N % NIAGARA LiMOHAWK NUCLEARENGINEERING DISPOSITION COVER SHEET ATTAI.'HMENT L Page 1 (Next~a.
Total~
Last ~A NINE MILEPOINT NUCLEARSTATION TiUe EDG FUEL OILTANKREPLACEMENT Unit (1, 2 or 0=Both):
Caiouhtion No.
S20.6-YD-TANK01 Originator CARMEN R. AGOSTA A Discipline: STRUCTURAL Rev Disp 00 00B Date 7/8/97 (Sub) System(s) 82 Design Change No.
NA Index No.
S20.6 Approver Date Superceded Document(s):
NONE NMPC Acceptance/Date:
/I/A DescripUon of Change TANK-82<3WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.
ResoluUon ADDTHE 82-43 SEWS TO THIS CALCULATION.
Cross Reference change(s):
NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s):
( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Copy of ApplicabilityReview Attached (Yes / N/R)? N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION Component ID(s) / EPN(s) / Line Number(s):
TANK42M TANK42M 9708070i42 9707$i PDR ADOC(t('5000220 P,
s PDR J
FORMATIfNET)ES48+0340
NT NIAGARA 4 MOHAWK NUCLEAR ENGINEERING CALCULATIONCONTINUATIONSHEET Page Z.
(Next~
Nine Mile Point Nuclear Station OriIIlnator te f7 ef.
Unit:
1 Checker/Date @4 os Caiculation No.
S20.6-YD-TANK01 Disposition:
00B Reviston 00 PURPOSE:
Document the Screening Evaluation Work Sheets (SEWS) forthe DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.
This SEWS has been prepared as part ofthe commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components.
~
CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.
ATTACHMENTS A. SEWS for Equipment ID Number 82-43.
FORMAT4 NEP-DES-08, Rev. 01 (F02)
ATTACHMENTZEZZHS SC ENING EVALUATION NORK SHE (SEMS)
Revision 2, Corrected, 6/28/91 Status Y
N U
Sheet 1 of 2 Equip.
ID No.
~
~
Equipment Description Location: Bldg. ~<~ floor El. 2 4 /
- Room, Row/Col c'
)
Nanufacturer, Nodel, Etc. (optional)
S CA AC TY VS DEHAND
~ Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:
~g ~n IS
/go@. iP.o~~ac.
4 gUAyaH Equip. Class 21 - Tanks and Heat Exchan ers OA C'c 5/c AC Fc ANCHO B
AND B
Capacity of anchor bolts and their embedments is equal to or greater than demand:
/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<<
OE'SIINC> l~
Ca<.C,.
S 2u.d - YO -78'~>i g
N U
N/A.
CONNEC ION BETMEEN ANCHO 80 TS AND E
Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand:
Y N
U
/A F
IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank:
Y N U(S TANK FOUNDA 0
Ring-type foundation is not used to support large, flat-bottom, vertical tank:
Y N U~/
IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1
ATTACHMENT CAlC NO REVISION PAGE NO Revision 2, Corrected, 6/28/g1 SCREEHIN6 EVANATIOH WORK SHEET (SEMS)
Sheet 2 pf 2
~
~
~
Equip.
ID No.
8 Z -43 Equipment Description COWEHTS Equip. Class 21 - Tanks and Heat Exchan ers fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/
A'ev.o Aced/ /a+~
76'G p~4/ oar~a:
7pnlr: a p~sic~ao To: <g
> ~p-Cp<aaal~.
P.V
- p,db)F p'/+/r'~/
/J
~~gr~~~~
7-~ ~g~~
g~g7'roars 222
/ O/'t OMBrtr%7rMM]
7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o)
~pQ SL,C L,O4gZ gag 8C.C.Ou
~C.Cdc >ac a COWos Evaluated by:
Data:
/08/pJ to 6.21-2