ML15110A384: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:Memorandum To: ---Mr: Todd Fish .. _.
* CC: From: Paul Isham Date: 02/18/2015 Re: Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week: Scenario 2
* Made adjustment to field reports coming into the control room. Scenario 3
* Made adjustment to field reports corning into the control room. Simulator JPM 5
* Downgraded from alternate path. Simulator JPM 8
* Downgraded from alternate path. Simulator JPM 6
* Replaced with a new alternate path JPM.
* Added an examiner note regarding steps that can be performed concurrently. Simulator JPM 7
* Minor adjustment to simulator initial conditions. Admin JPM RO/SRO C002
* Added additional clarifying information to the KEY
* Made editorial change to applicant handout. Admin JPM SRO RC
* Added an additional KEY for a form the applicant completes. Admin JPM SRO EP
* Added additional KEY s for forms the applicant completes. Admin JPM RO EP
* Added evaluator cue to terminate JPM after final critical step.}}

Revision as of 06:44, 12 June 2018

Nine Mile Point Station, Unit 1 - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML15110A384
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/18/2015
From: Isham P
Exelon Generation Co
To: Fish T H
Operations Branch I
Shared Package
ML14238A301 List:
References
TAC U01905
Download: ML15110A384 (1)


Text

Memorandum To: ---Mr: Todd Fish .. _.

  • CC: From: Paul Isham Date: 02/18/2015 Re: Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week: Scenario 2
  • Made adjustment to field reports coming into the control room. Scenario 3
  • Made adjustment to field reports corning into the control room. Simulator JPM 5
  • Downgraded from alternate path. Simulator JPM 8
  • Downgraded from alternate path. Simulator JPM 6
  • Replaced with a new alternate path JPM.
  • Added an examiner note regarding steps that can be performed concurrently. Simulator JPM 7
  • Minor adjustment to simulator initial conditions. Admin JPM RO/SRO C002
  • Added additional clarifying information to the KEY
  • Made editorial change to applicant handout. Admin JPM SRO RC
  • Added an additional KEY for a form the applicant completes. Admin JPM SRO EP
  • Added additional KEY s for forms the applicant completes. Admin JPM RO EP
  • Added evaluator cue to terminate JPM after final critical step.