62 Question:
62 Question:
Can I assume that non-isolable Instrument Air Leak mans a complete loss of Air pressure,  
Can I assume that non-isolable Instrument Air Leak mans a complete loss of Air pressure, = 0 psig? Response:
= 0 psig? Response:
Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure. Question # 63 Question:
Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure.
Am I to determine the impact on TV-1CN-100 solely on the indications received? (in the question stem) Response:
Question  
# 63 Question:
Am I to determine the impact on TV-1CN-100 solely on the indications received?  
(in the question stem) Response:
Yes Question#
Yes Question#
7 Question:
7 Question:
Asked about the status of the other pressurizer heaters.
Asked about the status of the other pressurizer heaters. Response:
Response:
Reminded the candidate to assume all systems function as designed.
Reminded the candidate to assume all systems function as designed.
Page 1 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual 1100 RO # R4 1120 SRO # 11 1125 RO # R1 1255 RO # R1 1403 SRO # 11 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#
Page 1 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual 1100 RO # R4 1120 SRO # 11 1125 RO # R1 1255 RO # R1 1403 SRO # 11 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#
55 Question:
55 Question:
Stated-with given conditions, CIB and SIS should have actuated by now. Choice B says pressure will continue to rise until CIB is automatically actuated.
Stated-with given conditions, CIB and SIS should have actuated by now. Choice B says pressure will continue to rise until CIB is automatically actuated.
Am I to assume that automatic CIB failed to actuate?
Am I to assume that automatic CIB failed to actuate? Response:
Response:
You have enough information to answer the question.
You have enough information to answer the question.
Question#
Question#
94 Question:
94 Question:
Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor?
Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor? Response:
Response:
Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion)
Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion)
Question#
Question#
65 Question:
65 Question:
Can you assume the transformer faults if doused with water? Response:
Can you assume the transformer faults if doused with water? Response:
Assume there are no other failures of detection or plant equipment.  
Assume there are no other failures of detection or plant equipment. (also informed other candidates, via white board of the status, per discussion with chief examiner)
(also informed other candidates, via white board of the status, per discussion with chief examiner)
Question # 37 Question:
Question  
# 37 Question:
For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray? Response:
For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray? Response:
Assume NSA for the given power level. Question  
Assume NSA for the given power level. Question # 65 Question:
# 65 Question:
Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment?
Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment?
Response:
Response:

Revision as of 09:09, 9 July 2018

Beaver Valley Unit 1 - Miscellaneous Exam Material (Folder 1)
ML15008A101
Person / Time
Site: Beaver Valley
Issue date: 09/04/2014
From:
FirstEnergy Nuclear Operating Co
To: Brian Fuller
Operations Branch I
Shared Package
ML14058A120 List:
References
U01884
Download: ML15008A101 (4)


Text

NRC Examination Student Questions During Exam and Proctor Responses Time Individual 0857 SRO # 11 0915 SRO # 12 1019 SRO # 12 1028 RO # R4 1045 SRO # 12 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#

23 Question:

The Control Room Radiation Monitor has different alarm levels, they are Warn and High. Did the monitor fail to the High setpoint level or to full meter scale? Response:

Assume the monitor has failed full scale. Question#

34 Question:

I am unsure of what the word "STUCK" means. Can the PORV be manually cycled? Note -The candidate then re-read the question and saw the wording about manually cycling and stated that he did not have a question Response:

No Response given, self answered by candidate.

Question#

62 Question:

Can I assume that non-isolable Instrument Air Leak mans a complete loss of Air pressure, = 0 psig? Response:

Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure. Question # 63 Question:

Am I to determine the impact on TV-1CN-100 solely on the indications received? (in the question stem) Response:

Yes Question#

7 Question:

Asked about the status of the other pressurizer heaters. Response:

Reminded the candidate to assume all systems function as designed.

Page 1 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual 1100 RO # R4 1120 SRO # 11 1125 RO # R1 1255 RO # R1 1403 SRO # 11 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#

55 Question:

Stated-with given conditions, CIB and SIS should have actuated by now. Choice B says pressure will continue to rise until CIB is automatically actuated.

Am I to assume that automatic CIB failed to actuate? Response:

You have enough information to answer the question.

Question#

94 Question:

Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor? Response:

Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion)

Question#

65 Question:

Can you assume the transformer faults if doused with water? Response:

Assume there are no other failures of detection or plant equipment. (also informed other candidates, via white board of the status, per discussion with chief examiner)

Question # 37 Question:

For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray? Response:

Assume NSA for the given power level. Question # 65 Question:

Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment?

Response:

Yes Page 2 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1417 Question#

7 SRO Question:

PC-1 RC-445 is in Auto at 45% in the initial conditions.

Am I understanding

  1. 13 that after the 1st stage failure it stayed at 45% demand? Response:

Yes, just as it is stated 1424 Question#

67 RO Question:

Is this diamond symbol actually in the procedure?

  1. R3 Response:

Yes 1440 End of the exam no further questions Beaver Valley BV1 LOT14 7/14/14 Page 3 of 3 Door Door Beaver Valley BV1LOT14 NRC Written Exam Seating Chart 7/14/14 Rear [ j Lunch Tables ,-] j RO R4 Chudy I i SPARE L.._ r I -4 Feet -4 Feet -4 Feet -4 Feet j SRO 12 Keener 1 SPARE l I I -4 Feet -4 Feet -4 Feet -4 Feet l RO R3 Frable L J SRO 13 Tabinowski I r -4 Feet -4 Feet Proctor Desk I Proctor Desk I Proctor Desk Front Room 103 BVPS Training Center RO R1 Hicks -4 Feet .I SRO 11 Hovanec -4 Feet .*: RO R2 Williams 11 Steve Hovanec 12 Shawn Keener 13 Craig Tabinowski R1 Roger Hicks R2 Jon Williams R3 Dave Frable R4 Steve Chudy I I I