ML15110A384: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Memorandum To: ---Mr: Todd Fish .. _. | |||
* CC: From: Paul Isham Date: 02/18/2015 Re: Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week: Scenario 2 | |||
* Made adjustment to field reports coming into the control room. Scenario 3 | |||
* Made adjustment to field reports corning into the control room. Simulator JPM 5 | |||
* Downgraded from alternate path. Simulator JPM 8 | |||
* Downgraded from alternate path. Simulator JPM 6 | |||
* Replaced with a new alternate path JPM. | |||
* Added an examiner note regarding steps that can be performed concurrently. Simulator JPM 7 | |||
* Minor adjustment to simulator initial conditions. Admin JPM RO/SRO C002 | |||
* Added additional clarifying information to the KEY | |||
* Made editorial change to applicant handout. Admin JPM SRO RC | |||
* Added an additional KEY for a form the applicant completes. Admin JPM SRO EP | |||
* Added additional KEY s for forms the applicant completes. Admin JPM RO EP | |||
* Added evaluator cue to terminate JPM after final critical step.}} |
Revision as of 06:44, 12 June 2018
ML15110A384 | |
Person / Time | |
---|---|
Site: | Nine Mile Point ![]() |
Issue date: | 02/18/2015 |
From: | Isham P Exelon Generation Co |
To: | Fish T H Operations Branch I |
Shared Package | |
ML14238A301 | List: |
References | |
TAC U01905 | |
Download: ML15110A384 (1) | |
Text
Memorandum To: ---Mr: Todd Fish .. _.
- CC: From: Paul Isham Date: 02/18/2015 Re: Proposed revisions for Nine Mile Point Unit 1 March 2015 operating exam The following revisions have been made to the Nine Mile Point Unit 1March2015 operating exam based on submittal comments and NRC prep week: Scenario 2
- Made adjustment to field reports coming into the control room. Scenario 3
- Made adjustment to field reports corning into the control room. Simulator JPM 5
- Downgraded from alternate path. Simulator JPM 8
- Downgraded from alternate path. Simulator JPM 6
- Replaced with a new alternate path JPM.
- Added an examiner note regarding steps that can be performed concurrently. Simulator JPM 7
- Minor adjustment to simulator initial conditions. Admin JPM RO/SRO C002
- Added additional clarifying information to the KEY
- Added evaluator cue to terminate JPM after final critical step.