{{#Wiki_filter:ACCELERATE DOCKV4ENT DISTRIJTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)I ACCESSION NBR:9404070150 DOC.DATE: 94/03/31 NOTARXZED:
{{#Wiki_filter:ACCELERATE DOCKV4ENT DISTRIJTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-397 WPPSS Nuclear Project.Unit 2.Washington Public Powe 05000397 R AUTH.NAME AUTHOR AFFILIATION MACKMAN,C.D.
I ACCESSION NBR:9404070150             DOC.DATE:   94/03/31   NOTARXZED: NO           DOCKET FACIL:50-397   WPPSS   Nuclear Project. Unit 2. Washington Public             Powe 05000397 R
Washington Public Power Supply System PARRISH,J.V.
AUTH. NAME           AUTHOR AFFILIATION MACKMAN,C.D.         Washington Public Power Supply System PARRISH,J.V.         Washington Public Power Supply System RECIP.NAME           RECIPXENT AFFILIATION D
Washington Public Power Supply System RECIP.NAME RECIPXENT AFFILIATION D  


==SUBJECT:==
==SUBJECT:==
LER 94-001-00:on 931230,untested fuel transfer to EDG fuel oil storage tanks occurredd.Caused by inadequate design change documentation
LER   94-001-00:on 931230,untested fuel transfer to EDG fuel oil storage tanks occurredd.Caused by inadequate design change documentation & operating procedure. Procedures revised.W/940331 ltr.
&operating procedure.
DISTRIBUTION CODE: IE22T COPIES RECEXVED:LTR                   ENCL     SIZE:
Procedures revised.W/940331 ltr.DISTRIBUTION CODE: IE22T COPIES RECEXVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.NOTES: D RECIPIENT ID CODE/NAME PDIV PD XNTERNAL: ACRS AEOD/DSP/TPAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HXCB NRR/DRXL/RPEB
TITLE: 50.73/50.9 Licensee Event Report (LER),               ncident Rpt, etc.
/DSS4/SPLB G VILE~02 RGN4 FILE 01 EXTERNAL: EG&G BRYCE,J.H NRC PDR NSIC POORE,W.COPIES LTTR ENCL 1 1 1'1 1 1 1 1 1'1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD(J AEOD/DOA AEOD/ROAB/DS P NRR/DE/EME B NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB' ST LOBBY WARD NSIC MURPHY,G.A NUDOCS FULL TXT COPIES LTTR ENCL~1 1 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1.1 1 1 1 1 1 1 D D S NOTE TO ALL"RIDS" RECIPIENTS:
NOTES:
PLEASE HELP US TO REDUCE WASTE(CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pi-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DONT NEEDf FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES'REQUIRED:
D RECIPIENT               COPIES            RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL        ID CODE/NAME       LTTR ENCL D
LTTR 28 ENCL 28 D WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 March 31, 1994 G02-94-076 Docket No.50-397 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555  
PDIV PD                       1      1    CLIFFORD(J            ~ 1    1 XNTERNAL: ACRS                           1    '1    AEOD/DOA                1    1 AEOD/DSP/TPAB                 1      1    AEOD/ROAB/DS P          2    2 NRR/DE/EELB                   1      1    NRR/DE/EME B            1    1 NRR/DORS/OEAB                 1
                                            '
NRR/DRCH/HHFB          1    1 NRR/DRCH/HXCB                 1      1    NRR/DRCH/HOLB          1    1 NRR/DRXL/RPEB                 1      1    NRR/DRSS/PRPB          2    2
              /DSS4/SPLB               1      1    NRR/DSSA/SRXB          1    1 G VILE~       02         1      1    RES/DSIR/EIB'          1. 1 RGN4     FILE   01          1      1 EXTERNAL: EG&G BRYCE,J.H                 2     2       ST LOBBY WARD        1   1 NRC PDR                      1     1     NSIC MURPHY,G.A         1   1 NSIC POORE,W.                 1     1     NUDOCS FULL TXT        1   1 D
S D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE( CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pi-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DONT NEEDf FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES'REQUIRED:             LTTR   28   ENCL   28
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 March 31, 1994 G02-94-076 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555


==Subject:==
==Subject:==
NUCLEAR PLANT%NP-2, OPERATING LICENSE NPF-21 LICENSEE EVENT REPORT NO.94-001 Transmitted herewith is Licensee Event Report No.94-001 for WNP-2.This report is submitted in response to the report'requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.
NUCLEAR PLANT %NP-2, OPERATING LICENSE NPF-21 LICENSEE EVENT REPORT NO. 94-001 Transmitted herewith is Licensee Event Report No. 94-001 for WNP-2. This report is submitted in response to the report 'requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.
/Should you have any questions or desire additional information, please call me or Herbert E.Kook at{509)377-4278.Sincerely, J'Parrish{Mail Drop 1023)sistant Managing'Director, Operations JVP/CDM/jcs Enclosure CC: Mr.K.E.Perkins, Jr., NRC-Region V Mr.R.Barr, NRC Resident Inspector (Mail Drop 927N, 2 Copies)Mr.N.-S.Reynolds, Winston&Strawn INPO Records Center-Atlanta, GA Mr.D.L.Williams, BPA (Mail Drop 399)9404070150 940331 PDR ADOCK 05000397 8, PDR p AGILITY NAHE (I)LICENSEE EVENT REPORT{LER)Mashin ton Nuclear Plant-Unit 2 DOCKET NUHB R ()PAGE (3)0 5 D 0 0 3 9 7 1 OF 6 ITLE (4)UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS EVENT DATE 5)LER NUHBER 6)REPORT DATE 7 OTHER FACILITIES INVOLVED 8}HOHTH DAY YEAR YEAR , SEQUENTIAL
                      /
,.'';NUHBER EVI SION UHBER HONTH DAY YEAR FACILITY HAHES CKE 50 NUH 00 R (5)1 2 3 0 9 3 9 4 0 0 1 0 0 0 3 3 I 9 4 5 D 00 PERATING ODE{9)HIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREHEHTS OF 10 CFR 5:{Check one or more of the following)(ll 1 OVER LEVEL (io)0.402(b)0.405(a)(1)(i) 0.405(a}(1)(ii) 0.405{a)(1)(iii) 0.405(a)(1)(iv) o 405(a)(1)(v) 0.405{C)50.36(c)(1) 50.36(c)(2)
Should you have any questions or desire additional information, please call me or Herbert E. Kook at {509) 377-4278.
X 50.73(a)(2)(i) 50.73{a)(2)(ii) 50.73(a)(2)(iii) 50.73(a)(2)(iv}
Sincerely, J'     Parrish {Mail Drop 1023) sistant Managing'Director, Operations JVP/CDM/jcs Enclosure CC:     Mr. K. E. Perkins, Jr., NRC - Region V Mr. R. Barr, NRC Resident Inspector (Mail Drop 927N, 2 Copies)
50.73{a){2)(v) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73{a)(2)(x) 77.71(b)73.73(c)THER{Specify in Abstract elow and in Text, HRC orm 366A)NAHE LICENSEE CONTACT FOR THIS LER (12 C.D.Mackaman, Licensing Engineer REA CODE TELEPHONE HUHBER 0 9 7 7 4 4 5 1 COHPLETE ONE LINE FOR EACH COHPONENT FAILURE DESCRlBED IN THlS REPORT (13)CAUSE SYSTEH COHPONENT HAHUFACTURER EPORTABLE 0 HPRDS CAUSE SYSTEH COHPONENT HANUFACTURER EPORTABLE TO HPRDS SUPPLEKENTAL REPORT EXPECTED (14)YES (lf yes, coaplete EXPECTED SUBHISSIOH DATE)HO XPECTED SUBHlSSlOH HONTN OAY TEAR ATE (15)During the period from December 14 through December 21, 1993, diesel fuel that included untested fuel was transferred from the Auxiliary Boiler Fuel Oil Storage Tank (FO-TK-1)to each of the three Emergency Diesel Generator (EDG)Fuel Oil Storage Tanks (DO-TK-1A, DO-TK-1B, and DO-TK-2).This event occurred during post modification testing of the recently installed Fuel Oil Filter Polisher System.Plant personnel involved in the testing identified the problem and initiated a Problem Evaluation Request (PER 293-1438)on December 30, 1993.An operability assessment was performed on December 30, 1993 to determine the status of EDG operability.
Mr. N. -S. Reynolds, Winston & Strawn INPO Records Center - Atlanta, GA Mr. D. L. Williams, BPA (Mail Drop 399) 9404070150 940331 PDR       ADOCK 05000397 8,                     PDR p
All three EDGs (DG-1, DG-2, and DG-3)were determined to be operable.This event was inconsistent with Technical Specification Surveillance (TSS)Requirement 4.8.1.1.2.c, which requires that diesel fuel be sampled prior to addition to the EDG storage tanks.As an immediate corrective action, personnel clearance tagged the Auxiliary Boiler suction valve for the Fuel Oil Filter Polisher System to assure the valve remains closed.This will prevent further transfer of fuel from the Auxiliary Boiler storage tank to the EDG storage tanks until a design review and Safety Evaluation are completed.
 
In addition, fuel oil samples were taken from all four fuel oil storage tanks and sent to an independent chemical testing facility for analysis.The root causes for this event were: (1)that the nonsafety-related Fuel Oil Filter Polisher System design change documentation did not include a 10CFR50.59 Safety Evaluation or an adequate evaluation of the nonsafety-related to safety-related system interactions, and (2)Operating Procedure PPM 2.8.15,"Diesel Fuel Oil Filter/Polisher System," did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied during system operation.
LICENSEE EVENT REPORT {LER)
LICENSEE EYENT REPOR C (LER)TEXT CONTINUATION ACILTTT NAHE (1)Washington Nuclear Plant-Unit 2 OOCKET KUHBER (2)0 5 0 0 0 3 9 7 LER KUHBER (8)ear umber ev.No.4 01 0 AGE (3)2 F 6 ITLE (4)UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS Further corrective actions include:{1)performing a design review and Safety Evaluation for the Fuel Oil Filter Polisher System modification request (PMR 83-107),{2)changing appropriate plant procedures based on the design review and Safety Evaluation, (3)counseling and training on the'lessons learned from this event, and (4)performing design reviews for planned design changes that add or change inter-ties between safety-related and nonsafety-related systems.This event posed no threat to the health and safety of the public or plant personnel.
AGILITY NAHE    (I)                                                                                DOCKET NUHB R   ( )                   PAGE (3)
RIICh i m Power Level-100%Plant Mode-1 (Power Operation) vent D ri ti n In August 1993, approximately 17,000 gallons of untested diesel fuel oil was added to the Auxiliary Boiler storage tank.During the period from December 14 through December 21, 1993, diesel fuel that included the untested fuel was transferred from the Auxiliary Boiler Fuel Oil Storage Tank (FO-TK-1)to each of the three Emergency Diesel Generator (EDG)Fuel Oil Storage Tanks{DO-TK-1A, DO-TK-IB, and DO-TK-2).This event occurred during post modification testing of the recently installed Fuel Oil Filter Polisher System.The testing included demonstrating the capability to transfer fuel from the Auxiliary Boiler storage tank to an EDG storage tank, and to recirculate the fuel through the filter polisher and back to the Auxiliary Boiler tank.A Maintenance Work Request (MWR-AR6637) was used to perform the testing and included steps that recirculated approximately 5,000 gallons of the untested fuel from the Auxiliary Boiler storage tank through each EDG storage tank.Plant personnel involved in the testing identified the problem and initiated a Problem Evaluation Request (PER 293-1438)on December 30, 1993.The System Engineer performed an operability assessment on December 30, 1993 to determine the status of EDG operability.
Mashin ton Nuclear Plant - Unit 2                                                                0   5   D   0     0 3     9   7     1   OF   6 ITLE   (4)
All three EDGs (DG-1, DG-2, and DG-3)were determined to be operable during the period from December 14 through December 30, 1993{the period in question).
UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS EVENT DATE   5)                   LER NUHBER 6)               REPORT DATE     7                 OTHER FACILITIES INVOLVED 8}
This determination was based on confidence that the untested fuel transferred from the Auxiliary Boiler tank met the American Society for Testing and Materials (ASTM)requirements specified in Technical Specifications 4.8.1.1.2.c and d.Analyses of fuel oil samples taken from all four fuel oil storage tanks supported this operability assessment.
HOHTH     DAY     YEAR   YEAR       , SEQUENTIAL     EVI SION    HONTH      DAY   YEAR FACILITY HAHES                                 CKE   NUH   R (5)
mm i rr iv ion 1.Operations personnel clearance tagged the Auxiliary Boiler suction valve for the Fuel Oil Filter Polisher System to assure the valve remains closed.This will prevent further transfer of fuel from the Auxiliary Boiler storage tank to the EDG storage tanks until a design review and Safety Evaluation are completed.
                                ,.'';  NUHBER        UHBER 50 00 1   2   3   0 9   3   9   4         0   0   1     0   0       0   3   3     I 9   4                                               5   D 00 PERATING               HIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREHEHTS             OF 10 CFR 5: {Check one   or more of the following)       (ll ODE  {9)          1 OVER LEVEL                 0.402(b)                           0.405{C)                    50.73(a)(2)(iv}                77.71(b)
LICENSEE EVENT REPORT (LER)TEXT CONTINUATION AC1L17Y NAME (1)Washington Nuclear Plant-Unit 2 OOCKE7 NUMBER (2)0 5 0 0 0 3 9 7 LER NUMBER (B)ear umber ev.No.AGE (3)4 001 0 3 t'17LE (4)UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS 2.Fuel oil samples were taken from all four fuel oil storage tanks and sent to Herguth Laboratories, Inc., an independent chemical testing facility, for analysis to assure compliance with the fuel quality requirements of TSS Requirement 4.8,1.1.2.c.
(io)                         0.405(a)(1)(i)                    50.36(c)(1)                   50.73{a){2)(v)                 73.73(c) 0.405(a}(1)(ii)                   50.36(c)(2)                   50.73(a)(2)(vii)                 THER {Specify in Abstract 0.405{a)(1)(iii)               X 50.73(a)(2)(i)               50.73(a)(2)(viii)(A)            elow and in Text, HRC 0.405(a)(1)(iv)                  50.73{a)(2)(ii)               50.73(a)(2)(viii)(B)            orm 366A) o 405(a)(1)(v)                   50.73(a)(2)(iii)             50.73{a)(2)(x)
rtherEv1 ai n nd rr iveA i n 1 H I The Supply System initially determined that this event was not reportable to the NRC based on a determination of no impact on EDG operability or fuel quality.However, after further evaluation, the original reportability determination was amended to recognize the noncompliance with TSS Requirement 4.8.1.1.2.c.
LICENSEE CONTACT FOR THIS LER (12 NAHE                                                                                                                            TELEPHONE HUHBER C. D. Mackaman,                 Licensing Engineer                                               REA CODE 0     9     7   7         4   4   5   1 COHPLETE ONE LINE FOR EACH COHPONENT FAILURE DESCRlBED IN THlS REPORT                 (13)
Specifically, this event is being reported pursuant to 10CFR50.73(a)(2)(i)(B) as"Any operation or condition prohibited by the plant's Technical Specifications...." 2.A feature of the Fuel Oil Filter Polisher System design change was the capability of transferring fuel from the Auxiliary Boiler storage tank to the three EDG storage tanks.This was a significant change to the method of adding fuel to the EDG storage tanks and is controlled by TSS 4.8.1.1.2.c.
CAUSE     SYSTEH     COHPONENT           HAHUFACTURER   EPORTABLE             CAUSE     SYSTEH     COHPONENT         HANUFACTURER     EPORTABLE 0  HPRDS                                                                      TO HPRDS SUPPLEKENTAL REPORT EXPECTED     (14)                                     XPECTED SUBHlSSlOH      HONTN    OAY    TEAR ATE (15)
However, the design change post modification testing=instructions, the system operating procedure, and related surveillance procedures did not require the fuel in the Auxiliary Boiler storage tank to be sampled prior to transferring the fuel to the EDG storage tanks.3.A design safety analysis for the Fuel Oil Filter Polisher System design change was completed on May 2, 1992.The preparer and reviewer did not recognize that the unit's operation could impact a safety-related system.Consequently, no Safety Evaluation was performed that would have evaluated the nonsafety-related to safety-related system interactions and identified the need for system controls.4.5.The Plant Operating Committee (POC)reviewed the Fuel Oil Filter Polisher System design change on August 19, 1992 at POC Meeting 92-34 and again on August 26, 1992 at POC Meeting 92-35.POC members missed an opportunity to address the design change deficiencies because they were provided with inaccurate information based on an inadequate review of the design change documentation.
YES  (lf yes, coaplete EXPECTED SUBHISSIOH DATE)           HO During the period from December 14 through December 21, 1993, diesel fuel that included untested fuel was transferred from the Auxiliary Boiler Fuel Oil Storage Tank (FO-TK-1) to each of the three Emergency Diesel Generator (EDG) Fuel Oil Storage Tanks (DO-TK-1A, DO-TK-1B, and DO-TK-2).
The Fuel Oil Filter Polisher System design change documentation included statements that identified Technical Specification fuel cleanliness requirements for system installation and that the Auxiliary Boiler storage tank will be connected to the EDG storage tanks.However, Operations Procedures personnel did not adequately review the design change documentation.
This event occurred during post modification testing of the recently installed Fuel Oil Filter Polisher System. Plant personnel involved in the testing identified the problem and initiated a Problem Evaluation Request (PER 293-1438) on December 30, 1993. An operability assessment was performed on December 30, 1993 to determine the status of EDG operability. All three EDGs (DG-1, DG-2, and DG-3) were determined to be operable. This event was inconsistent with Technical Specification Surveillance (TSS) Requirement 4.8.1.1.2.c, which requires that diesel fuel be sampled prior to addition to the EDG storage tanks.
As a result, PPM 2.8.15,"Diesel Fuel Oil Filter/Polisher System," did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied-during system operation.
As an immediate corrective action, personnel clearance tagged the Auxiliary Boiler suction valve for the Fuel Oil Filter Polisher System to assure the valve remains closed. This will prevent further transfer of fuel from the Auxiliary Boiler storage tank to the EDG storage tanks until a design review and Safety Evaluation are completed. In addition, fuel oil samples were taken from all four fuel oil storage tanks and sent to an independent chemical testing facility for analysis.
LICENSEE EVENT REPORT (LER)TEXT CONTINUATION AC1LlTT NAHE (1)Washington Nuclear Plant-Unit 2 OOCKET NUHBER (2)0 5 0 0 0 3 9 7 ear LER NUHBER (8)umber ev.No.4 01 0 AGE (3)4 F 6 lTLE (4)UNTESTED FUEL TRANSFERRED To THE EHERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS 6.The Fuel Oil Filter Polisher System design change testing was performed by MWR rather than by'a special test procedure.
The root causes for this event were: (1) that the nonsafety-related Fuel Oil Filter Polisher System design change documentation did not include a 10CFR50.59 Safety Evaluation or an adequate evaluation of the nonsafety-related to safety-related system interactions, and (2) Operating Procedure PPM 2.8.15, "Diesel Fuel Oil Filter/Polisher System," did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied during system operation.
This practice bypasses an opportunity for an additional 10CFR50.59 review and the higher level of scrutiny associated with approval of a Temporary Procedure in accordance with PPM 1.2.4,"Plant Procedure Approval Revision and Distribution.", In this case, the design change post modification test used PPM 2.8.15 for system lineups and operation.
 
However, a special test procedure should have been written and performed because the operating procedure was not adequate to support the post modification test.Consequently, the Technical Specification requirements were not adequately addressed when the MWR post modification testing instructions directed the performer to transfer fuel from the Auxiliary Boiler storage tank to the EDG storage tanks.7.As discussed above, Supply System personnel missed several opportunities to prevent this event.All of these missed opportunities were found to have, resulted from the mindset that"the fuel/polisher unit is not safety-related and[therefore]
LICENSEE EYENT REPOR C (LER)
does not affect components or items that are safety-related," Action will be'taken to correct this mindset.8.The Supply System believes that the changes incorporated into the 10CFR50.59 review and evaluation procedures on September 30, 1992 adequately address the related programmatic implications of this event.9.=The Supply System has improved the design change implementation review process since the Fuel Oil Filter Polisher System design change was reviewed and approved for installation.
TEXT CONTINUATION ACILTTT NAHE (1)                               OOCKET KUHBER (2)               LER KUHBER (8)        AGE (3) ear     umber       ev. No.
Design changes are now reviewed by a Project Review Group (PRG)and Project Engineers have been given overall ownership of assigned design changes.They act as a single point of contact for coordinating activities and will follow issues associated with a design change through to resolution.
Washington Nuclear Plant - Unit          2 0  5  0  0  0 3 9 7 4       01         0       2   F 6 ITLE (4)
These programmatic changes ensure that design changes receive a thorough pre-installation review and that implementation related issues are properly addressed.
UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL               OIL   STORAGE TANKS Further corrective actions include: {1) performing a design review and Safety Evaluation for the Fuel Oil Filter Polisher System modification request (PMR 83-107), {2) changing appropriate plant procedures based on the design review and Safety Evaluation, (3) counseling and training on the'lessons learned from this event, and (4) performing design reviews for planned design changes that add or change inter-ties between safety-related and nonsafety-related systems.
gag/gee The root causes for this event were: (1)that the nonsafety-related Fuel Oil Filter Polisher System design change documentation did not include a 10CFR50.59 Safety Evaluation or an adequate evaluation of the nonsafety-related to safety-related system interactions, and (2)Operating Procedure PPM 2.8.15 did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied during system operation.
This event posed no threat to the health and safety of the public or plant personnel.
A contributing cause was that a special test procedure was not written to perform the Fuel Oil Filter Polisher System design change post modification test.
RIICh i m Power Level - 100%
LICENSEE EVENT REPORT (LER)TEXT CONTINUATION ACILITY NAHE (1)Washington Nuclear Plant-Unit 2 OOCKET NUHBER (2)0 5 0 0 0 3 9 7 LER NUHBER (B)ear" umber ev.No.4 0 1 0 AGE (3)5 F 6 ITLE (4)UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS urth r rr iv A i n A design review and Safety Evaluation will be performed for the Fuel Oil Filter Polisher System design change Plant Modification Request (PMR 83-107)by August 1, 1994.2.Surveillance Procedure PPMs 7.4.8.1.1,2,"Diesel Fuel Purification," 7.4.8.1.1.2.3A,"Diesel Generator New Fuel Test," and 7.4.8.1.1.2.3B,"Diesel Generator Storage Tank Fuel Test," will be reviewed and changed as necessary by September 1, 1994 based on the results of the Fuel Oil Filter Polisher System design review and Safety Evaluation.
Plant Mode - 1 (Power Operation) vent D     ri ti n In August 1993, approximately 17,000 gallons of untested diesel fuel oil was added to the Auxiliary Boiler storage tank. During the period from December 14 through December 21, 1993, diesel fuel that included the untested fuel was transferred from the Auxiliary Boiler Fuel Oil Storage Tank (FO-TK-1) to each of the three Emergency Diesel Generator (EDG) Fuel Oil Storage Tanks {DO-TK-1A, DO-TK-IB, and DO-TK-2). This event occurred during post modification testing of the recently installed Fuel Oil Filter Polisher System. The testing included demonstrating the capability to transfer fuel from the Auxiliary Boiler storage tank to an EDG storage tank, and to recirculate the fuel through the filter polisher and back to the Auxiliary Boiler tank. A Maintenance Work Request (MWR-AR6637) was used to perform the testing and included steps that recirculated approximately 5,000 gallons of the untested fuel from the Auxiliary Boiler storage tank through each EDG storage tank. Plant personnel involved in the testing identified the problem and initiated a Problem Evaluation Request (PER 293-1438) on December 30, 1993.
3.Operating Procedure PPM 2.8;15 will be reviewed and changed as necessary by September 1, 1994 based on the results of the Fuel Oil Filter Polisher System design review and Safety Evaluation.
The System Engineer performed an operability assessment on December 30, 1993 to determine the status           of EDG operability. All three EDGs (DG-1, DG-2, and DG-3) were determined to be operable during the period from December 14 through December 30, 1993 {the period in question). This determination was based on confidence that the untested fuel transferred from the Auxiliary Boiler tank met the American Society for Testing and Materials (ASTM) requirements specified in Technical Specifications 4.8.1.1.2.c and d. Analyses of fuel oil samples taken from all four fuel oil storage tanks supported this operability assessment.
Training will be provided by April 30, 1994 for Design Engineers, Project Engineers, Technical Staff Engineers, and Operations procedure writers on the lessons learned from this event and the design issues relating to inter-ties and interactions between safety-related and nonsafety-related systems.5.Design change packages that add or change inter-ties between safety-related and nonsafety-related systems, wh'ere the resulting interactions have not been previously evaluated, will be reviewed.Packages scheduled for implementation during the Spring 1994 Refueling Outage (R-9)will be reviewed by April 30, 1994.The scope of the remaining outstanding packages will be evaluated and a review schedule will be developed by July 31, 1994.6.The individuals involved in this event, including POC members, will be counseled by April 30, 1994 on their role in causing the event and the lessons learned from the event.7.A lessons learned memorandum will be sent to Licensing personnel by April 8, 1994 concerning the error in the initial reportability determination for this event and will be discussed with Licensing personnel by April 15, 1994.f i nifi As previously discussed, an operability assessment established EDG operability during the period in question.Subsequent analyses of the fuel oil samples taken from all four fuel oil storage tanks supported this operability assessment.
mm     i       rr   iv   ion
Based on this documentation, this event did not impact EDG operability or fuel quality.Accordingly, this event had no safety significance and posed no threat to the health and safety of the public or plant personnel.
: 1.       Operations personnel clearance tagged the Auxiliary Boiler suction valve for the Fuel Oil Filter Polisher System to assure the valve remains closed. This will prevent further transfer of fuel from the Auxiliary Boiler storage tank to the EDG storage tanks until a design review and Safety Evaluation are completed.
LICENSEE EVENT REPORT (LER)TEXT CONTINUATION ACILITY HAHE (1)Washington Nuclear Plant-Unit 2 OOCKET HUHBER (2)0 5 0 0 0 3 9 7 LER HUHBER (B)ear umber ev.Ho.AGE (3)4 0 I 0 6 F 6 ITLE (4)UNTESTEO FUEL TRANSFERREO TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS i ilrEvn LERs 90-001, 90-007, 90-015, and 90-027 reported diesel fuel oil sampling and analysis problems that resulted in Technical Specification noncompliance conditions.
 
These previous events are similar because the fuel oil testing requirements were not met.However, the causes of these previous events did not involve design review or design implementation deficiencies.
LICENSEE EVENT REPORT (LER)
Thus, the corrective actions did not address the conditions described in this LER.EIIS Inf rmation R f II R ferne Auxiliary Boiler Fuel Oil Storage Tank (FO-TK-1)Emergency Diesel Generator Fuel Oil Storage Tanks (DO-TK-1A, DO-TK-1B, and DO-TK-2)Emergency Diesel Generators (DG-1, DG-2, and DG-3)Fuel Oil Filter Polisher System~tern SA DC EK DE/~mixen TK TK DG FLT r}}
TEXT CONTINUATION AC1L17Y NAME (1)                                 OOCKE7 NUMBER   (2)               LER NUMBER (B)        AGE  (3) ear     umber       ev. No.
Washington Nuclear Plant - Unit          2 0  5  0    0  0  3 9 7 4     001           0       3     t' 17LE (4)
UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL                 OIL   STORAGE TANKS
: 2.     Fuel oil samples were taken from all four fuel oil storage tanks and sent to Herguth Laboratories, Inc., an independent chemical testing facility, for analysis to assure compliance with the fuel quality requirements of TSS Requirement 4.8,1.1.2.c.
rtherEv1 ai     n nd     rr iveA   i n 1   H I
The Supply System initially determined that this event was not reportable to the NRC based on a determination of no impact on EDG operability or fuel quality. However, after further evaluation, the original reportability determination was amended to recognize the noncompliance with TSS Requirement 4.8.1.1.2.c. Specifically, this event is being reported pursuant to 10CFR50.73(a)(2)(i)(B) as "Any operation or condition prohibited by the plant's Technical Specifications...."
: 2.     A feature of the Fuel Oil Filter Polisher System design change was the capability of transferring fuel from the Auxiliary Boiler storage tank to the three EDG storage tanks. This was a significant change to the method of adding fuel to the EDG storage tanks and is controlled by TSS 4.8.1.1.2.c. However, the design change post modification testing         =
instructions, the system operating procedure, and related surveillance procedures did not require the fuel in the Auxiliary Boiler storage tank to be sampled prior to transferring the fuel to the EDG storage tanks.
: 3.     A design safety analysis for the Fuel Oil Filter Polisher System design change was completed on May 2, 1992. The preparer and reviewer did not recognize that the unit's operation could impact a safety-related system. Consequently, no Safety Evaluation was performed that would have evaluated the nonsafety-related to safety-related system interactions and identified the need for system controls.
: 4.     The Plant Operating Committee (POC) reviewed the Fuel Oil Filter Polisher System design change on August 19, 1992 at POC Meeting 92-34 and again on August 26, 1992 at POC Meeting 92-35. POC members missed an opportunity to address the design change deficiencies because they were provided with inaccurate information based on an inadequate review of the design change documentation.
: 5. The Fuel Oil Filter Polisher System design change documentation included statements that identified Technical Specification fuel cleanliness requirements for system installation and that the Auxiliary Boiler storage tank will be connected to the EDG storage tanks. However, Operations Procedures personnel did not adequately review the design change documentation.
As a result, PPM 2.8.15, "Diesel Fuel Oil Filter/Polisher System," did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied- during system operation.
 
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION AC1LlTT NAHE (1)                                 OOCKET NUHBER   (2)                 LER NUHBER (8)         AGE (3) ear      umber       ev. No.
Washington Nuclear Plant - Unit          2 0  5  0    0  0 3 9  7 4        01          0      4   F 6 lTLE (4)
UNTESTED FUEL TRANSFERRED To THE EHERGENCY DIESEL GENERATOR FUEL                   OIL   STORAGE TANKS
: 6. The Fuel Oil Filter Polisher System design change testing was performed by MWR rather than by 'a special test procedure. This practice bypasses an opportunity for an additional 10CFR50.59 review and the higher level of scrutiny associated with approval of a Temporary Procedure in accordance with PPM 1.2.4, "Plant Procedure Approval Revision and Distribution.",
In this case, the design change post modification test used PPM 2.8.15 for system lineups and operation. However, a special test procedure should have been written and performed because the operating procedure was not adequate to support the post modification test.
Consequently, the Technical Specification requirements were not adequately addressed when the MWR post modification testing instructions directed the performer to transfer fuel from the Auxiliary Boiler storage tank to the EDG storage tanks.
: 7.     As discussed above, Supply System personnel missed several opportunities to prevent this event. All of these missed opportunities were found to have, resulted from the mindset that "the fuel/polisher unit is not safety-related and [therefore] does not affect components or items that are safety-related," Action will be'taken to correct this mindset.
: 8.     The Supply System believes that the changes incorporated into the 10CFR50.59 review and evaluation procedures on September 30, 1992 adequately address the related programmatic implications of this event.
: 9.   =
The Supply System has improved the design change implementation review process since the Fuel Oil Filter Polisher System design change was reviewed and approved for installation.
Design changes are now reviewed by a Project Review Group (PRG) and Project Engineers have been given overall ownership of assigned design changes. They act as a single point of contact for coordinating activities and will follow issues associated with a design change through to resolution. These programmatic changes ensure that design changes receive a thorough pre-installation review and that implementation related issues are properly addressed.
gag /gee The root causes for this event were: (1) that the nonsafety-related Fuel Oil Filter Polisher System design change documentation did not include a 10CFR50.59 Safety Evaluation or an adequate evaluation of the nonsafety-related to safety-related system interactions, and (2) Operating Procedure PPM 2.8.15 did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied during system operation.
A contributing   cause was that a special test procedure was not written to perform the Fuel Oil Filter Polisher System design change post modification test.
 
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION ACILITY NAHE (1)                                 OOCKET NUHBER   (2)                 LER NUHBER (B)         AGE (3)
                                                                                      "
ear       umber       ev. No.
Washington Nuclear Plant - Unit            2 0  5  0    0  0 3 9  7 4         0 1         0       5   F 6 ITLE (4)
UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS urth r     rr iv A   i n A design review and Safety Evaluation will be performed for the Fuel Oil Filter Polisher System design change Plant Modification Request (PMR 83-107) by August 1, 1994.
: 2.       Surveillance Procedure PPMs 7.4.8.1.1,2, "Diesel Fuel Purification," 7.4.8.1.1.2.3A, "Diesel Generator New Fuel Test," and 7.4.8.1.1.2.3B, "Diesel Generator Storage Tank Fuel Test," will be reviewed and changed as necessary by September 1, 1994 based on the results of the Fuel Oil Filter Polisher System design review and Safety Evaluation.
: 3.       Operating Procedure PPM 2.8;15 will be reviewed and changed as necessary by September 1, 1994 based on the results of the Fuel Oil Filter Polisher System design review and Safety Evaluation.
Training will be provided by April 30, 1994 for Design Engineers, Project Engineers, Technical Staff Engineers, and Operations procedure writers on the lessons learned from this event and the design issues relating to inter-ties and interactions between safety-related and nonsafety-related systems.
: 5.     Design change packages that add or change inter-ties between safety-related and nonsafety-related systems, wh'ere the resulting interactions have not been previously evaluated, will be reviewed. Packages scheduled for implementation during the Spring 1994 Refueling Outage (R-9) will be reviewed by April 30, 1994. The scope of the remaining outstanding packages will be evaluated and a review schedule will be developed by July 31, 1994.
: 6.     The individuals involved in this event, including POC members, will be counseled by April 30, 1994 on their role in causing the event and the lessons learned from the event.
: 7.       A lessons learned memorandum will be sent to Licensing personnel by April 8, 1994 concerning the error in the initial reportability determination for this event and will be discussed with Licensing personnel by April 15, 1994.
f     i nifi As previously discussed, an operability assessment established EDG operability during the period in question. Subsequent analyses of the fuel oil samples taken from all four fuel oil storage tanks supported this operability assessment. Based on this documentation, this event did not impact EDG operability or fuel quality. Accordingly, this event had no safety significance and posed no threat to the health and safety of the public or plant personnel.
 
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION ACILITY HAHE (1)                               OOCKET HUHBER   (2)                   LER HUHBER (B)        AGE (3) ear     umber       ev. Ho.
Washington Nuclear Plant - Unit          2 0  5  0    0  0  3   9  7 4       0 I         0       6   F 6 ITLE (4)
UNTESTEO FUEL TRANSFERREO TO THE EMERGENCY DIESEL GENERATOR FUEL                     OIL   STORAGE TANKS i ilrEvn LERs 90-001, 90-007, 90-015, and 90-027 reported diesel fuel oil sampling and analysis problems that resulted in Technical Specification noncompliance conditions. These previous events are similar because the fuel oil testing requirements were not met. However, the causes of these previous events did not involve design review or design implementation deficiencies. Thus, the corrective actions did not address the conditions described in this LER.
EIIS Inf rmation R f                                                   II R   ferne
                                                                  ~tern          /~mixen Auxiliary Boiler Fuel Oil                                 SA              TK Storage Tank (FO-TK-1)
Emergency Diesel Generator Fuel                           DC              TK Oil Storage Tanks (DO-TK-1A, DO-TK-1B, and DO-TK-2)
Emergency Diesel Generators                               EK              DG (DG-1, DG-2, and DG-3)
Fuel Oil Filter Polisher System                           DE               FLT
 
r}}

Revision as of 13:36, 29 October 2019

LER 94-001-00:on 931230,untested Fuel Transfer to EDG Fuel Oil Storage Tanks Occurred.Caused by Inadequate Design Change Documentation & Operating Procedure.Procedures revised.W/940331 Ltr
ML17290B086
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1994
From: Mackaman C, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
94-076, 94-76, GO2-949076, LER-94-001, LER-94-1, NUDOCS 9404070150
Download: ML17290B086 (9)


Text

ACCELERATE DOCKV4ENT DISTRIJTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I ACCESSION NBR:9404070150 DOC.DATE: 94/03/31 NOTARXZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project. Unit 2. Washington Public Powe 05000397 R

AUTH. NAME AUTHOR AFFILIATION MACKMAN,C.D. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPXENT AFFILIATION D

SUBJECT:

LER 94-001-00:on 931230,untested fuel transfer to EDG fuel oil storage tanks occurredd.Caused by inadequate design change documentation & operating procedure. Procedures revised.W/940331 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEXVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.

NOTES:

D RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D

PDIV PD 1 1 CLIFFORD(J ~ 1 1 XNTERNAL: ACRS 1 '1 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DS P 2 2 NRR/DE/EELB 1 1 NRR/DE/EME B 1 1 NRR/DORS/OEAB 1

'

NRR/DRCH/HHFB 1 1 NRR/DRCH/HXCB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRXL/RPEB 1 1 NRR/DRSS/PRPB 2 2

/DSS4/SPLB 1 1 NRR/DSSA/SRXB 1 1 G VILE~ 02 1 1 RES/DSIR/EIB' 1. 1 RGN4 FILE 01 1 1 EXTERNAL: EG&G BRYCE,J.H 2 2 ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHY,G.A 1 1 NSIC POORE,W. 1 1 NUDOCS FULL TXT 1 1 D

S D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE( CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pi-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DONT NEEDf FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES'REQUIRED: LTTR 28 ENCL 28

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 March 31, 1994 G02-94-076 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

NUCLEAR PLANT %NP-2, OPERATING LICENSE NPF-21 LICENSEE EVENT REPORT NO.94-001 Transmitted herewith is Licensee Event Report No.94-001 for WNP-2. This report is submitted in response to the report 'requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.

/

Should you have any questions or desire additional information, please call me or Herbert E. Kook at {509) 377-4278.

Sincerely, J' Parrish {Mail Drop 1023) sistant Managing'Director, Operations JVP/CDM/jcs Enclosure CC: Mr. K. E. Perkins, Jr., NRC - Region V Mr. R. Barr, NRC Resident Inspector (Mail Drop 927N, 2 Copies)

Mr. N. -S. Reynolds, Winston & Strawn INPO Records Center - Atlanta, GA Mr. D. L. Williams, BPA (Mail Drop 399) 9404070150 940331 PDR ADOCK 05000397 8, PDR p

LICENSEE EVENT REPORT {LER)

AGILITY NAHE (I) DOCKET NUHB R ( ) PAGE (3)

Mashin ton Nuclear Plant - Unit 2 0 5 D 0 0 3 9 7 1 OF 6 ITLE (4)

UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS EVENT DATE 5) LER NUHBER 6) REPORT DATE 7 OTHER FACILITIES INVOLVED 8}

HOHTH DAY YEAR YEAR , SEQUENTIAL EVI SION HONTH DAY YEAR FACILITY HAHES CKE NUH R (5)

,.; NUHBER UHBER 50 00 1 2 3 0 9 3 9 4 0 0 1 0 0 0 3 3 I 9 4 5 D 00 PERATING HIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREHEHTS OF 10 CFR 5: {Check one or more of the following) (ll ODE {9) 1 OVER LEVEL 0.402(b) 0.405{C) 50.73(a)(2)(iv} 77.71(b)

(io) 0.405(a)(1)(i) 50.36(c)(1) 50.73{a){2)(v) 73.73(c) 0.405(a}(1)(ii) 50.36(c)(2) 50.73(a)(2)(vii) THER {Specify in Abstract 0.405{a)(1)(iii) X 50.73(a)(2)(i) 50.73(a)(2)(viii)(A) elow and in Text, HRC 0.405(a)(1)(iv) 50.73{a)(2)(ii) 50.73(a)(2)(viii)(B) orm 366A) o 405(a)(1)(v) 50.73(a)(2)(iii) 50.73{a)(2)(x)

LICENSEE CONTACT FOR THIS LER (12 NAHE TELEPHONE HUHBER C. D. Mackaman, Licensing Engineer REA CODE 0 9 7 7 4 4 5 1 COHPLETE ONE LINE FOR EACH COHPONENT FAILURE DESCRlBED IN THlS REPORT (13)

CAUSE SYSTEH COHPONENT HAHUFACTURER EPORTABLE CAUSE SYSTEH COHPONENT HANUFACTURER EPORTABLE 0 HPRDS TO HPRDS SUPPLEKENTAL REPORT EXPECTED (14) XPECTED SUBHlSSlOH HONTN OAY TEAR ATE (15)

YES (lf yes, coaplete EXPECTED SUBHISSIOH DATE) HO During the period from December 14 through December 21, 1993, diesel fuel that included untested fuel was transferred from the Auxiliary Boiler Fuel Oil Storage Tank (FO-TK-1) to each of the three Emergency Diesel Generator (EDG) Fuel Oil Storage Tanks (DO-TK-1A, DO-TK-1B, and DO-TK-2).

This event occurred during post modification testing of the recently installed Fuel Oil Filter Polisher System. Plant personnel involved in the testing identified the problem and initiated a Problem Evaluation Request (PER 293-1438) on December 30, 1993. An operability assessment was performed on December 30, 1993 to determine the status of EDG operability. All three EDGs (DG-1, DG-2, and DG-3) were determined to be operable. This event was inconsistent with Technical Specification Surveillance (TSS) Requirement 4.8.1.1.2.c, which requires that diesel fuel be sampled prior to addition to the EDG storage tanks.

As an immediate corrective action, personnel clearance tagged the Auxiliary Boiler suction valve for the Fuel Oil Filter Polisher System to assure the valve remains closed. This will prevent further transfer of fuel from the Auxiliary Boiler storage tank to the EDG storage tanks until a design review and Safety Evaluation are completed. In addition, fuel oil samples were taken from all four fuel oil storage tanks and sent to an independent chemical testing facility for analysis.

The root causes for this event were: (1) that the nonsafety-related Fuel Oil Filter Polisher System design change documentation did not include a 10CFR50.59 Safety Evaluation or an adequate evaluation of the nonsafety-related to safety-related system interactions, and (2) Operating Procedure PPM 2.8.15, "Diesel Fuel Oil Filter/Polisher System," did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied during system operation.

LICENSEE EYENT REPOR C (LER)

TEXT CONTINUATION ACILTTT NAHE (1) OOCKET KUHBER (2) LER KUHBER (8) AGE (3) ear umber ev. No.

Washington Nuclear Plant - Unit 2 0 5 0 0 0 3 9 7 4 01 0 2 F 6 ITLE (4)

UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS Further corrective actions include: {1) performing a design review and Safety Evaluation for the Fuel Oil Filter Polisher System modification request (PMR 83-107), {2) changing appropriate plant procedures based on the design review and Safety Evaluation, (3) counseling and training on the'lessons learned from this event, and (4) performing design reviews for planned design changes that add or change inter-ties between safety-related and nonsafety-related systems.

This event posed no threat to the health and safety of the public or plant personnel.

RIICh i m Power Level - 100%

Plant Mode - 1 (Power Operation) vent D ri ti n In August 1993, approximately 17,000 gallons of untested diesel fuel oil was added to the Auxiliary Boiler storage tank. During the period from December 14 through December 21, 1993, diesel fuel that included the untested fuel was transferred from the Auxiliary Boiler Fuel Oil Storage Tank (FO-TK-1) to each of the three Emergency Diesel Generator (EDG) Fuel Oil Storage Tanks {DO-TK-1A, DO-TK-IB, and DO-TK-2). This event occurred during post modification testing of the recently installed Fuel Oil Filter Polisher System. The testing included demonstrating the capability to transfer fuel from the Auxiliary Boiler storage tank to an EDG storage tank, and to recirculate the fuel through the filter polisher and back to the Auxiliary Boiler tank. A Maintenance Work Request (MWR-AR6637) was used to perform the testing and included steps that recirculated approximately 5,000 gallons of the untested fuel from the Auxiliary Boiler storage tank through each EDG storage tank. Plant personnel involved in the testing identified the problem and initiated a Problem Evaluation Request (PER 293-1438) on December 30, 1993.

The System Engineer performed an operability assessment on December 30, 1993 to determine the status of EDG operability. All three EDGs (DG-1, DG-2, and DG-3) were determined to be operable during the period from December 14 through December 30, 1993 {the period in question). This determination was based on confidence that the untested fuel transferred from the Auxiliary Boiler tank met the American Society for Testing and Materials (ASTM) requirements specified in Technical Specifications 4.8.1.1.2.c and d. Analyses of fuel oil samples taken from all four fuel oil storage tanks supported this operability assessment.

mm i rr iv ion

1. Operations personnel clearance tagged the Auxiliary Boiler suction valve for the Fuel Oil Filter Polisher System to assure the valve remains closed. This will prevent further transfer of fuel from the Auxiliary Boiler storage tank to the EDG storage tanks until a design review and Safety Evaluation are completed.

LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION AC1L17Y NAME (1) OOCKE7 NUMBER (2) LER NUMBER (B) AGE (3) ear umber ev. No.

Washington Nuclear Plant - Unit 2 0 5 0 0 0 3 9 7 4 001 0 3 t' 17LE (4)

UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS

2. Fuel oil samples were taken from all four fuel oil storage tanks and sent to Herguth Laboratories, Inc., an independent chemical testing facility, for analysis to assure compliance with the fuel quality requirements of TSS Requirement 4.8,1.1.2.c.

rtherEv1 ai n nd rr iveA i n 1 H I

The Supply System initially determined that this event was not reportable to the NRC based on a determination of no impact on EDG operability or fuel quality. However, after further evaluation, the original reportability determination was amended to recognize the noncompliance with TSS Requirement 4.8.1.1.2.c. Specifically, this event is being reported pursuant to 10CFR50.73(a)(2)(i)(B) as "Any operation or condition prohibited by the plant's Technical Specifications...."

2. A feature of the Fuel Oil Filter Polisher System design change was the capability of transferring fuel from the Auxiliary Boiler storage tank to the three EDG storage tanks. This was a significant change to the method of adding fuel to the EDG storage tanks and is controlled by TSS 4.8.1.1.2.c. However, the design change post modification testing =

instructions, the system operating procedure, and related surveillance procedures did not require the fuel in the Auxiliary Boiler storage tank to be sampled prior to transferring the fuel to the EDG storage tanks.

3. A design safety analysis for the Fuel Oil Filter Polisher System design change was completed on May 2, 1992. The preparer and reviewer did not recognize that the unit's operation could impact a safety-related system. Consequently, no Safety Evaluation was performed that would have evaluated the nonsafety-related to safety-related system interactions and identified the need for system controls.
4. The Plant Operating Committee (POC) reviewed the Fuel Oil Filter Polisher System design change on August 19, 1992 at POC Meeting 92-34 and again on August 26, 1992 at POC Meeting 92-35. POC members missed an opportunity to address the design change deficiencies because they were provided with inaccurate information based on an inadequate review of the design change documentation.
5. The Fuel Oil Filter Polisher System design change documentation included statements that identified Technical Specification fuel cleanliness requirements for system installation and that the Auxiliary Boiler storage tank will be connected to the EDG storage tanks. However, Operations Procedures personnel did not adequately review the design change documentation.

As a result, PPM 2.8.15, "Diesel Fuel Oil Filter/Polisher System," did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied- during system operation.

LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION AC1LlTT NAHE (1) OOCKET NUHBER (2) LER NUHBER (8) AGE (3) ear umber ev. No.

Washington Nuclear Plant - Unit 2 0 5 0 0 0 3 9 7 4 01 0 4 F 6 lTLE (4)

UNTESTED FUEL TRANSFERRED To THE EHERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS

6. The Fuel Oil Filter Polisher System design change testing was performed by MWR rather than by 'a special test procedure. This practice bypasses an opportunity for an additional 10CFR50.59 review and the higher level of scrutiny associated with approval of a Temporary Procedure in accordance with PPM 1.2.4, "Plant Procedure Approval Revision and Distribution.",

In this case, the design change post modification test used PPM 2.8.15 for system lineups and operation. However, a special test procedure should have been written and performed because the operating procedure was not adequate to support the post modification test.

Consequently, the Technical Specification requirements were not adequately addressed when the MWR post modification testing instructions directed the performer to transfer fuel from the Auxiliary Boiler storage tank to the EDG storage tanks.

7. As discussed above, Supply System personnel missed several opportunities to prevent this event. All of these missed opportunities were found to have, resulted from the mindset that "the fuel/polisher unit is not safety-related and [therefore] does not affect components or items that are safety-related," Action will be'taken to correct this mindset.
8. The Supply System believes that the changes incorporated into the 10CFR50.59 review and evaluation procedures on September 30, 1992 adequately address the related programmatic implications of this event.
9. =

The Supply System has improved the design change implementation review process since the Fuel Oil Filter Polisher System design change was reviewed and approved for installation.

Design changes are now reviewed by a Project Review Group (PRG) and Project Engineers have been given overall ownership of assigned design changes. They act as a single point of contact for coordinating activities and will follow issues associated with a design change through to resolution. These programmatic changes ensure that design changes receive a thorough pre-installation review and that implementation related issues are properly addressed.

gag /gee The root causes for this event were: (1) that the nonsafety-related Fuel Oil Filter Polisher System design change documentation did not include a 10CFR50.59 Safety Evaluation or an adequate evaluation of the nonsafety-related to safety-related system interactions, and (2) Operating Procedure PPM 2.8.15 did not include procedural controls to assure that TSS 4.8.1.1.2.c fuel cleanliness and testing requirements were satisfied during system operation.

A contributing cause was that a special test procedure was not written to perform the Fuel Oil Filter Polisher System design change post modification test.

LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION ACILITY NAHE (1) OOCKET NUHBER (2) LER NUHBER (B) AGE (3)

"

ear umber ev. No.

Washington Nuclear Plant - Unit 2 0 5 0 0 0 3 9 7 4 0 1 0 5 F 6 ITLE (4)

UNTESTED FUEL TRANSFERRED TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS urth r rr iv A i n A design review and Safety Evaluation will be performed for the Fuel Oil Filter Polisher System design change Plant Modification Request (PMR 83-107) by August 1, 1994.

2. Surveillance Procedure PPMs 7.4.8.1.1,2, "Diesel Fuel Purification," 7.4.8.1.1.2.3A, "Diesel Generator New Fuel Test," and 7.4.8.1.1.2.3B, "Diesel Generator Storage Tank Fuel Test," will be reviewed and changed as necessary by September 1, 1994 based on the results of the Fuel Oil Filter Polisher System design review and Safety Evaluation.
3. Operating Procedure PPM 2.8;15 will be reviewed and changed as necessary by September 1, 1994 based on the results of the Fuel Oil Filter Polisher System design review and Safety Evaluation.

Training will be provided by April 30, 1994 for Design Engineers, Project Engineers, Technical Staff Engineers, and Operations procedure writers on the lessons learned from this event and the design issues relating to inter-ties and interactions between safety-related and nonsafety-related systems.

5. Design change packages that add or change inter-ties between safety-related and nonsafety-related systems, wh'ere the resulting interactions have not been previously evaluated, will be reviewed. Packages scheduled for implementation during the Spring 1994 Refueling Outage (R-9) will be reviewed by April 30, 1994. The scope of the remaining outstanding packages will be evaluated and a review schedule will be developed by July 31, 1994.
6. The individuals involved in this event, including POC members, will be counseled by April 30, 1994 on their role in causing the event and the lessons learned from the event.
7. A lessons learned memorandum will be sent to Licensing personnel by April 8, 1994 concerning the error in the initial reportability determination for this event and will be discussed with Licensing personnel by April 15, 1994.

f i nifi As previously discussed, an operability assessment established EDG operability during the period in question. Subsequent analyses of the fuel oil samples taken from all four fuel oil storage tanks supported this operability assessment. Based on this documentation, this event did not impact EDG operability or fuel quality. Accordingly, this event had no safety significance and posed no threat to the health and safety of the public or plant personnel.

LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION ACILITY HAHE (1) OOCKET HUHBER (2) LER HUHBER (B) AGE (3) ear umber ev. Ho.

Washington Nuclear Plant - Unit 2 0 5 0 0 0 3 9 7 4 0 I 0 6 F 6 ITLE (4)

UNTESTEO FUEL TRANSFERREO TO THE EMERGENCY DIESEL GENERATOR FUEL OIL STORAGE TANKS i ilrEvn LERs90-001, 90-007,90-015, and 90-027 reported diesel fuel oil sampling and analysis problems that resulted in Technical Specification noncompliance conditions. These previous events are similar because the fuel oil testing requirements were not met. However, the causes of these previous events did not involve design review or design implementation deficiencies. Thus, the corrective actions did not address the conditions described in this LER.

EIIS Inf rmation R f II R ferne

~tern /~mixen Auxiliary Boiler Fuel Oil SA TK Storage Tank (FO-TK-1)

Emergency Diesel Generator Fuel DC TK Oil Storage Tanks (DO-TK-1A, DO-TK-1B, and DO-TK-2)

Emergency Diesel Generators EK DG (DG-1, DG-2, and DG-3)

Fuel Oil Filter Polisher System DE FLT