IR 05000186/2012202: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/29/2012
| issue date = 06/29/2012
| title = IR 05000186/12-202 on June 4-6, 2012, at the University of Missouri - Columbia Research Reactor - Transmittal Letter for NRC Security-Related Inspection Report No. 50-186/2012-202
| title = IR 05000186/12-202 on June 4-6, 2012, at the University of Missouri - Columbia Research Reactor - Transmittal Letter for NRC Security-Related Inspection Report No. 50-186/2012-202
| author name = Bowman G T
| author name = Bowman G
| author affiliation = NRC/NRR/DPR/PRTB
| author affiliation = NRC/NRR/DPR/PRTB
| addressee name = Butler R
| addressee name = Butler R
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:June 29, 2012
[[Issue date::June 29, 2012]]


Mr. Ralph Butler, Director Research Reactor Center University of Missouri - Columbia Research Park Columbia, MO 65211
==SUBJECT:==
 
UNIVERSITY OF MISSOURI, COLUMBIA - NRC SECURITY-RELATED INSPECTION REPORT NO. 50-186/2012-202
SUBJECT: UNIVERSITY OF MISSOURI, COLUMBIA - NRC SECURITY-RELATED INSPECTION REPORT NO. 50-186/2012-202


==Dear Mr. Butler:==
==Dear Mr. Butler:==
On June 4-6, 2012, the U.S. Nuclear Regulatory Commission (NRC) conducted a security inspection at your University of Missouri - Columbia Research Reactor facility. The inspection included a review of activities authorized for your facility. The enclosed repor t presents the results of that inspection.
June 29, 2012
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations, as well as compliance with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no safety concerns or non-compliances with NRC requirements were identified. No response to this letter is required.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 "Public inspections, exemptions, requests for withholding," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (Agencywide Documents Access and Management System (ADAMS)).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related items contained in the enclosure, and in accordance with 10 CFR 2.390(d), a copy of the enclosure will not be available for public inspection.
 
Sincerely,/RA/
 
Gregory T. Bowman, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
 
Docket No. 50-186 License No. R-103
 
Nonpublic
 
===Enclosure:===
NRC Security Inspection Report No. 50-186/2012-202 cc w/o encl: See next page
 
NOTICE: The enclosure contains Security-Related Information.
 
U p on se paration letter and Enclosure are DECONTROLLED. University of Missouri Docket No. 50-186
 
cc:
 
University of Missouri Associate Director Research Reactor Facility Columbia, MO 65201
 
Homeland Security Coordinator Missouri Office of Homeland Security P.O. Box 749 Jefferson City, MO 65102
 
Planner, Dept of Health and Senior Services Section for Environmental Public Health 930 Wildwood Drive, P.O. Box 570 Jefferson City, MO 65102-0570
 
Deputy Director for Policy Department of Natural Resources 1101 Riverside Drive Fourth Floor East Jefferson City, MO 65101
 
A-95 Coordinator Division of Planning Office of Administration P.O. Box 809, State Capitol Building Jefferson City, MO 65101
 
Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 June 29, 2012 Mr. Ralph Butler, Director Research Reactor Center University of Missouri - Columbia Research Park Columbia, MO 65211


SUBJECT: UNIVERSITY OF MISSOURI, COLUMBIA - NRC SECURITY-RELATED INSPECTION REPORT NO. 50-186/2012-202  
==SUBJECT:==
UNIVERSITY OF MISSOURI, COLUMBIA - NRC SECURITY-RELATED INSPECTION REPORT NO. 50-186/2012-202  


Dear M
Dear M
}}
}}

Revision as of 18:24, 28 June 2019

IR 05000186/12-202 on June 4-6, 2012, at the University of Missouri - Columbia Research Reactor - Transmittal Letter for NRC Security-Related Inspection Report No. 50-186/2012-202
ML12163A015
Person / Time
Site: University of Missouri-Columbia
Issue date: 06/29/2012
From: Gregory Bowman
Research and Test Reactors Branch B
To: Rhonda Butler
Univ of Missouri - Columbia
Shared Package
ML12163A008 List:
References
IR-12-202
Download: ML12163A015 (3)


Text

June 29, 2012

SUBJECT:

UNIVERSITY OF MISSOURI, COLUMBIA - NRC SECURITY-RELATED INSPECTION REPORT NO. 50-186/2012-202

Dear Mr. Butler:

June 29, 2012

SUBJECT:

UNIVERSITY OF MISSOURI, COLUMBIA - NRC SECURITY-RELATED INSPECTION REPORT NO. 50-186/2012-202

Dear M