05000336/LER-1997-019, Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
| Title = Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed
| Title = Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed
| Plant =  
| Plant =  
| Reporting criterion =  
| Reporting criterion = 10 CFR 50.73(a)(2)(i)(B)
| Power level =  
| Power level =  
| Mode =  
| Mode =  
| Docket = 05000336
| Docket = 05000336
| LER year = 2097
| LER year = 1997
| LER number = 19
| LER number = 19
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 32: Line 32:


=text=
=text=
{{#Wiki_filter:.             _    _        . _ -
{{#Wiki_filter:.
i Northeast                                             ""i"*"Y "* ("""'" *'h           **'"'""* "83
i Northeast
              $      NuclearEnergy                                         slaiston, Nua,a, po,u stauon Northeast Nudear Energy Company P.O. Box 128 Waterfont. CF 0638", 0128 (860) 447-1791 Fax (860) 444-4277 The Northcant Utilities System May 22,1997 Docket No. 50-336 B16455         ,
""i"*"Y "* ("""'" *'h **'"'""* "83 NuclearEnergy slaiston, Nua,a, po,u stauon Northeast Nudear Energy Company P.O. Box 128 Waterfont. CF 0638", 0128 (860) 447-1791 Fax (860) 444-4277 The Northcant Utilities System May 22,1997 Docket No. 50-336 B16455 Re: 10 CFR 50.73(a)(2)(i)(B)
Re: 10 CFR 50.73(a)(2)(i)(B)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-019-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 22,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i)(B).
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-019-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 22,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i)(B).
The following are NNECO's commitments made within this letter.
The following are NNECO's commitments made within this letter.
B16455-01: Noise interaction will be isolated and corrected prior to entering Mode 4                           4 from the current outage.
B16455-01: Noise interaction will be isolated and corrected prior to entering Mode 4 4
from the current outage.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: J. A. Price Director - Millstone Unit 2 e p;00@-
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: J. A. Price Director - Millstone Unit 2 e p;00@-
BY:       4'2/4/w           WIM H. W. Antifes Assistant Director Work Planning and Maintenance - Millstone Unit 2                             f cc: see page 2                                                                                   I 9705290030 970522 gDR       ADOCK0500g6 (wc422-$ REY.12 93
BY:
4'2/4/w WIM H. W. Antifes Assistant Director Work Planning and Maintenance - Millstone Unit 2 f
cc: see page 2 I
9705290030 970522 gDR ADOCK0500g6 (wc422-$ REY.12 93


U. S. Nuclear Regulatory Commission                                                     l B16455/Page 2 i
U. S. Nuclear Regulatory Commission l
 
B16455/Page 2 i
==Attachment:==
Attachment: LER 97-019-00 l
LER 97-019-00                                                               l i
i cc:
cc:   W. D. Travers, Director of Special Projects                                     -)
W. D. Travers, Director of Special Projects H. J. Miller, Region i Administrator D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 j
H. J. Miller, Region i Administrator                                               1 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2                     l D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2           j l
l l
l l
l I
I a
a
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 12:07, 11 December 2024

Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed
ML20148C724
Person / Time
Site: Millstone 
Issue date: 05/22/1997
From: Anthes H
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148C729 List:
References
B16455, NUDOCS 9705290030
Download: ML20148C724 (2)


LER-1997-019, Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3361997019R00 - NRC Website

text

.

i Northeast

""i"*"Y "* ("""'" *'h **'"'""* "83 NuclearEnergy slaiston, Nua,a, po,u stauon Northeast Nudear Energy Company P.O. Box 128 Waterfont. CF 0638", 0128 (860) 447-1791 Fax (860) 444-4277 The Northcant Utilities System May 22,1997 Docket No. 50-336 B16455 Re: 10 CFR 50.73(a)(2)(i)(B)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-019-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 22,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i)(B).

The following are NNECO's commitments made within this letter.

B16455-01: Noise interaction will be isolated and corrected prior to entering Mode 4 4

from the current outage.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: J. A. Price Director - Millstone Unit 2 e p;00@-

BY:

4'2/4/w WIM H. W. Antifes Assistant Director Work Planning and Maintenance - Millstone Unit 2 f

cc: see page 2 I

9705290030 970522 gDR ADOCK0500g6 (wc422-$ REY.12 93

U. S. Nuclear Regulatory Commission l

B16455/Page 2 i

Attachment: LER 97-019-00 l

i cc:

W. D. Travers, Director of Special Projects H. J. Miller, Region i Administrator D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 j

l l

I a