ML17319B323: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:~~<. DL'SIGNA~ P~GXKQ
                                                                              '
REQUEST FOR ADDITIONAL INFORMA84~~00              3g            'P<Napgt EQUIPMENT ENVIRONMENTAL QUALIFICATION (EEQ)
REVIEW OF LICENSEES'ESOLUTION OF OUTSTANDING ISSUES FROM NRC EQUIPMENT ENVIRONMENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT Indiana &  Michigan Electric Company, D. C. Cook  Unit 2 NRC Docket No. 50-316                                      December      18, 1981 NRC TAC No. 42461                                          Rev. 1, January 28, 1982 Rev. 2, April 7, 1982 Franklin Research Center A Division of The Franklin Institute The Benjamin Franidin Parkway, PNh.. Pa. 19103 (215) 448 1000 8205lz~~p7
 
              <'
- <U)M4'x",k'r
                  -jg f )p
 
RAIW5257-498 Rev. 2,  April 7, 1982 BACKGROUND Franklin Research Center            (FRC)  of Philadelphia, Pa. is providing assistance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors. PRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant.
This request for additional information (RAI) is the result of an evaluation of the information provided by letters dated -September 23, 1981
[1] r May 28 1981 [2] ~ Pebruary 3 1981 [3], and October 31 1980 [4]* FRC
                <                              g                            g            ~
previously requested TMI Action Plan information by a telephone memorandum dated August 11, 1981 [5].
In response, American Electric              Power (AEP)  transmitted the following information on August 17, 1981 [6].
: 1. Several figures and tables which depict pressure, temperature, and radiation of the containment as a function of time for both LOCA and MSLB events.
: 2. Copies        of the general notes referenced in the February 3,          1981 submittal.
B  letter        dated Pebruar      26    1982  9    the Licensee transmitted the re uested documents exce t A.l. A.l. A.l.r and A.l.u which have not et been established as uglification documents and therefore not incor rated into the central file and item A.l.s which will be su lanted b a new reference.
The Licensee also stated that a new submittal includin a revised master list
                                                        **
would be submitted b March 31 1982. (2)
  <<Numbers in brackets refer to citations found in the                  list of .references.
<<<<Throughout the text, superscript numbers in parentheses indicate the revision which the underlined material preceding the superscript was added.
                                                                                                  'n 00 Franklin Research Center A Dhision or The Frank!In Inseetc
 
RAZM5257-498 Rev. 2,  April 7,  1982 A. FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE                            TO THE NRC EEQ SER INFORMATION REQUESTED                                                          DATE RECEIVED BY    FRC***
: l. In reference to the Licensee's 90-day response [1] to the NRC SER [7], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceed:
: a. Conax Test Report IPS-234
: b. Conax Corp. Test Report IPS-137
: c. Conax Corp. Test Report ZPS-348                                        34829
: d. Cerro Wire and Cable Test Report of                        May          3 4 82  9  (2) 1976
: e. Westinghouse                    -    Canada Test Report                3482    9  (2)
CWAPD-332
: f. Limitorque Test Report 600461                                          3482  [9
: g. Westinghouse Corp. communication                                        34829 NS-PLC-5023 dated 4/26/78 from T. M. Anderson, Westinghouse, to E. G. Case, NRC
: h. Westinghouse                    Electric Corp.                          3//482 [9[ (2)
Communications'S-TMA-1950
: i. Conax Corp. Test Report IPS-326                                        34829
: j. Conax Corp. Test Report ZPS-327                                        ~34 82 [9 (2)
: k. Rockbestos Qualification of Pirewall ZZI Class IE Electrical Cable, May 1976 Same as d(2)
: 1. Conax Test Report IPS-339                                              3482    9
: m. Conax Test Report IPS-349                                              3482    9
***This column          will be              completed by  FRC as the requested  information is received.
    !ill Franklin Research Center A Diri[i()nd The F48[))([[() [[)8O()4(8
 
~ r>> ~ rr RAIW5257-498 Rev. 2, April 7, 1982 DATE RECEIVED BY  FRC***
: n. Qual. by letter of 6-2-71 from:                                  3 4 82  [9](  )
W. F. Hergreuter - Customer Service Lab, Brooklyn, NY to: A. H. Statton - Boston Edison Co.
Oe    Letter of 4-17-80 from J. M. Allen (Mobil Oil Corp.) to Allen Feibelman (AEP)
P. Floodup Tube Qual. Packet (on                      SCEW  CI1-1, CI2-1, etc. of Reference 1)
Not et in central file 9
: q. Instr. Cable                  Term. Packet    (on SCEW  TI1-1 of Reference                  1) Not    et in central  file
                ~9(2) re    Required Time Qual. Analysis (on SCEW CI1-1; CI2-1, etc. of Reference 1) Not et in central                    file 9 (2)
S~    Letter of 4/28/80 from                    P. K. Eapin  to      To be su    lanted AEP-NRC-003440 te ,Westinghouse                    Electric Corp.
Correspondence with as noted identity NS-PLC-5023 (on SCEW I-14 of Reference                        1)
                ~Same 'as Ue    Electrical Penetration                    and Analysis (on SCEW        EPOl-1        of Reference    1) Not    et in Ve    Cyprus Report No. 3525                                          ~34 82  9 We  Cyprus Report No. 3658                                            3482    9 Xe    A co            of the master list of                                4 (2) safet -related electrical e ui ment for D.C. Cook Unit 2 as re uired b IE Bulletin            79-01B Identification of lant ID numbers                                    4 (2) a licable to the safet -related electrical e ui ent for D. C. Cook Unit 2    if    not contained in the master              list re uested in x above w3 00  FranMin Research Center A C)iv(8)4)n d The Fran)(ln In8()((4(8
 
                                                          ,2. ~,26  xx)
RAI-C5257-498 Rev. 2,  April 7, 1982 B. FRC REVIEW OP INSTALLED TMI ACTION PLAN ITEMS INFORMATION REQUESTED                                                          DATE RECEIVED BY PRC~**
: 1. References 1, 2, and 3 do not provide adequate detail with respect to identification of TMI Action Plan equipment installed after 1/1/81.
: a. Identification of THI Action Plan                                        ~25    6 equipment installed with implementation dates after'/1/81 is .requested.
: b. The      correlation of these equipment, items                          ~25    6  (2) with the specific sections of NUREG-0737
[8] {as applicable) is requested.
[The      correlation is        needed to ensure that      all      items are included in the review, e.g.,              if a  transmitter is identified as a TMI Action Plan item, are the cable and terminal blocks associated with the device also identified?]
: c. Por      all installed              'JMI Action Plan                    ~25    6 equipment            identified,        a System Component Evaluation Worksheet {SCEW) (in accordance with 79-01B format) is requested.
: d. The approximate installation date for the                              ~25    6 TMI Action Plan equipment items is requested so that the appropriate qualification criteria                    (NUREG-0588          or  DOR Guidelines) can                  be used  in the        EEQ evaluation.
: 2. The    qualification documents, e.g., the actual                              -3 4 82 [9] {>>
test. reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified GRI Action Plan equipment are requested.                                [The identification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.]
r ill) Franklin Research Center h Divi66on oi The Franlhn Inaoo666
 
RAIM5257-498 Rev.-  2, April 7, 1982
: 3. Where the Licensee has a                    standard position with respect to a NUREG-0737 Owners'roup technical area or has requested extensions of implementation dates, this information is requested in order to incorporate review.
it          into the Ce INSTRUCTIONS FOR TRANSMITTING INFORMATION REQUESTED
: 1. The schedule            for completion of the                    FRC  assignment requires that the Licensee provide the requested                    information within              3 weeks of the date of the RAI.
: 2. The Licensee may                transmit the requested information                  as  follows:
o    complete package                directly to the            NRC  project  manager or o    copy    of cover letter to              NRC project            manager  and complete package  to FRC.
FRC    mailing address is as follows:
Nr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 till Franklin Research Center h vision d The Franl4n Insotute
 
~ ~ ~
RAI-C5257-498 Rev. 2, April 7,  1982 REFERENCES G. P. Maloney Letter to H. R. Denton, NRC.
 
==Subject:==
Donald C. Cook Nuclear Plant Unit Nos. 1 and 2> Response to SER on Environmental Qualification of Safety-Related Electrical Equipment Indiana a Michigan Electric, 23-Sep-81 AEP!NRC:00578 2~    R. S.        Hunter Letter to J. G. Keppler, NRC.
 
==Subject:==
Transmittal of corrected and additional pages to Attachments 2 and 5 of response to IE Bulletin 79-01B dated May 7, 1980 Indiana          &  Michigan    Electric,  28-May-81 AEP:NRC:0356E 3~    G. P. Maloney Letter to J.              G. Keppler, NRC.
 
==Subject:==
Response  to IE Bulletin 79-01B Indiana          a  Michigan Electric, 03-Feb-81 AEP NRC:0356D 4~    G. P. Maloney Letter to J. G. Keppler,                NRC. 
 
==Subject:==
Revisions to Response to IE Bulletin 79-01B.
Indiana          a  Michigan    Electric, 31-Oct-80 AEP:NRC:00356C
: 5. Telephone Memorandum C. J. Crane, J. Murphy (FRC), Conversation with S. Miner (NRC-PM),
J. I. Castresana, J. Delpersico, R. Shelberg, C. Shu (D.                  C. Cook representatives),
 
==Subject:==
Request for TMI Information,                  D. C. Cook Units 1 and 2, Dated 11-Aug-81.
6    J. I. Castresana Letter to C. Crane, FRC.
 
==Subject:==
Transmittal of figures                    and tables to facilitate TMI Action Plan item review American Electric Power Service, 14-Aug-81 7~  Office of Nuclear Reactor Regulation Safety Evaluation Report for D. C. Cook Unit                2 Environmental Qualification of Safety-Related Electrical              Equipment NRC,        29-Apr-81
      ~
8+  NUREG-0737,              "Clarification of    TMI Action Plan Requirements" NRC, November                1980 99 Franklin Research Center A Division or The Franksn @sac(e
 
RAIM5257>>498 Rev. 2<  April 7r 1982
: 9. K. S. Hunter Letter to            S. A. Var a, NRC. Sub'ect:  Donald C. Cook Nuclear Plant Unit Nos.            1 and 2: Re uest  for Additional Information on Environmental uglification of Safet -Related E ui ment Indiana & Michi an Electric 26-Feb-82 AEP:        NRC0578C I Franklin Research Center A Divi4ce ot The Frank5n inseu(e}}

Revision as of 06:38, 29 October 2019

to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML17319B323
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/07/1982
From:
FRANKLIN INSTITUTE
To:
NRC
Shared Package
ML17319B322 List:
References
RTR-NUREG-0737, RTR-NUREG-737 IEB-79-01B, IEB-79-1B, RAI-C5257-498, RAI-C5257-498-R02, RAI-C5257-498-R2, NUDOCS 8205170047
Download: ML17319B323 (9)


Text

{{#Wiki_filter:~~<. DL'SIGNA~ P~GXKQ

                                                                             '

REQUEST FOR ADDITIONAL INFORMA84~~00 3g 'P<Napgt EQUIPMENT ENVIRONMENTAL QUALIFICATION (EEQ) REVIEW OF LICENSEES'ESOLUTION OF OUTSTANDING ISSUES FROM NRC EQUIPMENT ENVIRONMENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT Indiana & Michigan Electric Company, D. C. Cook Unit 2 NRC Docket No. 50-316 December 18, 1981 NRC TAC No. 42461 Rev. 1, January 28, 1982 Rev. 2, April 7, 1982 Franklin Research Center A Division of The Franklin Institute The Benjamin Franidin Parkway, PNh.. Pa. 19103 (215) 448 1000 8205lz~~p7

              <'

- <U)M4'x",k'r

                 -jg f )p

RAIW5257-498 Rev. 2, April 7, 1982 BACKGROUND Franklin Research Center (FRC) of Philadelphia, Pa. is providing assistance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors. PRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant. This request for additional information (RAI) is the result of an evaluation of the information provided by letters dated -September 23, 1981 [1] r May 28 1981 [2] ~ Pebruary 3 1981 [3], and October 31 1980 [4]* FRC

                <                              g                            g            ~

previously requested TMI Action Plan information by a telephone memorandum dated August 11, 1981 [5]. In response, American Electric Power (AEP) transmitted the following information on August 17, 1981 [6].

1. Several figures and tables which depict pressure, temperature, and radiation of the containment as a function of time for both LOCA and MSLB events.
2. Copies of the general notes referenced in the February 3, 1981 submittal.

B letter dated Pebruar 26 1982 9 the Licensee transmitted the re uested documents exce t A.l. A.l. A.l.r and A.l.u which have not et been established as uglification documents and therefore not incor rated into the central file and item A.l.s which will be su lanted b a new reference. The Licensee also stated that a new submittal includin a revised master list

                                                       **

would be submitted b March 31 1982. (2)

 <<Numbers in brackets refer to citations found in the                  list of .references.

<<<<Throughout the text, superscript numbers in parentheses indicate the revision which the underlined material preceding the superscript was added.

                                                                                                 'n 00 Franklin Research Center A Dhision or The Frank!In Inseetc

RAZM5257-498 Rev. 2, April 7, 1982 A. FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER INFORMATION REQUESTED DATE RECEIVED BY FRC***

l. In reference to the Licensee's 90-day response [1] to the NRC SER [7], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceed:
a. Conax Test Report IPS-234
b. Conax Corp. Test Report IPS-137
c. Conax Corp. Test Report ZPS-348 34829
d. Cerro Wire and Cable Test Report of May 3 4 82 9 (2) 1976
e. Westinghouse - Canada Test Report 3482 9 (2)

CWAPD-332

f. Limitorque Test Report 600461 3482 [9
g. Westinghouse Corp. communication 34829 NS-PLC-5023 dated 4/26/78 from T. M. Anderson, Westinghouse, to E. G. Case, NRC
h. Westinghouse Electric Corp. 3//482 [9[ (2)

Communications'S-TMA-1950

i. Conax Corp. Test Report IPS-326 34829
j. Conax Corp. Test Report ZPS-327 ~34 82 [9 (2)
k. Rockbestos Qualification of Pirewall ZZI Class IE Electrical Cable, May 1976 Same as d(2)
1. Conax Test Report IPS-339 3482 9
m. Conax Test Report IPS-349 3482 9
      • This column will be completed by FRC as the requested information is received.
   !ill Franklin Research Center A Diri[i()nd The F48[))([[() [[)8O()4(8

~ r>> ~ rr RAIW5257-498 Rev. 2, April 7, 1982 DATE RECEIVED BY FRC***

n. Qual. by letter of 6-2-71 from: 3 4 82 [9]( )

W. F. Hergreuter - Customer Service Lab, Brooklyn, NY to: A. H. Statton - Boston Edison Co. Oe Letter of 4-17-80 from J. M. Allen (Mobil Oil Corp.) to Allen Feibelman (AEP) P. Floodup Tube Qual. Packet (on SCEW CI1-1, CI2-1, etc. of Reference 1) Not et in central file 9

q. Instr. Cable Term. Packet (on SCEW TI1-1 of Reference 1) Not et in central file
               ~9(2) re    Required Time Qual. Analysis (on SCEW CI1-1; CI2-1, etc. of Reference 1) Not et in central                     file 9 (2)

S~ Letter of 4/28/80 from P. K. Eapin to To be su lanted AEP-NRC-003440 te ,Westinghouse Electric Corp. Correspondence with as noted identity NS-PLC-5023 (on SCEW I-14 of Reference 1)

               ~Same 'as Ue    Electrical Penetration                     and Analysis (on SCEW         EPOl-1         of Reference     1) Not    et in Ve    Cyprus Report No. 3525                                           ~34 82   9 We   Cyprus Report No. 3658                                            3482    9 Xe    A co             of the master list of                                4 (2) safet -related electrical e ui ment for D.C. Cook Unit 2 as re uired b IE Bulletin            79-01B Identification of lant ID numbers                                    4 (2) a licable to the safet -related electrical e ui ent for D. C. Cook Unit 2    if     not contained in the master               list re uested in x above w3 00  FranMin Research Center A C)iv(8)4)n d The Fran)(ln In8()((4(8
                                                         ,2. ~,26  xx)

RAI-C5257-498 Rev. 2, April 7, 1982 B. FRC REVIEW OP INSTALLED TMI ACTION PLAN ITEMS INFORMATION REQUESTED DATE RECEIVED BY PRC~**

1. References 1, 2, and 3 do not provide adequate detail with respect to identification of TMI Action Plan equipment installed after 1/1/81.
a. Identification of THI Action Plan ~25 6 equipment installed with implementation dates after'/1/81 is .requested.
b. The correlation of these equipment, items ~25 6 (2) with the specific sections of NUREG-0737

[8] {as applicable) is requested. [The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a TMI Action Plan item, are the cable and terminal blocks associated with the device also identified?]

c. Por all installed 'JMI Action Plan ~25 6 equipment identified, a System Component Evaluation Worksheet {SCEW) (in accordance with 79-01B format) is requested.
d. The approximate installation date for the ~25 6 TMI Action Plan equipment items is requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.
2. The qualification documents, e.g., the actual -3 4 82 [9] {>>

test. reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified GRI Action Plan equipment are requested. [The identification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.] r ill) Franklin Research Center h Divi66on oi The Franlhn Inaoo666

RAIM5257-498 Rev.- 2, April 7, 1982

3. Where the Licensee has a standard position with respect to a NUREG-0737 Owners'roup technical area or has requested extensions of implementation dates, this information is requested in order to incorporate review.

it into the Ce INSTRUCTIONS FOR TRANSMITTING INFORMATION REQUESTED

1. The schedule for completion of the FRC assignment requires that the Licensee provide the requested information within 3 weeks of the date of the RAI.
2. The Licensee may transmit the requested information as follows:

o complete package directly to the NRC project manager or o copy of cover letter to NRC project manager and complete package to FRC. FRC mailing address is as follows: Nr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 till Franklin Research Center h vision d The Franl4n Insotute

~ ~ ~ RAI-C5257-498 Rev. 2, April 7, 1982 REFERENCES G. P. Maloney Letter to H. R. Denton, NRC.

Subject:

Donald C. Cook Nuclear Plant Unit Nos. 1 and 2> Response to SER on Environmental Qualification of Safety-Related Electrical Equipment Indiana a Michigan Electric, 23-Sep-81 AEP!NRC:00578 2~ R. S. Hunter Letter to J. G. Keppler, NRC.

Subject:

Transmittal of corrected and additional pages to Attachments 2 and 5 of response to IE Bulletin 79-01B dated May 7, 1980 Indiana & Michigan Electric, 28-May-81 AEP:NRC:0356E 3~ G. P. Maloney Letter to J. G. Keppler, NRC.

Subject:

Response to IE Bulletin 79-01B Indiana a Michigan Electric, 03-Feb-81 AEP NRC:0356D 4~ G. P. Maloney Letter to J. G. Keppler, NRC.

Subject:

Revisions to Response to IE Bulletin 79-01B. Indiana a Michigan Electric, 31-Oct-80 AEP:NRC:00356C

5. Telephone Memorandum C. J. Crane, J. Murphy (FRC), Conversation with S. Miner (NRC-PM),

J. I. Castresana, J. Delpersico, R. Shelberg, C. Shu (D. C. Cook representatives),

Subject:

Request for TMI Information, D. C. Cook Units 1 and 2, Dated 11-Aug-81. 6 J. I. Castresana Letter to C. Crane, FRC.

Subject:

Transmittal of figures and tables to facilitate TMI Action Plan item review American Electric Power Service, 14-Aug-81 7~ Office of Nuclear Reactor Regulation Safety Evaluation Report for D. C. Cook Unit 2 Environmental Qualification of Safety-Related Electrical Equipment NRC, 29-Apr-81

     ~

8+ NUREG-0737, "Clarification of TMI Action Plan Requirements" NRC, November 1980 99 Franklin Research Center A Division or The Franksn @sac(e

RAIM5257>>498 Rev. 2< April 7r 1982

9. K. S. Hunter Letter to S. A. Var a, NRC. Sub'ect: Donald C. Cook Nuclear Plant Unit Nos. 1 and 2: Re uest for Additional Information on Environmental uglification of Safet -Related E ui ment Indiana & Michi an Electric 26-Feb-82 AEP: NRC0578C I Franklin Research Center A Divi4ce ot The Frank5n inseu(e}}