{{#Wiki_filter:1 PrairieIslandNPEm Resource From: Richard Plasse Sent: Tuesday, February 10, 2009 10:01 AM To: Eckholt, Gene F.; Vincent, Robert
{{#Wiki_filter:PrairieIslandNPEm Resource From:                     Richard Plasse Sent:                     Tuesday, February 10, 2009 10:01 AM To:                       Eckholt, Gene F.; Vincent, Robert


==Subject:==
==Subject:==
FW: Naveen RAI Response Issues.doc Attachments:
FW: Naveen RAI Response Issues.doc Attachments:             Naveen RAI Response Issues.doc Rick draft followups of previous RAIs, can we do the telecon at 1:30 pm EST today?
Naveen RAI Response Issues.doc Rick draft followups of previous RAIs, can we do the telecon at 1:30 pm EST today?  
Rick 1


Rick Hearing Identifier: Prairie_Island_NonPublic Email Number: 738   Mail Envelope Properties   (Richard.Plasse@nrc.gov20090210100100)
Hearing Identifier:   Prairie_Island_NonPublic Email Number:         738 Mail Envelope Properties     (Richard.Plasse@nrc.gov20090210100100)


==Subject:==
==Subject:==
FW: Naveen RAI Response Issues.doc Sent Date:   2/10/2009 10:01:24 AM Received Date: 2/10/2009 10:01:00 AM From:   Richard Plasse Created By:   Richard.Plasse@nrc.gov Recipients:     "Eckholt, Gene F." <Gene.Eckholt@xenuclear.com>
FW: Naveen RAI Response Issues.doc Sent Date:             2/10/2009 10:01:24 AM Received Date:         2/10/2009 10:01:00 AM From:                 Richard Plasse Created By:           Richard.Plasse@nrc.gov Recipients:
Tracking Status: None "Vincent, Robert" <Robert.Vincent@xenuclear.com>
"Eckholt, Gene F." <Gene.Eckholt@xenuclear.com>
Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   100     2/10/2009 10:01:00 AM Naveen RAI Response Issues.doc   35906 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None "Vincent, Robert" <Robert.Vincent@xenuclear.com>
Drawing Continuation Responses
Tracking Status: None Post Office:
Files                           Size                   Date & Time MESSAGE                         100                   2/10/2009 10:01:00 AM Naveen RAI Response Issues.doc                       35906 Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:


2.3.4.5 Drawing LR-39222 and LR-39223  
Drawing Continuation Responses 2.3.4.5 Drawing LR-39222 and LR-39223 RAI: Location B-5, show a continuation of incoming pipe sections (with no identification numbers [Condensate Transfer]) from drawing LR-39220 NSPM Response: The continuation of drawings LR-39222 and LR-39223, location B-5, Condensate Transfer to line 8-DE-56, is shown on LR-39220, location E-2, 2 1/2 Condensate Transfer and Recycle Pump discharge lines connecting to line 8-DE-56 on either side of valve C-41-2.
 
3/4 Issue: The continuations are located at E-2 however the scoping criterion of pipe sections (out of system dashed lines) dont match. the feed lines (from unit 2 condensate storage tank) on LR-39222 are 10 CFR 54.4 (a) (1) lines to which these (a) (2) lines are connected (B-5). Additional information needed is the location of anchors on drawing (LR-39220, B-5)downstream of valves C-34-2 and C-40-3.
RAI: Location B-5, show a continuation of incoming pipe sections (with no identification numbers [Condensate Transfer
2.3.4.6 Drawings LR-39218 and LR-39219 RAI: Drawing LR-39218, locations F-6, G-5, and G-6, pipe sections 10-MS-27, 12-MS-3, 12-MS-4, respectively, continuations to drawing LR-39233 NSPM Response: The continuation of LR-39218, locations F-6, G-5 and G-6, lines 10-MS-27, 12-MS-3 and 12-MS-4, are shown on LR-39233, location F-1, at valve TD-4-2 (line 10-MS-27) and location B-3, at valves TD-10-1 and TD-10-5 (lines 12-MS-3 and 12-MS-4).
]) from drawing LR-39220 NSPM Response:
3/4 Issue: The continuation lines were located; however please confirm the scoping criteria for the out of system dashed lines (10) before valve TD-4-2 in drawing LR-39233.
The continuation of drawings LR-39222 and LR-39223, location B-5, Condensate Transfer to line 8-DE-56, is shown on LR-39220, location E-2, 2 1/2" Condensate Transfer and Recycle Pump disc harge lines connecting to line 8-DE-56 on either side of valve C-41-2.
RAI: Drawing LR-39218, location D-7, pipe sections 6-MS-31 continuations to drawing LR-39233 and drawing LR-39219, location D-7, pipe sections 6-2MS-31 continuation to drawing LR-39234.
 
NSPM Response: The continuation of drawings LR-39218 and LR-39219, location D-7, Drain to Trap, is shown on LR-39233, location C-2, at valve TD-11-1, and LR-39234, location C-2, at valve 2TD-11-1, respectively.
Issue: The continuations are located at E-2 however the scoping criterion of pipe sections (out of system dashed lines) don't match. the feed lines (from unit 2 condensate storage tank) on LR-39222 ar e 10 CFR 54.4 (a) (1) lines to which these (a) (2) lines are connected (B-5). Additional information needed is the location of anchors on drawing (LR-39220, B-5)downstream of valves C-34-2 and C-40-3.  
3/4 Issue: continuations were found, but the scoping criteria of piping section (out of system dashed lines) before valves TD-11-1 and 2TD-11-1 differ between drawings.
 
RAI: Drawing LR-39218, locations E-6 and E-7, pipe sections 3-MS-30, and upstream pipe sections after the valves TD-6-11, TD-6-12 1 Drains to Trap continuations to drawing LR-39233 and drawing LR-39219, locations E-6 and E-7, pipe sections 3-2MS-
2.3.4.6 Drawings LR-39218 and LR-39219  
 
RAI: Drawing LR-39218, locations F-6, G-5, and G-6, pipe sections 10-MS-27, 12-MS-3, 12-MS-4, respectively, conti nuations to drawing LR-39233 NSPM Response:
The continuation of LR-39218, lo cations F-6, G-5 and G-6, lines 10-MS-27, 12-MS-3 and 12-MS-4, are shown on LR-39233, location F-1, at valve TD-4-2 (line 10-MS-27) and location B-3, at valves TD-10-1 and TD-10-5 (lines 12-MS-3 and 12-MS-4).
Issue: The continuation lines were located; however please confirm the scoping criteria for the out of system dashed lin es (10") before valve TD-4-2 in drawing LR-39233.
RAI: Drawing LR-39218, location D-7, pipe sections 6-MS-31 continuations to drawing LR-39233 and drawing LR-39219, location D-7, pi pe sections 6-2MS-31 continuation to drawing LR-39234.
NSPM Response:
The continuation of drawings LR-39218 and LR-39219, location D-7, Drain to Trap, is shown on LR-39233, locat ion C-2, at valve TD-11-1, and LR-39234, location C-2, at valve 2TD-11-1, respectively.
Issue: continuations were found, but the scoping criteria of piping section (out of system dashed lines) before valves TD-11-1 and 2TD-11-1 differ between  
 
drawings.
 
RAI: Drawing LR-39218, locations E-6 and E-7, pipe sections 3-MS-30, and upstream pipe sections after the valv es TD-6-11, TD-6-12 1" "Drains to Trap" continuations to drawing LR-39233 and drawing LR-39219, locati ons E-6 and E-7, pipe sections 3-2MS-30, and upstream pipe sections after the valves 2TD-6-11, 2TD-6-12 continuations to drawing LR-39234.
NSPM Response:
The continuation of drawings LR-39218 and LR-39219, locations E-6 and E-7, Drains to Trap, is shown on LR-39233, location C-3, at valves TD-11-16, TD 11 and TD-6-12 and LR-39234, location C-3, at valves 2TD-11-16, 2TD-6-11 and 2TD-6-12.
Issue: The continuations were located; however the scoping criteria of piping section (out of system dashed lines) be fore the valves TD-11-16 and 2TD-11-16 should be 10 CFR 54.4 (a) (1) inst ead of 10 CFR 54.4 (a) (2). 


30, and upstream pipe sections after the valves 2TD-6-11, 2TD-6-12 continuations to drawing LR-39234.
NSPM Response: The continuation of drawings LR-39218 and LR-39219, locations E-6 and E-7, Drains to Trap, is shown on LR-39233, location C-3, at valves TD-11-16, TD 11 and TD-6-12 and LR-39234, location C-3, at valves 2TD-11-16, 2TD-6-11 and 2TD-6-12.
3/4 Issue: The continuations were located; however the scoping criteria of piping section (out of system dashed lines) before the valves TD-11-16 and 2TD-11-16 should be 10 CFR 54.4 (a) (1) instead of 10 CFR 54.4 (a) (2).
RAI: Drawing LR-39218, locations E-8 and H-8, pipe sections 1/2 -MS-59, 12-MS-35 respectively, continuations to LR-39233 and drawing LR-39219, locations E-8 and H-8, pipe sections 1/2 -2MS-32, 12-2MS-35 respectively, continuations to LR-39234.
RAI: Drawing LR-39218, locations E-8 and H-8, pipe sections 1/2 -MS-59, 12-MS-35 respectively, continuations to LR-39233 and drawing LR-39219, locations E-8 and H-8, pipe sections 1/2 -2MS-32, 12-2MS-35 respectively, continuations to LR-39234.
NSPM Response:
NSPM Response: The continuation of drawings LR-39218 and LR-39219, location E-8, 1/2-MS-59 and 1/2-2MS-32, Drain to Trap, are shown on LR-39233 and LR-39234, location C-9, at valve TD-16-1 and 2TD-16-1 respectively.
The continuation of drawings LR-39218 and LR-39219, location E-8, 1/2-MS-59 and 1/2-2MS-32, Drain to Trap, are shown on LR-39233 and LR-39234, location C-9, at valve TD 1 and 2TD-16-1 respectively. Issue: The scoping criteria of the dashed line before valve TD-16-1 on the continuation drawing LR-39233 at location C-9 differs from that on LR-39218.  
3/4 Issue: The scoping criteria of the dashed line before valve TD-16-1 on the continuation drawing LR-39233 at location C-9 differs from that on LR-39218.
 
RAI: Drawings LR-39218 and LR-39219, location F-6, show a continuation of) pipe sections 1-1/2-MS-40, 1-1/2-MS-41 and 2-2MS-40, 2-2MS-41 from stop valves of drawings LR-39233 and LR-39234, respectively.
RAI: Drawings LR-39218 and LR-39219, location F-6, show a continuation of) pipe sections 1-1/2-MS-40, 1-1/2-MS-41 and 2-2MS-40, 2-2MS-41 from stop valves of drawings LR-39233 and LR-39234, respectively.
NSPM Response:
NSPM Response: The continuations of drawing LR-39218, location F-6, Drains From Stop Valves, are shown on LR-39233, location A-4, Turb Stop Valve Drains and on LR-XH-2-15, location A-5, Connection 24. The continuations of LR-39219, location F-6, Drains From Stop Valves, are actually connected on LR-39234, location A-4, similar to the Unit 1 drawing; the connections are not explicitly shown. The continuation is also shown on LR-XH-1002-43, locations B-5 and B-6, Connection 24.
The continuations of drawing LR-39218, location F-6, Drains From Stop Valves, are shown on LR-39233, location A-4, Turb Stop Valve Drains and on LR-XH-2-15, location A-5, Connection 24. The continuations of LR-39219, location F-6, Drains From Stop Valves, are actually connected on LR-39234, location A-4, similar to the Unit 1 drawing; the connections are not explicitly shown. The continuation is also shown on LR-XH-1002-43, locations B-5 and B-6, Connection 24.  
3/4 Issue: The continuations were located; however, the scoping criteria of the continuations (as well as the stop valves) on LR-39233 differ. these lines are in scope for 10 CFR54.4(a)(1). Confirm the scoping classification of these lines on drawing LR-39233.}}
 
Issue: The continuations were located; however, the sc oping criteria of the continuations (as well as the stop valv es) on LR-39233 differ. these lines are in scope for 10 CFR54.4(a)(1). Confirm the sc oping classification of these lines on drawing LR-39233.}}

Revision as of 08:44, 14 November 2019

2009/02/10 PINGP Lr - FW: Naveen RAI Response Issues.Doc
ML090540457
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/10/2009
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML090540457 (4)


Text

PrairieIslandNPEm Resource From: Richard Plasse Sent: Tuesday, February 10, 2009 10:01 AM To: Eckholt, Gene F.; Vincent, Robert

Subject:

FW: Naveen RAI Response Issues.doc Attachments: Naveen RAI Response Issues.doc Rick draft followups of previous RAIs, can we do the telecon at 1:30 pm EST today?

Rick 1

Hearing Identifier: Prairie_Island_NonPublic Email Number: 738 Mail Envelope Properties (Richard.Plasse@nrc.gov20090210100100)

Subject:

FW: Naveen RAI Response Issues.doc Sent Date: 2/10/2009 10:01:24 AM Received Date: 2/10/2009 10:01:00 AM From: Richard Plasse Created By: Richard.Plasse@nrc.gov Recipients:

"Eckholt, Gene F." <Gene.Eckholt@xenuclear.com>

Tracking Status: None "Vincent, Robert" <Robert.Vincent@xenuclear.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 100 2/10/2009 10:01:00 AM Naveen RAI Response Issues.doc 35906 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Drawing Continuation Responses 2.3.4.5 Drawing LR-39222 and LR-39223 RAI: Location B-5, show a continuation of incoming pipe sections (with no identification numbers [Condensate Transfer]) from drawing LR-39220 NSPM Response: The continuation of drawings LR-39222 and LR-39223, location B-5, Condensate Transfer to line 8-DE-56, is shown on LR-39220, location E-2, 2 1/2 Condensate Transfer and Recycle Pump discharge lines connecting to line 8-DE-56 on either side of valve C-41-2.

3/4 Issue: The continuations are located at E-2 however the scoping criterion of pipe sections (out of system dashed lines) dont match. the feed lines (from unit 2 condensate storage tank) on LR-39222 are 10 CFR 54.4 (a) (1) lines to which these (a) (2) lines are connected (B-5). Additional information needed is the location of anchors on drawing (LR-39220, B-5)downstream of valves C-34-2 and C-40-3.

2.3.4.6 Drawings LR-39218 and LR-39219 RAI: Drawing LR-39218, locations F-6, G-5, and G-6, pipe sections 10-MS-27, 12-MS-3, 12-MS-4, respectively, continuations to drawing LR-39233 NSPM Response: The continuation of LR-39218, locations F-6, G-5 and G-6, lines 10-MS-27, 12-MS-3 and 12-MS-4, are shown on LR-39233, location F-1, at valve TD-4-2 (line 10-MS-27) and location B-3, at valves TD-10-1 and TD-10-5 (lines 12-MS-3 and 12-MS-4).

3/4 Issue: The continuation lines were located; however please confirm the scoping criteria for the out of system dashed lines (10) before valve TD-4-2 in drawing LR-39233.

RAI: Drawing LR-39218, location D-7, pipe sections 6-MS-31 continuations to drawing LR-39233 and drawing LR-39219, location D-7, pipe sections 6-2MS-31 continuation to drawing LR-39234.

NSPM Response: The continuation of drawings LR-39218 and LR-39219, location D-7, Drain to Trap, is shown on LR-39233, location C-2, at valve TD-11-1, and LR-39234, location C-2, at valve 2TD-11-1, respectively.

3/4 Issue: continuations were found, but the scoping criteria of piping section (out of system dashed lines) before valves TD-11-1 and 2TD-11-1 differ between drawings.

RAI: Drawing LR-39218, locations E-6 and E-7, pipe sections 3-MS-30, and upstream pipe sections after the valves TD-6-11, TD-6-12 1 Drains to Trap continuations to drawing LR-39233 and drawing LR-39219, locations E-6 and E-7, pipe sections 3-2MS-

30, and upstream pipe sections after the valves 2TD-6-11, 2TD-6-12 continuations to drawing LR-39234.

NSPM Response: The continuation of drawings LR-39218 and LR-39219, locations E-6 and E-7, Drains to Trap, is shown on LR-39233, location C-3, at valves TD-11-16, TD 11 and TD-6-12 and LR-39234, location C-3, at valves 2TD-11-16, 2TD-6-11 and 2TD-6-12.

3/4 Issue: The continuations were located; however the scoping criteria of piping section (out of system dashed lines) before the valves TD-11-16 and 2TD-11-16 should be 10 CFR 54.4 (a) (1) instead of 10 CFR 54.4 (a) (2).

RAI: Drawing LR-39218, locations E-8 and H-8, pipe sections 1/2 -MS-59, 12-MS-35 respectively, continuations to LR-39233 and drawing LR-39219, locations E-8 and H-8, pipe sections 1/2 -2MS-32, 12-2MS-35 respectively, continuations to LR-39234.

NSPM Response: The continuation of drawings LR-39218 and LR-39219, location E-8, 1/2-MS-59 and 1/2-2MS-32, Drain to Trap, are shown on LR-39233 and LR-39234, location C-9, at valve TD-16-1 and 2TD-16-1 respectively.

3/4 Issue: The scoping criteria of the dashed line before valve TD-16-1 on the continuation drawing LR-39233 at location C-9 differs from that on LR-39218.

RAI: Drawings LR-39218 and LR-39219, location F-6, show a continuation of) pipe sections 1-1/2-MS-40, 1-1/2-MS-41 and 2-2MS-40, 2-2MS-41 from stop valves of drawings LR-39233 and LR-39234, respectively.

NSPM Response: The continuations of drawing LR-39218, location F-6, Drains From Stop Valves, are shown on LR-39233, location A-4, Turb Stop Valve Drains and on LR-XH-2-15, location A-5, Connection 24. The continuations of LR-39219, location F-6, Drains From Stop Valves, are actually connected on LR-39234, location A-4, similar to the Unit 1 drawing; the connections are not explicitly shown. The continuation is also shown on LR-XH-1002-43, locations B-5 and B-6, Connection 24.

3/4 Issue: The continuations were located; however, the scoping criteria of the continuations (as well as the stop valves) on LR-39233 differ. these lines are in scope for 10 CFR54.4(a)(1). Confirm the scoping classification of these lines on drawing LR-39233.