ML12116A048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/25/2012
| issue date = 04/25/2012
| title = Aam ROP-12 Slides
| title = Aam ROP-12 Slides
| author name = Hunegs G K
| author name = Hunegs G
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name =  
| addressee name =  

Revision as of 00:10, 29 June 2019

Aam ROP-12 Slides
ML12116A048
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/25/2012
From: Hunegs G
NRC/RGN-I/DRP/PB6
To:
HUNEGS, GK
Shared Package
ML12055A196 List:
References
Download: ML12116A048 (23)


Text

Three Mile Island Annual Assessment O pen House p2011 Reactor Oversight ProcessNuclear Regulatory Commission -Region I Presentation IntroductionReactor Oversight Process Industry PerformanceThree Mile IslandPerformance ResultsWeb Information Contact Information Purpose Open forum for public discussion regarding Exelon's performance in 2011NRC will answer questions related to performance issues identified during its annualassessmentreviewofThree annual assessment review of Three Mile Island performance Region I Organization William DeanRegional Administrator David LewDeputy Regional AdministratorJames CliffordDirector, Division of Reactor Projects (Acting)James TrappChris MillerDirector, Division of Reactor SafetyPeter WilsonDeputy Director (Acting)Gordon HunegsBranch ChiefProject EngineersScott BarberNathan LaffertyThree Mile IslandResident InspectorsDavid WerkheiserJustin HeinlyDeputy DirectorRegional InspectorsVarious Security SafetyWhat We Do Environment Materials ReactorsWhat We RegulateWaste Radon MilitaryWhat We Don't Regulate X-Rays Continuous Training Assurance of Plant SafetyLong-Term Maintenance Defense In-Depth Regulation Compliance How We Regulate Regulatory FrameworkNRC's Safety Mission Strategic Performance AreasCornerstones Cross-Cutting AreasHuman Performance--Safety Conscious Work Environment--Problem Identification & Resolution Performance Indicators17 Performance Indicators (PIs)PIs for each cornerstoneLicensee submits data to NRC quarterly quarterlyInspection program verifies accuracyData available on NRC website Significance Threshold Increasin g Safet y Si g nificance Green WhiteYellow Red Performance Indicatorsgyg Inspection Findings Green WhiteYellow Red Increasing Safety Significance Action Matrix Columns Increasing Licensee Response Regulatory Response Degraded Multiple/Repetitive Degraded Unacceptable Performance Increasing*Safety Significance*Inspection

  • Management Involvement
  • Regulatory Action Industry-Wide Performance 11 3 1 1As of 12/31/2011 Licensee ResponseRegulatory Response De g raded Cornerstone 88 g Multiple/Repetitive Degraded Cornerstone Unacceptable IMC 0350 Process Industry-Wide Inspection FindingsFinding data current as of 2/24/2012 and does not include security findings 846 13Calendar Year 2011 data GreenWhite 13 2 0WhiteYellow Red Industry-Wide Performance Indicators 6585Calendar Year 2011data Green 9 0 0WhiteYellow Red NRC Annual Assessment SummaryExelon operated the plant safely and in a manner that preserved public health and safety and protected the environment.Three Mile Island was in the Licensee RCl fNRC'AtiMtifThree Mile Island R esponse C o l umn o f NRC's A c ti on M a t r i x f or the last quarter of 2011.

No substantive cross-cutting issues were

identifiedThe NRC plans to perform baseline inspections in 2012 NRC Inspection Activities 5636 hours0.0652 days <br />1.566 hours <br />0.00932 weeks <br />0.00214 months <br /> of direct inspectionTwo resident inspectors on siteEvent responseInspect over 20 areas of plant performanceElildtfikThree Mile Island for 2011

-Examp l es i nc l u d e opera t or per f ormance, r i s k management, equipment issues, and fire

protection Nine regional inspections Three team inspectionsTriennial Fire ProtectionEP Exercise EvaluationOperator Licensing Examinations Three Mile Island PIs and FindingsAll Green Performance IndicatorsFive Green / Severity Level IV inspection findingsJanuary 1 through December 31, 2011 Actions in Response to the Japan Nuclear Accident*Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html*Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov*Office of Public Affairs Point of Contact:

OPA.resource@nrc.gov or 301-415-8200 NRC Social Media Channels*Blog: http://public-blog.nrc-gateway.gov/

.flickr.com/photos/nrcgov/*Twitter: https://twitter.com/#!/nrcgov*YouTube:

http://www.youtube.com/user/NRCgov*RSS: http://www.nrc.gov/public-involve/listserver.html#rss 21 Contacting the NRCReport an emergency*(301) 816-5100 (call collect)Report a safety concern*(800) 695-7403

  • Allegation@nrcgov
  • Allegation@nrc

.govGeneral information or questions

  • www.nrc.govContact Three Mile Island Resident Inspector End of PresentationNuclear Regulatory Commission Region I Region I Middletown, PA April 11, 2012