NEJ MQHAwK CALCULATIONCOVER SHEET

% NIAGARA NUCLEARENGINEERING ATTACHNENT H Page 1 ( Next Total +~

Last~

NINE MILEPOINT NUCLEARSTATION Unit (1, 2 or 0=Both):

1 Discipline:

STRUCTURAL Title SCREENING EVALUATIONWORK SHEETS FOR BATTERYBOARD

¹11 Calcuhtlon No.

SO.OSEWSBB11 (Sub)system(s)

NA Building Fktor Elev.

Index No.

TB 261 SO.O Originator(s)

CARMEN R. AGOSTA Checker(s) /Approver(s)

N%GZ)

Rev 00 Descri tion INITIALISSUE Design Chan eNo.

B NA Date Chk Date A

- -17 Date Computer Output/Microfilm Filed Separately (Yes / No / NA): NA Superseded Document(s):

NONE Safety Class (SR / NSR / Qxx): SR Document Cross Reference(s) - For additional references see page(s):

NA Ref No Document No.

Doc T

Index Sheet Rev NER-1 S-012 SO.OSQUGANCHOR NER CALC SO.O 00 00 General Reference(s):

3. GENERIC IMPUMENTATIONPROCEDURE (GIP)
4. NMPC Letter to NRC, File Code NMP1L 1044, dated March 11, 1996 Remarks:

NONE Confirmation Required (Yes / No): No Final Issue Status File Location Operations Acceptance See Page(s):

( APP / FIO / VOI): APP

( Gale / Hold ): Gale Required ( Yes / No ): No Evaluation Number(s) / Revision: NR Copy ofApplicability Review Attached (Yes / N/R)'PN/R Component ID(s) / EPN(s) / Line Number(s):

NA Key Words 'NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION FORMAT¹ NEP-DES48-F0140 970807093'k 970731 PDR ADOCK 05000220 P

PDR

l

ElT NlAGARA El U MOHAWK NUCLEAR ENGINEERING CALCULATIONCONTINUATIONSHEET Pege 2

(Next~

Nine Mile Poinf Nuclear Station Unit:

1 Disposition:

Originator ate 7-/-f'7 Checker/Date Caicuhtion No.

Revtaion N 0 77-l7 SO.OSEWSBB1'l 00 PURPOSE:

Document the Screening Evaluation Work Sheets (SEWS) forthe AP/125V DC BATTERYBOARD¹11, equipment number BB11.

This SEWS has been prepared as part ofthe commitment to use the SQUG (Glp) methodology to document the seismic adequacy of SSEL components.

CONCLUSION: The BB11 weld and cinch anchor analysis concluded the anchorage is adequate based on the analysis in Attachment A, the cinch anchor capacities given in Calculation SO.OSQUGANCHOR (Ref. 2) and the bolt tightness check results confirming these type of anchors are tight.

Therefore, the SQUG outlier for BB11 is resolved.

ATTACHMENTS A. SEWS for Equipment ID Number 167A B. The Outlier Seismic Verification Sheet (OSVS) for Equipment ID Number 167A FORMAT¹ NEP-DES48, Rev. 01 (F02)

Niagara Mohawk Power Corporation - Nine Mile Point1 SCREENING EVALUATIONWORK SHEET (SEWS)

CAI.G NO REVISION PAGE NO GIP Rev 2, Corrected, 2/14/92 Status: No Sheet 1 of 8 ID: BB11(Rev. 0 Class: 14. Distribution Panels

==

Description:==

AP/125 V DC BATIERY BOARD ¹11 Building TB Manufacturer, Model, Etc.:

SEISMIC CAPACITYVS DEMAND Floor El.: 261.00 Room, Row/Col: A9,10 Elevation where equipment receives seismic input 2.

Elevation of seismic input below about 40'rom grade (grade = 243.00)

Equipment has fundamental frequency above about 8 Hz (est. frequen

= )

4.

Capaci based on:

1.00 Bounding Spectrum 5.

Demand based on:

1.00

  • Design Basis Ground Response Spectrum 261.00 Yes SRT 8.0000 E-001 LOG 1.8000 E-002 2.0000E-001 LOG HL Capacity

..... Demand 1.0000 E+002 Capaci Demand 1

Demand 2 File F:tGIPtGIPlspectra.des F:>GIP'PROJ003Rspectra.des F:tGIPtPROJ003Rspectra.des Record Label Bounding Spectrum UNIT:iPLANTIBLDG:iBUILDINGIEIQ:iSSEiELEV:iELEVATIONiROWI COL:

LL DIR: DIR NODE: 1 UNIT:IPlANTIBLDG:IBUILDINGIEIQ:ISSEIELEV:IELEVATIONIROWI COL:

LL DIR: DIR NODE: 1 Does capacity exceed demand'

Niagara Mohawk Power Corporation - Nine Mile Point 1 SCREENING EVALUATIONWORK SHEET (SEWS)

GIP Rev 2, Corrected, 2/14/92 Status: No Sheet2of8 ID: BB11(Rev. 0)

Class: 14. Distribution Panels

==

Description:==

AP/125 V DC BATTERYBOARD¹11 Building'B Manufacturer, Model, Etc.:

Floor El.: 261.00 Room, Row/Col: A9,10 CAVEATS - BOUNDING SPECTRUM DP/BS Caveat I - Earthquake Experience Equipment Class.

DP/BS Caveat 2-Contains only Circuit Breakers and Switches.

DP/BS Caveat 3-Doors Secured.

DP/BS Caveat 4 - Adjacent Cabinets Bolted Together DP/BS Caveat 5-General Configuration Similar to NEMAStandards.

DP/BS Caveat 6 - Adequate Anchorage.

DP/BS Caveat 7-Potential Chatter of Essential Rela s Evaluated.

DP/BS Caveat 8-No Other Concerns.

Yes Yes Yes Yes Yes No Yes*

Yes Is the intent of all the caveats met for Bounding Spectrum?

ANCHORAGE

1. The sizes and locations of anchors have been determined
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,

damping, center of rotation).

3. The type of anchorage is covered by the GIP
4. The adequacy ofthe anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, an gaps under the base are less than 1/4
7. Factors affecting essential relays have been considered: gaps under the base, capacity reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been considered.
9. The strength of the equipment base and the load path to the CG is adequate
10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.
11. The anchorage capacity exceeds the demand.

Are anchorage requirements met'?

INTERACTIONEFFECTS Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

1. Soft targets are free from impact by nearby equipment or structures
2. Ifthe equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
3. Attached lines have adequate flexibili
4. Overhead equipment or distribution systems are not likely to collapse.
5. No other adverse concerns were found.

Yes Yes Yes Yes Yes Is equipment free of interaction effects'

CALC NO o

P GIP Rev 2, Corrected, 2/14/9 Status: No et3of8 She Class: 14. Distribution Panels ID: BB11(Rev. 0)

==

Description:==

AP/125 V DC BATTERYBOARD f11 Niagara Mohawk Power Corporation - Nine Mile Point 1 SCREENING EVALUATIONWORK SHEET (SEWS) ar B Iding'TB Manufacturer, Model, Etc.:

Floor El: 261.00 Room, Row/Col: A9,10 IMPORTANTNOTE: This SEWS is a composite of the original SQUG pilot plant walkdown conducted in January and February of 1988 by D. Moore, A. Ordonez, W Djordjevic,.RF Oleck, J Valente, D Aelbrecht, J. Reddington, T.

Hester, D. Tahiliani, J. Raby, and F. Feng using the GIP, Revision 1; a supplementary walkdown conducted by RF Starck, F Feng and W Djordjevic in April 1989 still using Revision 1 ofthe GIP, and the final walkdown conducted in April 1993 by W Djordjevic and C Agosta to update the SEWS to Revision 2 GIP requirements as required by USNRC in SSER-2.

+ Contains a GE relay for the emergency seal pump (model 12HFA51A2H); however, NMPC advised that seal pump is not on SSEL, therefore, OK.

One bolt missing in top frame, but of no consequence.

Tray bolted to top of panel.

Adjacent block wall evaluated to IE80-11 program and therefore acceptable for design basis.-

Cabinet is stitch welded to embedded plate that is secured by Cinch anchors (see NMPC drawing C-18801-C, Rev. 3). This makes cabinet an outlier because overturning moment does exceed restoring moment and Cinch anchors willbe subject to tension.

Evaluated by:

Date:

I z!

Attachment:

ANCHOR Report 33@

g

Niagara Mohawk Power Corporation - Nine Mile Point 1 SCREENING EVALUATIONWORK SHEET (SEWS)

REVISION GIP Rev 2, Corrected, Status: No Sheet4of8 ID: BB11(Rev. 0)

Class: 14. Distribution Panels

==

Description:==

AP/125 V DC BATTERYBOARD ¹11 Building'B Manufacturer, Model, Etc.:

ANCHOR Report Floor El.: 261.00 Room, Row/Col: A9,10 Response Spectrum: Instructure Realistic Frequency: GIP - Flexible Damping: GIP - 5.00 Spectral Values:

Direction North - South East - West Vertical Acceleration (g's) 0.82 0.54 0.15 Angle: 0.00 Combination Criteria: SRSS Number ofWeights:

1 No Weight X

Y Z

1 7.50E+003 9.05E+001 2.00E+ 001 4.50E+001 Number of Forces: 0 I hamnta Number of Moments: 0 hlhMIahhS Number ofAnchor types:

1 Shear Tension Saf Ultimate Inter Inter Ultimate No.

Dia Manufact Product Tension Shear Coeff Coeff Fact

Niagara Mohawk Power Corporation - Nine Mile Point 1 SCREENING EVALUATIONWORK SHEET (SEWS)

CALC NO REVISION PAGE NO GIP Rev 2, Corrected, 2/14/92 Status: No Sheet 5 of 8 ID: BB11(Rev. 0)

Class: 14. Distribution Panels

==

Description:==

AP/125 V DC BATTERYBOARD ¹11 BuildIng: TB Manufacturer, Model, Etc.:

Floor El.. 261.00 Room, Row/Col A9 10 1

5/8 Other Unknown Expansion Anchor 685.00 685.00 1.00 0.30 1.00 General

'ltimateStress: 4000.00 psi.

Reduction Factor: 0.85 Kaid Allowable Stress:

30600 psi.

Number of Surfaces:

1 Direction Comp Direction Comp Ny Direction Com Nz 1

O.OOE+000 O.OOE+000 1.00E+000 Anchor Pattern for Surface ¹ 1 I" x Legend for Anchor Patterns

0

Niagara Ilohawk Power Corporation - Nine Mile Point 1 SCREENING EVALUATIONWORK SHEET (SEWS)

ATTACHMENT CALC NO REVISION Status: No Sheet 6 of 8 ID: BB11(Rev. 0)

Class: 14. Distribution Panels

==

Description:==

AP/125 V DC BATTERYBOARD ¹11 Building: TB Manufacturer, Model, Etc.:

Floor El.. 261.00 Room, Row/Col: A9,10 Anchors:

Concrete Lines:

Concrete Points:

Vfeld Uncs:

Number ofAnchors: 0

¹ of elements per line: 1 Number of Concrete Lines: 4 No Start X-Coord Stuart Y-Coord Start Z-Coord End X-Coord End Y-Coord End Z-Coord Sf Id Line Width O.OOE+000 2.00E+000 1.79E+002 O.OOE+000 1.81E+002 3.80E+001 2.00E+ 000 4.00E+001 O.OOE+000 0.00E+000 O.OOE+000 O.OOE+000 1.81E+002 1.79E+002 O.OOE+000 2.00E+000 2.00E+000 O.OOE+000 1

4.00E+ 001 O.OOE+000 1

3.80E+001 0.00E+ 000 1

O.OOE+000 O.OOE+000 1

4.00E+000 4.00E+000 4.00E+000 4.00E+000 Number of Concrete Points: 0 KeltdLint:S '

of elements per line: 1 Number ofWeld Lines: 24 Start Start Sta~

End End End Sf Line No X-Coord Y-Coord Z-Coord 1

2.50E+000 2.00E+000 1.00E+000 2

2.05E+001 2.00E+000 1.00E+000 3

3.40E+001 2.00E+000 1.00E+000 5.20E+001 2.00E+000 1.00E+000 1.00E+000 2.00E+000 7 15E+001 X-Coord 4.50E+000 2.25E+001 3.60E+001 5.40E+001 7.35E+001 Y-Coord 2.00E+000 2.00E+000 2.00E+000 2.00E+000 2.00E+000 Z-Coord 1.00E+000 1.00E+000 1.00E+000 1.00E+000 1.00E+000 Id Width 2.50E-001 2.50E-001 2.50E-001 2.50E-001 2.50E-001

Niagara Mohawk Power Corporation - Nine Mile Point 1 SCREENING EVALUATIONWORK SHEET (SEWS)

PA GIP Rev 2, Corrected, 2/14/92 Status: No Sheet 7 of 8 ID: BB11(Rev. 0)

Class: 14. Distribution Panels

==

Description:==

AP/125 V DC BATTERYBOARD¹11 Building. TB Manufacturer, Model, Etc.:

Floor El.: 261.00 Room, Row/Col: A9,10 6

8.95E+001 7

1.03E+002 8

1.21E+002 9

1.28E+002 10 1.46E+002 11 1.56E+002 12 1.74E+002 13 2.50E+000 14 2.05E+001 15 3.40E+001 16 5.20E+001 17 7.15E+001 18 8.95E+001 19 1.03E+002 20 1.21E+002 21 1.28E+002 22 1.46E+002 23 1.56E+002 24 1.74E+002 2.00E+000 1.00E+000 9.15E+001 2.00E+000 1.00E+000 1.05E+002 2.00E+000 1.00E+000 1.23E+002 2.00E+000 1.00E+000 1.30E+002 2.00E+000 1.00E+000 1.48E+002 2.00E+000 1.00E+000 1.58E+002 2.00E+000 1.00E+000 1.76E+002 3.80E+001 1.00E+000 4.50E+000 3.80E+001 1.00E+000 2.25E+001 3.80E+001 1.00E+000 3.60E+001 3.80E+001 1.00E+000 5.40E+001 3.80E+001 1.00E+000 7.35E+001 3.80E+001 1.00E+000 9.15E+001 3.80E+001 1.00E+000 1.05E+002 3.80E+001 1.00E+000 1.23E+002 3.80E+001 1.00E+000 1.30E+002 3.80E+001 1.00E+000 1.48Et002 3.80E+001 1.00E+000 1.58E+002 3.80E+001 1.00E+000 1.76E+002 2.00E+000 1.00E+000 1

2.50E-001 2.00E+000 1.00E+000 1

2.50E-001 2.00E+000 1.00E+000 1

2.50E-001 2.00E+000 1.00E+000 1

2.50E-001 2.00E+000 1.00E+000 1

2.50E-001 2.00E+000 1.00E+000 1

2.50E-001 2.00E+000 1.00E+000 1

2.50E-001 3.80E+ 001 1.00E+000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 3.80Et001 1.00E+000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 3.80E+001 1.00Et000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 3.80E+001 1.00E+000 1

2.50E-001 Reduction Factors Data Current: Yes Analysis Performed: Yes Type ofAnalysis: Regular Spectral Accelerations (G's)

Allowable No N-S E-W Vertical Load Factor 1

8.21E-001 2.14E-001 2.14E-001 3

-8.21E-001 2

-8.21E-001

-2.14E-001 5.85E-002

-5.85E-002 5.85E-002 29.586 31.488 29.784 8.21E-001

-2.14E-001

-5.85E-002 31.303 6

-8.21E-001 7

8.21E-001 2.14E-001 2.14E-001 8.21E-001

-2.14E<<001 5.85E-002

-5.85E-002

-5.85E-002 29.586 31.488 31.303

-8.21E-001

-2.14E-001 5.85E-002 29.784 9

3.28E-001 5.36E-001 11 3.28E-001 12

-3.28E-001

-5.36E-001 5.36E-001 10

-3.28E-001

-5.36E-001 5.85E-002

-5.85E-002 5.85E-002

-5.85E-002 24.628 26.647 24.628 26.647

Niagara Mohawk Power Corporation - Nine Mile Point 1 SCREENING EVALUATIONWORK SHEET (SEWS)

A I'\\1li (lll<ll~

CALC NO REVISION 4'lp Rev, Corr Status: No Sheet 8 of 8 ID: BB11(Rev. 0)

Class: 14. Distribution Panels

==

Description:==

AP/125 V DC BATTERYBOARD ¹11 Building. TB Manufacturer, Model, Etc.:

Floor El.: 261.00 Room, Row/Col: A9,10 13 14 15 16 17 18 19 20 21 22 23 24

-3.28E-001 3.28E-001 3.28E401

-3.28E-001 3.28E-001

-3.28E-001 3.28E-001

-3.28E-001

-3.28E-001 3.28E-001 3.28E-001

-3.28E-001 5.36E-001

-5.36E-001 5.36E-001

-5.36E-001 2.14E-001

-2.14E-001 2.14E-001

-2.14E-001 2.14E-001

-2.14E-001

-2.14E-001 2.14E-001 5.85E-002

-5.85E-002

-5.85E-002 5.85E-002 1.46E-001

-1.46E-001

>>1.46E-001 1.46E-001 1.46E-001

-1.46E-001 1.46E-001

-1.46E-001 25.042 26.220 26.220 25.042 44.079 59.302 58.885 44.765 44.765 58.885 44.079 59.302 Minimum Allowable Load Factor: 2.46E+001

SEA STEVENSON 8 ASSOCIATES a structural-mechanical consulting engineering firm JOB NO. 95C2873-C003 SUBJECT NMP1 IPEEE NMP1 IPEEE HCLPF Calculations for Selected Components SHEET 4A1-1 OF 13 Rev. (Preliminary)

By TMT8/20/95 Chk.

Appendices A1. Anchor Run for BB11 and BB12 hhhhhhhhh'esponse Spectrum: User Frequency: User - 0.00 Percent Damping: User - 0.00 Spectral Values ATTACHMEN'f CALC NO REVISION PAGE NO

~SR //

Direction North - South East - West Vertical Acceleration (g's) 0.412 0.396 0.129 Angle (N-S Direction makes with the XAxis): 90.00 Combination Criteria: SRSS

~

~

Neigh' Number of Weights:

1 No Weight 1

7500.00 90.500 20.000 45.000 Em:ms Number of External Forces: 0 j ha~a Number of External Moments: 0 hrzbar Number ofAnchor types:

1 Tension Shear No Dia Manufact Product Ultimate Tension Inter Ultimate Shear Coeff Inter Coeff Saf Fact 5/8 Other Unknown Expansion Anchor 970.00 1400.00 1.00 0.30 1.00 Ultimate Stress: 3500.00 psi.

JOB NO. 95C2873-C003 SUBJECT NMP1 IPEEE SHEET ¹ A1-2 OF 13 STEVENSON

&ASSOCIATES a structural-mechanical consulting engineering firm Reduction Factor: 0.85 Held

'llowable Stress:

30600 psi.

Rufams.

Number of Surfaces:

1 Surface Orientation NMP1 IPEEE HCLPF Calculations for Selected Components Rev. (Preliminary)

By TMT8/20/95 ChI<.

PAGE No Direction Comp Nx 0.000 Direction Comp Ny 0.000 Direction Comp Nz 1.000 Anchor Pattern for Surface ¹ 1 gY Legend forAnchor Patterns Anchor Bolts:

Concrete Unco:

~ggQg Concrete Points:

Weld Uncs:

SaA STEVENSON 8 ASSOCIATES a structural-mechanical consulting engineering firm JOB NO. 95C2873-C003 SUBJECT NMP1 IPEEE NMP1 IPEEE HCLPF Calculations for Selected Components SHEET ¹ A1-3 OF 13 Rev. (Preliminary)

By TMT8/20/95 ChIK.

barbar Number ofAnchors: 10 ATTACHMENT CAI.C NO

.uw ~s REVISION Anch No.

Id 1

1 2

1 3

1 4

1 Coord 12.625 64.625 116.625 168.625 Coord 2.500 2.500 2.500 2.500 Coord 0.000 0.000 0.000 0.000 Surf Id 5

1 6

7 8

1 9

1 10 1

12.625 64.625 116.625 37.500 37.500 37.500 2.500 181.000 20.000 20.000 168.625 37.500 0.000 0.000 0.000 0.000 0.000 0.000 I~

¹ of elements per line: 4 Number of Concrete Lines: 4 start No X-Coord 0.000 2.500 0.000 181.000 Start Y-Coord 2.500 0.000 37.500 0.000 stuart Z-Coord 0.000 0.000 0.000 0.000 End X-Coord 181.250 2.500 181.250 181.000 End Y-Coord 2.500 40.000 37.500 40.000 End Z-Coord 0.000 0.000 0.000 0.000 Sf Line Width 5.000 5.000 5.000 5.000 Number of Concrete Points: 0

¹ of elements per line: 4 Number of Weld Lines: 0 Reduction Factor Input for Anchor¹ 1 No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 2 No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 3

SEA JOB NO. 95C2873-C003 SUBJECT NMP1 IPEEE SHEET ¹ A1-4 OF 13 STEVENSON 8 ASSOCIATES a structural-mechanical consulting engineering firm NMP1 IPEEE HCLPF Calculations for Selected Components Rev. (Preliminary)

By TMT8/20/95 ChIc.

No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 4 No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 5 No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 6 No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 7 ATTACHMENT CALC NO REVISION PAGE NO

.PSE~

P/

No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 8 No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 9 No Input - Reduction factors needing user input are not used.

Reduction Factor Input for Anchor¹ 10 No Input - Reduction factors needing user input are not used.

Reduction Factors Data Current: Yes No Anc Pall/

Vali Pallrl Vallr RT RN RL RG RS RE RF RC RR RP RB RM 970.00 N/A 1400.00 N/A 970.00 N/A 1400.00 NIA X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X 970.00 1400.00 970.00 1400.00 970.00 NIA N/A N/A NIA X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X 1400.00 N/A 970.00 1400.00 970.00 1400.00 N/A X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

JOB NO. 95C2873-C003 SUBJECT NMP1 IPEEE SHEET ¹A1-5 OF 13 STEVENSON

&ASSOCIATES a structural-mechanical consulting engineering firm NMP1 IPEEE HCLPF Calculations for Selected Components Rev. (Preliminary)

By TMT8/20/95 CI1IK.

8 1

9 1

10 1

970.00 N/A 1400.00 N/A 970.00 1400.00 970.00 1400.00 N/A X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X N/A Pali Vali Pallr Vallr RT RN RL RG RS RE RF RC RR RP RB

= Not Applicable

= Allowable Pull without Reduced Inspection

= Allowable Shear without Reduced Inspection

= Allowable Pull with Reduced Inspection

= Allowable Shear with Reduced Inspection

= Outlier

= Reduction Factor Not Used

= Reduction Factor for Type of Anchorage

= Reduction Factor for Installation Adequacy

= Reduction Factor for Embedment

= Reduction Factor for Gap at Anchors

= Reduction Factor for Spacing

= Reduction Factor for Edge Distance

= Reduction Factor for Concrete Strength

= Reduction Factor for Concrete Cracks

= Reduction Factor for Essential Relays

= Reduction Factor for Base Stiffness and Prying Action

= Reduction Factor for Base Strength and Load Path

= Reduction Factor for Embed. Steel and Pads A>TAGHMENT CALC NO REVISION PAGE NO Analysis Performed: Yes Type ofAnalysis: Regular Spectral Accelerations (G's)

No N-S 0.412

-0.412

-0.412 0.412 0.412

-0.412 0.412

-0.412 0.165 E-W 0.158

-0.158 0.158

-0.158

-0.158 0.158 0.158

-0.158 0.396 Vertical 0.052

-0.052 0.052

-0.052 0.052

-0.052

-0.052 0.052 0.052 Safety Factor 2.064 2.273 2.064 2.273 2.064 2.273 2.273 2.064 3.367

JOB NO. 95C2873-C003 SUBJECT NMP1 IPEEE SHEET 4A1-6 OF 13 STEVENSON 8 ASSOCIATES a structural-mechanical consulting engineering firm NMP1 IPEEE HCLPF Calculations for Selected Components Rev. (Preliminary)

By TMT8/20/95 ChIc.

10 12 13 14 15 16 17 18 19 20 21 22 23 24

-0.165 0.165

-0.165

-0.165 0.165 0.165

-0.165 0.165

-0.165 0.165

-0.165

-0.165 0.165 0.165

-0.165

-0.396

-0.396 0.396 0.396

-0.396 0.396

-0.396 0.158

-0.158 0.158

-0.158 0.158

-0.158

-0.158 0.158

-0.052 0.052

-0.052 0.052

-0.052

-0.052 0.052 0.129

-0.129

-0.129 0.129 0.129

-0.129 0.129

-0.129 3.636 3.367 3.636 3.367 3.636 3.636 3.367 4.149 6.253 6.253 4.149 4.149 6.253 4.149 6.253 ATTACHMENT CALC NO REVISION PAGE NO

//

CP Minimum Safety Factor:

2.064 The anchorage can withstand 2.064 times greater seismic demand

+i inv<iniL>s g CALC NO REVISION OUTLIER SEISMIC VERIFICATIONSHEET (OSVS)

GIP ev, Correc e Sheet 1 of ID: BB11 (Rev. 0)

Class: 14. Distribution Panels

==

Description:==

AP/125 V DC BATTERYBOARD ¹11 Building: TB Floor El.: 261.00 Room, Row/Col: A9,10 a.

Identify all the screening guidelines which are not met. (Check more than one ifseveral guidelines could not be satisfied.)

Capacity vs. Demand Caveats Anchorage Seismic Interaction Other b.

Describe all the reasons for the outlier (i.e., ifall the listed outlier issues were resolved, then the signatories would consider this item of equipment to be verified for seismic adequacy).

Embedded channel to which Battery Board is secured is anchored with Cinch (leaded) type anchors; Cinch type anchors are not covered by the GIP.

a.

Defined proposed method(s) for resolving outlier.

Determine actual capacities of Cinch type anchors and compare them to demand loads or retrofit anchorage.

b.

Provide information needed to implement proposed method(s) for resolving outlier (e.g., estimate of fundamental frequency).

C f

pate~

70 fy /38/'I ~SuZ The information on this OSVS is, to the best of our knowledge and belief, correct and accurate, and resolution of the outlier issues listed on the previous page willsatisfy the requirments for this item of equipment to be verified for seismic adequacy:

Approved by:

Date:

ti 7