| =Text= | | =Text= |
| {{#Wiki_filter:ES-401 Written Examination Quality Checklist Form ES-401-6 Facility:':> | | {{#Wiki_filter:ES-401 Written Examination Quality Checklist Form ES-401-6 Facility:':> IA"'" & ~4h HO. Date of Exam: 11/111/ 2 cpfb Exam Level: RO |
| IA"'" & HO. Date of Exam: 11/111/ 2 cpf b Exam Level: RO SRO Initial Item Description a b* ,, c*# 1. Questions and answers are technically accurate and applicable to the facility. J, *If 2. a. NRC K/As are referenced for all questions. | | ~ SRO ~ |
| Vo 'lA 11 b. Facility learning objectives are referenced as available.
| | Initial Item Description a ,, |
| : 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 IA YJ/, 4 The sampling process was random and systematic (If more than 4 RO or 2 SRO questions w JI \f were repeated from the last two NRC licensing exams, consult the NRR/NRO OL program office). 5. Question duplication from the licensee screening/audit exam was controlled as indicated v below (check the item that applies) and appears appropriate J '){_The audit exam was systematically and randomly developed; or _the audit exam was completed before the license exam was started; or l)Q _the examinations were developed independently; or _the licensee certifies that there is no duplication; or _other (explain) | | b* c*# |
| : 6. Bank use meets limits (no more than 75 percent from the Bank Modified New I bank, at least 10 percent new, and the rest new or modified); | | : 1. Questions and answers are technically accurate and applicable to the facility. |
| enter the actual RO I SRO-only question 2.lJ I J.6 t 'b w A distribution(s) at right 7. Between 50 and 60 percent of the questions on the RO , exam are written at the comprehension/ | | ~ J, *If |
| analysis level; the Memory C/A SRO exam may exceed 60 percent if the randomly 1 I 1¥ . selected K/As support the higher cognitive levels; enter I 4/ l>Q '{f the actual RO I SRO question distribution(s) at right. j v 8. References/handouts provided do not give away answers or aid in the elimination of distractors. | | : 2. a. |
| : 9. Question content conforms to specific KIA statements in the previously approved examination LA , if outline and is appropriate for the tier to which they are assigned; deviations are justified. | | b. |
| I 10. Question psychometric quality and format meet the guidelines in ES Appendix B. V'il1 ff 11. The exam contains the required number of one-point, multiple choice items; the total is correct N 'fj and agrees with the value on the cover sheet. ff Printed Name I Signature Date a. Author c;,,Q
| | NRC K/As are referenced for all questions. |
| ... J/ ad lt/et//6 b. Facility Reviewer(*)
| | Facility learning objectives are referenced as available. Vo 'lA 11 |
| f' :i. Jr ¥ il., _ -_ I r | | : 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 IA YJ/, -(~ |
| .... A 1J/11J/1c,, c. NRC Chief Examiner (#) looo f-i<;i1 .c.ef',* : hwkli'i J ..
| | w JI 4 The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last two NRC licensing exams, consult the NRR/NRO OL program office). |
| ru 0 ( _., d. NRC Regional Supervisor | | v |
| --fz " j '-"" Note:
| | \f |
| * The facility reviewer's initials or signature are not applicable for NRG-developed examinations.
| | : 5. Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate J |
| # Independent NRC reviewer initials items in Column "c"; chief examiner concurrence}} | | '){_The audit exam was systematically and randomly developed; or |
| | _the audit exam was completed before the license exam was started; or |
| | _the examinations were developed independently; or l)Q ~y |
| | _the licensee certifies that there is no duplication; or |
| | _other (explain) |
| | : 6. Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or Bank Modified New I 7. |
| | modified); enter the actual RO I SRO-only question distribution(s) at right Between 50 and 60 percent of the questions on the RO |
| | ~l-f I~ |
| | Memory 2.lJ I ~ |
| | C/A J.6 t 'b w ,A \~ |
| | exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly |
| | . |
| | selected K/As support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at right. |
| | 3~ I 1 4/ I 1¥ l>Q j v '{f |
| | ~ |
| | : 8. References/handouts provided do not give away answers or aid in the elimination of distractors. |
| | ,~A (~ |
| | : 9. Question content conforms to specific KIA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified. LA I if |
| | : 10. Question psychometric quality and format meet the guidelines in ES Appendix B. ~ V'il1 ff |
| | : 11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet. N 'fj -~ |
| | ff Printed Name I Signature Date |
| | : a. Author c;,,Q <o~~. .J/ ~a ad lt/et//6 f' :i.Jr il., _-_ I l~Al r 1J/11J/1c,, |
| | : |
| | ¥ |
| | : b. Facility Reviewer(*) .... A looo f-i<;i1 .c.ef',* ~ h~ ~ |
| | -- |
| | : c. NRC Chief Examiner (#) |
| | _., |
| | hwkli'i J.. ~v~, ru 0 |
| | ( |
| | : d. NRC Regional Supervisor ~l fz Note: * |
| | " '-"" |
| | j The facility reviewer's initials or signature are not applicable for NRG-developed examinations. |
| | # Independent NRC reviewer initials items in Column "c"; chief examiner concurrence required~}} |
|
---|
Category:License-Operator
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1882020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Susquehanna Steam Electric Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval PLA-7801, Response to Request for Information Pertaining to a Licensed Operator2019-07-31031 July 2019 Response to Request for Information Pertaining to a Licensed Operator ML19189A3522019-07-0808 July 2019 LLC Licensed Operator Positive Fitness-For-Duty Test ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18060A2842018-03-0101 March 2018 Operator Licensing Examination Approval ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 2021-09-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 ML15126A2622015-01-10010 January 2015 Licensee Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML15126A2632015-01-0808 January 2015 Draft - Outlines (Folder 2) ML15126A2652015-01-0808 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15126A2642015-01-0808 January 2015 Draft Written Exam (Folder 2) ML15146A4192014-10-23023 October 2014 Final Qa/Related Forms (Folder 1) 2021-09-02
[Table view] |
Text
ES-401 Written Examination Quality Checklist Form ES-401-6 Facility:':> IA"'" & ~4h HO. Date of Exam: 11/111/ 2 cpfb Exam Level: RO
~ SRO ~
Initial Item Description a ,,
b* c*#
- 1. Questions and answers are technically accurate and applicable to the facility.
~ J, *If
- 2. a.
b.
NRC K/As are referenced for all questions.
Facility learning objectives are referenced as available. Vo 'lA 11
- 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 IA YJ/, -(~
w JI 4 The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last two NRC licensing exams, consult the NRR/NRO OL program office).
v
\f
- 5. Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate J
'){_The audit exam was systematically and randomly developed; or
_the audit exam was completed before the license exam was started; or
_the examinations were developed independently; or l)Q ~y
_the licensee certifies that there is no duplication; or
_other (explain)
- 6. Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or Bank Modified New I 7.
modified); enter the actual RO I SRO-only question distribution(s) at right Between 50 and 60 percent of the questions on the RO
~l-f I~
Memory 2.lJ I ~
C/A J.6 t 'b w ,A \~
exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly
.
selected K/As support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at right.
3~ I 1 4/ I 1¥ l>Q j v '{f
~
- 8. References/handouts provided do not give away answers or aid in the elimination of distractors.
,~A (~
- 9. Question content conforms to specific KIA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified. LA I if
- 10. Question psychometric quality and format meet the guidelines in ES Appendix B. ~ V'il1 ff
- 11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet. N 'fj -~
ff Printed Name I Signature Date
- a. Author c;,,Q <o~~. .J/ ~a ad lt/et//6 f' :i.Jr il., _-_ I l~Al r 1J/11J/1c,,
¥
- b. Facility Reviewer(*) .... A looo f-i<;i1 .c.ef',* ~ h~ ~
--
- c. NRC Chief Examiner (#)
_.,
hwkli'i J.. ~v~, ru 0
(
- d. NRC Regional Supervisor ~l fz Note: *
" '-""
j The facility reviewer's initials or signature are not applicable for NRG-developed examinations.
- Independent NRC reviewer initials items in Column "c"; chief examiner concurrence required~