|
---|
Category:License-Operator
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A4902022-01-28028 January 2022 Scenarios ML22157A0722022-01-28028 January 2022 Administered Scenarios ML22153A5142022-01-28028 January 2022 Inplant JPM ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 ML22153A4882022-01-28028 January 2022 RO Admin JPM ML22153A4942022-01-28028 January 2022 Sim JPM ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A1192022-01-28028 January 2022 Administered SRO Written Exam ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22157A1452022-01-28028 January 2022 Administered in Plant JPM U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A5302022-01-28028 January 2022 ES-301-1 Clinton Jan 22 ML22157A1982022-01-28028 January 2022 Administered RO Admin JPM ML22153A4982022-01-28028 January 2022 SRO Admin JPM ML22157A4162022-01-28028 January 2022 Outline Review Comments Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 2024-06-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 ML22157A1192022-01-28028 January 2022 Administered SRO Written Exam ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A4142022-01-28028 January 2022 ES-401-9 Written Exam Review Wksht Clinton 22 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A4162022-01-28028 January 2022 Outline Review Comments Clinton 2022 ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22157A1452022-01-28028 January 2022 Administered in Plant JPM ML22153A4942022-01-28028 January 2022 Sim JPM ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22153A5142022-01-28028 January 2022 Inplant JPM ML22157A0702022-01-28028 January 2022 Administered RO Written Exam ML22153A4682022-01-28028 January 2022 ES-301-4 ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22153A5252022-01-28028 January 2022 ES-301-2 Clinton Jan 22 ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4902022-01-28028 January 2022 Scenarios 2024-06-27
[Table view] |
Text
Exelon Generation Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604195 10 CFR 55.40 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle , Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company, LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16, 2015 and March 23, 2015 at Clinton Power Station.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
These examination materials have been developed in accordance with NUREG-1021 ,
"Operating Licensing Examination Standards", Revision 9, Supplement 1. Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam ination quality and are in compliance with NUREG-1021 .
In accordance with NUREG-1021 , Section ES-201 , "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
There are no regulatory commitments contained in this letter.
U-604195 Page 2 Should you have any questions related to this information, please contact Mr. Christopher Dunn, Site Training Director, at (217) 937-4000.
Respec~ully,
,\ lJ\ ___,
~~k ~~~ mer Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):
- RO/SRO Composite Examination with references attached
- Integrated Plant Operation Scenario Guides
o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc: Chief, NRC Operator Licensing Branch (without Attachments)
NRC Senior Resident Inspector - Clinton Power Station (without Attachments)
NRC Document Control Desk (without attachments)
Exelon Generation Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604195 10 CFR 55.40 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle , Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company, LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16, 2015 and March 23, 2015 at Clinton Power Station.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
These examination materials have been developed in accordance with NUREG-1021 ,
"Operating Licensing Examination Standards", Revision 9, Supplement 1. Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam ination quality and are in compliance with NUREG-1021 .
In accordance with NUREG-1021 , Section ES-201 , "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
There are no regulatory commitments contained in this letter.
U-604195 Page 2 Should you have any questions related to this information, please contact Mr. Christopher Dunn, Site Training Director, at (217) 937-4000.
Respec~ully,
,\ lJ\ ___,
~~k ~~~ mer Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):
- RO/SRO Composite Examination with references attached
- Integrated Plant Operation Scenario Guides
o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc: Chief, NRC Operator Licensing Branch (without Attachments)
NRC Senior Resident Inspector - Clinton Power Station (without Attachments)
NRC Document Control Desk (without attachments)