| | {{#Wiki_filter:From:Balsam, Briana To:Julie Crocker Cc:Logan, Dennis |
| | |
| | ==Subject:== |
| | NRC Comments on Salem draft Biological Opinion Date:Wednesday, January 04, 2012 7:40:00 AM Attachments:NRC Comments on Draft BiOp.docx |
| | : Julie, I have attached NRC's comments on the draft biological opinion for Salem. PSEG has committed to getting NRC comments by COB Friday (1/6). I will pass those on to you as soon as we receive them. I would also like to touch base with you this week to talk about the possibility of a site visit, as I had mentioned in my voicemail. |
| | I will be in the office all week, so you should be able to reach me. Thanks, Briana |
| | |
| | ___________________________Briana A. Balsam Biologist Division of License RenewalOffice of Nuclear Reactor RegulationU.S. Nuclear Regulatory Commission |
| | |
| | 301-415-1042 briana.balsam@nrc.gov |
| | |
| | NRC Comments on Draft Salem Biological Opinion January 3, 2011 Page Paragraph Comment Cover Letter Add Briana Balsam, NRC to the CC list. |
| | Overall Comment Some parenthetical references place a comma between the author and date, while some do not. |
| | 1 2 Change "Draft" to "Final Generic Environmental Impact Statement-dated March 2011." The BiOp refers to the final on page 12, and a few other places. Consistency on this reference should be checked throughout BiOp. |
| | 4 1 Change "NYDEP" to "NJDEP." |
| | 15 1 This paragraph refers to dates that have passed (September 16, 2011 and April 11, 2011) for listing actions on the loggerhead. This should be updated to reflect the current status. |
| | 68 4 Should the sentence "This Opinion examines the likely effects (direct and indirect) of the proposed action on shortnose sturgeon in the action area-" also include sea turtles? |
| | 77 3 In the last sentence, "-any potential loss of potential shortnose sturgeon" should be reworded to remove one of the two uses of "potential." |
| | 98 Reasonable and Prudent Measure #2 Modify to say: "All sea turtle and shortnose sturgeon impingements associated with the SNGS and sea turtle and shortnose sturgeon sightings in the action area must be reported to NMFS and NRC." 100 Term and Condition |
| | #7 Similar to the above comment, add "and NRC" to the notification requirement. |
| | 100 Term and Condition |
| | |
| | #8 Require PSEG to submit an annual report to both NMFS and NRC. |
| | 101 Term and Condition |
| | |
| | #14 Why is this term and condition worded that "NRC must require" rather than that "PSEG must collect fin clips"? The second wording option would be more consistent with the previous terms and conditions. |
| | |
| | 103 5 The concluding paragraph refers to "a license proposed for issuance by the NRC." However, the NRC issued renewed licenses for Salem and Hope Creek on June 30, 2011. The renewed licenses expire on August 13, 2036 (Salem 1), April 18, 2040 (Salem 2), and April 11, 2046 (Hope Creek).}} |
Revision as of 22:27, 30 July 2018
Similar Documents at Salem |
---|
Category:E-Mail
MONTHYEARML24310A0542024-10-31031 October 2024 NRR E-mail Capture - (External_Sender) PSEG Salem/Hope Creek Biological Opinion GAR-2020-02842 - Annual Ice Barrier Schedule Notification 20242025 ML24303A1752024-10-29029 October 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon 10/28/2024 ML24303A4242024-10-29029 October 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon 10/28/2024 ML24277A0812024-10-0303 October 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon Collected on 10/02/2024 ML24269A0362024-09-24024 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/24/2024 ML24248A0452024-09-0303 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/3/2024 ML24229A0422024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod Cladding ML24229A0432024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod Cladding ML24227A5092024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 8/13/2024 ML24228A1942024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form for a Live - Atlantic Sturgeon 8/14/2024 ML24250A0562024-07-11011 July 2024 PSEG to NMFS, Regarding Processing of Fin Clips ML24219A2472024-07-0909 July 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Shortnose Sturgeon 7/9/2024 ML24123A0522024-05-0101 May 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - One Deceased Sturgeon 4/30/2024 ML24106A0542024-04-12012 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Alive Atlantic Sturgeon 4/12/2024 ML24101A2192024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 4/8/24 ML24093A1222024-04-0101 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Atlantic Sturgeon 4/1/2024 ML24075A1862024-03-14014 March 2024 NRR E-mail Capture - (External_Sender) Biological Opinion Gar 2020-02842 - PSEG Salem and Hope Creek Generating Station Annual Incidental Take Report - 2023 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24030A8432024-01-30030 January 2024 NRR E-mail Capture - (External_Sender) 2023 PSEG Sturgeon Pit Tag Data ML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML24250A0572023-06-0606 June 2023 PSEG to NMFS, Request for Sturgeon Fin Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 2024-09-03
[Table view] |
Text
From:Balsam, Briana To:Julie Crocker Cc:Logan, Dennis
Subject:
NRC Comments on Salem draft Biological Opinion Date:Wednesday, January 04, 2012 7:40:00 AM Attachments:NRC Comments on Draft BiOp.docx
- Julie, I have attached NRC's comments on the draft biological opinion for Salem. PSEG has committed to getting NRC comments by COB Friday (1/6). I will pass those on to you as soon as we receive them. I would also like to touch base with you this week to talk about the possibility of a site visit, as I had mentioned in my voicemail.
I will be in the office all week, so you should be able to reach me. Thanks, Briana
___________________________Briana A. Balsam Biologist Division of License RenewalOffice of Nuclear Reactor RegulationU.S. Nuclear Regulatory Commission
301-415-1042 briana.balsam@nrc.gov
NRC Comments on Draft Salem Biological Opinion January 3, 2011 Page Paragraph Comment Cover Letter Add Briana Balsam, NRC to the CC list.
Overall Comment Some parenthetical references place a comma between the author and date, while some do not.
1 2 Change "Draft" to "Final Generic Environmental Impact Statement-dated March 2011." The BiOp refers to the final on page 12, and a few other places. Consistency on this reference should be checked throughout BiOp.
4 1 Change "NYDEP" to "NJDEP."
15 1 This paragraph refers to dates that have passed (September 16, 2011 and April 11, 2011) for listing actions on the loggerhead. This should be updated to reflect the current status.
68 4 Should the sentence "This Opinion examines the likely effects (direct and indirect) of the proposed action on shortnose sturgeon in the action area-" also include sea turtles?
77 3 In the last sentence, "-any potential loss of potential shortnose sturgeon" should be reworded to remove one of the two uses of "potential."
98 Reasonable and Prudent Measure #2 Modify to say: "All sea turtle and shortnose sturgeon impingements associated with the SNGS and sea turtle and shortnose sturgeon sightings in the action area must be reported to NMFS and NRC." 100 Term and Condition
- 7 Similar to the above comment, add "and NRC" to the notification requirement.
100 Term and Condition
- 8 Require PSEG to submit an annual report to both NMFS and NRC.
101 Term and Condition
- 14 Why is this term and condition worded that "NRC must require" rather than that "PSEG must collect fin clips"? The second wording option would be more consistent with the previous terms and conditions.
103 5 The concluding paragraph refers to "a license proposed for issuance by the NRC." However, the NRC issued renewed licenses for Salem and Hope Creek on June 30, 2011. The renewed licenses expire on August 13, 2036 (Salem 1), April 18, 2040 (Salem 2), and April 11, 2046 (Hope Creek).