Rev 0 to S20.6-YD-TANK01, EDG Fuel Oil Tank Replacement
ML17059B666
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/08/1997
From: Agosta C, Alvi M
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B657 List:
References
S20.6-YD-TANK01, S20.6-YD-TANK01-R00, S20.6-YD-TANK1, S20.6-YD-TANK1-R, NUDOCS 9708070142
Download: ML17059B666 (8)


Text

N % NIAGARA LiMOHAWK NUCLEARENGINEERING DISPOSITION COVER SHEET ATTAI.'HMENT L Page 1 (Next~a.

Total~

Last ~A NINE MILEPOINT NUCLEARSTATION TiUe EDG FUEL OILTANKREPLACEMENT Unit (1, 2 or 0=Both):

Caiouhtion No.

S20.6-YD-TANK01 Originator CARMEN R. AGOSTA A Discipline: STRUCTURAL Rev Disp 00 00B Date 7/8/97 (Sub) System(s) 82 Design Change No.

NA Index No.

S20.6 Approver Date Superceded Document(s):

NONE NMPC Acceptance/Date:

/I/A DescripUon of Change TANK-82<3WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.

ResoluUon ADDTHE 82-43 SEWS TO THIS CALCULATION.

Cross Reference change(s):

NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s):

( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Copy of ApplicabilityReview Attached (Yes / N/R)? N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION Component ID(s) / EPN(s) / Line Number(s):

TANK42M TANK42M 9708070i42 9707$i PDR ADOC(t('5000220 P,

s PDR J

FORMATIfNET)ES48+0340

NT NIAGARA 4 MOHAWK NUCLEAR ENGINEERING CALCULATIONCONTINUATIONSHEET Page Z.

(Next~

Nine Mile Point Nuclear Station OriIIlnator te f7 ef.

Unit:

1 Checker/Date @4 os Caiculation No.

S20.6-YD-TANK01 Disposition:

00B Reviston 00 PURPOSE:

Document the Screening Evaluation Work Sheets (SEWS) forthe DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.

This SEWS has been prepared as part ofthe commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components.

~

CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.

ATTACHMENTS A. SEWS for Equipment ID Number 82-43.

FORMAT4 NEP-DES-08, Rev. 01 (F02)

ATTACHMENTZEZZHS SC ENING EVALUATION NORK SHE (SEMS)

Revision 2, Corrected, 6/28/91 Status Y

N U

Sheet 1 of 2 Equip.

ID No.

~

~

Equipment Description Location: Bldg. ~<~ floor El. 2 4 /

Room, Row/Col c'

)

Nanufacturer, Nodel, Etc. (optional)

S CA AC TY VS DEHAND

~ Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:

~g ~n IS

/go@. iP.o~~ac.

4 gUAyaH Equip. Class 21 - Tanks and Heat Exchan ers OA C'c 5/c AC Fc ANCHO B

AND B

Capacity of anchor bolts and their embedments is equal to or greater than demand:

/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<<

OE'SIINC> l~

Ca<.C,.

S 2u.d - YO -78'~>i g

N U

N/A.

CONNEC ION BETMEEN ANCHO 80 TS AND E

Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand:

Y N

U

/A F

IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank:

Y N U(S TANK FOUNDA 0

Ring-type foundation is not used to support large, flat-bottom, vertical tank:

Y N U~/

IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1

ATTACHMENT CAlC NO REVISION PAGE NO Revision 2, Corrected, 6/28/g1 SCREEHIN6 EVANATIOH WORK SHEET (SEMS)

Sheet 2 pf 2

~

~

~

Equip.

ID No.

8 Z -43 Equipment Description COWEHTS Equip. Class 21 - Tanks and Heat Exchan ers fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/

A'ev.o Aced/ /a+~

76'G p~4/ oar~a:

7pnlr: a p~sic~ao To: <g

> ~p-Cp<aaal~.

P.V

- p,db)F p'/+/r'~/

/J

~~gr~~~~

7-~ ~g~~

g~g7'roars 222

/ O/'t OMBrtr%7rMM]

7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o)

~pQ SL,C L,O4gZ gag 8C.C.Ou

~C.Cdc >ac a COWos Evaluated by:

Data:

/08/pJ to 6.21-2