{{#Wiki_filter:NEXTera ENERGY, ARNOLD July 30, 2009 NG-09-0539 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Relief Request for 1st Period Limited Weld Examinations Pursuant to 10 CFR 50.55a(g)(5)(iii), NextEra T M Energy Duane Arnold, LLC, f/k/a FPL Energy Duane Arnold, LLC (hereafter, NextEra Energy Duane Arnold) hereby requests NRC approval of the enclosed relief request from IWB-2500 to allow performance of limited examinations of various welds. This relief is requested for the Fourth Ten year Interval of the Inservice Inspection Program for the Duane Arnold Energy Center (DAEC), which ends on February 21, 2014. Enclosure 1 of this letter contains the request for relief and Enclosure 2 contains the 1st period non-destructive evaluation reports associated with the components for which relief is sought.NextEra Energy Duane Arnold requests approval of this request by the end of December 2009.If you have any questions, please contact Steve Catron at (319) 851-7234.Richard L. Anderson Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Enclosures cc: Administrator, Region III, USNRC Project Manager, DAEC, USNRC Senior Resident Inspector, DAEC, USNRC .A NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324 Enclosure 1 to NG-09-0539 Page 1 of 9 Enclosure 1 10 CFR 50.55a REQUEST IN ACCORDANCE WITH 10 CFR 50.55a(g)(5)(iii)
{{#Wiki_filter:NEXTera ENERGY, ARNOLD July 30, 2009                                                             NG-09-0539 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Relief Request for 1st Period Limited Weld Examinations Pursuant to 10 CFR 50.55a(g)(5)(iii), NextEra M    T Energy Duane Arnold, LLC, f/k/a FPL Energy Duane Arnold, LLC (hereafter, NextEra Energy Duane Arnold) hereby requests NRC approval of the enclosed relief request from IWB-2500 to allow performance of limited examinations of various welds. This relief is requested for the Fourth Ten year Interval of the Inservice Inspection Program for the Duane Arnold Energy Center (DAEC), which ends on February 21, 2014. Enclosure 1 of this letter contains the request for relief and Enclosure 2 contains the 1st period non-destructive evaluation reports associated with the components for which relief is sought.
INSERVICE INSPECTION IMPRACTICALITY Enclosure 1 to NG-09-0539 Page 2 of 9 10 CFR 50.55a REQUEST IN ACCORDANCE WITH 10 CFR 50.55a(g)(5)(iii)
NextEra Energy Duane Arnold requests approval of this request by the end of December 2009.
INSERVICE INSPECTION IMPRACTICALITY Component Identification Code Class: Class 1  
If you have any questions, please contact Steve Catron at (319) 851-7234.
Richard L. Anderson Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Enclosures cc:     Administrator, Region III, USNRC Project Manager, DAEC, USNRC Senior Resident Inspector, DAEC, USNRC                                             .A NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA52324
 
Enclosure 1 to NG-09-0539 Page 1 of 9 Enclosure 1 10 CFR 50.55a REQUEST IN ACCORDANCE WITH 10 CFR 50.55a(g)(5)(iii)
INSERVICE INSPECTION IMPRACTICALITY
 
Enclosure 1 to NG-09-0539 Page 2 of 9 10 CFR 50.55a REQUEST IN ACCORDANCE WITH 10 CFR 50.55a(g)(5)(iii)
INSERVICE INSPECTION IMPRACTICALITY Component Identification Code Class:                 Class 1


==References:==
==References:==
ASME Code, Section XI, Subarticle IWB-2500 Table IWB-2500-1 Examination Categories:      B-A, R-A Item Numbers:                B1.40, and R1.16
==
Description:==
Reactor Vessel Head-to-Flange Weld, and Piping Welds.
Component Numbers:          See Table A for Component Identification
===Applicable Code Edition and Addenda===
ASME Section XI 2001 Edition, 2003 Addenda Code Requirement Section XI (2001 Edition with the 2003 Addenda), Subarticle IWB-2500 states in part "Components shall be examined and tested as specified in Table IWB-2500-1."
Table IWB-2500-1, Category B-A, Item B1.40, requires a volumetric examination of applicable Class 1 pressure retaining welds, which includes essentially 100% of weld length once during the ten year interval.
Relief Request NDE-R005 was approved on January 31, 2007 allowing the use of Risked Informed (RI) Inservice Inspection (ISI) for Class 1 and 2 welds. This relief request states that the original list of intended credited Class 1 welds may have been substituted on specific occasions with similar welds due to accessibility issues that would have resulted in reduced exam volumes. NextEra Energy Duane Arnold chooses welds for examination that are classified within the same risk matrix classification segment, using the same treatment criteria as those originally selected.
===Reason for Request===
The Duane Arnold Energy Center (DAEC) construction permit was issued in 1970 and the operating license was issued in 1974. The reactor vessel was designed and installed to ASME Section I11,1965 Edition, with the Summer 1967 Addenda. The parameters for accessibility for ISI were not requirements at that time and therefore were not necessarily factored into component and system configurations, thereby creating conditions where ASME Section X1 Code required examination coverage of Class 1 welds cannot be obtained.


ASME Code, Section XI, Subarticle IWB-2500 Table IWB-2500-1 Examination Categories:
Enclosure 1 to NG-09-0539 Page 3 of 9 10 CFR 50.55a recognizes the limitations to in-service inspection of components in accordance with Section XI of the ASME Code that are imposed due to early plants' design and construction, as follows:
B-A, R-A Item Numbers: B1.40, and R1.16
10 CFR 50.55a(g)(1): For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued prior to January 1, 1971, components (including supports) must meet the requirements of paragraphs(g)(4) and (5) of this section to the extent practical.
10 CFR 50.55a(g)(4): Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components (including supports) which are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and pre-service examination requirements, set forth in Section XI of editions of the ASME Boiler and Pressure Vessel Code... to the extent practical within the limitation of design, geometry and materials of construction of the components.
10 CFR 50.55a(g)(5)(iii): If the licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as specified in § 50.4, information to support the determinations.
Table A - Limited Exam Weld List Exam          Item    Component        Period      Code                Description Category      Number        Number      Examined Coverage B-A            B1.40      HCC-COOI          1         76.05%    Reactor Vessel Head-to-Flange Weld Reactor Water Cleanup R-A           R1.16                                              Piping Weld Recirculation Manifold to ARiser Piping Weld Reactor Vessel Head to Flange Weld -
HCC-CO01 This weld is the Head to Flange Weld which can only be examined from the head surface. The examination is limited to approximately 76.05% and is limited due to the configuration of the weld. Note that this weld examination is divided up into thirds, with each third being examined each period. The examination completed was from Stud Holes 60 to 20. There is no feasible option in order to examine the remaining 23.95%.
The Nondestructive Examination (NDE) procedure used for this examination incorporates the examination techniques qualified under Appendix VIII of the ASME Section XI Code by the Performance Demonstration Initiative (PDI). That procedure was approved under Relief Request NDE-R008 on January 31, 2007.


== Description:==
Enclosure 1 to NG-09-0539 Page 4 of 9 Reactor Water Cleanup Class 1 Weld CUA-J024 This weld is between a containment penetration and a motor operated valve (MO-2701). The valve side of the weld is not accessible for scanning due to geometry.
This weld is the only weld in the risk segment (CU-007) so there is no other weld to select. The consequence evaluation determined this weld to be high because it is the weld between the containment and the isolation valve (MO-2701). The material for the items welded together is Al 82 F316 forging penetration to an A351 CF8M cast valve. Per Generic Letter 88-01, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping," "Inspection Schedules" position (2), this weld would be considered in the Intergranular Stress Corrosion Cracking (IGSCC) Category A. The A182 F316 is solution heat treated which is an acceptable process for resistance to IGSCC. The staff position states:
        "Although castings with higher carbon content than 0. 035% are not considered to be resistant to sensitization, welds joining such castings (in the form of pump and valve bodies) to piping have been relatively free of IGSCC.
This may be attributedto a favorable residualstress distribution,as calculationshave indicated. For this reason, weld joining resistantmaterial to pumps and valves will be consideredto be resistant welds, and included in IGSCC Category A. If extensive weld repairs were performed the residual stress may be unfavorable, in which case such welds should be included in Category D."
Therefore, this weld is considered resistant to IGSCC. The volume examined was from the A182 F316 penetration side of the weld. The weld was not examined from the A351 CF8M cast valve side due to the configuration of the valve (see photo that follows).


Reactor Vessel Head-to-Flange Weld, and Piping Welds.Component Numbers: See Table A for Component Identification Applicable Code Edition and Addenda ASME Section XI 2001 Edition, 2003 Addenda Code Requirement Section XI (2001 Edition with the 2003 Addenda), Subarticle IWB-2500 states in part"Components shall be examined and tested as specified in Table IWB-2500-1." Table IWB-2500-1, Category B-A, Item B1.40, requires a volumetric examination of applicable Class 1 pressure retaining welds, which includes essentially 100% of weld length once during the ten year interval.Relief Request NDE-R005 was approved on January 31, 2007 allowing the use of Risked Informed (RI) Inservice Inspection (ISI) for Class 1 and 2 welds. This relief request states that the original list of intended credited Class 1 welds may have been substituted on specific occasions with similar welds due to accessibility issues that would have resulted in reduced exam volumes. NextEra Energy Duane Arnold chooses welds for examination that are classified within the same risk matrix classification segment, using the same treatment criteria as those originally selected.Reason for Request The Duane Arnold Energy Center (DAEC) construction permit was issued in 1970 and the operating license was issued in 1974. The reactor vessel was designed and installed to ASME Section I11, 1965 Edition, with the Summer 1967 Addenda. The parameters for accessibility for ISI were not requirements at that time and therefore were not necessarily factored into component and system configurations, thereby creating conditions where ASME Section X1 Code required examination coverage of Class 1 welds cannot be obtained.
Enclosure 1 to NG-09-0539 Page 3 of 9 10 CFR 50.55a recognizes the limitations to in-service inspection of components in accordance with Section XI of the ASME Code that are imposed due to early plants'design and construction, as follows: 10 CFR 50.55a(g)(1):
For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued prior to January 1, 1971, components (including supports) must meet the requirements of paragraphs(g)(4) and (5) of this section to the extent practical.
10 CFR 50.55a(g)(4):
Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components (including supports) which are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and pre-service examination requirements, set forth in Section XI of editions of the ASME Boiler and Pressure Vessel Code... to the extent practical within the limitation of design, geometry and materials of construction of the components.
10 CFR 50.55a(g)(5)(iii):
If the licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as specified in § 50.4, information to support the determinations.
Table A -Limited Exam Weld List Exam Item Component Period Code Description Category Number Number Examined Coverage B-A B1.40 HCC-COOI 1 76.05% Reactor Vessel Head-to-Flange Weld Reactor Water Cleanup R-A R1.16 Piping Weld Recirculation Manifold to A Riser Piping Weld Reactor Vessel Head to Flange Weld -HCC-CO01 This weld is the Head to Flange Weld which can only be examined from the head surface. The examination is limited to approximately 76.05% and is limited due to the configuration of the weld. Note that this weld examination is divided up into thirds, with each third being examined each period. The examination completed was from Stud Holes 60 to 20. There is no feasible option in order to examine the remaining 23.95%.The Nondestructive Examination (NDE) procedure used for this examination incorporates the examination techniques qualified under Appendix VIII of the ASME Section XI Code by the Performance Demonstration Initiative (PDI). That procedure was approved under Relief Request NDE-R008 on January 31, 2007.
Enclosure 1 to NG-09-0539 Page 4 of 9 Reactor Water Cleanup Class 1 Weld CUA-J024 This weld is between a containment penetration and a motor operated valve (MO-2701). The valve side of the weld is not accessible for scanning due to geometry.This weld is the only weld in the risk segment (CU-007) so there is no other weld to select. The consequence evaluation determined this weld to be high because it is the weld between the containment and the isolation valve (MO-2701).
The material for the items welded together is Al 82 F316 forging penetration to an A351 CF8M cast valve. Per Generic Letter 88-01, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping," "Inspection Schedules" position (2), this weld would be considered in the Intergranular Stress Corrosion Cracking (IGSCC) Category A. The A182 F316 is solution heat treated which is an acceptable process for resistance to IGSCC. The staff position states: "Although castings with higher carbon content than 0. 035% are not considered to be resistant to sensitization, welds joining such castings (in the form of pump and valve bodies) to piping have been relatively free of IGSCC.This may be attributed to a favorable residual stress distribution, as calculations have indicated.
For this reason, weld joining resistant material to pumps and valves will be considered to be resistant welds, and included in IGSCC Category A. If extensive weld repairs were performed the residual stress may be unfavorable, in which case such welds should be included in Category D." Therefore, this weld is considered resistant to IGSCC. The volume examined was from the A182 F316 penetration side of the weld. The weld was not examined from the A351 CF8M cast valve side due to the configuration of the valve (see photo that follows).
Enclosure 1 to NG-09-0539 Page 5 of 9 Since this weld is resistant to the degradation mechanism of IGSCC and there is no other degradation mechanism that has been identified for this weld, the volume examined is acceptable.
Enclosure 1 to NG-09-0539 Page 5 of 9 Since this weld is resistant to the degradation mechanism of IGSCC and there is no other degradation mechanism that has been identified for this weld, the volume examined is acceptable.
Recirculation System Class 1 Weld RMA-J004 This weld is the branch connection of the recirculation manifold to the recirculation riser line. The manifold side is not accessible for scanning due to geometry.
Recirculation System Class 1 Weld RMA-J004 This weld is the branch connection of the recirculation manifold to the recirculation riser line. The manifold side is not accessible for scanning due to geometry. There are a total of eight welds with this configuration (8 recirculation risers coming off the two manifolds); see ISI Isometrics 1.2-20 and 1.2-22 that follow.
There are a total of eight welds with this configuration (8 recirculation risers coming off the two manifolds);
 
see ISI Isometrics 1.2-20 and 1.2-22 that follow.
Enclosure 1 to NG-09-0539 Page 6 of 9 rn       RRF-8J-4A C       RRFC-EJ4   -
Enclosure 1 to NG-09-0539 Page 6 of 9 rn RRF-8J-4A C RRFC-EJ4 -RR-,14 ELD OVECRLAY WELD OVERLAY'R~ EPROM IN REPAIR IN R 0J A m WELD OVERLAY CINNRHB-REPAIR IN WELD OVERLAY COMMON REPAIR IN J5 5 1 A J3 D F N2 FPA 4S I" LINE TYP.DW339 031 j m wW21-J7 DW2 OW t -47 LUC$ DLS OM-J* EICLTO 1NFOO""&RSR I, 4 Enclosure 1 to NG-09-0539 Page 7 of 9 The detailed configuration of the branch connection weld provided below is taken from the construction drawing (B31-GO01-RD-N-B3).
RR-,14         ELD OVECRLAY                   WELD OVERLAY
As the configuration shows it does not allow an examination to be performed from the manifold side.--.T. ~N VA.* "" ' ' "'"T .: ..: .... .... ... .-..,.,~All eight manifold to riser welds were solution annealed which is an acceptable process for resistance to IGSCC. Each weld was identified in its own risk category so there is no other weld that could be selected to obtain a higher examination coverage.
      'R~                   EPROM IN                       REPAIR IN           R 0J   A m   WELDOVERLAY                                          CINNRHB-REPAIR IN                                                                 WELD OVERLAY COMMON                                                                   REPAIR IN 1   A   J5                                D J3 5 F N2                                             FPA 4S         I" LINE TYP.
These welds were determined to have Thermal Transients as a degradation mechanism under the RI-SI Program. The Degradation Mechanism Evaluation Document (M453-047) states: For the most part, the RCR System heats up and cools down slowly and uniformly so it is not susceptible to the thermal shocks that result in TT degradation mechanism.
DW339             031 j m   wW21
However, at the beginning of shutdown cooling, the RCR System does receive a double-shock from the RHR System (cold fluid and then hot fluid into formerly hot lines). The double-shock was analyzed for the RCR main loop discharge, manifold, and riser piping. The results indicate that all of these pipe segments are potentially susceptible to the TT degradation mechanism.
                                        -J7           DW2 LUC$             DLS OWt        -47
NextEra Energy Duane Arnold proposes to perform the ultrasonic examination on one more of the eight welds (which would only receive 50% coverage) in lieu of performing the examination on just one weld. One weld will be examined from each loop.Performing two of the eight welds (each receiving 50% coverage) is considered an acceptable alternative.
* EICLTO                       1NFOO""&RSR                         I,     4 OM-J
Enclosure 1 to NG-09-0539 Page 8 of 9 Proposed Alternative and Basis for Use In accordance with 10 CFR 50.55a(g)(5)(iii), relief is requested for the components listed in Table A on the basis that the required examination coverage of "essentially 100 percent" is impractical due to physical obstructions and the limitations imposed by design, geometry and materials of construction.
 
NextEra Energy Duane Arnold performed qualified examinations that achieved the maximum, practical amount of coverage obtainable within the limitations imposed by the design of the components.
Enclosure 1 to NG-09-0539 Page 7 of 9 The detailed configuration of the branch connection weld provided below is taken from the construction drawing (B31-GO01-RD-N-B3). As the configuration shows it does not allow an examination to be performed from the manifold side.
                                                                    --.
N                                       VA.
                    * ' ""* ' * "'"T .
T.        ~
        * :. . ....: . ... ... . *..   ,.,~     -..
All eight manifold to riser welds were solution annealed which is an acceptable process for resistance to IGSCC. Each weld was identified in its own risk category so there is no other weld that could be selected to obtain a higher examination coverage. These welds were determined to have Thermal Transients as a degradation mechanism under the RI-SI Program. The Degradation Mechanism Evaluation Document (M453-047) states:
For the most part, the RCR System heats up and cools down slowly and uniformly so it is not susceptible to the thermal shocks that result in TT degradation mechanism. However, at the beginning of shutdown cooling, the RCR System does receive a double-shock from the RHR System (cold fluid and then hot fluid into formerly hot lines). The double-shock was analyzed for the RCR main loop discharge, manifold, and riser piping. The results indicate that all of these pipe segments are potentially susceptible to the TT degradation mechanism.
NextEra Energy Duane Arnold proposes to perform the ultrasonic examination on one more of the eight welds (which would only receive 50% coverage) in lieu of performing the examination on just one weld. One weld will be examined from each loop.
Performing two of the eight welds (each receiving 50% coverage) is considered an acceptable alternative.
 
Enclosure 1 to NG-09-0539 Page 8 of 9 Proposed Alternative and Basis for Use In accordance with 10 CFR 50.55a(g)(5)(iii), relief is requested for the components listed in Table A on the basis that the required examination coverage of "essentially 100 percent" is impractical due to physical obstructions and the limitations imposed by design, geometry and materials of construction. NextEra Energy Duane Arnold performed qualified examinations that achieved the maximum, practical amount of coverage obtainable within the limitations imposed by the design of the components.
Additionally, for the Class 1 examination Category B-P, a VT-2 examination is performed on the subject components of the Reactor Coolant Pressure Boundary during system pressure tests each refueling outage. The examination was completed during the 2009 refueling outage and no evidence of leakage was identified for these components.
Additionally, for the Class 1 examination Category B-P, a VT-2 examination is performed on the subject components of the Reactor Coolant Pressure Boundary during system pressure tests each refueling outage. The examination was completed during the 2009 refueling outage and no evidence of leakage was identified for these components.
Based on the above, with due consideration of the earlier plant design, the underlying objectives of the Code required volumetric examinations have been met.The examinations were completed to the extent practical and no evidence of unacceptable flaws was detected.
Based on the above, with due consideration of the earlier plant design, the underlying objectives of the Code required volumetric examinations have been met.
VT-2 examinations performed on the subject Class 1 components during system pressure testing each refueling outage (in accordance with examination Category B-P) provide continued assurance that the structural integrity of the subject components is maintained.
The examinations were completed to the extent practical and no evidence of unacceptable flaws was detected. VT-2 examinations performed on the subject Class 1 components during system pressure testing each refueling outage (in accordance with examination Category B-P) provide continued assurance that the structural integrity of the subject components is maintained. Additionally, the DAEC Water Chemistry Program and inerted primary containment environment provide added measures of protection for the component materials.
Additionally, the DAEC Water Chemistry Program and inerted primary containment environment provide added measures of protection for the component materials.
Duration of Proposed Alternative Relief is requested for the Fourth Ten year Interval of the Inservice Inspection Program for the DAEC, which ends on February 21, 2014.
Duration of Proposed Alternative Relief is requested for the Fourth Ten year Interval of the Inservice Inspection Program for the DAEC, which ends on February 21, 2014.Precedents
Precedents
: 1) NRC Letter dated May 1, 2008, "Safety Evaluation for Request for Relief from IWB-2500 and IWC-2500 Requirements to Allow Performance of Limited Examinations of Various Welds for the Third 10-Year Interval of the Inservice Inspection Program (TAC No. MD5669)." 2) NRC Letter dated October 18, 1999, "Safety Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for Relief for Duane Arnold Energy Center (TAC No. MA4151)" specifically for Relief Request NDE-R028.3) NRC Letter dated March 23, 1998, "Evaluation of Third 10-Year Inservice Inspection Interval Program Plan Requests for Relief for the Duane Arnold Enclosure 1 to NG-09-0539 Page 9 of 9 Energy Center (TAC No. M95412)" specifically for Relief Requests NDE-R006, NDE-R007, NDE-R008, NDE-R009, and NDE-RO10.References None Enclosure 2 to NG-09-0539 Enclosure 2 1 st Period Non-Destructive Evaluation Reports 9 Pages Follow f.FPL UT Vessel Examination Site/Unit:
: 1)     NRC Letter dated May 1, 2008, "Safety Evaluation for Request for Relief from IWB-2500 and IWC-2500 Requirements to Allow Performance of Limited Examinations of Various Welds for the Third 10-Year Interval of the Inservice Inspection Program (TAC No. MD5669)."
DAEC I I Summary No.: 3300 Workscope:
: 2)     NRC Letter dated October 18, 1999, "Safety Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for Relief for Duane Arnold Energy Center (TAC No. MA4151)" specifically for Relief Request NDE-R028.
ISI Procedure:
: 3)     NRC Letter dated March 23, 1998, "Evaluation of Third 10-Year Inservice Inspection Interval Program Plan Requests for Relief for the Duane Arnold
Procedure Rev.: Work Order No.: ACP1211.27 1 1135860 Outage No.: RFO-20-1 Report No.: UT-07-100 Page: 1 of 3 Code: ASME 2001 Ed thru 2003 Add Cat,/Item:
 
B-A181.40 Location:
Enclosure 1 to NG-09-0539 Page 9 of 9 Energy Center (TAC No. M95412)" specifically for Relief Requests NDE-R006, NDE-R007, NDE-R008, NDE-R009, and NDE-RO10.
RB511 Drawing No.: VS-01-06 SHT-01
References None
 
Enclosure 2 to NG-09-0539 Enclosure 2 1st Period Non-Destructive Evaluation Reports 9 Pages Follow
: f.                                                                           UT Vessel Examination FPL Site/Unit:     DAEC     I         I                                               Procedure:         ACP1211.27                         Outage No.:         RFO-20-1 Summary No.:                    3300                                            Procedure Rev.:                1                              Report No.:       UT-07-100 Workscope:                      ISI                                          Work Order No.:              1135860                                  Page:     1     of       3 Code:             ASME 2001 Ed thru 2003 Add                         Cat,/Item:             B-A181.40                 Location:                             RB511 Drawing No.:                         VS-01-06 SHT-01                                


== Description:==
== Description:==
REACTOR VESSEL(STUD HOLES 60-20)
System ID:          RPV Component ID: HCC-CO0l                                                                                            Size/Length:      NWA              Thickness/Diameter:          3.93" Limitations:        Single sided exam due to configuration                                                                    Start Time:        1000            Finish Time:        1200 Examination Surface:          Inside    i      Outside    [*]                  Surface Condition: Blended Lo Location:              Stud Hole One                Wo Location:                    WCL                  Couplant:            Ultragel II              Batch No.:        06225 Temp. Tool Mf9.:                    PTC                      Serial No.:              254038                Surface Temp.:          70      'F Cal. Report No.:                                                                CAL-07-031 Angle Used        1-I        45  j45Tj          60    -      !6 Scanning d8 lndication(s):    Yet;          No , i                                      Scan Coverage:    Upstream ni. Downstream[i)        CW
* CCWi Comments:
Scan Sensitivity: Zone 1 / 82.5 Zone 2 1 83.5 Results:            Accept 1ýJ          Reject  i-          Info    F          _-_
Percent Of Coverage Obtained > 90%:                  76.05%                    Reviewed Previous Data:            Yes Examiner          Level    II-PDI                      *9frature                              Date Reviewer                                        S)gnature      ,                          Date Stevermer, Aaron J.                                                                                  Timm, Jeremy                            -2/22/2007                                    .
Examiner          Level    NIA                        2 Signature                              Date Site Review                                      Sigr(e                                    Date N/A                                                                                                Dohmen, Frank E.                  4 Other            Level    NIA                          Signature                            Date ANII Review                                      Signature                    .'          Date NIA                                                                                                Bowers, Jeremy                                .'3    j ..                    -__  "____"_
UT Vessel Examination
Supplemental Report PPL Report No.:      UT-07-100 Page:      2    of    3 Summary No.: 3300 Examiner-- Stevermer, Aaron J.    /:.                            Level:  11-PDI    Reviewer: Timm, Jeremy            .,    .... 7                    Date:
Examiner:    NIA                                                    Level:  N/A    Site Review: Dohmen, Frank E.                                        Date:    2:7  r,. ý Other: NIA                                                    Level:  NIA  ANM Review: Bowers, Jeremy                                          Date: 3>)
Comments: Coverage Plots AXIAL                                                              PARALLEL Sketch or P~hoto: U:Apps\OAEG D8\ER0CkRF020\REP0RT SOPPLEMENTSWLTXSN_3300                          (J:1Apps\0AEC(,DBkEROC\,RFO20\REPC)RTl SUPPLEMrENTS\UT\S N_3a00 CorpIDHOC0_C00l Repo rt UTO 7- GOAxial jpy                                      Cc~rnpIDHCC_ CO0l ReportUT 07_ 100P ara.lel jpg I(.OII  Cuwciage dlol- Axial s.waodirciioa 11CCCOO C~we-te p~      Pa ilA~gIca
                                                                                                                                                    . ici He-a
                                                          -A------
_
                                        *'r'j Flange Xz                  /          Flange Additional - Supplemental Reports
Supplemental Report F*PI. Energy                                                                                                                        Report No.:        UT-07-.100 Ilinei ArnoldEnerqy Csezi Page:    3    of    3 Summary No.: 3300 Examiner: Stevermer, Aaron J.                  F              Level II-PDI            Reviewer: Timm, Jeremy              ,                Date:  _____/__
Examiner: N/A                                                Level      NIA      Site Review: Dohmen, Frank E.              1C            Date: 2/Z7Io7 Other:    NIA                                          Level        NIA    ANII Review: Bowers, Jeremy                    -'          Date:
Comments: COVERAGE CALCULATIONS Sketch or Photo: U:AppsOAECDB\EROC\RFO20\REPORT SUPPLEMENTS\UT\SN_3300 ComplDHCCCO01 ReportUTO07_100 CovCalc.jpg RPV Coverage Calculation Sheet Note: calculations performed using 2D plot only Component ID        MCC-CO01 Area reuhEd t§eobeexamined Axial scan direction: Height Kwidth 3.93  Inches      x        5.3  Inches  equals    20.829 square Inches Parallel scan direction: Height x width 3.93  inches      X        5.3  Inches  equals    20.829 square Inches Total area required to be examined              41,658 square inches required for complete exam Actual area examined 60 degree R.L Axial scan direction: Height x width 3.93    Inches      x        5.3  Inches  equals    20.829 square inches Triangular area not examined (if applies)          1.53    X .5      X      2.92 height  equals 2.,2338 square inches Bass Axial scan direction area examined              18.5952 square Inches 60 degree R.L. Parallel scan direction: Height x width 3.93    Inches      x      3.33  Inches  equals  13.0869 square inches Additional inner 16% area achieved using 40 & 45 degree shear techniques: Height x width (Nozzle to RPV only) 0 Inches      x        0    Inches  equals      0  square inches Combining all scan directions:      31.6821 square inches lor total exam Divide area examined by required area:        equals coverage achieved            76.05 % coverage for total exam Calculations performed by:          Todd Stechinger            Level    Ill OAEC Review                          Frank Dohmen              Level    III ANIP Review                          J4eremy 5owera Additional - Supplemental Reports


REACTOR VESSEL(STUD HOLES 60-20)System ID: RPV Component ID: HCC-CO0l Size/Length:
0  FFPL Enerqy.                  Site/Unit:
NWA Thickness/Diameter:
DAEC                          I UT Calibration/Examination RFO-21 O(ane Arnold Energy Ceoe, Procedure:                 ACP1211.20                                  Outage No.:
3.93" Limitations:
Summary No.:                     117900-RI                                              Procedure Rev.:                         7                                     Report No.:             UT-09-006 Workscope:                         is'                                               Work Order No.:                     1144503                                       Page:       1       of         3 Code:                         ASME 2001 Ed Thru 2003Add                                   Cat./Item:               R-A/R1.16-2                       Location:                                 DW220 Drawing No.:                                 1.2-20 SHT-01                                      
Single sided exam due to configuration Start Time: 1000 Finish Time: 1200 Examination Surface: Inside i Outside Surface Condition:
Blended Lo Location:
Stud Hole One Wo Location:
WCL Couplant:
Ultragel II Batch No.: 06225 Temp. Tool Mf9.: PTC Serial No.: 254038 Surface Temp.: 70 'F Cal. Report No.: CAL-07-031 Angle Used 1-I 45 j45Tj 60 -!6 Scanning d8 lndication(s):
Yet; No , i Scan Coverage:
Upstream ni. Downstream[i)
CW CCWi Comments: Scan Sensitivity:
Zone 1 / 82.5 Zone 2 1 83.5 Results: Accept 1ýJ Reject i- Info F _-_Percent Of Coverage Obtained > 90%: 76.05% Reviewed Previous Data: Yes Examiner Level II-PDI Date Reviewer S)gnature , Date Stevermer, Aaron J. -2/22/2007 Timm, Jeremy .Examiner Level NIA 2 Signature Date Site Review Sigr(e Date N/A Dohmen, Frank E. 4 Other Level NIA Signature Date ANII Review Signature
.' Date NIA Bowers, Jeremy .'3 j .. -__ "____"_UT Vessel Examination PPL Supplemental Report Report No.: UT-07-100 Page: 2 of 3 Summary No.: Examiner--
Examiner: Other: 3300 Stevermer, Aaron J. /:.NIA NIA Level: 11-PDI Level: N/A Level: NIA Reviewer:
Timm, Jeremy ., 7 ....Site Review: Dohmen, Frank E.ANM Review: Bowers, Jeremy Date: Date: 2:7 r,. ýDate: 3>)Comments:
Coverage Plots AXIAL PARALLEL Sketch or P~hoto: U:Apps\OAEG D8\ER0CkRF020\REP0RT SOPPLEMENTSWLTXSN_3300 CorpIDHOC0_C00l Repo rt UTO 7- G O Axial jpy I(.OII Cuwciage dlol- Axial s.wao dirciioa (J:1Apps\0AEC(,DBkEROC\,RFO20\REPC)RTl SUPPLEMrENTS\UT\S N_3a00 Cc~rnpIDHCC_
CO0l ReportUT 07_ 100 P ara.lel jpg 11CCCOO C~we-te p~ Pa ilA~g Ica .ici He-a-A ------_ Flange X z Flange /Additional
-Supplemental Reports F*PI. Energy I linei Arnold Enerqy Csezi Supplemental Report Report No.: UT-07-.100 Page: 3 of 3 Summary No.: 3300 Examiner:
Stevermer, Aaron J. F Level Examiner:
N/A Level Other: NIA Level II-PDI Reviewer:
Timm, Jeremy , NIA Site Review: Dohmen, Frank E. 1C NIA ANII Review: Bowers, Jeremy -'Date: _____/__Date: 2/Z7Io7 Date: Comments:
COVERAGE CALCULATIONS Sketch or Photo: U:AppsOAECDB\EROC\RFO20\REPORT SUPPLEMENTS\UT\SN_3300 ComplDHCCCO01 ReportUTO07_100 CovCalc.jpg RPV Coverage Calculation Sheet Note: calculations performed using 2D plot only Component ID MCC-CO01 Area reuhEd t§eo be examined Axial scan direction:
Height K width 3.93 Inches x 5.3 Inches equals 20.829 square Inches Parallel scan direction:
Height x width 3.93 inches X 5.3 Inches equals 20.829 square Inches Total area required to be examined 41,658 square inches required for complete exam Actual area examined 60 degree R.L Axial scan direction:
Height x width 3.93 Inches x 5.3 Inches equals 20.829 square inches Triangular area not examined (if applies) 1.53 X .5 X 2.92 height equals 2.,2338 square inches Bass Axial scan direction area examined 18.5952 square Inches 60 degree R.L. Parallel scan direction:
Height x width 3.93 Inches x 3.33 Inches equals 13.0869 square inches Additional inner 16% area achieved using 40 & 45 degree shear techniques:
Height x width (Nozzle to RPV only)0 Inches x 0 Inches equals 0 square inches Combining all scan directions:
31.6821 square inches lor total exam Divide area examined by required area: equals coverage achieved 76.05 % coverage for total exam Calculations performed by: OAEC Review ANIP Review Todd Stechinger Level Ill Frank Dohmen J4eremy 5owera Level III Additional
-Supplemental Reports 0 FFPL Enerqy. Site/Unit:
O(ane Arnold Energy Ceoe, Summary No.: Workscope:
UT Calibration/Examination DAEC I 117900-RI is'Procedure:
Procedure Rev.: Work Order No.: ACP1211.20 7 1144503 Outage No.: RFO-21 Report No.: UT-09-006 Page: 1 of 3 Code: ASME 2001 Ed Thru 2003Add Cat./Item:
R-A/R1.16-2 Location:
DW220 Drawing No.: 1.2-20 SHT-01


== Description:==
== Description:==
MANIFOLD TO PIPE WELD OFF OF THE RECIRCULATION MAN System ID:          RM Component ID:        RMA-J004                                                                                                                    Size/Length:        1.1"    132"            Thickness/Diameter:            0.844" / 12' Limitations:        Single side acess due to branch configuration                                                                                              Start Time:          1408            Finish Time:              1506 Instrument Settings                                                  Search Unit                              CaL      Time        Date                      Axial Orientated Search Unit Serial No.:                            01R6B7                        Serial No.:                    01RPIH                      Checks                                  Calibration        Signal          Sweep          Sound Path Manufacturer:                        Krautkramer                      Manufacturer:                      KBA                    Initial Cal. 1100      2f8209          Refleotor      Amplitude %        Division Model:                                USN 6D SW                      Size:            .50"          Shape:        Round          inter. Cal. 1408      218/2009        1.0* Notch            85              5.0                1.413 Delay.              6.8847        Range:            2.828            Freq.:      1.5 MHz            Style:      Comp G        Inter. Cal.
MIT Cal/Vel:        0.1232        Pulser:          Square            Exam Angle:          452        # of Elements:      1    Inter. Cal.            _
Damping:              500 L)        Reject              0%            Mode:                          Shear                -      Final Cal. 1633      218/2009 Rep. Rate:          Autohigh        Freq.:          2.0 mhz          Measured Angle:                        452                              Couplant                                                      _I      ......
Filter:                NIA          Mode:          Fullwave          Wedge Styte:                      MSWQC                    Cal. Batch:          06225                      Circumferential Orientated Search Unit Voltage:            450 volts      Other:        PW 330 nS                                                                    Type:            Ultragel II              Calibration        Signal          Sweep            r      path Ax. Gain (dB):            11.0      CIrc. Gain (dB):      N/A                          Search Unit Cable                      Mfg.:            Sonotech                  Reflector      Amplitude %        Division 1    Screen Div. =      .2828    in. of        Sound Path          Type:                          RG-174                      Exam Batch:            06225                  WA Linearity Report No.:                      L-09-001                  Length:          6'        No. Corn.:          0        Type:            Ultragel II Calibration Block                                                Scan Coverage                        Mfg.:          Sonotech Cal. Block No.:                            5539
___________________- Upstream        []    Downstream-]        Scan dB: 23.0              Reference Block                                Reference/Simulator Block Thickness:        .5"--2.0"          Dia.:            0                    CW 0                CCW &] Scan dB: 23.0          Serial No.:          08-4349            Gain                AmSne %          Division      Sound Path Cal. 51k. Temp.:      75*2 Temp. Tool:              M415              Exam Surface:                          OD                Type:            ROMPAS                  11.0      FSDH            20          3.8              1.067 Recordable Indication(s):                Yes  []      No [      (If Yes, Ref. Attached Ultrasonic indication Report.)
Results:            Accept []            Reject  [J            Info []                                                                            Comments:      See supplemental sheet for thickness and contour and coverage plot, Percent Of Coverage Obtained > 90%:                    50%0            Reviewed Previous Data:                    Yes Examiner                Level  III-PDf                        _,Signat                                          Date    Reviewer                                                        na                                            Dte Davis, Layn R.                                                                                                020091 Examiner                Level    II-PDi                          Signature                                        Date    Site Review                                                  Sigratur)                                    /    Date Totosky, Ryan J.                                                                                            2//209                                                                                                                f/)Zt*19 Other                  Level    NfA                            Sidgnature          -                          Date    ANII Review                                                  Signature                                        Date UT Calibration/Examination


MANIFOLD TO PIPE WELD OFF OF THE RECIRCULATION MAN System ID: RM Component ID: RMA-J004 Size/Length:
a  F4    Energy.               Site/Unit:       DAEC UT Cal ibration/Examination Duamn Amild Eneigy Coen%*'                                                                                         Procedure:                 ACP1211.20                                    Outage No.:         RFO-21 Summary No.:                           ISI                                                                                    7                                      Report No.:       UT-09-006 I 17900-Ri'                                         Procedure Rev.:
1.1" 132" Thickness/Diameter:
Workscope:                           'SI                                          Work Order No.:                     1144503                                           Page:     2     of     3 Code:                       ASME 2001 Ed Thru 2003Add                                   Cat/Item:               R-A/RI.16-2                       Location:                                 DW220 Drawing No.:                                 1.2-20 SHT-O1                                      
0.844" / 12'Limitations:
Single side acess due to branch configuration Start Time: 1408 Finish Time: 1506 Instrument Settings Search Unit CaL Time Date Axial Orientated Search Unit Serial No.: 01R6B7 Serial No.: 01RPIH Checks Calibration Signal Sweep Sound Path Manufacturer:
Krautkramer Manufacturer:
KBA Initial Cal. 1100 2f8209 Refleotor Amplitude
% Division Model: USN 6D SW Size: .50" Shape: Round inter. Cal. 1408 218/2009 1.0* Notch 85 5.0 1.413 Delay. 6.8847 Range: 2.828 Freq.: 1.5 MHz Style: Comp G Inter. Cal.MIT Cal/Vel: 0.1232 Pulser: Square Exam Angle: 452 # of Elements:
1 Inter. Cal. _Damping: 500 L) Reject 0% Mode: Shear -Final Cal. 1633 218/2009 Rep. Rate: Autohigh Freq.: 2.0 mhz Measured Angle: 452 Couplant ......_I Filter: NIA Mode: Fullwave Wedge Styte: MSWQC Cal. Batch: 06225 Circumferential Orientated Search Unit Voltage: 450 volts Other: PW 330 nS Type: Ultragel II Calibration Signal Sweep r path Ax. Gain (dB): 11.0 CIrc. Gain (dB): N/A Search Unit Cable Mfg.: Sonotech Reflector Amplitude
% Division 1 Screen Div. = .2828 in. of Sound Path Type: RG-174 Exam Batch: 06225 WA Linearity Report No.: L-09-001 Length: 6' No. Corn.: 0 Type: Ultragel II Calibration Block Scan Coverage Mfg.: Sonotech Cal. Block No.: 5539 Upstream [] Downstream-]
Scan dB: 23.0___________________-
Reference Block Reference/Simulator Block Thickness:
.5"- -2.0" Dia.: 0 CW 0 CCW &] Scan dB: 23.0 Serial No.: 08-4349 Gain AmSne % Division Sound Path Cal. 51k. Temp.: Temp. Tool: M415 Exam Surface: OD Type: ROMPAS 11.0 FSDH 20 3.8 1.067 Recordable Indication(s):
Yes [] No [ (If Yes, Ref. Attached Ultrasonic indication Report.)Results: Accept [] Reject [J Info [] Comments:
See supplemental sheet for thickness and contour and coverage plot, Percent Of Coverage Obtained > 90%: 50%0 Reviewed Previous Data: Yes Examiner Level III-PDf _,Signat Date Reviewer na Dte Davis, Layn R. 020091 Examiner Level II-PDi Signature Date Site Review Sigratur)
/ Date Totosky, Ryan J. 2//209 f/)Zt*19 Other Level NfA Sidgnature
-Date ANII Review Signature Date UT Calibration/Examination a F4 Energy. Site/Unit:
DAEC Duamn Amild Eneigy Coen%*'Summary No.: Workscope:
UT Cal ibration/Examination ISI I 17900-Ri''SI Procedure:
Procedure Rev.: Work Order No.: ACP1211.20 7 1144503 Outage No.: RFO-21 Report No.: UT-09-006 Page: 2 of 3 Code: ASME 2001 Ed Thru 2003Add Cat/Item:
R-A/RI.16-2 Location:
DW220 Drawing No.: 1.2-20 SHT-O1


== Description:==
== Description:==
MANIFOLD TO PIPE WELD OFF OF THE RECIRCULATION MAN System ID:          RM Component ID:      RMA-J004                                                                                                                  Size/Length:        1.1"    / 3Z'          Thickness/Diameter:      0.844" / 12' Limitations:        Single side acess due to branch configuration                                                                                              Start Time:          1408            Finish Time:          1506 Instrument Settings                                                  Search Unit                            Cal.      Time        Date                        Axial Orfenta-ed Search Unit Serial No.:                            01R6B7 Mauacuer    rutrme        SeriaJ No.:                  08-440                      Checks            .Calibration            CS                Signal        Sweep    1Sound Path Manufacturer:                      Krautkramer                        Manufacturer:                    RTD                    Initial Cal. 1205      2(8=2009          Reflector      Amplitude %      Division Model:                              USN 60 SW                        Size:      2 (8 x 14)      Shape:      Rectangle      Inter. Cal. 1445      2/8/2009          1.0" Notch            so            5.0          2.00 Delay:              8.6128        Range:              4.0            Freq.:      2.0 MHz        Style:  TRL2-Aust        Inter. Cal.
M'tl CarNel:        0.2222        Pulser:          Square            Exam Angle:          602      # of Elements:    2    Inter. Cal. I Damping:            500 .        Reject:            0%              Mode:                        Long                -      Final Cal. 1637      2/812009 Rep. Rate:        Autohigh        Freq.:          2.0 mhz            Measured Angle:                    602                              Couplant Filter:              N/A          Mode:          Fullwave            Wedge Style:                  Integral                Cal. Batch:          06225                      Circumferential Orientated Search Unit Voltage:          450 volts        Other:        PW 250 ne                                                                  Type:            Ultragel II                Calbration          Signal        Sweep      Soud Path N/A                          Search Unit Cable                    Mfg.:            Sonotech                    Reflector      Amplitude %      DMsion Ax. Gain (dB):          51.0      Circ. Gain (dB):
1 Screen Div. =          0.4    in. of      Sound Path            Type:                      RG-174                    Exam Batch:            06225                    N/A Linearity Report No.:                      L-09-001                    Length:        6'      No. Conn,:          0        Type:            Ultragel II Calibration Block                                                Scan Coverage                      Mfg.:            Sonotech Cal. Block No.:                          5539                        Upstream  []    Downstream--      Scan dr:  67.0              Reference Block                                Reference/Simulator Block Thickness:      .5" - 2.0"        Dia.:            0                      CW [E            CCW E]      Scan dB:  N/A                                                Gaia                    Signal        Swee Cal, BIk. Temp.: 759_ Temp. Tool:                  M415              Exam Surface:                      OD                Type:            ROMPAS                    47.0      FSDH            85          3.5          1D41 Temp. Tool:              M415              Surface Condition:                Blended Comp. Temp.:        89W Recordable Indication(s):              Yes  []      No V        (If Yes, Ref. Attached Ultrasonic Indication Report.)
Results:          Accept []            Reject  E]              Info  []                                                                        Comments: See supplemental sheet for thickness and contour and coverage plot.
Percent Of Coverage Obtained > 90%:                    50%              Reviewed Previous Data:                Yes Examiner              Level  ilI-pot                          Signature                                    Date    Reviewer                                                      Signature                                  Date Davis, Layn R.                                                                                          29W/2009                                  CC S.(*qj                                                          V, Examiner              Level  iI.pDI                            Signature                                    Date    Site Review                                                  S                                    .u    Date Tolosky, Ryan J.2/8/2009 Other                  Level  NIA                                                                            Dale ANII Review Dagnature                                                            Signature                          '    'Dale UT Calibration/Examinalion
Supplemental Report i::L Report No.:    UT-09-006 Page:    3    of    3 Summary No.: 117900-RI Examiner: Davis, Layn R.          Level: III-PDI      Reviewer:      L      I    S ,,        Date:
Examiner: Tolosky, Ryan J.        Level: fl-PDI    Site Review:                ee"',          Date:  /  /<1 Other:    N/A                  Level:  N/A    ANII Review:        -)I (-.                Date:  -q Comments:
4 t
I                    I Re Lce r-45 ~
K -
                                      -
eovet~e.
56'Z 6orve,-3 Additional - Supplemental Reports


MANIFOLD TO PIPE WELD OFF OF THE RECIRCULATION MAN System ID: RM Component ID: RMA-J004 Size/Length:
UT Calibration/Examination F3L Energy                    Site/Unit:
1.1" / 3Z' Thickness/Diameter:
DAEC          I1                                                Procedure:                   ACP121i1.20                                  Outage No.:         RFO-20-1 DomneArnold *l*,eOry ICellar Summary No.:                       74600-4J                                        Procedure Rev.:                             6                                      Report No.:         UT-07-028 Work<scope:                                                                       Work Order No.:                       1135836                                           Page:     1       of     2 Code:                         ASME 2001 Ed thru 2003 Add                                 Cat./item:             R-A/R1.16-4                         Location:                                   RB270 Drawing No.:                                   1.2-1 IA SHT-01                                    
0.844" / 12'Limitations:
Single side acess due to branch configuration Start Time: 1408 Finish Time: 1506 Instrument Settings Search Unit Cal. Time Date Axial Orfenta-ed Search Unit Serial No.: 01R6B7 SeriaJ No.: 08-440 Checks CS Mauacuer rutrme .Calibration Signal Sweep 1Sound Path Manufacturer:
Krautkramer Manufacturer:
RTD Initial Cal. 1205 2(8=2009 Reflector Amplitude
% Division Model: USN 60 SW Size: 2 (8 x 14) Shape: Rectangle Inter. Cal. 1445 2/8/2009 1.0" Notch so 5.0 2.00 Delay: 8.6128 Range: 4.0 Freq.: 2.0 MHz Style: TRL2-Aust Inter. Cal.M'tl CarNel: 0.2222 Pulser: Square Exam Angle: 602 # of Elements:
2 Inter. Cal. I Damping: 500 .Reject: 0% Mode: Long -Final Cal. 1637 2/812009 Rep. Rate: Autohigh Freq.: 2.0 mhz Measured Angle: 602 Couplant Filter: N/A Mode: Fullwave Wedge Style: Integral Cal. Batch: 06225 Circumferential Orientated Search Unit Voltage: 450 volts Other: PW 250 ne Type: Ultragel II Calbration Signal Sweep Soud Path Ax. Gain (dB): 51.0 Circ. Gain (dB): N/A Search Unit Cable Mfg.: Sonotech Reflector Amplitude
% DMsion 1 Screen Div. = 0.4 in. of Sound Path Type: RG-174 Exam Batch: 06225 N/A Linearity Report No.: L-09-001 Length: 6' No. Conn,: 0 Type: Ultragel II Calibration Block Scan Coverage Mfg.: Sonotech Cal. Block No.: 5539 Upstream [] Downstream--
Scan dr: 67.0 Reference Block Reference/Simulator Block Thickness:
.5" -2.0" Dia.: 0 CW [E CCW E] Scan dB: N/A Gaia Signal Swee Cal, BIk. Temp.: 759_ Temp. Tool: M415 Exam Surface: OD Type: ROMPAS 47.0 FSDH 85 3.5 1D41 Comp. Temp.: 89W Temp. Tool: M415 Surface Condition:
Blended Recordable Indication(s):
Yes [] No V (If Yes, Ref. Attached Ultrasonic Indication Report.)Results: Accept [] Reject E] Info [] Comments:
See supplemental sheet for thickness and contour and coverage plot.Percent Of Coverage Obtained > 90%: 50% Reviewed Previous Data: Yes Examiner Level ilI-pot Signature Date Reviewer Signature Date Davis, Layn R. 29W/2009 CC S.(* qj V, Examiner Level iI.pDI Signature Date Site Review S .u Date Tolosky, Ryan J.2/8/2009 Other Level NIA Dagnature Dale ANII Review Signature
' 'Dale UT Calibration/Examinalion Supplemental Report i::L Report No.: UT-09-006 Page: 3 of 3 Summary No.: 117900-RI Examiner:
Davis, Layn R.Examiner:
Tolosky, Ryan J.Other: N/A Level: III-PDI Level: fl-PDI Level: N/A Reviewer:
L I S ,, Site Review: ee"', ANII Review: -)I (-.Date: Date: / /<1 Date: -q Comments: 4 t I I Re Lce r-45 ~K --eovet~e.56'Z 6orve,-3 Additional
-Supplemental Reports F3L Energy Site/Unit:
Domne Arnold ICellar Summary No.: Work<scope:
UT Calibration/Examination DAEC I 1 74600-4J Procedure:
Procedure Rev.: Work Order No.: ACP121i1.20 6 1135836 Outage No.: RFO-20-1 Report No.: UT-07-028 Page: 1 of 2 Code: ASME 2001 Ed thru 2003 Add Cat./item:
R-A/R1.16-4 Location:
RB270 Drawing No.: 1.2-1 IA SHT-01


== Description:==
== Description:==
PIPE - MOTOR OPERATED GATE System ID:          CU Component ID: CUA-J024                                                                                                                          Size/Length:      .90" 115.75"              Thickness/Diameter.      .58" /5.0" OD Limitations:        Single sided exam due to valve configuration.                                                                                              Start Time:          1400              Finish Time:        1415 Instrument Settings                                                Search Unit                            Cal.      Time        Date                        Axial Orientated Search Unit Serial No.:                              01LCBL                          Serial No.:                01D4NY                      Checks ,                                Calibration            Signal        Sweep      Sound Path Manufacturer:                          Krautkramer                        Manufacturer:                  KBA                    Initial Cal. 0735    2/12/2007        Reflector        Amplitude %        Division Model:                                  USN 60 SW                          Size:      .375"        Shape:        Round          Inter. Cal. 1400    2/1212007        1" Notch                80            8.0          1.43" Delay:                015.30          Range:          1.850"            Freq.:    1.50 MHz        Style:    Comp-G          Inter. Cal. 1415    2112/2007            NIA M'tl CalNel:          .1223          Pulser:          Square              Exam Angle:      45&deg;      # of Elements: Single      Inter. Cal. N/A  _
Damping:              5000          Reject:            0%              Mode:                      Shear                      Final Cal. 1510    2/1212007 Rep. Rate:        AutoHigh          Freq.:          2.0 MHz            Measured Angle:                  45*                              Couplant Filter:              Fixed          Mode:          FullWave            Wedge Style:                MSWQC                    Cal. Batch:          06225                      Circumferential Orientated Search Unit Voltage:                450          Other. PulseWidth 330 ns                                                                Type:            Ultragel II              Calibration            Signal        Sweep      S      P Ax. Gain (dB):            23        Circ. Gain (dB):        23                        Search Unit Cable                      Mfg.:            Sonotech                  Reflector        Amplitude %        Division    SoundPath 10    Screen Div. = 1.850          in. of      Sound Path            Type:                      RG-174                      Exam Batch:          06225                  N/A Linearity Report No.:                        L-07-ODI                    Length:      6-        No. Conn.:        0          Type:            Ultragel 11 Calibration Block                                                Scan Coverage                        Mfg.:          Sonotech Cal. Block No.:                            5539                          Upstream W Downstream[]            Scan dB:    37              Reference Block                                Reference/Simulator Block Thickness          V5"-2.0"          Dia.:            Flat                    CWR              CCW66 Scan dB:        37              No.a      LMT03              Gaia
                                                                                                                                                                          ,oudrit Cal. Bk Temp        78__ Temp Tool:                  253987              Exam Surface:                    OD                  Sao"d                                              Reflector Amplitude % Division Cal Ek.Tep.78 Tep.Tol:______________________________Type:                                                    SS Rompas                  23          SDH            18          6.8          1.05",
Comp. Temp.:        78'      Temp. Tool:            253987              Surface Condition:              Blended                                                        N/A                    __SD Recordable Indication(s):                  Yes  U        No []        (If Yes, Ref. Attached Ultrasonic Indication Report)
Results:          Accept 6d              Reject  U              Info    FU                                                                      Comments:      No downstream scans due to valve configuration.
60&deg; angle reported on UT-07-029 Percent Of Coverage Obtained > 90%:                      50%              Reviewed Previous Data:              Yes Examiner                Level    III-PDI                          S'      lure                                Date  Reviewer                            ..                ....      ignature                                Date 211212007    Blechinger, ToddP. "..r--/-
Examinear                Level    ISignature                                                                    Date  Site Review                                                          fur                      /          Date Pollock, Norm E.                                                                                        2112J2007      DheFrank            E.                  4        U      ki,-1"S/.$70" Other                    Level    N/A                              Signature                                  Date    ANII Review                                                    Signature                                  Date NIA                                                                                                                  Bowers, Jeremy                                    .'3    (....                            -        7 UT Calibration/Examination
0 FPIL gnargV Supplemental Report Report No.:      UT-07-028 auan Arnold Energy Cooler Page:    2    of    2 Summary No.: 74600-RI Examiner: Davis, Layn R              73"    0 .-    Level: III-PDI        Reviewer: Blechinger, Todd P.                Date:  2'ht*7 Examiner      Pollock, Norm E,                    Level:        I    Site Review:  Dohmen, Frank E.                  Date: 31    )0 Other      N/A                                Level:      N/A  ANII Review:    Bowers, Jeremy      )t'*        Date:
Comments:          Actual configuration penetration fitting to valve.
50 % code coverage due to single sided access.
                          *Actual diameter 5.0", actual weld length 15.75" Sketch or Photo:        U:\Apps\DAECDB\EROC\RFO20\REPORT SUPPLEMENTS\UT\SN_74600-RI CompIDCUA-J024 Report_UT-07-028 Coverage Plot.jpg SYST'MM,        RW r C-I                      COMPONENT ID NO0.,'    QA3    5~-
                                -        -      -          ~CROWN HEIGHT'          .
2  .~            -            CROWN WIOTH:.9 WELD LENG3TH:..~
6                                              _ _  _  _ _  _ _  _ _  _  _ _  _  _    F__
C-VePZA&6                tlUe 7V $51I~CLe ,`Z &#xfd; 9CC,-k-c        1tO 0i  ".        -0L I-                                                          VALV'E (46                    4  0'tL I      &#xa3; Additional - Supplemental Reports


PIPE -MOTOR OPERATED GATE System ID: CU Component ID: CUA-J024 Size/Length:
UT Calibration/Examination Ft    E__nergy              Site/Unit:
.90" 115.75" Thickness/Diameter.
DAEC              /                                               Procedure:                     ACP1211.20                                  Outage No.:           RFO-20-1 Ovane Amnold &,   vqy CIlwer Summary No.:                           74600-RI                                       Procedure Rev.:                           6                                     Report No.:         UT-07-029 Workscope:                              ISI                                        Work Order No.:                      1135836                                          Page:     1     of       1 Code:                       ASME 2001 Ed thru 2003 Add                                   Cat/Item:             R-AIRI.16-4                         Location:                                   RB270 Drawing No.:                               1.2-1 1A SHT-01                                      
.58" /5.0" OD Limitations:
Single sided exam due to valve configuration.
Start Time: 1400 Finish Time: 1415 Instrument Settings Search Unit Cal. Time Date Axial Orientated Search Unit Serial No.: 01LCBL Serial No.: 01D4NY Checks , Calibration Signal Sweep Sound Path Manufacturer:
Krautkramer Manufacturer:
KBA Initial Cal. 0735 2/12/2007 Reflector Amplitude
% Division Model: USN 60 SW Size: .375" Shape: Round Inter. Cal. 1400 2/1212007 1" Notch 80 8.0 1.43" Delay: 015.30 Range: 1.850" Freq.: 1.50 MHz Style: Comp-G Inter. Cal. 1415 2112/2007 NIA M'tl CalNel: .1223 Pulser: Square Exam Angle: 45&deg; # of Elements:
Single Inter. Cal. N/A _Damping: 5000 Reject: 0% Mode: Shear Final Cal. 1510 2/1212007 Rep. Rate: AutoHigh Freq.: 2.0 MHz Measured Angle: 45* Couplant Filter: Fixed Mode: FullWave Wedge Style: MSWQC Cal. Batch: 06225 Circumferential Orientated Search Unit Voltage: 450 Other. PulseWidth 330 ns Type: Ultragel II Calibration Signal Sweep S P Ax. Gain (dB): 23 Circ. Gain (dB): 23 Search Unit Cable Mfg.: Sonotech Reflector Amplitude
% Division SoundPath 10 Screen Div. = 1.850 in. of Sound Path Type: RG-174 Exam Batch: 06225 N/A Linearity Report No.: L-07-ODI Length: 6- No. Conn.: 0 Type: Ultragel 11 Calibration Block Scan Coverage Mfg.: Sonotech Cal. Block No.: 5539 Upstream W Downstream[]
Scan dB: 37 Reference Block Reference/Simulator Block Thickness V5"-2.0" Dia.: Flat CWR CCW66 Scan dB: 37 Gaia No.a LMT03 ,oudrit Cal. Bk Temp 78__ Temp Tool: 253987 Exam Surface: OD Sao"d Reflector Amplitude
% Division Cal Ek.Tep.78 Tep.Tol:______________________________Type:
SS Rompas 23 SDH 18 6.8 1.05", Comp. Temp.: 78' Temp. Tool: 253987 Surface Condition:
Blended N/A __SD Recordable Indication(s):
Yes U No [] (If Yes, Ref. Attached Ultrasonic Indication Report)Results: Accept 6d Reject U Info FU Comments:
No downstream scans due to valve configuration.
60&deg; angle reported on UT-07-029 Percent Of Coverage Obtained > 90%: 50% Reviewed Previous Data: Yes Examiner Level III-PDI S' lure Date Reviewer .. .... ignature Date 211212007 Blechinger, ToddP. "..r--/-Examinear Level ISignature Date Site Review / fur Date Pollock, Norm E. 2112J2007 DheFrank E. 4 U ki,-1"S/.$70" Other Level N/A Signature Date ANII Review Signature Date NIA Bowers, Jeremy .'3 (.... -7 UT Calibration/Examination 0 FPIL gnargV auan Arnold Energy Cooler Summary No.: 74600-RI Examiner:
Davis, Layn R Examiner Pollock, Norm E, Other N/A Supplemental Report Report No.: UT-07-028 Page: 2 of 2 73" .-0 Level: III-PDI Reviewer:
Blechinger, Todd P.Level: I Site Review: Dohmen, Frank E.Level: N/A ANII Review: Bowers, Jeremy Date:  Date: 31 )0 Date: Comments:
Actual configuration penetration fitting to valve.50 % code coverage due to single sided access.*Actual diameter 5.0", actual weld length 15.75" Sketch or Photo: U:\Apps\DAECDB\EROC\RFO20\REPORT SUPPLEMENTS\UT\SN_74600-RI CompIDCUA-J024 Report_UT-07-028 Coverage Plot.jpg SYST'MM, R W r C- I COMPONENT ID NO0.,' QA 3 5~----~CROWN HEIGHT' .2 .~ -CROWN WIOTH:.9 WELD LENG3TH:..~
6 F__ _ _ _ _ _ _ _ _ _ _ _ _ _ _0i ". -0L C-VePZA& 6 tlUe 7V $51I~CLe ,`Z &#xfd; 1tO 9CC,-k-c I- VALV'E (46 4 0'tL I &#xa3;Additional
-Supplemental Reports Ft E__nergy Site/Unit:
Ovane Amnold &, vqy CIlwer Summary No.: Workscope:
UT Calibration/Examination DAEC /74600-RI ISI Procedure:
Procedure Rev.: Work Order No.: ACP1211.20 6 1135836 Outage No.: RFO-20-1 Report No.: UT-07-029 Page: 1 of 1 Code: ASME 2001 Ed thru 2003 Add Cat/Item:
R-AIRI.16-4 Location:
RB270 Drawing No.: 1.2-1 1A SHT-01


== Description:==
== Description:==
 
PIPE - MOTOR OPERATED GATE System ID:         CU Component ID: CUA-J024                                                                                                                         Size/Length:     .90" 115.75"               Thickness/Diameter: 0.580" I5.0" OD Limitations:       Single sided due to valve configuration                                                                                                   Start Time:         1416               Finish Time:         1422 Instrument Settings                                                   Search Unit                           Cal.       Time       Date                     Axial Orientated Search Unit Serial No-:                           01LCBL                           Serial No.:                 05-335                   Checks                 _               Calibration           Signal         Sw         S Initiatlo     Cal.a                                                 S e eP     Sound Path Manufacturer:                       Krautkramer                         Manufacturer:                   RTD                   Initial Cal     0720   21/2/2007       Reflector         Amplitude %         Division Model:                             USN 60 SW                           Size:   2 (7x10 mm)       Shape:       Rect         Inter. Cal.     14116   2112J2007       1" Notch                 80             7.0           2.04" Delay:             0/7.050       Range:             3.0"             Freq.:     2.0 MHz         Style:       TRL2         Inter. Cal.     1422   211212007           N/A M'tl CaWel:         .2304         Pulser:         Square               Exam Angle:         60'     # of Elements: Dual       Inter. Cal.       NA Fia1C       15051 2112/200 Damping:             5000         Reject:             0%               Mode:                       Shear                     Fina   Cal.
PIPE -MOTOR OPERATED GATE System ID: CU Component ID: CUA-J024 Size/Length:  
Rep. Rate:         AutoHigh       Freq.:         2.00 MHz             Measured Angle:                   60'                             Couplant Filter:             Fixed         Mode:           FullWave             Wedge Style:                     NIA                   Cal. Batch:           06225                   Circumferential Orientated Search Unit Voltage:             450         Other: PulseWidth 250 ns                                                                   Type:             Ultragel 11           Calibration           Signal         Sweep       SoundPa.
.90" 115.75" Thickness/Diameter:
Ax. Gain (dB):           58       Circ. Gain (dB):             68                       Search Unit Cable                     Mfg.:             Sonotech               Reflector         Amplitude %         Division 10 Screen Div. = 3.0             in. of       Sound Path             Type:                       RG-174                     Exam Batch:           06225NA Linearity Report No.:                     L-07-001                     Length:         6'       No. Conn.:         0         Type:             Ultragel 11 Calibration Block                                                 Scan Coverage                       Mfg.:             Sonotech Cal. Block No-:                         5539                           Upstream W Downstream[j Scan dB:               64 Reference Block                               Reference/Simulator Block Thickness         .5"-2.0"         Die.:             Flat                     CWI-             CCW-] Scan dB: N/A           SerialNo.:             LMT-032           di                         Signal       Sweep SoundPath Cal. Bk. Temp. 78' Temp. Tool:                     253987               Exam Surface:                     OD                 Type:           SS Rompas               dB 48     Reflector SDHI Amplitude  60 % Division45        - 1.43" Comp. Temp.:       78. Temp. Tool:             253987               Surface Condition:               Blended                                                       NIA Recordable Indication(s):               Yes             No n-/       (IfYes. Ref. Attached Ultrasonic Indication Report.)
0.580" I5.0" OD Limitations:
Results:           Accept [             Reject nJ                 Info []                                                                         Comments: No downstream scans due to valve configuration.
Single sided due to valve configuration Start Time: 1416 Finish Time: 1422 Instrument Settings Search Unit Cal. Time Date Axial Orientated Search Unit Serial No-: 01LCBL Serial No.: 05-335 Checks _ Calibration Signal Sw S Initiatlo Cal.a S e eP Sound Path Manufacturer:
Krautkramer Manufacturer:
RTD Initial Cal 0720 21/2/2007 Reflector Amplitude  
% Division Model: USN 60 SW Size: 2 (7x10 mm) Shape: Rect Inter. Cal. 14116 2112J2007 1" Notch 80 7.0 2.04" Delay: 0/7.050 Range: 3.0" Freq.: 2.0 MHz Style: TRL2 Inter. Cal. 1422 211212007 N/A M'tl CaWel: .2304 Pulser: Square Exam Angle: 60' # of Elements:
Dual Inter. Cal. NA Fia1C 15051 2112/200 Damping: 5000 Reject: 0% Mode: Shear Fina Cal.Rep. Rate: AutoHigh Freq.: 2.00 MHz Measured Angle: 60' Couplant Filter: Fixed Mode: FullWave Wedge Style: NIA Cal. Batch: 06225 Circumferential Orientated Search Unit Voltage: 450 Other: PulseWidth 250 ns Type: Ultragel 11 Calibration Signal Sweep SoundPa.Ax. Gain (dB): 58 Circ. Gain (dB): 68 Search Unit Cable Mfg.: Sonotech Reflector Amplitude  
% Division 10 Screen Div. = 3.0 in. of Sound Path Type: RG-174 Exam Batch: 06225NA Linearity Report No.: L-07-001 Length: 6' No. Conn.: 0 Type: Ultragel 11 Calibration Block Scan Coverage Mfg.: Sonotech Cal. Block No-: 5539 Upstream W Downstream[j Scan dB: 64 Reference Block Reference/Simulator Block Thickness  
.5"-2.0" Die.: Flat CWI- CCW-] Scan dB: N/A SerialNo.:
LMT-032 di Signal Sweep SoundPath dB Reflector Amplitude
% Division Cal. Bk. Temp. 78' Temp. Tool: 253987 Exam Surface: OD Type: SS Rompas 48 SDHI 60 45 -1.43" Comp. Temp.: 78. Temp. Tool: 253987 Surface Condition:
Blended NIA Recordable Indication(s):
Yes No n-/ (If Yes. Ref. Attached Ultrasonic Indication Report.)Results: Accept [ Reject nJ Info [] Comments:
No downstream scans due to valve configuration.
Reference Coverage plot on 45&deg; angle report# UT-07-028.
Reference Coverage plot on 45&deg; angle report# UT-07-028.
Percent Of Coverage Obtained > 90%: 50% Reviewed Previous Data: Yes Examiner Level III-PDI .,, -Sgnature Date Reviewer nature , '.- Date Davis, Layn R , ' 211212007 Blechinger, Todd P....= I ". /7 Examiner Level i Signature Date Site Review t e Date Pollock, Norm E. 2/1212007 Dohmen, Frank E. J l C..7 Other Level N/A Signature Date ANII Review Signature Date N/A Bowers, Jeremy 3- '.-- .r3-o 5%0 UT Calibration/Examination
Percent Of Coverage Obtained > 90%:                     50%             Reviewed Previous Data:               Yes Examiner             Level   III-PDI                   .,,     -Sgnature                                   Date   Reviewer                                                         nature       ,     '.-                     Date Davis, Layn R                                       ,       '                                         211212007     Blechinger, Todd P....=                                   I                     ".                   /* /7 Examiner             Level   i                                   Signature                                 Date   Site Review                                                         t e                                     Date Pollock, Norm E.                                                                                       2/1212007     Dohmen, Frank E.                                             J           l                             C..7 Other                 Level   N/A                                 Signature                                 Date   ANII Review                                                 Signature                                     Date N/A                                                                                                                 Bowers, Jeremy                                                     '.--                         .r3-o 3- 5%0 UT Calibration/Examination
-_-_-_____'__-'_-  
                                                                                                                        -_-_-_____'__-'_- ............
............  
                                                                                                                                                  .__..           __ - ------
.__ .. ............  
                                                                                                                                                      . . ..........
.........
                                                                                                                                                                .........                                                               ----------------
__ ------- ----------------  
                                                                                                                                                                                                                                                    --- '.-__}}
---'.-__}}

Revision as of 04:19, 14 November 2019

Relief Request for 1st Period Limited Weld Examinations
ML092230346
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/30/2009
From: Richard Anderson
Nextera Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-09-0539
Download: ML092230346 (20)


Text

NEXTera ENERGY, ARNOLD July 30, 2009 NG-09-0539 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Relief Request for 1st Period Limited Weld Examinations Pursuant to 10 CFR 50.55a(g)(5)(iii), NextEra M T Energy Duane Arnold, LLC, f/k/a FPL Energy Duane Arnold, LLC (hereafter, NextEra Energy Duane Arnold) hereby requests NRC approval of the enclosed relief request from IWB-2500 to allow performance of limited examinations of various welds. This relief is requested for the Fourth Ten year Interval of the Inservice Inspection Program for the Duane Arnold Energy Center (DAEC), which ends on February 21, 2014. Enclosure 1 of this letter contains the request for relief and Enclosure 2 contains the 1st period non-destructive evaluation reports associated with the components for which relief is sought.

NextEra Energy Duane Arnold requests approval of this request by the end of December 2009.

If you have any questions, please contact Steve Catron at (319) 851-7234.

Richard L. Anderson Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Enclosures cc: Administrator, Region III, USNRC Project Manager, DAEC, USNRC Senior Resident Inspector, DAEC, USNRC .A NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA52324

Enclosure 1 to NG-09-0539 Page 1 of 9 Enclosure 1 10 CFR 50.55a REQUEST IN ACCORDANCE WITH 10 CFR 50.55a(g)(5)(iii)

INSERVICE INSPECTION IMPRACTICALITY

Enclosure 1 to NG-09-0539 Page 2 of 9 10 CFR 50.55a REQUEST IN ACCORDANCE WITH 10 CFR 50.55a(g)(5)(iii)

INSERVICE INSPECTION IMPRACTICALITY Component Identification Code Class: Class 1

References:

ASME Code,Section XI, Subarticle IWB-2500 Table IWB-2500-1 Examination Categories: B-A, R-A Item Numbers: B1.40, and R1.16

==

Description:==

Reactor Vessel Head-to-Flange Weld, and Piping Welds.

Component Numbers: See Table A for Component Identification

Applicable Code Edition and Addenda

ASME Section XI 2001 Edition, 2003 Addenda Code Requirement Section XI (2001 Edition with the 2003 Addenda), Subarticle IWB-2500 states in part "Components shall be examined and tested as specified in Table IWB-2500-1."

Table IWB-2500-1, Category B-A, Item B1.40, requires a volumetric examination of applicable Class 1 pressure retaining welds, which includes essentially 100% of weld length once during the ten year interval.

Relief Request NDE-R005 was approved on January 31, 2007 allowing the use of Risked Informed (RI) Inservice Inspection (ISI) for Class 1 and 2 welds. This relief request states that the original list of intended credited Class 1 welds may have been substituted on specific occasions with similar welds due to accessibility issues that would have resulted in reduced exam volumes. NextEra Energy Duane Arnold chooses welds for examination that are classified within the same risk matrix classification segment, using the same treatment criteria as those originally selected.

Reason for Request

The Duane Arnold Energy Center (DAEC) construction permit was issued in 1970 and the operating license was issued in 1974. The reactor vessel was designed and installed to ASME Section I11,1965 Edition, with the Summer 1967 Addenda. The parameters for accessibility for ISI were not requirements at that time and therefore were not necessarily factored into component and system configurations, thereby creating conditions where ASME Section X1 Code required examination coverage of Class 1 welds cannot be obtained.

Enclosure 1 to NG-09-0539 Page 3 of 9 10 CFR 50.55a recognizes the limitations to in-service inspection of components in accordance with Section XI of the ASME Code that are imposed due to early plants' design and construction, as follows:

10 CFR 50.55a(g)(1): For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued prior to January 1, 1971, components (including supports) must meet the requirements of paragraphs(g)(4) and (5) of this section to the extent practical.

10 CFR 50.55a(g)(4): Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components (including supports) which are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and pre-service examination requirements, set forth in Section XI of editions of the ASME Boiler and Pressure Vessel Code... to the extent practical within the limitation of design, geometry and materials of construction of the components.

10 CFR 50.55a(g)(5)(iii): If the licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as specified in § 50.4, information to support the determinations.

Table A - Limited Exam Weld List Exam Item Component Period Code Description Category Number Number Examined Coverage B-A B1.40 HCC-COOI 1 76.05% Reactor Vessel Head-to-Flange Weld Reactor Water Cleanup R-A R1.16 Piping Weld Recirculation Manifold to ARiser Piping Weld Reactor Vessel Head to Flange Weld -

HCC-CO01 This weld is the Head to Flange Weld which can only be examined from the head surface. The examination is limited to approximately 76.05% and is limited due to the configuration of the weld. Note that this weld examination is divided up into thirds, with each third being examined each period. The examination completed was from Stud Holes 60 to 20. There is no feasible option in order to examine the remaining 23.95%.

The Nondestructive Examination (NDE) procedure used for this examination incorporates the examination techniques qualified under Appendix VIII of the ASME Section XI Code by the Performance Demonstration Initiative (PDI). That procedure was approved under Relief Request NDE-R008 on January 31, 2007.

Enclosure 1 to NG-09-0539 Page 4 of 9 Reactor Water Cleanup Class 1 Weld CUA-J024 This weld is between a containment penetration and a motor operated valve (MO-2701). The valve side of the weld is not accessible for scanning due to geometry.

This weld is the only weld in the risk segment (CU-007) so there is no other weld to select. The consequence evaluation determined this weld to be high because it is the weld between the containment and the isolation valve (MO-2701). The material for the items welded together is Al 82 F316 forging penetration to an A351 CF8M cast valve. Per Generic Letter 88-01, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping," "Inspection Schedules" position (2), this weld would be considered in the Intergranular Stress Corrosion Cracking (IGSCC) Category A. The A182 F316 is solution heat treated which is an acceptable process for resistance to IGSCC. The staff position states:

"Although castings with higher carbon content than 0. 035% are not considered to be resistant to sensitization, welds joining such castings (in the form of pump and valve bodies) to piping have been relatively free of IGSCC.

This may be attributedto a favorable residualstress distribution,as calculationshave indicated. For this reason, weld joining resistantmaterial to pumps and valves will be consideredto be resistant welds, and included in IGSCC Category A. If extensive weld repairs were performed the residual stress may be unfavorable, in which case such welds should be included in Category D."

Therefore, this weld is considered resistant to IGSCC. The volume examined was from the A182 F316 penetration side of the weld. The weld was not examined from the A351 CF8M cast valve side due to the configuration of the valve (see photo that follows).

Enclosure 1 to NG-09-0539 Page 5 of 9 Since this weld is resistant to the degradation mechanism of IGSCC and there is no other degradation mechanism that has been identified for this weld, the volume examined is acceptable.

Recirculation System Class 1 Weld RMA-J004 This weld is the branch connection of the recirculation manifold to the recirculation riser line. The manifold side is not accessible for scanning due to geometry. There are a total of eight welds with this configuration (8 recirculation risers coming off the two manifolds); see ISI Isometrics 1.2-20 and 1.2-22 that follow.

Enclosure 1 to NG-09-0539 Page 6 of 9 rn RRF-8J-4A C RRFC-EJ4 -

RR-,14 ELD OVECRLAY WELD OVERLAY

'R~ EPROM IN REPAIR IN R 0J A m WELDOVERLAY CINNRHB-REPAIR IN WELD OVERLAY COMMON REPAIR IN 1 A J5 D J3 5 F N2 FPA 4S I" LINE TYP.

DW339 031 j m wW21

-J7 DW2 LUC$ DLS OWt -47

  • EICLTO 1NFOO""&RSR I, 4 OM-J

Enclosure 1 to NG-09-0539 Page 7 of 9 The detailed configuration of the branch connection weld provided below is taken from the construction drawing (B31-GO01-RD-N-B3). As the configuration shows it does not allow an examination to be performed from the manifold side.

--.

N VA.

  • ' ""* ' * "'"T .

T. ~

  • :. . ....: . ... ... . *.. ,.,~ -..

All eight manifold to riser welds were solution annealed which is an acceptable process for resistance to IGSCC. Each weld was identified in its own risk category so there is no other weld that could be selected to obtain a higher examination coverage. These welds were determined to have Thermal Transients as a degradation mechanism under the RI-SI Program. The Degradation Mechanism Evaluation Document (M453-047) states:

For the most part, the RCR System heats up and cools down slowly and uniformly so it is not susceptible to the thermal shocks that result in TT degradation mechanism. However, at the beginning of shutdown cooling, the RCR System does receive a double-shock from the RHR System (cold fluid and then hot fluid into formerly hot lines). The double-shock was analyzed for the RCR main loop discharge, manifold, and riser piping. The results indicate that all of these pipe segments are potentially susceptible to the TT degradation mechanism.

NextEra Energy Duane Arnold proposes to perform the ultrasonic examination on one more of the eight welds (which would only receive 50% coverage) in lieu of performing the examination on just one weld. One weld will be examined from each loop.

Performing two of the eight welds (each receiving 50% coverage) is considered an acceptable alternative.

Enclosure 1 to NG-09-0539 Page 8 of 9 Proposed Alternative and Basis for Use In accordance with 10 CFR 50.55a(g)(5)(iii), relief is requested for the components listed in Table A on the basis that the required examination coverage of "essentially 100 percent" is impractical due to physical obstructions and the limitations imposed by design, geometry and materials of construction. NextEra Energy Duane Arnold performed qualified examinations that achieved the maximum, practical amount of coverage obtainable within the limitations imposed by the design of the components.

Additionally, for the Class 1 examination Category B-P, a VT-2 examination is performed on the subject components of the Reactor Coolant Pressure Boundary during system pressure tests each refueling outage. The examination was completed during the 2009 refueling outage and no evidence of leakage was identified for these components.

Based on the above, with due consideration of the earlier plant design, the underlying objectives of the Code required volumetric examinations have been met.

The examinations were completed to the extent practical and no evidence of unacceptable flaws was detected. VT-2 examinations performed on the subject Class 1 components during system pressure testing each refueling outage (in accordance with examination Category B-P) provide continued assurance that the structural integrity of the subject components is maintained. Additionally, the DAEC Water Chemistry Program and inerted primary containment environment provide added measures of protection for the component materials.

Duration of Proposed Alternative Relief is requested for the Fourth Ten year Interval of the Inservice Inspection Program for the DAEC, which ends on February 21, 2014.

Precedents

1) NRC Letter dated May 1, 2008, "Safety Evaluation for Request for Relief from IWB-2500 and IWC-2500 Requirements to Allow Performance of Limited Examinations of Various Welds for the Third 10-Year Interval of the Inservice Inspection Program (TAC No. MD5669)."
2) NRC Letter dated October 18, 1999, "Safety Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for Relief for Duane Arnold Energy Center (TAC No. MA4151)" specifically for Relief Request NDE-R028.
3) NRC Letter dated March 23, 1998, "Evaluation of Third 10-Year Inservice Inspection Interval Program Plan Requests for Relief for the Duane Arnold

Enclosure 1 to NG-09-0539 Page 9 of 9 Energy Center (TAC No. M95412)" specifically for Relief Requests NDE-R006, NDE-R007, NDE-R008, NDE-R009, and NDE-RO10.

References None

Enclosure 2 to NG-09-0539 Enclosure 2 1st Period Non-Destructive Evaluation Reports 9 Pages Follow

f. UT Vessel Examination FPL Site/Unit: DAEC I I Procedure: ACP1211.27 Outage No.: RFO-20-1 Summary No.: 3300 Procedure Rev.: 1 Report No.: UT-07-100 Workscope: ISI Work Order No.: 1135860 Page: 1 of 3 Code: ASME 2001 Ed thru 2003 Add Cat,/Item: B-A181.40 Location: RB511 Drawing No.: VS-01-06 SHT-01

Description:

REACTOR VESSEL(STUD HOLES 60-20)

System ID: RPV Component ID: HCC-CO0l Size/Length: NWA Thickness/Diameter: 3.93" Limitations: Single sided exam due to configuration Start Time: 1000 Finish Time: 1200 Examination Surface: Inside i Outside [*] Surface Condition: Blended Lo Location: Stud Hole One Wo Location: WCL Couplant: Ultragel II Batch No.: 06225 Temp. Tool Mf9.: PTC Serial No.: 254038 Surface Temp.: 70 'F Cal. Report No.: CAL-07-031 Angle Used 1-I 45 j45Tj 60 - !6 Scanning d8 lndication(s): Yet; No , i Scan Coverage: Upstream ni. Downstream[i) CW

  • CCWi Comments:

Scan Sensitivity: Zone 1 / 82.5 Zone 2 1 83.5 Results: Accept 1ýJ Reject i- Info F _-_

Percent Of Coverage Obtained > 90%: 76.05% Reviewed Previous Data: Yes Examiner Level II-PDI *9frature Date Reviewer S)gnature , Date Stevermer, Aaron J. Timm, Jeremy -2/22/2007 .

Examiner Level NIA 2 Signature Date Site Review Sigr(e Date N/A Dohmen, Frank E. 4 Other Level NIA Signature Date ANII Review Signature .' Date NIA Bowers, Jeremy .'3 j .. -__ "____"_

UT Vessel Examination

Supplemental Report PPL Report No.: UT-07-100 Page: 2 of 3 Summary No.: 3300 Examiner-- Stevermer, Aaron J. /:. Level: 11-PDI Reviewer: Timm, Jeremy ., .... 7 Date:

Examiner: NIA Level: N/A Site Review: Dohmen, Frank E. Date: 2:7 r,. ý Other: NIA Level: NIA ANM Review: Bowers, Jeremy Date: 3>)

Comments: Coverage Plots AXIAL PARALLEL Sketch or P~hoto: U:Apps\OAEG D8\ER0CkRF020\REP0RT SOPPLEMENTSWLTXSN_3300 (J:1Apps\0AEC(,DBkEROC\,RFO20\REPC)RTl SUPPLEMrENTS\UT\S N_3a00 CorpIDHOC0_C00l Repo rt UTO 7- GOAxial jpy Cc~rnpIDHCC_ CO0l ReportUT 07_ 100P ara.lel jpg I(.OII Cuwciage dlol- Axial s.waodirciioa 11CCCOO C~we-te p~ Pa ilA~gIca

. ici He-a

-A------

_

Supplemental Report F*PI. Energy Report No.: UT-07-.100 Ilinei ArnoldEnerqy Csezi Page: 3 of 3 Summary No.: 3300 Examiner: Stevermer, Aaron J. F Level II-PDI Reviewer: Timm, Jeremy , Date: _____/__

Examiner: N/A Level NIA Site Review: Dohmen, Frank E. 1C Date: 2/Z7Io7 Other: NIA Level NIA ANII Review: Bowers, Jeremy -' Date:

Comments: COVERAGE CALCULATIONS Sketch or Photo: U:AppsOAECDB\EROC\RFO20\REPORT SUPPLEMENTS\UT\SN_3300 ComplDHCCCO01 ReportUTO07_100 CovCalc.jpg RPV Coverage Calculation Sheet Note: calculations performed using 2D plot only Component ID MCC-CO01 Area reuhEd t§eobeexamined Axial scan direction: Height Kwidth 3.93 Inches x 5.3 Inches equals 20.829 square Inches Parallel scan direction: Height x width 3.93 inches X 5.3 Inches equals 20.829 square Inches Total area required to be examined 41,658 square inches required for complete exam Actual area examined 60 degree R.L Axial scan direction: Height x width 3.93 Inches x 5.3 Inches equals 20.829 square inches Triangular area not examined (if applies) 1.53 X .5 X 2.92 height equals 2.,2338 square inches Bass Axial scan direction area examined 18.5952 square Inches 60 degree R.L. Parallel scan direction: Height x width 3.93 Inches x 3.33 Inches equals 13.0869 square inches Additional inner 16% area achieved using 40 & 45 degree shear techniques: Height x width (Nozzle to RPV only) 0 Inches x 0 Inches equals 0 square inches Combining all scan directions: 31.6821 square inches lor total exam Divide area examined by required area: equals coverage achieved 76.05 % coverage for total exam Calculations performed by: Todd Stechinger Level Ill OAEC Review Frank Dohmen Level III ANIP Review J4eremy 5owera Additional - Supplemental Reports

0 FFPL Enerqy. Site/Unit:

DAEC I UT Calibration/Examination RFO-21 O(ane Arnold Energy Ceoe, Procedure: ACP1211.20 Outage No.:

Summary No.: 117900-RI Procedure Rev.: 7 Report No.: UT-09-006 Workscope: is' Work Order No.: 1144503 Page: 1 of 3 Code: ASME 2001 Ed Thru 2003Add Cat./Item: R-A/R1.16-2 Location: DW220 Drawing No.: 1.2-20 SHT-01

Description:

MANIFOLD TO PIPE WELD OFF OF THE RECIRCULATION MAN System ID: RM Component ID: RMA-J004 Size/Length: 1.1" 132" Thickness/Diameter: 0.844" / 12' Limitations: Single side acess due to branch configuration Start Time: 1408 Finish Time: 1506 Instrument Settings Search Unit CaL Time Date Axial Orientated Search Unit Serial No.: 01R6B7 Serial No.: 01RPIH Checks Calibration Signal Sweep Sound Path Manufacturer: Krautkramer Manufacturer: KBA Initial Cal. 1100 2f8209 Refleotor Amplitude % Division Model: USN 6D SW Size: .50" Shape: Round inter. Cal. 1408 218/2009 1.0* Notch 85 5.0 1.413 Delay. 6.8847 Range: 2.828 Freq.: 1.5 MHz Style: Comp G Inter. Cal.

MIT Cal/Vel: 0.1232 Pulser: Square Exam Angle: 452 # of Elements: 1 Inter. Cal. _

Damping: 500 L) Reject 0% Mode: Shear - Final Cal. 1633 218/2009 Rep. Rate: Autohigh Freq.: 2.0 mhz Measured Angle: 452 Couplant _I ......

Filter: NIA Mode: Fullwave Wedge Styte: MSWQC Cal. Batch: 06225 Circumferential Orientated Search Unit Voltage: 450 volts Other: PW 330 nS Type: Ultragel II Calibration Signal Sweep r path Ax. Gain (dB): 11.0 CIrc. Gain (dB): N/A Search Unit Cable Mfg.: Sonotech Reflector Amplitude % Division 1 Screen Div. = .2828 in. of Sound Path Type: RG-174 Exam Batch: 06225 WA Linearity Report No.: L-09-001 Length: 6' No. Corn.: 0 Type: Ultragel II Calibration Block Scan Coverage Mfg.: Sonotech Cal. Block No.: 5539

___________________- Upstream [] Downstream-] Scan dB: 23.0 Reference Block Reference/Simulator Block Thickness: .5"--2.0" Dia.: 0 CW 0 CCW &] Scan dB: 23.0 Serial No.: 08-4349 Gain AmSne % Division Sound Path Cal. 51k. Temp.: 75*2 Temp. Tool: M415 Exam Surface: OD Type: ROMPAS 11.0 FSDH 20 3.8 1.067 Recordable Indication(s): Yes [] No [ (If Yes, Ref. Attached Ultrasonic indication Report.)

Results: Accept [] Reject [J Info [] Comments: See supplemental sheet for thickness and contour and coverage plot, Percent Of Coverage Obtained > 90%: 50%0 Reviewed Previous Data: Yes Examiner Level III-PDf _,Signat Date Reviewer na Dte Davis, Layn R. 020091 Examiner Level II-PDi Signature Date Site Review Sigratur) / Date Totosky, Ryan J. 2//209 f/)Zt*19 Other Level NfA Sidgnature - Date ANII Review Signature Date UT Calibration/Examination

a F4 Energy. Site/Unit: DAEC UT Cal ibration/Examination Duamn Amild Eneigy Coen%*' Procedure: ACP1211.20 Outage No.: RFO-21 Summary No.: ISI 7 Report No.: UT-09-006 I 17900-Ri' Procedure Rev.:

Workscope: 'SI Work Order No.: 1144503 Page: 2 of 3 Code: ASME 2001 Ed Thru 2003Add Cat/Item: R-A/RI.16-2 Location: DW220 Drawing No.: 1.2-20 SHT-O1

Description:

MANIFOLD TO PIPE WELD OFF OF THE RECIRCULATION MAN System ID: RM Component ID: RMA-J004 Size/Length: 1.1" / 3Z' Thickness/Diameter: 0.844" / 12' Limitations: Single side acess due to branch configuration Start Time: 1408 Finish Time: 1506 Instrument Settings Search Unit Cal. Time Date Axial Orfenta-ed Search Unit Serial No.: 01R6B7 Mauacuer rutrme SeriaJ No.: 08-440 Checks .Calibration CS Signal Sweep 1Sound Path Manufacturer: Krautkramer Manufacturer: RTD Initial Cal. 1205 2(8=2009 Reflector Amplitude % Division Model: USN 60 SW Size: 2 (8 x 14) Shape: Rectangle Inter. Cal. 1445 2/8/2009 1.0" Notch so 5.0 2.00 Delay: 8.6128 Range: 4.0 Freq.: 2.0 MHz Style: TRL2-Aust Inter. Cal.

M'tl CarNel: 0.2222 Pulser: Square Exam Angle: 602 # of Elements: 2 Inter. Cal. I Damping: 500 . Reject: 0% Mode: Long - Final Cal. 1637 2/812009 Rep. Rate: Autohigh Freq.: 2.0 mhz Measured Angle: 602 Couplant Filter: N/A Mode: Fullwave Wedge Style: Integral Cal. Batch: 06225 Circumferential Orientated Search Unit Voltage: 450 volts Other: PW 250 ne Type: Ultragel II Calbration Signal Sweep Soud Path N/A Search Unit Cable Mfg.: Sonotech Reflector Amplitude % DMsion Ax. Gain (dB): 51.0 Circ. Gain (dB):

1 Screen Div. = 0.4 in. of Sound Path Type: RG-174 Exam Batch: 06225 N/A Linearity Report No.: L-09-001 Length: 6' No. Conn,: 0 Type: Ultragel II Calibration Block Scan Coverage Mfg.: Sonotech Cal. Block No.: 5539 Upstream [] Downstream-- Scan dr: 67.0 Reference Block Reference/Simulator Block Thickness: .5" - 2.0" Dia.: 0 CW [E CCW E] Scan dB: N/A Gaia Signal Swee Cal, BIk. Temp.: 759_ Temp. Tool: M415 Exam Surface: OD Type: ROMPAS 47.0 FSDH 85 3.5 1D41 Temp. Tool: M415 Surface Condition: Blended Comp. Temp.: 89W Recordable Indication(s): Yes [] No V (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept [] Reject E] Info [] Comments: See supplemental sheet for thickness and contour and coverage plot.

Percent Of Coverage Obtained > 90%: 50% Reviewed Previous Data: Yes Examiner Level ilI-pot Signature Date Reviewer Signature Date Davis, Layn R. 29W/2009 CC S.(*qj V, Examiner Level iI.pDI Signature Date Site Review S .u Date Tolosky, Ryan J.2/8/2009 Other Level NIA Dale ANII Review Dagnature Signature ' 'Dale UT Calibration/Examinalion

Supplemental Report i::L Report No.: UT-09-006 Page: 3 of 3 Summary No.: 117900-RI Examiner: Davis, Layn R. Level: III-PDI Reviewer: L I S ,, Date:

Examiner: Tolosky, Ryan J. Level: fl-PDI Site Review: ee"', Date: / /<1 Other: N/A Level: N/A ANII Review: -)I (-. Date: -q Comments:

4 t

I I Re Lce r-45 ~

K -

-

eovet~e.

56'Z 6orve,-3 Additional - Supplemental Reports

UT Calibration/Examination F3L Energy Site/Unit:

DAEC I1 Procedure: ACP121i1.20 Outage No.: RFO-20-1 DomneArnold *l*,eOry ICellar Summary No.: 74600-4J Procedure Rev.: 6 Report No.: UT-07-028 Work<scope: Work Order No.: 1135836 Page: 1 of 2 Code: ASME 2001 Ed thru 2003 Add Cat./item: R-A/R1.16-4 Location: RB270 Drawing No.: 1.2-1 IA SHT-01

Description:

PIPE - MOTOR OPERATED GATE System ID: CU Component ID: CUA-J024 Size/Length: .90" 115.75" Thickness/Diameter. .58" /5.0" OD Limitations: Single sided exam due to valve configuration. Start Time: 1400 Finish Time: 1415 Instrument Settings Search Unit Cal. Time Date Axial Orientated Search Unit Serial No.: 01LCBL Serial No.: 01D4NY Checks , Calibration Signal Sweep Sound Path Manufacturer: Krautkramer Manufacturer: KBA Initial Cal. 0735 2/12/2007 Reflector Amplitude % Division Model: USN 60 SW Size: .375" Shape: Round Inter. Cal. 1400 2/1212007 1" Notch 80 8.0 1.43" Delay: 015.30 Range: 1.850" Freq.: 1.50 MHz Style: Comp-G Inter. Cal. 1415 2112/2007 NIA M'tl CalNel: .1223 Pulser: Square Exam Angle: 45° # of Elements: Single Inter. Cal. N/A _

Damping: 5000 Reject: 0% Mode: Shear Final Cal. 1510 2/1212007 Rep. Rate: AutoHigh Freq.: 2.0 MHz Measured Angle: 45* Couplant Filter: Fixed Mode: FullWave Wedge Style: MSWQC Cal. Batch: 06225 Circumferential Orientated Search Unit Voltage: 450 Other. PulseWidth 330 ns Type: Ultragel II Calibration Signal Sweep S P Ax. Gain (dB): 23 Circ. Gain (dB): 23 Search Unit Cable Mfg.: Sonotech Reflector Amplitude % Division SoundPath 10 Screen Div. = 1.850 in. of Sound Path Type: RG-174 Exam Batch: 06225 N/A Linearity Report No.: L-07-ODI Length: 6- No. Conn.: 0 Type: Ultragel 11 Calibration Block Scan Coverage Mfg.: Sonotech Cal. Block No.: 5539 Upstream W Downstream[] Scan dB: 37 Reference Block Reference/Simulator Block Thickness V5"-2.0" Dia.: Flat CWR CCW66 Scan dB: 37 No.a LMT03 Gaia

,oudrit Cal. Bk Temp 78__ Temp Tool: 253987 Exam Surface: OD Sao"d Reflector Amplitude % Division Cal Ek.Tep.78 Tep.Tol:______________________________Type: SS Rompas 23 SDH 18 6.8 1.05",

Comp. Temp.: 78' Temp. Tool: 253987 Surface Condition: Blended N/A __SD Recordable Indication(s): Yes U No [] (If Yes, Ref. Attached Ultrasonic Indication Report)

Results: Accept 6d Reject U Info FU Comments: No downstream scans due to valve configuration.

60° angle reported on UT-07-029 Percent Of Coverage Obtained > 90%: 50% Reviewed Previous Data: Yes Examiner Level III-PDI S' lure Date Reviewer .. .... ignature Date 211212007 Blechinger, ToddP. "..r--/-

Examinear Level ISignature Date Site Review fur / Date Pollock, Norm E. 2112J2007 DheFrank E. 4 U ki,-1"S/.$70" Other Level N/A Signature Date ANII Review Signature Date NIA Bowers, Jeremy .'3 (.... - 7 UT Calibration/Examination

0 FPIL gnargV Supplemental Report Report No.: UT-07-028 auan Arnold Energy Cooler Page: 2 of 2 Summary No.: 74600-RI Examiner: Davis, Layn R 73" 0 .- Level: III-PDI Reviewer: Blechinger, Todd P. Date: 2'ht*7 Examiner Pollock, Norm E, Level: I Site Review: Dohmen, Frank E. Date: 31 )0 Other N/A Level: N/A ANII Review: Bowers, Jeremy )t'* Date:

Comments: Actual configuration penetration fitting to valve.

50 % code coverage due to single sided access.

  • Actual diameter 5.0", actual weld length 15.75" Sketch or Photo: U:\Apps\DAECDB\EROC\RFO20\REPORT SUPPLEMENTS\UT\SN_74600-RI CompIDCUA-J024 Report_UT-07-028 Coverage Plot.jpg SYST'MM, RW r C-I COMPONENT ID NO0.,' QA3 5~-

- - - ~CROWN HEIGHT' .

2 .~ - CROWN WIOTH:.9 WELD LENG3TH:..~

6 _ _ _ _ _ _ _ _ _ _ _ _ _ _ F__

C-VePZA&6 tlUe 7V $51I~CLe ,`Z ý 9CC,-k-c 1tO 0i ". -0L I- VALV'E (46 4 0'tL I £ Additional - Supplemental Reports

UT Calibration/Examination Ft E__nergy Site/Unit:

DAEC / Procedure: ACP1211.20 Outage No.: RFO-20-1 Ovane Amnold &, vqy CIlwer Summary No.: 74600-RI Procedure Rev.: 6 Report No.: UT-07-029 Workscope: ISI Work Order No.: 1135836 Page: 1 of 1 Code: ASME 2001 Ed thru 2003 Add Cat/Item: R-AIRI.16-4 Location: RB270 Drawing No.: 1.2-1 1A SHT-01

Description:

PIPE - MOTOR OPERATED GATE System ID: CU Component ID: CUA-J024 Size/Length: .90" 115.75" Thickness/Diameter: 0.580" I5.0" OD Limitations: Single sided due to valve configuration Start Time: 1416 Finish Time: 1422 Instrument Settings Search Unit Cal. Time Date Axial Orientated Search Unit Serial No-: 01LCBL Serial No.: 05-335 Checks _ Calibration Signal Sw S Initiatlo Cal.a S e eP Sound Path Manufacturer: Krautkramer Manufacturer: RTD Initial Cal 0720 21/2/2007 Reflector Amplitude % Division Model: USN 60 SW Size: 2 (7x10 mm) Shape: Rect Inter. Cal. 14116 2112J2007 1" Notch 80 7.0 2.04" Delay: 0/7.050 Range: 3.0" Freq.: 2.0 MHz Style: TRL2 Inter. Cal. 1422 211212007 N/A M'tl CaWel: .2304 Pulser: Square Exam Angle: 60' # of Elements: Dual Inter. Cal. NA Fia1C 15051 2112/200 Damping: 5000 Reject: 0% Mode: Shear Fina Cal.

Rep. Rate: AutoHigh Freq.: 2.00 MHz Measured Angle: 60' Couplant Filter: Fixed Mode: FullWave Wedge Style: NIA Cal. Batch: 06225 Circumferential Orientated Search Unit Voltage: 450 Other: PulseWidth 250 ns Type: Ultragel 11 Calibration Signal Sweep SoundPa.

Ax. Gain (dB): 58 Circ. Gain (dB): 68 Search Unit Cable Mfg.: Sonotech Reflector Amplitude % Division 10 Screen Div. = 3.0 in. of Sound Path Type: RG-174 Exam Batch: 06225NA Linearity Report No.: L-07-001 Length: 6' No. Conn.: 0 Type: Ultragel 11 Calibration Block Scan Coverage Mfg.: Sonotech Cal. Block No-: 5539 Upstream W Downstream[j Scan dB: 64 Reference Block Reference/Simulator Block Thickness .5"-2.0" Die.: Flat CWI- CCW-] Scan dB: N/A SerialNo.: LMT-032 di Signal Sweep SoundPath Cal. Bk. Temp. 78' Temp. Tool: 253987 Exam Surface: OD Type: SS Rompas dB 48 Reflector SDHI Amplitude 60 % Division45 - 1.43" Comp. Temp.: 78. Temp. Tool: 253987 Surface Condition: Blended NIA Recordable Indication(s): Yes No n-/ (IfYes. Ref. Attached Ultrasonic Indication Report.)

Results: Accept [ Reject nJ Info [] Comments: No downstream scans due to valve configuration.

Reference Coverage plot on 45° angle report# UT-07-028.

Percent Of Coverage Obtained > 90%: 50% Reviewed Previous Data: Yes Examiner Level III-PDI .,, -Sgnature Date Reviewer nature , '.- Date Davis, Layn R , ' 211212007 Blechinger, Todd P....= I ". /* /7 Examiner Level i Signature Date Site Review t e Date Pollock, Norm E. 2/1212007 Dohmen, Frank E. J l C..7 Other Level N/A Signature Date ANII Review Signature Date N/A Bowers, Jeremy '.-- .r3-o 3- 5%0 UT Calibration/Examination