ML091520491: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO SYSTEM d TITLE:        SAMPLE CONTAINMENT FOR HYDROGEN CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


JPM: RO SYSTEM d TITLE: SAMPLE CONTAINMENT FOR HYDROGEN 
JPM RO SYSTEM d JOB PERFORMANCE MEASURE DATA PAGE Task:   Left channel of Containment Hydrogen monitoring in service.
 
Alternate Path: YES Facility JPM #: PL-OPS-HYR-003J K/A: 028A4.03       Importance:       RO: 3.1         SRO: 3.3 K/A Statement: Location and operation of hydrogen sampling and analysis of containment atmosphere, including alarms and indications Task Standard: Left channel of Containment Hydrogen monitoring placed in service in the Accident Mode.
CANDIDATE: _____________________________________________
Preferred Evaluation Location: Simulator       __X__       In Plant   _____
 
Preferred Evaluation Method:       Perform     __X__       Simulate   _____
EXAMINER: _____________________________________________
 
JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 2 of 10 JULY 2008  JOB PERFORMANCE MEASURE DATA PAGE Task: Left channel of Containment Hydrogen monitoring in service.  
 
Alternate Path: YES  
 
Facility JPM #: PL-OPS-HYR-003J  
 
K/A: 028A4.03 Importance: RO: 3.1   SRO: 3.3  
 
K/A Statement: Location and operation of hydrogen sampling and analysis of containment atmosphere, including alarms and indications  
 
Task Standard: Left channel of Containment Hydrogen monitoring placed in service in the 'Accident Mode'.  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
EOP-4.0, Loss Of Coolant Recovery     SOP-38, Gaseous Waste Monitoring System
EOP-4.0, Loss Of Coolant Recovery SOP-38, Gaseous Waste Monitoring System Validation Time:12 minutes         Time Critical:   NO Candidate:
 
Time Start: ________         Time Finish:     ________
Validation Time: 12 minutes Time Critical: NO  
Performance Time:         ________ minutes Performance Rating:       SAT______         UNSAT ______
 
Comments:
Candidate:
Examiner: _______________________________                   Date:   ______________
 
Signature PALISADES NUCLEAR PLANT                   Page 2 of 10                         JULY 2008
Time Start: ________ Time Finish: ________  
 
Performance Time: ________ minutes  
 
Performance Rating: SAT______ UNSAT ______  
 
Comments:  
 
Examiner: _______________________________ Date: ______________ Signature JPM RO SYSTEM d  PALISADES NUCLEAR PLANT Page 3 of 10 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-38, Gaseous Waste Monitoring System, Section 7.5.1, Rev. 24
 
Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE
 
DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


JPM RO SYSTEM d EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-38, Gaseous Waste Monitoring System, Section 7.5.1, Rev. 24 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* The plant has been tripped due to a primary coolant leak.
* The plant has been tripped due to a primary coolant leak.
* EOP-1.0 actions are complete, EOP-4.0 is the in use procedure.
* EOP-1.0 actions are complete, EOP-4.0 is the in use procedure.
* Both channels of Hydrogen Monitoring have been in standby for greater than 6 hours.  
* Both channels of Hydrogen Monitoring have been in standby for greater than 6 hours.
 
INITIATING CUES:
INITIATING CUES:
* During performance of EOP-4.0, the CRS directs you to sample containment for hydrogen utilizing the LEFT CHANNEL Hydrogen Monitor per EOP-4.0 step 12.  
* During performance of EOP-4.0, the CRS directs you to sample containment for hydrogen utilizing the LEFT CHANNEL Hydrogen Monitor per EOP-4.0 step 12.
 
PALISADES NUCLEAR PLANT                     Page 3 of 10                             JULY 2008
JPM RO SYSTEM d  PALISADES NUCLEAR PLANT Page 4 of 10 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate EOP-4.0, Loss Of Coolant Accident, Step 12  Step 12 of EOP-4.0 located S  U Comment: 
 
Proc. Step TASK ELEMENT 2 STANDARD Grade n/a Locate SOP-38, Gaseous Waste Monitoring System, Section 7.5.2, To Sample Containment For H 2  SOP-38, step 7.5.2 located.
S  U Comment:  Evaluator provides the operator a working copy SOP-38, Section 7.5.2.
 
Proc. Step TASK ELEMENT 3 STANDARD Grade7.5.2a ENSURE sampling system in STANDBY for at least six hours.
Operator determines sampling system in standby for at least six hours (given in initial conditions).
S  U Comment:  EVALUATOR CUE:
If Operator asks if step 7.5.1 actions are complete, CUE that step 7.5.1 actions are complete.
 
JPM RO SYSTEM d  PALISADES NUCLEAR PLANT Page 5 of 10 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade7.5.2b CHECK desired hand switch in normal position  Left Channel HS-2419  HS-2419 verified in the normal position S  U Comment: 


Proc. Step TASK ELEMENT 5 STANDARD Grade7.5.2c CHECK Range selector switch to the "0-10% range, for desired channel."
JPM RO SYSTEM d Proc. Step               TASK ELEMENT 1                                    STANDARD                         Grade Locate EOP-4.0, Loss Of Coolant Accident, Step 12 of EOP-4.0 located n/a      Step 12                                                                                            S U Comment:
Left channel Hydrogen Monitor Range select switch verified set to the 0-10% range position.
Proc. Step               TASK ELEMENT 2                                    STANDARD                         Grade Locate SOP-38, Gaseous Waste Monitoring System, Section 7.5.2, To Sample            SOP-38, step 7.5.2 located.
S U Comment:
n/a      Containment For H2                                                                                S U Comment:
Proc. Step TASK ELEMENT 6 STANDARD Grade7.5.2d If CHP or CHR signal present or imminent, THEN ENABLE the sample valves to be opened by turning the appropriate Key Switch to the ACCI position.
Evaluator provides the operator a working copy SOP-38, Section 7.5.2.
Left Channel HS-2419 (Key 364)
Proc. Step                TASK ELEMENT 3                                    STANDARD                          Grade ENSURE sampling system in STANDBY for      Operator determines sampling system in standby 7.5.2a    at least six hours.                         for at least six hours (given in initial conditions). S U Comment:
Key 364 obtained AND Inserts Key in HS-2419. AND Places HS-2419 to the ACCI position.
EVALUATOR CUE: If Operator asks if step 7.5.1 actions are complete, CUE that step 7.5.1 actions are complete.
S U Comment:  EVALUATOR NOTE:
PALISADES NUCLEAR PLANT                      Page 4 of 10                                          JULY 2008
HS-2419 to ACCI position is required by EOP-4.0 step 12.
EVALUATOR CUE:
If asked if HS-2419 is to be placed in the ACCI position, REPORT that the procedural direction is to be followed.
CRITICAL STEP


JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 6 of 10 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade7.5.2e For the desired channel, OPERATE the following hand switches to the OPEN position AND RELEASE:  Left Channel HS-2417  HS-2417 placed to the open position. AND HS-2417 released. S  U Comment:
JPM RO SYSTEM d Proc. Step               TASK ELEMENT 4                                        STANDARD                      Grade CHECK desired hand switch in normal position HS-2419 verified in the normal position 7.5.2b          Left Channel                                                                                S U HS-2419 Comment:
CRITICAL STEP
Proc. Step              TASK ELEMENT 5                                        STANDARD                     Grade CHECK Range selector switch to the 0-        Left channel Hydrogen Monitor Range select 7.5.2c      10% range, for desired channel.              switch verified set to the 0-10% range position. S U Comment:
Proc. Step              TASK ELEMENT 6                                        STANDARD                      Grade If CHP or CHR signal present or imminent, THEN ENABLE the sample valves to be          Key 364 obtained opened by turning the appropriate Key        AND Switch to the ACCI position.                  Inserts Key in HS-2419.
7.5.2d                                                    AND                                               S U Left Channel                             Places HS-2419 to the ACCI position.
HS-2419 (Key 364)
Comment:
EVALUATOR NOTE: HS-2419 to ACCI position is required by EOP-4.0 step 12.
EVALUATOR CUE: If asked if HS-2419 is to be placed in the ACCI position, REPORT that the procedural direction is to be followed.
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 5 of 10                                      JULY 2008


Proc. Step TASK ELEMENT 8 STANDARD Grade7.5.2f For the desired channel, PLACE the following hand switches to the OPEN position:
JPM RO SYSTEM d Proc. Step             TASK ELEMENT 7                                    STANDARD                     Grade For the desired channel, OPERATE the following hand switches to the OPEN position AND RELEASE:                       HS-2417 placed to the open position.
Left Channel HS-2413A HS-2413B HS-2415A HS-2415B    HS-2413A placed to open position (red open light on, green close light off). AND HS-2413B placed to open position (red open light on, green close light off).
7.5.2e                                                AND                                              S U Left Channel HS-2417 released.
AND HS-2415A placed to open position (red open light on, green close light off). AND HS-2415B placed to open position (red open light on, green close light off).
HS-2417 Comment:
S  U Comment:
CRITICAL STEP Proc. Step              TASK ELEMENT 8                                    STANDARD                      Grade For the desired channel, PLACE the HS-2413A placed to open position (red open light following hand switches to the OPEN on, green close light off).
CRITICAL STEP
position:
AND HS-2413B placed to open position (red open light Left Channel on, green close light off).
HS-2413A AND HS-2413B 7.5.2f                                                HS-2415A placed to open position (red open light S U HS-2415A on, green close light off).
HS-2415B                              AND HS-2415B placed to open position (red open light on, green close light off).
Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                      Page 6 of 10                                  JULY 2008


JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 7 of 10 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade7.5.2g ENERGIZE Recorder AR-2401, Containment Hydrogen Recorder, as follows: 1. PLACE Power Switch to ON (Left Side of Recorder)
JPM RO SYSTEM d Proc. Step             TASK ELEMENT 9                                   STANDARD                       Grade ENERGIZE Recorder AR-2401, Containment Hydrogen Recorder, as follows:                                     Recorder AR-2401 power switch placed to on.
AND
: 1. PLACE Power Switch to ON (Left 7.5.2g                                                Recorder AR-2401 chart drive switch placed to    S U Side of Recorder) on
: 2. PLACE Chart Drive Switch to ON (Top of Recorder)
: 2. PLACE Chart Drive Switch to ON (Top of Recorder)
Recorder AR-2401 power switch placed to on. AND Recorder AR-2401 chart drive switch placed to on  S  U Comment:
Comment:
 
Proc. Step             TASK ELEMENT 10                                   STANDARD                       Grade PLACE the desired hand switch to the ANALYZE position.
Proc. Step TASK ELEMENT 10 STANDARD Grade7.5.2h PLACE the desired hand switch to the ANALYZE position.
HS-2427L placed to the analyze position.
Left Channel HS-2427L  HS-2427L placed to the analyze position.
7.5.2h          Left Channel                                                                            S U HS-2427L Comment:
S U Comment: EVALUATOR NOTE: Sample light will not light as expected.
EVALUATOR NOTE: Sample light will not light as expected.
EVALUATOR NOTE: EK-0227,Cont H 2 Mont C-161 Fail (on front of Panel C-11A) will annunciate as expected.
EVALUATOR NOTE: EK-0227,Cont H2 Mont C-161 Fail (on front of Panel C-11A) will annunciate as expected.
CRITICAL STEP
CRITICAL STEP Proc. Step            TASK ELEMENT 11                                  STANDARD                        Grade PUSH ALARM RESET pushbutton to clear        Alarm reset pushbutton on left channel hydrogen 7.5.2i  any alarms                                  monitor pushed.                                  S U Comment:
EVALUATOR NOTE: Sample light will not light as expected.
PALISADES NUCLEAR PLANT                      Page 7 of 10                                    JULY 2008


Proc. Step TASK ELEMENT 11 STANDARD Grade7.5.2i PUSH ALARM RESET pushbutton to clear any alarms Alarm reset pushbutton on left channel hydrogen monitor pushed.
JPM RO SYSTEM d Proc. Step             TASK ELEMENT 12                                    STANDARD                       Grade IF the SAMPLE light does NOT light, THEN:                                        HS-2426L is pushed.
S U Comment: EVALUATOR NOTE: Sample light will not light as expected.
AND
: 1. PUSH desired REMOTE SELECTOR pushbutton                 SAMPLE light lights.
7.5.2j.1                                                                                                S U Left Channel HS-2426L Comment:
EVALUATOR NOTE: Sample light will light as expected.
CRITICAL STEP Proc. Step            TASK ELEMENT 13                                    STANDARD                      Grade ENSURE the desired Function Selector Switch in the SAMPLE position.
HS-2428L is verified in the SAMPLE position.
7.5.2j.2      Left Channel                                                                              S U HS-2428L Comment:
Proc. Step            TASK ELEMENT 14                                    STANDARD                      Grade WHEN Hydrogen Monitor has been in Operator determines that 15 minutes will have to ANALYZE for at least 15 minutes, THEN 7.5.2k                                                elapse to perform this step.                      S U READ % H2.
Comment:
EVALUATOR CUE: CUE Operator that another Operator will perform this step.
PALISADES NUCLEAR PLANT                      Page 8 of 10                                  JULY 2008


JPM RO SYSTEM d PALISADES NUCLEAR PLANT Page 8 of 10 JULY 2008 Proc. Step TASK ELEMENT 12 STANDARD Grade7.5.2j.1 IF the SAMPLE light does NOT light, THEN: 1. PUSH desired REMOTE SELECTOR pushbutton Left Channel HS-2426L  HS-2426L is pushed. AND SAMPLE light lights.
JPM RO SYSTEM d Proc. Step           TASK ELEMENT 15                                         STANDARD                       Grade Notify CRS that the left channel of CRS notified that the left channel of Containment Containment Hydrogen monitoring is in n/a                                                    Hydrogen monitoring has been placed in service. S U service.
 
Comment:
S  U Comment:  EVALUATOR NOTE: Sample light will light as expected.
END OF TASK PALISADES NUCLEAR PLANT                         Page 9 of 10                                     JULY 2008
CRITICAL STEP
 
Proc. Step TASK ELEMENT 13 STANDARD Grade7.5.2j.2 ENSURE the desired Function Selector Switch in the SAMPLE position.
 
Left Channel HS-2428L  HS-2428L is verified in the SAMPLE position.
S  U Comment: 
 
Proc. Step TASK ELEMENT 14 STANDARD Grade7.5.2k WHEN Hydrogen Monitor has been in ANALYZE for at least 15 minutes, THEN READ % H 2. Operator determines that 15 minutes will have to elapse to perform this step.
S  U Comment:  EVALUATOR CUE:
CUE Operator that another Operator will perform this step.
 
JPM RO SYSTEM d  PALISADES NUCLEAR PLANT Page 9 of 10 JULY 2008 Proc. Step TASK ELEMENT 15 STANDARD Graden/a Notify CRS that the left channel of Containment Hydrogen monitoring is in service. CRS notified that the left channel of Containment Hydrogen monitoring has been placed in service.
S U Comment:
 
END OF TASK  
 
JPM RO SYSTEM d  PALISADES NUCLEAR PLANT Page 10 of 10 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)


JPM RO SYSTEM d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* The plant has been tripped due to a primary coolant leak.
* The plant has been tripped due to a primary coolant leak.
* EOP-1.0 actions are complete, EOP-4.0 is the in use procedure.
* EOP-1.0 actions are complete, EOP-4.0 is the in use procedure.
* Both channels of Hydrogen Monitoring have been in standby for greater than 6 hours.  
* Both channels of Hydrogen Monitoring have been in standby for greater than 6 hours.
 
INITIATING CUES:
INITIATING CUES:
* During performance of EOP-4.0, the CRS directs you to sample containment for hydrogen utilizing the LEFT CHANNEL Hydrogen Monitor per EOP-4.0 step 12.}}
* During performance of EOP-4.0, the CRS directs you to sample containment for hydrogen utilizing the LEFT CHANNEL Hydrogen Monitor per EOP-4.0 step 12.
PALISADES NUCLEAR PLANT              Page 10 of 10                          JULY 2008}}

Revision as of 05:12, 14 November 2019

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System D, Title: Sample Containment for Hydrogen
ML091520491
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200319 List:
References
Download: ML091520491 (10)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYSTEM d TITLE: SAMPLE CONTAINMENT FOR HYDROGEN CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM RO SYSTEM d JOB PERFORMANCE MEASURE DATA PAGE Task: Left channel of Containment Hydrogen monitoring in service.

Alternate Path: YES Facility JPM #: PL-OPS-HYR-003J K/A: 028A4.03 Importance: RO: 3.1 SRO: 3.3 K/A Statement: Location and operation of hydrogen sampling and analysis of containment atmosphere, including alarms and indications Task Standard: Left channel of Containment Hydrogen monitoring placed in service in the Accident Mode.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

EOP-4.0, Loss Of Coolant Recovery SOP-38, Gaseous Waste Monitoring System Validation Time:12 minutes Time Critical: NO Candidate:

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 10 JULY 2008

JPM RO SYSTEM d EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-38, Gaseous Waste Monitoring System, Section 7.5.1, Rev. 24 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The plant has been tripped due to a primary coolant leak.
  • Both channels of Hydrogen Monitoring have been in standby for greater than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

INITIATING CUES:

PALISADES NUCLEAR PLANT Page 3 of 10 JULY 2008

JPM RO SYSTEM d Proc. Step TASK ELEMENT 1 STANDARD Grade Locate EOP-4.0, Loss Of Coolant Accident, Step 12 of EOP-4.0 located n/a Step 12 S U Comment:

Proc. Step TASK ELEMENT 2 STANDARD Grade Locate SOP-38, Gaseous Waste Monitoring System, Section 7.5.2, To Sample SOP-38, step 7.5.2 located.

n/a Containment For H2 S U Comment:

Evaluator provides the operator a working copy SOP-38, Section 7.5.2.

Proc. Step TASK ELEMENT 3 STANDARD Grade ENSURE sampling system in STANDBY for Operator determines sampling system in standby 7.5.2a at least six hours. for at least six hours (given in initial conditions). S U Comment:

EVALUATOR CUE: If Operator asks if step 7.5.1 actions are complete, CUE that step 7.5.1 actions are complete.

PALISADES NUCLEAR PLANT Page 4 of 10 JULY 2008

JPM RO SYSTEM d Proc. Step TASK ELEMENT 4 STANDARD Grade CHECK desired hand switch in normal position HS-2419 verified in the normal position 7.5.2b Left Channel S U HS-2419 Comment:

Proc. Step TASK ELEMENT 5 STANDARD Grade CHECK Range selector switch to the 0- Left channel Hydrogen Monitor Range select 7.5.2c 10% range, for desired channel. switch verified set to the 0-10% range position. S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade If CHP or CHR signal present or imminent, THEN ENABLE the sample valves to be Key 364 obtained opened by turning the appropriate Key AND Switch to the ACCI position. Inserts Key in HS-2419.

7.5.2d AND S U Left Channel Places HS-2419 to the ACCI position.

HS-2419 (Key 364)

Comment:

EVALUATOR NOTE: HS-2419 to ACCI position is required by EOP-4.0 step 12.

EVALUATOR CUE: If asked if HS-2419 is to be placed in the ACCI position, REPORT that the procedural direction is to be followed.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 10 JULY 2008

JPM RO SYSTEM d Proc. Step TASK ELEMENT 7 STANDARD Grade For the desired channel, OPERATE the following hand switches to the OPEN position AND RELEASE: HS-2417 placed to the open position.

7.5.2e AND S U Left Channel HS-2417 released.

HS-2417 Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade For the desired channel, PLACE the HS-2413A placed to open position (red open light following hand switches to the OPEN on, green close light off).

position:

AND HS-2413B placed to open position (red open light Left Channel on, green close light off).

HS-2413A AND HS-2413B 7.5.2f HS-2415A placed to open position (red open light S U HS-2415A on, green close light off).

HS-2415B AND HS-2415B placed to open position (red open light on, green close light off).

Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 6 of 10 JULY 2008

JPM RO SYSTEM d Proc. Step TASK ELEMENT 9 STANDARD Grade ENERGIZE Recorder AR-2401, Containment Hydrogen Recorder, as follows: Recorder AR-2401 power switch placed to on.

AND

1. PLACE Power Switch to ON (Left 7.5.2g Recorder AR-2401 chart drive switch placed to S U Side of Recorder) on
2. PLACE Chart Drive Switch to ON (Top of Recorder)

Comment:

Proc. Step TASK ELEMENT 10 STANDARD Grade PLACE the desired hand switch to the ANALYZE position.

HS-2427L placed to the analyze position.

7.5.2h Left Channel S U HS-2427L Comment:

EVALUATOR NOTE: Sample light will not light as expected.

EVALUATOR NOTE: EK-0227,Cont H2 Mont C-161 Fail (on front of Panel C-11A) will annunciate as expected.

CRITICAL STEP Proc. Step TASK ELEMENT 11 STANDARD Grade PUSH ALARM RESET pushbutton to clear Alarm reset pushbutton on left channel hydrogen 7.5.2i any alarms monitor pushed. S U Comment:

EVALUATOR NOTE: Sample light will not light as expected.

PALISADES NUCLEAR PLANT Page 7 of 10 JULY 2008

JPM RO SYSTEM d Proc. Step TASK ELEMENT 12 STANDARD Grade IF the SAMPLE light does NOT light, THEN: HS-2426L is pushed.

AND

1. PUSH desired REMOTE SELECTOR pushbutton SAMPLE light lights.

7.5.2j.1 S U Left Channel HS-2426L Comment:

EVALUATOR NOTE: Sample light will light as expected.

CRITICAL STEP Proc. Step TASK ELEMENT 13 STANDARD Grade ENSURE the desired Function Selector Switch in the SAMPLE position.

HS-2428L is verified in the SAMPLE position.

7.5.2j.2 Left Channel S U HS-2428L Comment:

Proc. Step TASK ELEMENT 14 STANDARD Grade WHEN Hydrogen Monitor has been in Operator determines that 15 minutes will have to ANALYZE for at least 15 minutes, THEN 7.5.2k elapse to perform this step. S U READ % H2.

Comment:

EVALUATOR CUE: CUE Operator that another Operator will perform this step.

PALISADES NUCLEAR PLANT Page 8 of 10 JULY 2008

JPM RO SYSTEM d Proc. Step TASK ELEMENT 15 STANDARD Grade Notify CRS that the left channel of CRS notified that the left channel of Containment Containment Hydrogen monitoring is in n/a Hydrogen monitoring has been placed in service. S U service.

Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 9 of 10 JULY 2008

JPM RO SYSTEM d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The plant has been tripped due to a primary coolant leak.
  • Both channels of Hydrogen Monitoring have been in standby for greater than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

INITIATING CUES:

PALISADES NUCLEAR PLANT Page 10 of 10 JULY 2008