ML16357A150: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 26: Line 26:
16.1  PRELIMINARY TECHNICAL SPECIFICATIONS This section is not applicable to the LGS UFSAR.  
16.1  PRELIMINARY TECHNICAL SPECIFICATIONS This section is not applicable to the LGS UFSAR.  


LGS UFSAR CHAPTER 16 16.2-1 REV. 13, SEPTEMBER 2006  16.2  PROPOSED FINAL TECHNICAL SPECIFICATIONS The final Technical Specifications for Limerick Unit 1 are based on the NRC's Standard Technical Specifications for BWRs (NUREG-0123) and were issued as Appendix A to Facility Operating License NPF-39. The proposed final Technical Specifications for Unit 2 were based on Unit 1 Technical Specifications as a guide. The Unit 2 Technical Specifications were issued as Appendix A to Facility Operating License NPF-85.  
LGS UFSAR CHAPTER 16 16.2-1 REV. 13, SEPTEMBER 2006  16.2  PROPOSED FINAL TECHNICAL SPECIFICATIONS The final Technical Specifications for Limerick Unit 1 are based on the NRC's Standard Technical Specifications for BWRs (NUREG-0123) and were issued as Appendix A to Facility Operating License NPF-39. The proposed final Technical Specifications for Unit 2 were based on Unit 1 Technical Specifications as a guide. The Unit 2 Technical Specifications were issued as Appendix A to Facility Operating License NPF-85.}}
 
}}

Revision as of 02:05, 19 May 2018

Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
ML16357A150
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/19/2016
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16357A167 List:
References
Download: ML16357A150 (3)


Text

LGS UFSAR CHAPTER 16 16-i REV. 13, SEPTEMBER 2006 CHAPTER 16 - TECHNICAL SPECIFICATIONS TABLE OF CONTENTS

16.1 PRELIMINARY TECHNICAL SPECIFICATIONS

16.2 PROPOSED FINAL TECHNICAL SPECIFICATIONS

LGS UFSAR CHAPTER 16 16.1-1 REV. 13, SEPTEMBER 2006 CHAPTER 16 - TECHNICAL SPECIFICATIONS

16.1 PRELIMINARY TECHNICAL SPECIFICATIONS This section is not applicable to the LGS UFSAR.

LGS UFSAR CHAPTER 16 16.2-1 REV. 13, SEPTEMBER 2006 16.2 PROPOSED FINAL TECHNICAL SPECIFICATIONS The final Technical Specifications for Limerick Unit 1 are based on the NRC's Standard Technical Specifications for BWRs (NUREG-0123) and were issued as Appendix A to Facility Operating License NPF-39. The proposed final Technical Specifications for Unit 2 were based on Unit 1 Technical Specifications as a guide. The Unit 2 Technical Specifications were issued as Appendix A to Facility Operating License NPF-85.