ML15314A111: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
==Subject:== | ==Subject:== | ||
Clinton Power Station Submittal of Integrated In i tial License Tra i ning Examination Materials Enclosed are the examinat i on materials which Exelon Generating Company , LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16 , 2015 and March 23 , 2015 at Clinton Power Station. This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations , Job Performance Measures , and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021 , " Operating Licensing Examination Standards", Revision 9 , Supplement | Clinton Power Station Submittal of Integrated In i tial License Tra i ning Examination Materials Enclosed are the examinat i on materials which Exelon Generating Company , LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16 , 2015 and March 23 , 2015 at Clinton Power Station. This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations , Job Performance Measures , and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021 , " Operating Licensing Examination Standards", Revision 9 , Supplement | ||
: 1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam i nation quality and are in compliance with NUREG-1021. I n accordance with NUREG-1021 , Section ES-201 , " Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete. | : 1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam i nation quality and are in compliance with NUREG-1021. I n accordance with NUREG-1021 , Section ES-201 , " Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete. | ||
There are no regulatory commitments contained in this letter. | There are no regulatory commitments contained in this letter. | ||
Line 35: | Line 35: | ||
==Subject:== | ==Subject:== | ||
Clinton Power Station Submittal of Integrated In i tial License Tra i ning Examination Materials Enclosed are the examinat i on materials which Exelon Generating Company , LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16 , 2015 and March 23 , 2015 at Clinton Power Station. This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations , Job Performance Measures , and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021 , " Operating Licensing Examination Standards", Revision 9 , Supplement | Clinton Power Station Submittal of Integrated In i tial License Tra i ning Examination Materials Enclosed are the examinat i on materials which Exelon Generating Company , LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16 , 2015 and March 23 , 2015 at Clinton Power Station. This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations , Job Performance Measures , and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021 , " Operating Licensing Examination Standards", Revision 9 , Supplement | ||
: 1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam i nation quality and are in compliance with NUREG-1021. I n accordance with NUREG-1021 , Section ES-201 , " Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete. | : 1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam i nation quality and are in compliance with NUREG-1021. I n accordance with NUREG-1021 , Section ES-201 , " Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete. | ||
There are no regulatory commitments contained in this letter. | There are no regulatory commitments contained in this letter. |
Revision as of 15:48, 27 April 2019
ML15314A111 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 11/10/2015 |
From: | NRC/RGN-III |
To: | Exelon Generation Co |
Zoia, C D | |
Shared Package | |
ML15124A055 | List: |
References | |
Download: ML15314A111 (2) | |
Text
Clinton Power Station 8401 Power Road Clinton , IL 61727 U-604195 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road , Suite 210 Lisle , Illinois 60532-4352 Clinton Power Station , Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Exelon Generation 10 CFR 55.40
Subject:
Clinton Power Station Submittal of Integrated In i tial License Tra i ning Examination Materials Enclosed are the examinat i on materials which Exelon Generating Company , LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16 , 2015 and March 23 , 2015 at Clinton Power Station. This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations , Job Performance Measures , and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021 , " Operating Licensing Examination Standards", Revision 9 , Supplement
- 1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam i nation quality and are in compliance with NUREG-1021. I n accordance with NUREG-1021 , Section ES-201 , " Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
There are no regulatory commitments contained in this letter.
U-604195 Page 2 Should you have any questions related to this information , please contact Mr. Christopher Dunn, Site Training Director , at (217) 937-4000. ,\ lJ\ ___, Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):
- RO/SRO Composite Examination with references attached
- Control Room Systems and Facility Walk-Through Job Performance Measures with references attached
- Administrative Topic Job Performance Measures with references attached
- Integrated Plant Operation Scenario Guides
- Completed Checklists
- o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc: Chief , NRC Operator Licensing Branch (without Attachments)
NRC Senior Resident Inspector
-Clinton Power Station (without Attachments)
NRC Document Control Desk (without attachments)
Clinton Power Station 8401 Power Road Clinton , IL 61727 U-604195 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road , Suite 210 Lisle , Illinois 60532-4352 Clinton Power Station , Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Exelon Generation 10 CFR 55.40
Subject:
Clinton Power Station Submittal of Integrated In i tial License Tra i ning Examination Materials Enclosed are the examinat i on materials which Exelon Generating Company , LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16 , 2015 and March 23 , 2015 at Clinton Power Station. This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations , Job Performance Measures , and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021 , " Operating Licensing Examination Standards", Revision 9 , Supplement
- 1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam i nation quality and are in compliance with NUREG-1021. I n accordance with NUREG-1021 , Section ES-201 , " Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
There are no regulatory commitments contained in this letter.
U-604195 Page 2 Should you have any questions related to this information , please contact Mr. Christopher Dunn, Site Training Director , at (217) 937-4000. ,\ lJ\ ___, Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):
- RO/SRO Composite Examination with references attached
- Control Room Systems and Facility Walk-Through Job Performance Measures with references attached
- Administrative Topic Job Performance Measures with references attached
- Integrated Plant Operation Scenario Guides
- Completed Checklists
- o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc: Chief , NRC Operator Licensing Branch (without Attachments)
NRC Senior Resident Inspector
-Clinton Power Station (without Attachments)
NRC Document Control Desk (without attachments)