ML093080241: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/30/2009
| issue date = 12/30/2009
| title = Kansas State University Triga Reactor, No. 50-188/OL-10-01, Initial Examination Report
| title = Kansas State University Triga Reactor, No. 50-188/OL-10-01, Initial Examination Report
| author name = Eads J H
| author name = Eads J
| author affiliation = NRC/NRR/DPR/PRTB
| author affiliation = NRC/NRR/DPR/PRTB
| addressee name = Whaley M
| addressee name = Whaley M
Line 84: Line 84:


REPORT DETAILS
REPORT DETAILS
: 1. Examiners:    Paul V. Doyle Jr., Chief Examiner, NRC  
: 1. Examiners:    Paul V. Doyle Jr., Chief Examiner, NRC
: 2. Results:
: 2. Results:
RO PASS/FAILSRO PASS/FAILTOTAL PASS/FAIL Written 0/0 0
RO PASS/FAILSRO PASS/FAILTOTAL PASS/FAIL Written 0/0 0

Revision as of 16:22, 11 July 2019

Kansas State University Triga Reactor, No. 50-188/OL-10-01, Initial Examination Report
ML093080241
Person / Time
Site: Kansas State University
Issue date: 12/30/2009
From: Johnny Eads
Research and Test Reactors Branch B
To: Whaley M
Kansas State University
Doyle P, NRC/NRR/DPR/PRT, 415-1058
Shared Package
ML092450598 List:
References
50-188/OL-10-001 50-188/OL-10-001
Download: ML093080241 (4)


Text

December 30, 2009

Mr. Michael Whaley, Manager KSU Nuclear Reactor Facility Department of Mechanical and Nuclear Engineering 112 Ward Hall Kansas State University Manhattan, KS 66506-2500

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-188/OL-10-01, KANSAS STATE UNIVERSITY TRIGA REACTOR

Dear Mr. Whaley:

During the week of October 19, 2009, the Nuclear Regulatory Commission (NRC) administered operator licensing examinations at your Kansas State University TRIGA reactor. The examinations were conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.

In accordance with Title 10 of the Code of Federal Regulations Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail Paul.Doyle@nrc.gov.

Sincerely,

/RA by Paul V. Doyle Acting For/ Johnny H. Eads Jr., Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Docket No. 50-188

Enclosures:

As stated

cc w/o encl: See next page December 30, 2009 Mr. Michael Whaley, Manager KSU Nuclear Reactor Facility Department of Mechanical and Nuclear Engineering 112 Ward Hall Kansas State University Manhattan, KS 66506-2500

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-188/OL-10-01, KANSAS STATE UNIVERSITY TRIGA REACTOR

Dear Mr. Whaley:

During the week of October 19, 2009, the Nuclear Regulatory Commission (NRC) administered operator licensing examinations at your Kansas State University TRIGA reactor. The examinations were conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.

In accordance with Title 10 of the Code of Federal Regulations Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail Paul.Doyle@nrc.gov.

Sincerely,

/RA by Paul V. Doyle Acting For/ Johnny H. Eads Jr., Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Docket No. 50-188

Enclosures:

As stated

cc w/o encl: See next page DISTRIBUTION: (w/enclosures) PUBLIC PRTB r/f RidsNRRDPRPRTA RidsNRRDPRPRTB Facility File (CHart) O7F8 ADAMS ACCESSION #: ML093080241 TEMPLATE #:NRR-074 OFFICE PRTB:CE IOLB:LA E PRTB:SC NAME PDoyle CRevelle JEads (PDoyle Acting For) DATE 11/4/09 11/30/2009 12/30/2009 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY Kansas State University Docket No. 50-188 cc:

Office of the Governor State of Kansas Topeka, KS 66612 Thomas A. Conley, RRPJ, CHP, Section Chief Radiation and Asbestos Control KS Dept of Health & Environment 1000 SW Jackson, Suite 320 Topeka, KS 66612-1366 Mayor of Manhattan P.O. Box 748 Manhattan, KS 66502

Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT

REPORT NO.: 50-188/OL-10-01

FACILITY DOCKET NO.: 50-188

FACILITY LICENSE NO.: R-88

FACILITY: Kansas State University TRIGA Reactor

EXAMINATION DATES: October 22, 2009

SUBMITTED BY: __________________________ _October 27, 2009 Paul V. Doyle Jr., Chief Examiner Date

SUMMARY

On October 22, 2009, the NRC administered operating tests to three senior reactor operator (upgrade) candidates,. All three candidates passed all portions of their respective examinations.

REPORT DETAILS

1. Examiners: Paul V. Doyle Jr., Chief Examiner, NRC
2. Results:

RO PASS/FAILSRO PASS/FAILTOTAL PASS/FAIL Written 0/0 0

/00/0 Operating Tests0/0 3

/03/0 Overall 0/0 3

/03/0 3. Exit Meeting:

Paul Doyle, Chief Examiner, NRC P. Michael Whaley, Reactor Manager, KSU There was no formal exit meeting at the facility. The examiner spoke to the reactor manager via telephone on October 22, 2009. The examiner did not identify any problems or training program weaknesses during examination administration, relayed those facts to the reactor manager.

ENCLOSURE