ML15008A101: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML15008A101
| number = ML15008A101
| issue date = 09/04/2014
| issue date = 09/04/2014
| title = Beaver Valley Unit 1 - Miscellaneous Exam Material (Folder 1)
| title = Miscellaneous Exam Material (Folder 1)
| author name =  
| author name =  
| author affiliation = FirstEnergy Nuclear Operating Co
| author affiliation = FirstEnergy Nuclear Operating Co

Revision as of 02:19, 29 January 2019

Miscellaneous Exam Material (Folder 1)
ML15008A101
Person / Time
Site: Beaver Valley
Issue date: 09/04/2014
From:
FirstEnergy Nuclear Operating Co
To: Brian Fuller
Operations Branch I
Shared Package
ML14058A120 List:
References
U01884
Download: ML15008A101 (4)


Text

NRC Examination Student Questions During Exam and Proctor Responses Time Individual 0857 SRO # 11 0915 SRO # 12 1019 SRO # 12 1028 RO # R4 1045 SRO # 12 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#

23 Question:

The Control Room Radiation Monitor has different alarm levels, they are Warn and High. Did the monitor fail to the High setpoint level or to full meter scale? Response:

Assume the monitor has failed full scale. Question#

34 Question:

I am unsure of what the word "STUCK" means. Can the PORV be manually cycled? Note -The candidate then re-read the question and saw the wording about manually cycling and stated that he did not have a question Response:

No Response given, self answered by candidate.

Question#

62 Question:

Can I assume that non-isolable Instrument Air Leak mans a complete loss of Air pressure, = 0 psig? Response:

Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure. Question # 63 Question:

Am I to determine the impact on TV-1CN-100 solely on the indications received? (in the question stem) Response:

Yes Question#

7 Question:

Asked about the status of the other pressurizer heaters. Response:

Reminded the candidate to assume all systems function as designed.

Page 1 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual 1100 RO # R4 1120 SRO # 11 1125 RO # R1 1255 RO # R1 1403 SRO # 11 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#

55 Question:

Stated-with given conditions, CIB and SIS should have actuated by now. Choice B says pressure will continue to rise until CIB is automatically actuated.

Am I to assume that automatic CIB failed to actuate? Response:

You have enough information to answer the question.

Question#

94 Question:

Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor? Response:

Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion)

Question#

65 Question:

Can you assume the transformer faults if doused with water? Response:

Assume there are no other failures of detection or plant equipment. (also informed other candidates, via white board of the status, per discussion with chief examiner)

Question # 37 Question:

For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray? Response:

Assume NSA for the given power level. Question # 65 Question:

Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment?

Response:

Yes Page 2 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1417 Question#

7 SRO Question:

PC-1 RC-445 is in Auto at 45% in the initial conditions.

Am I understanding

  1. 13 that after the 1st stage failure it stayed at 45% demand? Response:

Yes, just as it is stated 1424 Question#

67 RO Question:

Is this diamond symbol actually in the procedure?

  1. R3 Response:

Yes 1440 End of the exam no further questions Beaver Valley BV1 LOT14 7/14/14 Page 3 of 3 Door Door Beaver Valley BV1LOT14 NRC Written Exam Seating Chart 7/14/14 Rear [ j Lunch Tables ,-] j RO R4 Chudy I i SPARE L.._ r I -4 Feet -4 Feet -4 Feet -4 Feet j SRO 12 Keener 1 SPARE l I I -4 Feet -4 Feet -4 Feet -4 Feet l RO R3 Frable L J SRO 13 Tabinowski I r -4 Feet -4 Feet Proctor Desk I Proctor Desk I Proctor Desk Front Room 103 BVPS Training Center RO R1 Hicks -4 Feet .I SRO 11 Hovanec -4 Feet .*: RO R2 Williams 11 Steve Hovanec 12 Shawn Keener 13 Craig Tabinowski R1 Roger Hicks R2 Jon Williams R3 Dave Frable R4 Steve Chudy I I I