Subject:
1 - ME1821 - clarification for preparation of 2nd Request for Additional Information (RAI)
Location:
0-13D20 Start:
Wed 6/16/2010 12:00AM End:
Thu 6/17/201012:00 AM Show Time As:
Tentative Recurrence:
(none)
Meeting Status:
Not yet responded Organizer:
Feintuch, Karl Required Attendees:
Purtscher, Patrick; 'Thomas.Byrne@nexteraenergy.com'; Feintuch, Karl Optional Attendees:
'Byrne, Thomas'; 'Dohmen, Frank'
=== Closeout update 2010-06-016-1730 ET===
- 1. The DAEC submitted its expected RAI response: Letter NG-010-0328 dated June 15, 2010. Its ADAMS Accession Number is ML101660124.
- 2. Reviewer Purtscher notified PM Feintuch on June 16, 2010 that the response was acceptable for his needs.
- 3. This is the concluding update. No addition RAI items are anticipated.
=== update 2010-06-07-1523 ET===========
This update changes the start and end date to June 16, 2010, a dummy date to correspond to the expected date of the RAI response. No action is requested from this update.
=== update 2010-06-04-1035 ET===========
The NRC staff makes the following observation about Table A, Limited Exam Weld List, pdf page 5/21 in your application letter NG-09-0539 dated July, 30, 2009, as a consequence of the RAI conference calls recently (June 3,2010) concluded:
In your RAI response due on June 16, 2010, consider changing the item number of CUA-J024 from R1.16 Item Number, which in EPRI terminology represents IGSCC susceptible, to R1.1O.
The change is not essential to the Safety Evaluation, but appears to be more appropriate based on the exchange of information between parties to the June 3, 2010, conference call.
If there are any questions, call Karl Feintuch at 301-415-3079.
=== update 2010-06-03-1700 ET=========
All invited parties met via conference call. All agenda items were addressed. The draft "2nd " RAI items (refer to update 2010-05-24-1816 ET below) were finalized. June 16,2010, was agreed as the response date.
Subsequent to the meeting, DAEC (Byrne) provided color images of docketed photographic information to be submitted as part of the RAI response:
Picturel.jpg Picture2.jpg 1
=== update 2010-06-01-0945 ET=========
All parties (NRC: Feintuch, Purtscher; DAEC: Byrne, Dohmen) have accepted and the bridge Line information is confirmed.
=== update 2010-06-01-0846 ET==========
To: Tom Byrne Pat confirms Thursday, June 3, 2010, 3:00 PM ET as the conference call time.
Please accept this update with a reply confirming or correcting the bridge line information currently appearing in the Location line above. The start date and time above have been modified to match this meeting.
To: All There are no new attachments.
Agenda:
Clarify any remaining concerns regarding needed response to draft RAI.
Affirm draft is the final version of the RAI Affirm the response date for the RAI Karl
=== update 2010-06-01-1600 ET==========
To: Pat Purtscher This message corresponds to my phone call of a few minutes ago. Tom Byrne requests a one-hour conference call on Thursday, June 4,2010 at either 2 PM ET or 3 PM (your choice). There are no new documents to discuss (see below).
Please "accept" this update with a reply comment indicating your choice. (If up-to-date, your calendar indicates that 3 PM ET may be best.) In turn, I will modify the Outlook schedule for this appointment with actual dates.
==== update 2010-05-24-1816 ET========
The "date" of the conference has been changed to a dummy date (6/4/2010 - the DAEC day off) to keep it active in Outlook for updating purposes. Attached is the RAI item list that resulted from today's call.
~.w L:J ME1821 2nd RAI items final 05-...
=== update 2010-05-24-1603 ET==========
Meeting started at 3:00 PM.
Attending were:
DAEC - Tom Byrne (coordinating), Frank Dohmen, Andy Lee USNRC - Karl Feintuch (coordinating), Pat Purtscher Draft RAI was reviewed. RAI 8" was determined to be already on the docket and therefore its text will be replaced with "RAI 8 (deleted)."
A second call is planned later this week to further clarify "RAI 2." During the conference call DAEC Letter NG 02-0259 dated March 29, 2002, pertaining to the Risk Informed Inservice Inspection program, was referenced.
It is included here for convenience.
2
lSI Report
- -02-0259 (29Mar20
=== update 2010-05-24-1004 ET===
~
CJ ME1821 2nd RAI items Draft 201...
== original message=====
Meeting time is 3:00 PM ET (2:00 PM CT)
Agenda is clarification of information on the docket, or needed to be requested for the docket, pertaining to TAC ME1821 - a relief request in letter NG-09-0539 dated 30 July 2009, as supplemented by a letter dated 25 Feb 2010.
In preparation for the meeting, Pat Purtscher is to provide a draft list of items by the morning of 5/24/2010, to be compared with docketed items during the meeting, for refinement into a list of formal RAI items to be issued as a result of the meeting.
An update to this invitation will confirm mutual understanding of the needed items and a schedule for response by DAEC Participating NRC personnel are:
Karl Feintuch, PM Patrick Purtscher, Reviewer Participating personnel for Duane Arnold Energy Center are Thomas Byrne Other cognizant personnel, as attending and as invited by Thomas Byrne through his own DAEC resources.
Working documents thus far are attached for convenience. The draft list will be added when available.
ME1821 RAI ME1821 (RR Appli sponse (25Feb2010 Ltr 30Ju109)...
3