ML120760068: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  March 16, 2012 
[[Issue date::March 16, 2012]]
Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North
Baxley, GA 31513  SUBJECT:  EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2012301 AND 05000366/2012301 
Dear Mr. Madison:  In a telephone conversation on March 12, 2012, between Mr. Charlie Edmund, Examination Group Lead, Mr. Anthony Ball, Plant Operations Instructor, Mr. Edward Jones, Plant Operations Instructor, and Mr. Edwin Lea, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Edwin I. Hatch Nuclear Plant.  The operating test is scheduled to be administered during the weeks of June 18 and June 25, 2012.  The written
examination is scheduled to be administered the week of June 25, 2012.  The on-site preparatory week is scheduled for the week of May 28, 2012.  As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by April 12, 2012.  Mr. Edwin Lea provided the written examination outline to your staff in December 2011.  The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by April 30, 2012.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.  We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. 
SNC, Inc. 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on  February 28, 2013.  The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the
collection of information.  Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.      The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).  Thank you for your cooperation in this matter.  Mr. Edmund has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Edwin Lea at 
SNC, Inc. 3  (404) 997-4567, (Internet E-mail: Edwin.Lea@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).  Sincerely,        /RA: Malcolm Widmann for/  Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety 
Docket Nos.  50-321, 50-366 License Nos.  DPR-57, NPF-5  cc:  See Page 4   
SNC, Inc. 3  (404) 997-4567, (Internet E-mail: Edwin.Lea@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).  Sincerely,        /RA: Malcolm Widmann for/  Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety 
Docket Nos.  50-321, 50-366 License Nos.  DPR-57, NPF-5  cc:  See Page 4   
   
   
   
  xG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE xG NON-SENSITIVE ADAMS: xG Yes ACCESSION NUMBER:__ML120760068______________  xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RA RA      NAME LEA FRANKE      DATE 3/16/2012 3/16/2012 3/      /2012 3/      /2012 3/      /2012 3/      /2012 3/      /2012 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME: G:\OLEXAMS\HATCH EXAMINATIONS\INITIAL EXAM 2012-301\HATCH 120 DAY NOTIFICATION LETTER 2012 301.DOCX 
   
 
SNC, Inc. 4  cc: S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc. Electronic Mail Distribution 
J. L. Pemberton SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. Electronic Mail Distribution 
D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  Paula Marino Vice President
Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  T. A. Lynch
Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution 
Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution  M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution 
B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution 
D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  T. D. Honeycutt
Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  L. Mike Stinson
Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  N. J. Stringfellow Licensing Manager
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  L. P. Hill Licensing Supervisor
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  L. L. Crumpton Administrative Assistant, Sr. Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  Steven B. Tipps Hatch Principal Engineer - Licensing
Edwin I. Hatch Nuclear Plant Electronic Mail Distribution  W. E. Duvall Site Support Manager
Edwin I. Hatch Nuclear Plant Electronic Mail Distribution    (cc cont'd - See page 5)
SNC, Inc. 5  (cc cont'd) Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N
Baxley, GA  30334  Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant
Oglethorpe Power Corporation Electronic Mail Distribution  Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution
Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution
Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution 
James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
Al Frazier Emergency Response and Radiation Program Manager Environmental Protection Division
Georgia Department of Natural Resources Electronic Mail Distribution  Judson H. Turner Director Environmental Protection Division Georgia Department of Natural Resources
Electronic Mail Distribution   
Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution 
James A. Capp Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
Mr. Steven M. Jackson Senior Engineer - Power  Supply Municipal Electric Authority of Georgia Electronic Mail Distribution  Reece McAlister
Executive Secretary Georgia Public Service Commission Electronic Mail Distribution  Chairman
Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA  31513 
Amy Whaley Resident Manager Electronic Mail Distribution  Southern Nuclear Operating Company, Inc.
ATTN:  Mr. Steve Grantham  Training Manager Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
 
SNC, Inc. 6  Letter to Dennis R. Madison from Mark E. Franke dated March 16, 2012.  SUBJECT:  EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2012301 AND 05000366/2012301 
Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource 
 


Mr. Dennis Vice President Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2012301 AND 05000366/2012301
==Dear Mr. Madison:==
In a telephone conversation on March 12, 2012, between Mr. Charlie Edmund, Examination Group Lead, Mr. Anthony Ball, Plant Operations Instructor, Mr. Edward Jones, Plant Operations Instructor, and Mr. Edwin Lea, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Edwin I. Hatch Nuclear Plant. The operating test is scheduled to be administered during the weeks of June 18 and June 25, 2012. The written examination is scheduled to be administered the week of June 25, 2012. The on-site preparatory week is scheduled for the week of May 28, 2012. As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by April 12, 2012. Mr. Edwin Lea provided the written examination outline to your staff in December 2011. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by April 30, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
SNC, Inc. 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Edmund has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Edwin Lea at SNC, Inc. 3 (404) 997-4567, (Internet E-mail: Edwin.Lea@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
Sincerely,/RA: Malcolm Widmann for/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 cc: See Page 4 SNC, Inc. 3 (404) 997-4567, (Internet E-mail: Edwin.Lea@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
Sincerely,/RA: Malcolm Widmann for/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 cc: See Page 4
xG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE xG NON-SENSITIVE ADAMS: xG Yes ACCESSION NUMBER:__ML120760068______________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME LEA FRANKE DATE 3/16/2012 3/16/2012 3/ /2012 3/ /2012 3/ /2012 3/ /2012 3/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\HATCH EXAMINATIONS\INITIAL EXAM 2012-301\HATCH 120 DAY NOTIFICATION LETTER 2012 301.DOCX
SNC, Inc. 4 cc: S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc. Electronic Mail Distribution J. L. Pemberton SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. Electronic Mail Distribution D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. A. Lynch Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Dennis Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr. Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution W. E. Duvall Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution (cc cont'd - See page 5)
SNC, Inc. 5 (cc cont'd) Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 30334 Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Al Frazier Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Judson H. Turner Director Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James A. Capp Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513 Amy Whaley Resident Manager Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
ATTN: Mr. Steve Grantham Training Manager Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SNC, Inc. 6 Letter to Dennis from Mark E. Franke dated March 16, 2012.
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2012301 AND 05000366/2012301 Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource
}}
}}

Revision as of 06:19, 2 April 2018

Edwin I. Hatch - Notification of Licensed Operator Initial Examination 05000321-12-301 and 05000366-12-301
ML120760068
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/16/2012
From: Franke M E
Division of Nuclear Materials Safety II
To: Madison D R
Southern Nuclear Operating Co
References
Download: ML120760068 (7)


See also: IR 05000321/2012301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 16, 2012

Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North

Baxley, GA 31513 SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2012301 AND 05000366/2012301

Dear Mr. Madison: In a telephone conversation on March 12, 2012, between Mr. Charlie Edmund, Examination Group Lead, Mr. Anthony Ball, Plant Operations Instructor, Mr. Edward Jones, Plant Operations Instructor, and Mr. Edwin Lea, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Edwin I. Hatch Nuclear Plant. The operating test is scheduled to be administered during the weeks of June 18 and June 25, 2012. The written

examination is scheduled to be administered the week of June 25, 2012. The on-site preparatory week is scheduled for the week of May 28, 2012. As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by April 12, 2012. Mr. Edwin Lea provided the written examination outline to your staff in December 2011. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by April 30, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

SNC, Inc. 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the

collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and

Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Edmund has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Edwin Lea at

SNC, Inc. 3 (404) 997-4567, (Internet E-mail: Edwin.Lea@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov). Sincerely, /RA: Malcolm Widmann for/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety

Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 cc: See Page 4

SNC, Inc. 3 (404) 997-4567, (Internet E-mail: Edwin.Lea@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov). Sincerely, /RA: Malcolm Widmann for/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety

Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 cc: See Page 4

xG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE xG NON-SENSITIVE ADAMS: xG Yes ACCESSION NUMBER:__ML120760068______________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME LEA FRANKE DATE 3/16/2012 3/16/2012 3/ /2012 3/ /2012 3/ /2012 3/ /2012 3/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\HATCH EXAMINATIONS\INITIAL EXAM 2012-301\HATCH 120 DAY NOTIFICATION LETTER 2012 301.DOCX

SNC, Inc. 4 cc: S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

J. L. Pemberton SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Paula Marino Vice President

Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. A. Lynch

Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. D. Honeycutt

Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. Mike Stinson

Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution N. J. Stringfellow Licensing Manager

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. P. Hill Licensing Supervisor

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr. Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Steven B. Tipps Hatch Principal Engineer - Licensing

Edwin I. Hatch Nuclear Plant Electronic Mail Distribution W. E. Duvall Site Support Manager

Edwin I. Hatch Nuclear Plant Electronic Mail Distribution (cc cont'd - See page 5)

SNC, Inc. 5 (cc cont'd) Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N

Baxley, GA 30334 Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant

Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution

Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution

Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution

James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

Al Frazier Emergency Response and Radiation Program Manager Environmental Protection Division

Georgia Department of Natural Resources Electronic Mail Distribution Judson H. Turner Director Environmental Protection Division Georgia Department of Natural Resources

Electronic Mail Distribution

Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

James A. Capp Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister

Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Chairman

Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513

Amy Whaley Resident Manager Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

ATTN: Mr. Steve Grantham Training Manager Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SNC, Inc. 6 Letter to Dennis R. Madison from Mark E. Franke dated March 16, 2012. SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2012301 AND 05000366/2012301

Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource