ENS 44205: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 05/12/2008 15:00 EDT | | event date = 05/12/2008 15:00 EDT | ||
| last update date = 05/12/2008 | | last update date = 05/12/2008 | ||
| title = Shut Down Initiated Due | | title = Shut Down Initiated Due to Inoperable Steam Generator Flow Channels | ||
| event text = This 4-hour notification is being made to report that Salem Unit 2 has initiated a manual reactor shutdown in accordance with [Technical Specification] 3.0.3. The shutdown was initiated due to all eight steam generator steam flow channels being declared inoperable at 1500 on 5/12/08. All eight steam flow channels were indicating lower than actual steam flow such that the high steam flow coincident with low steam pressure or low-low Tave would not occur within the allowable values specified in the technical specifications. Salem Unit 2 is currently in Mode 1. Reactor Coolant System Temperature is 551 degrees Fahrenheit with pressure @ 2235 PSIG. Salem Unit 2 has no other shutdown Tech. Spec. action statements in effect. Prior to the initiating event Salem Unit 2 was raising power at 1/2 % per hour after 2R16 refueling outage. | | event text = This 4-hour notification is being made to report that Salem Unit 2 has initiated a manual reactor shutdown in accordance with [Technical Specification] 3.0.3. The shutdown was initiated due to all eight steam generator steam flow channels being declared inoperable at 1500 on 5/12/08. All eight steam flow channels were indicating lower than actual steam flow such that the high steam flow coincident with low steam pressure or low-low Tave would not occur within the allowable values specified in the technical specifications. Salem Unit 2 is currently in Mode 1. Reactor Coolant System Temperature is 551 degrees Fahrenheit with pressure @ 2235 PSIG. Salem Unit 2 has no other shutdown Tech. Spec. action statements in effect. Prior to the initiating event Salem Unit 2 was raising power at 1/2 % per hour after 2R16 refueling outage. | ||
All ECCS and ESF Systems are available. | All ECCS and ESF Systems are available. |
Latest revision as of 22:14, 1 March 2018
Where | |
---|---|
Salem New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+1.8 h0.075 days <br />0.0107 weeks <br />0.00247 months <br />) | |
Opened: | Gary Meekins 20:48 May 12, 2008 |
NRC Officer: | Pete Snyder |
Last Updated: | May 12, 2008 |
44205 - NRC Website
| |