Line 2: |
Line 2: |
| | number = ML071410300 | | | number = ML071410300 |
| | issue date = 05/16/2007 | | | issue date = 05/16/2007 |
| | title = North Anna, Unit 2 - Submittal of Stress Evaluation, Preliminary Engineering Evaluation of Insurge/Outsurge Tranients and Examination Results for the Completed Alloy 600 Pressurizer Nozzle Alternative Weld Repair CMP-023R1 | | | title = Submittal of Stress Evaluation, Preliminary Engineering Evaluation of Insurge/Outsurge Tranients and Examination Results for the Completed Alloy 600 Pressurizer Nozzle Alternative Weld Repair CMP-023R1 |
| | author name = Bischof G T | | | author name = Bischof G T |
| | author affiliation = Virginia Electric & Power Co (VEPCO) | | | author affiliation = Virginia Electric & Power Co (VEPCO) |
Revision as of 11:02, 10 February 2019
Letter Sequence Request |
---|
|
|
MONTHYEARML0714103002007-05-16016 May 2007 Submittal of Stress Evaluation, Preliminary Engineering Evaluation of Insurge/Outsurge Tranients and Examination Results for the Completed Alloy 600 Pressurizer Nozzle Alternative Weld Repair CMP-023R1 Project stage: Request ML0717205282007-05-24024 May 2007 Use of Weld Overlays (TAC Nos. MD3903/3904) Project stage: Other ML0717002682007-06-15015 June 2007 Response to Request for Additional Information on 05/24/2007 Weld Overlays as an Alternative Repair Technique Project stage: Response to RAI ML0715000152007-06-26026 June 2007 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0720703562007-07-25025 July 2007 CMP-022R1 and Unit 2, CMP-023R1, Response to Request for Additional Information Weld Overlays as an Alternative Repair Technique Project stage: Response to RAI ML0727500642007-10-0101 October 2007 Relief Request CMP-022R1 Revised Non-Destructive Examination Requirements for the 'A' Safety Valve Pressurizer Nozzle Using Weld Overlay as an Alternative Repair Technique Project stage: Request ML0722202282007-12-19019 December 2007 Relief Requests CMP-022 and CMP-023 Regarding Use of Weld Overlays as an Alternative Repair Technique Project stage: Other 2007-05-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection 2024-09-24
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RicHMOND, VIRGINIA 23261 May 16, 2007 U.S. Nuclear Regulatory Commission Serial No. 06-1007B Attention:
Document Control Desk NLOS /ETS One White Flint North Docket No. 50-339 11555 Rockville Pike License No. NPF-7 Rockville, MD 20852-2738 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNIT 2 SUBMITTAL OF STRESS EVALUATION, PRELIMINARY ENGINEERING EVALUATION OF INSURGE/OUTSURGE TRANSIENTS AND EXAMINATION RESULTS FOR THE COMPLETED ALLOY 600 PRESSURIZER NOZZLE ALTERNATIVE WELD REPAIR CMP-023R1 In a letter, dated January 3, 2007 (Serial No. 06-1007), as supplemented on March 13, 2007 (Serial No. 06-1007A), Dominion requested approval to use a proposed alternative to apply dissimilar metal weld overlays for repair/replacement activities associated with Alloy 600 materials.
That request contained alternative requirements for the North Anna Units 1 and 2 Inservice Inspection (ISI) programs to perform full structural preemptive weld overlays (PWOLs) to mitigate the potential for primary water stress corrosion cracking (PWSCC) susceptibility for those pressurizer nozzles containing Alloy 600.As stated in our Relief Request, Dominion committed to provide: (1) the final stress analysis for five of the weld overlays and the preliminary engineering evaluation of insurge/outsurge transients for the surge line prior to entry into Mode 4; (2) the examination results of the weld overlays; and, (3) a discussion of any repairs to the overlay material and/or base material and the reason for the repair; within 14 days after the completion of the ultrasonic examination of weld overlay installations.
The examination results of the six completed PWOLs and the proprietary version of the stress analysis for the mitigated nozzles and the preliminary engineering evaluation of insurge/outsurge transients were submitted directly to Mr. S. P. Lingam of your staff on April 11, 2007. This letter documents the submittal of the above information and provides:
- 1) the non-proprietary version of the stress analysis and the insurge/outsurge evaluation for public disclosure (Attachment 1); 2) a proprietary version of revision 2 to calculation 32-9035736-002 (Attachment 2); 3) the required affidavit to support the classification of the information previously submitted to Mr. S. P. Ungam, as well as, the revised calculation in Attachment 2 (Attachment 3); and, 4) the following restatement of the examination results of the mitigated pressurizer nozzles.AFto~
Serial No. 06-1007B Docket No. 50-339 Alternative Request CMP-023R1 Page 2 of 3 Six full structural mitigative PWOLs for the North Anna Unit 2 pressurizer safety, spray, relief, and surge nozzles were performed during the spring 2007 refueling outage (N2R18) in accordance with relief request CMP-023R1.
The surface and volumetric examinations of the weld and base material were completed with no recordable indications.
The examinations resulted in 100% coverage in accordance with relief request CMP-023R1 for both the preservice and inservice examination volumes. There were no repairs necessary to the weld overlay material or base metal during the installation of the PWOLs.This letter also satisfies the 60-day notification commitments made in Dominion letter dated February 26, 2007 (Serial No. 07-0035B) and the NRC Confirmatory Action Letter dated March 29, 2007 for North Anna Unit 2.If you have any questions regarding this submittal, please contact Mr. Thomas Shaub at (804) 273-2763.Very truly yours, Gerald T. Bischof Vice President
-Nuclear Engineering Attachments
- 1. Non-proprietary
-PWOL Stress Analysis Calculations For Alloy 600 Pressurizer Nozzle Repair.2. Proprietary
-PWOL Stress Analysis Calculation 32-9035736-002.
- 3. Affidavit
-PWOL Stress Analysis Results For Alloy 600 Pressurizer Nozzle Repair.Commitments made in this letter: None Serial No. 06-1007B Docket No. 50-339 Alternative Request CMP-023R1 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission (without attachments)
Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr. (without attachments)
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.Suite 300 Glen Allen, Virginia 23060 Mr. J. T. Reece (without attachments)
NRC Senior Resident Inspector North Anna Power Station Mr. S. P. Lingam NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8-H12 Rockville, Maryland 20852 Mr. M. M. Grace (without attachments)
Authorized Nuclear Insurance Inspector North Anna Power Station