ML17059B666: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:~ | ||
ATTAI.'HMENT L | |||
% NIAGARA Page 1 (Next~a. | |||
/I/A DescripUon of Change TANK-82<3 WAS | N Li MOHAWK DISPOSITION COVER SHEET Total NUCLEAR ENGINEERING Last ~A NINE MILE POINT NUCLEAR STATION Unit (1, 2 or 0=Both): Discipline: STRUCTURAL TiUe Caiouhtion No. Rev Disp EDG FUEL OIL TANKREPLACEMENT S20.6-YD-TANK01 00 00B Originator CARMEN R. AGOSTA A Date 7/8/97 (Sub) System(s) Index No. | ||
82 S20.6 Design Change No. Approver Date NA NMPC Acceptance/Date: /I/A Superceded Document(s): NONE DescripUon of Change TANK-82<3 WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION. | |||
ResoluUon ADD THE 82-43 SEWS TO THIS CALCULATION. | ResoluUon ADD THE 82-43 SEWS TO THIS CALCULATION. | ||
Cross Reference change(s): | Cross Reference change(s): | ||
NONE Confirmation Required (Yes/No): Yes Final Issue Status File Location Operations Acceptance See Page(s): (APP/FIO/VOI): APP (Gale/Hold):Gale Req'd.(Yes/No): Yes Evaluation Number(s)/Revision: NR Copy of Applicability Review Attached (Yes/N/R)?N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION | NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s): ( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Component ID(s) / EPN(s) / Line Number(s): | ||
Copy of Applicability Review Attached (Yes / N/R)? N/R TANK42M TANK42M Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION P, | |||
9708070i42 PDR 9707$ | |||
ADOC(t('5000220 s | |||
i PDR J FORMAT If NET) ES48+0340 | |||
T NIAGARA N 4 MOHAWK NUCLEAR ENGINEERING Nine Mile Point Nuclear Station CALCULATIONCONTINUATIONSHEET Unit: 1 Page (Next Disposition: 00B | |||
~Z. | |||
OriIIlnator te Checker/Date Caiculation No. Reviston f7 @4 os S20.6-YD-TANK01 00 ef. | |||
PURPOSE: Document the Screening Evaluation Work Sheets (SEWS) for the DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43. | |||
Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+seismic+variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.ATTACHMENTS A.SEWS for Equipment ID Number 82-43.FORMAT 4 NEP-DES-08, Rev.01 (F02) | This SEWS has been prepared as part of the commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components. ~ | ||
CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill. Therefore, the DG Fuel Oil Tank is seismically adequate. | |||
ATTACHMENTS A. SEWS for Equipment ID Number 82-43. | |||
FORMAT 4 NEP-DES-08, Rev. 01 (F02) | |||
ATTACHMENT ZEZZHS | ATTACHMENT ZEZZHS Revision 2, Corrected, 6/28/91 Status Y N U SC ENING EVALUATION NORK SHE (SEMS) Sheet 1 of 2 Equip.~ ID No.~ Equip. Class 21 - Tanks and Heat Exchan ers Equipment Description OA C'c 5/c AC Fc Location: Bldg. ~<~ floor El. 2 4 / Room, Row/Col c' | ||
S CA AC TY VS DEHAND~Buckling capacity of shell of large.flat-bottom, vertical tank is,equal to or greater than demand:~g~n IS/go@. | ) Nanufacturer, Nodel, Etc. (optional) | ||
S CA AC TY VS DEHAND | |||
~ | |||
Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand: | |||
~g ~n IS i | |||
/go@. P.o~~ac. 4 gUAyaH ANCHO B AND B Capacity of anchor bolts and their embedments is equal to or greater than demand: | |||
/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<< g N U N/A. | |||
OE'SIINC> l~ Ca<.C,. S 2u.d - YO -78'~>i CONNEC ION BETMEEN ANCHO 80 TS AND E Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand: Y N U /A F IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank: Y N U(S TANK FOUNDA 0 Ring-type foundation is not used to support large, flat-bottom, vertical tank: Y N U~/ | |||
IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1 | |||
ATTACHMENT CAlC NO REVISION | ATTACHMENT CAlC NO REVISION Revision 2, Corrected, 6/28/g1 PAGE NO SCREEHIN6 EVANATIOH WORK SHEET (SEMS) Sheet 2 pf 2 Equip.~ ID No.~ 8 Z -43 Equip. Class 21 - Tanks and Heat Exchan ers | ||
7"brf rtrIAL g 5CIsmrc.L,p&oS C p~<>>o)~pQ SL,C L,O4 gZ gag 8C.C.Ou | ~ | ||
Equipment Description COW EHTS fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/ A'ev.o Aced/ /a+~ | |||
76'G p~4/ oar~a: | |||
7pnlr: a p~sic~ao To: <g > ~p- Cp<aaal~. | |||
P.V - p,db)F | |||
/ O/'t OMBrtr%7rMM] | |||
p'/+/r'~/ /J ~~gr~~~~ 7-~ ~g~~ g~g7'roars 222 7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o) | |||
~C.Cdc >ac a COW os | |||
~pQ SL,C L,O4 gZ gag 8C.C.Ou Evaluated by: Data: /08/pJ to 6.21-2}} | |||
Revision as of 06:30, 30 October 2019
| ML17059B666 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/08/1997 |
| From: | Agosta C, Alvi M NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17059B657 | List: |
| References | |
| S20.6-YD-TANK01, S20.6-YD-TANK01-R00, S20.6-YD-TANK1, S20.6-YD-TANK1-R, NUDOCS 9708070142 | |
| Download: ML17059B666 (8) | |
Text
~
ATTAI.'HMENT L
% NIAGARA Page 1 (Next~a.
N Li MOHAWK DISPOSITION COVER SHEET Total NUCLEAR ENGINEERING Last ~A NINE MILE POINT NUCLEAR STATION Unit (1, 2 or 0=Both): Discipline: STRUCTURAL TiUe Caiouhtion No. Rev Disp EDG FUEL OIL TANKREPLACEMENT S20.6-YD-TANK01 00 00B Originator CARMEN R. AGOSTA A Date 7/8/97 (Sub) System(s) Index No.
82 S20.6 Design Change No. Approver Date NA NMPC Acceptance/Date: /I/A Superceded Document(s): NONE DescripUon of Change TANK-82<3 WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.
ResoluUon ADD THE 82-43 SEWS TO THIS CALCULATION.
Cross Reference change(s):
NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s): ( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Component ID(s) / EPN(s) / Line Number(s):
Copy of Applicability Review Attached (Yes / N/R)? N/R TANK42M TANK42M Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION P,
9708070i42 PDR 9707$
ADOC(t('5000220 s
i PDR J FORMAT If NET) ES48+0340
T NIAGARA N 4 MOHAWK NUCLEAR ENGINEERING Nine Mile Point Nuclear Station CALCULATIONCONTINUATIONSHEET Unit: 1 Page (Next Disposition: 00B
~Z.
OriIIlnator te Checker/Date Caiculation No. Reviston f7 @4 os S20.6-YD-TANK01 00 ef.
PURPOSE: Document the Screening Evaluation Work Sheets (SEWS) for the DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.
This SEWS has been prepared as part of the commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components. ~
CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill. Therefore, the DG Fuel Oil Tank is seismically adequate.
ATTACHMENTS A. SEWS for Equipment ID Number 82-43.
FORMAT 4 NEP-DES-08, Rev. 01 (F02)
ATTACHMENT ZEZZHS Revision 2, Corrected, 6/28/91 Status Y N U SC ENING EVALUATION NORK SHE (SEMS) Sheet 1 of 2 Equip.~ ID No.~ Equip. Class 21 - Tanks and Heat Exchan ers Equipment Description OA C'c 5/c AC Fc Location: Bldg. ~<~ floor El. 2 4 / Room, Row/Col c'
) Nanufacturer, Nodel, Etc. (optional)
S CA AC TY VS DEHAND
~
Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:
~g ~n IS i
/go@. P.o~~ac. 4 gUAyaH ANCHO B AND B Capacity of anchor bolts and their embedments is equal to or greater than demand:
/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<< g N U N/A.
OE'SIINC> l~ Ca<.C,. S 2u.d - YO -78'~>i CONNEC ION BETMEEN ANCHO 80 TS AND E Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand: Y N U /A F IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank: Y N U(S TANK FOUNDA 0 Ring-type foundation is not used to support large, flat-bottom, vertical tank: Y N U~/
IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1
ATTACHMENT CAlC NO REVISION Revision 2, Corrected, 6/28/g1 PAGE NO SCREEHIN6 EVANATIOH WORK SHEET (SEMS) Sheet 2 pf 2 Equip.~ ID No.~ 8 Z -43 Equip. Class 21 - Tanks and Heat Exchan ers
~
Equipment Description COW EHTS fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/ A'ev.o Aced/ /a+~
76'G p~4/ oar~a:
7pnlr: a p~sic~ao To: <g > ~p- Cp<aaal~.
P.V - p,db)F
/ O/'t OMBrtr%7rMM]
p'/+/r'~/ /J ~~gr~~~~ 7-~ ~g~~ g~g7'roars 222 7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o)
~C.Cdc >ac a COW os
~pQ SL,C L,O4 gZ gag 8C.C.Ou Evaluated by: Data: /08/pJ to 6.21-2