| | issue date = 06/28/2007 | | | issue date = 06/28/2007 |
| | title = Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments | | | title = Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments |
| | author name = Hamilton B H | | | author name = Hamilton B |
| | author affiliation = Duke Energy Carolinas, LLC, Duke Power Co | | | author affiliation = Duke Energy Carolinas, LLC, Duke Power Co |
| | addressee name = | | | addressee name = |
|
---|
Category:Letter
MONTHYEARIR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds 2024-08-26
[Table view] |
Text
BRUCE H HAMILTON Vice President* Energye Oconee Nuclear Station Duke Energy Corporation ONOI VP / 7800 Rochester Highway Seneca, SC 29672 864 885 3487 864 885 4208 fax une ,20070 1 bhharmilton@duke-energy.
corn June 28, 2007 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC (Duke)Oconee Nuclear Station, Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-28, Renewed Operating Licenses DPR-38, DPR-47, and DPR-55 Revision to Tornado/HELB Mitigation Strategies and Regulatory Commitments
Reference:
Letter to the Nuclear Regulatory Commission from Henry B. Barron (Duke) dated November 30, 2006, 'Tornado/HELB Mitigation Strategies and Regulatory Commitments" The purpose of this letter is to adjust the due date for commitment 7T in the aforementioned reference and to inform the Staff that the due date for commitment 5T will likely need a similar adjustment.
Duke committed to notify the Staff of significant changes to the scope and/or completion dates of any tornado and high energy line break commitments, as described in Attachments 1 and 3 respectively, of the referenced letter.Commitment 7T addressed the July 2007 submittal of a License Amendment Request (LAR) that would establish a new tornado licensing basis and mitigation strategy for Oconee Nuclear Station (ONS). The adjustment in the LAR submittal schedule is necessitated by intervening circumstances that could not have been reasonably anticipated when the commitment was made in November 2006.First, in March 2007, the NRC published Revision 1 to Regulatory Guide (RG)1.76, "Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants," which Duke plans to incorporate into its tornado licensing basis. Second, Duke has initiated a study to more accurately depict the anticipated tornado characteristics (such as frequency and size) for the region surrounding ONS.Third, an element in the new tornado mitigation strategy is the proposed use of Fiber Reinforced Polymer (FRP) to strengthen selected existing masonry walls against tornado effects. The approval of the associated June 2006 LAR has been delayed beyond its anticipated approval date.www. duke-energy.
com Nuclear Regulatory Commission Revision to Tornado/HELB Mitigation Strategies and Regulatory Commitments Page 2 Based on current expectations for completion of revisions to the tornado mitigation strategy incorporating the above referenced information, the submittal of the tornado LAR addressed in Commitment 7T is anticipated in January 2008.In addition, the intervening circumstances described above will likely result in a change in the scope and implementation of the modifications to the existing West Penetration Rooms and Cask Decontamination Tank Rooms masonry walls (commitment 5T). Additional information regarding the scope and implementation schedule for this activity will be provided in separate correspondence.
Inquiries concerning this matter should be directed to Mr. Richard Freudenberger at (864)885-3908.
Very sincerely yours, Bruce H. Hamilton Vice President, Oconee Site Nuclear Regulatory Commission Revision to Tomado/HELB Mitigation Strategies and Regulatory Commitments Page 3 cc: James Dyer Director, Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2738 Dr. W. D. Travers Regional Administrator U.S. Nuclear Regulatory Commission
-Region II Sam Nunn Atlanta Federal Center, 23 T85 61 Forsyth St., SW Atlanta, GA 30303-8931 Mr. L. N. Olshan Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Tim McGinty Deputy Director Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Charles Casto Director, DRP U.S. Nuclear Regulatory Commission
-Region II Sam Nunn Atlanta Federal Center, 23 T85 61 Forsyth St., SW Atlanta, GA 30303-8931 Mr. Joseph W. Shea Director, DRS U.S. Nuclear Regulatory Commission
-Region II Sam Nunn Atlanta Federal Center, 23 T85 61 Forsyth St., SW Atlanta, GA 30303-8931 Nuclear Regulatory Commission Revision to Tomado/HELB Mitigation Striategies and Regulatory Commitments Page 4 Mr. James Moorman Chief, Branch 1, DRP U.S. Nuclear Regulatory Commission
-Region II Sam Nunn Atlanta Federal Center, 23 T85 61 Forsyth St., SW Atlanta, GA 30303-8931 Mr. Robert E. Carroll U.S. Nuclear Regulatory Commission
-Region II Sam Nunn Atlanta Federal Center, 23 T85 61 Forsyth St., SW Atlanta, GA 30303-8931 Mr. Dan Rich NRC Senior Resident Inspector Oconee Nuclear Station Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street, Columbia, SC 29201 j Nuclear Regulatory Commission Revision to Tornado/HELB Mitigation Strategies and Regulatory Commitments Page 5 bcc: H. B. Barron R. A. Jones D. A. Baxter R. Mike Glover L. E. Nicholson B. G. Davenport J. R. Sumpter L. M. Kanipe S. L. Nader L. F. Vaughn S. D. Capps J. E. Burchfield R. J. Freudenberger G. K. Mc Aninch J. E. Smith (NRC Commitment Coordinator)
S. C. Newman J. N. Robertson R. E. Hall T. D. Mills R. L. Gill -NRI&IA R. D. Hart -CNS K. L. Ashe -MNS D. Repka NSRB, EC05N ELL, ECO50 File -T.S. Working ONS Document Management