|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:CALLAWAY | | {{#Wiki_filter:CALLAWAY -SA Figure 13.1-2a has been deleted. Rev. OL-7 5/94 |
| -SA Figure 13.1-2a has been deleted. | |
| Rev. OL-7 5/94 | |
|
| |
|
| CALLAWAY | | CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94}} |
| -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. | |
| Rev. OL-7 5/94 CALLAWAY | |
| -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. | |
| Rev. OL-7 5/94 CALLAWAY | |
| -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. | |
| Rev. OL-7 5/94 CALLAWAY | |
| -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. | |
| Rev. OL-7 5/94 CALLAWAY | |
| -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. | |
| Rev. OL-7 5/94 CALLAWAY | |
| -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. | |
| Rev. OL-7 5/94 CALLAWAY | |
| -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. | |
| Rev. OL-7 5/94}} | |
Letter Sequence Other |
---|
|
|
MONTHYEARML17048A1762017-03-0303 March 2017 Final Safety Analysis Report, Revision OL-22, Chapter 1 Figures, Introduction and General Description of the Plant Project stage: Other ML17048A1962017-03-0303 March 2017 Final Safety Analysis Report, Revision OL-22, Chapter 1 Drawings FSAR Figures 1.2 - 1 Through 1.2-48 Are Withheld Per Regulatory Issue Summary 2015-17 Project stage: Other ML17048A1572017-03-0303 March 2017 Final Safety Analysis Report, Revision OL-22, Chapter 1, Introduction and General Description of the Plant Project stage: Other ML17062A5872017-03-0808 March 2017 Final Safety Analysis Report, Revision OL-22, Chapter 13 Figures, Conduct of Operations Project stage: Other ML17079A2012017-03-22022 March 2017 Final Safety Analysis Report, Revision OL-22, Chapter 8 Figures, Electric Power Project stage: Other 2017-03-03
[Table View] |
|
---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARML23318A1082023-12-28028 December 2023 FSAR Chapter 1, Figures Redacted ML23165A2432023-06-14014 June 2023 FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19 ML23062A6382022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Figures ML23062A6492022-12-29029 December 2022 Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification Bases ML23062A6542022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures ML23062A6532022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML23062A6522022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures ML23062A6512022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements ML23062A6502022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements ML23062A6472022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures ML23062A6452022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23062A6442022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6422022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23062A6412022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection ML23062A6402022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23062A6392022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Figures ML23062A6372022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Change Notice Log ML23062A6362022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23062A6352022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis ML23062A6342022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures ML23062A6332022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23062A6322022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures ML23062A6312022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor ML23062A6302022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Site Characteristics ML23062A6292022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures ML23062A6182022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23062A6062022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power ML23062A6072022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time ML23062A6082022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Figures ML23062A6092022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23062A6112022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Sections ML23062A6122022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures ML23062A6132022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Tables ML23062A6152022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Figures ML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6172022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML23062A6242022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement 2023-06-14
[Table view] |
Text
CALLAWAY -SA Figure 13.1-2a has been deleted. Rev. OL-7 5/94
CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94 CALLAWAY -SA Figures 13.1-3a, 13.1-3b, 13.1-3c, 13.1-3d, 13.1-3e, 13.1-3f and 13.1-4 have been deleted. Rev. OL-7 5/94