05000336/LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred on 970108,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
| Title = Forwards LER 97-002-00 Which Documents an Event That Occurred on 970108,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed
| Title = Forwards LER 97-002-00 Which Documents an Event That Occurred on 970108,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed
| Plant =  
| Plant =  
| Reporting criterion =  
| Reporting criterion = 10 CFR 50.73(a)(2)(ii)
| Power level =  
| Power level =  
| Mode =  
| Mode =  
| Docket = 05000336
| Docket = 05000336
| LER year = 2097
| LER year = 1997
| LER number = 2
| LER number = 2
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 32: Line 32:


=text=
=text=
{{#Wiki_filter:. _ . .      . . _ .      .-                -              .-                    . .
{{#Wiki_filter:. _..
4 e
4 e
t             Northeast                                                   Millatone ofrice.
t Northeast Millatone ofrice.
* Hoi, rerry ita.. woierfora, er
* Hoi, rerry ita.. woierfora, er
($ , Utilities System                                             p.o. ,,,1 128 herford, CT 0638.%0128                                 ,
($, Utilities System p.o.,,,1 128 herford, CT 0638.%0128 (203) 447-1791 February 7,1997 Docket No. 50-336 B16182 Re: 10 CFR 50.73(a)(2)(ii)
(203) 447-1791                                       -
[
February 7,1997                       ,
t U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i
Docket No. 50-336 B16182 Re: 10 CFR 50.73(a)(2)(ii)                           [
i I
t U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555                                                                                                         i i
l I
I l
This letter forwards Licensee Event Report (LER) 97-002-00, documenting an event l
I    This letter forwards Licensee Event Report (LER) 97-002-00, documenting an event l     that occurred at Millstone Nuclear Power Station, Unit No. 2 on January 8,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii).
that occurred at Millstone Nuclear Power Station, Unit No. 2 on January 8,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii).
The following are NNECO's commitments made within this letter. All other statements                                           I made within this letter are for information only.
The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only.
L             B16182-01: An evaluation of 2-HV-210 and associated procedures will be l                             perfomled. Other operator actions which are included in the j                             safety analyses will be reviewed and validated, as necessary.
L B16182-01: An evaluation of 2-HV-210 and associated procedures will be l
l                             Design changes and validations which result from this review l
perfomled. Other operator actions which are included in the j
will be completed before entering Mode 4 l
safety analyses will be reviewed and validated, as necessary.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY                                               l
l Design changes and validations which result from this review l
                                                                ~
will be completed before entering Mode 4 Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N
N Martin L. Bowling, Jr. _/
1 Martin L. Bowling, Jr. _/
1 Millstone Unit No. 2 Recovery Officer
~
                                                                                                            /I f
Millstone Unit No. 2 Recovery Officer
180070                                                                                         ,'                      ,
/I f
cc: see page 2                                                                                   g 9702190108 970207                                                                         \
180070 cc: see page 2 g
PDR     ADOCK 05000336 ,
9702190108 970207
s                     PDR l
\\
PDR ADOCK 05000336,
s PDR l


U. S. Nuclear Regulatory Commi:sion
U. S. Nuclear Regulatory Commi:sion
                , B16182/Page 2 i
, B16182/Page 2 i
 
Attachment: LER 97-002-00 l
==Attachment:==
l cc:
LER 97-002-00                                                                   l l
W. D. Travers, Director of Special Projects l
l                                                                                                             :
H. J. Miller, Region 1 Administrator 4
cc:    W. D. Travers, Director of Special Projects
D. P. Beaulieu, Senior Resident inspector (Acting), Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 f
,                        H. J. Miller, Region 1 Administrator                                               l 4
!                        D. P. Beaulieu, Senior Resident inspector (Acting), Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 f
r i
r i
I
I l
                                                                                                                \
\\
l l-l l
l-l l
l l
l l
l 1
l 1
                                                                -_
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 04:51, 12 December 2024

Forwards LER 97-002-00 Which Documents an Event That Occurred on 970108,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed
ML20134L407
Person / Time
Site: Millstone 
Issue date: 02/07/1997
From: Bowling M
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134L411 List:
References
B16182, NUDOCS 9702190108
Download: ML20134L407 (2)


LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred on 970108,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)
3361997002R00 - NRC Website

text

. _..

4 e

t Northeast Millatone ofrice.

  • Hoi, rerry ita.. woierfora, er

($, Utilities System p.o.,,,1 128 herford, CT 0638.%0128 (203) 447-1791 February 7,1997 Docket No. 50-336 B16182 Re: 10 CFR 50.73(a)(2)(ii)

[

t U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i

i I

l I

This letter forwards Licensee Event Report (LER) 97-002-00, documenting an event l

that occurred at Millstone Nuclear Power Station, Unit No. 2 on January 8,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii).

The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only.

L B16182-01: An evaluation of 2-HV-210 and associated procedures will be l

perfomled. Other operator actions which are included in the j

safety analyses will be reviewed and validated, as necessary.

l Design changes and validations which result from this review l

will be completed before entering Mode 4 Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N

1 Martin L. Bowling, Jr. _/

~

Millstone Unit No. 2 Recovery Officer

/I f

180070 cc: see page 2 g

9702190108 970207

\\

PDR ADOCK 05000336,

s PDR l

U. S. Nuclear Regulatory Commi:sion

, B16182/Page 2 i

Attachment: LER 97-002-00 l

l cc:

W. D. Travers, Director of Special Projects l

H. J. Miller, Region 1 Administrator 4

D. P. Beaulieu, Senior Resident inspector (Acting), Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 f

r i

I l

\\

l-l l

l l