ML15265A487: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[L-2015-216, St. Lucie Plant - Request for Information Response and Electronic Input/Output Files Supporting the Flooding Hazards Reevaluation Report]]
{{Adams
| number = ML15265A487
| issue date = 08/20/2015
| title = St. Lucie Plant - Request for Information Response and Electronic Input/Output Files Supporting the Flooding Hazards Reevaluation Report
| author name = Katzman E S
| author affiliation = Florida Power & Light Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000335, 05000389
| license number =
| contact person =
| case reference number = L-2015-216
| document type = Letter
| page count = 3
}}
 
=Text=
{{#Wiki_filter:0L-2015-216 August 20, 2015 10 CFR 50.4 F PLo U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 RE: FPL/St. Lucie Plant's Request for Infoi.mation (RFI) Response and Electronic Input/Output Files Supporting the Flooding Hazards Reevaluation Report
 
==References:==
: 1) FPL Letter dated March 10, 2015, "FPL/St. Lucie Plant's Flooding Hazards Reevaluation for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," Accession No. ML15083A306.
: 2) NRC Letter dated June 1, 2015, "Nuclear Regulatory Commission Plan for the Audit of Florida Power and Light Company's Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for St. Lucie Plant, Units 1 And 2 (TAC No. MF6113 and MF6114)," Accession No. ML15147A591.
: 3) NRC email from Tekia Govan to Eric Katzman dated May 14, 2015, "Request:
Audit Preparation Documents for St. Lucie." 4) FPL Letter L-2015-168 dated June 3, 2015, "FPL/St. Lucie Plant' s Electronic Input/Output Files Supporting the Flooding Hazards Reevaluation Report," Accession No. ML 15166A089.
: 5) FPL/NRC Telecon dated July 29, 2015 related to the St. Lucie FHRR.Reference 1 provided the Flooding Hazards Reevaluation Report (FHRR) for the St. Lucie Plant.Reference 2 notified Florida Power & Light (FPL) of the upcoming audit activities pertaining to the St. Lucie FHRR. In Reference 3, the NRC requested that FPL provide the electronic versions of the numerical model files (i.e., input and output files) that support the FHRR and FPL provided the requested information in Reference 4.During the Reference 5 teleconference, The NRC requested some clarifications.
The attachment provides this information.
Additionally, the NRC requested the computer output files for the Local Intense Precipitation depth results. The requested electronic files are within the CD accompanying this letter.This letter makes no new commitments or changes to any existing commitments.
Florida Power & Light Company /-G" 6501 S. Ocean Drive, Jensen Beach, FL 34957 _
L-2015-216 Page 2 If you have any questions or require additional information, please contact Eric Katzman, St.Lucie Licensing Manager, at (772) 467-7734.Respectfully submitted, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/KWF Attachment CD labeled -St. Lucie Power Plant, NRC Information Need 3: Local Intense Precipitation per Conference Call of 07/29/2015 cc: USNRC Regional Administrator, Region II, w/o CD USNRC Senior Resident Inspector, St. Lucie Units 1 and 2 w/o CD L-2015-216 Attachment Page 1 of X Clarification request: All Flood Causing Mechanisms
-Comparison of Reevaluated Flood Hazard with Current Design Basis
 
==Background:==
 
The FHRR for the St Lucie site provides comparisons of the reevaluated flood hazards with the CLB for all flood causing mechanisms for which a CLB had been established in Section 3.0. FHRLR Section 5.14 of the report is a summary of this comparison.
The §50.54(f)letter requested a comparison with the current design basis.Request: The licensee is requested to provide clarification regarding the inconsistencies identified in the FHRR with regard to the comparison of the reevaluated flood hazard to the current design basis and submit a revised hazard comparison consistent with the instructions provided in the §50.54(f) letter.Response: The current licensing basis (CLB) flooding information used for comparison in Section 5 is consistent with the current design basis (CDB) for flooding at PSL. The comparisons in Section 5.14 are not affected by the change in terminology and remain valid for a comparison of the FHRR to the CDB.}}

Revision as of 01:20, 17 March 2019

St. Lucie Plant - Request for Information Response and Electronic Input/Output Files Supporting the Flooding Hazards Reevaluation Report
ML15265A487
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/20/2015
From: Katzman E S
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2015-216
Download: ML15265A487 (3)


Text

0L-2015-216 August 20, 2015 10 CFR 50.4 F PLo U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 RE: FPL/St. Lucie Plant's Request for Infoi.mation (RFI) Response and Electronic Input/Output Files Supporting the Flooding Hazards Reevaluation Report

References:

1) FPL Letter dated March 10, 2015, "FPL/St. Lucie Plant's Flooding Hazards Reevaluation for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," Accession No. ML15083A306.
2) NRC Letter dated June 1, 2015, "Nuclear Regulatory Commission Plan for the Audit of Florida Power and Light Company's Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for St. Lucie Plant, Units 1 And 2 (TAC No. MF6113 and MF6114)," Accession No. ML15147A591.
3) NRC email from Tekia Govan to Eric Katzman dated May 14, 2015, "Request:

Audit Preparation Documents for St. Lucie." 4) FPL Letter L-2015-168 dated June 3, 2015, "FPL/St. Lucie Plant' s Electronic Input/Output Files Supporting the Flooding Hazards Reevaluation Report," Accession No. ML 15166A089.

5) FPL/NRC Telecon dated July 29, 2015 related to the St. Lucie FHRR.Reference 1 provided the Flooding Hazards Reevaluation Report (FHRR) for the St. Lucie Plant.Reference 2 notified Florida Power & Light (FPL) of the upcoming audit activities pertaining to the St. Lucie FHRR. In Reference 3, the NRC requested that FPL provide the electronic versions of the numerical model files (i.e., input and output files) that support the FHRR and FPL provided the requested information in Reference 4.During the Reference 5 teleconference, The NRC requested some clarifications.

The attachment provides this information.

Additionally, the NRC requested the computer output files for the Local Intense Precipitation depth results. The requested electronic files are within the CD accompanying this letter.This letter makes no new commitments or changes to any existing commitments.

Florida Power & Light Company /-G" 6501 S. Ocean Drive, Jensen Beach, FL 34957 _

L-2015-216 Page 2 If you have any questions or require additional information, please contact Eric Katzman, St.Lucie Licensing Manager, at (772) 467-7734.Respectfully submitted, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/KWF Attachment CD labeled -St. Lucie Power Plant, NRC Information Need 3: Local Intense Precipitation per Conference Call of 07/29/2015 cc: USNRC Regional Administrator, Region II, w/o CD USNRC Senior Resident Inspector, St. Lucie Units 1 and 2 w/o CD L-2015-216 Attachment Page 1 of X Clarification request: All Flood Causing Mechanisms

-Comparison of Reevaluated Flood Hazard with Current Design Basis

Background:

The FHRR for the St Lucie site provides comparisons of the reevaluated flood hazards with the CLB for all flood causing mechanisms for which a CLB had been established in Section 3.0. FHRLR Section 5.14 of the report is a summary of this comparison.

The §50.54(f)letter requested a comparison with the current design basis.Request: The licensee is requested to provide clarification regarding the inconsistencies identified in the FHRR with regard to the comparison of the reevaluated flood hazard to the current design basis and submit a revised hazard comparison consistent with the instructions provided in the §50.54(f) letter.Response: The current licensing basis (CLB) flooding information used for comparison in Section 5 is consistent with the current design basis (CDB) for flooding at PSL. The comparisons in Section 5.14 are not affected by the change in terminology and remain valid for a comparison of the FHRR to the CDB.