{{#Wiki_filter: | {{#Wiki_filter:PrairieIslandNPEm Resource From: Richard Plasse Sent: Tuesday, February 10, 2009 10:01 AM To: Eckholt, Gene F.; Vincent, Robert | ||
==Subject:== | ==Subject:== | ||
FW: Naveen RAI Response Issues.doc Attachments: | FW: Naveen RAI Response Issues.doc Attachments: Naveen RAI Response Issues.doc Rick draft followups of previous RAIs, can we do the telecon at 1:30 pm EST today? | ||
Naveen RAI Response Issues.doc Rick draft followups of previous RAIs, can we do the telecon at 1:30 pm EST today? | Rick 1 | ||
Hearing Identifier: Prairie_Island_NonPublic Email Number: 738 Mail Envelope Properties (Richard.Plasse@nrc.gov20090210100100) | |||
==Subject:== | ==Subject:== | ||
FW: Naveen RAI Response Issues.doc | FW: Naveen RAI Response Issues.doc Sent Date: 2/10/2009 10:01:24 AM Received Date: 2/10/2009 10:01:00 AM From: Richard Plasse Created By: Richard.Plasse@nrc.gov Recipients: | ||
Tracking Status: None | "Eckholt, Gene F." <Gene.Eckholt@xenuclear.com> | ||
Tracking Status: None Post Office: | Tracking Status: None "Vincent, Robert" <Robert.Vincent@xenuclear.com> | ||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 100 2/10/2009 10:01:00 AM Naveen RAI Response Issues.doc 35906 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received: | |||
2.3.4.5 Drawing LR-39222 and LR-39223 | Drawing Continuation Responses 2.3.4.5 Drawing LR-39222 and LR-39223 RAI: Location B-5, show a continuation of incoming pipe sections (with no identification numbers [Condensate Transfer]) from drawing LR-39220 NSPM Response: The continuation of drawings LR-39222 and LR-39223, location B-5, Condensate Transfer to line 8-DE-56, is shown on LR-39220, location E-2, 2 1/2 Condensate Transfer and Recycle Pump discharge lines connecting to line 8-DE-56 on either side of valve C-41-2. | ||
3/4 Issue: The continuations are located at E-2 however the scoping criterion of pipe sections (out of system dashed lines) dont match. the feed lines (from unit 2 condensate storage tank) on LR-39222 are 10 CFR 54.4 (a) (1) lines to which these (a) (2) lines are connected (B-5). Additional information needed is the location of anchors on drawing (LR-39220, B-5)downstream of valves C-34-2 and C-40-3. | |||
RAI: Location B-5, show a continuation of incoming pipe sections (with no identification numbers [Condensate Transfer | 2.3.4.6 Drawings LR-39218 and LR-39219 RAI: Drawing LR-39218, locations F-6, G-5, and G-6, pipe sections 10-MS-27, 12-MS-3, 12-MS-4, respectively, continuations to drawing LR-39233 NSPM Response: The continuation of LR-39218, locations F-6, G-5 and G-6, lines 10-MS-27, 12-MS-3 and 12-MS-4, are shown on LR-39233, location F-1, at valve TD-4-2 (line 10-MS-27) and location B-3, at valves TD-10-1 and TD-10-5 (lines 12-MS-3 and 12-MS-4). | ||
]) from drawing LR-39220 NSPM Response: | 3/4 Issue: The continuation lines were located; however please confirm the scoping criteria for the out of system dashed lines (10) before valve TD-4-2 in drawing LR-39233. | ||
The continuation of drawings LR-39222 and LR-39223, location B-5, Condensate Transfer to line 8-DE-56, is shown on LR-39220, location E-2, 2 1/2 | RAI: Drawing LR-39218, location D-7, pipe sections 6-MS-31 continuations to drawing LR-39233 and drawing LR-39219, location D-7, pipe sections 6-2MS-31 continuation to drawing LR-39234. | ||
NSPM Response: The continuation of drawings LR-39218 and LR-39219, location D-7, Drain to Trap, is shown on LR-39233, location C-2, at valve TD-11-1, and LR-39234, location C-2, at valve 2TD-11-1, respectively. | |||
Issue: The continuations are located at E-2 however the scoping criterion of pipe sections (out of system dashed lines) | 3/4 Issue: continuations were found, but the scoping criteria of piping section (out of system dashed lines) before valves TD-11-1 and 2TD-11-1 differ between drawings. | ||
RAI: Drawing LR-39218, locations E-6 and E-7, pipe sections 3-MS-30, and upstream pipe sections after the valves TD-6-11, TD-6-12 1 Drains to Trap continuations to drawing LR-39233 and drawing LR-39219, locations E-6 and E-7, pipe sections 3-2MS- | |||
2.3.4.6 Drawings LR-39218 and LR-39219 | |||
RAI: Drawing LR-39218, locations F-6, G-5, and G-6, pipe sections 10-MS-27, 12-MS-3, 12-MS-4, respectively, | |||
The continuation of LR-39218, | |||
Issue: The continuation lines were located; however please confirm the scoping criteria for the out of system dashed | |||
RAI: Drawing LR-39218, location D-7, pipe sections 6-MS-31 continuations to drawing LR-39233 and drawing LR-39219, location D-7, | |||
NSPM Response: | |||
The continuation of drawings LR-39218 and LR-39219, location D-7, Drain to Trap, is shown on LR-39233, | |||
Issue: continuations were found, but the scoping criteria of piping section (out of system dashed lines) before valves TD-11-1 and 2TD-11-1 differ between | |||
drawings. | |||
RAI: Drawing LR-39218, locations E-6 and E-7, pipe sections 3-MS-30, and upstream pipe sections after the | |||
30, and upstream pipe sections after the valves 2TD-6-11, 2TD-6-12 continuations to drawing LR-39234. | |||
NSPM Response: The continuation of drawings LR-39218 and LR-39219, locations E-6 and E-7, Drains to Trap, is shown on LR-39233, location C-3, at valves TD-11-16, TD 11 and TD-6-12 and LR-39234, location C-3, at valves 2TD-11-16, 2TD-6-11 and 2TD-6-12. | |||
3/4 Issue: The continuations were located; however the scoping criteria of piping section (out of system dashed lines) before the valves TD-11-16 and 2TD-11-16 should be 10 CFR 54.4 (a) (1) instead of 10 CFR 54.4 (a) (2). | |||
RAI: Drawing LR-39218, locations E-8 and H-8, pipe sections 1/2 -MS-59, 12-MS-35 respectively, continuations to LR-39233 and drawing LR-39219, locations E-8 and H-8, pipe sections 1/2 -2MS-32, 12-2MS-35 respectively, continuations to LR-39234. | RAI: Drawing LR-39218, locations E-8 and H-8, pipe sections 1/2 -MS-59, 12-MS-35 respectively, continuations to LR-39233 and drawing LR-39219, locations E-8 and H-8, pipe sections 1/2 -2MS-32, 12-2MS-35 respectively, continuations to LR-39234. | ||
NSPM Response: | NSPM Response: The continuation of drawings LR-39218 and LR-39219, location E-8, 1/2-MS-59 and 1/2-2MS-32, Drain to Trap, are shown on LR-39233 and LR-39234, location C-9, at valve TD-16-1 and 2TD-16-1 respectively. | ||
The continuation of drawings LR-39218 and LR-39219, location E-8, 1/2-MS-59 and 1/2-2MS-32, Drain to Trap, are shown on LR-39233 and LR-39234, location C-9, at valve TD 1 and 2TD-16-1 respectively. Issue: The scoping criteria of the dashed line before valve TD-16-1 on the continuation drawing LR-39233 at location C-9 differs from that on LR-39218. | 3/4 Issue: The scoping criteria of the dashed line before valve TD-16-1 on the continuation drawing LR-39233 at location C-9 differs from that on LR-39218. | ||
RAI: Drawings LR-39218 and LR-39219, location F-6, show a continuation of) pipe sections 1-1/2-MS-40, 1-1/2-MS-41 and 2-2MS-40, 2-2MS-41 from stop valves of drawings LR-39233 and LR-39234, respectively. | RAI: Drawings LR-39218 and LR-39219, location F-6, show a continuation of) pipe sections 1-1/2-MS-40, 1-1/2-MS-41 and 2-2MS-40, 2-2MS-41 from stop valves of drawings LR-39233 and LR-39234, respectively. | ||
NSPM Response: | NSPM Response: The continuations of drawing LR-39218, location F-6, Drains From Stop Valves, are shown on LR-39233, location A-4, Turb Stop Valve Drains and on LR-XH-2-15, location A-5, Connection 24. The continuations of LR-39219, location F-6, Drains From Stop Valves, are actually connected on LR-39234, location A-4, similar to the Unit 1 drawing; the connections are not explicitly shown. The continuation is also shown on LR-XH-1002-43, locations B-5 and B-6, Connection 24. | ||
The continuations of drawing LR-39218, location F-6, Drains From Stop Valves, are shown on LR-39233, location A-4, Turb Stop Valve Drains and on LR-XH-2-15, location A-5, Connection 24. The continuations of LR-39219, location F-6, Drains From Stop Valves, are actually connected on LR-39234, location A-4, similar to the Unit 1 drawing; the connections are not explicitly shown. The continuation is also shown on LR-XH-1002-43, locations B-5 and B-6, Connection 24. | 3/4 Issue: The continuations were located; however, the scoping criteria of the continuations (as well as the stop valves) on LR-39233 differ. these lines are in scope for 10 CFR54.4(a)(1). Confirm the scoping classification of these lines on drawing LR-39233.}} | ||
Issue: The continuations were located; however, the |
Revision as of 08:44, 14 November 2019
ML090540457 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 02/10/2009 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
Download: ML090540457 (4) | |
Text
PrairieIslandNPEm Resource From: Richard Plasse Sent: Tuesday, February 10, 2009 10:01 AM To: Eckholt, Gene F.; Vincent, Robert
Subject:
FW: Naveen RAI Response Issues.doc Attachments: Naveen RAI Response Issues.doc Rick draft followups of previous RAIs, can we do the telecon at 1:30 pm EST today?
Rick 1
Hearing Identifier: Prairie_Island_NonPublic Email Number: 738 Mail Envelope Properties (Richard.Plasse@nrc.gov20090210100100)
Subject:
FW: Naveen RAI Response Issues.doc Sent Date: 2/10/2009 10:01:24 AM Received Date: 2/10/2009 10:01:00 AM From: Richard Plasse Created By: Richard.Plasse@nrc.gov Recipients:
"Eckholt, Gene F." <Gene.Eckholt@xenuclear.com>
Tracking Status: None "Vincent, Robert" <Robert.Vincent@xenuclear.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 100 2/10/2009 10:01:00 AM Naveen RAI Response Issues.doc 35906 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Drawing Continuation Responses 2.3.4.5 Drawing LR-39222 and LR-39223 RAI: Location B-5, show a continuation of incoming pipe sections (with no identification numbers [Condensate Transfer]) from drawing LR-39220 NSPM Response: The continuation of drawings LR-39222 and LR-39223, location B-5, Condensate Transfer to line 8-DE-56, is shown on LR-39220, location E-2, 2 1/2 Condensate Transfer and Recycle Pump discharge lines connecting to line 8-DE-56 on either side of valve C-41-2.
3/4 Issue: The continuations are located at E-2 however the scoping criterion of pipe sections (out of system dashed lines) dont match. the feed lines (from unit 2 condensate storage tank) on LR-39222 are 10 CFR 54.4 (a) (1) lines to which these (a) (2) lines are connected (B-5). Additional information needed is the location of anchors on drawing (LR-39220, B-5)downstream of valves C-34-2 and C-40-3.
2.3.4.6 Drawings LR-39218 and LR-39219 RAI: Drawing LR-39218, locations F-6, G-5, and G-6, pipe sections 10-MS-27, 12-MS-3, 12-MS-4, respectively, continuations to drawing LR-39233 NSPM Response: The continuation of LR-39218, locations F-6, G-5 and G-6, lines 10-MS-27, 12-MS-3 and 12-MS-4, are shown on LR-39233, location F-1, at valve TD-4-2 (line 10-MS-27) and location B-3, at valves TD-10-1 and TD-10-5 (lines 12-MS-3 and 12-MS-4).
3/4 Issue: The continuation lines were located; however please confirm the scoping criteria for the out of system dashed lines (10) before valve TD-4-2 in drawing LR-39233.
RAI: Drawing LR-39218, location D-7, pipe sections 6-MS-31 continuations to drawing LR-39233 and drawing LR-39219, location D-7, pipe sections 6-2MS-31 continuation to drawing LR-39234.
NSPM Response: The continuation of drawings LR-39218 and LR-39219, location D-7, Drain to Trap, is shown on LR-39233, location C-2, at valve TD-11-1, and LR-39234, location C-2, at valve 2TD-11-1, respectively.
3/4 Issue: continuations were found, but the scoping criteria of piping section (out of system dashed lines) before valves TD-11-1 and 2TD-11-1 differ between drawings.
RAI: Drawing LR-39218, locations E-6 and E-7, pipe sections 3-MS-30, and upstream pipe sections after the valves TD-6-11, TD-6-12 1 Drains to Trap continuations to drawing LR-39233 and drawing LR-39219, locations E-6 and E-7, pipe sections 3-2MS-
30, and upstream pipe sections after the valves 2TD-6-11, 2TD-6-12 continuations to drawing LR-39234.
NSPM Response: The continuation of drawings LR-39218 and LR-39219, locations E-6 and E-7, Drains to Trap, is shown on LR-39233, location C-3, at valves TD-11-16, TD 11 and TD-6-12 and LR-39234, location C-3, at valves 2TD-11-16, 2TD-6-11 and 2TD-6-12.
3/4 Issue: The continuations were located; however the scoping criteria of piping section (out of system dashed lines) before the valves TD-11-16 and 2TD-11-16 should be 10 CFR 54.4 (a) (1) instead of 10 CFR 54.4 (a) (2).
RAI: Drawing LR-39218, locations E-8 and H-8, pipe sections 1/2 -MS-59, 12-MS-35 respectively, continuations to LR-39233 and drawing LR-39219, locations E-8 and H-8, pipe sections 1/2 -2MS-32, 12-2MS-35 respectively, continuations to LR-39234.
NSPM Response: The continuation of drawings LR-39218 and LR-39219, location E-8, 1/2-MS-59 and 1/2-2MS-32, Drain to Trap, are shown on LR-39233 and LR-39234, location C-9, at valve TD-16-1 and 2TD-16-1 respectively.
3/4 Issue: The scoping criteria of the dashed line before valve TD-16-1 on the continuation drawing LR-39233 at location C-9 differs from that on LR-39218.
RAI: Drawings LR-39218 and LR-39219, location F-6, show a continuation of) pipe sections 1-1/2-MS-40, 1-1/2-MS-41 and 2-2MS-40, 2-2MS-41 from stop valves of drawings LR-39233 and LR-39234, respectively.
NSPM Response: The continuations of drawing LR-39218, location F-6, Drains From Stop Valves, are shown on LR-39233, location A-4, Turb Stop Valve Drains and on LR-XH-2-15, location A-5, Connection 24. The continuations of LR-39219, location F-6, Drains From Stop Valves, are actually connected on LR-39234, location A-4, similar to the Unit 1 drawing; the connections are not explicitly shown. The continuation is also shown on LR-XH-1002-43, locations B-5 and B-6, Connection 24.
3/4 Issue: The continuations were located; however, the scoping criteria of the continuations (as well as the stop valves) on LR-39233 differ. these lines are in scope for 10 CFR54.4(a)(1). Confirm the scoping classification of these lines on drawing LR-39233.