Request for Extension for Time to Respond to Severity Level IV, Non-Cited Violation 05000390-11-008-01
ML11105A150
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/11/2011
From: Krich R
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IR-11-008
Download: ML11105A150 (2)


Text

Tennessee Valley Authority 1101 Market Street, LP 3R Chattanooga, Tennessee 37402-2801 R. M. Krich Vice President Nuclear Licensing April 11,2011 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390

Subject:

Request for Extension for Time to Respond to Severity Level IV, Non-Cited Violation 0500039012011008-01, "Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specifications Associated with the Essential Raw Cooling Water System"

Reference:

Letter from NRC (G. T. Hopper) to TVA (R. M. Krich),

"Watts Bar Nuclear Plant, Unit 1 - NRC Problem Identification and Resolution Inspection Report 05000390/2011008," dated March 11,2011 In the above Reference, the NRC issued Severity Level IV Non-Cited Violation (NCV)05000390/2011008-01, "Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specifications Associated with the Essential Raw Cooling Water System." In the cover letter for the Reference, the NRC stated:

If you wish to contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, A TTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional AdministratorRegion II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Senior Resident Inspectorat the Watts Bar Nuclear Plant, Unit 1. -

printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 April 11,2011 Based on the issuance date for the above Reference, the 30-day response date to potentially contest this NCV is April 11, 2011.

TVA has conducted preliminary review of the NCV. To complete a more comprehensive review of the NCV, TVA requests that the response date for potential challenge of the referenced NCV be extended to May 11, 2011. Kara Stacy of my staff spoke to Craig Kontz of NRC Region II, Division of Reactor Projects, on April 11, 2011, to advise the NRC of TVA's request for an extension.

If you have any questions in this matter, please contact me at 423-751-3628.

Respectfully, R. M. Krich cc:

NRC Director, Office of Enforcement NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 1