MEMORANDUM TO:    Andrea D. Veil, Executive Director Advisory Committee on Reactor Safeguards
 
FROM:  Anna H. Bradford, Deputy Director
 
  /RA Frank Akstulewicz Acting for/
Division of New Reactor Licensing  Office of New Reactors
 
==SUBJECT:==
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19.3, "BEYOND DESIGN BASIS EXTERNAL EVENT"
 
By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design.
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its Safety Evaluation (SE) wi th no Open Items for Chapter 19.3, "Beyond Design Basis External Event" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17271A180). Unless otherwise stated in the SE, the staff's review was based on Revision 1 of the application. The SE is being provided to support a meeting of the subcommittee of the ACRS scheduled for February 21, 2018. The ACRS full committee meeting will be held after the subcommittee meeting. 
 
The staff concludes that the SE does not contain any information exempt from public disclosure. However, the U.S. Nuclear Regulatory Commission will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the staff's conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the ADAMS.
The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure. 
 
Docket No.:  52-046
 
CONTACTS: James A. Steckel, NRO/DNRL (301) 415-1026
 
William R. Ward, NRO/DNRL (301) 415-7038
 
PKG:  ML17271A087 MEMO:  ML17271A098  SER:  ML17271A180    *via email  NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA* DNRL/ LB2: PM DNRL/LB2 BC DNRL: D NAME JSteckel BAbeywickrama WWard MMcCoppin ABradford(FMA for) DATE 12/12/2017 11/ 21 /2017 1/25/2018 12/18/2017 1/26/2018}}

Revision as of 05:20, 22 September 2018

APR1400 P4 Chapter 19.3 ACRS Memo
ML17271A098
Person / Time
Site: 05200046
Issue date: 01/26/2018
From: Bradford A H
NRC/NRO/DNRL
To: Veil A D
Advisory Committee on Reactor Safeguards
Santos C
Shared Package
ML17271A087 List:
References
Download: ML17271A098 (2)


Text

January 26, 2018

MEMORANDUM TO: Andrea D. Veil, Executive Director Advisory Committee on Reactor Safeguards

FROM: Anna H. Bradford, Deputy Director

/RA Frank Akstulewicz Acting for/

Division of New Reactor Licensing Office of New Reactors

SUBJECT:

ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19.3, "BEYOND DESIGN BASIS EXTERNAL EVENT"

By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design.

Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its Safety Evaluation (SE) wi th no Open Items for Chapter 19.3, "Beyond Design Basis External Event" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17271A180). Unless otherwise stated in the SE, the staff's review was based on Revision 1 of the application. The SE is being provided to support a meeting of the subcommittee of the ACRS scheduled for February 21, 2018. The ACRS full committee meeting will be held after the subcommittee meeting.

The staff concludes that the SE does not contain any information exempt from public disclosure. However, the U.S. Nuclear Regulatory Commission will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to verify the staff's conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the ADAMS.

The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure.

Docket No.: 52-046

CONTACTS: James A. Steckel, NRO/DNRL (301) 415-1026

William R. Ward, NRO/DNRL (301) 415-7038