ML17271A098: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:January 26, 2018 | ||
MEMORANDUM TO: Andrea D. Veil, Executive Director Advisory Committee on Reactor Safeguards | |||
FROM: Anna H. Bradford, Deputy Director | |||
/RA Frank Akstulewicz Acting for/ | |||
Division of New Reactor Licensing Office of New Reactors | |||
==SUBJECT:== | |||
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19.3, "BEYOND DESIGN BASIS EXTERNAL EVENT" | |||
By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. | |||
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its Safety Evaluation (SE) wi th no Open Items for Chapter 19.3, "Beyond Design Basis External Event" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17271A180). Unless otherwise stated in the SE, the staff's review was based on Revision 1 of the application. The SE is being provided to support a meeting of the subcommittee of the ACRS scheduled for February 21, 2018. The ACRS full committee meeting will be held after the subcommittee meeting. | |||
The staff concludes that the SE does not contain any information exempt from public disclosure. However, the U.S. Nuclear Regulatory Commission will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the staff's conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the ADAMS. | |||
The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure. | |||
Docket No.: 52-046 | |||
CONTACTS: James A. Steckel, NRO/DNRL (301) 415-1026 | |||
William R. Ward, NRO/DNRL (301) 415-7038 | |||
PKG: ML17271A087 MEMO: ML17271A098 SER: ML17271A180 *via email NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA* DNRL/ LB2: PM DNRL/LB2 BC DNRL: D NAME JSteckel BAbeywickrama WWard MMcCoppin ABradford(FMA for) DATE 12/12/2017 11/ 21 /2017 1/25/2018 12/18/2017 1/26/2018}} |
Revision as of 05:20, 22 September 2018
ML17271A098 | |
Person / Time | |
---|---|
Site: | 05200046 |
Issue date: | 01/26/2018 |
From: | Bradford A H NRC/NRO/DNRL |
To: | Veil A D Advisory Committee on Reactor Safeguards |
Santos C | |
Shared Package | |
ML17271A087 | List: |
References | |
Download: ML17271A098 (2) | |
Text
January 26, 2018
MEMORANDUM TO: Andrea D. Veil, Executive Director Advisory Committee on Reactor Safeguards
FROM: Anna H. Bradford, Deputy Director
/RA Frank Akstulewicz Acting for/
Division of New Reactor Licensing Office of New Reactors
SUBJECT:
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19.3, "BEYOND DESIGN BASIS EXTERNAL EVENT"
By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design.
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its Safety Evaluation (SE) wi th no Open Items for Chapter 19.3, "Beyond Design Basis External Event" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17271A180). Unless otherwise stated in the SE, the staff's review was based on Revision 1 of the application. The SE is being provided to support a meeting of the subcommittee of the ACRS scheduled for February 21, 2018. The ACRS full committee meeting will be held after the subcommittee meeting.
The staff concludes that the SE does not contain any information exempt from public disclosure. However, the U.S. Nuclear Regulatory Commission will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the staff's conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the ADAMS.
The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure.
Docket No.: 52-046
CONTACTS: James A. Steckel, NRO/DNRL (301) 415-1026
William R. Ward, NRO/DNRL (301) 415-7038
PKG: ML17271A087 MEMO: ML17271A098 SER: ML17271A180 *via email NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA* DNRL/ LB2: PM DNRL/LB2 BC DNRL: D NAME JSteckel BAbeywickrama WWard MMcCoppin ABradford(FMA for) DATE 12/12/2017 11/ 21 /2017 1/25/2018 12/18/2017 1/26/2018