JPM Number: JPM416 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3313.01 Rev: 16d Procedure CPS 3312.01 Rev: 45b Procedure Rev:
- 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12
JPM Number: JPM416 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any suitable IC which will establish the following conditions:
- RPV level between Level 1 and Level 3
- RPV Inlet Valves 1B21-F065A and 1B21-F065B shut
- Drywell Pressure less than 1.68 psig
- Division 1 ECCS initiation logic not sealed in
- HPCS Pump shaft sheared.
- 4160V Bus 1B1 de-energized.
- 3. Release JPM416 which will establish the following:
- S_A05_A02_A09S61B_1 LPCS/LPCI FM RHR A MAN INIT PB overridden in the Release position.
- Insert malfunctions LP17BE21C1FTC LPCS Pump Bkr Fails To Close and RH51BE12C2AFTC RHR Pump A Bkr Fails To Close.
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-209 (PW-91632) is saved for the 2014 ILT NRC Exam.
- 7. Freeze Simulator.
Page 4 of 12
JPM Number: JPM416 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- Either Low Pressure Core Spray Pump or Residual Heat Removal Pump A is running and injecting into the RPV maintaining RPV level between +8.9 inches (Level 3) and +52 inches (Level 8).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS 3313.01, Rev 16d LOW PRESSURE CORE SPRAY (LPCS)
- CPS 3312.01, Rev. 45b RESIDUAL HEAT REMOVAL (RHR)
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
- This JPM is written to trip the first ECCS Pump (LPCS or RHR A) that the examinee attempts to start, requiring the examinee to use the opposite pump to restore RPV water level (alternate path).
Page 5 of 12
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3408.01 Rev: 18b Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any Mode 4 IC with Containment Building Ventilation and Continuous Containment Purge systems secured and CCP ready for startup.
- 2. Ensure clearance tags are removed from the following P800 VR/VQ Control Switches:
- 5. Place / verify the CCP Joystick in the Neutral position.
- 7. Release JPM417 which will insert an override on the CNMT CONTINUOUS PRG MODE SWITCH in the Neutral position (S_A18_A03_S08 = 5 Neutral)
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-206 (PW 91632) is saved for the ILT 14-1 NRC Exam.
- 7. Freeze Simulator.
Page 4 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- The Containment Building Ventilation System is running in Containment Vent Mode per CPS 3408.01 Containment Building / Drywell HVAC (VR, VQ).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
Page 6 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3408.01 CONTAINMENT BUILDING/DRYWELL HVAC (VR, VQ) 8.1.1.1 Startup Continuous Containment Purge Unfiltered (Auto)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 1 Examinee attempts to startup the 8.1.1.1.3 Continuous Containment Purge Examinee determines that the valve alignment System in the Unfiltered Mode verifications listed in the step are not applicable in (Auto) (fails). Mode 4.
8.1.1.1.4 On 1H13-P800-5043, the examinee verifies the control switches for 1VR006A, 6B, 7B, and 7A are in the center position (Auto) with the green indicating lights lit and the red indicating lights extinguished.
8.1.1.1.5 On 1H13-P800-5042, the examinee rotates the control switch for 1VQ003 DW Prg Cnmt Exh Inbd Isol Vlv fully clockwise and verifies the red light illuminates and the green light extinguishes.
8.1.1.1.6 & 7 On 1H13-P800-5043, the examinee verifies that the 1VR06CA/CB and 7CA/CB Selector switches are in the 06CA LEAD and 07CA LEAD positions.
8.1.1.1.8
- On 1H13-P800-5043, operator depresses the center release button on 1HS-VR101, positions the joystick to the UNFILT position (to the right), and then observes that none of the system valves reposition or the system fans start.
- Examinee reports failure of the CCP system to Page 8 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number align and start correctly.
Cues:
- When the failure is reported, acknowledge the report
- If the examinee asks for further direction, cue him/her that containment ventilation is needed to support the critical path work.
Begin Alternate Path 2 Examinee attempts to startup the 8.2.1.1.1 / 8.1.3 Continuous Containment Purge System in the Unfiltered Mode Examinee secures the CCP system per section (Manual Operation) (fails). 8.1.3 of 3408.01.
8.2.1.1.4 On 1H13-P800-5042, the examinee rotates the Note to evaluator - JPM step 2 is control switch for 1VQ003 DW Prg Cnmt Exh Inbd NA if the examinee elects to startup Isol Vlv fully clockwise and verifies the red light the Containment Building illuminates and the green light extinguishes.
Ventilation System in Containment Vent Mode Manual or Auto (JPM 8.2.1.1.5 Step 3 and 4) On 1H13-P800-5043, operator depresses the center release button on 1HS-VR101, positions the joystick to the MANUAL position (to the top).
8.2.1.1.6 & 8.2.1.1.7 On 1H13-P800-5043, the examinee verifies that the 1VR06CA/CB and 7CA/CB Selector switches are in the 06CA LEAD and 07CA LEAD positions.
8.2.1.1.8
- On 1H13-P800-5043, the examinee rotates the control switch for 1VR006A clockwise to the OPEN position and observes NO change in valve position.
- Examinee reports failure of the CCP system to align and start correctly.
Cues:
- When the failure is reported, acknowledge the report
- If the examinee asks for further direction, cue him/her that containment ventilation is needed to support the critical path work.
Page 9 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 3 Examinee starts the Containment *8.2.1.2.1 / 8.1.3 Building Ventilation System in Examinee secures the CCP system per Containment Vent Mode section 8.1.3 of 3408.01.
(Manual).
8.2.1.2.2 On 1H13-P800-5042, the examinee verifies the Note to evaluator - JPM step 3 is CNMT Bldg Vent Sys Switch is in the MANUAL NA if the examinee elects to position (rotated counterclockwise).
startup the Containment Building Ventilation System in 8.2.1.2.3 Containment Vent Mode (Auto) On 1H13-P800-5042, the examinee verifies the (JPM Step 4) CNMT BLDG SPLY FAN 1VR03CA/CB SELECTOR SWITCH is in FAN A FAST position.
8.2.1.2.4 On 1H13-P800-5042, the examinee verifies the CNMT BLDG EXH FAN 1VR04CA/CB SELECTOR SWITCH is in FAN 4CA position.
- 8.2.1.2.6 On 1H13-P800-5042, the examinee rotates the control switches for 1VR001A, 1VR001B, 1VQ004B, 1VQ004A, 1VQ003, and 1VQ01Y clockwise to the OPEN position, and verifies the red light illuminates and the green light extinguishes for each valve.
- 8.2.1.2.7 On 1H13-P800-5042, the examinee rotates the control switch for CNMT Bldg Exh Fan 4CA to the START position, releases the switch, and then verifies the red light illuminates and the green light extinguishes. Examinee also verifies that the red light illuminates and the green light extinguishes for CNMT Bldg Exh Fan 4CA Isol Dmpr 1VR08YA.
- 8.2.1.2.8 On 1H13-P800-5042, the examinee rotates the control switch for CNMT Bldg Sply Fan 3CA to the START position, releases the switch, and then verifies the red light illuminates and the green light extinguishes. Examinee also verifies that the red lights illuminate and the green lights extinguish for CNMT Bldg Sply Fan 3CA Isol Dmpr 1VR02YA and CNMT Bldg Outside Air Sply Inlt Dmpr 1VR01Y.
Page 10 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.2.1.2.9 Examinee contacts an Equipment Operator to turn 1VR01A on.
Cues:
If the examinee requests outside air temperature, cue him / her that outside air temperature is 55°F.
8.2.1.2.10 Operator directs an Equipment Operator to start/verify running 1VR12C.
Cues:
1VR12C is running.
8.2.1.2.11 Operator contacts Chemistry to perform CPS 1024.35 Control of Radioactive Effluents as necessary.
Cues:
Acknowledge the direction from the operator.
State that the JPM is complete.
Page 11 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 4 Examinee starts the Containment *8.1.1.3.1 / 8.1.3 Building Ventilation System in Examinee secures the Continuous Containment Vent Mode (Auto). Containment Purge System.
Note to evaluator - JPM step 4 is NA if the examinee elects to startup the Containment Building Ventilation System in Containment *8.1.1.3.3 Vent Mode (Manual) (JPM Step 3)
On 1H13-P800-5042, the examinee rotates the CNMT BLDG VENT SYS SWITCH clockwise to the AUTO position.
- 8.1.1.3.4 On 1H13-P800-5042, the examinee rotates the control switch for 1VQ003 DW Prg Cnmt Exh Inbd Isol Vlv clockwise to the AUTO position.
8.1.1.3.5 On 1H13-P800-5042, the examinee verifies that the CNMT BLDG SPLY FAN 1VR03CA/CB SELECTOR SWITCH is in FAN A FAST position.
8.1.1.3.6 On 1H13-P800-5042, the examinee verifies that the CNMT BLDG EXH FAN 1VR04CA/CB SELECTOR SWITCH is in FAN 4CA position.
Page 12 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 8.1.1.3.7 On 1H13-P800-5042, the examinee depresses the center release button on 1HS-VR001 and then positions the joystick to the top position (CNMT VENT) and then observes the following:
- Supply Fan 1VR03CA starts (green light OFF, red light ON)
- 1VR02YA opens (green light OFF, red light ON)
- 1VR01Y opens (green light OFF, red light ON)
- 1VR001A opens (green light OFF, red light ON)
- 1VR001B opens (green light OFF, red light ON)
- 1VQ003 opens (green light OFF, red light ON)
- 1VQ004B opens (green light OFF, red light ON)
- 1VQ004A opens (green light OFF, red light ON)
- 1VQ01Y opens (green light OFF, red light ON)
- Exhaust Fan 1VR04CA starts (green light OFF, red light ON)
- 1VR08YA opens (green light OFF, red light ON) 8.1.1.3.8 Examinee contacts an Equipment Operator to turn 1VR01A on.
Cues:
- If the examinee requests outside air temperature, cue him / her that outside air temperature is 55°F.
8.1.1.3.9 Operator asks if cooling is desired.
Cues:
- Cooling is not desired.
Page 13 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.1.3.10 Operator directs an Equipment Operator to start/verify running 1VR12C.
Cues:
- 1VR12C is running.
8.1.1.3.11 Operator contacts Chemistry to perform CPS 1024.35 Control of Radioactive Effluents as necessary.
Cues:
- Acknowledge the direction from the operator.
8.1.1.3.12 On 1H13-P800-5042 the Operator rotates the control switches for the running fans (1VR03CA and 1VR04CA) clockwise to the after start position, releases each control switch, and then verifies annunciator 5042-5G AUTO START VR SYSTEM SUP/EXH FAN resets.
Cues:
State that the JPM is complete.
TERMINATING CUES:
The Containment Building Ventilation system is operating in Containment Vent Mode IAW CPS 3408.01 Containment Building /Drywell HVAC (VR, VQ).
STOP TIME:
Page 14 of 16
JPM Number: JPM418 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 9080.02 Rev: 52a Procedure Rev:
Procedure Rev:
Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13
JPM Number: JPM418 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 2. Perform/verify the following panel manipulations:
- Start Diesel Generator 1B
- DG 1B Output Breaker Synch Switch is off with the key removed.
- Make sure recorder power is on to allow the SVC Voltmeter to indicate.
- 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 4. This completes the setup for this JPM.
- 5. Save to a different IC if JPM is being used more than once. IC-205 OR IC-206 is saved for the 2014 ILT NRC Exam (password 91632).
- 6. Freeze Simulator.
Page 4 of 13
JPM Number: JPM418 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- Examinee parallels and loads Diesel Generator 1B.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 3506.01C002, Rev 12 DIESEL GENERATOR 1B PRE-START CHECKLIST
- CPS No. 3506.01C005, Rev 1a DIESEL GENERATOR START LOG
- CPS No. 3506.01D002, Rev 5a DIESEL GENERATOR 1B OPERATING LOGS
- CPS No. 9080.02, Rev 52a DIESEL GENERATOR 1B OPERABILITY - MANUAL AND QUICK START OPERABILITY
- CPS No. 9080.02D001, Rev 43 DIESEL GENERATOR 1B OPERABILITY - MANUAL AND QUICK START DATA SHEET EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
Page 5 of 13
JPM Number: JPM429 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3302.01 Rev: 35a Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13
JPM Number: JPM429 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to a full power IC. Perform the following:
- Trip the A Reactor Feedpump Turbine and allow the RR Flow Control Valves to runback.
- Restore the A Reactor Feedpump to service.
- 2. No simulator lesson plan is required for this JPM.
- 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 4. This completes the setup for this JPM.
- 5. Save to a different IC if JPM is being used more than once. IC-205 is saved for the ILT 14-1 NRC Exam (password 91632).
- 6. Freeze Simulator.
Page 4 of 13
JPM Number: JPM429 - rev 01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- The Reactor Recirculation (RR) System Flow Control Valve (FCV) Runback is reset IAW section 8.4.2 of CPS 3302.01 REACTOR RECIRCULATION.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 3302.01, Rev 35a REACTOR RECIRCULATION EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- Do NOT allow examinee to shine any type light into a panel.
- All pre-job briefings are completed.
Page 5 of 13
JPM Number: JPM501 - rev 02 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 9031.07 Rev: 33b Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10
JPM Number: JPM501 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Reset the simulator to an IC with the Main Turbine On-line.
- 2. Ensure computer points C71-NC013, 14, 15, 16, 17, 18, 19, and 20 are displayed on PPC Display
- 10.
- 3. No Simulator Lesson Plan is required for this JPM.
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-205 is saved for the ILT 14-1 NRC Exam (password 91632).
- 7. Freeze Simulator.
Page 4 of 10
JPM Number: JPM501 - rev 02 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- The Main Turbine (TG) System Main Turbine Control Valve Tests is complete IAW CPS 9031.07.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 9031.07, Rev 33b MAIN TURBINE CONTROL VALVE TESTS EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
- This JPM contains cues provided to the examinee from the evaluator and the instructor stationed at 1H13-P678. Review these cues to ensure the communications to the examinee are coordinated between the instructor and evaluator.
Page 5 of 10
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3103.01 Rev: 29d Procedure CPS 5002.02 Rev: 29 Procedure CPS 5002.03 Rev: 28
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any suitable IC (comparable with IC-8) with TDRFP A on the MLC in auto and the TDRFP B in rolling standby.
- 3. Release JPM530 which will perform the following:
- Disable TDRFP B trips from 1H13-P680.
- Insert vibration alarms and indications when TDRFP B speed is increased above 2800 rpm.
- Insert seat leakage into the HPSV & HPCV (9% & 2% respectively)
- a. MS0ASLVALVE41 9%
- b. MS0ASLVALVE40 2%
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-208 is saved for the ILT 14-1 NRC Exam (password 91632).
- 7. Freeze Simulator.
Page 4 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- Mitigating actions have been taken for high vibrations on the B TDRFP and the RFP has been secured.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 5002.02, Rev 29 Alarm Panel 5002 Annunciators - Row 2
- CPS No. 5002.03, Rev 28 Alarm Panel 5002 Annunciators - Row 3 EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
Page 5 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3103.01 Feedwater (FW) section 8.1.4.4 Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B)
Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 8.1.4.4 Transfer rolling STANDBY TDRFP B to 8.1.4.4.1 feeding RPV through 1FW002B. Examinee determines TDRFP B is in rolling standby per the initiating cue.
8.1.4.4.2 Examinee determines that 5 Condensate Polishers are adequate to perform the evolution.
Cue: 5 Condensate Polishers are in service.
8.1.4.4.3 Examinee observes Red M on the Digital Feedwater Display for 1FW010B and the 1FW010B valve icon is red.
8.1.4.4.4 Examinee observes that TDRFP B speed is ~ 2370 rpm and that no further actions are required.
- 8.1.4.4.5 Examinee clicks on:
- Valve icon for 1FW002B
- TDRFP Main Discharge Valve 1FW002B (and observes the blue outline on the control box)
- Open (and then verifies indication changes to Intermediate and then Full Open)
- Exit Page 7 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 8.1.4.4 Transfer rolling STANDBY TDRFP B to *8.1.4.4.6 feeding RPV through 1FW002B (cont.) Examinee clicks on:
- Valve icon for 1FW010B
- 1FW010B Min Flow (and observes the blue outline on the control box)
- Close
- Exit Note: 1FW010B will not physically close with TDRFP B reset and 1FW002B full open.
If the examinee depresses the 1FW010B close pushbutton before 1FW002B is full open, 1FW010B will close. If this happens, the error should be considered a failure of a critical step.
NOTE Steps 8.1.4.4.7 and 8.1.4.4.8 have been deleted in the procedure. Step 8.1.4.4.9 is N/A.
- 8.1.4.4 *8.1.4.4.10 (cont.) Examinee observes that TDRFP B indicates FPB Speed Setter.
Examinee clicks on:
- FPB Speed Setter
- TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
- Bring Pump On-Line (and then verifies TDRFP B speed increasing)
- Exit Page 8 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
ALTERNATE PATH BEGINS Annunciator 5002-2F High Vibr RFP 1B Shaft will be received when TDRFP B speed increases above 2800 rpm.
Annunciator 5002-3F High Vibr RFPT 1B Shaft will be received 30 seconds later.
Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.4.4.10 Reduce Turbine Speed to clear vibration 8.1.4.4.10.2.c alarms (fails) Examinee clicks on:
5002-2F
- FPB Speed Setter 5002-3F
- TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
- Speed Setter Mode
- Exit Examinee clicks on:
- FPB (pump icon)
- TDRFP B (and observes the blue outline on the control box)
- until setpoint (SP) indicates 0 RPM (and then observes that TDRFP B speed begins to lower, but stabilizes at ~ 2000 RPM and that annunciators 5002-2F and 3F remain locked in)
- Exit Cue: If the examinee requests an Equipment Operator to investigate, acknowledge the order and then cue the examinee, Vibrations can be felt on the floor of TB 800. Im leaving due to safety concerns.
Page 9 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.10 TDRFP Shutdown 8.1.10.1 Examinee discusses with the CRS the need to lockout the RR FCVs during the TDRFP S/D.
Cue: Do not lockout the RR FCVs.
Note: If the examinee elects to trip B TDRFP based on the report from the Equipment Operator, this step is NA.
8.1.10.4 Examinee clicks on:
- FPB Trip/Reset pushbutton
- TDRFP B (and observes the blue outline on the control box)
- Exit (may or may not perform)
Examinee reports failure of the B TDRFP to trip to the CRS.
- 8.3.14 Securing A TDRFP That Will Not Trip 8.3.14.1 From P680 On 1H13-P680-5002, the examinee depresses the L pushbutton on the B TDRFP SLIM Controller and verifies the L pushbutton red light illuminates.
8.3.14.2 No action required; the SLIM is at 0%
output.
- 8.3.14.3 Examinee locates control switch for 1B21-F303B on 1H13-P870-5016, rotates the control switch counter clockwise to the close position, and then verifies the green light illuminates and the red light extinguishes.
Examinee verifies TDRFP B RPM lowering, and that the high vibration annunciators clear.
Cue: the JPM is complete.
Page 10 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
TERMINATING CUES:
The B TDRFP is secured IAW CPS No. 3103.01 section 8.3.14 Securing A TDRFP That Will Not Trip From P680.
STOP TIME:
Page 11 of 13
JPM Number: JPM531 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3320.01 Rev: 12 Procedure CPS 3317.01 Rev: 30c Procedure CPS 3312.01 Rev: 45b
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 16
JPM Number: JPM531 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any suitable IC with:
- a. Reactor in Mode 3 or 4
- b. RHR Pump A in standby
- c. Upper Pools dumped per CPS 4411.03 Appendix E Method 1.0 Dump Upper Pools (1FC036 and 1FC037 shut; 1SM001A, 2A, 1B, and 2B open.
- 1) SHUT 1SM001A, 2A, 1B, AND 2B as soon as 5040-5E LOW LEVEL CNMT XFER POOL is received (note - delaying this action will add substantial time to the JPM).
- 4. When requested by the examinee to energize 1E12-F037A, release JPM531 which will energize 1E12-F037A RHR A Cnmt Pool Cooling & Shutoff Valve.
- 5. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 6. This completes the setup for this JPM.
- 7. Save to a different IC if JPM is being used more than once. IC-206 (PW-91632) is saved for the 2014 ILT NRC Exam.
- 8. Freeze Simulator.
Page 4 of 16
JPM Number: JPM531 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- The Upper Containment Pool level has been restored IAW CPS 3312.01 Residual Heat Removal (RHR) section 8.3.2 Pumping Suppression Pool to CNMT Pool.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS 3317.01, Rev 30c Fuel Pool Cooling and Cleanup (FC)
- CPS 3312.01, Rev. 45b Residual Heat Removal (RHR)
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
- This JPM requires the breaker to be turned ON for 1E12-F037A (step 8.3.2.5) which is performed by inserting a remote function from the simulator booth. Be prepared to communicate with the simulator booth operator to accomplish this step.
- The cue for critical step 8.3.2.12.1 to close 1E12-F037A is triggered when annunciator 5040-5F Low Level Upper CNMT Pool resets. Be prepared to provide the cue to the examinee when annunciator 5040-5F resets.
- After the examinee has repeated back the initiating cue, provide the examinee with CPS 3317.01 Fuel Pool Cooling and Cleanup (FC) and CPS 3312.01 Residual Heat Removal (RHR).
Page 5 of 16
JPM Number: JPM537 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1) Task description and number, JPM description and number are identified.
________ 2) Knowledge and Abilities (K/A) references are included.
________ 3) Performance location specified. (in-plant, control room, simulator, or other)
________ 4) Initial setup conditions are identified.
________ 5) Initiating cue (and terminating cue if required) are properly identified.
________ 6) Task standards identified and verified by SME review.
________ 7) Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8) Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 9031.10 Rev: 25c Procedure CPS 3101.01 Rev: 23b Procedure Rev:
________ 9) Verify cues both verbal and visual are free of conflict.
________ 10) Verify performance time is accurate
________ 11) If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12) When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 17
JPM Number: JPM537 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 3. Release JPM537 which will perform the following:
- Insert malfunction YAMSSIFP_2 0% (causes 1B21-F022B to fail completely closed) when the test push-button is depressed and then released for 1B21-F022B, Main Steam Line B Inbd MSIV.
- Deletes malfunction YAMSSIFP_2 0% when the control switch for 1B21-F022B is placed in CLOSE.
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-205 (PW-91632) is saved for the 2014 ILT NRC Exam.
- 7. Station an instructor to acknowledge alarms (not associated with the JPM) and perform Independent Verifications as required.
- 8. Freeze Simulator.
Page 4 of 17
JPM Number: JPM537 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- 1B21-F022B Main Steam Line B Inbd MSIV is open IAW CPS 3101.01 Main Steam (MS).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 9031.10, Rev 25c RPS Main Steam Line Isolation Valve Channel Functional
- CPS 3101.01, Rev23b Main Steam (MS, IS & ADS)
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
- When the initiating cue has been acknowledged by the examinee, provide the examinee with a copy of CPS 9031.10 RPS Main Steam Line Isolation Valve Channel Functional. Do NOT provide the examinee with the copy of CPS 3101.01 Main Steam that is included in the JPM package until the examinee locates the procedure to perform the alternate path steps beginning on page 12.
Page 5 of 17
JPM Number: JPM416 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3313.01 Rev: 16d Procedure CPS 3312.01 Rev: 45b Procedure Rev:
- 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12
JPM Number: JPM416 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any suitable IC which will establish the following conditions:
- RPV level between Level 1 and Level 3
- RPV Inlet Valves 1B21-F065A and 1B21-F065B shut
- Drywell Pressure less than 1.68 psig
- Division 1 ECCS initiation logic not sealed in
- HPCS Pump shaft sheared.
- 4160V Bus 1B1 de-energized.
- 3. Release JPM416 which will establish the following:
- S_A05_A02_A09S61B_1 LPCS/LPCI FM RHR A MAN INIT PB overridden in the Release position.
- Insert malfunctions LP17BE21C1FTC LPCS Pump Bkr Fails To Close and RH51BE12C2AFTC RHR Pump A Bkr Fails To Close.
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-209 (PW-91632) is saved for the 2014 ILT NRC Exam.
- 7. Freeze Simulator.
Page 4 of 12
JPM Number: JPM416 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- Either Low Pressure Core Spray Pump or Residual Heat Removal Pump A is running and injecting into the RPV maintaining RPV level between +8.9 inches (Level 3) and +52 inches (Level 8).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS 3313.01, Rev 16d LOW PRESSURE CORE SPRAY (LPCS)
- CPS 3312.01, Rev. 45b RESIDUAL HEAT REMOVAL (RHR)
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
- This JPM is written to trip the first ECCS Pump (LPCS or RHR A) that the examinee attempts to start, requiring the examinee to use the opposite pump to restore RPV water level (alternate path).
Page 5 of 12
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3408.01 Rev: 18b Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any Mode 4 IC with Containment Building Ventilation and Continuous Containment Purge systems secured and CCP ready for startup.
- 2. Ensure clearance tags are removed from the following P800 VR/VQ Control Switches:
- 5. Place / verify the CCP Joystick in the Neutral position.
- 7. Release JPM417 which will insert an override on the CNMT CONTINUOUS PRG MODE SWITCH in the Neutral position (S_A18_A03_S08 = 5 Neutral)
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-206 (PW 91632) is saved for the ILT 14-1 NRC Exam.
- 7. Freeze Simulator.
Page 4 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- The Containment Building Ventilation System is running in Containment Vent Mode per CPS 3408.01 Containment Building / Drywell HVAC (VR, VQ).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
Page 6 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3408.01 CONTAINMENT BUILDING/DRYWELL HVAC (VR, VQ) 8.1.1.1 Startup Continuous Containment Purge Unfiltered (Auto)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 1 Examinee attempts to startup the 8.1.1.1.3 Continuous Containment Purge Examinee determines that the valve alignment System in the Unfiltered Mode verifications listed in the step are not applicable in (Auto) (fails). Mode 4.
8.1.1.1.4 On 1H13-P800-5043, the examinee verifies the control switches for 1VR006A, 6B, 7B, and 7A are in the center position (Auto) with the green indicating lights lit and the red indicating lights extinguished.
8.1.1.1.5 On 1H13-P800-5042, the examinee rotates the control switch for 1VQ003 DW Prg Cnmt Exh Inbd Isol Vlv fully clockwise and verifies the red light illuminates and the green light extinguishes.
8.1.1.1.6 & 7 On 1H13-P800-5043, the examinee verifies that the 1VR06CA/CB and 7CA/CB Selector switches are in the 06CA LEAD and 07CA LEAD positions.
8.1.1.1.8
- On 1H13-P800-5043, operator depresses the center release button on 1HS-VR101, positions the joystick to the UNFILT position (to the right), and then observes that none of the system valves reposition or the system fans start.
- Examinee reports failure of the CCP system to Page 8 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number align and start correctly.
Cues:
- When the failure is reported, acknowledge the report
- If the examinee asks for further direction, cue him/her that containment ventilation is needed to support the critical path work.
Begin Alternate Path 2 Examinee attempts to startup the 8.2.1.1.1 / 8.1.3 Continuous Containment Purge System in the Unfiltered Mode Examinee secures the CCP system per section (Manual Operation) (fails). 8.1.3 of 3408.01.
8.2.1.1.4 On 1H13-P800-5042, the examinee rotates the Note to evaluator - JPM step 2 is control switch for 1VQ003 DW Prg Cnmt Exh Inbd NA if the examinee elects to startup Isol Vlv fully clockwise and verifies the red light the Containment Building illuminates and the green light extinguishes.
Ventilation System in Containment Vent Mode Manual or Auto (JPM 8.2.1.1.5 Step 3 and 4) On 1H13-P800-5043, operator depresses the center release button on 1HS-VR101, positions the joystick to the MANUAL position (to the top).
8.2.1.1.6 & 8.2.1.1.7 On 1H13-P800-5043, the examinee verifies that the 1VR06CA/CB and 7CA/CB Selector switches are in the 06CA LEAD and 07CA LEAD positions.
8.2.1.1.8
- On 1H13-P800-5043, the examinee rotates the control switch for 1VR006A clockwise to the OPEN position and observes NO change in valve position.
- Examinee reports failure of the CCP system to align and start correctly.
Cues:
- When the failure is reported, acknowledge the report
- If the examinee asks for further direction, cue him/her that containment ventilation is needed to support the critical path work.
Page 9 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 3 Examinee starts the Containment *8.2.1.2.1 / 8.1.3 Building Ventilation System in Examinee secures the CCP system per Containment Vent Mode section 8.1.3 of 3408.01.
(Manual).
8.2.1.2.2 On 1H13-P800-5042, the examinee verifies the Note to evaluator - JPM step 3 is CNMT Bldg Vent Sys Switch is in the MANUAL NA if the examinee elects to position (rotated counterclockwise).
startup the Containment Building Ventilation System in 8.2.1.2.3 Containment Vent Mode (Auto) On 1H13-P800-5042, the examinee verifies the (JPM Step 4) CNMT BLDG SPLY FAN 1VR03CA/CB SELECTOR SWITCH is in FAN A FAST position.
8.2.1.2.4 On 1H13-P800-5042, the examinee verifies the CNMT BLDG EXH FAN 1VR04CA/CB SELECTOR SWITCH is in FAN 4CA position.
- 8.2.1.2.6 On 1H13-P800-5042, the examinee rotates the control switches for 1VR001A, 1VR001B, 1VQ004B, 1VQ004A, 1VQ003, and 1VQ01Y clockwise to the OPEN position, and verifies the red light illuminates and the green light extinguishes for each valve.
- 8.2.1.2.7 On 1H13-P800-5042, the examinee rotates the control switch for CNMT Bldg Exh Fan 4CA to the START position, releases the switch, and then verifies the red light illuminates and the green light extinguishes. Examinee also verifies that the red light illuminates and the green light extinguishes for CNMT Bldg Exh Fan 4CA Isol Dmpr 1VR08YA.
- 8.2.1.2.8 On 1H13-P800-5042, the examinee rotates the control switch for CNMT Bldg Sply Fan 3CA to the START position, releases the switch, and then verifies the red light illuminates and the green light extinguishes. Examinee also verifies that the red lights illuminate and the green lights extinguish for CNMT Bldg Sply Fan 3CA Isol Dmpr 1VR02YA and CNMT Bldg Outside Air Sply Inlt Dmpr 1VR01Y.
Page 10 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.2.1.2.9 Examinee contacts an Equipment Operator to turn 1VR01A on.
Cues:
If the examinee requests outside air temperature, cue him / her that outside air temperature is 55°F.
8.2.1.2.10 Operator directs an Equipment Operator to start/verify running 1VR12C.
Cues:
1VR12C is running.
8.2.1.2.11 Operator contacts Chemistry to perform CPS 1024.35 Control of Radioactive Effluents as necessary.
Cues:
Acknowledge the direction from the operator.
State that the JPM is complete.
Page 11 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 4 Examinee starts the Containment *8.1.1.3.1 / 8.1.3 Building Ventilation System in Examinee secures the Continuous Containment Vent Mode (Auto). Containment Purge System.
Note to evaluator - JPM step 4 is NA if the examinee elects to startup the Containment Building Ventilation System in Containment *8.1.1.3.3 Vent Mode (Manual) (JPM Step 3)
On 1H13-P800-5042, the examinee rotates the CNMT BLDG VENT SYS SWITCH clockwise to the AUTO position.
- 8.1.1.3.4 On 1H13-P800-5042, the examinee rotates the control switch for 1VQ003 DW Prg Cnmt Exh Inbd Isol Vlv clockwise to the AUTO position.
8.1.1.3.5 On 1H13-P800-5042, the examinee verifies that the CNMT BLDG SPLY FAN 1VR03CA/CB SELECTOR SWITCH is in FAN A FAST position.
8.1.1.3.6 On 1H13-P800-5042, the examinee verifies that the CNMT BLDG EXH FAN 1VR04CA/CB SELECTOR SWITCH is in FAN 4CA position.
Page 12 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 8.1.1.3.7 On 1H13-P800-5042, the examinee depresses the center release button on 1HS-VR001 and then positions the joystick to the top position (CNMT VENT) and then observes the following:
- Supply Fan 1VR03CA starts (green light OFF, red light ON)
- 1VR02YA opens (green light OFF, red light ON)
- 1VR01Y opens (green light OFF, red light ON)
- 1VR001A opens (green light OFF, red light ON)
- 1VR001B opens (green light OFF, red light ON)
- 1VQ003 opens (green light OFF, red light ON)
- 1VQ004B opens (green light OFF, red light ON)
- 1VQ004A opens (green light OFF, red light ON)
- 1VQ01Y opens (green light OFF, red light ON)
- Exhaust Fan 1VR04CA starts (green light OFF, red light ON)
- 1VR08YA opens (green light OFF, red light ON) 8.1.1.3.8 Examinee contacts an Equipment Operator to turn 1VR01A on.
Cues:
- If the examinee requests outside air temperature, cue him / her that outside air temperature is 55°F.
8.1.1.3.9 Operator asks if cooling is desired.
Cues:
- Cooling is not desired.
Page 13 of 16
JPM Number: JPM417 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.1.3.10 Operator directs an Equipment Operator to start/verify running 1VR12C.
Cues:
- 1VR12C is running.
8.1.1.3.11 Operator contacts Chemistry to perform CPS 1024.35 Control of Radioactive Effluents as necessary.
Cues:
- Acknowledge the direction from the operator.
8.1.1.3.12 On 1H13-P800-5042 the Operator rotates the control switches for the running fans (1VR03CA and 1VR04CA) clockwise to the after start position, releases each control switch, and then verifies annunciator 5042-5G AUTO START VR SYSTEM SUP/EXH FAN resets.
Cues:
State that the JPM is complete.
TERMINATING CUES:
The Containment Building Ventilation system is operating in Containment Vent Mode IAW CPS 3408.01 Containment Building /Drywell HVAC (VR, VQ).
STOP TIME:
Page 14 of 16
JPM Number: JPM418 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 9080.02 Rev: 52a Procedure Rev:
Procedure Rev:
Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13
JPM Number: JPM418 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 2. Perform/verify the following panel manipulations:
- Start Diesel Generator 1B
- DG 1B Output Breaker Synch Switch is off with the key removed.
- Make sure recorder power is on to allow the SVC Voltmeter to indicate.
- 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 4. This completes the setup for this JPM.
- 5. Save to a different IC if JPM is being used more than once. IC-205 OR IC-206 is saved for the 2014 ILT NRC Exam (password 91632).
- 6. Freeze Simulator.
Page 4 of 13
JPM Number: JPM418 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- Examinee parallels and loads Diesel Generator 1B.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 3506.01C002, Rev 12 DIESEL GENERATOR 1B PRE-START CHECKLIST
- CPS No. 3506.01C005, Rev 1a DIESEL GENERATOR START LOG
- CPS No. 3506.01D002, Rev 5a DIESEL GENERATOR 1B OPERATING LOGS
- CPS No. 9080.02, Rev 52a DIESEL GENERATOR 1B OPERABILITY - MANUAL AND QUICK START OPERABILITY
- CPS No. 9080.02D001, Rev 43 DIESEL GENERATOR 1B OPERABILITY - MANUAL AND QUICK START DATA SHEET EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
Page 5 of 13
JPM Number: JPM429 - rev 01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3302.01 Rev: 35a Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13
JPM Number: JPM429 - rev 01 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to a full power IC. Perform the following:
- Trip the A Reactor Feedpump Turbine and allow the RR Flow Control Valves to runback.
- Restore the A Reactor Feedpump to service.
- 2. No simulator lesson plan is required for this JPM.
- 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 4. This completes the setup for this JPM.
- 5. Save to a different IC if JPM is being used more than once. IC-205 is saved for the ILT 14-1 NRC Exam (password 91632).
- 6. Freeze Simulator.
Page 4 of 13
JPM Number: JPM429 - rev 01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- The Reactor Recirculation (RR) System Flow Control Valve (FCV) Runback is reset IAW section 8.4.2 of CPS 3302.01 REACTOR RECIRCULATION.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 3302.01, Rev 35a REACTOR RECIRCULATION EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- Do NOT allow examinee to shine any type light into a panel.
- All pre-job briefings are completed.
Page 5 of 13
JPM Number: JPM501 - rev 02 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 9031.07 Rev: 33b Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10
JPM Number: JPM501 - rev 02 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Reset the simulator to an IC with the Main Turbine On-line.
- 2. Ensure computer points C71-NC013, 14, 15, 16, 17, 18, 19, and 20 are displayed on PPC Display
- 10.
- 3. No Simulator Lesson Plan is required for this JPM.
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-205 is saved for the ILT 14-1 NRC Exam (password 91632).
- 7. Freeze Simulator.
Page 4 of 10
JPM Number: JPM501 - rev 02 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- The Main Turbine (TG) System Main Turbine Control Valve Tests is complete IAW CPS 9031.07.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 9031.07, Rev 33b MAIN TURBINE CONTROL VALVE TESTS EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
- This JPM contains cues provided to the examinee from the evaluator and the instructor stationed at 1H13-P678. Review these cues to ensure the communications to the examinee are coordinated between the instructor and evaluator.
Page 5 of 10
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3103.01 Rev: 29d Procedure CPS 5002.02 Rev: 29 Procedure CPS 5002.03 Rev: 28
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any suitable IC (comparable with IC-8) with TDRFP A on the MLC in auto and the TDRFP B in rolling standby.
- 3. Release JPM530 which will perform the following:
- Disable TDRFP B trips from 1H13-P680.
- Insert vibration alarms and indications when TDRFP B speed is increased above 2800 rpm.
- Insert seat leakage into the HPSV & HPCV (9% & 2% respectively)
- a. MS0ASLVALVE41 9%
- b. MS0ASLVALVE40 2%
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-208 is saved for the ILT 14-1 NRC Exam (password 91632).
- 7. Freeze Simulator.
Page 4 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- Mitigating actions have been taken for high vibrations on the B TDRFP and the RFP has been secured.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 5002.02, Rev 29 Alarm Panel 5002 Annunciators - Row 2
- CPS No. 5002.03, Rev 28 Alarm Panel 5002 Annunciators - Row 3 EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
Page 5 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3103.01 Feedwater (FW) section 8.1.4.4 Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B)
Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 8.1.4.4 Transfer rolling STANDBY TDRFP B to 8.1.4.4.1 feeding RPV through 1FW002B. Examinee determines TDRFP B is in rolling standby per the initiating cue.
8.1.4.4.2 Examinee determines that 5 Condensate Polishers are adequate to perform the evolution.
Cue: 5 Condensate Polishers are in service.
8.1.4.4.3 Examinee observes Red M on the Digital Feedwater Display for 1FW010B and the 1FW010B valve icon is red.
8.1.4.4.4 Examinee observes that TDRFP B speed is ~ 2370 rpm and that no further actions are required.
- 8.1.4.4.5 Examinee clicks on:
- Valve icon for 1FW002B
- TDRFP Main Discharge Valve 1FW002B (and observes the blue outline on the control box)
- Open (and then verifies indication changes to Intermediate and then Full Open)
- Exit Page 7 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 8.1.4.4 Transfer rolling STANDBY TDRFP B to *8.1.4.4.6 feeding RPV through 1FW002B (cont.) Examinee clicks on:
- Valve icon for 1FW010B
- 1FW010B Min Flow (and observes the blue outline on the control box)
- Close
- Exit Note: 1FW010B will not physically close with TDRFP B reset and 1FW002B full open.
If the examinee depresses the 1FW010B close pushbutton before 1FW002B is full open, 1FW010B will close. If this happens, the error should be considered a failure of a critical step.
NOTE Steps 8.1.4.4.7 and 8.1.4.4.8 have been deleted in the procedure. Step 8.1.4.4.9 is N/A.
- 8.1.4.4 *8.1.4.4.10 (cont.) Examinee observes that TDRFP B indicates FPB Speed Setter.
Examinee clicks on:
- FPB Speed Setter
- TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
- Bring Pump On-Line (and then verifies TDRFP B speed increasing)
- Exit Page 8 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
ALTERNATE PATH BEGINS Annunciator 5002-2F High Vibr RFP 1B Shaft will be received when TDRFP B speed increases above 2800 rpm.
Annunciator 5002-3F High Vibr RFPT 1B Shaft will be received 30 seconds later.
Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.4.4.10 Reduce Turbine Speed to clear vibration 8.1.4.4.10.2.c alarms (fails) Examinee clicks on:
5002-2F
- FPB Speed Setter 5002-3F
- TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
- Speed Setter Mode
- Exit Examinee clicks on:
- FPB (pump icon)
- TDRFP B (and observes the blue outline on the control box)
- until setpoint (SP) indicates 0 RPM (and then observes that TDRFP B speed begins to lower, but stabilizes at ~ 2000 RPM and that annunciators 5002-2F and 3F remain locked in)
- Exit Cue: If the examinee requests an Equipment Operator to investigate, acknowledge the order and then cue the examinee, Vibrations can be felt on the floor of TB 800. Im leaving due to safety concerns.
Page 9 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.10 TDRFP Shutdown 8.1.10.1 Examinee discusses with the CRS the need to lockout the RR FCVs during the TDRFP S/D.
Cue: Do not lockout the RR FCVs.
Note: If the examinee elects to trip B TDRFP based on the report from the Equipment Operator, this step is NA.
8.1.10.4 Examinee clicks on:
- FPB Trip/Reset pushbutton
- TDRFP B (and observes the blue outline on the control box)
- Exit (may or may not perform)
Examinee reports failure of the B TDRFP to trip to the CRS.
- 8.3.14 Securing A TDRFP That Will Not Trip 8.3.14.1 From P680 On 1H13-P680-5002, the examinee depresses the L pushbutton on the B TDRFP SLIM Controller and verifies the L pushbutton red light illuminates.
8.3.14.2 No action required; the SLIM is at 0%
output.
- 8.3.14.3 Examinee locates control switch for 1B21-F303B on 1H13-P870-5016, rotates the control switch counter clockwise to the close position, and then verifies the green light illuminates and the red light extinguishes.
Examinee verifies TDRFP B RPM lowering, and that the high vibration annunciators clear.
Cue: the JPM is complete.
Page 10 of 13
JPM Number: JPM530 - rev 00 Clinton Power Station Job Performance Measure (JPM)
TERMINATING CUES:
The B TDRFP is secured IAW CPS No. 3103.01 section 8.3.14 Securing A TDRFP That Will Not Trip From P680.
STOP TIME:
Page 11 of 13
JPM Number: JPM531 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 3320.01 Rev: 12 Procedure CPS 3317.01 Rev: 30c Procedure CPS 3312.01 Rev: 45b
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 16
JPM Number: JPM531 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any suitable IC with:
- a. Reactor in Mode 3 or 4
- b. RHR Pump A in standby
- c. Upper Pools dumped per CPS 4411.03 Appendix E Method 1.0 Dump Upper Pools (1FC036 and 1FC037 shut; 1SM001A, 2A, 1B, and 2B open.
- 1) SHUT 1SM001A, 2A, 1B, AND 2B as soon as 5040-5E LOW LEVEL CNMT XFER POOL is received (note - delaying this action will add substantial time to the JPM).
- 4. When requested by the examinee to energize 1E12-F037A, release JPM531 which will energize 1E12-F037A RHR A Cnmt Pool Cooling & Shutoff Valve.
- 5. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 6. This completes the setup for this JPM.
- 7. Save to a different IC if JPM is being used more than once. IC-206 (PW-91632) is saved for the 2014 ILT NRC Exam.
- 8. Freeze Simulator.
Page 4 of 16
JPM Number: JPM531 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- The Upper Containment Pool level has been restored IAW CPS 3312.01 Residual Heat Removal (RHR) section 8.3.2 Pumping Suppression Pool to CNMT Pool.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS 3317.01, Rev 30c Fuel Pool Cooling and Cleanup (FC)
- CPS 3312.01, Rev. 45b Residual Heat Removal (RHR)
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
- This JPM requires the breaker to be turned ON for 1E12-F037A (step 8.3.2.5) which is performed by inserting a remote function from the simulator booth. Be prepared to communicate with the simulator booth operator to accomplish this step.
- The cue for critical step 8.3.2.12.1 to close 1E12-F037A is triggered when annunciator 5040-5F Low Level Upper CNMT Pool resets. Be prepared to provide the cue to the examinee when annunciator 5040-5F resets.
- After the examinee has repeated back the initiating cue, provide the examinee with CPS 3317.01 Fuel Pool Cooling and Cleanup (FC) and CPS 3312.01 Residual Heat Removal (RHR).
Page 5 of 16
JPM Number: JPM537 - rev 00 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1) Task description and number, JPM description and number are identified.
________ 2) Knowledge and Abilities (K/A) references are included.
________ 3) Performance location specified. (in-plant, control room, simulator, or other)
________ 4) Initial setup conditions are identified.
________ 5) Initiating cue (and terminating cue if required) are properly identified.
________ 6) Task standards identified and verified by SME review.
________ 7) Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8) Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure CPS 9031.10 Rev: 25c Procedure CPS 3101.01 Rev: 23b Procedure Rev:
________ 9) Verify cues both verbal and visual are free of conflict.
________ 10) Verify performance time is accurate
________ 11) If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12) When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 17
JPM Number: JPM537 - rev 00 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 3. Release JPM537 which will perform the following:
- Insert malfunction YAMSSIFP_2 0% (causes 1B21-F022B to fail completely closed) when the test push-button is depressed and then released for 1B21-F022B, Main Steam Line B Inbd MSIV.
- Deletes malfunction YAMSSIFP_2 0% when the control switch for 1B21-F022B is placed in CLOSE.
- 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 5. This completes the setup for this JPM.
- 6. Save to a different IC if JPM is being used more than once. IC-205 (PW-91632) is saved for the 2014 ILT NRC Exam.
- 7. Station an instructor to acknowledge alarms (not associated with the JPM) and perform Independent Verifications as required.
- 8. Freeze Simulator.
Page 4 of 17
JPM Number: JPM537 - rev 00 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
- 1B21-F022B Main Steam Line B Inbd MSIV is open IAW CPS 3101.01 Main Steam (MS).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS No. 9031.10, Rev 25c RPS Main Steam Line Isolation Valve Channel Functional
- CPS 3101.01, Rev23b Main Steam (MS, IS & ADS)
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
- When the initiating cue has been acknowledged by the examinee, provide the examinee with a copy of CPS 9031.10 RPS Main Steam Line Isolation Valve Channel Functional. Do NOT provide the examinee with the copy of CPS 3101.01 Main Steam that is included in the JPM package until the examinee locates the procedure to perform the alternate path steps beginning on page 12.