ML102950214: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:4/28/10 Muring"te j iter"s were uist;u5suo at ummuma %,vuTuTrrcnmn mcwting tside oT Scope SALEM ONE Weekend Coverage:
{{#Wiki_filter:4/28/10 Muring"te   j iter"s were uist;u5suo at ummuma     %,vuTuTrrcnmn mcwting tside oT Scope SALEM ONE               Weekend Coverage:                         AL =(9X)>O.07         AL2=(2of3)>O. 11         AL3=(1X)>013.
AL =(9X)>O.07 AL2=(2of3)>O.
Outside of Scope AFW follow-up issues Verify hydro/pressure test is code compliant - O'Hara, determined approach was acceptable, received test records but still needs to verify test results. PSEG will also provide the leak check procedure 4127 am.
11 AL3=(1X)>013.
* Evaluate the 50.59 for AFW modifications - O'Hara, received 4/27
Outside of Scope AFW follow-up issues Verify hydro/pressure test is code compliant  
* Smart samples o Verify repairs to the control air system elbow that was replaced (how will PSEG certify the repair) - O'Hara, PSEG adding more detail to description of document, to provide by 4/27 PM o Verify control air extent of condition - O'Hara o Backfill procedure reviews to verify coating and backfill cure times - O'Hara, PSEG to provide by 4/27 pm o Verify control air clamping material - O'Hara, PSEG to provide supporting document 4/27 am co AFW pipe weld records - O'Hara, PSEG to assess status of documents by 4/27 pm Outside of Scope ftnatn     Inr*ttcreom was delleW in n
-O'Hara, determined approach was acceptable, received test records but still needs to verify test results. PSEG will also provide the leak check procedure 4127 am.* Evaluate the 50.59 for AFW modifications  
            . . . . . . ,-s               M.
-O'Hara, received 4/27* Smart samples o Verify repairs to the control air system elbow that was replaced (how will PSEG certify the repair) -O'Hara, PSEG adding more detail to description of document, to provide by 4/27 PM o Verify control air extent of condition  
 
-O'Hara o Backfill procedure reviews to verify coating and backfill cure times -O'Hara, PSEG to provide by 4/27 pm o Verify control air clamping material -O'Hara, PSEG to provide supporting document 4/27 am co AFW pipe weld records -O'Hara, PSEG to assess status of documents by 4/27 pm Outside of Scope ftnatn ttc Inr* reom was delleW n in......,-s M .
Dutside of Scope Unit 2AFW Testing -PSEG determined that they did not perform ASME code required pressure drop test for the buried sections of the 22 and 24 headers.
Dutside of Scope Unit 2AFW Testing -PSEG determined that they did not perform ASME code required pressure drop test for the buried sections of the 22 and 24 headers.* C0nfirm the PSEG'risk assessment to delay. AFW.test.ing for 1yearT is reasonable  
* C0nfirm the PSEG'risk assessment to delay. AFW.test.ing for 1yearT is reasonable - Cahill; complete, no concerns
-Cahill; complete, no concerns* Evaluate if performing a risk assessmentti t eet TechniclSpeciIficatiion4.0,5 is'appropriate if a test was never performed verses missed -Conte/Ennis, follow-up with T/S branch regarding TIA and precedent  
* Evaluate if performing a risk assessmentti t       eet TechniclSpeciIficatiion4.0,5 is'appropriate if a test was never performed verses missed - Conte/Ennis, follow-up with T/S branch regarding TIA and precedent - discussions ongoing Operability - Initial assessment Unit 2 was that it is in better condition based on newer piping; 1994 inspection that identified intact coating; and ISI code gives more allowance to an operating unit (can take credit for up to 90% of the yield stress).
-discussions ongoing Operability  
      " Evaluate the Unit 2 AFW extent of condition operability assessment - Schroeder/O'Hara operability determination received 4127
-Initial assessment Unit 2 was that it is in better condition based on newer piping; 1994 inspection that identified intact coating; and ISI code gives more allowance to an operating unit (can take credit for up to 90% of the yield stress)." Evaluate the Unit 2 AFW extent of condition operability assessment  
* Confirm the finite element analysis for the Unit 1 as found condition is acceptable including the use of appropriate methodsand assumptions - Gray and O'Hara reviewed and did not identify any concerns; HQ review in pr~ogress                                                                                                             j*
-Schroeder/O'Hara operability determination received 4127* Confirm the finite element analysis for the Unit 1 as found condition is acceptable including the use of appropriate methodsand assumptions  
n                                                                                                                                 I Dutside of Scope
-Gray and O'Hara reviewed and did not identify any concerns; HQ review in pr~ogress n I Dutside of Scope: AdditionallItems t Status Board Items:* Salem 1, AFW buried piping -modifications and testing* Salem 2, (PRIORITY)  
:                                   AdditionallItemst Status Board Items:
-T/S risk assessment for AFW~testingý operability determination I
* Salem 1, AFW buried piping - modifications and testing
* Salem 2, (PRIORITY) - T/S risk assessment for AFW~testingý operability determination                                     I
 
Outside of Scop.
Outside of Scop.
Outside of Scope
Outside of Scope
[outsidae of Scope}}
[outsidae of Scope}}

Latest revision as of 07:26, 13 November 2019

Branch 3 Daily Status
ML102950214
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/28/2010
From:
NRC Region 1
To:
NRC Region 1
References
FOIA/PA-2010-0334
Download: ML102950214 (5)


Text

4/28/10 Muring"te j iter"s were uist;u5suo at ummuma  %,vuTuTrrcnmn mcwting tside oT Scope SALEM ONE Weekend Coverage: AL =(9X)>O.07 AL2=(2of3)>O. 11 AL3=(1X)>013.

Outside of Scope AFW follow-up issues Verify hydro/pressure test is code compliant - O'Hara, determined approach was acceptable, received test records but still needs to verify test results. PSEG will also provide the leak check procedure 4127 am.

  • Evaluate the 50.59 for AFW modifications - O'Hara, received 4/27
  • Smart samples o Verify repairs to the control air system elbow that was replaced (how will PSEG certify the repair) - O'Hara, PSEG adding more detail to description of document, to provide by 4/27 PM o Verify control air extent of condition - O'Hara o Backfill procedure reviews to verify coating and backfill cure times - O'Hara, PSEG to provide by 4/27 pm o Verify control air clamping material - O'Hara, PSEG to provide supporting document 4/27 am co AFW pipe weld records - O'Hara, PSEG to assess status of documents by 4/27 pm Outside of Scope ftnatn Inr*ttcreom was delleW in n

. . . . . . ,-s M.

Dutside of Scope Unit 2AFW Testing -PSEG determined that they did not perform ASME code required pressure drop test for the buried sections of the 22 and 24 headers.

  • C0nfirm the PSEG'risk assessment to delay. AFW.test.ing for 1yearT is reasonable - Cahill; complete, no concerns
  • Evaluate if performing a risk assessmentti t eet TechniclSpeciIficatiion4.0,5 is'appropriate if a test was never performed verses missed - Conte/Ennis, follow-up with T/S branch regarding TIA and precedent - discussions ongoing Operability - Initial assessment Unit 2 was that it is in better condition based on newer piping; 1994 inspection that identified intact coating; and ISI code gives more allowance to an operating unit (can take credit for up to 90% of the yield stress).

" Evaluate the Unit 2 AFW extent of condition operability assessment - Schroeder/O'Hara operability determination received 4127

  • Confirm the finite element analysis for the Unit 1 as found condition is acceptable including the use of appropriate methodsand assumptions - Gray and O'Hara reviewed and did not identify any concerns; HQ review in pr~ogress j*

n I Dutside of Scope

AdditionallItemst Status Board Items:
  • Salem 1, AFW buried piping - modifications and testing

Outside of Scop.