| {{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 | | {{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 October 15, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391 |
| | |
| October 15, 2010 | |
| | |
| U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 | |
| | |
| Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391 | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Watts Bar Nuclear Plant (WBN) Unit 2 - Denial of Notice of Violation (NOV) 05000391/2010603-08, Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Additional Information | | Watts Bar Nuclear Plant (WBN) Unit 2 - Denial of Notice of Violation (NOV) 05000391/2010603-08, Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Additional Information |
|
| |
|
| ==Reference:== | | ==Reference:== |
| : 1. NRC letter to TVA, "Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated Inspection Report 05000391/2010603 and Notice of Violation," | | : 1. NRC letter to TVA, Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated Inspection Report 05000391/2010603 and Notice of Violation, dated August 5, 2010 (ML102170465) |
| dated August 5, 2010 (ML102170465) | | : 2. TVA letter to NRC, Watts Bar Nuclear Plant (WBN) Unit 2 - Denial of Notice of Violation (NOV) 05000391/2010603-08, Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers (ML102520435) |
| : 2. TVA letter to NRC, "Watts Bar Nuclear Plant (WBN) Unit 2 - Denial of Notice of Violation (NOV) 05000391/2010603-08, Failure to Adequately Evaluate | | By letter dated August 5, 2010 (Reference 1), the U.S. Nuclear Regulatory Commission (NRC) issued Inspection Report Number 05000391/2010603 concerning the April 6-30, 2010, inspection conducted at Tennessee Valley Authoritys (TVA) WBN Unit 2. By letter dated September 7, 2010 (Reference 2), the sentence The calculated natural frequencies of the front cover panel in the three directions were also in excess of 33 Hz and rigid should not have been included in the letter at that time. This was first identified by TVA on September 13, 2010, and discussed with Theodore Fanelli and Guillermo Crespo in a meeting at WBN site on September 14, 2010. This condition has been entered in the Corrective Action Program. |
| | | Subsequently, a calculation was issued that validated the above sentence. |
| and Qualify Molded Case Circuit Breakers" (ML102520435) | | There are no new commitments associated with this submittal. If you have any questions, please contact William Crouch at (423) 365-2004. |
| By letter dated August 5, 2010 (Reference 1), the U.S. Nuclear Regulatory Commission (NRC) issued Inspection Report Number 05000391/2010603 concerning the April 6-30, 2010, inspection conducted at Tennessee Valley Authority's (TVA) WBN Unit 2. By letter dated September 7, 2010 (Reference 2), the sentence "The calculated natural frequencies of the front cover panel in the three directions were also in excess of 33 Hz and rigid" should not have been included in the letter at that time. This was first identified by TVA on September 13, 2010, and discussed with Theodore Fanelli and Guillermo Crespo in a meeting at WBN site on September 14, 2010. This condition has been entered in the Corrective Action Program. | |
| Subsequently, a calculation was issued that validated the above sentence. | |
| | |
| There are no new commitments associated with this submittal. If you have any questions, please contact William Crouch at (423) 365-2004. | |
|
| |
|
| U.S.Nuclear Regulatory Commission Page 2 October 15, 2010 I declare under penalty of perjury that the foregoing is true and correct.Executed on the 15 th day of October, 2010.Sincerely, cc: U.S.Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381}} | | U.S. Nuclear Regulatory Commission Page 2 October 15, 2010 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th day of October, 2010. |
| | Sincerely, cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381}} |
|
---|
Category:Letter
MONTHYEARCNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24009A1712024-02-16016 February 2024 Environmental Assessment and Finding of No Significant Impact Related to an Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods (EPID L-2023-LLA-0039) - Letter ML24019A0722024-02-14014 February 2024 Request for Withholding Information from Public Disclosure IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation 2024-09-05
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML21027A3942020-12-0707 December 2020 TVA Response to Notice of Violations (EA-19-092) ML20198M4202020-07-0808 July 2020 William Bill Sprinkle, Response to Apparent Violation, IA-20-018 L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-0422019-09-12012 September 2019 Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 ML16344A0482016-12-0909 December 2016 Reply to Notice of Violation (EA-16-117) CNL-15-217, Reply to Notice of Violation (EA-15-112)2015-10-16016 October 2015 Reply to Notice of Violation (EA-15-112) CNL-15-152, Reply to Notice of Violation (EA-15-075)2015-07-24024 July 2015 Reply to Notice of Violation (EA-15-075) CNL-15-079, Reply to Notice of Violation (EA-14-179)2015-05-0101 May 2015 Reply to Notice of Violation (EA-14-179) ML13204A3832013-07-18018 July 2013 Reply to Notice of Violation (EA-13-019) 391/2013611-01, -02, and -03 Related to Tva'S Commercial Grade Dedication Program ML13192A0332013-07-0303 July 2013 Reply to a Notice of Violation; EA-13-018 IR 05000391/20106032012-07-17017 July 2012 Units 1 & 2 - Reply to Notice of Violation 05000391/2010603-08 - Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Revised Response ML12202A0102012-07-17017 July 2012 Units 1 & 2 - Reply to Notice of Violation 05000391/2010603-08 - Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Revised Response ML12172A4122012-06-18018 June 2012 Tennessee Valley Authority - Reply to Notice of Violation 05000391-10-603-08 - Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Revised Response ML12160A3522012-06-0707 June 2012 Reply to Notice of Violation 391/2012612-01 - Failure to Correct a Condition Adverse to Quality Associated with Containment Spray Pump Layup and Preventive Maintenance ML11164A1412011-06-0909 June 2011 Reply to Notice of Violation 05000391/2010603-08 - Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Revised Response ML11105A1502011-04-11011 April 2011 Request for Extension for Time to Respond to Severity Level IV, Non-Cited Violation 05000390-11-008-01 ML1109605912011-03-31031 March 2011 Response to Non-Cited Violations 05000390-10-005-03, Failure to Use Worst Case 6900 Vac Bus Voltage in Design Calculations ML1033002172010-11-24024 November 2010 Reply to Notice of Violation 05000391/2010603-08 - Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers ML1028804932010-10-15015 October 2010 Denial of Notice of Violation (NOV) 05000391-2010603-08, Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Additional Information ML1025204352010-09-0707 September 2010 Denial of Notice of Violation, 05000391/2010603-08, Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers ML0908306622009-03-23023 March 2009 Denial of Non-Cited Violation 05000390-08-05-04, Carbon Dioxide System in Fire Area 48 Failed to Meet Design Criterion ML0416002752004-06-0303 June 2004 & Watts Bar Nuclear Plant - Interim Safeguards and Security Compensatory Measures Reports & Notices of Violation - Reply to Notices of Violation ML0322000402003-07-25025 July 2003 National Pollutant Discharge Elimination System Permit No.TN0020158 - Response to Notice of Violation ML0316701792003-06-0404 June 2003 National Pollutant Discharge Elimination System (NPDES) Permit No. TN0020168 - Response to Notice of Violation 2020-07-08
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 October 15, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant (WBN) Unit 2 - Denial of Notice of Violation (NOV)05000391/2010603-08, Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Additional Information
Reference:
- 1. NRC letter to TVA, Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated Inspection Report 05000391/2010603 and Notice of Violation, dated August 5, 2010 (ML102170465)
- 2. TVA letter to NRC, Watts Bar Nuclear Plant (WBN) Unit 2 - Denial of Notice of Violation (NOV)05000391/2010603-08, Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers (ML102520435)
By letter dated August 5, 2010 (Reference 1), the U.S. Nuclear Regulatory Commission (NRC) issued Inspection Report Number 05000391/2010603 concerning the April 6-30, 2010, inspection conducted at Tennessee Valley Authoritys (TVA) WBN Unit 2. By letter dated September 7, 2010 (Reference 2), the sentence The calculated natural frequencies of the front cover panel in the three directions were also in excess of 33 Hz and rigid should not have been included in the letter at that time. This was first identified by TVA on September 13, 2010, and discussed with Theodore Fanelli and Guillermo Crespo in a meeting at WBN site on September 14, 2010. This condition has been entered in the Corrective Action Program.
Subsequently, a calculation was issued that validated the above sentence.
There are no new commitments associated with this submittal. If you have any questions, please contact William Crouch at (423) 365-2004.
U.S. Nuclear Regulatory Commission Page 2 October 15, 2010 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th day of October, 2010.
Sincerely, cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381