ML14310A404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/24/2014
| issue date = 10/24/2014
| title = 2014-08 - Draft Outline Comments
| title = 2014-08 - Draft Outline Comments
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name =  
| addressee name =  

Revision as of 06:52, 21 June 2019

2014-08 - Draft Outline Comments
ML14310A404
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 10/24/2014
From: Vincent Gaddy
Operations Branch IV
To:
Entergy Operations
laura hurley
References
50-416/14-008, 50-417/14-008 50-416/OL-14, 50-417/OL-14
Download: ML14310A404 (2)


Text

Attachment 6 OBDI 202 - I OLE Process Rev 1 DRAFT OUTLINE COMMENTS Facility: Grand Gulf First Exam Date:

10/17/2014 Written Exam Outline Comment Resolution 1 NRC Generated NA 2 3 4 5 Administrative JPM Outline Comment Resolution 1 None 2 3 Ensure RO admin JPM 3 has 5 or fewer tags if this is a tagout type JPM.

This was confirmed.

4 5 Control Room / In

-Plant System JPM Outline Comment Resolution 1 General comment

- Confirm the simulator JPMs can be run in parallel and two are performed in the actual control room. Will discuss.

This was confirmed during validation.

2 3 4 5 Attachment 6 OBDI 202 - I OLE Process Rev 1 Simulator Scenario Outline Comments Comment Resolution 1 Revise the scenario to include some I/C events for the ATC prior to the main event. Currently, there is only one (event 6). Reword the critical tasks so they are tasks and are measurable.

These actions were completed.

2 Add one I/C event for the BOP prior to the main event unless there are BOP actions for event 5.

What actions does the BOP perform for reducing power (event 1)?

There are no malfunctions after entering the EOPs as required (see ES

-301-4). What are the critical tasks?

These deficiencies were corrected. The BOP has to reduce the main turbine pressure setpoint during power changes.

3 What actions does the BOP perform for reducing power (event 3)?

What are the critical tasks?

The BOP has to reduce the main turbine pressure setpoint during power changes.

4 Reword critical task 1 to something like "Before suppression pool temperature reaches 115 degrees-".

Reword critical task 2

- will discuss.

Reword critical task 3 to "Initiate rod insertion actions prior to exiting procedure EP

-2A." The critical tasks were revised.

5 What are the critical tasks?

Swap events 5 and 6.

The critical tasks were inserted into the scenario. Events 5 and 6 were swapped.