ML13254A211: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  September 10, 2013 Mr. Tom E. Tynan Vice President  
[[Issue date::September 10, 2013]]
Southern Nuclear Operating Company, Inc.  
 
Vogtle Electric Generating Plant  
Mr. Tom Vice President Southern Nuclear Operating Company, Inc.
7821 River Road  
 
Waynesboro, GA 30830 SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED  
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301  
 
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301
Dear Mr. Tynan: In a telephone conversation on August 28, 2013, between Mr. John Acree, Nuclear Operations  
 
Training Supervisor and Ms. Amanda Toth, Operations Engineer, arrangements were made for the administration of licensing examinations at Vogtle. The operating test is scheduled to be  
==Dear Mr. Tynan:==
administered during the weeks of May 12, 2014 and May 19, 2014. The written examination is scheduled to be administered the week of May 26, 2014. The on-site preparatory week is scheduled for the week of April 14, 2014.  
In a telephone conversation on August 28, 2013, between Mr. John Acree, Nuclear Operations Training Supervisor and Ms. Amanda Toth, Operations Engineer, arrangements were made for the administration of licensing examinations at Vogtle. The operating test is scheduled to be administered during the weeks of May 12, 2014 and May 19, 2014. The written examination is scheduled to be administered the week of May 26, 2014. The on-site preparatory week is scheduled for the week of April 14, 2014.
 
As agreed during the telephone conversation, your staff will prepare both the operating test and  
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,  
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,  
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 24, 2014. Ms. Amanda Toth provided a written examination outline to your staff in August 2013. The operating test and the supporting reference materials identified in  
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 24, 2014. Ms. Amanda Toth provided a written examination outline to your staff in August 2013. The operating test and the supporting reference materials identified in Attachment 3 to ES-201 will be due by March 24, 2014. The written examination will be due by March 31, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
Attachment 3 to ES-201 will be due by March 24, 2014. The written examination will be due by March 31, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations  
 
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.  
 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
 
T. Tynan 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  
 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver  
 
requests (if any) at least 30 days before the first examination date. If the applications are not  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov)  
received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  
 
Sincerely,/RA: Malcolm T. Widmann for/
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500  
Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety  
hours per response, including the time for reviewing instructions, gathering and maintaining the  
 
data needed, writing the examinations, and completing and reviewing the collection of  
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81  
information. Send comments on any aspect of this collection of information, including  
 
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,  
cc: Distribution via Listserv Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov)  
Washington, DC 20503.  
 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  
Sincerely,/RA: Malcolm T. Widmann for/
Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
 
enclosures will be available electronically for public inspection in the NRC Public Document  
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81  
Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).  
 
T. Tynan 3  Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov) Sincerely,  
/RA: Malcolm T. Widmann for/
Mark E. Franke, Chief       Operations Branch 2  
      Division of Reactor Safety  
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
cc: Distribution via Listserv
T. Tynan 4  Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov) Sincerely,  
/RA: Malcolm T. Widmann for/
Mark E. Franke, Chief       Operations Branch 2  
      Division of Reactor Safety  
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
cc: Distribution via Listserv  
cc: Distribution via Listserv  
 
 
  x PUBLICLY AVAILABLE  NON-PUBLICLY AVAILABLE  SENSITIVE x NON-SENSITIVE ADAMS:x  Yes ACCESSION NUMBER:_ML13254A211________________ x SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RA VIA EMAIL      NAME TOTH BACON      DATE 9/    /2013 9/    /2013 9/    /2013 9/    /2013 9/    /2013 9/    /2013 9/    /2013 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME:  G:\OLEXAMS\VOGTLE EXAMINATIONS\INITIAL EXAMS\INITIAL EXAM 2014-301\CORRESPONDENCE\VG 2014-301 CORPORATE NOTIFICATION LETTER_R0.DOCX   
  Letter to Tom E. Tynan from Mark E. Franke dated September 10, 2013. 
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED  OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301  DISTRIBUTION: C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas) OE Mail (email address if applicable) RIDSNRRDIRS
PUBLIC
RidsNrrPMVogtle Resource 
 
 


x PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE x NON-SENSITIVE ADAMS:x Yes ACCESSION NUMBER:_ML13254A211________________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA VIA EMAIL NAME TOTH BACON DATE 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\VOGTLE EXAMINATIONS\INITIAL EXAMS\INITIAL EXAM 2014-301\CORRESPONDENCE\VG 2014-301 CORPORATE NOTIFICATION LETTER_R0.DOCX Letter to Tom from Mark E. Franke dated September 10, 2013.
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301 DISTRIBUTION: C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas) OE Mail (email address if applicable) RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource
}}
}}

Revision as of 13:23, 22 March 2018

Vogtle Electric Generating Plant - Notification of Licensed Operator Initial Examination 05000424-14-301 and 05000425-14-301
ML13254A211
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/10/2013
From: Franke M E
Division of Reactor Safety II
To: Tynan T E
Southern Nuclear Operating Co
References
ER-14-301
Download: ML13254A211 (5)


See also: IR 05000424/2014301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 10, 2013 Mr. Tom E. Tynan Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830 SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301

Dear Mr. Tynan: In a telephone conversation on August 28, 2013, between Mr. John Acree, Nuclear Operations

Training Supervisor and Ms. Amanda Toth, Operations Engineer, arrangements were made for the administration of licensing examinations at Vogtle. The operating test is scheduled to be

administered during the weeks of May 12, 2014 and May 19, 2014. The written examination is scheduled to be administered the week of May 26, 2014. The on-site preparatory week is scheduled for the week of April 14, 2014.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 24, 2014. Ms. Amanda Toth provided a written examination outline to your staff in August 2013. The operating test and the supporting reference materials identified in

Attachment 3 to ES-201 will be due by March 24, 2014. The written examination will be due by March 31, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

T. Tynan 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

T. Tynan 3 Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov) Sincerely,

/RA: Malcolm T. Widmann for/

Mark E. Franke, Chief Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81

cc: Distribution via Listserv

T. Tynan 4 Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov) Sincerely,

/RA: Malcolm T. Widmann for/

Mark E. Franke, Chief Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81

cc: Distribution via Listserv

x PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE x NON-SENSITIVE ADAMS:x Yes ACCESSION NUMBER:_ML13254A211________________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA VIA EMAIL NAME TOTH BACON DATE 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013 9/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\VOGTLE EXAMINATIONS\INITIAL EXAMS\INITIAL EXAM 2014-301\CORRESPONDENCE\VG 2014-301 CORPORATE NOTIFICATION LETTER_R0.DOCX

Letter to Tom E. Tynan from Mark E. Franke dated September 10, 2013.

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2014301 AND 05000425/2014301 DISTRIBUTION: C. Evans, RII EICS (Part 72 Only)

L. Douglas, RII EICS (Linda Douglas) OE Mail (email address if applicable) RIDSNRRDIRS

PUBLIC

RidsNrrPMVogtle Resource