ML14310A404

From kanterella
Jump to navigation Jump to search
2014-08 - Draft Outline Comments
ML14310A404
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 10/24/2014
From: Vincent Gaddy
Operations Branch IV
To:
Entergy Operations
laura hurley
References
50-416/14-008, 50-417/14-008 50-416/OL-14, 50-417/OL-14
Download: ML14310A404 (2)


Text

DRAFT OUTLINE COMMENTS Grand Facility: First Exam Date: 10/17/2014 Gulf Written Exam Outline Comment Resolution 1 NRC Generated NA 2

3 4

5 Administrative JPM Outline Comment Resolution 1 None 2

Ensure RO admin JPM 3 has 5 or fewer This was confirmed.

3 tags if this is a tagout type JPM.

4 5

Control Room / In-Plant System JPM Outline Comment Resolution General comment - Confirm the This was confirmed during validation.

simulator JPMs can be run in parallel 1

and two are performed in the actual control room. Will discuss.

2 3

4 5 OBDI 202 - IOLE Process Rev 1

Simulator Scenario Outline Comments Comment Resolution Revise the scenario to include some I/C These actions were completed.

events for the ATC prior to the main event. Currently, there is only one 1

(event 6).

Reword the critical tasks so they are tasks and are measurable.

Add one I/C event for the BOP prior to These deficiencies were corrected. The BOP the main event unless there are BOP has to reduce the main turbine pressure actions for event 5. setpoint during power changes.

What actions does the BOP perform for 2

reducing power (event 1)?

There are no malfunctions after entering the EOPs as required (see ES-301-4).

What are the critical tasks?

What actions does the BOP perform for The BOP has to reduce the main turbine 3 reducing power (event 3)? pressure setpoint during power changes.

What are the critical tasks?

Reword critical task 1 to something like The critical tasks were revised.

Before suppression pool temperature reaches 115 degrees.

4 Reword critical task 2 - will discuss.

Reword critical task 3 to Initiate rod insertion actions prior to exiting procedure EP-2A.

What are the critical tasks? The critical tasks were inserted into the 5

Swap events 5 and 6. scenario. Events 5 and 6 were swapped. OBDI 202 - IOLE Process Rev 1