Line 33: Line 33:
There are no new regulatory commitments contained in this letter. If you have questions regarding this matter, please contact Kevin Casey at (423) 751-8523.
There are no new regulatory commitments contained in this letter. If you have questions regarding this matter, please contact Kevin Casey at (423) 751-8523.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of June 2013.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of June 2013.
Respe       Ily, J V~6ea ice\- resident, Nuclear Licensing
Respe
: Ily, J V~6ea ice\\- resident, Nuclear Licensing


==Enclosure:==
==Enclosure:==
Browns Ferry Nuclear Plant, Unit 2, Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report cc (Enclosure):
Browns Ferry Nuclear Plant, Unit 2, Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report cc (Enclosure):
NRC Regional Administrator - Region II NRR Director - NRC Headquarters NRR Project Manager - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Browns Ferry Nuclear Plant
NRC Regional Administrator - Region II NRR Director - NRC Headquarters NRR Project Manager - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Browns Ferry Nuclear Plant
Line 45: Line 45:
© Copyright 2012 WorleyParsons Services Pty Ltd
© Copyright 2012 WorleyParsons Services Pty Ltd


NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 REV DESCRIPTION       ORIG REVIEW     WORLEY- DATE   CLIENT     DATE PARSONS       APPROVAL APPROVAL I  BFN Unit 2 Selsm(I              ~/I&NIY 7       Z"       A         0 4/7-3 / ZC(
NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 REV DESCRIPTION I
Walkdown Report Page 2 of 907
BFN Unit 2 Selsm(I Walkdown Report ORIG REVIEW WORLEY-DATE CLIENT DATE PARSONS APPROVAL APPROVAL
~/I&NIY 7
Z" A
0 4/7-3 / ZC (
Page 2 of 907


REVISION LOG
REVISION LOG


==Title:==
==Title:==
Browns ferry Nuclear Plant - Unit 2 Fukushima Near-Term Task Force Recommendation2.3: Seismic Response Report Revision                               DESCRIPTION OF REVISION                                           Date No.                                                                                                 Approved 0         Initial Issue                                                                         16-Nov-2012 1         Revision to add additional walkdowns for inaccessible equipment that was identified   16-Apr-2013 in Rev. 0 of this report. Walkdowns performed during BFN Unit 2 refueling outage.
Browns ferry Nuclear Plant - Unit 2 Fukushima Near-Term Task Force Recommendation2.3: Seismic Response Report Revision DESCRIPTION OF REVISION Date No.
Approved 0
Initial Issue 16-Nov-2012 16-Apr-2013 1
Revision to add additional walkdowns for inaccessible equipment that was identified in Rev. 0 of this report. Walkdowns performed during BFN Unit 2 refueling outage.
Also, revision to Appendix G: Peer Review Report.
Also, revision to Appendix G: Peer Review Report.
Added page numbers: 2-1, 113-1, 714-1, and 847-1 through 847-16 Revised page numbers: 3-4, 10-11, 14-15, 110-111, 113, 370-379, 550-559, and 907 TVA 10534 [8-19951                                     Page 2-1 of 907
Added page numbers: 2-1, 113-1, 714-1, and 847-1 through 847-16 Revised page numbers: 3-4, 10-11, 14-15, 110-111, 113, 370-379, 550-559, and 907 TVA 10534 [8-19951 Page 2-1 of 907


i*I                                                         NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Table of Contents
i*I NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Table of Contents
: 1) Executive Sum m ary .......................................................................................................                 4
: 1) Executive Sum m ary.......................................................................................................
: 2) Seism ic Licensing Basis ....................................................................................................               5 2.1 General Plant Description .............................................................................................                 5 2.2 G round Response Spectra ...........................................................................................                     5 2.3 Structures ......................................................................................................................... 8 2.4 Equipm ent ........................................................................................................................     8 2.5 Seism ic Spatial System Interactions .............................................................................                       9
4
: 3) Personnel Q ualifications .................................................................................................               10 3.1 Equipm ent Selection Personnel ..................................................................................                       10 3.2 Seism ic W alkdown Engineers .....................................................................................                     10 3.3 Licensing Basis Reviewers ........................................................................................                     10 3.4 IPEEE Reviewers ......................................................................................................                 11 3.5 Peer Review Team ......................................................................................................               11
: 2) Seism ic Licensing Basis....................................................................................................
: 4) Selection of Structures, System s, and Com ponents (SSCs) .............................................                                   12 4.1 SW EL Selection ...............................................................................................................       12 4.2 SW EL Analysis ................................................................................................................       13
5 2.1 General Plant Description.............................................................................................
: 5) Seism ic W alkdowns and Area W alk-Bys ...........................................................................                         14 5.1 Seism ic W alkdown Checklists ....................................................................................                     14 5.2 SW C Sum m ary & AW C Sum m ary .............................................................................                         15
5 2.2 G round Response Spectra...........................................................................................
: 6) Licensing Basis Evaluations ..............................................................................................                 16 6.1 Licensing Basis Calculations ......................................................................................                   16 6.2 Potentially Seism ically Adverse Conditions ..................................................................                         16
5 2.3 Structures.........................................................................................................................
: 7) IPEEE Vulnerabilities Resolution Report ...........................................................................                       18 7.1 IPEEE Description ......................................................................................................               18 7.2 IPEEE Findings and Vulnerabilities .............................................................................                       18
8 2.4 Equipm ent........................................................................................................................
: 8) Peer Review .........................................................................................................................     19
8 2.5 Seism ic Spatial System Interactions.............................................................................
: 9) References ........................................................................................................................... 20
9
: 10) Appendices .........................................................................................................................     21 Appendix A: Resum es .........................................................................................................               22 Appendix B: Base List 1 ........................................................................................................             57 Appendix C: Base List 2 ......................................................................................................               83 Appendix D: SW ELs and Areas ..............................................................................................                 109 Appendix E: SW Cs .............................................................................................................           113-1 Appendix F: AW Cs ..............................................................................................................           714-1 R1 Appendix G : Peer Review Report ............................................................................................                 900 Page 3 of 907
: 3) Personnel Q ualifications.................................................................................................
10 3.1 Equipm ent Selection Personnel..................................................................................
10 3.2 Seism ic W alkdown Engineers.....................................................................................
10 3.3 Licensing Basis Reviewers........................................................................................
10 3.4 IPEEE Reviewers......................................................................................................
11 3.5 Peer Review Team......................................................................................................
11
: 4) Selection of Structures, System s, and Com ponents (SSCs).............................................
12 4.1 SW EL Selection...............................................................................................................
12 4.2 SW EL Analysis................................................................................................................
13
: 5) Seism ic W alkdowns and Area W alk-Bys...........................................................................
14 5.1 Seism ic W alkdown Checklists....................................................................................
14 5.2 SW C Sum m ary & AW C Sum m ary.............................................................................
15
: 6) Licensing Basis Evaluations..............................................................................................
16 6.1 Licensing Basis Calculations......................................................................................
16 6.2 Potentially Seism ically Adverse Conditions..................................................................
16
: 7) IPEEE Vulnerabilities Resolution Report...........................................................................
18 7.1 IPEEE Description......................................................................................................
18 7.2 IPEEE Findings and Vulnerabilities.............................................................................
18
: 8) Peer Review.........................................................................................................................
19
: 9) References...........................................................................................................................
20
: 10) Appendices.........................................................................................................................
21 Appendix A: Resum es.........................................................................................................
22 Appendix B: Base List 1........................................................................................................
57 Appendix C: Base List 2......................................................................................................
83 Appendix D: SW ELs and Areas..............................................................................................
109 Appendix E: SW Cs.............................................................................................................
113-1 Appendix F: AW Cs..............................................................................................................
714-1 R1 Appendix G : Peer Review Report............................................................................................
900 Page 3 of 907


hi*                               NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
hi*
: 1) Executive Summary As a result of the Fukushima Daiichi Nuclear Power Plant accident, the United States (U.S.) Nuclear Regulatory Commission (NRC) required all U.S. nuclear power plants to perform seismic walkdowns to identify and address degraded, non-conforming or unanalyzed conditions and to verify the current plant configuration with the current seismic licensing basis. The NRC Near-Term Task Force (NTTF) issued a report (Reference 1) that made a series of recommendations. Subsequently, the NRC issued a 50.54(f) Letter (Reference 2) that requests information to assure that these recommendations are addressed by all U.S. nuclear power plants. This report provides guidance for conducting a seismic walkdown as required in the 50.54(f) Letter, , Recommendation 2.3: Seismic.
NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
: 1) Executive Summary As a result of the Fukushima Daiichi Nuclear Power Plant accident, the United States (U.S.) Nuclear Regulatory Commission (NRC) required all U.S. nuclear power plants to perform seismic walkdowns to identify and address degraded, non-conforming or unanalyzed conditions and to verify the current plant configuration with the current seismic licensing basis. The NRC Near-Term Task Force (NTTF) issued a report (Reference 1) that made a series of recommendations. Subsequently, the NRC issued a 50.54(f) Letter (Reference 2) that requests information to assure that these recommendations are addressed by all U.S. nuclear power plants. This report provides guidance for conducting a seismic walkdown as required in the 50.54(f) Letter,, Recommendation 2.3: Seismic.
In support of conducting the NTTF-2.3 Seismic Walkdowns, the Electrical Power Research Institute (EPRI) issued a report entitled Seismic Walkdown Guidance (Reference 3) to provide instruction for uniform seismic walkdowns of all U.S. nuclear power plants. This document also includes guidance for reporting the findings of the required walkdowns.
In support of conducting the NTTF-2.3 Seismic Walkdowns, the Electrical Power Research Institute (EPRI) issued a report entitled Seismic Walkdown Guidance (Reference 3) to provide instruction for uniform seismic walkdowns of all U.S. nuclear power plants. This document also includes guidance for reporting the findings of the required walkdowns.
At Unit 2 of the Browns Ferry Nuclear Plant (BFN), a total of 120 items, general Seismic Category 1, were selected from the original Individual Plant Examination for External Events (IPEEE) Safe Shutdown Equipment List (SSEL) to fulfill the requirements of the NTTF-2.3 Seismic Walkdowns. The selected equipment was located in various environments and included many different types of equipment from multiple safety systems. A total of 50 areas were included for area walk-bys. The equipment walkdowns and area walk-bys were performed by seven walkdown engineers organized in teams consisting of two walkdown engineers and operations personnel, between July 9, 2012 and March 25, 2013.
At Unit 2 of the Browns Ferry Nuclear Plant (BFN), a total of 120 items, general Seismic Category 1, were selected from the original Individual Plant Examination for External Events (IPEEE) Safe Shutdown Equipment List (SSEL) to fulfill the requirements of the NTTF-2.3 Seismic Walkdowns. The selected equipment was located in various environments and included many different types of equipment from multiple safety systems. A total of 50 areas were included for area walk-bys. The equipment walkdowns and area walk-bys were performed by seven walkdown engineers organized in teams consisting of two walkdown engineers and operations personnel, between July 9, 2012 and March 25, 2013.
Of the 120 equipment items in the Seismic Walkdown Equipment List (SWEL), 120 were completed during the walkdown phase. Three potential adverse seismic conditions were found and addressed through the Tennessee Valley Authority (TVA) Corrective           R1 Action Program (CAP).
Of the 120 equipment items in the Seismic Walkdown Equipment List (SWEL), 120 were completed during the walkdown phase. Three potential adverse seismic conditions were found and addressed through the Tennessee Valley Authority (TVA) Corrective R1 Action Program (CAP).
Page 4 of 907
Page 4 of 907


Til                                   NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
Til NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
: 2) Seismic Licensing Basis The seismic licensing basis for the BFN is derived from Reference 4 - BFN FSAR.
: 2) Seismic Licensing Basis The seismic licensing basis for the BFN is derived from Reference 4 - BFN FSAR.
2.1 General Plant Description The BFN site is located on the north shore of Wheeler Lake at river mile 294 in Limestone County in north Alabama. The site is approximately 10 miles southwest of Athens, Alabama, and 10 miles northwest of the center of Decatur, Alabama. The plant consists of three General Electric (GE) boiling water reactors with Mark I containments, each with an electrical output of about 1,100 megawatts. Commercial operation of each unit began on the following dates: Unit 1 on August 1, 1974, Unit 2 on March 1, 1975, and Unit 3 on March 1, 1977.
2.1 General Plant Description The BFN site is located on the north shore of Wheeler Lake at river mile 294 in Limestone County in north Alabama. The site is approximately 10 miles southwest of Athens, Alabama, and 10 miles northwest of the center of Decatur, Alabama. The plant consists of three General Electric (GE) boiling water reactors with Mark I containments, each with an electrical output of about 1,100 megawatts. Commercial operation of each unit began on the following dates: Unit 1 on August 1, 1974, Unit 2 on March 1, 1975, and Unit 3 on March 1, 1977.
Line 80: Line 123:
Page 5 of 907
Page 5 of 907


NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT SITE DESIGN SPECTRUM OPERATIONAL BASIS EARThQUAKE AMENDMENT        16          HORIZOUTAL FIGURE 2.5-8 Figure 1 - Site Design Spectrum Operating Basis Earthquake Page 6 of 907
NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT SITE DESIGN SPECTRUM OPERATIONAL BASIS EARThQUAKE HORIZOUTAL FIGURE 2.5-8 AMENDMENT 16 Figure 1 - Site Design Spectrum Operating Basis Earthquake Page 6 of 907


NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT SITE DESLGN SPECTRUM DESIGN1 BASIS EaXTQqUA'/
NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT SITE DESLGN SPECTRUM DESIGN1 BASIS EaXTQqUA'/
HORIZOWTAL AMENDMENT        16                    FIGURE 2.5-9 Figure 2 - Site Design Spectrum Design Basis Earthquake Page 7 of 907
HORIZOWTAL FIGURE 2.5-9 AMENDMENT 16 Figure 2 - Site Design Spectrum Design Basis Earthquake Page 7 of 907


hNTTF                                           Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 2.3 Structures The design of all structures and facilities (Class I & II) conformed to the applicable general codes or specifications such as Uniform Building Code (UBC); American Institute of Steel Construction (AISC); "Specification for the Design, Fabrication, and Erection of Structural Steel for Buildings"; American Concrete Institute (ACI) "Building Code Requirements for Reinforced Concrete" (ACI 318-71), "Requirements for Reinforced Concrete" (ACI 318-71), "Requirements for Reinforced Concrete Chimneys" (ACI 907); and American Welding Society (AWS) "Structural Welding Code - Steel" (AWS-D.1.1), among others.
hNTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 2.3 Structures The design of all structures and facilities (Class I & II) conformed to the applicable general codes or specifications such as Uniform Building Code (UBC); American Institute of Steel Construction (AISC); "Specification for the Design, Fabrication, and Erection of Structural Steel for Buildings"; American Concrete Institute (ACI) "Building Code Requirements for Reinforced Concrete" (ACI 318-71), "Requirements for Reinforced Concrete" (ACI 318-71), "Requirements for Reinforced Concrete Chimneys" (ACI 907); and American Welding Society (AWS) "Structural Welding Code - Steel" (AWS-D.1.1), among others.
Seismic requirements for Class I structures, features, and systems are contained in TVA General Design Criteria BFN-50-C-7102. The design of Class I structures was based on the following criteria:
Seismic requirements for Class I structures, features, and systems are contained in TVA General Design Criteria BFN-50-C-7102. The design of Class I structures was based on the following criteria:
* OBE considered a horizontal ground acceleration of 0.10g.
OBE considered a horizontal ground acceleration of 0.10g.
* DBE considered a horizontal ground acceleration of 0.20g
DBE considered a horizontal ground acceleration of 0.20g Vertical ground accelerations associated with the OBE and DBE were defined as 2/3 of the corresponding horizontal response spectra.
* Vertical ground accelerations associated with the OBE and DBE were defined as 2/3 of the corresponding horizontal response spectra.
Class I structures, equipment and safety-related piping were designed such that stress and deformation behavior of structures, piping, and equipment were maintained within the allowable limits when subjected to loads such as dead, live, pressure, and thermal, under normal operating conditions combined with the seismic effects resulting from the response to the OBE. These allowable limits are defined in appropriate design standards such as the American Society of Mechanical Engieers (ASME) Boiler and Pressure Vessel Code; American National Standards Institute (ANSI) Code for Pressure Piping ANSI B31.1.0, Power Piping; ACI 318 Building Code Requirements for Reinforced Concrete; the AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings. In addition, the stresses that resulted from normal loads and design basis loss-of-coolant accident loads combined with the response to the DBE were limited so that no loss of function occurred and the capability of making a safe and orderly plant shutdown was maintained.
Class I structures, equipment and safety-related piping were designed such that stress and deformation behavior of structures, piping, and equipment were maintained within the allowable limits when subjected to loads such as dead, live, pressure, and thermal, under normal operating conditions combined with the seismic effects resulting from the response to the OBE. These allowable limits are defined in appropriate design standards such as the American Society of Mechanical Engieers (ASME) Boiler and Pressure Vessel Code; American National Standards Institute (ANSI) Code for Pressure Piping ANSI B31.1.0, Power Piping; ACI 318 Building Code Requirements for Reinforced Concrete; the AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings. In addition, the stresses that resulted from normal loads and design basis loss-of-coolant accident loads combined with the response to the DBE were limited so that no loss of function occurred and the capability of making a safe and orderly plant shutdown was maintained.
2.4 Equipment GE designed, fabricated, and supplied the nuclear steam supply system (NSSS),
2.4 Equipment GE designed, fabricated, and supplied the nuclear steam supply system (NSSS),
Line 95: Line 137:
Page 8 of 907
Page 8 of 907


pm,                                     NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 All the Class I instrumentation and electrical equipment were designed and tested or analyzed to ensure their capability to perform their required functions during and after the DBE. This includes equipment made by GE as well as that purchased by GE.
pm, NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 All the Class I instrumentation and electrical equipment were designed and tested or analyzed to ensure their capability to perform their required functions during and after the DBE. This includes equipment made by GE as well as that purchased by GE.
Suppliers of Class I equipment were required to verify the adequacy of their equipment by submitting test, analytical, or operating experience data. Typically, equipment supplied as part of the original design is in compliance with Institute of Electrical and Electronics Engineers (IEEE)-344-71 requirements.
Suppliers of Class I equipment were required to verify the adequacy of their equipment by submitting test, analytical, or operating experience data. Typically, equipment supplied as part of the original design is in compliance with Institute of Electrical and Electronics Engineers (IEEE)-344-71 requirements.
In addition, BFN was identified as one of the operating plants to be reviewed for the NRC Unresolved Safety Issue (USI) A-46 requirements. As such, plant-specific verification of the seismic adequacy of selected safe shutdown equipment items (SSEL
In addition, BFN was identified as one of the operating plants to be reviewed for the NRC Unresolved Safety Issue (USI) A-46 requirements. As such, plant-specific verification of the seismic adequacy of selected safe shutdown equipment items (SSEL
- Safe Shutdown Equipment List) has been performed as part of the Unresolved Safety Issue (USI) A-46 resolution (Reference 5).
- Safe Shutdown Equipment List) has been performed as part of the Unresolved Safety Issue (USI) A-46 resolution (Reference 5).
Furthermore, the use of A-46 criteria and methods in accordance with the implementation guidelines provided in References 7 and 8 has been included as an alternate approach for the seismic qualification of new equipment and replacements for existing equipment (Appendix C, Reference 9).
Furthermore, the use of A-46 criteria and methods in accordance with the implementation guidelines provided in References 7 and 8 has been included as an alternate approach for the seismic qualification of new equipment and replacements for existing equipment (Appendix C, Reference 9).
2.5 Seismic Spatial System Interactions The BFN has a seismic categorization similar to Regulatory Guide 1.29, using the terminology of Class I and Class I1.The term Il/I is used to describe physical conditions where Class II components are located above or in proximity to Class I components.
2.5 Seismic Spatial System Interactions The BFN has a seismic categorization similar to Regulatory Guide 1.29, using the terminology of Class I and Class I1. The term Il/I is used to describe physical conditions where Class II components are located above or in proximity to Class I components.
Seismic induced spray refers to the possible breach of a fluid pressure boundary due to its own seismic response or its seismic interaction with other plant features. Seismic induced spray is a hazard when there are target Class I components, vulnerable to fluid spray, in the vicinity of the source.
Seismic induced spray refers to the possible breach of a fluid pressure boundary due to its own seismic response or its seismic interaction with other plant features. Seismic induced spray is a hazard when there are target Class I components, vulnerable to fluid spray, in the vicinity of the source.
A comprehensive "11/1" seismic interaction verification program was implemented as part of the BFN-1 Restart Project. Seismic spatial interactions (failure, falling, and impact) were evaluated for all SSEL items during the USI A-46 resolution program. Impact-related seismic interactions are further addressed by the TVA BFN Potential Clearance Discrepancy (PCD) evaluation program for piping clearance discrepancies of 3" and under. Seismic-induced spray evaluations were addressed by detailed walkdowns and bounding evaluations in accordance with TVA Design Criteria BFN-50-C-7306.
A comprehensive "11/1" seismic interaction verification program was implemented as part of the BFN-1 Restart Project. Seismic spatial interactions (failure, falling, and impact) were evaluated for all SSEL items during the USI A-46 resolution program. Impact-related seismic interactions are further addressed by the TVA BFN Potential Clearance Discrepancy (PCD) evaluation program for piping clearance discrepancies of 3" and under. Seismic-induced spray evaluations were addressed by detailed walkdowns and bounding evaluations in accordance with TVA Design Criteria BFN-50-C-7306.
Page 9 of 907
Page 9 of 907


iuE                                     NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
iuE NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
: 3) Personnel Qualifications The personnel qualification for all individuals involved in the execution of the Fukushima Near-Term Task Force Recommendation 2.3: Seismic can be found in this section. Full resumes for the listed individuals can be found in Appendix A of this document.
: 3) Personnel Qualifications The personnel qualification for all individuals involved in the execution of the Fukushima Near-Term Task Force Recommendation 2.3: Seismic can be found in this section. Full resumes for the listed individuals can be found in Appendix A of this document.
3.1 Equipment Selection Personnel The personnel involved in equipment selection and review are:
3.1 Equipment Selection Personnel The personnel involved in equipment selection and review are:
" Steve Gray, Retired Senior Reactor Operator (SRO) from BFN with extensive experience providing engineering support through all phases of the operating site.
" Steve Gray, Retired Senior Reactor Operator (SRO) from BFN with extensive experience providing engineering support through all phases of the operating site.
* Nicholas Pressler, Senior Structural Engineer with 7 years of experience, including 2 years of experience in the nuclear industry.
Nicholas Pressler, Senior Structural Engineer with 7 years of experience, including 2 years of experience in the nuclear industry.
* Jason Black - Associate Structural engineer with 1.5 years of engineering experience, including 1.5 years in the nuclear power industry.
* Jason Black - Associate Structural engineer with 1.5 years of engineering experience, including 1.5 years in the nuclear power industry.
3.2 Seismic Walkdown Engineers The personnel involved in performing the seismic walkdowns are:
3.2 Seismic Walkdown Engineers The personnel involved in performing the seismic walkdowns are:
* Nicholas Pressler
Nicholas Pressler
"   Patrick McCarraher, Senior Supervising Structural Engineer with over 38 years of engineering experience, including 15 years in the nuclear power industry.
" Patrick McCarraher, Senior Supervising Structural Engineer with over 38 years of engineering experience, including 15 years in the nuclear power industry.
* Jeffry Lawrence, Mechanical Engineer II, Engineer in Training (E.I.T.) with five years of engineering experience, including two in the nuclear power industry.
Jeffry Lawrence, Mechanical Engineer II, Engineer in Training (E.I.T.) with five years of engineering experience, including two in the nuclear power industry.
* Avinash Chunduri, Structural Engineer II with 6 years of engineering experience, including 1.5 years' experience in nuclear power industry.
Avinash Chunduri, Structural Engineer II with 6 years of engineering experience, including 1.5 years' experience in nuclear power industry.
* George Bongart, Associate Civil Engineer with 9 months engineering experience.
George Bongart, Associate Civil Engineer with 9 months engineering experience.
" Jason Black
" Jason Black
" James Edgar, Professional engineer in the state of Tennessee with 11 years of engineering experience including 2 years in the nuclear power industry.
" James Edgar, Professional engineer in the state of Tennessee with 11 years of engineering experience including 2 years in the nuclear power industry.
  " Josh Best - - Project Mechanical Engineer with 5 years engineering experience,           R1 including 4 years in the nuclear power industry.
" Josh Best - - Project Mechanical Engineer with 5 years engineering experience, R1 including 4 years in the nuclear power industry.
3.3 Licensing Basis Reviewer The personnel involved in performing the licensing basis reviews:
3.3 Licensing Basis Reviewer The personnel involved in performing the licensing basis reviews:
* Steve Samaras, Site engineer at BFN with extensive experience providing engineering support for the operating site.
Steve Samaras, Site engineer at BFN with extensive experience providing engineering support for the operating site.
Page 10 of 907
Page 10 of 907


NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 3.4 IPEEE Reviewers The personnel involved in reviewing IPEEE vulnerabilities are:
3.4 IPEEE Reviewers NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 The personnel involved in reviewing IPEEE vulnerabilities are:
* Josh Best
* Josh Best
" Jason Black                                                                               I R1 3.5 Peer Review Team The personnel involved in the peer review process are:
" Jason Black 3.5 Peer Review Team The personnel involved in the peer review process are:
* John Dizon, Over 30 years of experience in the field of civil and structural engineering, earthquake engineering, risk assessment and project management.
John Dizon, Over 30 years of experience in the field of civil and structural engineering, earthquake engineering, risk assessment and project management.
" Steve Eder, Over 30 years of experience in the field of civil and structural engineering, project management, seismic engineering, risk management John Dizon is the Peer Review Team Leader.
" Steve Eder, Over 30 years of experience in the field of civil and structural engineering, project management, seismic engineering, risk management John Dizon is the Peer Review Team Leader.
Page 11 of 907
I R1 Page 11 of 907


miu                                   NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
miu NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
: 4) Selection of Structures, Systems, and Components (SSCs)
: 4) Selection of Structures, Systems, and Components (SSCs)
The selection of SSCs for the Recommendation 2.3 Seismic walkdowns followed the guideline provided in Reference 3 - The EPRI Seismic Walkdown Guidance. The SWELs and list of corresponding Area Walk-Bys for BFN Unit 2 can be found in Appendix D of this document.
The selection of SSCs for the Recommendation 2.3 Seismic walkdowns followed the guideline provided in Reference 3 - The EPRI Seismic Walkdown Guidance. The SWELs and list of corresponding Area Walk-Bys for BFN Unit 2 can be found in Appendix D of this document.
Line 144: Line 186:
This categorized list is presented in Appendix B as Base List 1. After separating the data into the previously mentioned categories, a sample was selected from Base List 1 to represent all Special Considerations that were required by the EPRI Walkdown Page 12 of 907
This categorized list is presented in Appendix B as Base List 1. After separating the data into the previously mentioned categories, a sample was selected from Base List 1 to represent all Special Considerations that were required by the EPRI Walkdown Page 12 of 907


iuN                                     NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Guidance. Once safety functions were assigned, the equipment was reviewed and compared to plant documentation to locate any new or modified equipment. To account for high risk equipment in the walkdown process, the SWEL was compared to the Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) Rankings and any shared equipment was noted.
iuN NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Guidance. Once safety functions were assigned, the equipment was reviewed and compared to plant documentation to locate any new or modified equipment. To account for high risk equipment in the walkdown process, the SWEL was compared to the Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) Rankings and any shared equipment was noted.
Some of the equipment classes that were listed in the EPRI walkdown guidance were not covered in the original SSEL, and therefore are not present in Base List 1.
Some of the equipment classes that were listed in the EPRI walkdown guidance were not covered in the original SSEL, and therefore are not present in Base List 1.
However, in order to include all of the classes of equipment, the scope of the selection was expanded for these seismic walkdowns to include other Seismic Category 1 Safety Related equipment for the classes that were not previously covered.
However, in order to include all of the classes of equipment, the scope of the selection was expanded for these seismic walkdowns to include other Seismic Category 1 Safety Related equipment for the classes that were not previously covered.
Line 151: Line 193:
4.2 SWEL Analysis The combined SWEL for BFN Unit 2 consists of 120 items of equipment. The SWEL for BFN Unit 2 adequately addresses all criteria that were required for the selection of SSCs in the EPRI Seismic Walkdown Guidance. These criteria include a distribution of environments, systems, safety functions, and classes of equipment.
4.2 SWEL Analysis The combined SWEL for BFN Unit 2 consists of 120 items of equipment. The SWEL for BFN Unit 2 adequately addresses all criteria that were required for the selection of SSCs in the EPRI Seismic Walkdown Guidance. These criteria include a distribution of environments, systems, safety functions, and classes of equipment.
The following equipment addresses the new and improved equipment criteria for BFN Unit 2:
The following equipment addresses the new and improved equipment criteria for BFN Unit 2:
H UNID                       Description BFN-2-PM P-076-0110         CNTMT ATM MON SYS ANLZR 2A SMPLRTN PMP Tablel. New/Improved Equipment Page 13 of 907
UNID BFN-2-PM P-076-0110 Description CNTMT ATM MON SYS ANLZR 2A SMPLRTN PMP Tablel. New/Improved Equipment H
Page 13 of 907


hNTTF                                         Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
hNTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
: 5) Seismic Walkdowns and Area Walk-Bys Guidance for performing the walkdowns and walk-bys required for Fukushima NTTF Recommendation 2.3 can be found in Reference 3 - The ElectricalPower Research Institute's Seismic Walkdown Guidance.
: 5) Seismic Walkdowns and Area Walk-Bys Guidance for performing the walkdowns and walk-bys required for Fukushima NTTF Recommendation 2.3 can be found in Reference 3 - The Electrical Power Research Institute's Seismic Walkdown Guidance.
The walkdowns and walk-bys were conducted in accordance with these guidelines and each was given a final status. Ifno issues were noted or housekeeping and minor maintenance issues were noted during a walkdown or walk-by, a YES status was given to the selected piece of equipment or area. Ifa potentially adverse seismic condition was noted, a NO status was given and the equipment was entered into the CAP to begin a functional evaluation. Ifequipment was inaccessible, or ifa portion of an item of equipment was unobservable, an UNKNOWN status was given.
The walkdowns and walk-bys were conducted in accordance with these guidelines and each was given a final status. If no issues were noted or housekeeping and minor maintenance issues were noted during a walkdown or walk-by, a YES status was given to the selected piece of equipment or area. If a potentially adverse seismic condition was noted, a NO status was given and the equipment was entered into the CAP to begin a functional evaluation. If equipment was inaccessible, or if a portion of an item of equipment was unobservable, an UNKNOWN status was given.
5.1 Seismic Walkdown Checklists One hundred and twenty (120) out of one hundred and twenty (120) Seismic Walkdown           I R1 Checklists (SWCs) were completed at BFN Unit 2. The SWCs completed at BFN Unit 2 can be found in Appendix E of this document. The types of potentially adverse seismic conditions that were addressed during these walkdowns include:
5.1 Seismic Walkdown Checklists One hundred and twenty (120) out of one hundred and twenty (120) Seismic Walkdown Checklists (SWCs) were completed at BFN Unit 2. The SWCs completed at BFN Unit 2 can be found in Appendix E of this document. The types of potentially adverse seismic conditions that were addressed during these walkdowns include:
0   Bent, broken, missing, or loose hardware Corrosion that is more than moderate Visible cracks in surrounding concrete Impact of soft targets Collapsing equipment Line flexibility Fifty (50) Area Walk-By Checklists (AWCs) were completed at BFN Unit 2. These             I R1 AWCs can be found in Appendix F of this document. The types of potentially adverse seismic conditions that were addressed during these walk-bys include:
I R1 0
* Anchorage of equipment
S S
* Degraded conditions of anchorage
S S
* Cable/conduit raceways and HVAC ducts
0 Bent, broken, missing, or loose hardware Corrosion that is more than moderate Visible cracks in surrounding concrete Impact of soft targets Collapsing equipment Line flexibility Fifty (50) Area Walk-By Checklists (AWCs) were completed at BFN Unit 2. These AWCs can be found in Appendix F of this document. The types of potentially adverse seismic conditions that were addressed during these walk-bys include:
* Spatial interactions between equipment
I R1 Anchorage of equipment Degraded conditions of anchorage Cable/conduit raceways and HVAC ducts Spatial interactions between equipment Flooding/spray hazards Fire hazards Housekeeping and temporary equipment Page 14 of 907
* Flooding/spray hazards
* Fire hazards
* Housekeeping and temporary equipment Page 14 of 907


~iI                                   NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Anchorage configuration for 50 items of equipment in BFN Unit 2 was verified by             R drawings, calculations, and/or the A-46 Screening Evaluation Worksheets (SEWs).           . R1 For cabinets and panels that were selected for walkdown, NRC guidance was followed to determine which could and could not be opened for internal inspection. Undue safety hazards, operational hazards, or cabinets that required extensive disassembly were documented and only observable anchorage was included in those walkdowns.
~iI NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Anchorage configuration for 50 items of equipment in BFN Unit 2 was verified by R
drawings, calculations, and/or the A-46 Screening Evaluation Worksheets (SEWs).  
. R1 For cabinets and panels that were selected for walkdown, NRC guidance was followed to determine which could and could not be opened for internal inspection. Undue safety hazards, operational hazards, or cabinets that required extensive disassembly were documented and only observable anchorage was included in those walkdowns.
5.2 SWC & AWC Summary The results documented by the SWCs and AWCs for BFN Unit 2 are summarized below:
5.2 SWC & AWC Summary The results documented by the SWCs and AWCs for BFN Unit 2 are summarized below:
* 117 SWCs resulted in a YES status                                                   RI
117 SWCs resulted in a YES status RI 3 SWCs resulted in a NO status I
* 3 SWCs resulted in a NO status                                                   I o Potentially Adverse Condition 1 0 BFN-0-STN-067-0926 o Potentially Adverse Condition 2 0 BFN-2-PNLA-009-0015 o Potentially Adverse Condition 3 M BFN-2-PNLA-009-0005
o Potentially Adverse Condition 1 0 BFN-0-STN-067-0926 o Potentially Adverse Condition 2 0 BFN-2-PNLA-009-0015 o Potentially Adverse Condition 3 M BFN-2-PNLA-009-0005 50 AWCs resulted in a YES status R1 Page 15 of 907
* 50 AWCs resulted in a YES status                                                   R1 Page 15 of 907


hil                                   NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
hil NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
: 6) Licensing Basis Evaluations 6.1 Licensing Basis Calculations When a potentially adverse seismic condition was identified at BFN, the condition was entered into the corrective action program. No licensing basis evaluations were performed by the walkdown team per TVA expectations to communicate any potential operability concerns as soon as they were identified. Due to the nature of this process, no calculations were performed by the walkdown team for licensing basis evaluations before the CAP entry was submitted. All licensing basis determinations were performed by BFN engineering on each CAP entry.
: 6) Licensing Basis Evaluations 6.1 Licensing Basis Calculations When a potentially adverse seismic condition was identified at BFN, the condition was entered into the corrective action program. No licensing basis evaluations were performed by the walkdown team per TVA expectations to communicate any potential operability concerns as soon as they were identified. Due to the nature of this process, no calculations were performed by the walkdown team for licensing basis evaluations before the CAP entry was submitted. All licensing basis determinations were performed by BFN engineering on each CAP entry.
Multiple CAP entries were generated during the seismic walkdown process at BFN Unit
Multiple CAP entries were generated during the seismic walkdown process at BFN Unit
Line 179: Line 220:
Page 16 of 907
Page 16 of 907


miu                                     NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 6.2.1 Potentially Adverse Seismic Condition 1 During a walkdown of BFN-0-STN-067-0926 it was observed that the concrete pad the strainer was sitting on was cracked. This has been entered into the CAP Program and a work order has been written to address the issue.
miu NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 6.2.1 Potentially Adverse Seismic Condition 1 During a walkdown of BFN-0-STN-067-0926 it was observed that the concrete pad the strainer was sitting on was cracked. This has been entered into the CAP Program and a work order has been written to address the issue.
6.2.2 Potentially Adverse Seismic Condition 2 During the walkdown of BFN-2-PNLA-009-0015 it was observed that the light cage was missing from the interior light. During a seismic event there would be a possibility that the light bulb could dislodge and potentially impact soft targets inside the panel. This has been entered into the CAP Program and a work order has been written to address the issue.
6.2.2 Potentially Adverse Seismic Condition 2 During the walkdown of BFN-2-PNLA-009-0015 it was observed that the light cage was missing from the interior light. During a seismic event there would be a possibility that the light bulb could dislodge and potentially impact soft targets inside the panel. This has been entered into the CAP Program and a work order has been written to address the issue.
6.2.3 Potentially Adverse Seismic Condition 3 During the walkdown of BFN-2-PNLA-009-0005 it was observed that the light cage was missing from the interior light. During a seismic event there would be a possibility that the light bulb could dislodge and potentially impact soft targets inside the panel. This has been entered into the CAP Program and a work order has been written to address the issue.
6.2.3 Potentially Adverse Seismic Condition 3 During the walkdown of BFN-2-PNLA-009-0005 it was observed that the light cage was missing from the interior light. During a seismic event there would be a possibility that the light bulb could dislodge and potentially impact soft targets inside the panel. This has been entered into the CAP Program and a work order has been written to address the issue.
Page 17 of 907
Page 17 of 907


hil                                       NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
hil NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
: 7) IPEEE Vulnerabilities Resolution Report 7.1 IPEEE Description In Generic Letter 88-20, Supplement 4, the NRC requested that the utilities for all active nuclear power plants in the United States perform an evaluation of their nuclear power generating facilities to identify any vulnerabilities associated with the occurrence of several plant-specific external events, and to access the impact of these vulnerabilities on the potential for plant core damage or radioactive material release. This program, designated the Individual Plant Examination of External Events, is a corollary program to the Individual Plant Examination (IPE) which focuses on the vulnerabilities associated with the occurrence of external events. The BFN was designated as a 0.3g focused scope plant for the seismic IPEEE.
: 7) IPEEE Vulnerabilities Resolution Report 7.1 IPEEE Description In Generic Letter 88-20, Supplement 4, the NRC requested that the utilities for all active nuclear power plants in the United States perform an evaluation of their nuclear power generating facilities to identify any vulnerabilities associated with the occurrence of several plant-specific external events, and to access the impact of these vulnerabilities on the potential for plant core damage or radioactive material release. This program, designated the Individual Plant Examination of External Events, is a corollary program to the Individual Plant Examination (IPE) which focuses on the vulnerabilities associated with the occurrence of external events. The BFN was designated as a 0.3g focused scope plant for the seismic IPEEE.
7.2 IPEEE Findings and Vulnerabilities The IPEEE Report for the BFN addressed multiple vulnerabilities that were identified during the original IPEEE walkdown process for Units 2 and 3 systems including common systems for all three units. A full list of these vulnerabilities can be found in Reference 6 - Seismic IPEEE Report for Browns Ferry NuclearPlant. A list of the equipment identified during IPEEE is listed below along with actions taken.
7.2 IPEEE Findings and Vulnerabilities The IPEEE Report for the BFN addressed multiple vulnerabilities that were identified during the original IPEEE walkdown process for Units 2 and 3 systems including common systems for all three units. A full list of these vulnerabilities can be found in Reference 6 - Seismic IPEEE Report for Browns Ferry Nuclear Plant. A list of the equipment identified during IPEEE is listed below along with actions taken.
UNID                 DESCRIPTION                   RESOLUTION Transformer to be replaced as part of the BFN-0-OXF-219-       HCLPF capacity below         long-term asbestos material removal TDA                 0.3g                         program at BFN.
UNID DESCRIPTION RESOLUTION Transformer to be replaced as part of the BFN-0-OXF-219-HCLPF capacity below long-term asbestos material removal TDA 0.3g program at BFN.
Transformer to be replaced as part of the BFN-O-OXF-219-       HCLPF capacity below         long-term asbestos material removal TDB                 0.3g                         program at BFN.
Transformer to be replaced as part of the BFN-O-OXF-219-HCLPF capacity below long-term asbestos material removal TDB 0.3g program at BFN.
Page 18 of 907
Page 18 of 907


pm'                                     NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
pm' NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
: 8) Peer Review A peer review was performed in accordance with References 2 and 3. The peer review process involved considerable interaction with the review teams, and was performed throughout all phases of the effort including the following:
: 8) Peer Review A peer review was performed in accordance with References 2 and 3. The peer review process involved considerable interaction with the review teams, and was performed throughout all phases of the effort including the following:
    "   Selection of the SSCs included on the SWEL
" Selection of the SSCs included on the SWEL In-plant walkdown observations and completed checklists for the Seismic Walkdowns and Area Walk-Bys Identified potentially adverse seismic conditions, utilization of the CAP process, and associated licensing basis review considerations
* In-plant walkdown observations and completed checklists for the Seismic Walkdowns and Area Walk-Bys
" Submittal report In summary, the peer review results are confirmatory and fully supportive of the evaluations and findings as described in this report. The completed peer review report is included as Appendix G to this report.
    "  Identified potentially adverse seismic conditions, utilization of the CAP process, and associated licensing basis review considerations
    "   Submittal report In summary, the peer review results are confirmatory and fully supportive of the evaluations and findings as described in this report. The completed peer review report is included as Appendix G to this report.
Page 19 of 907
Page 19 of 907
: 9) References NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Refere nce Document Title Document Number Preparer No.
Recommendations for Enhancing N/A United States Nuclear Reactor Safety in the 2 1st Century Regulatory Commission Letter: Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54 (f)
United States Nuclear 2
Regarding Recommendations 2.1, N/A Regulatory Commission 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Electric Power Research Task Force Recommendation 2.3:
Institute Seismic 4
BFN FSAR, Revision 4 Tennessee Valley Authority Browns Ferry Nuclear Plant USI A-46 50147-R-001 Tennessee Valley Authority Seismic Evaluation Report 517R01 Tne eValyAtoi 6
Seismic IPEEE Report Browns Ferry 50147-R-002 Tennessee Valley Authority Nuclear Plant 517R02 TneeValyAtoi Generic Implementation Procedure 7
(GIP) for Seismic Verification of N/A Seismic Qualification Nuclear Plant Equipment - Revision Utilities Group 3A, December 2001 Implementation Guidelines for Seismic Qualification of New and 8
Replacement Equipment/Parts N/A Seismic Qualification (NARE) Using the Generic Utilities Group Implementation Procedure (GIP) -
Revision 5 October 2002 9
BFN FSAR BFN-24.4 Tennessee Valley Authority Page 20 of 907


NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2
fotwfs ;errv Unit 2 SW-r.L 4rovwn Trrly tfal 2 SeIimIC Wshidpow Eqo~uipent ilst Ocwatcd~y:
: 9) References Refere nce                Document Title                  Document Number                Preparer No.
Pppoaed By Itr Ie Iqiilp.c~
Recommendations for Enhancing                      N/A        United States Nuclear Reactor Safety in the 2 1st Century                            Regulatory Commission Letter: Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54 (f)                                  United States Nuclear 2      Regarding Recommendations 2.1,                     N/A        Regulatory Commission 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident Seismic Walkdown Guidance for Resolution of Fukushima Near-Term                              Electric Power Research Task Force Recommendation 2.3:                                 Institute Seismic 4     BFN FSAR, Revision 4                                          Tennessee Valley Authority Browns Ferry Nuclear Plant USI A-46            50147-R-001    Tennessee Valley Authority Seismic Evaluation Report                      517R01        Tne        eValyAtoi 6     Seismic IPEEE Report Browns Ferry              50147-R-002    Tennessee Valley Authority Nuclear Plant                                  517R02        TneeValyAtoi Generic Implementation Procedure 7      (GIP) for Seismic Verification of        N/A                 Seismic Qualification Nuclear Plant Equipment - Revision                            Utilities Group 3A, December 2001 Implementation Guidelines for Seismic Qualification of New and 8     Replacement Equipment/Parts              N/A                  Seismic Qualification (NARE) Using the Generic                                      Utilities Group Implementation Procedure (GIP) -
Clasil
Revision 5 October 2002 9      BFN FSAR                                  BFN-24.4             Tennessee Valley Authority Page 20 of 907
,v-4d~
1A08 S
IRA
_(GSIL~k __
ai Ii eulto1348206MIRS otRiLRFNwr n
unwimi RANING Ra "t-J Mwlf.
AW.
iC--i
_1..0 1 SN0-A4U.03110022 U & UlEL617 MOR AJU 10 0
O 6171 MECI4001MI'AM 10311 2.3A,5.1 NO I
NO 031 2063 BFN0O-ANU-030,089 Ul & UZ8. 53 ANUS 18 0 1 CS 15931 MECH EQUIP Am 3 &P LINE 0311 2.3.4ý5 NO I
NO I 00 w 468 248 11.2A.,9 NO 1090 2020 2019 2009 2000 2068 2072 2071 2080 Hal2 3
FN.42-3AA9.211-000C 4EVSNI2thOWN BOARD C
3 0M,40-bOAA-211-0=3 4XVHVr3UOVMOWN0A40 1
BFN-0-B088-22940MOA 480VOISOAUXBOI2 IL 39-0.9089-219-3 4SO AsvDsL8111 30 0
CS 617 2A 4kV 5O90D AM C YES 199 I
1 I a
$9I 3
25 4kV 505D Fi.M 0 48DV AUX 111 4903 801585 SATT 20 M 2 DGC 21 4 1.2.3,4,5 YES 19 23 NO.
021 219 1,V,4.5 219 1.2.3,4.5 28 2so
: LLN, T.
J12 YES 7
4 YES NO iUs
_4 14 14 16 16 BFN-0-SD00.280-00OZ BFN.04CHG8.2544000008 8FN-D-CH"-31-nWO 8PN.-V-AN030-0068 2M8 2;fl
=10 6
205-3 16 to 11 9
2051 I 10 I
W-0.FCO-0304060 20321
-207o 14 Bfld.0-FCOO020-0069A BFGN-O-PMP-092-OOCU 8ON-0-PNLA-0248-(XXX 8FN-0.PNLA-248-00DOC BSIV 047N 067-0326 BPN.-D1NK.084.062 BPNv~.0-VR.34.0640D BEN 0VV-lEA219.10 250-V DC BATTERY BOARD 2
,2SVOCOSLSYS BATOOARO.C 125 VOC OSL SYS BAI BOARD D DGC I2ZVDCOSLSYSGTRYCHGRtA DGC 125 VDCDSLSYSBTIY CHG R 0GD.125 VOC 000 5TS 890{
RCGR A 002D.125 HVC DSL.SYSiTRYOiGR B CONTROL SAY WATER CHILLER 8
OI.SE.L GEN RM C;EXHtFAN A
DIES.EL GE.N M C EXH FAN A DIESELGEN RM 0 E4XH FAN A DIESEL GEN RM D EMHFAN INLET DAMPER FOR FAN *A" IN OG ROOM "C' OUTLET DAMPER FOR FAN W IN 00 ROOM -C" DESEL5 G.NERATOR C 1IESM GENERATOR 0
RHRSW PUMP C2 RNRSWPUMP 80 2108 DISTRIBUTION PANEL 58-C 2SOV DISTRIBU.TION PANI ELSB 91 ECW PUMP D0SCHARGE STRAINE C IEEW PUMP DISCARGE STRAINER BON-0-N508-06435, NITROG W STRG rNK 8 VSL GEN 0 RIGHT U43K STARTING AIR TANK CADMN2 TANK W 3
AVA8RIZrR CAOM2I1 TANK "
VAPORIZER AKV/480V X111%1 TO0B 480V SH10M5N BOARD ZA 486V SHUTDOWN B8OARD 8 460V AM(7V 80 ZA" 480V RMOV SO 20 SROV RMOV 8D2C*
480V REAC MOV RD 2D 480V PEAC2RMOVISO 2E 0
-0 0
0 0
0 0
0 0
Dr.
3.5 0GI I65 56S 7i5 595 DG HALLWAY O6 DGC 583 0c6 C OGD DG D R-C-Dr, 1565 0
00 165 S45 NO 0 I tNA*E 254 1.,2.3.4.5 254 1,.3,.4.5 254 -'.23.4.5 254 1.,'.3,4,5 154 1.2.3.4.S 73-2 2=]4.
)30 1.4s
)30 3.4.3 230 3,4.5 130 3,4,5 2301 3.4.5 O~c OGC C
S5DVSDB.
BSOY10 8
NO NO No NO YEO 065 NO.
NO YES0 YE5 YES
)7Zr 4.5 2205 21, l
o10l 01 NO 0
CB 617 0
rI.TAKE 565 o
INTAK, 565 0
YARD S63 o
00
-165
: 0.
YARD 365 0
YARO 565 o
Do 5a3 IO8 384 034 032 31 1004.5 34, 72.2.2.,5 S3 165 YES YES YeS YES I o0 1017 2
2 Co BO?-2-B:188.268-000264 2
Re
' 'A r.37 75953 593 622 SOLH1AST CORKiER 2A 4MDV.SDBD RM C 23 4Y 50080 RM O 2A4 kV 1090 RM C 29 4kV S000 It.% D FICA8.1/313 ACA - 1/A11 RCA -UN" 2A AW SDBI RIO.C 28 0LV SORD, RM P 8ATT 80 RM 2 SW6CORNER No I
YES YES NO NO YES YES NO No No YES NO 810 YES No NO NO No NO NO NOj YES 017 YES
.2 13 017 018 005 015 016 126 129 7
019 019 007 020
?
YES
.1 0 332 7
2015 1
2016.
1 20o5 16 205?4 10 81 1L2,3.4.5 YES 11.
250V BATTERY CHARGER 2A EECW/IRI PUMP 2A ROOM COOLER 2
R CS i
BFN-2-C..-067-048
)671I 3,4.5 No:
021 035 091 090 093 037 039
.09 0
8FN-2-O. RE-070
:EOW/OlIR PUMP Z ROOM COOLER 2
41, 205 1
ONZ.C.R08707 J
08W/CS PU.MP2A ROOM COOLER 324 60.529 SW CORNER 1067 I 3.4,5 NW CORNER 1067 4 3.4.5 I NO0 2114 7
13i Page 110 of 907


fotwfs ;errv Unit 2                                                                                                                                                                                               SW-r.L 4rovwnTrrly tfal 2SeIimIC    WshidpowEqo~uipent  ilst                                            Ocwatcd~y:                                                Pppoaed By                          Itr Ie Iqiilp.c~      Clasil                                                                            ,v- 4d~          1A08          S IRA    _(GSIL~k    __
Browns Ferry Unit 2 5WEL Equip. Class (0 U
____________________ aieulto1348206MIRS                                                        Ii      unwimi    RANING            RaiC--i otRiLRFNwr "t-J Mwlf.n AW.
Safety RISK LERF New or Anch.
_1..0      1  SN0-A4U.03110022                    U &UlEL617 MOR AJU 10              0          O    6171      MECI4001MI'AM        10311 2.3A,5.1       NO     I                      NO     031 2063                      BFN0O-ANU-030,089                      Ul & UZ8. 53 ANUS18            0 1       CS 15931    MECHEQUIP  Am 3 &P LINE 0311 2.3.4ý5           NO     I      -               NO I 00 w468                                                          NO 1090 24811.2A.,9 2020                3      FN.42-3AA9.211-000C                  4EVSNI2thOWN    BOARD  C          0        CS    617      2A 4kV 5O90DAM C                            YES        199 2019          3          0M,40-bOAA-211-0=3                    4XVHVr3UOVMOWN0A40            I      1I a        $9I 3      25 4kV505D Fi.M0      21  4 1.2.3,4,5     YES        19  23            NO. 021 2009            1          BFN-0-B088-22940MOA                      480VOISOAUXBOI2                                            48DVAUX111          219    1,V,4.5        YES          7  4          YES    iUs 2000          IL          39-0.9089-219- 3                         AsvDsL8111 30 4SO                                                        4903801585          219    1.2.3,4.5 2068          _4          BFN-0-SD00.280-00OZ                  250-V DCBATTERYBOARD 2             0                          SATT20 M 2         28                                                  NO 2072          14                                              ,2SVOCOSLSYS BATOOARO.C                        Dr. 3.5            DGC            2so    T.
.21)
LLN,J12        NO 2071        14                                                125 VOCOSLSYSBAI BOARDD                                                              254    1.,2.3.4.5    NO                           YES I  o0 2080          16                                            DGC I2ZVDCOSLSYSGTRYCHGRtA                                          0GI                254    1,.3,.4.5 Hal2        16                                            DGC 125 VDCDSLSYSBTIY CHGR                            I65                              254    -'.23.4.5 BFN.04CHG8.2544000008 2M8          16 to                                              0GD.125 VOC000 5TS 890{
NDesptior Unit Bldg.
RCGR A        0              56S          DG HALLWAY          254    1.,'.3,4,5 2;fl                                                        002D.125 HVCDSL.SYSiTRYOiGR B            -0            7i5                              154    1.2.3.4.S                                   165 YES
Eiev.
  =106        11            8FN-D-CH"-31-nWO                  CONTROLSAYWATER CHILLER      8      0              595                              73-2   2=]4.
Room Sys. Function RANKINGS Rank Replaced Verified 2049 B
205-3                      8PN.-V-AN030-0068                    OI.SE.LGEN RMC;EXHtFAN  A        0 9
BFN-2-FCV-023-0034 RHR HTX 2A COOL WATER OUTLET 2
DIES.ELGE.N M C EXHFANA                    O6                    DGC            )30      1.4s                                      YES 0              583              0c6C            )30      3.4.3      NO                           YeS DIESELGENRM 0 E4XH  FANA          0                                OGD              230    3,4.5                                    YES   019 DIESELGEN RM D EMHFAN                                              DG D                                NO                                   019 0                                                130      3,4,5                                    YES No 2051 I        10        I    W-0.FCO-0304060          INLETDAMPER FOR FAN *A"IN OG ROOM "C'      0        Dr, 1565              R-C-2301 3.4.5          NO                           NO 007 Bfld.0-FCOO020-0069A OUTLETDAMPERFOR FAN W IN 00 ROOM -C"                                                O~c                                                                      020 YEO DESEL5G.NERATOR C                                              OGC                                                                          7 065 BFGN-O-PMP-092-OOCU 1IESMGENERATOR  0            0        00    165                                                                                NO 20321                                                                  RHRSW PUMP C2                0    I tNA*E S45                  C              )7Zr      4.5        NO.                          YES RNRSWPUMP 80                                                                                      NO                           YES   017 8ON-0-PNLA-0248-(XXX                                                                                  S5DVSDB.
RB 565 U/R9 023 4,5 NO NO 041 2046 8
2108 DISTRIBUTIONPANEL58-C                                                                                YES0                          NO      7 8FN-0.PNLA-248-00DOC
BFN-2-FCV-023-0040 RHR HTX 2C COOL WATER OUTLET 2
-207o          14                                              2SOVDISTRIBU.TIONPANI  ELSB        0          CB    617              BSOY10                              YE5                                    ?
RB 565 U/R9 023 4,5 NO NO 041 2001 0
8 BSIV047N 067-0326 91ECW PUMP D0SCHARGESTRAINE            0      rI.TAKE 565                                      1004.5        YES             S3                  017 C IEEW PUMP DISCARGE STRAINER          o      INTAK, 565                                                                                    No    018 2205          21,l          BPN.-D1NK.084.062          BON-0-N508-06435, NITROGW STRG rNK8        0        YARD S63                                                                                    No VSLGEN 0 RIGHT U43K    STARTINGAIRTANK  o        00    -165                            IO8                                                YES   005 3                                                                              34, o10l        01            BPNv~.0-VR.34.0640D                CADMN2TANK W AVA8RIZrR            0.      YARD 365                                  384 NO    015 BEN0VV-lEA219.10                                                      0        YARO    565                              034 CAOM2I1  TANK" VAPORIZER                                                                                                                810    016 AKV/480V X111%1TO0B          o        Do    5a3      SOLH1AST CORKiER        032                  No    I      -               YES 126 480V SH10M5N BOARDZA                                        2A 4MDV.SDBD  RM C      31  72.2.2.,5 YES             .2   13          No 1017          2                                                 486V SHUTDOWNB8OARD8                                        23 4Y 50080 RM O                                                                  129 460V AM(7V 80 ZA"                                                                                                                NO 480V RMOVSO 20 2         Co    r.37      2A4 kV 1090 RM C BO?-2-B:188.268-000264                                                                  75953      29 4kVS000 It.%D                            YES       .10  332          NO SROVRMOV 8D2C*                                            FICA8.1/313                                                            No 480V REACMOV RD 2D            2         Re    593          ACA- 1/A11
BFN-2-FCV-0B3-OO8A 2A SLC SQUIB VLV (GE-1l-14A) 2 RB 639 SLC AREA 063 1
                                                                                                          ' 'A 2015          1                                                  480V PEAC2RMOVISO 2E                            622          RCA-UN" 2016.          1                                                                                                             2AAWSDBIRIO.C          81 1L2,3.4.5       YES       11.
NO NO 004 2002 0
28 0LVSORD,RM P                                                          NO 021 NO 035 20o5          16                                                250VBATTERY    CHARGER 2A        2         R CS          i      8ATT 80 RM 2                                                                 091 205?4
BFN-2-FCV-063-O0OBB 2B SLC SQUIB VLV ( GE-11-148) 2 RB 639 SLC AREA 063 1
        .09 10 0
NO NO 004 2038 7
BFN-2-C..-067-048 8FN-2-O.RE-070 EECW/IRIPUMP2AROOMCOOLER
BFN-2-ECV-064-0020 SUPPRESSION CHAMBER VAC RLF VLV 2
:EOW/OlIR PUMP Z ROOM COOLER            2             "  41, SW6CORNER SW CORNER
RB 565 SE CORNER 064 5
                                                                                                                                                    )671I 3,4.5 1067I 3.4,5 No:                          NOj 090 093 205. 1     ONZ.C.R08707        J        08W/CS PU.MP2AROOMCOOLER              324      60.529              NWCORNER          10674 3.4.5 I         NO0                          YES  037 039 2114          7 13i Page 110 of 907
NO NO 009 2039 7
BFN-2-FCV-064-0021 SUPP CHAMBER VAC RLF VLV 2
RB 565 R/2T 064 5
No NO 009 2040 7
8FN-2-FCV-O64-0032 SUPP CHAMBER EXHAUST INBD ISOL VLV 2
RB 565 R12/Q 054 5
NO NO 010 2041 7
RFN-2-FCV-064-0033 SUPP CHAMBER EXHAUST OUTBO ISOLVLV 2
RB 5B5 RP/P 064 5
NO NO 010 2044 7
BFN-2-FCV-067-0050 EECW SYSTEM NORTH HEADER BACKUP TO RBCCW 2
RB 593 PIR13 067 3,4,5 NO NO 039 2045 8
RFN-2-FCV-074-O001 RHR PMP A SUPP POOL SUCTION VALVE 2
RB 519 SW CORNER 074 3,4 NO NO 012 2051 8
BFN-2-FCV-075-0022 SYS 1 TEST BYPASS VLV OPERATOR 2
RB 519 NW CORNER 075 3
NO NO 037 2050 8
BFN-2-FCV-075-0037 CS/PUMP 28 & 2D MINI-FLOW VALVE 2
RB 541 NE CORNER 075 3
NO NO 038 2108 8
BFN-2-FCV-078-0062 SYSTEM ISOLATION MOTOR OPERATED VLV 2
RB 639 RCA 078 SWEL 2 NO NO 104 2042 7
BFN-2-FCV-08S-39A/0219 CRD SCRAM INLET VALVE.
2 RB 565 P-S/R9&13 085 1
NO NO 011 2043 7
BFN-2-FCV-085-39A/0227 CRD SCRAM INLET VALVE 2
RB 565 P-S/R9&13 085 1
NO NO 011 2047 8
BFN-2-FSV-08S-0037A CRD\\SCRAM DUMP VALVE 2
RB 565 N/R12 085 1
NO NO 040 2048 8
BFN-2-FSV-,85-DI37B CRD\\SCRAM DUMP VALVE 2
RB 565 N/R12 095 1
NO NO 040 2064 13 BFN-2-GEN-26R-0002DA LPO MI 2DA GENERATOR 2
RB 639 U/R14 269 3
NO YES 005 2065 13 BFN-2-GEN-268-O00ZDN LPCI MG 2DN GENERATOR 2
RB 621 U/R13 268 3
NO YES 003 2066 13 BFN-2-GEN-268-0002EA LPCI MG 2EA GENERATOR 2
RB 621 U/R14 266 3
NO YES 003 2067 13 BFN-2-GEN-268-OOO2EN LPCI MG 2EN GENERATOR 2
RB 639 U/R14 268 3
NO YES 005 2079 16 BFN-2-INV-256-0001 DIV I ECCS ATU INVERTER 2
RB 593 28 4kV SDBD RM D 256 1,2,3,4,5 NO YES 021 2086 38 BFN-2-LPNL-9ZS-0001 PANEL 25-0001 2
RB 519 NWCORNER 925 3
NO NO 037 2088 18 BFN-2-LPNL-925-OOOSA LOCAL PANEL 25-SA 2
RB 593 S/R10 925 1,2 NO YES 036 2089 19 BFN-2-LPNL-925-O005 LOCAL PANEL 25-59 2
RB 593 S/RiO 925 1,2 NO YES 036 2090 18 BFN-2-LPNL-925-O0OSD LOCAL PANEL 25-51 2
RB 593 S/RIO 925 1,2 NO YES 036 2091 19 BFN-2-LPNL-925-=06A LOCAL PANEL 25-6A 2
RB 593 P/R12 925 1,2 NO YES 039 2092 18 BFN-2-LPNL-92S-4]006D LOCAL PANEL 25-60 2
RB 593 P/R12 929 1,2 NO YES 039 2087 19 BFN-2-LPNL-925-0060 PANEL 25-60 FOR CS PMP 2
RB 519 NE CORNER 925 3
NO NO 014 2093 18 BFN-2-LPNL-925-0223 LOCAL PANEL 2-25-223 2
RB 593 Q/112 925 1,2 NO YES 039 2109 20 BFN-2-LS-078-0001D SKIMMER SURGE TANK LEVEL LOW LOW ISOL 2
RB 639 RCA 079 SWEL 2 NO NO 099 2110 20 BFN-2-LS-078-0OOIE SKIMMER SURGE TANK LEVEL LOW LOW ISOL 2
RB 639 RCA 078 SWEL 2 NO NO 099 2111 20 BFN-2-LS-078-OOO1F SKIMMER SURGE TANK LEVEL LOW LOW ISOL 2
RB 639 RCA 076 SWEL2 NO NO 099 2112 20 BFN-2-LS-079-0001G SKIMMER SURGE TANK LOW LEVELSWITCH 2
RB 639 RCA 078 SWEL2 NO NO 099 2115 7
BFN-2-PCV-001-O019 MS/MAIN STEAM SAFETY RELIEF VALVE 2
RB 585 DRY WELL 001 2
NO NO N
2116 7
BFN-2-PCV-001-OD34 MS/MAIN STEAM SAFETY RELIEF VALVE 2
RB SBS DRY WELL 001 2
NO NO____
2029 5
BFN-Z-PMP-063-0006A 2A SLC PUMP (GE-11-2A) 2 RB 639 SLC AREA 063 1
NO YES 004 2030 5
BFN-2-PMP-063-=0689 2Z SLC PUMP (GE-11-2B) 2 RB 639 SLC AREA 063 1
NO YES 004 2031 S
BFN-2-PMP-073-0029 HPCI BOOSTER PUMP 2
RB 519 HPCI ROOM 073 3
NO NO 013 2028 5
BFN-2-PMP-073-OD47 HPCI TURBINE AUXIUARYOIL PUMP 2
RB S19 HPCI ROOM 073 3
NO NO 013 2033 6
BFN-2-PMP-074-0005 RESIDUAL HEAT REMOVAL PUMP 2A 2
RB 519 SW CORNER 074 3,4 NO YES 012 2034 6
BFN-2-PMP-074-O016 RESIDUAL HEAT REMOVAL PUMP 2C 2
RB 519 SW CORNER 074 3,4 NO YES 012 2036 6
BFN-2-PMP-075-003 CORE SPRAY PUMP 2B 2
RB 519 NE CORNER 075 3
NO YES 014 2037 6
BFN-2-PMP-075-OD42 CORE SPRAY PUMP 20 2
RB 519 HE CORNER 075 3
NO YES 014 2027 5
BFN-2-PMP-076-0110 CNTMT ATM MON SYS ANLZR 2A SMPLRTN PMP 2
RB 565 SCRAM VALVE AREA 076 5
NO YES NO 035 2096 20 BFN-2-PNLA-009-D003A REACTOR SHUTDOWN & CONTAINMENT COOLING 2
CR 617 U2 MCR 009 2,3 NO YES 120 2099 20 BFN-2-PNLA-009-000S REACTOR CONTROL PANEL 2
CR 617 U2 MCR 009 1
NO YES 120 2100 20 BFN-2-PNLA-09-0006 FEEDWATER DTM & CONDS PNL 2
CD 637 U2MCR 009 1
NO YES 120 2044 20 BFN-2-PNLA-0:9-0009 CONTROL PNLA 9-9 2
CB 617 U2 MCR 009 1,2.3,4,5 YES 193 YES 120 11ev4 -
2095 2096 2097 2073 20 BFN-2-PNLA-009-001S PNL 9-15 AUX INSTR RM 2
CR 593 U2 AIR
)091 1
NO YES 089 PNLA-009-D017 PNL 9-17 AUX INSTR RM UT-2 2
CB 593 U2AIR 009 1
NO I-I I
I YES 089 20 20 PNLA-.O0-0D32 CS&HPCI (CHAI PNLA 9-32 2
C1 1 593 UZAIR
)091 3
1 NO YES 089 I-BFN-2-PNLA-O09-0081 PANEL 9-R1 AUX INSTR ROOM 2
U2 AIR
)09 1 2.3.4.5 1 NO NO 069 3211 19 B FN-2-TE-084-O I
616 TORUS WATER TEMP ELEMENT 2
TORUS 064 5
NO NO 126 TORUS 064 5
NO NO 126 2118 19 BFN-2-TE-064-M161C TORUS WATER TEMP ELEMENT 2
RB 1519 Page 111 of 907


Browns Ferry Unit 2                                                                                                                                                                                     5WEL Equip. Class (0                                                                            U-     -                                      Safety      RISK          LERF New or    Anch.
Browns Ferry Unit 2 Area Walk-Bys No.
            .21)                  NDesptior                                                      Unit Bldg. Eiev.        Room        Sys. Function    RANKINGS        Rank Replaced Verified 2049          B          BFN-2-FCV-023-0034              RHRHTX2ACOOLWATEROUTLET                  2    RB    565            U/R9      023      4,5        NO                            NO      041 2046          8          BFN-2-FCV-023-0040              RHRHTX2C COOLWATEROUTLET                  2    RB    565            U/R9      023      4,5        NO                            NO      041 2001          0        BFN-2-FCV-0B3-OO8A                2A SLCSQUIBVLV(GE-1l-14A)              2   RB    639        SLCAREA      063        1       NO      -                    NO      004 2002          0        BFN-2-FCV-063-O0OBB                2BSLCSQUIBVLV( GE-11-148)              2    RB    639        SLCAREA      063        1        NO                            NO      004 2038          7         BFN-2-ECV-064-0020          SUPPRESSION    CHAMBER VACRLFVLV            2    RB    565       SECORNER      064      5        NO                            NO      009 2039          7         BFN-2-FCV-064-0021                SUPP CHAMBERVACRLF VLV                  2    RB    565           R/2T      064      5        No                            NO      009 2040          7          8FN-2-FCV-O64-0032        SUPPCHAMBEREXHAUSTINBDISOLVLV                  2    RB    565          R12/Q      054      5        NO                            NO      010 2041          7          RFN-2-FCV-064-0033        SUPP CHAMBER      EXHAUSTOUTBOISOLVLV          2    RB    5B5            RP/P      064      5        NO                            NO      010 2044          7          BFN-2-FCV-067-0050    EECWSYSTEMNORTHHEADER          BACKUP  TO RBCCW 2      RB    593          PIR13      067    3,4,5      NO                            NO      039 2045          8         RFN-2-FCV-074-O001          RHRPMP A SUPP POOLSUCTIONVALVE                2    RB    519      SW CORNER      074      3,4        NO                            NO      012 2051          8          BFN-2-FCV-075-0022              SYS1 TESTBYPASSVLVOPERATOR                2    RB    519      NW CORNER      075      3        NO                            NO      037 2050          8          BFN-2-FCV-075-0037          CS/PUMP 28 & 2D MINI-FLOW        VALVE      2   RB    541        NECORNER      075      3        NO                            NO      038 2108          8          BFN-2-FCV-078-0062        SYSTEMISOLATION        MOTOROPERATED    VLV    2   RB    639            RCA        078 SWEL2          NO                            NO      104 2042          7      BFN-2-FCV-08S-39A/0219                  CRDSCRAMINLET    VALVE.            2    RB    565        P-S/R9&13      085      1        NO                            NO      011 2043          7      BFN-2-FCV-085-39A/0227                  CRDSCRAMINLET    VALVE              2    RB    565        P-S/R9&13      085      1        NO                            NO      011 2047          8        BFN-2-FSV-08S-0037A                  CRD\SCRAM    DUMP VALVE              2   RB    565          N/R12      085      1        NO                            NO      040 2048          8        BFN-2-FSV-,85-DI37B                  CRD\SCRAM    DUMP VALVE              2   RB    565          N/R12      095      1        NO                            NO      040 2064        13        BFN-2-GEN-26R-0002DA                  LPO MI 2DA GENERATOR                  2   RB    639          U/R14      269      3         NO                            YES      005 2065        13        BFN-2-GEN-268-O00ZDN                  LPCIMG2DN GENERATOR                  2   RB     621          U/R13      268      3        NO                            YES      003 2066        13        BFN-2-GEN-268-0002EA                  LPCIMG2EAGENERATOR                    2   RB     621          U/R14      266      3        NO                            YES      003 2067        13        BFN-2-GEN-268-OOO2EN                  LPCIMG 2ENGENERATOR                  2   RB     639          U/R14      268      3        NO                            YES      005 2079        16          BFN-2-INV-256-0001                  DIVI ECCSATUINVERTER                2   RB     593    28 4kV SDBDRMD    256 1,2,3,4,5      NO                            YES      021 2086        38        BFN-2-LPNL-9ZS-0001                        PANEL25-0001                    2   RB     519       NWCORNER        925      3        NO                            NO      037 2088        18       BFN-2-LPNL-925-OOOSA                      LOCAL  PANEL25-SA                2   RB     593          S/R10      925      1,2       NO                            YES      036 2089        19        BFN-2-LPNL-925-O005                      LOCAL  PANEL25-59                2   RB     593          S/RiO      925      1,2       NO                            YES      036 2090        18        BFN-2-LPNL-925-O0OSD                    LOCALPANEL25-51                    2   RB     593          S/RIO      925      1,2       NO                            YES      036 2091        19        BFN-2-LPNL-925-=06A                      LOCAL  PANEL25-6A                2   RB     593          P/R12      925      1,2       NO                          YES      039 2092        18        BFN-2-LPNL-92S-4]006D                    LOCALPANEL25-60                    2   RB     593          P/R12      929      1,2        NO                            YES      039 2087        19        BFN-2-LPNL-925-0060                  PANEL 25-60 FORCSPMP                2   RB     519        NECORNER      925      3        NO                            NO      014 2093        18        BFN-2-LPNL-925-0223                    LOCALPANEL2-25-223                  2   RB     593          Q/112      925      1,2       NO                          YES      039 2109        20          BFN-2-LS-078-0001D      SKIMMER    SURGETANKLEVEL    LOWLOWISOL        2   RB     639            RCA        079    SWEL  2     NO                            NO      099 2110        20          BFN-2-LS-078-0OOIE      SKIMMER    SURGETANKLEVEL    LOWLOWISOL        2   RB     639            RCA        078 SWEL2          NO                            NO      099 2111        20          BFN-2-LS-078-OOO1F      SKIMMER    SURGETANKLEVEL    LOW  LOW ISOL    2   RB     639            RCA        076 SWEL2          NO                            NO      099 2112        20          BFN-2-LS-079-0001G      SKIMMER    SURGETANK LOWLEVELSWITCH            2   RB     639            RCA        078 SWEL2          NO                            NO      099 2115          7        BFN-2-PCV-001-O019          MS/MAIN STEAMSAFETYRELIEF        VALVE      2   RB     585         DRYWELL       001      2         NO      -                   N NO 2116          7        BFN-2-PCV-001-OD34          MS/MAIN STEAMSAFETYRELIEF        VALVE      2   RB     SBS        DRYWELL       001      2         NO                            NO____          11ev4-2029          5        BFN-Z-PMP-063-0006A                    2ASLCPUMP (GE-11-2A)                2   RB     639        SLCAREA      063      1        NO                            YES      004 2030          5        BFN-2-PMP-063-=0689                    2ZSLCPUMP (GE-11-2B)                2   RB     639        SLCAREA      063      1        NO                            YES      004 2031          S         BFN-2-PMP-073-0029                      HPCIBOOSTERPUMP                    2   RB     519        HPCIROOM      073      3        NO                            NO      013 2028          5        BFN-2-PMP-073-OD47            HPCITURBINE      AUXIUARYOIL  PUMP        2   RB     S19      HPCIROOM        073      3        NO                            NO      013 2033          6        BFN-2-PMP-074-0005            RESIDUAL    HEATREMOVAL    PUMP 2A          2    RB    519      SW CORNER      074      3,4        NO                            YES      012 2034          6        BFN-2-PMP-074-O016            RESIDUAL    HEATREMOVAL    PUMP 2C        2   RB     519      SW CORNER      074      3,4        NO                            YES      012 2036          6        BFN-2-PMP-075-003                     CORESPRAYPUMP 2B                    2   RB     519        NECORNER      075      3        NO                          YES      014 2037          6        BFN-2-PMP-075-OD42                    CORESPRAYPUMP 20                    2   RB     519        HECORNER      075      3        NO                            YES      014 2027          5        BFN-2-PMP-076-0110      CNTMTATMMON SYSANLZR2ASMPLRTNPMP                  2   RB     565  SCRAMVALVE    AREA 076      5        NO                  YES      NO      035 2096        20        BFN-2-PNLA-009-D003A    REACTOR    SHUTDOWN &CONTAINMENT        COOLING  2    CR    617          U2 MCR      009      2,3        NO                          YES      120 2099        20        BFN-2-PNLA-009-000S                  REACTOR    CONTROL  PANEL            2   CR    617          U2 MCR      009      1        NO                          YES      120 2100        20        BFN-2-PNLA-09-0006                FEEDWATER      DTM &CONDSPNL            2   CD    637          U2MCR        009      1        NO                          YES      120 2044        20        BFN-2-PNLA-0:9-0009                      CONTROL    PNLA9-9                2   CB    617          U2 MCR      009 1,2.3,4,5      YES    193    -             YES      120 2095        20        BFN-2-PNLA-009-001S                  PNL9-15 AUXINSTRRM                  2   CR    593          U2 AIR      )091    1        NO                            YES      089 2096                          PNLA-009-D017                PNL 9-17 AUX INSTR RM UT-2             2    CB    593          U2AIR      009      1        NO  I-     I    I        I YES      089 2097        20                PNLA-.O0-0D32                CS&HPCI (CHAI PNLA9-32              2     C1  1 593          UZAIR        )091    3    1  NO                          YES      089 2073        20                          .. I-NO      069 BFN-2-PNLA-O09-0081                PANEL 9-R1 AUX INSTR ROOM              2                        U2 AIR        )09 1 2.3.4.5 1    NO 3211        19        B FN-2-TE-084-O I  616              TORUS WATER TEMP ELEMENT                2                        TORUS        064      5        NO                            NO      126 2118        19        BFN-2-TE-064-M161C                TORUS WATER TEMP ELEMENT                2    RB  1519          TORUS        064      5        NO                            NO    126 Page 111 of 907
AWC No.
Unit Building Elevation Location Walkdown Date 002 O-CB-EL593-002 0
CB 593 Mech Equip Room 7/17/2012 069 O-CB-EL595-069 0
CB 595 Roof Chiller A & B Area 8/3/2012 001 O-CB-EL617-001 0
CB 617 Mech Equip Room 7/17/2012 120 O-CB-EL617-120 1/2 CB 617 Unit 1 & 2 Main Control Room 8/14/2012 006 O-DG-EL565-006 0
DG 565 Electrical Tunnel 7/19/2012 007 O-DG-EL565-007 0
DG 565 Diesel Generator Room C 7/19/2012 008 O-DG-EL565-008 0
DG 565 Diesel Generator Room D 7/19/2012 019 O-DG-EL583-019 0
DG 583 Fan Room D 7/25/2012 020 O-DG-EL583-020 0
DG 583 Fan Room C 7/25/2012 115 O-DG-EL583-115 0
DG 583 Diesel Aux Board Room 8/13/2012 015 0-YD-EL565-015 0
YD 565 Vaporizer Tank A Area 7/25/2012 016 0-YD-EL565-016 0
YD 565 Vaporizer Tank B Area 7/25/2012 017 0-YD-EL565-017 0
Intake 565 RHRSW Pump Room B 7/25/2012 018 0-YD-EL565-018 0
Intake 565 RHRSW Pump Room C 7/25/2012 066 2-CB-EL593-066 2
CB 593 Battery Board Room 2 8/3/2012 089 2-CB-EL593-089 2
CB 593 Aux Instrument Room 7/19/2012 090 2-CB-EL593-090 2
CB 593 Battery Room 7/19/2012 091 2-CB-EL593-091 2
CB 593 Battery Board Room 7/19/2012 067 2-CB-EL617-067 2
CB 617 250V Shutdown Board Room C 8/3/2012 012 2-RB-EL519-012 2
RB 519 RHR Pump Area 7/20/2012 013 2-RB-EL519-013 2
RB 519 HPCI Room 7/20/2012 014 2-RB-EL519-014 2
RB 519 NE Quad 7/20/2012 037 2-RB-EL519-037 2
RB 519 NW Quad 7/30/2012 126 2-RB-EL519-126 2
RB 519 Unit 2 Under Torus 10/18/2012 038 2-RB-EL541-038 2
RB 541 NE Quad 7/30/2012 096 2-RB-EL541-096 2
RB 541 SW Quad 8/9/2012 009 2-RB-EL565-009 2
RB 565 SE Quad 7/20/2012 010 2-RB-EL565-010 2
RB 565 NW Quad 7/20/2012 011 2-RB-EL565-011 2
RB 565 Scram Valve Area East Side 7/20/2012 035 2-RB-EL565-035 2
RB 565 Scram Valve Area West Side 7/30/2012 040 2-RB-EL565-040 2
RB 565 Scram Dump Valves N/R12 7/30/2012 041 2-RB-EL565-041 2
RB 565 Elevator/Stairs Door Area 7/30/2012 109 2-RB-EL565-109 2
RB 565 R14-R12, R-U 8/10/2012 130 2-RB-EL565-130 2
RB 565 UNIT 2 DRYWELL 3/25/2013 131 2-RB-EL565-131 2
RB 565 UNIT 2 STEAM VAULT 3/25/2013 132 2-RB-EL585-132 2
RB 585 UNIT 2 DRYWELL 3/25/2013 133 2-RB-ELS85-133 2
RB 585 UNIT 2 DRYWELL 3/25/2013 021 2-RB-EL593-021 2
RB 593 Electrical Board Room 2B 7/19/2012 036 2-RB-EL593-036 2
RB 593 Column Lines R9 to R11, U to S 7/30/2012 039 2-RB-EL593-039 2
RB 593 RBCCW Heat Exchanger Area 7/30/2012 108 2-RB-EL593-108 2
RB 593 R11-R13, S-U 8/10/2012 119 2-RB-EL593-119 2
RB 593 480V Shutdown Board Room 2B 8/13/2012 003 2-RB-EL621-003 2
RB 621 LPCI Generator Area 7/18/2012 022 2-RB-EL621-022 2
RB 621 Electrical Board Room 2A 7/19/2012 110 2-RB-EL621-110 2
RB 621 S-U, R8-R1O 8/10/2012 118 2-RB-EL621-118 2
RB 621 480V Shutdown Board Room 2A 8/13/2012 004 2-RB-EL639-004 2
RB 639 SLC Area 7/18/2012 005 2-RB-EL639-005 2
RB 639 LPCI Generator Area 7/18/2012 099 2-RB-EL639-099 2
RB 639 SLC Area (By Stairs) 8/9/2012 104 2-RB-EL639-104 2
RB 639 S-U, R8-R11 8/9/2012 R1 Page 113 of 907


Browns Ferry Unit 2                                                                          Area Walk-Bys No.        AWC No. Unit Building Elevation                  Location          Walkdown Date 002    O-CB-EL593-002  0      CB      593              Mech Equip Room              7/17/2012 069    O-CB-EL595-069  0      CB      595            Roof Chiller A & B Area          8/3/2012 001    O-CB-EL617-001  0      CB      617              Mech Equip Room              7/17/2012 120    O-CB-EL617-120 1/2    CB      617        Unit 1 & 2 Main Control Room        8/14/2012 006    O-DG-EL565-006  0      DG      565                Electrical Tunnel            7/19/2012 007    O-DG-EL565-007  0      DG      565          Diesel Generator Room C          7/19/2012 008    O-DG-EL565-008  0      DG      565          Diesel Generator Room D          7/19/2012 019    O-DG-EL583-019  0      DG      583                  Fan Room D                7/25/2012 020    O-DG-EL583-020  0      DG      583                  Fan Room C                7/25/2012 115    O-DG-EL583-115  0      DG      583            Diesel Aux Board Room            8/13/2012 015    0-YD-EL565-015  0      YD      565            Vaporizer Tank A Area            7/25/2012 016    0-YD-EL565-016  0      YD      565            Vaporizer Tank B Area          7/25/2012 017    0-YD-EL565-017  0    Intake    565            RHRSW Pump Room B              7/25/2012 018    0-YD-EL565-018  0    Intake    565            RHRSW Pump Room C              7/25/2012 066    2-CB-EL593-066  2      CB      593            Battery Board Room 2            8/3/2012 089    2-CB-EL593-089  2      CB      593            Aux Instrument Room            7/19/2012 090    2-CB-EL593-090  2      CB      593                  Battery Room              7/19/2012 091    2-CB-EL593-091  2      CB      593              Battery Board Room            7/19/2012 067    2-CB-EL617-067  2      CB      617        250V Shutdown Board Room C            8/3/2012 012    2-RB-EL519-012  2      RB      519                RHR Pump Area              7/20/2012 013    2-RB-EL519-013  2      RB      519                    HPCI Room                7/20/2012 014    2-RB-EL519-014  2      RB      519                    NE Quad                7/20/2012 037    2-RB-EL519-037  2      RB      519                    NW Quad                7/30/2012 126    2-RB-EL519-126  2      RB      519              Unit 2 Under Torus            10/18/2012 038    2-RB-EL541-038  2      RB      541                    NE Quad                7/30/2012 096    2-RB-EL541-096  2      RB      541                    SW Quad                  8/9/2012 009    2-RB-EL565-009  2      RB      565                    SE Quad                7/20/2012 010    2-RB-EL565-010  2      RB      565                    NW Quad                7/20/2012 011    2-RB-EL565-011  2      RB      565          Scram Valve Area East Side        7/20/2012 035    2-RB-EL565-035  2      RB      565          Scram Valve Area West Side        7/30/2012 040    2-RB-EL565-040  2      RB      565          Scram Dump Valves N/R12            7/30/2012 041    2-RB-EL565-041  2      RB      565          Elevator/Stairs Door Area        7/30/2012 109    2-RB-EL565-109  2      RB      565                  R14-R12, R-U              8/10/2012 130  2-RB-EL565-130  2      RB      565                UNIT 2 DRYWELL              3/25/2013 131  2-RB-EL565-131  2      RB      565            UNIT 2 STEAM VAULT              3/25/2013 132  2-RB-EL585-132  2      RB      585                UNIT 2 DRYWELL              3/25/2013 133  2-RB-ELS85-133  2      RB      585                UNIT 2 DRYWELL              3/25/2013          R1 021    2-RB-EL593-021  2      RB      593          Electrical Board Room 2B          7/19/2012 036    2-RB-EL593-036  2      RB      593        Column Lines R9 to R11, U to S      7/30/2012 039    2-RB-EL593-039  2      RB      593        RBCCW Heat Exchanger Area          7/30/2012 108  2-RB-EL593-108  2      RB      593                  R11-R13, S-U              8/10/2012 119  2-RB-EL593-119  2      RB      593      480V Shutdown Board Room 2B          8/13/2012 003    2-RB-EL621-003  2      RB      621              LPCI Generator Area            7/18/2012 022    2-RB-EL621-022  2      RB      621          Electrical Board Room 2A          7/19/2012 110  2-RB-EL621-110  2      RB      621                  S-U, R8-R1O              8/10/2012 118  2-RB-EL621-118  2      RB      621      480V Shutdown Board Room 2A          8/13/2012 004    2-RB-EL639-004  2      RB      639                    SLC Area                7/18/2012 005    2-RB-EL639-005  2      RB      639              LPCI Generator Area            7/18/2012 099    2-RB-EL639-099  2      RB      639              SLC Area (By Stairs)            8/9/2012 104  2-RB-EL639-104  2      RB      639                  S-U, R8-R11                8/9/2012 Page 113 of 907
INTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Appendix E: SWCs The following signatures are provided for the engineers responsible for the Seismic Walkdown Checklists that were performed during the Unit 2 outage March 25, 2013. The equipment walked down during the outage include:
 
BFN-2-FCV-001-0026 BFN-2-FCV-001-0038 BFN-2-PCV-001-0019 BFN-2-PCV-001-0034 Name Signature Date Josh Best gt  
INTTF                                           Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Appendix E: SWCs The following signatures are provided for the engineers responsible for the Seismic Walkdown Checklists that were performed during the Unit 2 outage March 25, 2013. The equipment walked down during the outage include:
-//
BFN-2-FCV-001-0026 BFN-2-FCV-001-0038 BFN-2-PCV-001-0019 BFN-2-PCV-001-0034 Name                                     Signature                             Date Josh Best                     gt         "'-        -//                         -. **
Jason Black*
Jason Black*           f*     IA,. A                                         *-*O, Page 113-1 of 907
f*
IA,. A  
*-*O, Page 113-1 of 907


Sheet 1 of 5 Status: Y 0NElULI Seismic Walkdown Checklist (SWC)
Sheet 1 of 5 Status: Y 0NElULI Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-FCV-001-0026         Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Location: Bldg. U2 RB Floor El. 565 Room, Area 130, Drywell Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Location: Bldg. U2 RB Floor El. 565 Room, Area 130, Drywell Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage
: 1. Is the anchorage configuration verification required (i.e., is   Y[:N M the item one of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose         Y EIN   lI U EI N/A 2 hardware?
Y[:N M
3Enter the equipment class name from Appendix B, Classes of Equipment.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Y EIN lI U EI N/A 2 3Enter the equipment class name from Appendix B, Classes of Equipment.
Page 370 of 907 R1
Page 370 of 907 R1


Sheet 2 of 5 Seismic Walkdown Checklist (SWC) 3 Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 7 Equipment Description MSIV "B" Inboard Isolation Valve Anchorage (Continued)
Sheet 2 of 5 Seismic Walkdown Checklist (SWC)
: 3. Is the anchorage free of corrosion that is more than mild   Y FIN El U El  N/A E surface oxidation?
Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Anchorage (Continued)
: 4. Is the anchorage free of visible cracks in the concrete near Y FIN [I U I-1 N/A E the anchors?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 5. Is the anchorage configuration consistent with plant         Y FIN LI U F1 N/A M documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Page 371 of 907                                     R1
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y FIN El U El N/A E Y FIN [I U I-1 N/A E Y FIN LI U F1 N/A M Page 371 of 907 R1


Sheet 3 of 5 Seismic Walkdown Checklist (SWC)
Sheet 3 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve
Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve
: 6. Based on the above anchorage evaluations, is the                 Y ON EjU E anchorage free of potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Interaction Effects
Y ON EjU E Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or               YE NE: U[Z] N/A[L]
: 7. Are soft targets free from impact by nearby equipment or structures?
structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and       YE NEJ U[-] N/A[D lighting, and masonry block walls not likely to collapse onto the equipment?
YE NE:
Page 372 of 907 R1
U[Z] N/A[L]
YE NEJ U[-] N/A[D Page 372 of 907 R1


Sheet 4 of 5 Seismic Walkdown Checklist (SWC)
Sheet 4 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Interaction Effects (Continued)
Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Interaction Effects (Continued)
: 9. Do attached lines have adequate flexibility to avoid damage?     YE N  U[:I N/A[:]
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment YEN[l  UEl free of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
YE N U[:I N/A[:]
: 11. Have you looked for and found no other seismic conditions that   YE NEI UFI could adversely affect the safety functions of the equipment?
YEN[l UEl Other Adverse Conditions
Page 373 of 907 R1
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YE NEI UFI Page 373 of 907 R1


Sheet 5 of 5 Seismic Walkdown Checklist (SWC)
Sheet 5 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Comments (Additional pages may be added as necessary)
Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Comments (Additional pages may be added as necessary)
Evaluated by: Josh Best                                 Date:3/25/2013 Jason Black                                    3/25/2013 Page 374 of 907 R1
Evaluated by: Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 374 of 907 R1


Sheet 1 of 5 Status: Y ENE]ULI Seismic Walkdown Checklist (SWC)
Sheet 1 of 5 Status: Y ENE]ULI Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-FCV-001-0038         Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve Location: Bldg. U2-RB Floor El. 565 Room, Area 131, Steam Vault Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve Location: Bldg. U2-RB Floor El. 565 Room, Area 131, Steam Vault Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchoraqe
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchoraqe
: 1. Is the anchorage configuration verification required (i.e., is Y E NE the item one of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is Y E N E the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose         Y [L] N [] U [] N/A Z hardware?
: 2. Is the anchorage free of bent, broken, missing or loose Y [L] N [] U [] N/A Z hardware?
3Enter the equipment class name from Appendix B, Classes of Equipment.
3Enter the equipment class name from Appendix B, Classes of Equipment.
Page 375 of 907 R1
Page 375 of 907 R1


Sheet 2 of 5 Seismic Walkdown Checklist (SWC) 3 Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 7 Equipment Description MSIV "C" Outboard Isolation Valve Anchorage (Continued)
Sheet 2 of 5 Seismic Walkdown Checklist (SWC)
: 3. Is the anchorage free of corrosion that is more than mild   Y [-N [] U El N/A Z surface oxidation?
Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve Anchorage (Continued)
: 4. Is the anchorage free of visible cracks in the concrete near Y ON EI U 0 N/A 2 the anchors?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 5. Is the anchorage configuration consistent with plant       Y EN  El U F1 N/A 0 documentation? (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Page 376 of 907 R1
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y [-N [] U El N/A Z Y ON EI U 0 N/A 2 Y EN El U F1 N/A 0 Page 376 of 907 R1


Sheet 3 of 5 Seismic Walkdown Checklist (SWC)
Sheet 3 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve
Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve
: 6. Based on the above anchorage evaluations, is the                 YON [:1U [-
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
anchorage free of potentially adverse seismic conditions?
YON [:1U [-
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or             YON[l  ULI N/A[l structures?
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and       YO NEJ U[-- N/A-lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Page 377 of 907 R1
YON[l ULI N/A[l YO NEJ U[-- N/A-Page 377 of 907 R1


Sheet 4 of 5 Seismic Walkdown Checklist (SWC) 3 Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 7 Equipment Description MSIV "C" Outboard Isolation Valve Interaction Effects (Continued)
Sheet 4 of 5 Seismic Walkdown Checklist (SWC)
: 9. Do attached lines have adequate flexibility to avoid damage?     YI N  u[:l N/A[-]
Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 37 Equipment Description MSIV "C" Outboard Isolation Valve Interaction Effects (Continued)
: 10. Based on the above seismic interaction evaluations, is equipment YEN[:] U--
: 9. Do attached lines have adequate flexibility to avoid damage?
free of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YI N u[:l N/A[-]
YEN[:] U--
Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that   YO NLuEIjU could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Page 378 of 907 R1
YO NLuEIjU Page 378 of 907 R1


Sheet 5 of 5 Seismic Walkdown Checklist (SWC)
Sheet 5 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve Comments (Additional pages may be added as necessary)
Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve Comments (Additional pages may be added as necessary)
Evaluated by: Josh Best                                 Date:3/25/2013 Jason Black                                    3/25/2013 Page 379 of 907 R1
Evaluated by: Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 379 of 907 R1


Sheet 1 of 5 Status: Y ZNE] UF Seismic Walkdown Checklist (SWC)
Sheet 1 of 5 Status: Y ZNE] UF Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0019         Equipment Class 3 7 Equipment Description MSRV Location: Bldg. U2 RB Floor El. 585 Room, Area 132, Drywell Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Location: Bldg. U2 RB Floor El. 585 Room, Area 132, Drywell Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage
: 1. Is the anchorage configuration verification required (i.e., is Y [IN 0 the item one of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose         Y [:NEl U ElN/A hardware?
Y [IN 0
3Enter the equipment class name from Appendix B, Classes of Equipment.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Page 550 of 907                                           R1
Y [:NEl U ElN/A 3Enter the equipment class name from Appendix B, Classes of Equipment.
Page 550 of 907 R1


Sheet 2 of 5 Seismic Walkdown Checklist (SWC)
Sheet 2 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Anchorage (Continued)
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Anchorage (Continued)
: 3. Is the anchorage free of corrosion that is more than mild   YIZIN ElUEl N/AZ surface oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near YEFNEII uf[I N/AE the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant         YEIN F1 U E N/A 0 documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Page 551 of 907 R1
YIZIN ElUEl N/A Z YEFNEII uf[I N/A E YEIN F1 U E N/A 0 Page 551 of 907 R1


Sheet 3 of 5 Seismic Walkdown Checklist (SWC)
Sheet 3 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV
: 6. Based on the above anchorage evaluations, is the                 Y ON [:U Ej anchorage free of potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Interaction Effects
Y ON [:U Ej Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or               YON[:  ULI N/AE--
: 7. Are soft targets free from impact by nearby equipment or structures?
structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and       YZ NEI U-] N/A[--
YON[: ULI N/AE--
lighting, and masonry block walls not likely to collapse onto the equipment?
YZ NEI U-] N/A[--
R1 Page 552 of 907
R1 Page 552 of 907


Sheet 4 of 5 Seismic Walkdown Checklist (SWC)
Sheet 4 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Interaction Effects (Continued)
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Interaction Effects (Continued)
: 9. Do attached lines have adequate flexibility to avoid damage?     YO N  UE-- N/A[:]
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment YEN[:] U[:
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
free of potentially adverse seismic interaction effects?
YO N UE-- N/A[:]
YEN[:] U[:
Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that   YO NEI UFl could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Page 553 of 907                               R1
YO NEI UFl Page 553 of 907 R1


Sheet 5 of 5 Seismic Walkdown Checklist (SWC)
Sheet 5 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Comments (Additional pages may be added as necessary)
Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 37 Equipment Description MSRV Comments (Additional pages may be added as necessary)
Evaluated by: Josh Best                                 Date:3/25/2013 Jason Black                                    3/25/2013 Page 554 of 907                         R1
Evaluated by: Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 554 of 907 R1


Sheet 1 of 5 Status: Y ENEDU D Seismic Walkdown Checklist (SWC)
Sheet 1 of 5 Status: Y ENEDU D Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0034         Equipment Class   3 7 Equipment Description MSRV Location: Bldg. U2 RB Floor El. 585 Room, Area 133, Drywell Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV Location: Bldg. U2 RB Floor El. 585 Room, Area 133, Drywell Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage
: 1. Is the anchorage configuration verification required (i.e., is   Y IZIN N the item one of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is Y IZIN N the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose         Y OIN 0i U [] N/A E hardware?
: 2. Is the anchorage free of bent, broken, missing or loose Y OIN 0i U [] N/A E hardware?
3Enter the equipment class name from Appendix B, Classes of Equipment.
3Enter the equipment class name from Appendix B, Classes of Equipment.
Page 555 of 907                                           R1
Page 555 of 907 R1


Sheet 2 of 5 Seismic Walkdown Checklist (SWC)
Sheet 2 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 Z Equipment Description MSRV Anchorage (Continued)
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 Z Equipment Description MSRV Anchorage (Continued)
: 3. Is the anchorage free of corrosion that is more than mild   Y EI-N El U El N/A Z surface oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near Y rIN  El U [: N/A Z the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant         Y -N [--I U E-1N/A Z documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Page 556 of 907 R1
Y EI-N El U El N/A Z Y rIN El U [: N/A Z Y -N [--I U E-1N/A Z Page 556 of 907 R1


Sheet 3 of 5 Seismic Walkdown Checklist (SWC)
Sheet 3 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV
: 6. Based on the above anchorage evaluations, is the                 Y ON [:1 U [:]
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
anchorage free of potentially adverse seismic conditions?
Y ON [:1 U [:]
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or               YON[]I    ULI N/AD structures?
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and         YM NEI UE- N/A[:]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
lighting, and masonry block walls not likely to collapse onto the equipment?
YON[]I ULI N/AD YM NEI UE-N/A[:]
Page 557 of 907                                         R1
Page 557 of 907 R1


Sheet 4 of 5 Seismic Walkdown Checklist (SWC)
Sheet 4 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV Interaction Effects (Continued)
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV Interaction Effects (Continued)
: 9. Do attached lines have adequate flexibility to avoid damage?     YN N    ULI N/A[D]
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment YM N[I: U[-D free of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
YN N ULI N/A[D]
: 11. Have you looked for and found no other seismic conditions that   YN NEII u-Il could adversely affect the safety functions of the equipment?
YM N[I:
Page 558 of 907 R1
U[-D Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YN NEII u-Il R1 Page 558 of 907


Sheet 5 of 5 Seismic Walkdown Checklist (SWC)
Sheet 5 of 5 Seismic Walkdown Checklist (SWC)
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV Comments (Additional pages may be added as necessary)
Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV Comments (Additional pages may be added as necessary)
Evaluated by: Josh Best                                 Date:3/25/2013 Jason Black                                    3/25/2013 Page 559 of 907                         R1
Evaluated by: Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 559 of 907 R1


NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Appendix F: AWCs The following signatures are provided for the engineers responsible for the Area Walk-By Checklists that were performed during the Unit 2 outage March 25, 2013. The walk-bys performed during the outage include:
NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Appendix F: AWCs The following signatures are provided for the engineers responsible for the Area Walk-By Checklists that were performed during the Unit 2 outage March 25, 2013. The walk-bys performed during the outage include:
2-RB-EL565-130 2-RB-EL565-131 2-RB-EL585-132 2-RB-EL585-133 Name                                     Signature                             Date Jason Black Josh Best                                                                     =  _
2-RB-EL565-130 2-RB-EL565-131 2-RB-EL585-132 2-RB-EL585-133 Name Signature Date Jason Black Josh Best 2 /.5
2/.5_ __
=
RI Page 714-1 of 907
RI Page 714-1 of 907


Sheet 1 of 4 Status: YZ0 NE] U 0 2-RB-EL565-130 Area Walk-By Checklist (AWC)
Sheet 1 of 4 Status: YZ0 NE] U 0 2-RB-EL565-130 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB       Floor El. 565 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
Location: Bldg. U2 RB Floor El. 565 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable
Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable
: 1. Does anchorage of equipment in the area appear to be free               Y[EN El UEl N/A [
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free               Y ZN [_1 U [:1 N/A   ED of significant degraded conditions?
Y[EN El U El N/A [
4If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Y ZN [_1 U [:1 N/A ED 4If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Page 847-1 of 907 R1
Page 847-1 of 907 R1


Sheet 2 of 4 2-RB-EL565-1 30 Area Walk-By Checklist (AWC)
Sheet 2 of 4 2-RB-EL565-1 30 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB     Floor El. 565 Area 4 Drywell
Location: Bldg. U2 RB Floor El. 565 Area 4 Drywell
: 3. Based on a visual inspection from the floor, do the             YO*N [:1 U [] N/A [--I cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y  N-I U El N/AZ1
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y ON [1 UEI N/A [:
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
Page 847-2 of 907                                     R1
YO*N [:1 U [] N/A [--I Y
N-I U El N/AZ1 Y ON [1 UEI N/A [:
Page 847-2 of 907 R1


Sheet 3 of 4 2-RB-EL565-130 Area Walk-By Checklist (AWC)
Sheet 3 of 4 2-RB-EL565-130 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB       Floor El. 565 Area 4 Drywell
Location: Bldg. U2 RB Floor El. 565 Area 4 Drywell
: 6. Does it appear that the area is free of potentially adverse   Y [NL[I1UEl N/A E seismic interactions that could cause a fire in the area?
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
: 7. Does it appear that the area is free of potentially adverse   Y NN ElU [1N/A E seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Temporary outage scaffolding was located above and below the MSIV.
Temporary outage scaffolding was located above and below the MSIV.
This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSIV.
This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSIV.
: 8. Have you looked for and found no other seismic conditions     YEN[:1 UEl1 that could adversely affect the safety functions of the equipment in the area?
Y [NL[I1UEl N/A E Y NN ElU [1N/A E
Page 847-3 of 907 R1
: 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
YEN[:1 UEl1 Page 847-3 of 907 R1


Sheet 4 of 4 2-RB-EL565-130 Area Walk-By Checklist (AWC)
Sheet 4 of 4 2-RB-EL565-130 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB   Floor El. 565 Area 4 Drywell Comments (Additional pages may be added as necessary)
Location: Bldg. U2 RB Floor El. 565 Area 4 Drywell Comments (Additional pages may be added as necessary)
Equipment associated with this AWC:
Equipment associated with this AWC:
BFN-2-FCV-001-0026 Evaluated by:Josh Best                                     Date:3/25/2013 Jason Black                                      3/25/2013 Page 847-4 of 907                         R1
BFN-2-FCV-001-0026 Evaluated by:Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 847-4 of 907 R1


Sheet 1 of 4 Status: Y Z NEI     UEl 2-RB-EL565-131 Area Walk-By Checklist (AWC)
Sheet 1 of 4 Status: Y Z NEI UEl 2-RB-EL565-131 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB       Floor El. 565 Area 4 Steam Vault Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
Location: Bldg. U2 RB Floor El. 565 Area4 Steam Vault Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable
Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable
: 1. Does anchorage of equipment in the area appear to be free               Y ONF1 U [1N/A [3 of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free               Y ON F1 U F1 N/A [E]
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
of significant degraded conditions?
Y ONF1 U [1N/A [3 Y ON F1 U F1 N/A [E]
"Ifthe room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
"If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Page 847-5 of 907                                                   R1
Page 847-5 of 907 R1


Sheet 2 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)
Sheet 2 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB     Floor El. 565 Area 4 Steam Vault
Location: Bldg. U2 RB Floor El. 565 Area 4 Steam Vault
: 3. Based on a visual inspection from the floor, do the             Y ON El U El N/A Er cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 4. Does it appear that the area is free of potentially adverse     Y0ON El U [_1 N/A1 seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse   Y NN [] U El N/A[
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
seismic interactions that could cause flooding or spray in the area?
Y ON El U El N/A Er Y0ON El U [_1 N/A1 Y NN [] U El N/A[
R1 Page 847-6 of 907
R1 Page 847-6 of 907


Sheet 3 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)
Sheet 3 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB     Floor El. 565 Area 4 Steam Vault
Location: Bldg. U2 RB Floor El. 565 Area 4 Steam Vault
: 6. Does it appear that the area is free of potentially adverse Y ENEl  UEl  N/A [:
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
seismic interactions that could cause a fire in the area?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse Y EN E U EII N/A El seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Temporary outage scaffolding was located above the MSIV. This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSIV.
Temporary outage scaffolding was located above the MSIV. This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSIV.
: 8. Have you looked for and found no other seismic conditions   Y [KN E- U [-
Y ENEl UEl N/A [:
that could adversely affect the safety functions of the equipment in the area?
Y EN E U EII N/A El
: 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
Y [KN E-U [-
Page 847-7 of 907 R1
Page 847-7 of 907 R1


Sheet 4 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)
Sheet 4 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB   Floor El. 565 Area 4 Steam Vault Comments (Additional pages may be added as necessary)
Location: Bldg. U2 RB Floor El. 565 Area 4 Steam Vault Comments (Additional pages may be added as necessary)
Equipment associated with this Area Walk-by Checklist:
Equipment associated with this Area Walk-by Checklist:
BFN-2-FCV-001 -0038 Evaluated by:Josh Best                                     Date:3/25/2013 Jason Black                                        3/25/2013 Page 847-8 of 907 R1
BFN-2-FCV-001 -0038 Evaluated by:Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 847-8 of 907 R1


Sheet 1 of 4 Status: Y Z   N ] U[ZJ 2-RB-EL585-132 Area Walk-By Checklist (AWC)
Sheet 1 of 4 Status: Y Z N ]
Location: Bldg. U2 RB         Floor El. 585 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
U[ZJ 2-RB-EL585-132 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.
The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.
Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable
Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable
: 1. Does anchorage of equipment in the area appear to be free               Y ON    El U F1 N/A[]
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free               Y ON El U -- N/A []
Y ON El U F1 N/A[]
of significant degraded conditions?
Y ON El U -- N/A []
4 1f the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
4 1f the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Page 847-9 of 907 R1
Page 847-9 of 907 R1


Sheet 2 of 4 2-RB-EL585-132 Area Walk-By Checklist (AWC)
Sheet 2 of 4 2-RB-EL585-132 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB     Floor El. 585 Area 4 Drywell
Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell
: 3. Based on a visual inspection from the floor, do the             YZN ElU ElN/A E cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 4. Does it appear that the area is free of potentially adverse     Y EN EUEl N/A E seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse   YZN ElU E1N/A El seismic interactions that could cause flooding or spray in the area?
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
Page 847-10 of 907 R1
YZN ElU ElN/A E Y EN EUEl N/A E YZN ElU E1N/A El Page 847-10 of 907 R1


Sheet 3 of 4 2-RB-EL585-132 Area Walk-By Checklist (AWC)
Sheet 3 of 4 2-RB-EL585-132 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB       Floor El. 585 Area 4 Drywell
Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell
: 6. Does it appear that the area is free of potentially adverse   YON EI  U El  N/A [Z seismic interactions that could cause a fire in the area?
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
: 7. Does it appear that the area is free of potentially adverse   Y ON [I U [-] N/A I1 seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Temporary outage scaffolding was located above and below the MSRV.
Temporary outage scaffolding was located above and below the MSRV.
This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSRV.
This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSRV.
: 8. Have you looked for and found no other seismic conditions     Y ZN [I U [1 that could adversely affect the safety functions of the equipment in the area?
YON EI U El N/A [Z Y ON [I U [-] N/A I1
Page 847-11 of 907                                     R1
: 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
Y ZN [I U [1 Page 847-11 of 907 R1


Sheet 4 of 4 2-RB-EL585-1 32 Area Walk-By Checklist (AWC)
Sheet 4 of 4 2-RB-EL585-1 32 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB   Floor El. 585 Area 4 Drywell Comments (Additional pages may be added as necessary)
Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell Comments (Additional pages may be added as necessary)
Equipment associated with this Area Walk-By Checklist:
Equipment associated with this Area Walk-By Checklist:
BFN-2-PCV-001-0019 Evaluated by:Josh Best                                       Date:3/25/2013 Jason Black                                        3/25/2013 Page 847-12 of 907                         R1
BFN-2-PCV-001-0019 Evaluated by:Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 847-12 of 907 R1


Sheet 1 of 4 Status: Y Z N E] U f 2-RB-EL585-133 Area Walk-By Checklist (AWC)
Sheet 1 of 4 Status: Y Z N E] U f 2-RB-EL585-133 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB       Floor El. 585 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable
Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable
: 1. Does anchorage of equipment in the area appear to be free               YEN [] U E N/A[-Z of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free               YE*N [-]U L N/A E1 of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
4If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
YEN [] U E N/A[-Z YE*N [-]U L N/A E1 4If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
R1 Page 847-13 of 907
R1 Page 847-13 of 907


Sheet 2 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)
Sheet 2 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB     Floor El. 585 Area 4 Drywell
Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell
: 3. Based on a visual inspection from the floor, do the             YON El U EII N/AZE cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 4. Does it appear that the area is free of potentially adverse     Y ON ElU [1 N/A E seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse   Y ONEl UEl N/A [:
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
seismic interactions that could cause flooding or spray in the area?
YON El U EII N/AZE Y ON ElU [1 N/A E Y ONEl UEl N/A [:
Page 847-14 of 907                                   R1
Page 847-14 of 907 R1


Sheet 3 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)
Sheet 3 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB       Floor El. 585 Area 4 Drywell
Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell
: 6. Does it appear that the area is free of potentially adverse   Y ON El U El N/A El seismic interactions that could cause a fire in the area?
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
: 7. Does it appear that the area is free of potentially adverse   Y ON E- U El N/A El seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Temporary outage scaffolding was located above and below the MSRV.
Temporary outage scaffolding was located above and below the MSRV.
This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSRV.
This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSRV.
: 8. Have you looked for and found no other seismic conditions     Y ON 0 U F that could adversely affect the safety functions of the equipment in the area?
Y ON El U El N/A El Y ON E-U El N/A El
Page 847-15 of 907                                   R1
: 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
Y ON 0 U F Page 847-15 of 907 R1


Sheet 4 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)
Sheet 4 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)
Location: Bldg. U2 RB   Floor El. 585 Area 4 Drywell Comments (Additional pages may be added as necessary)
Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell Comments (Additional pages may be added as necessary)
Equipment associated with this Area Walk-By Checklist:
Equipment associated with this Area Walk-By Checklist:
BFN-2-PCV-001 -0034 Evaluated by:Josh Best                                       Date:3/25/2013 Jason Black                                        3/25/2013 Page 847-16 of 907                         R1
BFN-2-PCV-001 -0034 Evaluated by:Josh Best Jason Black Date:3/25/2013 3/25/2013 R1 Page 847-16 of 907


NTTF 2.3/BFN-02, R1 April 3, 2013 Page 7 of 7 full concurrence with all of the potential adverse seismic conditions summarized in Section 6.2 of the BFN2 Seismic Response Report.
NTTF 2.3/BFN-02, R1 April 3, 2013 Page 7 of 7 full concurrence with all of the potential adverse seismic conditions summarized in Section 6.2 of the BFN2 Seismic Response Report.
Comments regarding the individual potential adverse seismic conditions for BFN1 include the following:
Comments regarding the individual potential adverse seismic conditions for BFN1 include the following:
    " Potentially Adverse Seismic Condition 1 addresses cracking of the concrete base pad for strainer 0-STN-067-0926. Based on the configuration including attached piping as well as other anchors and pedestal, it was judged that there was sufficient margin for the strainer to withstand a design basis earthquake. The walkdown team noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to repair the crack so that no further damage will occur to the concrete.
" Potentially Adverse Seismic Condition 1 addresses cracking of the concrete base pad for strainer 0-STN-067-0926. Based on the configuration including attached piping as well as other anchors and pedestal, it was judged that there was sufficient margin for the strainer to withstand a design basis earthquake. The walkdown team noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to repair the crack so that no further damage will occur to the concrete.
    "  Potentially Adverse Seismic Condition 2 addresses a missing safety cage for an interior light for 2-PNLA-009-0015. The walkdown team determined that the florescent light bulb could dislodge during a seismic event and impact soft targets inside the panel. This does not appear to be credible due to the interfering cabling and other components inside of the panel. The walkdown team conservatively noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to reinstall the missing cage.
Potentially Adverse Seismic Condition 2 addresses a missing safety cage for an interior light for 2-PNLA-009-0015. The walkdown team determined that the florescent light bulb could dislodge during a seismic event and impact soft targets inside the panel. This does not appear to be credible due to the interfering cabling and other components inside of the panel. The walkdown team conservatively noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to reinstall the missing cage.
* Potentially Adverse Seismic Condition 3 addresses a missing safety cage for an interior light for 2-PNLA-009-0005. The walkdown team determined that the florescent light bulb could dislodge during a seismic event and impact soft targets inside the panel. This does not appear to be credible due to the interfering cabling and other components inside of the panel. The walkdown team conservatively noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to reinstall the missing cage.
Potentially Adverse Seismic Condition 3 addresses a missing safety cage for an interior light for 2-PNLA-009-0005. The walkdown team determined that the florescent light bulb could dislodge during a seismic event and impact soft targets inside the panel. This does not appear to be credible due to the interfering cabling and other components inside of the panel. The walkdown team conservatively noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to reinstall the missing cage.
SUBMITTAL REPORT The peer review team has reviewed the BFN2 submittal report in detail, including the additional       IR1 walkdown evaluations performed during the March refueling outage, and we are in full concurrence with the documented observations and findings. The report is in compliance with the guidance in EPRI Report 1025286, and meets the requirements and objectives of the NRC 50.54 (f) letter.
SUBMITTAL REPORT The peer review team has reviewed the BFN2 submittal report in detail, including the additional I R1 walkdown evaluations performed during the March refueling outage, and we are in full concurrence with the documented observations and findings. The report is in compliance with the guidance in EPRI Report 1025286, and meets the requirements and objectives of the NRC 50.54 (f) letter.
In our opinion, the potential adverse seismic conditions identified by the program are in general only minor issues, and this is a reflection of the adequate seismic design criteria as well as sufficiently rigorous seismic-related construction and maintenance procedures that TVA has in place at BFN2. The walkdown demonstrates that the current plant configuration is in compliance with the current seismic licensing basis. Furthermore, the walkdown demonstrates that that TVA has maintained or improved the seismic IPEEE HCLPF capacity of the plant.
In our opinion, the potential adverse seismic conditions identified by the program are in general only minor issues, and this is a reflection of the adequate seismic design criteria as well as sufficiently rigorous seismic-related construction and maintenance procedures that TVA has in place at BFN2. The walkdown demonstrates that the current plant configuration is in compliance with the current seismic licensing basis. Furthermore, the walkdown demonstrates that that TVA has maintained or improved the seismic IPEEE HCLPF capacity of the plant.
Sincerely, John 0. Dizon, P.E.                                           Stephen J. Eder, P.E.
Sincerely, John 0. Dizon, P.E.
Lead Peer Reviewer                                             Peer Reviewer Page 907 of 907 FACILITY RISK CONSULTANTS, INC.}}
Stephen J. Eder, P.E.
Lead Peer Reviewer Peer Reviewer Page 907 of 907 FACILITY RISK CONSULTANTS, INC.}}

Latest revision as of 07:17, 11 January 2025

Tennessee Valley Authority - Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant, Unit 2 Seismic Walkdown
ML13183A058
Person / Time
Site: Browns Ferry 
Issue date: 06/28/2013
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13183A058 (66)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 June 28, 2013 10 CFR 50.54(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Facility Operating License No. DPR-52 NRC Docket No. 50-260

Subject:

Tennessee Valley Authority - Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant, Unit 2 Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012
2. TVA Letter to NRC, "Tennessee Valley Authority (TVA) - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant Seismic Walkdown Results for Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 27, 2012 On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Near Term Task Force (NTTF) Recommendation 2.3: Seismic.

In Reference 2, the Tennessee Valley Authority (TVA) provided the Browns Ferry Nuclear Plant (BFN) seismic walkdown reports in accordance with the NRC Request for Information (Reference 1). The BFN seismic walkdown reports documented the plant walkdowns performed to identify and address plant-specific vulnerabilities and verify the adequacies of Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 June 28, 2013 monitoring and maintenance procedures. In Section 5.1 of Enclosure 2 to Reference 2, TVA identified 4 pieces of BFN, Unit 2, equipment that could not be walked down due to being inaccessible during reactor power operations. TVA committed in Reference 2 to complete seismic walkdowns for these 4 pieces of equipment in the BFN, Unit 2, spring of 2013 refueling outage. TVA has completed these remaining seismic walkdowns.

The purpose of this letter is to provide the results of the completed BFN, Unit 2, walkdown inspections performed for the 4 pieces of equipment identified in Reference 2. Specifically, the Enclosure of this letter provides the updated Seismic Walkdown Report for BFN, Unit 2.

Pages 3, 4, 10, 11, 14, 15, 110, 111, 113, 370to 379, 550to 559 and 907 of the Enclosure to this letter have been revised to include the results for these walkdowns and these pages supersede those pages submitted in Enclosure 2 to Reference 2. The remaining pages of the Enclosure to this letter (pages 2-1, 113-1, 714-1, and 847-1 to 847-16) are new and added to the report to document these additional walkdowns. There were no degraded, nonconforming, or unanalyzed conditions that required either immediate or follow-up actions identified as a result of these additional seismic walkdowns at BFN, Unit 2.

There are no new regulatory commitments contained in this letter. If you have questions regarding this matter, please contact Kevin Casey at (423) 751-8523.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of June 2013.

Respe

Ily, J V~6ea ice\\- resident, Nuclear Licensing

Enclosure:

Browns Ferry Nuclear Plant, Unit 2, Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report cc (Enclosure):

NRC Regional Administrator - Region II NRR Director - NRC Headquarters NRR Project Manager - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Browns Ferry Nuclear Plant

ENCLOSURE BROWNS FERRY NUCLEAR PLANT, UNIT 2 FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2: SEISMIC RESPONSE REPORT

BROWNS FERRY NUCLEAR PLANT - UNIT 2 FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.3: SEISMIC RESPONSE REPORT 16-April-2013 WorleyParsons 633 Chestnut St. Suite 400 Chattanooga TN, 37450 Tel: 423-757-8020 Fax: 423-757-5869 www.worleyparsons.com WorleyParsons Services Pty Ltd ABN 61 001 279 812

© Copyright 2012 WorleyParsons Services Pty Ltd

NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 REV DESCRIPTION I

BFN Unit 2 Selsm(I Walkdown Report ORIG REVIEW WORLEY-DATE CLIENT DATE PARSONS APPROVAL APPROVAL

~/I&NIY 7

Z" A

0 4/7-3 / ZC (

Page 2 of 907

REVISION LOG

Title:

Browns ferry Nuclear Plant - Unit 2 Fukushima Near-Term Task Force Recommendation2.3: Seismic Response Report Revision DESCRIPTION OF REVISION Date No.

Approved 0

Initial Issue 16-Nov-2012 16-Apr-2013 1

Revision to add additional walkdowns for inaccessible equipment that was identified in Rev. 0 of this report. Walkdowns performed during BFN Unit 2 refueling outage.

Also, revision to Appendix G: Peer Review Report.

Added page numbers: 2-1, 113-1, 714-1, and 847-1 through 847-16 Revised page numbers: 3-4, 10-11, 14-15, 110-111, 113, 370-379, 550-559, and 907 TVA 10534 [8-19951 Page 2-1 of 907

i*I NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Table of Contents

1) Executive Sum m ary.......................................................................................................

4

2) Seism ic Licensing Basis....................................................................................................

5 2.1 General Plant Description.............................................................................................

5 2.2 G round Response Spectra...........................................................................................

5 2.3 Structures.........................................................................................................................

8 2.4 Equipm ent........................................................................................................................

8 2.5 Seism ic Spatial System Interactions.............................................................................

9

3) Personnel Q ualifications.................................................................................................

10 3.1 Equipm ent Selection Personnel..................................................................................

10 3.2 Seism ic W alkdown Engineers.....................................................................................

10 3.3 Licensing Basis Reviewers........................................................................................

10 3.4 IPEEE Reviewers......................................................................................................

11 3.5 Peer Review Team......................................................................................................

11

4) Selection of Structures, System s, and Com ponents (SSCs).............................................

12 4.1 SW EL Selection...............................................................................................................

12 4.2 SW EL Analysis................................................................................................................

13

5) Seism ic W alkdowns and Area W alk-Bys...........................................................................

14 5.1 Seism ic W alkdown Checklists....................................................................................

14 5.2 SW C Sum m ary & AW C Sum m ary.............................................................................

15

6) Licensing Basis Evaluations..............................................................................................

16 6.1 Licensing Basis Calculations......................................................................................

16 6.2 Potentially Seism ically Adverse Conditions..................................................................

16

7) IPEEE Vulnerabilities Resolution Report...........................................................................

18 7.1 IPEEE Description......................................................................................................

18 7.2 IPEEE Findings and Vulnerabilities.............................................................................

18

8) Peer Review.........................................................................................................................

19

9) References...........................................................................................................................

20

10) Appendices.........................................................................................................................

21 Appendix A: Resum es.........................................................................................................

22 Appendix B: Base List 1........................................................................................................

57 Appendix C: Base List 2......................................................................................................

83 Appendix D: SW ELs and Areas..............................................................................................

109 Appendix E: SW Cs.............................................................................................................

113-1 Appendix F: AW Cs..............................................................................................................

714-1 R1 Appendix G : Peer Review Report............................................................................................

900 Page 3 of 907

hi*

NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2

1) Executive Summary As a result of the Fukushima Daiichi Nuclear Power Plant accident, the United States (U.S.) Nuclear Regulatory Commission (NRC) required all U.S. nuclear power plants to perform seismic walkdowns to identify and address degraded, non-conforming or unanalyzed conditions and to verify the current plant configuration with the current seismic licensing basis. The NRC Near-Term Task Force (NTTF) issued a report (Reference 1) that made a series of recommendations. Subsequently, the NRC issued a 50.54(f) Letter (Reference 2) that requests information to assure that these recommendations are addressed by all U.S. nuclear power plants. This report provides guidance for conducting a seismic walkdown as required in the 50.54(f) Letter,, Recommendation 2.3: Seismic.

In support of conducting the NTTF-2.3 Seismic Walkdowns, the Electrical Power Research Institute (EPRI) issued a report entitled Seismic Walkdown Guidance (Reference 3) to provide instruction for uniform seismic walkdowns of all U.S. nuclear power plants. This document also includes guidance for reporting the findings of the required walkdowns.

At Unit 2 of the Browns Ferry Nuclear Plant (BFN), a total of 120 items, general Seismic Category 1, were selected from the original Individual Plant Examination for External Events (IPEEE) Safe Shutdown Equipment List (SSEL) to fulfill the requirements of the NTTF-2.3 Seismic Walkdowns. The selected equipment was located in various environments and included many different types of equipment from multiple safety systems. A total of 50 areas were included for area walk-bys. The equipment walkdowns and area walk-bys were performed by seven walkdown engineers organized in teams consisting of two walkdown engineers and operations personnel, between July 9, 2012 and March 25, 2013.

Of the 120 equipment items in the Seismic Walkdown Equipment List (SWEL), 120 were completed during the walkdown phase. Three potential adverse seismic conditions were found and addressed through the Tennessee Valley Authority (TVA) Corrective R1 Action Program (CAP).

Page 4 of 907

Til NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2

2) Seismic Licensing Basis The seismic licensing basis for the BFN is derived from Reference 4 - BFN FSAR.

2.1 General Plant Description The BFN site is located on the north shore of Wheeler Lake at river mile 294 in Limestone County in north Alabama. The site is approximately 10 miles southwest of Athens, Alabama, and 10 miles northwest of the center of Decatur, Alabama. The plant consists of three General Electric (GE) boiling water reactors with Mark I containments, each with an electrical output of about 1,100 megawatts. Commercial operation of each unit began on the following dates: Unit 1 on August 1, 1974, Unit 2 on March 1, 1975, and Unit 3 on March 1, 1977.

2.2 Ground Response Spectra The BFN licensing-basis Operating Basis Earthquake (OBE) and Design Basis Earthquake (DBE) ground motion acceleration response spectra are defined in Sections 2.5.4 and 12.2 of the BFN Final Safety Analysis Report (FSAR). The site design ground spectrum is that of a Housner shaped spectrum with horizontal peak ground acceleration (PGA) corresponding to the OBE is 0.10g and the DBE is 0.20g, defined at the top of the sound rock. Vertical ground motion is two-thirds of the horizontal ground motion as specified in the FSAR. Figure 1 shows the OBE and Figure 2 shows the DBE input spectra with various damping.

Page 5 of 907

NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT SITE DESIGN SPECTRUM OPERATIONAL BASIS EARThQUAKE HORIZOUTAL FIGURE 2.5-8 AMENDMENT 16 Figure 1 - Site Design Spectrum Operating Basis Earthquake Page 6 of 907

NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT SITE DESLGN SPECTRUM DESIGN1 BASIS EaXTQqUA'/

HORIZOWTAL FIGURE 2.5-9 AMENDMENT 16 Figure 2 - Site Design Spectrum Design Basis Earthquake Page 7 of 907

hNTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 2.3 Structures The design of all structures and facilities (Class I & II) conformed to the applicable general codes or specifications such as Uniform Building Code (UBC); American Institute of Steel Construction (AISC); "Specification for the Design, Fabrication, and Erection of Structural Steel for Buildings"; American Concrete Institute (ACI) "Building Code Requirements for Reinforced Concrete" (ACI 318-71), "Requirements for Reinforced Concrete" (ACI 318-71), "Requirements for Reinforced Concrete Chimneys" (ACI 907); and American Welding Society (AWS) "Structural Welding Code - Steel" (AWS-D.1.1), among others.

Seismic requirements for Class I structures, features, and systems are contained in TVA General Design Criteria BFN-50-C-7102. The design of Class I structures was based on the following criteria:

OBE considered a horizontal ground acceleration of 0.10g.

DBE considered a horizontal ground acceleration of 0.20g Vertical ground accelerations associated with the OBE and DBE were defined as 2/3 of the corresponding horizontal response spectra.

Class I structures, equipment and safety-related piping were designed such that stress and deformation behavior of structures, piping, and equipment were maintained within the allowable limits when subjected to loads such as dead, live, pressure, and thermal, under normal operating conditions combined with the seismic effects resulting from the response to the OBE. These allowable limits are defined in appropriate design standards such as the American Society of Mechanical Engieers (ASME) Boiler and Pressure Vessel Code; American National Standards Institute (ANSI) Code for Pressure Piping ANSI B31.1.0, Power Piping; ACI 318 Building Code Requirements for Reinforced Concrete; the AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings. In addition, the stresses that resulted from normal loads and design basis loss-of-coolant accident loads combined with the response to the DBE were limited so that no loss of function occurred and the capability of making a safe and orderly plant shutdown was maintained.

2.4 Equipment GE designed, fabricated, and supplied the nuclear steam supply system (NSSS),

turbine-generators, as well as the nuclear fuel for the plant. GE also provided technical supervision for the installation and startup services of this equipment. In general, the modules were designed to withstand and perform their functions during an OBE and a DBE. This qualification was ascertained by either analytical techniques, vibration testing techniques, or a combination of the two. A seismic specification covering the following procedure was made a part of the purchase order.

Page 8 of 907

pm, NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 All the Class I instrumentation and electrical equipment were designed and tested or analyzed to ensure their capability to perform their required functions during and after the DBE. This includes equipment made by GE as well as that purchased by GE.

Suppliers of Class I equipment were required to verify the adequacy of their equipment by submitting test, analytical, or operating experience data. Typically, equipment supplied as part of the original design is in compliance with Institute of Electrical and Electronics Engineers (IEEE)-344-71 requirements.

In addition, BFN was identified as one of the operating plants to be reviewed for the NRC Unresolved Safety Issue (USI) A-46 requirements. As such, plant-specific verification of the seismic adequacy of selected safe shutdown equipment items (SSEL

- Safe Shutdown Equipment List) has been performed as part of the Unresolved Safety Issue (USI) A-46 resolution (Reference 5).

Furthermore, the use of A-46 criteria and methods in accordance with the implementation guidelines provided in References 7 and 8 has been included as an alternate approach for the seismic qualification of new equipment and replacements for existing equipment (Appendix C, Reference 9).

2.5 Seismic Spatial System Interactions The BFN has a seismic categorization similar to Regulatory Guide 1.29, using the terminology of Class I and Class I1. The term Il/I is used to describe physical conditions where Class II components are located above or in proximity to Class I components.

Seismic induced spray refers to the possible breach of a fluid pressure boundary due to its own seismic response or its seismic interaction with other plant features. Seismic induced spray is a hazard when there are target Class I components, vulnerable to fluid spray, in the vicinity of the source.

A comprehensive "11/1" seismic interaction verification program was implemented as part of the BFN-1 Restart Project. Seismic spatial interactions (failure, falling, and impact) were evaluated for all SSEL items during the USI A-46 resolution program. Impact-related seismic interactions are further addressed by the TVA BFN Potential Clearance Discrepancy (PCD) evaluation program for piping clearance discrepancies of 3" and under. Seismic-induced spray evaluations were addressed by detailed walkdowns and bounding evaluations in accordance with TVA Design Criteria BFN-50-C-7306.

Page 9 of 907

iuE NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2

3) Personnel Qualifications The personnel qualification for all individuals involved in the execution of the Fukushima Near-Term Task Force Recommendation 2.3: Seismic can be found in this section. Full resumes for the listed individuals can be found in Appendix A of this document.

3.1 Equipment Selection Personnel The personnel involved in equipment selection and review are:

" Steve Gray, Retired Senior Reactor Operator (SRO) from BFN with extensive experience providing engineering support through all phases of the operating site.

Nicholas Pressler, Senior Structural Engineer with 7 years of experience, including 2 years of experience in the nuclear industry.

  • Jason Black - Associate Structural engineer with 1.5 years of engineering experience, including 1.5 years in the nuclear power industry.

3.2 Seismic Walkdown Engineers The personnel involved in performing the seismic walkdowns are:

Nicholas Pressler

" Patrick McCarraher, Senior Supervising Structural Engineer with over 38 years of engineering experience, including 15 years in the nuclear power industry.

Jeffry Lawrence, Mechanical Engineer II, Engineer in Training (E.I.T.) with five years of engineering experience, including two in the nuclear power industry.

Avinash Chunduri, Structural Engineer II with 6 years of engineering experience, including 1.5 years' experience in nuclear power industry.

George Bongart, Associate Civil Engineer with 9 months engineering experience.

" Jason Black

" James Edgar, Professional engineer in the state of Tennessee with 11 years of engineering experience including 2 years in the nuclear power industry.

" Josh Best - - Project Mechanical Engineer with 5 years engineering experience, R1 including 4 years in the nuclear power industry.

3.3 Licensing Basis Reviewer The personnel involved in performing the licensing basis reviews:

Steve Samaras, Site engineer at BFN with extensive experience providing engineering support for the operating site.

Page 10 of 907

3.4 IPEEE Reviewers NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 The personnel involved in reviewing IPEEE vulnerabilities are:

  • Josh Best

" Jason Black 3.5 Peer Review Team The personnel involved in the peer review process are:

John Dizon, Over 30 years of experience in the field of civil and structural engineering, earthquake engineering, risk assessment and project management.

" Steve Eder, Over 30 years of experience in the field of civil and structural engineering, project management, seismic engineering, risk management John Dizon is the Peer Review Team Leader.

I R1 Page 11 of 907

miu NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2

4) Selection of Structures, Systems, and Components (SSCs)

The selection of SSCs for the Recommendation 2.3 Seismic walkdowns followed the guideline provided in Reference 3 - The EPRI Seismic Walkdown Guidance. The SWELs and list of corresponding Area Walk-Bys for BFN Unit 2 can be found in Appendix D of this document.

4.1 SWEL Selection The development of SWEL 1 began with the integrated SSEL that was developed for the resolution of USI A-46 program and the implementation of IPEEE program for BFN Units 2 and 3 (References 5 and 6, respectively). This list was divided by unit, location, system, and equipment class. After separating the data into these categories, equipment was selected to represent the multiple equipment classes. Many of the suggested equipment classes that were listed in the EPRI guidance were not included in the original SSEL. In order to include all of the recommended classes of equipment, the scope of the selection was expanded to cover all Seismic Category 1 Safety Related equipment.

After a wide variety of environments and equipment classes were satisfied, each entry in the list was assigned to one of the five safety functions that support safe shutdown of the plant. Safety Function "0 - Support Function" was added in addition to the EPRI guidance to include equipment that does not perform one particular safety function but does support all five primary safety functions. These six safety functions are:

0. Support Functions
1. Reactor reactivity control
2. Reactor coolant pressure control
3. Reactor coolant inventory control
4. Decay heat removal
5. Containment function The SSEL developed during the USI A-46 program included one path to satisfy the five safety functions listed above. The seismic IPEEE required both a preferred path and an alternate path, so the USI A-46 SSEL was expanded accordingly. In some cases there are multiple systems involved in these safety functions. In these cases Systems, Structures and Components (SSC) from the redundant systems that were not part of USI A-46 were added to the SWEL 1. For instance, the Standby Liquid Cooling (SLC) system was not inspected during the USI A-46 program, and was added to the SWEL for that reason.

This categorized list is presented in Appendix B as Base List 1. After separating the data into the previously mentioned categories, a sample was selected from Base List 1 to represent all Special Considerations that were required by the EPRI Walkdown Page 12 of 907

iuN NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Guidance. Once safety functions were assigned, the equipment was reviewed and compared to plant documentation to locate any new or modified equipment. To account for high risk equipment in the walkdown process, the SWEL was compared to the Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) Rankings and any shared equipment was noted.

Some of the equipment classes that were listed in the EPRI walkdown guidance were not covered in the original SSEL, and therefore are not present in Base List 1.

However, in order to include all of the classes of equipment, the scope of the selection was expanded for these seismic walkdowns to include other Seismic Category 1 Safety Related equipment for the classes that were not previously covered.

The SWEL 1 represents the full list of equipment that was selected from Base List 1 and from the Category 1 equipment list. The SWEL 1 can be found in Appendix D.

Base List 2, presented in Appendix C, is a list of all spent fuel pool systems and equipment. SWEL 2 consists solely of equipment related to the Spent Fuel Pool at the site, including any equipment or system failure that could cause rapid drain-down of the pool and accidental exposures of fuel assemblies. The Spent Fuel Pool system was reviewed with the system engineers and it was determined that there is no path for rapid drain-down to occur. The full list of seismic category 1 SSC's was reviewed and it was determined that there were 5 pieces of equipment related to the spent fuel pool that were seismic category 1 and fit into one of the equipment categories. These pieces of equipment make up SWEL 2.

4.2 SWEL Analysis The combined SWEL for BFN Unit 2 consists of 120 items of equipment. The SWEL for BFN Unit 2 adequately addresses all criteria that were required for the selection of SSCs in the EPRI Seismic Walkdown Guidance. These criteria include a distribution of environments, systems, safety functions, and classes of equipment.

The following equipment addresses the new and improved equipment criteria for BFN Unit 2:

UNID BFN-2-PM P-076-0110 Description CNTMT ATM MON SYS ANLZR 2A SMPLRTN PMP Tablel. New/Improved Equipment H

Page 13 of 907

hNTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2

5) Seismic Walkdowns and Area Walk-Bys Guidance for performing the walkdowns and walk-bys required for Fukushima NTTF Recommendation 2.3 can be found in Reference 3 - The Electrical Power Research Institute's Seismic Walkdown Guidance.

The walkdowns and walk-bys were conducted in accordance with these guidelines and each was given a final status. If no issues were noted or housekeeping and minor maintenance issues were noted during a walkdown or walk-by, a YES status was given to the selected piece of equipment or area. If a potentially adverse seismic condition was noted, a NO status was given and the equipment was entered into the CAP to begin a functional evaluation. If equipment was inaccessible, or if a portion of an item of equipment was unobservable, an UNKNOWN status was given.

5.1 Seismic Walkdown Checklists One hundred and twenty (120) out of one hundred and twenty (120) Seismic Walkdown Checklists (SWCs) were completed at BFN Unit 2. The SWCs completed at BFN Unit 2 can be found in Appendix E of this document. The types of potentially adverse seismic conditions that were addressed during these walkdowns include:

I R1 0

S S

S S

0 Bent, broken, missing, or loose hardware Corrosion that is more than moderate Visible cracks in surrounding concrete Impact of soft targets Collapsing equipment Line flexibility Fifty (50) Area Walk-By Checklists (AWCs) were completed at BFN Unit 2. These AWCs can be found in Appendix F of this document. The types of potentially adverse seismic conditions that were addressed during these walk-bys include:

I R1 Anchorage of equipment Degraded conditions of anchorage Cable/conduit raceways and HVAC ducts Spatial interactions between equipment Flooding/spray hazards Fire hazards Housekeeping and temporary equipment Page 14 of 907

~iI NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Anchorage configuration for 50 items of equipment in BFN Unit 2 was verified by R

drawings, calculations, and/or the A-46 Screening Evaluation Worksheets (SEWs).

. R1 For cabinets and panels that were selected for walkdown, NRC guidance was followed to determine which could and could not be opened for internal inspection. Undue safety hazards, operational hazards, or cabinets that required extensive disassembly were documented and only observable anchorage was included in those walkdowns.

5.2 SWC & AWC Summary The results documented by the SWCs and AWCs for BFN Unit 2 are summarized below:

117 SWCs resulted in a YES status RI 3 SWCs resulted in a NO status I

o Potentially Adverse Condition 1 0 BFN-0-STN-067-0926 o Potentially Adverse Condition 2 0 BFN-2-PNLA-009-0015 o Potentially Adverse Condition 3 M BFN-2-PNLA-009-0005 50 AWCs resulted in a YES status R1 Page 15 of 907

hil NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2

6) Licensing Basis Evaluations 6.1 Licensing Basis Calculations When a potentially adverse seismic condition was identified at BFN, the condition was entered into the corrective action program. No licensing basis evaluations were performed by the walkdown team per TVA expectations to communicate any potential operability concerns as soon as they were identified. Due to the nature of this process, no calculations were performed by the walkdown team for licensing basis evaluations before the CAP entry was submitted. All licensing basis determinations were performed by BFN engineering on each CAP entry.

Multiple CAP entries were generated during the seismic walkdown process at BFN Unit

2. There were a total of three CAP entries that were considered potential seismically adverse conditions. No degraded or non-conforming conditions were found during the course of this walkdown process.

6.2 Potentially Seismically Adverse Conditions The potentially seismically adverse seismic conditions summarized above are described in more detail below.

Page 16 of 907

miu NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 6.2.1 Potentially Adverse Seismic Condition 1 During a walkdown of BFN-0-STN-067-0926 it was observed that the concrete pad the strainer was sitting on was cracked. This has been entered into the CAP Program and a work order has been written to address the issue.

6.2.2 Potentially Adverse Seismic Condition 2 During the walkdown of BFN-2-PNLA-009-0015 it was observed that the light cage was missing from the interior light. During a seismic event there would be a possibility that the light bulb could dislodge and potentially impact soft targets inside the panel. This has been entered into the CAP Program and a work order has been written to address the issue.

6.2.3 Potentially Adverse Seismic Condition 3 During the walkdown of BFN-2-PNLA-009-0005 it was observed that the light cage was missing from the interior light. During a seismic event there would be a possibility that the light bulb could dislodge and potentially impact soft targets inside the panel. This has been entered into the CAP Program and a work order has been written to address the issue.

Page 17 of 907

hil NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2

7) IPEEE Vulnerabilities Resolution Report 7.1 IPEEE Description In Generic Letter 88-20, Supplement 4, the NRC requested that the utilities for all active nuclear power plants in the United States perform an evaluation of their nuclear power generating facilities to identify any vulnerabilities associated with the occurrence of several plant-specific external events, and to access the impact of these vulnerabilities on the potential for plant core damage or radioactive material release. This program, designated the Individual Plant Examination of External Events, is a corollary program to the Individual Plant Examination (IPE) which focuses on the vulnerabilities associated with the occurrence of external events. The BFN was designated as a 0.3g focused scope plant for the seismic IPEEE.

7.2 IPEEE Findings and Vulnerabilities The IPEEE Report for the BFN addressed multiple vulnerabilities that were identified during the original IPEEE walkdown process for Units 2 and 3 systems including common systems for all three units. A full list of these vulnerabilities can be found in Reference 6 - Seismic IPEEE Report for Browns Ferry Nuclear Plant. A list of the equipment identified during IPEEE is listed below along with actions taken.

UNID DESCRIPTION RESOLUTION Transformer to be replaced as part of the BFN-0-OXF-219-HCLPF capacity below long-term asbestos material removal TDA 0.3g program at BFN.

Transformer to be replaced as part of the BFN-O-OXF-219-HCLPF capacity below long-term asbestos material removal TDB 0.3g program at BFN.

Page 18 of 907

pm' NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2

8) Peer Review A peer review was performed in accordance with References 2 and 3. The peer review process involved considerable interaction with the review teams, and was performed throughout all phases of the effort including the following:

" Selection of the SSCs included on the SWEL In-plant walkdown observations and completed checklists for the Seismic Walkdowns and Area Walk-Bys Identified potentially adverse seismic conditions, utilization of the CAP process, and associated licensing basis review considerations

" Submittal report In summary, the peer review results are confirmatory and fully supportive of the evaluations and findings as described in this report. The completed peer review report is included as Appendix G to this report.

Page 19 of 907

9) References NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Refere nce Document Title Document Number Preparer No.

Recommendations for Enhancing N/A United States Nuclear Reactor Safety in the 2 1st Century Regulatory Commission Letter: Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54 (f)

United States Nuclear 2

Regarding Recommendations 2.1, N/A Regulatory Commission 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Electric Power Research Task Force Recommendation 2.3:

Institute Seismic 4

BFN FSAR, Revision 4 Tennessee Valley Authority Browns Ferry Nuclear Plant USI A-46 50147-R-001 Tennessee Valley Authority Seismic Evaluation Report 517R01 Tne eValyAtoi 6

Seismic IPEEE Report Browns Ferry 50147-R-002 Tennessee Valley Authority Nuclear Plant 517R02 TneeValyAtoi Generic Implementation Procedure 7

(GIP) for Seismic Verification of N/A Seismic Qualification Nuclear Plant Equipment - Revision Utilities Group 3A, December 2001 Implementation Guidelines for Seismic Qualification of New and 8

Replacement Equipment/Parts N/A Seismic Qualification (NARE) Using the Generic Utilities Group Implementation Procedure (GIP) -

Revision 5 October 2002 9

BFN FSAR BFN-24.4 Tennessee Valley Authority Page 20 of 907

fotwfs ;errv Unit 2 SW-r.L 4rovwn Trrly tfal 2 SeIimIC Wshidpow Eqo~uipent ilst Ocwatcd~y:

Pppoaed By Itr Ie Iqiilp.c~

Clasil

,v-4d~

1A08 S

IRA

_(GSIL~k __

ai Ii eulto1348206MIRS otRiLRFNwr n

unwimi RANING Ra "t-J Mwlf.

AW.

iC--i

_1..0 1 SN0-A4U.03110022 U & UlEL617 MOR AJU 10 0

O 6171 MECI4001MI'AM 10311 2.3A,5.1 NO I

NO 031 2063 BFN0O-ANU-030,089 Ul & UZ8. 53 ANUS 18 0 1 CS 15931 MECH EQUIP Am 3 &P LINE 0311 2.3.4ý5 NO I

NO I 00 w 468 248 11.2A.,9 NO 1090 2020 2019 2009 2000 2068 2072 2071 2080 Hal2 3

FN.42-3AA9.211-000C 4EVSNI2thOWN BOARD C

3 0M,40-bOAA-211-0=3 4XVHVr3UOVMOWN0A40 1

BFN-0-B088-22940MOA 480VOISOAUXBOI2 IL 39-0.9089-219-3 4SO AsvDsL8111 30 0

CS 617 2A 4kV 5O90D AM C YES 199 I

1 I a

$9I 3

25 4kV 505D Fi.M 0 48DV AUX 111 4903 801585 SATT 20 M 2 DGC 21 4 1.2.3,4,5 YES 19 23 NO.

021 219 1,V,4.5 219 1.2.3,4.5 28 2so

LLN, T.

J12 YES 7

4 YES NO iUs

_4 14 14 16 16 BFN-0-SD00.280-00OZ BFN.04CHG8.2544000008 8FN-D-CH"-31-nWO 8PN.-V-AN030-0068 2M8 2;fl

=10 6

205-3 16 to 11 9

2051 I 10 I

W-0.FCO-0304060 20321

-207o 14 Bfld.0-FCOO020-0069A BFGN-O-PMP-092-OOCU 8ON-0-PNLA-0248-(XXX 8FN-0.PNLA-248-00DOC BSIV 047N 067-0326 BPN.-D1NK.084.062 BPNv~.0-VR.34.0640D BEN 0VV-lEA219.10 250-V DC BATTERY BOARD 2

,2SVOCOSLSYS BATOOARO.C 125 VOC OSL SYS BAI BOARD D DGC I2ZVDCOSLSYSGTRYCHGRtA DGC 125 VDCDSLSYSBTIY CHG R 0GD.125 VOC 000 5TS 890{

RCGR A 002D.125 HVC DSL.SYSiTRYOiGR B CONTROL SAY WATER CHILLER 8

OI.SE.L GEN RM C;EXHtFAN A

DIES.EL GE.N M C EXH FAN A DIESELGEN RM 0 E4XH FAN A DIESEL GEN RM D EMHFAN INLET DAMPER FOR FAN *A" IN OG ROOM "C' OUTLET DAMPER FOR FAN W IN 00 ROOM -C" DESEL5 G.NERATOR C 1IESM GENERATOR 0

RHRSW PUMP C2 RNRSWPUMP 80 2108 DISTRIBUTION PANEL 58-C 2SOV DISTRIBU.TION PANI ELSB 91 ECW PUMP D0SCHARGE STRAINE C IEEW PUMP DISCARGE STRAINER BON-0-N508-06435, NITROG W STRG rNK 8 VSL GEN 0 RIGHT U43K STARTING AIR TANK CADMN2 TANK W 3

AVA8RIZrR CAOM2I1 TANK "

VAPORIZER AKV/480V X111%1 TO0B 480V SH10M5N BOARD ZA 486V SHUTDOWN B8OARD 8 460V AM(7V 80 ZA" 480V RMOV SO 20 SROV RMOV 8D2C*

480V REAC MOV RD 2D 480V PEAC2RMOVISO 2E 0

-0 0

0 0

0 0

0 0

Dr.

3.5 0GI I65 56S 7i5 595 DG HALLWAY O6 DGC 583 0c6 C OGD DG D R-C-Dr, 1565 0

00 165 S45 NO 0 I tNA*E 254 1.,2.3.4.5 254 1,.3,.4.5 254 -'.23.4.5 254 1.,'.3,4,5 154 1.2.3.4.S 73-2 2=]4.

)30 1.4s

)30 3.4.3 230 3,4.5 130 3,4,5 2301 3.4.5 O~c OGC C

S5DVSDB.

BSOY10 8

NO NO No NO YEO 065 NO.

NO YES0 YE5 YES

)7Zr 4.5 2205 21, l

o10l 01 NO 0

CB 617 0

rI.TAKE 565 o

INTAK, 565 0

YARD S63 o

00

-165

0.

YARD 365 0

YARO 565 o

Do 5a3 IO8 384 034 032 31 1004.5 34, 72.2.2.,5 S3 165 YES YES YeS YES I o0 1017 2

2 Co BO?-2-B:188.268-000264 2

Re

' 'A r.37 75953 593 622 SOLH1AST CORKiER 2A 4MDV.SDBD RM C 23 4Y 50080 RM O 2A4 kV 1090 RM C 29 4kV S000 It.% D FICA8.1/313 ACA - 1/A11 RCA -UN" 2A AW SDBI RIO.C 28 0LV SORD, RM P 8ATT 80 RM 2 SW6CORNER No I

YES YES NO NO YES YES NO No No YES NO 810 YES No NO NO No NO NO NOj YES 017 YES

.2 13 017 018 005 015 016 126 129 7

019 019 007 020

?

YES

.1 0 332 7

2015 1

2016.

1 20o5 16 205?4 10 81 1L2,3.4.5 YES 11.

250V BATTERY CHARGER 2A EECW/IRI PUMP 2A ROOM COOLER 2

R CS i

BFN-2-C..-067-048

)671I 3,4.5 No:

021 035 091 090 093 037 039

.09 0

8FN-2-O. RE-070

EOW/OlIR PUMP Z ROOM COOLER 2

41, 205 1

ONZ.C.R08707 J

08W/CS PU.MP2A ROOM COOLER 324 60.529 SW CORNER 1067 I 3.4,5 NW CORNER 1067 4 3.4.5 I NO0 2114 7

13i Page 110 of 907

Browns Ferry Unit 2 5WEL Equip. Class (0 U

Safety RISK LERF New or Anch.

.21)

NDesptior Unit Bldg.

Eiev.

Room Sys. Function RANKINGS Rank Replaced Verified 2049 B

BFN-2-FCV-023-0034 RHR HTX 2A COOL WATER OUTLET 2

RB 565 U/R9 023 4,5 NO NO 041 2046 8

BFN-2-FCV-023-0040 RHR HTX 2C COOL WATER OUTLET 2

RB 565 U/R9 023 4,5 NO NO 041 2001 0

BFN-2-FCV-0B3-OO8A 2A SLC SQUIB VLV (GE-1l-14A) 2 RB 639 SLC AREA 063 1

NO NO 004 2002 0

BFN-2-FCV-063-O0OBB 2B SLC SQUIB VLV ( GE-11-148) 2 RB 639 SLC AREA 063 1

NO NO 004 2038 7

BFN-2-ECV-064-0020 SUPPRESSION CHAMBER VAC RLF VLV 2

RB 565 SE CORNER 064 5

NO NO 009 2039 7

BFN-2-FCV-064-0021 SUPP CHAMBER VAC RLF VLV 2

RB 565 R/2T 064 5

No NO 009 2040 7

8FN-2-FCV-O64-0032 SUPP CHAMBER EXHAUST INBD ISOL VLV 2

RB 565 R12/Q 054 5

NO NO 010 2041 7

RFN-2-FCV-064-0033 SUPP CHAMBER EXHAUST OUTBO ISOLVLV 2

RB 5B5 RP/P 064 5

NO NO 010 2044 7

BFN-2-FCV-067-0050 EECW SYSTEM NORTH HEADER BACKUP TO RBCCW 2

RB 593 PIR13 067 3,4,5 NO NO 039 2045 8

RFN-2-FCV-074-O001 RHR PMP A SUPP POOL SUCTION VALVE 2

RB 519 SW CORNER 074 3,4 NO NO 012 2051 8

BFN-2-FCV-075-0022 SYS 1 TEST BYPASS VLV OPERATOR 2

RB 519 NW CORNER 075 3

NO NO 037 2050 8

BFN-2-FCV-075-0037 CS/PUMP 28 & 2D MINI-FLOW VALVE 2

RB 541 NE CORNER 075 3

NO NO 038 2108 8

BFN-2-FCV-078-0062 SYSTEM ISOLATION MOTOR OPERATED VLV 2

RB 639 RCA 078 SWEL 2 NO NO 104 2042 7

BFN-2-FCV-08S-39A/0219 CRD SCRAM INLET VALVE.

2 RB 565 P-S/R9&13 085 1

NO NO 011 2043 7

BFN-2-FCV-085-39A/0227 CRD SCRAM INLET VALVE 2

RB 565 P-S/R9&13 085 1

NO NO 011 2047 8

BFN-2-FSV-08S-0037A CRD\\SCRAM DUMP VALVE 2

RB 565 N/R12 085 1

NO NO 040 2048 8

BFN-2-FSV-,85-DI37B CRD\\SCRAM DUMP VALVE 2

RB 565 N/R12 095 1

NO NO 040 2064 13 BFN-2-GEN-26R-0002DA LPO MI 2DA GENERATOR 2

RB 639 U/R14 269 3

NO YES 005 2065 13 BFN-2-GEN-268-O00ZDN LPCI MG 2DN GENERATOR 2

RB 621 U/R13 268 3

NO YES 003 2066 13 BFN-2-GEN-268-0002EA LPCI MG 2EA GENERATOR 2

RB 621 U/R14 266 3

NO YES 003 2067 13 BFN-2-GEN-268-OOO2EN LPCI MG 2EN GENERATOR 2

RB 639 U/R14 268 3

NO YES 005 2079 16 BFN-2-INV-256-0001 DIV I ECCS ATU INVERTER 2

RB 593 28 4kV SDBD RM D 256 1,2,3,4,5 NO YES 021 2086 38 BFN-2-LPNL-9ZS-0001 PANEL 25-0001 2

RB 519 NWCORNER 925 3

NO NO 037 2088 18 BFN-2-LPNL-925-OOOSA LOCAL PANEL 25-SA 2

RB 593 S/R10 925 1,2 NO YES 036 2089 19 BFN-2-LPNL-925-O005 LOCAL PANEL 25-59 2

RB 593 S/RiO 925 1,2 NO YES 036 2090 18 BFN-2-LPNL-925-O0OSD LOCAL PANEL 25-51 2

RB 593 S/RIO 925 1,2 NO YES 036 2091 19 BFN-2-LPNL-925-=06A LOCAL PANEL 25-6A 2

RB 593 P/R12 925 1,2 NO YES 039 2092 18 BFN-2-LPNL-92S-4]006D LOCAL PANEL 25-60 2

RB 593 P/R12 929 1,2 NO YES 039 2087 19 BFN-2-LPNL-925-0060 PANEL 25-60 FOR CS PMP 2

RB 519 NE CORNER 925 3

NO NO 014 2093 18 BFN-2-LPNL-925-0223 LOCAL PANEL 2-25-223 2

RB 593 Q/112 925 1,2 NO YES 039 2109 20 BFN-2-LS-078-0001D SKIMMER SURGE TANK LEVEL LOW LOW ISOL 2

RB 639 RCA 079 SWEL 2 NO NO 099 2110 20 BFN-2-LS-078-0OOIE SKIMMER SURGE TANK LEVEL LOW LOW ISOL 2

RB 639 RCA 078 SWEL 2 NO NO 099 2111 20 BFN-2-LS-078-OOO1F SKIMMER SURGE TANK LEVEL LOW LOW ISOL 2

RB 639 RCA 076 SWEL2 NO NO 099 2112 20 BFN-2-LS-079-0001G SKIMMER SURGE TANK LOW LEVELSWITCH 2

RB 639 RCA 078 SWEL2 NO NO 099 2115 7

BFN-2-PCV-001-O019 MS/MAIN STEAM SAFETY RELIEF VALVE 2

RB 585 DRY WELL 001 2

NO NO N

2116 7

BFN-2-PCV-001-OD34 MS/MAIN STEAM SAFETY RELIEF VALVE 2

RB SBS DRY WELL 001 2

NO NO____

2029 5

BFN-Z-PMP-063-0006A 2A SLC PUMP (GE-11-2A) 2 RB 639 SLC AREA 063 1

NO YES 004 2030 5

BFN-2-PMP-063-=0689 2Z SLC PUMP (GE-11-2B) 2 RB 639 SLC AREA 063 1

NO YES 004 2031 S

BFN-2-PMP-073-0029 HPCI BOOSTER PUMP 2

RB 519 HPCI ROOM 073 3

NO NO 013 2028 5

BFN-2-PMP-073-OD47 HPCI TURBINE AUXIUARYOIL PUMP 2

RB S19 HPCI ROOM 073 3

NO NO 013 2033 6

BFN-2-PMP-074-0005 RESIDUAL HEAT REMOVAL PUMP 2A 2

RB 519 SW CORNER 074 3,4 NO YES 012 2034 6

BFN-2-PMP-074-O016 RESIDUAL HEAT REMOVAL PUMP 2C 2

RB 519 SW CORNER 074 3,4 NO YES 012 2036 6

BFN-2-PMP-075-003 CORE SPRAY PUMP 2B 2

RB 519 NE CORNER 075 3

NO YES 014 2037 6

BFN-2-PMP-075-OD42 CORE SPRAY PUMP 20 2

RB 519 HE CORNER 075 3

NO YES 014 2027 5

BFN-2-PMP-076-0110 CNTMT ATM MON SYS ANLZR 2A SMPLRTN PMP 2

RB 565 SCRAM VALVE AREA 076 5

NO YES NO 035 2096 20 BFN-2-PNLA-009-D003A REACTOR SHUTDOWN & CONTAINMENT COOLING 2

CR 617 U2 MCR 009 2,3 NO YES 120 2099 20 BFN-2-PNLA-009-000S REACTOR CONTROL PANEL 2

CR 617 U2 MCR 009 1

NO YES 120 2100 20 BFN-2-PNLA-09-0006 FEEDWATER DTM & CONDS PNL 2

CD 637 U2MCR 009 1

NO YES 120 2044 20 BFN-2-PNLA-0:9-0009 CONTROL PNLA 9-9 2

CB 617 U2 MCR 009 1,2.3,4,5 YES 193 YES 120 11ev4 -

2095 2096 2097 2073 20 BFN-2-PNLA-009-001S PNL 9-15 AUX INSTR RM 2

CR 593 U2 AIR

)091 1

NO YES 089 PNLA-009-D017 PNL 9-17 AUX INSTR RM UT-2 2

CB 593 U2AIR 009 1

NO I-I I

I YES 089 20 20 PNLA-.O0-0D32 CS&HPCI (CHAI PNLA 9-32 2

C1 1 593 UZAIR

)091 3

1 NO YES 089 I-BFN-2-PNLA-O09-0081 PANEL 9-R1 AUX INSTR ROOM 2

U2 AIR

)09 1 2.3.4.5 1 NO NO 069 3211 19 B FN-2-TE-084-O I

616 TORUS WATER TEMP ELEMENT 2

TORUS 064 5

NO NO 126 TORUS 064 5

NO NO 126 2118 19 BFN-2-TE-064-M161C TORUS WATER TEMP ELEMENT 2

RB 1519 Page 111 of 907

Browns Ferry Unit 2 Area Walk-Bys No.

AWC No.

Unit Building Elevation Location Walkdown Date 002 O-CB-EL593-002 0

CB 593 Mech Equip Room 7/17/2012 069 O-CB-EL595-069 0

CB 595 Roof Chiller A & B Area 8/3/2012 001 O-CB-EL617-001 0

CB 617 Mech Equip Room 7/17/2012 120 O-CB-EL617-120 1/2 CB 617 Unit 1 & 2 Main Control Room 8/14/2012 006 O-DG-EL565-006 0

DG 565 Electrical Tunnel 7/19/2012 007 O-DG-EL565-007 0

DG 565 Diesel Generator Room C 7/19/2012 008 O-DG-EL565-008 0

DG 565 Diesel Generator Room D 7/19/2012 019 O-DG-EL583-019 0

DG 583 Fan Room D 7/25/2012 020 O-DG-EL583-020 0

DG 583 Fan Room C 7/25/2012 115 O-DG-EL583-115 0

DG 583 Diesel Aux Board Room 8/13/2012 015 0-YD-EL565-015 0

YD 565 Vaporizer Tank A Area 7/25/2012 016 0-YD-EL565-016 0

YD 565 Vaporizer Tank B Area 7/25/2012 017 0-YD-EL565-017 0

Intake 565 RHRSW Pump Room B 7/25/2012 018 0-YD-EL565-018 0

Intake 565 RHRSW Pump Room C 7/25/2012 066 2-CB-EL593-066 2

CB 593 Battery Board Room 2 8/3/2012 089 2-CB-EL593-089 2

CB 593 Aux Instrument Room 7/19/2012 090 2-CB-EL593-090 2

CB 593 Battery Room 7/19/2012 091 2-CB-EL593-091 2

CB 593 Battery Board Room 7/19/2012 067 2-CB-EL617-067 2

CB 617 250V Shutdown Board Room C 8/3/2012 012 2-RB-EL519-012 2

RB 519 RHR Pump Area 7/20/2012 013 2-RB-EL519-013 2

RB 519 HPCI Room 7/20/2012 014 2-RB-EL519-014 2

RB 519 NE Quad 7/20/2012 037 2-RB-EL519-037 2

RB 519 NW Quad 7/30/2012 126 2-RB-EL519-126 2

RB 519 Unit 2 Under Torus 10/18/2012 038 2-RB-EL541-038 2

RB 541 NE Quad 7/30/2012 096 2-RB-EL541-096 2

RB 541 SW Quad 8/9/2012 009 2-RB-EL565-009 2

RB 565 SE Quad 7/20/2012 010 2-RB-EL565-010 2

RB 565 NW Quad 7/20/2012 011 2-RB-EL565-011 2

RB 565 Scram Valve Area East Side 7/20/2012 035 2-RB-EL565-035 2

RB 565 Scram Valve Area West Side 7/30/2012 040 2-RB-EL565-040 2

RB 565 Scram Dump Valves N/R12 7/30/2012 041 2-RB-EL565-041 2

RB 565 Elevator/Stairs Door Area 7/30/2012 109 2-RB-EL565-109 2

RB 565 R14-R12, R-U 8/10/2012 130 2-RB-EL565-130 2

RB 565 UNIT 2 DRYWELL 3/25/2013 131 2-RB-EL565-131 2

RB 565 UNIT 2 STEAM VAULT 3/25/2013 132 2-RB-EL585-132 2

RB 585 UNIT 2 DRYWELL 3/25/2013 133 2-RB-ELS85-133 2

RB 585 UNIT 2 DRYWELL 3/25/2013 021 2-RB-EL593-021 2

RB 593 Electrical Board Room 2B 7/19/2012 036 2-RB-EL593-036 2

RB 593 Column Lines R9 to R11, U to S 7/30/2012 039 2-RB-EL593-039 2

RB 593 RBCCW Heat Exchanger Area 7/30/2012 108 2-RB-EL593-108 2

RB 593 R11-R13, S-U 8/10/2012 119 2-RB-EL593-119 2

RB 593 480V Shutdown Board Room 2B 8/13/2012 003 2-RB-EL621-003 2

RB 621 LPCI Generator Area 7/18/2012 022 2-RB-EL621-022 2

RB 621 Electrical Board Room 2A 7/19/2012 110 2-RB-EL621-110 2

RB 621 S-U, R8-R1O 8/10/2012 118 2-RB-EL621-118 2

RB 621 480V Shutdown Board Room 2A 8/13/2012 004 2-RB-EL639-004 2

RB 639 SLC Area 7/18/2012 005 2-RB-EL639-005 2

RB 639 LPCI Generator Area 7/18/2012 099 2-RB-EL639-099 2

RB 639 SLC Area (By Stairs) 8/9/2012 104 2-RB-EL639-104 2

RB 639 S-U, R8-R11 8/9/2012 R1 Page 113 of 907

INTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Appendix E: SWCs The following signatures are provided for the engineers responsible for the Seismic Walkdown Checklists that were performed during the Unit 2 outage March 25, 2013. The equipment walked down during the outage include:

BFN-2-FCV-001-0026 BFN-2-FCV-001-0038 BFN-2-PCV-001-0019 BFN-2-PCV-001-0034 Name Signature Date Josh Best gt

-//

Jason Black*

f*

IA,. A

  • -*O, Page 113-1 of 907

Sheet 1 of 5 Status: Y 0NElULI Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Location: Bldg. U2 RB Floor El. 565 Room, Area 130, Drywell Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y[:N M

2. Is the anchorage free of bent, broken, missing or loose hardware?

Y EIN lI U EI N/A 2 3Enter the equipment class name from Appendix B, Classes of Equipment.

Page 370 of 907 R1

Sheet 2 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Anchorage (Continued)

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Y FIN El U El N/A E Y FIN [I U I-1 N/A E Y FIN LI U F1 N/A M Page 371 of 907 R1

Sheet 3 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y ON EjU E Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

YE NE:

U[Z] N/A[L]

YE NEJ U[-] N/A[D Page 372 of 907 R1

Sheet 4 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Interaction Effects (Continued)

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YE N U[:I N/A[:]

YEN[l UEl Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YE NEI UFI Page 373 of 907 R1

Sheet 5 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0026 Equipment Class 3 7 Equipment Description MSIV "B" Inboard Isolation Valve Comments (Additional pages may be added as necessary)

Evaluated by: Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 374 of 907 R1

Sheet 1 of 5 Status: Y ENE]ULI Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve Location: Bldg. U2-RB Floor El. 565 Room, Area 131, Steam Vault Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchoraqe

1. Is the anchorage configuration verification required (i.e., is Y E N E the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose Y [L] N [] U [] N/A Z hardware?

3Enter the equipment class name from Appendix B, Classes of Equipment.

Page 375 of 907 R1

Sheet 2 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve Anchorage (Continued)

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Y [-N [] U El N/A Z Y ON EI U 0 N/A 2 Y EN El U F1 N/A 0 Page 376 of 907 R1

Sheet 3 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YON [:1U [-

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

YON[l ULI N/A[l YO NEJ U[-- N/A-Page 377 of 907 R1

Sheet 4 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 37 Equipment Description MSIV "C" Outboard Isolation Valve Interaction Effects (Continued)

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YI N u[:l N/A[-]

YEN[:] U--

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YO NLuEIjU Page 378 of 907 R1

Sheet 5 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-FCV-001-0038 Equipment Class 3 7 Equipment Description MSIV "C" Outboard Isolation Valve Comments (Additional pages may be added as necessary)

Evaluated by: Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 379 of 907 R1

Sheet 1 of 5 Status: Y ZNE] UF Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Location: Bldg. U2 RB Floor El. 585 Room, Area 132, Drywell Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y [IN 0

2. Is the anchorage free of bent, broken, missing or loose hardware?

Y [:NEl U ElN/A 3Enter the equipment class name from Appendix B, Classes of Equipment.

Page 550 of 907 R1

Sheet 2 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Anchorage (Continued)

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

YIZIN ElUEl N/A Z YEFNEII uf[I N/A E YEIN F1 U E N/A 0 Page 551 of 907 R1

Sheet 3 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y ON [:U Ej Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

YON[: ULI N/AE--

YZ NEI U-] N/A[--

R1 Page 552 of 907

Sheet 4 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 3 7 Equipment Description MSRV Interaction Effects (Continued)

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YO N UE-- N/A[:]

YEN[:] U[:

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YO NEI UFl Page 553 of 907 R1

Sheet 5 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0019 Equipment Class 37 Equipment Description MSRV Comments (Additional pages may be added as necessary)

Evaluated by: Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 554 of 907 R1

Sheet 1 of 5 Status: Y ENEDU D Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV Location: Bldg. U2 RB Floor El. 585 Room, Area 133, Drywell Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable Anchorage

1. Is the anchorage configuration verification required (i.e., is Y IZIN N the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose Y OIN 0i U [] N/A E hardware?

3Enter the equipment class name from Appendix B, Classes of Equipment.

Page 555 of 907 R1

Sheet 2 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 Z Equipment Description MSRV Anchorage (Continued)

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Y EI-N El U El N/A Z Y rIN El U [: N/A Z Y -N [--I U E-1N/A Z Page 556 of 907 R1

Sheet 3 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y ON [:1 U [:]

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

YON[]I ULI N/AD YM NEI UE-N/A[:]

Page 557 of 907 R1

Sheet 4 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV Interaction Effects (Continued)

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YN N ULI N/A[D]

YM N[I:

U[-D Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YN NEII u-Il R1 Page 558 of 907

Sheet 5 of 5 Seismic Walkdown Checklist (SWC)

Equipment ID No. BFN-2-PCV-001-0034 Equipment Class 3 7 Equipment Description MSRV Comments (Additional pages may be added as necessary)

Evaluated by: Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 559 of 907 R1

NTTF Recommendation 2.3: Seismic Response Report Browns Ferry Unit 2 Appendix F: AWCs The following signatures are provided for the engineers responsible for the Area Walk-By Checklists that were performed during the Unit 2 outage March 25, 2013. The walk-bys performed during the outage include:

2-RB-EL565-130 2-RB-EL565-131 2-RB-EL585-132 2-RB-EL585-133 Name Signature Date Jason Black Josh Best 2 /.5

=

RI Page 714-1 of 907

Sheet 1 of 4 Status: YZ0 NE] U 0 2-RB-EL565-130 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 565 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.

The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Y[EN El U El N/A [

Y ZN [_1 U [:1 N/A ED 4If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Page 847-1 of 907 R1

Sheet 2 of 4 2-RB-EL565-1 30 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 565 Area 4 Drywell

3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

YO*N [:1 U [] N/A [--I Y

N-I U El N/AZ1 Y ON [1 UEI N/A [:

Page 847-2 of 907 R1

Sheet 3 of 4 2-RB-EL565-130 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 565 Area 4 Drywell

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Temporary outage scaffolding was located above and below the MSIV.

This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSIV.

Y [NL[I1UEl N/A E Y NN ElU [1N/A E

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?

YEN[:1 UEl1 Page 847-3 of 907 R1

Sheet 4 of 4 2-RB-EL565-130 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 565 Area 4 Drywell Comments (Additional pages may be added as necessary)

Equipment associated with this AWC:

BFN-2-FCV-001-0026 Evaluated by:Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 847-4 of 907 R1

Sheet 1 of 4 Status: Y Z NEI UEl 2-RB-EL565-131 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 565 Area4 Steam Vault Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.

The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Y ONF1 U [1N/A [3 Y ON F1 U F1 N/A [E]

"If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Page 847-5 of 907 R1

Sheet 2 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 565 Area 4 Steam Vault

3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

Y ON El U El N/A Er Y0ON El U [_1 N/A1 Y NN [] U El N/A[

R1 Page 847-6 of 907

Sheet 3 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 565 Area 4 Steam Vault

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Temporary outage scaffolding was located above the MSIV. This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSIV.

Y ENEl UEl N/A [:

Y EN E U EII N/A El

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?

Y [KN E-U [-

Page 847-7 of 907 R1

Sheet 4 of 4 2-RB-EL565-131 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 565 Area 4 Steam Vault Comments (Additional pages may be added as necessary)

Equipment associated with this Area Walk-by Checklist:

BFN-2-FCV-001 -0038 Evaluated by:Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 847-8 of 907 R1

Sheet 1 of 4 Status: Y Z N ]

U[ZJ 2-RB-EL585-132 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.

The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.

Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Y ON El U F1 N/A[]

Y ON El U -- N/A []

4 1f the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Page 847-9 of 907 R1

Sheet 2 of 4 2-RB-EL585-132 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell

3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

YZN ElU ElN/A E Y EN EUEl N/A E YZN ElU E1N/A El Page 847-10 of 907 R1

Sheet 3 of 4 2-RB-EL585-132 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Temporary outage scaffolding was located above and below the MSRV.

This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSRV.

YON EI U El N/A [Z Y ON [I U [-] N/A I1

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?

Y ZN [I U [1 Page 847-11 of 907 R1

Sheet 4 of 4 2-RB-EL585-1 32 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell Comments (Additional pages may be added as necessary)

Equipment associated with this Area Walk-By Checklist:

BFN-2-PCV-001-0019 Evaluated by:Josh Best Jason Black Date:3/25/2013 3/25/2013 Page 847-12 of 907 R1

Sheet 1 of 4 Status: Y Z N E] U f 2-RB-EL585-133 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.

The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Note: Y = Yes, N = No, U = Unknown, N/A = Not Applicable

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

YEN [] U E N/A[-Z YE*N [-]U L N/A E1 4If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

R1 Page 847-13 of 907

Sheet 2 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell

3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

YON El U EII N/AZE Y ON ElU [1 N/A E Y ONEl UEl N/A [:

Page 847-14 of 907 R1

Sheet 3 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Temporary outage scaffolding was located above and below the MSRV.

This scaffolding must be removed prior to Unit 2 outage completion. The scaffolds have been inspected and seismically braced in accordance with plant procedures. No potentially adverse seismic interactions are associated with the MSRV.

Y ON El U El N/A El Y ON E-U El N/A El

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?

Y ON 0 U F Page 847-15 of 907 R1

Sheet 4 of 4 2-RB-EL585-133 Area Walk-By Checklist (AWC)

Location: Bldg. U2 RB Floor El. 585 Area 4 Drywell Comments (Additional pages may be added as necessary)

Equipment associated with this Area Walk-By Checklist:

BFN-2-PCV-001 -0034 Evaluated by:Josh Best Jason Black Date:3/25/2013 3/25/2013 R1 Page 847-16 of 907

NTTF 2.3/BFN-02, R1 April 3, 2013 Page 7 of 7 full concurrence with all of the potential adverse seismic conditions summarized in Section 6.2 of the BFN2 Seismic Response Report.

Comments regarding the individual potential adverse seismic conditions for BFN1 include the following:

" Potentially Adverse Seismic Condition 1 addresses cracking of the concrete base pad for strainer 0-STN-067-0926. Based on the configuration including attached piping as well as other anchors and pedestal, it was judged that there was sufficient margin for the strainer to withstand a design basis earthquake. The walkdown team noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to repair the crack so that no further damage will occur to the concrete.

Potentially Adverse Seismic Condition 2 addresses a missing safety cage for an interior light for 2-PNLA-009-0015. The walkdown team determined that the florescent light bulb could dislodge during a seismic event and impact soft targets inside the panel. This does not appear to be credible due to the interfering cabling and other components inside of the panel. The walkdown team conservatively noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to reinstall the missing cage.

Potentially Adverse Seismic Condition 3 addresses a missing safety cage for an interior light for 2-PNLA-009-0005. The walkdown team determined that the florescent light bulb could dislodge during a seismic event and impact soft targets inside the panel. This does not appear to be credible due to the interfering cabling and other components inside of the panel. The walkdown team conservatively noted this as a potential adverse seismic condition and entered it into the CAP. A work order was initiated to reinstall the missing cage.

SUBMITTAL REPORT The peer review team has reviewed the BFN2 submittal report in detail, including the additional I R1 walkdown evaluations performed during the March refueling outage, and we are in full concurrence with the documented observations and findings. The report is in compliance with the guidance in EPRI Report 1025286, and meets the requirements and objectives of the NRC 50.54 (f) letter.

In our opinion, the potential adverse seismic conditions identified by the program are in general only minor issues, and this is a reflection of the adequate seismic design criteria as well as sufficiently rigorous seismic-related construction and maintenance procedures that TVA has in place at BFN2. The walkdown demonstrates that the current plant configuration is in compliance with the current seismic licensing basis. Furthermore, the walkdown demonstrates that that TVA has maintained or improved the seismic IPEEE HCLPF capacity of the plant.

Sincerely, John 0. Dizon, P.E.

Stephen J. Eder, P.E.

Lead Peer Reviewer Peer Reviewer Page 907 of 907 FACILITY RISK CONSULTANTS, INC.