IR 05000335/2010503: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams|number = ML110730810}}
{{Adams
| number = ML110730810
| issue date = 03/09/2011
| title = St. Lucie Plant - NRC Emergency Preparedness Annual Inspection Report 05000335/2010503 and 05000389/2010503
| author name = Bonser B R
| author affiliation = NRC/RGN-II/DRS/PSB1
| addressee name = Nazar M
| addressee affiliation = Florida Power & Light Co
| docket = 05000335, 05000389
| license number = DPR-067, NPF-016
| contact person =
| document report number = IR-10-503
| document type = Letter
| page count = 3
}}


{{IR-Nav| site = 05000335 | year = 2010 | report number = 503 }}
{{IR-Nav| site = 05000335 | year = 2010 | report number = 503 }}
Line 9: Line 23:
Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420


SUBJECT: ST. LUCIE PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000335/2010503 AND 05000389/2010503
SUBJECT: ST. LUCIE PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000335/2010503 AND 05000389/2010503


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the St. Lucie Plant. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000335/2010503 and 05000389/2010503. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the St. Lucie Plant. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000335/2010503 and 05000389/2010503. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/ Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16  
Sincerely,/RA/ Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16  


cc w/encl.: (See page 2)
cc w/encl.: (See page 2)
FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution Ronnie Lingle Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Larry Nicholson, Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti, Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Byron Koons Director Florida Division of Emergency Management 2555 Shumard Oaks Blvd. Tallahassee, FL   32399 J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company P.O. Box 14000 Juno Beach, FL   33408 Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL   34957-2010 Seth B. Duston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution Ronnie Lingle Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Larry Nicholson, Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti, Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Byron Koons Director Florida Division of Emergency Management 2555 Shumard Oaks Blvd. Tallahassee, FL 32399 J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 Seth B. Duston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420


SUBJECT: ST. LUCIE PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000335/2010503 AND 05000389/2010503
SUBJECT: ST. LUCIE PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000335/2010503 AND 05000389/2010503


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
Line 28: Line 42:
Sincerely,/RA/  
Sincerely,/RA/  


Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16  
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16  


cc w/encl.: (See page 2) Distribution w/encl: C. Evans, RII EICS (Part 72 Only)
cc w/encl.: (See page 2) Distribution w/encl: C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas)
L. Douglas, RII EICS (Linda Douglas)
OE Mail (email address if applicable)
OE Mail (email address if applicable)
RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource X   PUBLICLY AVAILABLE G   NON-PUBLICLY AVAILABLE G   SENSITIVE         X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML 110730810   X   SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP     SIGNATURE RA RA     NAME B. BONSER D. RICH     DATE 03/09/2011 03/08/2011     E-MAIL COPY?     YES NO   YES NO   YES NO   YES NO   YES NO   YES NO   YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\EMERGENCY PREPAREDNESS\ANNUAL CLOSEOUT LETTERS\ST LUCIE ANNUAL CLOSEOUT 2010.DOCX
RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML 110730810 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME B. BONSER D. RICH DATE 03/09/2011 03/08/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\EMERGENCY PREPAREDNESS\ANNUAL CLOSEOUT LETTERS\ST LUCIE ANNUAL CLOSEOUT 2010.DOCX
}}
}}

Revision as of 01:58, 19 February 2018

St. Lucie Plant - NRC Emergency Preparedness Annual Inspection Report 05000335/2010503 and 05000389/2010503
ML110730810
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/09/2011
From: Bonser B R
NRC/RGN-II/DRS/PSB1
To: Nazar M
Florida Power & Light Co
References
IR-10-503
Download: ML110730810 (3)


Text

March 9, 2011

Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: ST. LUCIE PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000335/2010503 AND 05000389/2010503

Dear Mr. Nazar:

On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the St. Lucie Plant. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000335/2010503 and 05000389/2010503. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16

cc w/encl.: (See page 2)

FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution Ronnie Lingle Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Larry Nicholson, Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti, Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Byron Koons Director Florida Division of Emergency Management 2555 Shumard Oaks Blvd. Tallahassee, FL 32399 J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 Seth B. Duston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: ST. LUCIE PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000335/2010503 AND 05000389/2010503

Dear Mr. Nazar:

On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the St. Lucie Plant. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000335/2010503 and 05000389/2010503. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16

cc w/encl.: (See page 2) Distribution w/encl: C. Evans, RII EICS (Part 72 Only)

L. Douglas, RII EICS (Linda Douglas)

OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML 110730810 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME B. BONSER D. RICH DATE 03/09/2011 03/08/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\EMERGENCY PREPAREDNESS\ANNUAL CLOSEOUT LETTERS\ST LUCIE ANNUAL CLOSEOUT 2010.DOCX