4            os        S20.6-YD-TANK01                       00 ef.
~CONCLUSION:
PURPOSE:       Document the Screening Evaluation Work Sheets (SEWS) for the DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.
Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+seismic+variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.ATTACHMENTS A.SEWS for Equipment ID Number 82-43.FORMAT 4 NEP-DES-08, Rev.01 (F02)  
This SEWS has been prepared as part of the commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components.         ~
CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis       load combination of DL+ seismic+ variable tank fill. Therefore, the DG Fuel Oil Tank is seismically adequate.
ATTACHMENTS A. SEWS for Equipment ID Number 82-43.
FORMAT 4 NEP-DES-08, Rev. 01 (F02)


ATTACHMENT ZEZZHS SC ENING EVALUATION NORK SHE (SEMS)Revision 2, Corrected, 6/28/91 Status Y N U Sheet 1 of 2 Equip.ID No.~~Equipment Description Location: Bldg.~<~floor El.2 4/Room, Row/Col c')Nanufacturer, Nodel, Etc.(optional)
ATTACHMENT ZEZZHS                             Revision 2, Corrected, 6/28/91 Status       Y N U SC  ENING EVALUATION NORK SHE    (SEMS)              Sheet 1 of 2 Equip.~ ID No.~                             Equip. Class  21 - Tanks and Heat Exchan ers Equipment Description           OA  C'c      5/c          AC              Fc Location: Bldg.       ~<~       floor El. 2 4 /     Room, Row/Col       c'
S CA AC TY VS DEHAND~Buckling capacity of shell of large.flat-bottom, vertical tank is,equal to or greater than demand:~g~n IS/go@.i P.o~~ac.4 gUAyaH Equip.Class 21-Tanks and Heat Exchan ers OA C'c 5/c AC Fc ANCHO B AND B Capacity of anchor bolts and their embedments is equal to or greater than demand:/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~4<<OE'SIINC>l~Ca<.C,.S 2u.d-YO-78'~>i g N U N/A.CONNEC ION BETMEEN ANCHO 80 TS AND E Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand: Y N U/A F IBI OF AC Attached piping has adequate flexibility to accaaaodate motion of large, flat-bottom, vertical tank: Y N U(S TANK FOUNDA 0 Ring-type foundation is not used to support large, flat-bottom, vertical tank: Y N U~/IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1  
) Nanufacturer, Nodel, Etc. (optional)
S         CA AC TY VS DEHAND
  ~
Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:
      ~g ~n     IS           i
                      /go@. P.o~~ac. 4 gUAyaH ANCHO     B     AND     B Capacity of anchor bolts and their embedments is equal to or greater than demand:
    /Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~               4<<           g  N U  N/A.
OE'SIINC> l~ Ca<.C,. S 2u.d - YO -78'~>i CONNEC ION BETMEEN ANCHO         80 TS AND   E Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand:                 Y   N U   /A F     IBI     OF     AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank:                           Y   N U(S TANK FOUNDA     0 Ring-type foundation is not used to support large, flat-bottom, vertical tank:                                             Y N U~/
IS   E UIPNENT   SEISNICALLY ADE OAT T 6.21-1


ATTACHMENT CAlC NO REVISION PAGE NO Revision 2, Corrected, 6/28/g1 SCREEHIN6 EVANATIOH WORK SHEET (SEMS)Sheet 2 pf 2~~~Equip.ID No.8 Z-43 Equipment Description COW EHTS Equip.Class 21-Tanks and Heat Exchan ers fVrIrI Pc cwLGuL~7.row S~4'4-Y~-TarIr'w o/A'ev.o Aced//a+~76'G p~4/oar~a: 7pnlr: a p~sic~ao To:<g>~p-Cp<aaal~.P.V-p,db)F p'/+/r'~//J~~gr~~~~7-~~g~~g~g7'roars 222/O/'t OMBrtr%7rMM]
ATTACHMENT CAlC NO REVISION Revision 2, Corrected, 6/28/g1 PAGE NO                      SCREEHIN6 EVANATIOH WORK SHEET (SEMS)     Sheet 2 pf   2 Equip.~ ID No.~    8 Z -43           Equip. Class   21 - Tanks and Heat Exchan ers
7"brf rtrIAL g 5CIsmrc.L,p&oS C p~<>>o)~pQ SL,C L,O4 gZ gag 8C.C.Ou~C.Cdc>ac a COW os Evaluated by: Data:/08/pJ to 6.21-2}}
                                ~
Equipment Description COW EHTS fVrIrIPc    cwLGuL~7.row         S ~4'4     Y~ - TarIr'w o/ A'ev.o         Aced/ /a+~
76'G     p~4/ oar~a:
7pnlr: a p~sic~ao To: <g > ~p-                         Cp<aaal~.
P.V - p,db)F
                                                                            / O/'t  OMBrtr%7rMM]
p'/+/r'~/     /J ~~gr~~~~ 7-~         ~g~~     g~g7'roars 222 7"brf rtrIAL g 5CIsmrc. L,p&oS       C p~<>>o)
                                                    ~C.Cdc >ac a      COW os
            ~pQ SL,C       L,O4 gZ gag   8C.C.Ou Evaluated by:                                                       Data:   /08/pJ to 6.21-2}}

Revision as of 06:30, 30 October 2019

Rev 0 to S20.6-YD-TANK01, EDG Fuel Oil Tank Replacement.
ML17059B666
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/08/1997
From: Agosta C, Alvi M
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B657 List:
References
S20.6-YD-TANK01, S20.6-YD-TANK01-R00, S20.6-YD-TANK1, S20.6-YD-TANK1-R, NUDOCS 9708070142
Download: ML17059B666 (8)


Text

~

ATTAI.'HMENT L

% NIAGARA Page 1 (Next~a.

N Li MOHAWK DISPOSITION COVER SHEET Total NUCLEAR ENGINEERING Last ~A NINE MILE POINT NUCLEAR STATION Unit (1, 2 or 0=Both): Discipline: STRUCTURAL TiUe Caiouhtion No. Rev Disp EDG FUEL OIL TANKREPLACEMENT S20.6-YD-TANK01 00 00B Originator CARMEN R. AGOSTA A Date 7/8/97 (Sub) System(s) Index No.

82 S20.6 Design Change No. Approver Date NA NMPC Acceptance/Date: /I/A Superceded Document(s): NONE DescripUon of Change TANK-82<3 WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.

ResoluUon ADD THE 82-43 SEWS TO THIS CALCULATION.

Cross Reference change(s):

NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s): ( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Component ID(s) / EPN(s) / Line Number(s):

Copy of Applicability Review Attached (Yes / N/R)? N/R TANK42M TANK42M Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION P,

9708070i42 PDR 9707$

ADOC(t('5000220 s

i PDR J FORMAT If NET) ES48+0340

T NIAGARA N 4 MOHAWK NUCLEAR ENGINEERING Nine Mile Point Nuclear Station CALCULATIONCONTINUATIONSHEET Unit: 1 Page (Next Disposition: 00B

~Z.

OriIIlnator te Checker/Date Caiculation No. Reviston f7 @4 os S20.6-YD-TANK01 00 ef.

PURPOSE: Document the Screening Evaluation Work Sheets (SEWS) for the DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.

This SEWS has been prepared as part of the commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components. ~

CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill. Therefore, the DG Fuel Oil Tank is seismically adequate.

ATTACHMENTS A. SEWS for Equipment ID Number 82-43.

FORMAT 4 NEP-DES-08, Rev. 01 (F02)

ATTACHMENT ZEZZHS Revision 2, Corrected, 6/28/91 Status Y N U SC ENING EVALUATION NORK SHE (SEMS) Sheet 1 of 2 Equip.~ ID No.~ Equip. Class 21 - Tanks and Heat Exchan ers Equipment Description OA C'c 5/c AC Fc Location: Bldg. ~<~ floor El. 2 4 / Room, Row/Col c'

) Nanufacturer, Nodel, Etc. (optional)

S CA AC TY VS DEHAND

~

Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:

~g ~n IS i

/go@. P.o~~ac. 4 gUAyaH ANCHO B AND B Capacity of anchor bolts and their embedments is equal to or greater than demand:

/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<< g N U N/A.

OE'SIINC> l~ Ca<.C,. S 2u.d - YO -78'~>i CONNEC ION BETMEEN ANCHO 80 TS AND E Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand: Y N U /A F IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank: Y N U(S TANK FOUNDA 0 Ring-type foundation is not used to support large, flat-bottom, vertical tank: Y N U~/

IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1

ATTACHMENT CAlC NO REVISION Revision 2, Corrected, 6/28/g1 PAGE NO SCREEHIN6 EVANATIOH WORK SHEET (SEMS) Sheet 2 pf 2 Equip.~ ID No.~ 8 Z -43 Equip. Class 21 - Tanks and Heat Exchan ers

~

Equipment Description COW EHTS fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/ A'ev.o Aced/ /a+~

76'G p~4/ oar~a:

7pnlr: a p~sic~ao To: <g > ~p- Cp<aaal~.

P.V - p,db)F

/ O/'t OMBrtr%7rMM]

p'/+/r'~/ /J ~~gr~~~~ 7-~ ~g~~ g~g7'roars 222 7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o)

~C.Cdc >ac a COW os

~pQ SL,C L,O4 gZ gag 8C.C.Ou Evaluated by: Data: /08/pJ to 6.21-2