ML14087A305: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML14087A305
| number = ML14087A305
| issue date = 03/28/2014
| issue date = 03/28/2014
| title = Perry, Unit 1 - 2013 Annual Report of Emergency Core Cooling System Errors and Model Changes
| title = 2013 Annual Report of Emergency Core Cooling System Errors and Model Changes
| author name = Harkness E J
| author name = Harkness E J
| author affiliation = FirstEnergy Nuclear Operating Co
| author affiliation = FirstEnergy Nuclear Operating Co

Latest revision as of 14:10, 17 March 2019

2013 Annual Report of Emergency Core Cooling System Errors and Model Changes
ML14087A305
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/28/2014
From: Harkness E J
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-14-092
Download: ML14087A305 (2)


Text

FENOCŽ ' RrstEnergy Nuclear Operating Company Ernest J. Harlm888 Vice President March 28, 2014 L-14-092 ATTN: Document Control Desk U.S. Nuclear Regulatory_Commission Washington, DC 20555-0001

SUBJECT:

  • Perry Nuclear Power Plant, Unit No.1 Docket No. 50-440, License No. NPF-58 Perry Nuclear Power Plant P.O. Box97 10 Center Road Perry. Ohio 44081 44()..280-5382 Fax:440-28().8029 10 CFR 50.46(a)(3)(ii)

There are no regulatory commitments contained in this letter. If there are any questions or if additional information*

is required, please contact Mr. Thomas Lentz, Manager -Fleet Licensing at (330) 315-6810.

J /

Ernest J. Harkness

Attachment:

2013 Annual Report of Emergency Core Cooling System Errors and Model Changes cc: NRC Region Ill Administrator NRC Resident Inspector NRC Project Manager Attachment L-14-092 2013 Annual Report of Emergency Core Cooling System Errors and Model Changes

  • Page 1of1
  • New Errors and Changes: Change in an aceeptable evaluation model or application of such model: None Errors: None A review was conducted of the corrective action program, correspondence and notifications from General Electric and Global Nuclear Fuels, Supplemental Reload
  • Licensing Report for Perry Reload 14 /Cycle 15, and Perry Calculation FM-038, Perry Peak Cladding Temperatures.*

No changes to an acceptable evaluation model or application, or error notifications were issued to Perry Nuclear Power Plant during the year 2013.