{{#Wiki_filter:Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
{{#Wiki_filter:Appendix C                   Job Performance Measure               Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Facility: Columbia Generating Station        Task No:
Task Title: Determine Jet Pump              Job Performance Measure No: SA.1JPM Operability Page 1 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Appendix C                 Job Performance Measure     Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 1. John Q Operator
 
: 2. SS # - 5555     5555
the operator.
: 3. DOB - 01/01/71
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. 1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
K/A  
GEN-RPP-07.
Page 1                                               
 
Sa4jpmr1 Facility:  Columbia Generating Station Task No:
Task Title:  Determine Jet Pump Operability Job Performance Measure No: SA.1JPM Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 2                                               
 
Sa4jpmr1 K/A  


==Reference:==
==Reference:==
2.1.7 3.7/4.4 Examinee: NRC Examiner:
2.1.7 3.7/4.4 Examinee:                                 NRC Examiner:
Facility Evaluator:
Facility Evaluator:                       Date: 02/22/01 Page 2 Sa4jpmr1
Date: 02/22/01 Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 3                                               
 
Sa4jpmr1 Method of testing:
Admin - Simulate Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per


GEN-RPP-07.
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 4                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Method of testing:
Admin - Simulate Page 3 Sa4jpmr1


Sa4jpmr1 Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Appendix C           Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Page 4 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
JPM SETUP INFORMATION Page 5 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                  Job Performance Measure                Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Initial Conditions:    The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Task Standard:          Perform a manual calculation for Jet Pump Operability per OSP-RRC-D701.
Page 6 Sa4jpmr1


the operator.
Appendix C                   Job Performance Measure                 Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
 
: 2. SS # - 5555     5555
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
GEN-RPP-07.
: 5. 6.875 rem TEDE lifetime.
Page 5                                               
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Sa4jpmr1 JPM SETUP INFORMATION Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Required Materials:     N/A General  
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 6                                               
 
Sa4jpmr1 Initial Conditions:   
 
The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Task Standard:
Perform a manual calculation for Jet Pump Operability per OSP-RRC-D701.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 7                                               
 
Sa4jpmr1 Required Materials:
N/A General  


==References:==
==References:==
OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1 Initiating Cue:        The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Page 7 Sa4jpmr1


OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1 Initiating Cue:
Appendix C                 Job Performance Measure                   Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 1. Determine if Jet Pumps JP1 through JP10 are operable.
: 2. Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
: 3. A Histogram is not available.
Time Critical Task:    NO Page 8 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                  Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Validation Time:        15 min.
Simulator ICs:          14 in freeze Malfunctions/Remote    N/A Triggers:
Page 9 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C              Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Overrides:              N/A Special Setup          N/A Instructions:
Page 10 Sa4jpmr1


the operator.
Appendix C              Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
PERFORMANCE INFORMATION Page 11 Sa4jpmr1


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C                Job Performance Measure                  Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
START TIME:
Critical Step: YES Performance Step: 1    Using the supplied OSP-RRC-D701 rev 5, step 7.2.3.a and 7.2.3.b and Attachment 10.1; perform the jet pump operability for JP1 through JP10.
Page 12 Sa4jpmr1


GEN-RPP-07.
Appendix C                Job Performance Measure                  Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 8                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
CUE:
Standard:              1. Jet pump panel readings are recorded within 10% of panel indications - See attached copy of 10.1.
: 2. All Jet pumps are determined to be operable - The YES box is checked for step 7.2.3.b.
Page 13 Sa4jpmr1


Sa4jpmr1 1.Determine if Jet Pumps JP1 through JP10 are operable.
Appendix C           Job Performance Measure   Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
2.Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
3.A Histogram is not available.
: 1. John Q Operator
Time Critical Task:
: 2. SS # - 5555     5555
NO Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Comment:
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 9                                               
 
Sa4jpmr1 Validation Time:
15 min.Simulator ICs:
14 in freeze Malfunctions/Remote Triggers: N/A Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 10                                               
 
Sa4jpmr1 Overrides:
N/A Special Setup Instructions:
N/A Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 11                                               
 
Sa4jpmr1 PERFORMANCE INFORMATION Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 12                                               
 
Sa4jpmr1 START TIME:
Critical Step:  YES Performance Step: 1 Using the supplied OSP-RRC-D701 rev 5, step 7.2.3.a and 7.2.3.b and Attachment 10.1; perform the jet pump operability for JP1 through JP10.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 13                                               
 
Sa4jpmr1 CUE:  Standard: 1.Jet pump panel readings are recorded within 10% of panel indications - See attached copy of 10.1.
2.All Jet pumps are determined to be operable - The YES box is checked for step 7.2.3.b.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 14                                               
 
Sa4jpmr1 Comment:
SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.
SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 14 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 1. John Q Operator
 
: 2. SS # - 5555     5555
the operator.
: 3. DOB - 01/01/71
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. 1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
JPM TERMINATION TIME:
GEN-RPP-07.
JPM START TIME:        -
Page 15                                               
 
Sa4jpmr1 JPM TERMINATION TIME: JPM START TIME:        -
JPM COMPLETION TIME:
JPM COMPLETION TIME:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 15 Sa4jpmr1
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per


GEN-RPP-07.
Appendix C                  Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 16                                              
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
VERIFICATION OF COMPLETION JPM Number:            SA.1JPM Examinees Name:
Page 16 Sa4jpmr1


Sa4jpmr1 VERIFICATION OF COMPLETION JPM Number:
Appendix C           Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
SA.1JPM Examinee's Name:
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 1. John Q Operator
 
: 2. SS # - 5555     5555
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
the operator.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
Examiners Name:
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 17                                               
 
Sa4jpmr1 Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 17 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 1. John Q Operator
 
: 2. SS # - 5555     5555
the operator.
: 3. DOB - 01/01/71
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. 1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Number of Attempts:
GEN-RPP-07.
Page 18                                               
 
Sa4jpmr1 Number of Attempts:
Time to Complete:
Time to Complete:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 18 Sa4jpmr1
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 19                                               
 
Sa4jpmr1 JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 20                                               


Sa4jpmr1 READ TO THE EXAMINEE:
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Page 19 Sa4jpmr1


performance measure will be satisfied.
Appendix C                     Job Performance Measure                   Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Task Standard:
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
Perform a manual calculation for Jet Pump Operability per OSP-RRC-D701.
: 1. John Q Operator
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Task Standard:              Perform a manual calculation for Jet Pump Operability per OSP-RRC-D701.
Page 20 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                Job Performance Measure                    Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 1. John Q Operator
 
: 2. SS # - 5555     5555
the operator.
: 3. DOB - 01/01/71
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. 1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Required Materials:     N/A Safety Equipment:       N/A General  
GEN-RPP-07.
Page 21                                               
 
Sa4jpmr1 Required Materials:
N/A Safety Equipment:
N/A General  


==References:==
==References:==
OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1 Page 21 Sa4jpmr1


OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1 Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Appendix C                   Job Performance Measure                 Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Time Critical Task:    NO Initial Conditions:    The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Page 22 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                  Job Performance Measure                Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
INITIATING CUE The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Page 23 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                    Job Performance Measure            Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 1. Determine if Jet Pumps JP1 through JP10 are operable.
: 2. Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
: 3. A Histogram is not available.
Page 24 Sa4jpmr1


the operator.
Appendix C               Job Performance Measure               Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
 
: 2. SS # - 5555     5555
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
GEN-RPP-07.
: 5. 6.875 rem TEDE lifetime.
Page 22                                               
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Sa4jpmr1 Time Critical Task:
INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number:                             Validation Time: 15 min.
NO Initial Conditions:   
 
The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 23                                               
 
Sa4jpmr1 INITIATING CUE The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 24                                               
 
Sa4jpmr1 1.Determine if Jet Pumps JP1 through JP10 are operable.
2.Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
3.A Histogram is not available.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 25                                               
 
Sa4jpmr1 INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number:
Validation Time: 15 min.
NUREG 1123  
NUREG 1123  


==Reference:==
==Reference:==
2.1.7 3.7/4.4 Time Critical: NO Location: Simulator Performance Method: Perform - Admin Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
2.1.7 3.7/4.4     Time Critical: NO Location: Simulator                     Performance Method: Perform - Admin Page 25 Sa4jpmr1
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 26                                               
 
Sa4jpmr1 Prepared/Revised by:  S Hutchison Revision Date:  1/11/01 Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 27                                               
 
Sa4jpmr1 STUDENT INFORMATION Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 28                                               
 
Sa4jpmr1 Initial Conditions:   
 
The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 29                                               
 
Sa4jpmr1 INITIATING CUE The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                Job Performance Measure            Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Prepared/Revised by: S Hutchison          Revision Date: 1/11/01 Page 26 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
STUDENT INFORMATION Page 27 Sa4jpmr1


the operator.
Appendix C                Job Performance Measure          Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Initial Conditions:    The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Page 28 Sa4jpmr1


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C              Job Performance Measure          Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
INITIATING CUE The plant is operating at 100% power. The Jet Pump Operability surveillance is due.
Page 29 Sa4jpmr1


GEN-RPP-07.
Appendix C                Job Performance Measure      Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 30                                              
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 1. Determine if Jet Pumps JP1 through JP10 are operable.
: 2. Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
: 3. A Histogram is not available.
Page 30 Sa4jpmr1


Sa4jpmr1 1.Determine if Jet Pumps JP1 through JP10 are operable.
Appendix C           Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
2.Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
3.A Histogram is not available.
: 1. John Q Operator
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Page 31 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                  Job Performance Measure                Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Facility: Columbia Generating Station      Task No:
Task Title: Interrupt EWDs                  Job Performance Measure No: SA.2JM Page 1 Sa2jpmrr


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                 Job Performance Measure     Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
the operator.
: 1. John Q Operator
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 2. SS # - 5555     5555
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
GEN-RPP-07.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Page 31                                               
K/A  
 
Sa4jpmr1 Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 1                                               
 
Sa2jpmrr Facility:  Columbia Generating Station Task No:
Task Title:  Interrupt EWDs Job Performance Measure No: SA.2JM Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 2                                               
 
Sa2jpmrr K/A  


==Reference:==
==Reference:==
2.1.24 2.8/3.1 Examinee: NRC Examiner:
2.1.24 2.8/3.1 Examinee:                                   NRC Examiner:
Facility Evaluator:
Facility Evaluator:                         Date: 02/22/01 Page 2 Sa2jpmrr
Date: 02/22/01 Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Method of testing:
Admin - Simulate Page 3 Sa2jpmrr


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Page 4 Sa2jpmrr


the operator.
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
JPM SETUP INFORMATION Page 5 Sa2jpmrr


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C                  Job Performance Measure                  Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Initial Conditions:    The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.
Task Standard:          Indications for the start of ROA-FN-1A are explained correctly using EWD 80E001.
Page 6 Sa2jpmrr


GEN-RPP-07.
Appendix C                 Job Performance Measure                   Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 3                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
 
: 1. John Q Operator
Sa2jpmrr Method of testing:
: 2. SS # - 5555     5555
Admin - Simulate Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Required Materials:     N/A General  
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 4                                               
 
Sa2jpmrr Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 5                                               
 
Sa2jpmrr JPM SETUP INFORMATION Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 6                                               
 
Sa2jpmrr Initial Conditions:  
 
The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.
Task Standard:
Indications for the start of ROA-FN-1A are explained correctly using EWD 80E001.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 7                                               
 
Sa2jpmrr Required Materials:
N/A General  


==References:==
==References:==
EWD 80E001 Initiating Cue:        The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario Page 7 Sa2jpmrr


EWD 80E001 Initiating Cue:
Appendix C                   Job Performance Measure                     Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
 
: 1. John Q Operator
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 2. SS # - 5555      5555
 
: 3. DOB - 01/01/71
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
occurs:
: 1. The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
: 2. The CRO notices that the green STOP/OFF indication at the control switch is off. Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.
: 3. The EO reports the breaker closes by sound and the manual Page 8 Sa2jpmrr


the operator.
Appendix C                 Job Performance Measure                     Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
 
: 2. SS # - 5555     5555
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
GEN-RPP-07.
: 5. 6.875 rem TEDE lifetime.
Page 8                                               
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Sa2jpmrr occurs: 1.The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
indicators but there is no closed indication on the lights on the breaker door.
2.The CRO notices that the green STOP/OFF indication at the control switch is off. Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.
: 4. The CRO also notes there is no closed/running indication in the control room.
3.The EO reports the breaker closes by sound and the manual Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 5. The CRO places the control switch in the TRIP position.
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 9                                               
 
Sa2jpmrr indicators but there is no closed indication on the lights on the breaker door.
4.The CRO also notes there is no closed/running indication in the control room.
5.The CRO places the control switch in the TRIP position.
Nothing happens, the fan continues to run.
Nothing happens, the fan continues to run.
6.All light bulbs have been verified as good.
: 6. All light bulbs have been verified as good.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 9 Sa2jpmrr


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                  Job Performance Measure              Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.
Time Critical Task:    NO Validation Time:        10 min.
Simulator ICs:          N/A Page 10 Sa2jpmrr


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C              Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Malfunctions/Remote    N/A Triggers:
Overrides:              N/A Special Setup          N/A Instructions:
Page 11 Sa2jpmrr


the operator.
Appendix C              Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
PERFORMANCE INFORMATION START TIME:
Page 12 Sa2jpmrr


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C                Job Performance Measure              Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Critical Step: YES Performance Step: 1    Demonstrate on EWD 80E001 the reason for the indications in the Initiating Cue.
Standard:              Using EWD 80E001, demonstrate the following :
Page 13 Sa2jpmrr


GEN-RPP-07.
Appendix C                Job Performance Measure                        Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 10                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 1. For the fan to start, the close fuses, FO3-1, FO3-2, F10-1, and F10-2 have to be installed and operable.
: 2. All light indications for the fan are in the trip circuit.
: 3. For the fan to trip, the trip fuses FO4-1 and FO4-2 have to be installed and operable.
: 4. Since the fan started the close fuses were good.
: 5. Since there was no breaker indication locally or in the Page 14 Sa2jpmrr


Sa2jpmrr Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.
Appendix C                 Job Performance Measure                     Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Time Critical Task:
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
NO Validation Time:
: 1. John Q Operator
10 min.Simulator ICs:
: 2. SS # - 5555      5555
N/A Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
control room and the fan would not trip with the control switch the trip fuses FO4-1 and FO4-2 (either or both) are blown or not installed correctly.
FOR FULL CREDIT - It must be indicated that bad/blown trip fuses prevent both light indication and the trip of the fan.
Page 15 Sa2jpmrr


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Appendix C           Job Performance Measure   Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 1. John Q Operator
 
: 2. SS # - 5555     5555
the operator.
: 3. DOB - 01/01/71
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. 1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Comment:
GEN-RPP-07.
Page 11                                               
 
Sa2jpmrr Malfunctions/Remote Triggers: N/A Overrides:
N/A Special Setup Instructions:
N/A Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 12                                               
 
Sa2jpmrr PERFORMANCE INFORMATION START TIME:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 13                                               
 
Sa2jpmrr Critical Step:  YES Performance Step: 1 Demonstrate on EWD 80E001 the reason for the indications in the Initiating Cue.
Standard: Using EWD 80E001, demonstrate the following :
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 14                                               
 
Sa2jpmrr 1.For the fan to start, the close fuses, FO3-1, FO3-2, F10-1, and F10-2 have to be installed and operable.
2.All light indications for the fan are in the trip circuit.
3.For the fan to trip, the trip fuses FO4-1 and FO4-2 have to be installed and operable.
4.Since the fan started the close fuses were good.
5.Since there was no breaker indication locally or in the Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 15                                               
 
Sa2jpmrr control room and the fan would not trip with the control switch the trip fuses FO4-1 and FO4-2 (either or both) are blown or not installed correctly.
FOR FULL CREDIT
- It must be indicated that bad/blown trip fuses prevent both light indication and the trip of the fan.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 16                                               
 
Sa2jpmrr Comment:
SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.
SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 16 Sa2jpmrr


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 1. John Q Operator
 
: 2. SS # - 5555     5555
the operator.
: 3. DOB - 01/01/71
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. 1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
JPM TERMINATION TIME:
GEN-RPP-07.
JPM START TIME:        -
Page 17                                               
 
Sa2jpmrr JPM TERMINATION TIME: JPM START TIME:        -
JPM COMPLETION TIME:
JPM COMPLETION TIME:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 17 Sa2jpmrr
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                  Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
VERIFICATION OF COMPLETION JPM Number:            SA.2JPM Examinees Name:
Page 18 Sa2jpmrr


the operator.
Appendix C           Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
 
: 2. SS # - 5555     5555
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
GEN-RPP-07.
: 5. 6.875 rem TEDE lifetime.
Page 18                                               
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Sa2jpmrr VERIFICATION OF COMPLETION JPM Number:
Examiners Name:
SA.2JPM Examinee's Name:
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 19                                               
 
Sa2jpmrr Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 19 Sa2jpmrr


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 1. John Q Operator
 
: 2. SS # - 5555     5555
the operator.
: 3. DOB - 01/01/71
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. 1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Number of Attempts:
GEN-RPP-07.
Page 20                                               
 
Sa2jpmrr Number of Attempts:
Time to Complete:
Time to Complete:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 20 Sa2jpmrr
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 21                                               
 
Sa2jpmrr JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to


the operator.
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Page 21 Sa2jpmrr


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C                      Job Performance Measure                  Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Task Standard:              Indications for the start of ROA-FN-1A are explained correctly using EWD 80E001.
Page 22 Sa2jpmrr


GEN-RPP-07.
Appendix C               Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 22                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
 
: 1. John Q Operator
Sa2jpmrr READ TO THE EXAMINEE:
: 2. SS # - 5555     5555
I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
performance measure will be satisfied.
: 5. 6.875 rem TEDE lifetime.
Task Standard:
: 6. All dose is from Energy Northwest exposure.
Indications for the start of ROA-FN-1A are explained correctly using EWD 80E001.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Required Materials:     N/A Safety Equipment:       N/A General  
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 23                                               
 
Sa2jpmrr Required Materials:
N/A Safety Equipment:
N/A General  


==References:==
==References:==
EWD 80E001 Page 23 Sa2jpmrr


EWD 80E001 Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Appendix C                 Job Performance Measure               Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 1. John Q Operator
 
: 2. SS # - 5555     5555
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
the operator.
: 5. 6.875 rem TEDE lifetime.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 6. All dose is from Energy Northwest exposure.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Time Critical Task:     N/A Initial Conditions:     The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
Page 24 Sa2jpmrr
 
GEN-RPP-07.
Page 24                                               
 
Sa2jpmrr Time Critical Task:
N/A Initial Conditions:  
 
The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C                    Job Performance Measure              Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
INITIATING CUE The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario occurs:
Page 25 Sa2jpmrr


GEN-RPP-07.
Appendix C                     Job Performance Measure                   Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 25                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
 
: 1. John Q Operator
Sa2jpmrr INITIATING CUE The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario occurs:
: 2. SS # - 5555     5555
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
: 1. The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
the operator.
: 2. The CRO notices that the green STOP/OFF indication at the control switch is off.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 26                                               
 
Sa2jpmrr 1.The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
2.The CRO notices that the green STOP/OFF indication at the control switch is off.
Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.
Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.
3.The EO reports the breaker closes by sound and the manual indicators but there is no Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 3. The EO reports the breaker closes by sound and the manual indicators but there is no Page 26 Sa2jpmrr


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                      Job Performance Measure                Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
closed indication on the lights on the breaker door.
: 4. The CRO also notes there is no closed/running indication in the control room.
: 5. The CRO places the control switch in the TRIP position. Nothing happens, the fan continues to run.
: 6. All light bulbs have been verified as good.
Page 27 Sa2jpmrr


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C              Job Performance Measure                  Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
the operator.
: 1. John Q Operator
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 2. SS # - 5555     5555
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
GEN-RPP-07.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Page 27                                               
Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.
INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Page 28 Sa2jpmrr


Sa2jpmrr closed indication on the lights on the breaker door.
Appendix C               Job Performance Measure               Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
4.The CRO also notes there is no closed/running indication in the control room.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.The CRO places the control switch in the TRIP position. Nothing happens, the fan continues to run.
: 1. John Q Operator
6.All light bulbs have been verified as good.
: 2. SS # - 5555     5555
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Task Number:                             Validation Time: 10 min.
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 28                                               
 
Sa2jpmrr Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.
INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 29                                               
 
Sa2jpmrr Task Number:
Validation Time: 10 min.
NUREG 1123  
NUREG 1123  


==Reference:==
==Reference:==
2.1.24 2.8/3.1 Time Critical: NO Location: Simulator Performance Method: Simulate - Admin Prepared/Revised by: S Hutchison Revision Date: 1/11/01 Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
2.1.24 2.8/3.1     Time Critical: NO Location: Simulator                       Performance Method: Simulate - Admin Prepared/Revised by: S Hutchison         Revision Date: 1/11/01 Page 29 Sa2jpmrr


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
STUDENT INFORMATION Page 30 Sa2jpmrr


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                  Job Performance Measure            Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Initial Conditions:    The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.
Page 31 Sa2jpmrr


the operator.
Appendix C              Job Performance Measure          Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
INITIATING CUE The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario occurs:
Page 32 Sa2jpmrr


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C                Job Performance Measure              Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 1. The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
: 2. The CRO notices that the green STOP/OFF indication at the control switch is off. Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.
Page 33 Sa2jpmrr


GEN-RPP-07.
Appendix C                 Job Performance Measure               Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 30                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
 
: 1. John Q Operator
Sa2jpmrr STUDENT INFORMATION Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 2. SS # - 5555     5555
 
: 3. DOB - 01/01/71
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 4. 1.8 rem TEDE year to date.
 
: 5. 6.875 rem TEDE lifetime.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
the operator.
: 3. The EO reports the breaker closes by sound and the manual indicators but there is no closed indication on the lights on the breaker door.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. The CRO also notes there is no closed/running indication in the control room.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. The CRO places the control switch in the TRIP position. Nothing Page 34 Sa2jpmrr
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per


GEN-RPP-07.
Appendix C               Job Performance Measure         Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 31                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
 
: 1. John Q Operator
Sa2jpmrr Initial Conditions:   
: 2. SS # - 5555     5555
 
: 3. DOB - 01/01/71
The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.
: 4. 1.8 rem TEDE year to date.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
happens, the fan continues to run.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 6. All light bulbs have been verified as good.
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 32                                               
 
Sa2jpmrr INITIATING CUE The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario occurs:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 33                                               
 
Sa2jpmrr 1.The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
2.The CRO notices that the green STOP/OFF indication at the control switch is off. Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 34                                               
 
Sa2jpmrr 3.The EO reports the breaker closes by sound and the manual indicators but there is no closed indication on the lights on the breaker door.
4.The CRO also notes there is no closed/running indication in the control room. 5.The CRO places the control switch in the TRIP position. Nothing Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 35                                               
 
Sa2jpmrr happens, the fan continues to run.
6.All light bulbs have been verified as good.
Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.
Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 35 Sa2jpmrr


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Page 36 Sa2jpmrr


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                 Job Performance Measure               Form ES-C-1 Worksheet SA.3JPM Facility: Columbia Generating Station       Task No: SRO-0026 Task Title: Complete Planned Special       Job Performance Measure No: SA.3JPM Exposure K/A  
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 36                                               
 
Sa2jpmrr Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.3JPM Page 1                                               
 
Sa3jpmr0 Facility: Columbia Generating Station Task No: SRO-0026 Task Title: Complete Planned Special Exposure Job Performance Measure No: SA.3JPM K/A  


==Reference:==
==Reference:==
2.3.4 2.5/3.1 Examinee: NRC Examiner:
2.3.4 2.5/3.1 Examinee:                                   NRC Examiner:
Facility Evaluator:
Facility Evaluator:                         Date: 02/22/01 Method of testing:
Date: 02/22/01 Method of testing:
Admin - Simulate Page 1 Sa3jpmr0
Admin - Simulate Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.3JPM Page 2                                               
 
Sa3jpmr0 JPM SETUP INFORMATION Initial Conditions:   
 
The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is expected to receive a total of


350 mrem to perform the task. An Increased Exposure Request is required for the task.
Appendix C                Job Performance Measure                    Form ES-C-1 Worksheet SA.3JPM JPM SETUP INFORMATION Initial Conditions: The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is expected to receive a total of 350 mrem to perform the task. An Increased Exposure Request is required for the task.
Task Standard:
Task Standard:     The paperwork for the Increased Exposure Request is completed in accordance with GEN-RPP-07.
The paperwork for the Increased Exposure Request is completed in accordance with GEN-RPP-07.
Required Materials: N/A General  
Required Materials:
N/A General  


==References:==
==References:==
GEN-RPP-07.
GEN-RPP-07.
Initiating Cue:
Initiating Cue:     The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following
: 1. John Q Operator
: 2. SS # - 555-55-5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Time Critical Task: NO Validation Time:    10 min.
Simulator ICs:      N/A Malfunctions/Remote N/A Triggers:
Overrides:          N/A Special Setup      N/A Instructions:
Page 2 Sa3jpmr0


information applies to the operator.
Appendix C             Job Performance Measure                   Form ES-C-1 Worksheet SA.3JPM PERFORMANCE INFORMATION START TIME:
1.John Q Operator 2.SS # - 555-55-5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
Critical Step: YES Performance Step: 1 Complete the first 3 sections of the Increased Exposure Request as the Supervisor of the designated operator.
5.6.875 rem TEDE lifetime.
Standard:           Increased Exposure Request form is completed in accordance with GEN-RPP-07.
6.All dose is from Energy Northwest exposure.
Grading Standard - compare candidates completed form with the attached form. Passing Criteria = each required section must match the attached form. The reason and justification must match the intent.
As the operator's supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Time Critical Task:
NO Validation Time:
10 min.Simulator ICs:
N/A Malfunctions/Remote Triggers: N/A Overrides:
N/A Special Setup Instructions:
N/A Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.3JPM Page 3                                               
 
Sa3jpmr0 PERFORMANCE INFORMATION START TIME:
Critical Step: YES Performance Step:  1 Complete the first 3 sections of the Increased Exposure Request as the Supervisor of the designated operator.
Standard: Increased Exposure Request form is completed in accordance with GEN-RPP-07.
Grading Standard - compare candidates completed form with the attached form. Passing Criteria = each required section must match the attached form. The reason and justification
 
must match the intent.
Comment:
Comment:
SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.
SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.
JPM TERMINATION TIME: JPM START TIME:         -
JPM TERMINATION TIME:
JPM START TIME:     -
JPM COMPLETION TIME:
JPM COMPLETION TIME:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.3JPM Page 4                                               
Page 3 Sa3jpmr0
 
Sa3jpmr0 VERIFICATION OF COMPLETION JPM Number:
SA.3JPM Examinee's Name:
Examiner's Name:


Appendix C              Job Performance Measure Form ES-C-1 Worksheet SA.3JPM VERIFICATION OF COMPLETION JPM Number:        SA.3JPM Examinees Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.3JPM Page 5                                               
Page 4 Sa3jpmr0


Sa3jpmr0 JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE READ TO THE EXAMINEE:
Appendix C                      Job Performance Measure                    Form ES-C-1 Worksheet SA.3JPM JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide
I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Task Standard:             The paperwork for the Increased Exposure Request is completed in accordance with GEN-RPP-07.
initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Required Materials:         N/A Safety Equipment:           N/A General  
Task Standard:
The paperwork for the Increased Exposure Request is completed in accordance with GEN-RPP-07.
Required Materials:
N/A Safety Equipment:
N/A General  


==References:==
==References:==
GEN-RPP-07.
GEN-RPP-07.
Time Critical Task:
Time Critical Task:         NO Initial Conditions:         The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is expected to receive a total of 350 mrem to perform the task. An Increased Exposure Request is required for the task.
NO Initial Conditions:  
 
The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is expected to receive a total of 350 mrem to perform the task. An Increased Exposure Request is required for the task.
INITIATING CUE The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
INITIATING CUE The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
1.John Q Operator 2.SS # - 555-55-5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 1. John Q Operator
5.6.875 rem TEDE lifetime.
: 2. SS # - 555-55-5555
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.3JPM Page 6                                               
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
Page 5 Sa3jpmr0


Sa3jpmr0 6.All dose is from Energy Northwest exposure.
Appendix C                  Job Performance Measure                Form ES-C-1 Worksheet SA.3JPM
As the operator's supervisor, complete the Increased Exposure Request per GEN-RPP-
: 6. All dose is from Energy Northwest exposure.
: 07. INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number: SRO-0026 Validation Time: 10 min.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number: SRO-0026                         Validation Time: 10 min.
NUREG 1123  
NUREG 1123  


==Reference:==
==Reference:==
2.3.4 2.5/3.1 Time Critical: NO Location: Admin Performance Method: Simulate Prepared/Revised by: S Hutchison Revision Date: 1/10/01 Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.3JPM Page 7                                               
2.3.4 2.5/3.1           Time Critical: NO Location: Admin                               Performance Method: Simulate Prepared/Revised by: S Hutchison             Revision Date: 1/10/01 Page 6 Sa3jpmr0


Sa3jpmr0 STUDENT INFORMATION Initial Conditions:     
Appendix C                Job Performance Measure              Form ES-C-1 Worksheet SA.3JPM STUDENT INFORMATION Initial Conditions:    The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is expected to receive a total of 350 mrem to perform the task. An Increased Exposure Request is required for the task.
 
The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot
 
spot from a trap in the drywell. The operator selected is expected to receive a total of 350 mrem to perform the task. An Increased Exposure Request is required for the task.
INITIATING CUE The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
INITIATING CUE The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
1.John Q Operator 2.SS # - 555-55-5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 1. John Q Operator
5.6.875 rem TEDE lifetime.
: 2. SS # - 555-55-5555
6.All dose is from Energy Northwest exposure.
: 3. DOB - 01/01/71
As the operator's supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 4. 1.8 rem TEDE year to date.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Page 7 Sa3jpmr0
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 1                                               
 
Sa4jpmr1 Facility:  Columbia Generating Station Task No:  SRO-0233 Task Title:  Classify the Event Job Performance Measure No: SA.4JPM Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per


GEN-RPP-07.
Appendix C                  Job Performance Measure                Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 2                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Facility: Columbia Generating Station        Task No: SRO-0233 Task Title: Classify the Event              Job Performance Measure No: SA.4JPM Page 1 Sa4jpmr1


Sa4jpmr1 K/A  
Appendix C                  Job Performance Measure      Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
K/A  


==Reference:==
==Reference:==
2.4.41 2.3/4.1 Examinee: NRC Examiner:
2.4.41 2.3/4.1 Examinee:                                   NRC Examiner:
Facility Evaluator:
Facility Evaluator:                         Date: 02/22/01 Page 2 Sa4jpmr1
Date: 02/22/01 Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 3                                               
 
Sa4jpmr1 Method of testing:
Admin - Simulate Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Method of testing:
Admin - Simulate Page 3 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Page 4 Sa4jpmr1


the operator.
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
JPM SETUP INFORMATION Page 5 Sa4jpmr1


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C                  Job Performance Measure                  Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Initial Conditions:    The plant is in Mode 3.
Task Standard:          Classify the event correctly per PPM 13.1.1 Classifying the Emergency.
Page 6 Sa4jpmr1


GEN-RPP-07.
Appendix C                 Job Performance Measure                   Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 4                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
 
: 1. John Q Operator
Sa4jpmr1 Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 2. SS # - 5555     5555
 
: 3. DOB - 01/01/71
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 4. 1.8 rem TEDE year to date.
 
: 5. 6.875 rem TEDE lifetime.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
the operator.
Required Materials:     N/A General  
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 5                                               
 
Sa4jpmr1 JPM SETUP INFORMATION Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 6                                               
 
Sa4jpmr1 Initial Conditions:   
 
The plant is in Mode 3.
Task Standard:
Classify the event correctly per PPM 13.1.1 Classifying the Emergency.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 7                                               
 
Sa4jpmr1 Required Materials:
N/A General  


==References:==
==References:==
PPM 13.1.1 rev 28, page 13 Initiating Cue:        The plant is in Mode 3. The following conditions exist:
Page 7 Sa4jpmr1


PPM 13.1.1 rev 28, page 13 Initiating Cue:
Appendix C                 Job Performance Measure                     Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
The plant is in Mode 3. The following conditions exist:
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 1. John Q Operator
 
: 2. SS # - 5555     5555
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
the operator.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 1. Reactor Pressure is 687 psig and down slow
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 2. Reactor Level is -62 inches and stable
 
: 3. Drywell temperature is 251°F and up slow
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 4. Drywell pressure is 8 psig and up slow
 
: 5. Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.
GEN-RPP-07.
: 6. Wind direction 300° Page 8 Sa4jpmr1
Page 8                                               
 
Sa4jpmr1 1.Reactor Pressure is 687 psig and down slow 2.Reactor Level is -62 inches and stable 3.Drywell temperature is 251°F and up slow 4.Drywell pressure is 8 psig and up slow 5.Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.
6.Wind direction 300° Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 9                                               
 
Sa4jpmr1 7.Wind speed 8 mph 8.Stability Classification E 9.No precipitation Based on these conditions, determine the Emergency Classification, and complete a CNF form.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 10                                               
 
Sa4jpmr1 Time Critical Task:
NO Validation Time:
15 min Simulator ICs:
N/A Malfunctions/Remote Triggers: N/A Overrides:
N/A Special Setup N/A Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 11                                               
 
Sa4jpmr1 Instructions:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 12                                               
 
Sa4jpmr1 PERFORMANCE INFORMATION Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                  Job Performance Measure                Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 7. Wind speed 8 mph
: 8. Stability Classification E
: 9. No precipitation Based on these conditions, determine the Emergency Classification, and complete a CNF form.
Page 9 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                  Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Time Critical Task:    NO Validation Time:        15 min Simulator ICs:          N/A Malfunctions/Remote    N/A Triggers:
Overrides:              N/A Special Setup          N/A Page 10 Sa4jpmr1


the operator.
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Instructions:
Page 11 Sa4jpmr1


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C              Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
GEN-RPP-07.
: 1. John Q Operator
Page 13                                               
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
PERFORMANCE INFORMATION Page 12 Sa4jpmr1


Sa4jpmr1 START TIME:
Appendix C                Job Performance Measure            Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Critical Step: Yes Performance Step: 1 Review plant data and complete CNF form.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
START TIME:
Critical Step: Yes Performance Step: 1     Review plant data and complete CNF form.
CUE:
CUE:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 13 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                Job Performance Measure                Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Standard:              1. Review data and complete CNF form as attached.
: 2. EAL is ALERT based on either 2.1.a.1 or 3.1.a.1 of PPM 13.1.1.
Comment:
Page 14 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C          Job Performance Measure    Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.
Page 15 Sa4jpmr1


the operator.
Appendix C             Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
 
: 2. SS # - 5555     5555
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
GEN-RPP-07.
: 5. 6.875 rem TEDE lifetime.
Page 14                                               
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Sa4jpmr1 Standard: 1.Review data and complete CNF form as attached.
JPM TERMINATION TIME:
2.EAL is ALERT based on either 2.1.a.1 or 3.1.a.1 of PPM 13.1.1.Comment:
JPM START TIME:        -
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 15                                               
 
Sa4jpmr1 SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 16                                               
 
Sa4jpmr1 JPM TERMINATION TIME: JPM START TIME:        -
JPM COMPLETION TIME:
JPM COMPLETION TIME:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 16 Sa4jpmr1
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to


the operator.
Appendix C                  Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
VERIFICATION OF COMPLETION JPM Number:            SA.4JPM Examinees Name:
Page 17 Sa4jpmr1


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C           Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
GEN-RPP-07.
: 1. John Q Operator
Page 17                                               
: 2. SS # - 5555     5555
 
: 3. DOB - 01/01/71
Sa4jpmr1 VERIFICATION OF COMPLETION JPM Number:
: 4. 1.8 rem TEDE year to date.
SA.4JPM Examinee's Name:
: 5. 6.875 rem TEDE lifetime.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Examiners Name:
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 18                                               
 
Sa4jpmr1 Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 18 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
: 1. John Q Operator
 
: 2. SS # - 5555     5555
the operator.
: 3. DOB - 01/01/71
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
: 4. 1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 5. 6.875 rem TEDE lifetime.
 
: 6. All dose is from Energy Northwest exposure.
exposure.As the operator's supervisor, complete the Increased Exposure Request per
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
 
Number of Attempts:
GEN-RPP-07.
Page 19                                               
 
Sa4jpmr1 Number of Attempts:
Time to Complete:
Time to Complete:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Page 19 Sa4jpmr1
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 20                                               
 
Sa4jpmr1 JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 21                                               
 
Sa4jpmr1 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job
 
performance measure will be satisfied.
Task Standard:
Classify the event correctly per PPM 13.1.1 Classifying the Emergency.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Page 20 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                      Job Performance Measure                  Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Task Standard:              Classify the event correctly per PPM 13.1.1 Classifying the Emergency.
Page 21 Sa4jpmr1


the operator.
Appendix C                Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
 
: 2. SS # - 5555     5555
exposure.As the operator's supervisor, complete the Increased Exposure Request per
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
GEN-RPP-07.
: 5. 6.875 rem TEDE lifetime.
Page 22                                               
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Sa4jpmr1 Required Materials:
Required Materials:     N/A Safety Equipment:       N/A General  
N/A Safety Equipment:
N/A General  


==References:==
==References:==
PPM 13.1.1 rev 28, page 13 Page 22 Sa4jpmr1


PPM 13.1.1 rev 28, page 13 Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Appendix C                 Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Time Critical Task:    NO Initial Conditions:    The plant is in Mode 3.
Page 23 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C                  Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
INITIATING CUE The plant is in Mode 3. The following conditions exist:
Page 24 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C                    Job Performance Measure                Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 1. Reactor Pressure is 687 psig and down slow
: 2. Reactor Level is -62 inches and stable
: 3. Drywell temperature is 251°F and up slow
: 4. Drywell pressure is 8 psig and up slow
: 5. Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.
Page 25 Sa4jpmr1


the operator.
Appendix C                  Job Performance Measure                  Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 6. Wind direction 300°
: 7. Wind speed 8 mph
: 8. Stability Classification E
: 9. No precipitation Based on these conditions, determine the Emergency Classification, and complete a CNF Page 26 Sa4jpmr1


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
form.
Page 27 Sa4jpmr1


GEN-RPP-07.
Appendix C                 Job Performance Measure             Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 23                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
 
: 1. John Q Operator
Sa4jpmr1 Time Critical Task:
: 2. SS # - 5555     5555
NO Initial Conditions:   
: 3. DOB - 01/01/71
 
: 4. 1.8 rem TEDE year to date.
The plant is in Mode 3.
: 5. 6.875 rem TEDE lifetime.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
: 6. All dose is from Energy Northwest exposure.
 
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number: SRO-0233                     Validation Time: 15 NUREG 1123  
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 24                                               
 
Sa4jpmr1 INITIATING CUE The plant is in Mode 3. The following conditions exist:
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 25                                               
 
Sa4jpmr1 1.Reactor Pressure is 687 psig and down slow 2.Reactor Level is -62 inches and stable 3.Drywell temperature is 251°F  and up slow 4.Drywell pressure is 8 psig and up slow 5.Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 26                                               
 
Sa4jpmr1 6.Wind direction 300° 7.Wind speed 8 mph 8.Stability Classification E 9.No precipitation Based on these conditions, determine the Emergency Classification, and complete a CNF Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 27                                               
 
Sa4jpmr1 form.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 28                                               
 
Sa4jpmr1 INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number: SRO-0233 Validation Time: 15 NUREG 1123  


==Reference:==
==Reference:==
2.4.41 2.3/4.1 Time Critical: NO Location: Admin Performance Method: Admin Prepared/Revised by: S Hutchison Revision Date: 1/10/01 Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
2.4.41 2.3/4.1       Time Critical: NO Location: Admin                           Performance Method: Admin Prepared/Revised by: S Hutchison           Revision Date: 1/10/01 Page 28 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C          Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Page 29 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
Appendix C            Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
STUDENT INFORMATION Page 30 Sa4jpmr1


the operator.
Appendix C                Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
: 1. John Q Operator
: 2. SS # - 5555     5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Initial Conditions:    The plant is in Mode 3.
Page 31 Sa4jpmr1


exposure.As the operator's supervisor, complete the Increased Exposure Request per
Appendix C              Job Performance Measure      Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
INITIATING CUE The plant is in Mode 3. The following conditions exist:
: 1. Reactor Pressure is 687 psig and down slow Page 32 Sa4jpmr1


GEN-RPP-07.
Appendix C                Job Performance Measure        Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
Page 29                                               
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 2. Reactor Level is -62 inches and stable
: 3. Drywell temperature is 251°F and up slow
: 4. Drywell pressure is 8 psig and up slow
: 5. Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.
Page 33 Sa4jpmr1


Sa4jpmr1 Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet   SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
Appendix C                 Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
: 6. Wind direction 300°
: 7. Wind speed 8 mph
: 8. Stability Classification E
: 9. No precipitation Page 34 Sa4jpmr1


drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  
Appendix C              Job Performance Measure            Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.
: 1. John Q Operator
: 2. SS # - 5555      5555
: 3. DOB - 01/01/71
: 4. 1.8 rem TEDE year to date.
: 5. 6.875 rem TEDE lifetime.
: 6. All dose is from Energy Northwest exposure.
As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.
Based on these conditions, determine the Emergency Classification, and complete a CNF form.
Page 35 Sa4jpmr1


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION SRO                                    FEB. 22, 2001 Question No. The plant is operating at 99% power. IN-4 has been lost due to equipment SA.1-1        failure.
Which plant department is the most affected by a loss of IN-4?
CLOSED REFERENCE ANSWER:        Security


the operator.
===Response===
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
SAT / UNSAT LO 5897        2.1.27 2.8/2.9                            82-RSY-1200-T5 Question No. The plant is shutdown in Mode 4. Maintenance is underway in the Primary SA.1-2        Access Point. A laborer calls the control room and notifies you that an unknown/unbadged person has wondered into the Yakima Building (GSB) asking for directions to FFTF.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
What are the required NRC notifications for this event?
OPEN REFERENCE ANSWER:        1 Hour notification to the NRC.


exposure.As the operator's supervisor, complete the Increased Exposure Request per
===Response===
SAT / UNSAT LO 6011                    2.1.13 2.1/2.9                    PPM 1.10.1 rev 19, page 9 page 1


GEN-RPP-07.
ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION SRO                                  FEB. 22, 2001 Question No. The plant is shutdown in Mode 4. Maintenance is underway in the Primary SA.1-2        Access Point. A laborer calls the control room and notifies you that an unknown/unbadged person has wondered into the Yakima Building (GSB) asking for directions to FFTF.
Page 30                                               
What are the required NRC notifications for this event?
 
OPEN REFERENCE page 2
Sa4jpmr1 STUDENT INFORMATION Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.  


He is expected to receive a total of 350 mrem to perform the task. The following information applies to
ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION SRO                                   FEB. 22, 2001 Question No. The plant is operating at 99% power. IN-4 has been lost due to equipment SA.1-1       failure.
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 31                                               
 
Sa4jpmr1 Initial Conditions:   
 
The plant is in Mode 3.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 32                                               
 
Sa4jpmr1 INITIATING CUE The plant is in Mode 3. The following conditions exist:
1.Reactor Pressure is 687 psig and down slow Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 33                                               
 
Sa4jpmr1 2.Reactor Level is -62 inches and stable 3.Drywell temperature is 251°F  and up slow 4.Drywell pressure is 8 psig and up slow 5.Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.
Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 34                                               
 
Sa4jpmr1 6.Wind direction 300° 7.Wind speed 8 mph 8.Stability Classification E 9.No precipitation Appendix C                            Job Performance Measure                      Form ES-C-1 Worksheet  SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the
 
drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.
 
He is expected to receive a total of 350 mrem to perform the task. The following information applies to
 
the operator.
1.John Q Operator 2.SS # - 5555 5555 3.DOB - 01/01/71 4.1.8 rem TEDE year to date.
5.6.875 rem TEDE lifetime.6.All dose is from Energy Northwest
 
exposure.As the operator's supervisor, complete the Increased Exposure Request per
 
GEN-RPP-07.
Page 35                                               
 
Sa4jpmr1 Based on these conditions, determine the Emergency Classification, and complete a CNF form.
ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION   SRO                                     FEB. 22, 2001 page 1 Question No.
SA.1-1 The plant is operating at 99% power. IN-4 has been lost due to equipment failure.
Which plant department is the most affected by a loss of IN-4?
CLOSED REFERENCE ANSWER: Security Response: SAT / UNSAT LO 5897 2.1.27  2.8/2.9 82-RSY-1200-T5 Question No.
SA.1-2 The plant is shutdown in Mode 4. Maintenance is underway in the Primary Access Point. A laborer calls the control room and notifies you that an unknown/unbadged person has wondered into the Yakima Building (GSB) asking for directions to FFTF.
What are the required NRC notifications for this event?
OPEN REFERENCE ANSWER: 1 Hour notification to the NRC.
Response: SAT / UNSAT LO 6011 2.1.13  2.1/2.9 PPM 1.10.1 rev 19, page 9 ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION  SRO                                      FEB. 22, 2001 page 2 Question No.
SA.1-2 The plant is shutdown in Mode 4. Maintenance is underway in the Primary Access Point. A laborer calls the control room and notifies you that an unknown/unbadged person has wondered into the Yakima Building (GSB) asking for directions to FFTF.
What are the required NRC notifications for this event?
OPEN REFERENCE ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION  SRO                                      FEB. 22, 2001 page 3 Question No.
SA.1-1 The plant is operating at 99% power. IN-4 has been lost due to equipment failure.
Which plant department is the most affected by a loss of IN-4?
Which plant department is the most affected by a loss of IN-4?
CLOSED REFERENCE}}
CLOSED REFERENCE page 3}}

Revision as of 05:57, 24 November 2019

CGS-Retake Exam-2/2001-draft Operating Exam
ML010680324
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/22/2001
From:
NRC Region 4
To:
References
-RFPFR
Download: ML010680324 (112)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Facility: Columbia Generating Station Task No:

Task Title: Determine Jet Pump Job Performance Measure No: SA.1JPM Operability Page 1 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

K/A

Reference:

2.1.7 3.7/4.4 Examinee: NRC Examiner:

Facility Evaluator: Date: 02/22/01 Page 2 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Method of testing:

Admin - Simulate Page 3 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Page 4 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM SETUP INFORMATION Page 5 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Initial Conditions: The plant is operating at 100% power. The Jet Pump Operability surveillance is due.

Task Standard: Perform a manual calculation for Jet Pump Operability per OSP-RRC-D701.

Page 6 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Required Materials: N/A General

References:

OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1 Initiating Cue: The plant is operating at 100% power. The Jet Pump Operability surveillance is due.

Page 7 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

1. Determine if Jet Pumps JP1 through JP10 are operable.
2. Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
3. A Histogram is not available.

Time Critical Task: NO Page 8 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Validation Time: 15 min.

Simulator ICs: 14 in freeze Malfunctions/Remote N/A Triggers:

Page 9 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Overrides: N/A Special Setup N/A Instructions:

Page 10 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

PERFORMANCE INFORMATION Page 11 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

START TIME:

Critical Step: YES Performance Step: 1 Using the supplied OSP-RRC-D701 rev 5, step 7.2.3.a and 7.2.3.b and Attachment 10.1; perform the jet pump operability for JP1 through JP10.

Page 12 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

CUE:

Standard: 1. Jet pump panel readings are recorded within 10% of panel indications - See attached copy of 10.1.

2. All Jet pumps are determined to be operable - The YES box is checked for step 7.2.3.b.

Page 13 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Comment:

SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.

Page 14 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM TERMINATION TIME:

JPM START TIME: -

JPM COMPLETION TIME:

Page 15 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

VERIFICATION OF COMPLETION JPM Number: SA.1JPM Examinees Name:

Page 16 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Examiners Name:

Date Performed:

Facility Evaluator:

Page 17 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Number of Attempts:

Time to Complete:

Page 18 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Page 19 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

READ TO THE EXAMINEE:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Task Standard: Perform a manual calculation for Jet Pump Operability per OSP-RRC-D701.

Page 20 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Required Materials: N/A Safety Equipment: N/A General

References:

OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1 Page 21 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Time Critical Task: NO Initial Conditions: The plant is operating at 100% power. The Jet Pump Operability surveillance is due.

Page 22 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INITIATING CUE The plant is operating at 100% power. The Jet Pump Operability surveillance is due.

Page 23 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

1. Determine if Jet Pumps JP1 through JP10 are operable.
2. Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
3. A Histogram is not available.

Page 24 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number: Validation Time: 15 min.

NUREG 1123

Reference:

2.1.7 3.7/4.4 Time Critical: NO Location: Simulator Performance Method: Perform - Admin Page 25 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Prepared/Revised by: S Hutchison Revision Date: 1/11/01 Page 26 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

STUDENT INFORMATION Page 27 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Initial Conditions: The plant is operating at 100% power. The Jet Pump Operability surveillance is due.

Page 28 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INITIATING CUE The plant is operating at 100% power. The Jet Pump Operability surveillance is due.

Page 29 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

1. Determine if Jet Pumps JP1 through JP10 are operable.
2. Perform OSP-RRC-D701 rev 5, step 7.2.3.a, 7.2.3.b, and ATT. 10.1, using panel indications for these jet pumps.
3. A Histogram is not available.

Page 30 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.1JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Page 31 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Facility: Columbia Generating Station Task No:

Task Title: Interrupt EWDs Job Performance Measure No: SA.2JM Page 1 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

K/A

Reference:

2.1.24 2.8/3.1 Examinee: NRC Examiner:

Facility Evaluator: Date: 02/22/01 Page 2 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Method of testing:

Admin - Simulate Page 3 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Page 4 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM SETUP INFORMATION Page 5 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Initial Conditions: The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.

Task Standard: Indications for the start of ROA-FN-1A are explained correctly using EWD 80E001.

Page 6 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Required Materials: N/A General

References:

EWD 80E001 Initiating Cue: The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario Page 7 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

occurs:

1. The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
2. The CRO notices that the green STOP/OFF indication at the control switch is off. Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.
3. The EO reports the breaker closes by sound and the manual Page 8 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

indicators but there is no closed indication on the lights on the breaker door.

4. The CRO also notes there is no closed/running indication in the control room.
5. The CRO places the control switch in the TRIP position.

Nothing happens, the fan continues to run.

6. All light bulbs have been verified as good.

Page 9 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.

Time Critical Task: NO Validation Time: 10 min.

Simulator ICs: N/A Page 10 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Malfunctions/Remote N/A Triggers:

Overrides: N/A Special Setup N/A Instructions:

Page 11 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

PERFORMANCE INFORMATION START TIME:

Page 12 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Critical Step: YES Performance Step: 1 Demonstrate on EWD 80E001 the reason for the indications in the Initiating Cue.

Standard: Using EWD 80E001, demonstrate the following :

Page 13 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

1. For the fan to start, the close fuses, FO3-1, FO3-2, F10-1, and F10-2 have to be installed and operable.
2. All light indications for the fan are in the trip circuit.
3. For the fan to trip, the trip fuses FO4-1 and FO4-2 have to be installed and operable.
4. Since the fan started the close fuses were good.
5. Since there was no breaker indication locally or in the Page 14 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

control room and the fan would not trip with the control switch the trip fuses FO4-1 and FO4-2 (either or both) are blown or not installed correctly.

FOR FULL CREDIT - It must be indicated that bad/blown trip fuses prevent both light indication and the trip of the fan.

Page 15 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Comment:

SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.

Page 16 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM TERMINATION TIME:

JPM START TIME: -

JPM COMPLETION TIME:

Page 17 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

VERIFICATION OF COMPLETION JPM Number: SA.2JPM Examinees Name:

Page 18 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Examiners Name:

Date Performed:

Facility Evaluator:

Page 19 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Number of Attempts:

Time to Complete:

Page 20 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Page 21 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

READ TO THE EXAMINEE:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Task Standard: Indications for the start of ROA-FN-1A are explained correctly using EWD 80E001.

Page 22 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Required Materials: N/A Safety Equipment: N/A General

References:

EWD 80E001 Page 23 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Time Critical Task: N/A Initial Conditions: The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.

Page 24 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INITIATING CUE The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario occurs:

Page 25 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

1. The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
2. The CRO notices that the green STOP/OFF indication at the control switch is off.

Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.

3. The EO reports the breaker closes by sound and the manual indicators but there is no Page 26 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

closed indication on the lights on the breaker door.

4. The CRO also notes there is no closed/running indication in the control room.
5. The CRO places the control switch in the TRIP position. Nothing happens, the fan continues to run.
6. All light bulbs have been verified as good.

Page 27 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.

INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Page 28 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Task Number: Validation Time: 10 min.

NUREG 1123

Reference:

2.1.24 2.8/3.1 Time Critical: NO Location: Simulator Performance Method: Simulate - Admin Prepared/Revised by: S Hutchison Revision Date: 1/11/01 Page 29 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

STUDENT INFORMATION Page 30 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Initial Conditions: The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability.

Page 31 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INITIATING CUE The plant is operating at power. ROA-FN-1A has to be started following maintenance for operability. The following scenario occurs:

Page 32 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

1. The breaker for the fan has been racked in and the EO has notified the control room he is ready for a start.
2. The CRO notices that the green STOP/OFF indication at the control switch is off. Thinking the light bulb is burned out; the CRO places the control switch for ROA-FN-1A to start.

Page 33 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

3. The EO reports the breaker closes by sound and the manual indicators but there is no closed indication on the lights on the breaker door.
4. The CRO also notes there is no closed/running indication in the control room.
5. The CRO places the control switch in the TRIP position. Nothing Page 34 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

happens, the fan continues to run.

6. All light bulbs have been verified as good.

Using EWD 80E001, explain why there are no indicating lights for ROA-FN-1A and why it cannot be tripped.

Page 35 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.2JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Page 36 Sa2jpmrr

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.3JPM Facility: Columbia Generating Station Task No: SRO-0026 Task Title: Complete Planned Special Job Performance Measure No: SA.3JPM Exposure K/A

Reference:

2.3.4 2.5/3.1 Examinee: NRC Examiner:

Facility Evaluator: Date: 02/22/01 Method of testing:

Admin - Simulate Page 1 Sa3jpmr0

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.3JPM JPM SETUP INFORMATION Initial Conditions: The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is expected to receive a total of 350 mrem to perform the task. An Increased Exposure Request is required for the task.

Task Standard: The paperwork for the Increased Exposure Request is completed in accordance with GEN-RPP-07.

Required Materials: N/A General

References:

GEN-RPP-07.

Initiating Cue: The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 555-55-5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Time Critical Task: NO Validation Time: 10 min.

Simulator ICs: N/A Malfunctions/Remote N/A Triggers:

Overrides: N/A Special Setup N/A Instructions:

Page 2 Sa3jpmr0

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.3JPM PERFORMANCE INFORMATION START TIME:

Critical Step: YES Performance Step: 1 Complete the first 3 sections of the Increased Exposure Request as the Supervisor of the designated operator.

Standard: Increased Exposure Request form is completed in accordance with GEN-RPP-07.

Grading Standard - compare candidates completed form with the attached form. Passing Criteria = each required section must match the attached form. The reason and justification must match the intent.

Comment:

SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.

JPM TERMINATION TIME:

JPM START TIME: -

JPM COMPLETION TIME:

Page 3 Sa3jpmr0

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.3JPM VERIFICATION OF COMPLETION JPM Number: SA.3JPM Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Page 4 Sa3jpmr0

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.3JPM JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE READ TO THE EXAMINEE:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Task Standard: The paperwork for the Increased Exposure Request is completed in accordance with GEN-RPP-07.

Required Materials: N/A Safety Equipment: N/A General

References:

GEN-RPP-07.

Time Critical Task: NO Initial Conditions: The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is expected to receive a total of 350 mrem to perform the task. An Increased Exposure Request is required for the task.

INITIATING CUE The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 555-55-5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.

Page 5 Sa3jpmr0

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.3JPM

6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number: SRO-0026 Validation Time: 10 min.

NUREG 1123

Reference:

2.3.4 2.5/3.1 Time Critical: NO Location: Admin Performance Method: Simulate Prepared/Revised by: S Hutchison Revision Date: 1/10/01 Page 6 Sa3jpmr0

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.3JPM STUDENT INFORMATION Initial Conditions: The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is expected to receive a total of 350 mrem to perform the task. An Increased Exposure Request is required for the task.

INITIATING CUE The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years. He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 555-55-5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Page 7 Sa3jpmr0

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Facility: Columbia Generating Station Task No: SRO-0233 Task Title: Classify the Event Job Performance Measure No: SA.4JPM Page 1 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

K/A

Reference:

2.4.41 2.3/4.1 Examinee: NRC Examiner:

Facility Evaluator: Date: 02/22/01 Page 2 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Method of testing:

Admin - Simulate Page 3 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Page 4 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM SETUP INFORMATION Page 5 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Initial Conditions: The plant is in Mode 3.

Task Standard: Classify the event correctly per PPM 13.1.1 Classifying the Emergency.

Page 6 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Required Materials: N/A General

References:

PPM 13.1.1 rev 28, page 13 Initiating Cue: The plant is in Mode 3. The following conditions exist:

Page 7 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

1. Reactor Pressure is 687 psig and down slow
2. Reactor Level is -62 inches and stable
3. Drywell temperature is 251°F and up slow
4. Drywell pressure is 8 psig and up slow
5. Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.
6. Wind direction 300° Page 8 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

7. Wind speed 8 mph
8. Stability Classification E
9. No precipitation Based on these conditions, determine the Emergency Classification, and complete a CNF form.

Page 9 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Time Critical Task: NO Validation Time: 15 min Simulator ICs: N/A Malfunctions/Remote N/A Triggers:

Overrides: N/A Special Setup N/A Page 10 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Instructions:

Page 11 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

PERFORMANCE INFORMATION Page 12 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

START TIME:

Critical Step: Yes Performance Step: 1 Review plant data and complete CNF form.

CUE:

Page 13 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Standard: 1. Review data and complete CNF form as attached.

2. EAL is ALERT based on either 2.1.a.1 or 3.1.a.1 of PPM 13.1.1.

Comment:

Page 14 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

SAT / UNSAT THE EXAMINEE SHOULD ANNOUNCE THE TERMINATION POINT OF THE JPM AT THIS POINT.

Page 15 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM TERMINATION TIME:

JPM START TIME: -

JPM COMPLETION TIME:

Page 16 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

VERIFICATION OF COMPLETION JPM Number: SA.4JPM Examinees Name:

Page 17 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Examiners Name:

Date Performed:

Facility Evaluator:

Page 18 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Number of Attempts:

Time to Complete:

Page 19 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

JPM INFORMATION CARD HAND THE STUDENT INFORMATION CARD TO THE EXAMINEE Page 20 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

READ TO THE EXAMINEE:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiation cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Task Standard: Classify the event correctly per PPM 13.1.1 Classifying the Emergency.

Page 21 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Required Materials: N/A Safety Equipment: N/A General

References:

PPM 13.1.1 rev 28, page 13 Page 22 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Time Critical Task: NO Initial Conditions: The plant is in Mode 3.

Page 23 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INITIATING CUE The plant is in Mode 3. The following conditions exist:

Page 24 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

1. Reactor Pressure is 687 psig and down slow
2. Reactor Level is -62 inches and stable
3. Drywell temperature is 251°F and up slow
4. Drywell pressure is 8 psig and up slow
5. Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.

Page 25 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

6. Wind direction 300°
7. Wind speed 8 mph
8. Stability Classification E
9. No precipitation Based on these conditions, determine the Emergency Classification, and complete a CNF Page 26 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

form.

Page 27 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INFORMATION BELOW THIS LINE NOT SHARED WITH EXAMINEE Task Number: SRO-0233 Validation Time: 15 NUREG 1123

Reference:

2.4.41 2.3/4.1 Time Critical: NO Location: Admin Performance Method: Admin Prepared/Revised by: S Hutchison Revision Date: 1/10/01 Page 28 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Page 29 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

STUDENT INFORMATION Page 30 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Initial Conditions: The plant is in Mode 3.

Page 31 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

INITIATING CUE The plant is in Mode 3. The following conditions exist:

1. Reactor Pressure is 687 psig and down slow Page 32 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

2. Reactor Level is -62 inches and stable
3. Drywell temperature is 251°F and up slow
4. Drywell pressure is 8 psig and up slow
5. Drywell unidentified leakage on EDR-FRS-623 went offscale high for a short period of time and returned to 0.

Page 33 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

6. Wind direction 300°
7. Wind speed 8 mph
8. Stability Classification E
9. No precipitation Page 34 Sa4jpmr1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SA.4JPM The plant is in a refueling outage with the drywell open. A valve manipulation is required to flush a hot spot from a trap in the drywell. The operator selected is 30 years old and has been employed by Energy Northwest for 5 years.

He is expected to receive a total of 350 mrem to perform the task. The following information applies to the operator.

1. John Q Operator
2. SS # - 5555 5555
3. DOB - 01/01/71
4. 1.8 rem TEDE year to date.
5. 6.875 rem TEDE lifetime.
6. All dose is from Energy Northwest exposure.

As the operators supervisor, complete the Increased Exposure Request per GEN-RPP-07.

Based on these conditions, determine the Emergency Classification, and complete a CNF form.

Page 35 Sa4jpmr1

ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION SRO FEB. 22, 2001 Question No. The plant is operating at 99% power. IN-4 has been lost due to equipment SA.1-1 failure.

Which plant department is the most affected by a loss of IN-4?

CLOSED REFERENCE ANSWER: Security

Response

SAT / UNSAT LO 5897 2.1.27 2.8/2.9 82-RSY-1200-T5 Question No. The plant is shutdown in Mode 4. Maintenance is underway in the Primary SA.1-2 Access Point. A laborer calls the control room and notifies you that an unknown/unbadged person has wondered into the Yakima Building (GSB) asking for directions to FFTF.

What are the required NRC notifications for this event?

OPEN REFERENCE ANSWER: 1 Hour notification to the NRC.

Response

SAT / UNSAT LO 6011 2.1.13 2.1/2.9 PPM 1.10.1 rev 19, page 9 page 1

ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION SRO FEB. 22, 2001 Question No. The plant is shutdown in Mode 4. Maintenance is underway in the Primary SA.1-2 Access Point. A laborer calls the control room and notifies you that an unknown/unbadged person has wondered into the Yakima Building (GSB) asking for directions to FFTF.

What are the required NRC notifications for this event?

OPEN REFERENCE page 2

ADMINISTRATIVE TOPICS SECTION A2 COLUMBIA GENERATING STATION SRO FEB. 22, 2001 Question No. The plant is operating at 99% power. IN-4 has been lost due to equipment SA.1-1 failure.

Which plant department is the most affected by a loss of IN-4?