{{#Wiki_filter:1 IPRenewal NPEmails From: Tyner, Donna [dtyner@entergy.com]
{{#Wiki_filter:IPRenewal NPEmails From:                   Tyner, Donna [dtyner@entergy.com]
Sent: Friday, June 12, 2009 11:12 AM To: Green, Kimberly Cc: Caputo, Charles; STROUD, MICHAEL D; Curry, John J
Sent:                   Friday, June 12, 2009 11:12 AM To:                     Green, Kimberly Cc:                     Caputo, Charles; STROUD, MICHAEL D; Curry, John J


==Subject:==
==Subject:==
NL-09-079 - Reply to License Renewal RAI Attachments:
NL-09-079 - Reply to License Renewal RAI Attachments:             NL-09-079 - RAI Reply.pdf
NL-09-079 - RAI Reply.pdfKim, Attached is an advance electronic copy of NL-09-079, "License Renewal RAI Reply - Offsite Power, Refueling Cavity, and U2 AFW Pump Rm Fire Event".  
: Kim, Attached is an advance electronic copy of NL-09-079, License Renewal RAI Reply - Offsite Power, Refueling Cavity, and U2 AFW Pump Rm Fire Event.
Thank you, Donna 1


Thank you, Donna Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 1495   Mail Envelope Properties   (3934ABBB09976D4286276A97F3ECA098045ED4AD)
Hearing Identifier:     IndianPointUnits2and3NonPublic_EX Email Number:           1495 Mail Envelope Properties     (3934ABBB09976D4286276A97F3ECA098045ED4AD)


==Subject:==
==Subject:==
NL-09-079 - Reply to License Renewal RAI Sent Date:   6/12/2009 11:12:24 AM Received Date: 6/12/2009 11:12:43 AM From:   Tyner, Donna Created By:   dtyner@entergy.com Recipients:     "Caputo, Charles" <ccapu90@entergy.com>
NL-09-079 - Reply to License Renewal RAI Sent Date:             6/12/2009 11:12:24 AM Received Date:         6/12/2009 11:12:43 AM From:                   Tyner, Donna Created By:             dtyner@entergy.com Recipients:
Tracking Status: None "STROUD, MICHAEL D" <MSTROUD@entergy.com>
"Caputo, Charles" <ccapu90@entergy.com>
Tracking Status: None "Curry, John J" <jcurry2@entergy.com> Tracking Status: None "Green, Kimberly" <Kimberly.Green@nrc.gov> Tracking Status: None  
Tracking Status: None "STROUD, MICHAEL D" <MSTROUD@entergy.com>
Tracking Status: None "Curry, John J" <jcurry2@entergy.com>
Tracking Status: None "Green, Kimberly" <Kimberly.Green@nrc.gov>
Tracking Status: None Post Office:            IPCEXETSP001.etrsouth.corp.entergy.com Files                          Size                    Date & Time MESSAGE                        189                    6/12/2009 11:12:43 AM NL-09-079 - RAI Reply.pdf                      1436742 Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:  IPCEXETSP001.etrsouth.corp.entergy.com Files    Size      Date & Time MESSAGE    189      6/12/2009 11:12:43 AM NL-09-079 - RAI Reply.pdf    1436742 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:       
NL-09-079 Page 2 of 2 FRD/dmt


NL-09-079   Page 2 of 2 FRD/dmt
==Attachment:==
: 1. Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event
: 2. List of Regulatory Commitments, Revision 9 cc:  Mr. Samuel J. Collins, Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Ms. Kimberly Green, NRC Safety Project Manager Mr. Kenneth Chang, NRC Branch Chief, Engineering Review Branch I Mr. John Boska, NRR Senior Project Manager Mr. Paul Eddy, New York State Department of Public Service NRC Resident Inspectors Office Mr. Francis J. Murray, President and CEO, NYSERDA
 
ATTACHMENT 1 TO NL-09-079 Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286


==Attachment:==
Attachment 1 NL-09-079 Page 1 of 51 INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION OFFSITE POWER, REFUELING CAVITY, AND UNIT 2 AUXILIARY FEEDWATER PUMP ROOM FIRE EVENT RAI 2.5-4 In license renewal application (LRA) Section 2.5, as clarified in LRA Amendment 3, dated March 24, 2008, the applicant included in the scope of license renewal the structures and components for one offsite circuit path (138 kV/Station Auxiliary Transformer circuit, the immediate access circuit). The applicant is requested to explain why the second offsite circuit (the delayed access circuit) path, from the first inter-tie with the offsite distribution systems at the Buchanan substations to the safety buses, was not included in the scope of license renewal.
1.Reply to Request for Additional Information Regarding Offsite Power,    Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event 2. List of Regulatory Commitments, Revision 9 cc: Mr. Samuel J. Collins, Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Ms. Kimberly Green, NRC Safety Project Manager  Mr. Kenneth Chang, NRC Branch Chief, Engineering Review Branch I Mr. John Boska, NRR Senior Project Manager  Mr. Paul Eddy, New York State Department of Public Service NRC Resident Inspector's Office Mr. Francis J. Murray, President and CEO, NYSERDA ATTACHMENT 1 TO NL-09-079Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire EventENTERGY NUCLEAR OPERATIONS, INC. INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286 NL-09-079 Page 1 of 51 INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION OFFSITE POWER, REFUELING CAVITY, AND UNIT 2 AUXILIARY FEEDWATER PUMP ROOM FIRE EVENT RAI 2.5-4 In license renewal application (LRA) Section 2.5, as clarified in LRA Amendment 3, dated March 24, 2008, the applicant included in the scope of license renewal the structures and components for one offsite circuit path (138 kV/Station Auxiliary Transformer circuit, the immediate access circuit). The applicant is requested to explain why the second offsite circuit (the delayed access circuit) path, from the first inter-tie with the offsite distribution systems at the Buchanan substations to the safety buses, was not included in the scope of license renewal. Specifically, the applicant is requested to explain why the components up to and including either 138 kV circuit breaker F1 or 345 kV circuit breaker F7 for IP2 and either 138 kV circuit breaker F3 or 345 kV circuit breaker F7 for IP3 were not included in the scope of license renewal. Response for RAI 2.5-4 The components up to and including either 138 kV circuit breaker F1 or 345 kV circuit breaker F7 for IP2 and either 138 kV circuit breaker F3 or 345 kV circuit breaker F7 for IP3 were not included in the scope of license renewal because they do not meet the scoping criteria of 10 CFR 54.4. The scoping for offsite power recovery was in accordance with the guidance provided in a staff letter dated April 1, 2002. That letter states, "For purposes of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule.The breakers identified in this RAI are part of the offsite power source; and not plant system components that are used to connect the plant to the offsite power source.
Specifically, the applicant is requested to explain why the components up to and including either 138 kV circuit breaker F1 or 345 kV circuit breaker F7 for IP2 and either 138 kV circuit breaker F3 or 345 kV circuit breaker F7 for IP3 were not included in the scope of license renewal.
Response for RAI 2.5-4 The components up to and including either 138 kV circuit breaker F1 or 345 kV circuit breaker F7 for IP2 and either 138 kV circuit breaker F3 or 345 kV circuit breaker F7 for IP3 were not included in the scope of license renewal because they do not meet the scoping criteria of 10 CFR 54.4. The scoping for offsite power recovery was in accordance with the guidance provided in a staff letter dated April 1, 2002. That letter states, For purposes of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule. The breakers identified in this RAI are part of the offsite power source; and not plant system components that are used to connect the plant to the offsite power source.
Discussion The second offsite circuit path was explicitly added in response to RAI 2.5-1.
Discussion The second offsite circuit path was explicitly added in response to RAI 2.5-1.
RAI 2.5-1 (Dated 10/24/07; ML0729200270) asked the following question. According to the above, both paths from the safety-related 480 Volt (V) buses to the first circuit breaker from the offsite line, used to control the offsite circuits to the plant, should be age managed. The guidance does not specify that the switchyard is not part of the plant system nor that the switchyard does not need to be included in the scope of license renewal. Explain in detail which high voltage breakers and other components in the switchyard will be connected from the startup transformers up to the offsite power system for the purpose of SBO  
RAI 2.5-1 (Dated 10/24/07; ML0729200270) asked the following question.
According to the above, both paths from the safety-related 480 Volt (V) buses to the first circuit breaker from the offsite line, used to control the offsite circuits to the plant, should be age managed. The guidance does not specify that the switchyard is not part of the plant system nor that the switchyard does not need to be included in the scope of license renewal. Explain in detail which high voltage breakers and other components in the switchyard will be connected from the startup transformers up to the offsite power system for the purpose of SBO recovery.
 
Attachment 1 NL-09-079 Page 2 of 51 RAI 2.5-1 Response Excerpt (Dated 11/16/2007)
General Design Criterion 17 of 10 CFR Part 50, Appendix A, specifies that electric power from the transmission network to the onsite electric distribution system be supplied by two physically independent circuits to minimize the likelihood of their simultaneous failure. As discussed in IP2 UFSAR Section 8.1.2.1, 10 CFR 50 Appendix A General Design Criterion 17 - Electric Power Systems, the two physically independent circuits supplying offsite power to IP2 are the Buchanan Substation via the Con Edison 138 kV system feeder and the Buchanan 13.8 kV system feeder. The 138 kV system feeder is the primary offsite power source connected to the 6.9 kV buses through the station auxiliary transformer. The 13.8 kV system feeder is the secondary offsite power source connected to the 6.9 kV buses through the GT autotransformer. The station auxiliary transformer and the GT autotransformer perform the functions assigned to the typical startup transformers referred to in the April 1, 2002 letter.
LRA Figure 2.5-2 showed only the primary offsite power source or the 6.9kV source from the 138kV/6.9kV station auxiliary transformer, which is connected to the Buchanan substation through the Con Edison 138kV feeder. Figure 2.5-2 is revised as shown in this response to add the secondary offsite power feeder from the 13.8 kV Buchanan substation via the GT autotransformer.
As shown in the revised LRA Figure 2.5-2, the 6.9 kV buses receive power from the two independent sources of offsite power via the 138 kV / 6.9 kV station auxiliary transformer or the 13.8 kV / 6.9 kV GT autotransformer. The station auxiliary transformer is connected to the 138 kV Buchanan substation, the primary offsite power source, via switchyard bus, overhead transmission conductors, and underground transmission conductors through motor-operated disconnect F3A, which is located at the Buchanan substation. The GT autotransformer is connected to the 13.8 kV Buchanan substation, the secondary offsite power source, via underground medium voltage cable through breaker F2-3, which is located at the Buchanan substation.
General Design Criterion 17 of 10 CFR Part 50, Appendix A, specifies that electric power from the transmission network to the onsite electric distribution system be supplied by two physically independent circuits to minimize the likelihood of their simultaneous failure. As discussed in IP3 UFSAR Section 8.2.1, Network Interconnection, and 8.2.3, Emergency Power - Sources Description, the two physically independent circuits supplying offsite power to IP3 are the Buchanan Substation via the Con Edison 138 kV system feeder and the Buchanan 13.8 kV system feeder. The 138 kV system feeder is the primary offsite power source connected to the 6.9 kV buses through the station auxiliary transformer. The 13.8 kV system feeder is the secondary offsite power source connected to the 6.9 kV buses through the GT autotransformer. The station auxiliary transformer and the GT autotransformer perform the functions assigned to the typical startup transformers referred to in the April 1, 2002 letter.
 
Attachment 1 NL-09-079 Page 3 of 51 LRA Figure 2.5-3 showed only the primary offsite power source or the 6.9kV source from the 138kV/6.9kV station auxiliary transformer, which is connected to the Buchanan substation through the Con Edison 138kV feeder.. Figure 2.5-3 is revised as shown in this response to add the secondary offsite power feeder from the 13.8 kV Buchanan substation via the GT autotransformer.
As shown in the revised LRA Figure 2.5-3, the 6.9 kV buses receive power from the two independent sources of offsite power via the 138 kV / 6.9 kV station auxiliary transformer or the 13.8 kV / 6.9 kV GT autotransformer. The station auxiliary transformer is connected to the 138 kV Buchanan substation, the primary offsite power source, via switchyard bus and overhead transmission conductors through breaker BT2-6, which is located at the Buchanan substation.
The GT autotransformer is connected to the 13.8 kV Buchanan substation, the secondary offsite power source, via underground medium voltage cable through breaker F3-1, which is located at the Buchanan substation.
(Revised LRA Figures 2.5-2 and 2.5-3 were also provided with this RAI response.)
Based on discussions with the NRC staff on 12/12/07 and 1/30/08 this RAI response was revised for the IP2 138 kV connection point.
RAI 2.5-1 Response Clarification Excerpt (Dated 3/24/2008)
(A revised LRA Figure 2.5-2 was also provided with this RAI clarification.)
The boundaries described in the RAI 2.5-1 response were determined in accordance with the guidance provided in a staff letter dated April 1, 2002. The following excerpt from the RAI 2.5-1 response discusses this determination.
RAI 2.5-1 Response Excerpt (Dated 11/16/2007)
The staff position in the letter dated April 1, 2002, Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout (SBO)
Rule (10 CFR 50.63) for License Renewal (10 CFR 54.4(a)(3)) is that the plant system portion of the offsite power system should be included within the scope of license renewal. Specifically, the letter states,
 
Attachment 1 NL-09-079 Page 4 of 51 For purposes of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule.
Implementation of the staff position requires definition of the offsite power source. The April 1, 2002 letter states:
The offsite power systems of U.S. nuclear power plants consist of a transmission system (grid) component that provides a source of power and a plant system component that connects that power source to a plants onsite electrical distribution system which powers safety equipment. The staff has historically relied upon the well-distributed, redundant, and interconnected nature of the grid to provide the necessary level of reliability to support nuclear power plant operations.
In this discussion, the staff defines the offsite power source as the transmission system or the grid. The staff refers to the well-distributed, redundant, and interconnected nature of the grid. The Buchanan substation, which includes the 345 kV, the 138 kV, and the 13.8 kV sections, is a key element of the well-distributed, redundant and interconnected grid or transmission system that constitutes the offsite power source for IP2 and IP3.
The Buchanan substation provides for the interconnection of multiple sources of power and provides dispatch control for a multiple county transmission network. The multiple power sources are interconnected through switchyard bus, transmission conductors, and breakers within the substation. In keeping with the guidance in the letter dated April 1, 2002, the SBO recovery paths from the plant systems to the offsite power system or grid connection are included in scope for license renewal.
The 138 kV circuit breaker F1, the 345 kV circuit breaker F7, and the 138 kV circuit breaker F3 are part of the Buchanan Substation, which is part of the well-distributed, redundant and interconnected grid or transmission system that constitutes the offsite power source for IP2 and IP3. In other words, these breakers are part of the transmission system (grid) component that provides a source of power; and not plant system components that connect that power source to the plants onsite electrical distribution system which powers safety equipment. The Buchanan Substation is not the IP2 or IP3 switchyard. The Buchanan Substation is part of the Con Edison transmission and distribution system, and it provides distribution to Westchester County and the New York City area with 345 kV, 138 kV, and 13.8 kV transmission lines. The Con Edison transmission system does not perform a function that meets the license renewal scoping criteria of 10 CFR 54.4.
The breakers conservatively included in scope for the offsite power recovery path are the interface points added to the Buchanan Substation during the construction of IP2 and IP3. As stated in LRA Section 2.5:
 
Attachment 1 NL-09-079 Page 5 of 51 In addition to the plant electrical systems, certain switchyard components required to restore offsite power following a station blackout were conservatively included within the scope of license renewal even though those components are not relied on in safety analyses or plant evaluations to perform a function that demonstrates compliance with the Commission's regulations for station blackout (SBO) (10 CFR 50.63).
The breakers are shown on LRA Figure 2.5-2 (Amended by letter dated 3/24/2008), and LRA Figure 2.5-3 (Amended by letter dated 11/16/2007).
Follow-up RAI 2: Open Item 3.0.3.2.15-1 The purpose of this follow-up request for additional information (RAI) is to request additional information and clarification to help the staff to understand the applicants May 1, 2009 response to Follow-up RAI 1 for Open Item 3.0.3.2.15-1. Specifically, the staff requests the following:
(a)  In part (a) of the applicants response, Figures 1 through 4 do not clearly identify the flow path from the refueling cavity liner to the A, B, and C water exit locations.
Therefore, please provide the following additional descriptive information. In an elevation view (similar to Figure 2), cut through each of the exit locations A, B, and C, showing the horizontal and vertical dimension between the entry point through the liner and the exit location. To the extent possible, describe the possible circumferential traverse of the leakage, from the entry point through the liner to the exit location.
(b)  The staff requests the applicant to provide the following additional information/clarification regarding the revised license renewal commitments in part (b) of the applicants response:
(1)  The current remediation plan has targeted the 2014 outage for completion.
Please identify actions that will be taken if the remediation plan is unsuccessful.
(2)    Identify the specific location and number of the concrete core samples (e.g., the three water exit locations) that will be removed and tested (i) during the upcoming 2010 refueling outage, and (ii) at 10 years into the extended period of operation (if a permanent solution for the leakage has not been achieved, in accordance with Entergys current remediation plan). Define the tests that will be performed, and the objective of each test.
(3)    Please advise if the revised commitments in the applicants May 1, 2009 response include chemical analysis of the leaking water (i) during the upcoming 2010 refueling outage, and (ii) at 10 years into the extended period of operation.
Please identify the analyses that will be performed, and the objective of each analysis.
 
Attachment 1 NL-09-079 Page 6 of 51 Response for Follow-up RAI 2: Open Item 3.0.3.2.15-1
: a. Based on leakage investigations, the reactor refueling cavity begins to leak when the water in the cavity reaches an approximate elevation between 80- 85. As can be seen on the attached elevation views of the cavity (Figures 1 thru 4), horizontal weld seams exist between these elevations, but the exact liner leakage points are unknown. We can , however, make the following observations regarding the relationship between the leakage areas in the concrete structure denoted as points A, B and C, and conditions of the cavity liner:
: 1. Above point A, defects in the CeramAlloy patch along a horizontal weld seam located on the south wall at an elevation between 80- 85 has been observed. The CeramAlloy patch material that covers several weld seams was a previous attempt to mitigate the cavity leakage. This is a potential cavity liner leak point for the observed leakage on the concrete structure at point A.
: 2. Above the exit point denoted as B, defects in a CeramAlloy patch along a horizontal weld seam located at an elevation between 80- 85 on the south wall has been observed. This patch area is an extension from the area discussed in item 1 above. In addition, the upper internals stand support base is attached to the cavity floor above the vicinity of the observed leakage in the concrete structure at point B. Both these areas in the cavity liner are potential leak point sources for the observed leakage at point B.
: 3. Above the observed leakage area in the concrete structure denoted as point C, defects in both the CeramAlloy patches along weld seams and potential defects in the weld seams themselves at the north cavity wall have been observed. These defects are located approximately 10-15 above the cavity floor and are potential leak points for the leakage observed at point C.
: b. The following provides Entergys response to part (b) of the staffs request.
: 1. Should the remediation plan for the cavity liner targeted for completion during the 2014 outage be unsuccessful, Entergy will perform additional monitoring to assess the condition of potentially affected structures. To assure continued structural integrity of the reactor refueling cavity reinforced concrete walls, Entergy will perform further core sampling and inspect reinforcing steel at suspect locations as described in item 3.
: 2. (i) During the upcoming 2010 outage, a total of 3 core bore samples will be taken from the reinforced concrete walls that form the outer shell of the reactor refueling cavity steel liner. The locations of these core bores will be chosen based on the following.
3/4 Locations in the vicinity of observed liner/liner patch degradation in relative proximity to the observed leak points A, B and C on the concrete structure.
3/4 Accessibility of suspect areas based on the principle of As Low As Reasonably Achievable (ALARA) and physical interferences.
 
Attachment 1 NL-09-079 Page 7 of 51 The core samples will be tested and chemically analyzed to determine the effect, if any, past leakage has had on the concrete properties. The objectives of the physical and chemical tests of the concrete core samples are as follows.
3/4 Determine the compressive strength of concrete.
3/4 Determine boron and chloride concentration in concrete.
3/4 Determine pH of concrete.
In addition, a petrographic examination will be performed on the core samples to evaluate the cementitious matrix, and, to the extent possible, determine the durability of the concrete.
In addition, reinforcing steel in the core sample areas will be exposed and inspected. Visual inspections of the reinforcing steel will be performed to determine the extent of material loss, if any, from the steel as a result of the borated water leakage.
: 2.      (ii) If a solution to the leakage has not been achieved, Entergy will perform core samples and reinforcing steel inspections prior to 10 years into the period of extended operation. Locations of the core samples will be chosen based on the extent and location of the leakage remaining following previous repair efforts. Core samples will be tested and chemically analyzed as discussed under part 2 above. Visual inspections of the reinforcing steel will be performed to determine the extent of material loss, if any, from the steel as a result of the borated water leakage.
: 3. (I and ii) Revised Commitment 36 includes chemical analysis of water leakage from the refueling cavity. During the upcoming 2010 outage, Entergy will collect water samples from the cavity leak and perform chemical analysis.
If the leakage has not been stopped, Entergy will collect additional water samples of the leak during the same outage as the core samples are taken no later than 10 years into the period of extended operation. The water that is collected will be analyzed for the following.
3/4    Boron concentration 3/4    pH 3/4    Iron 3/4    Calcium Results of the analysis will be evaluated to assess the aggressiveness of the leaking fluid to reinforced concrete structures.
 
NL-09-079 Page 8 of 51
 
NL-09-079 Page 9 of 51
 
Attachment 1 NL-09-079 Page 10 of 51
 
Attachment 1 NL-09-079 Page 11 of 51
 
Attachment 1 NL-09-079 Page 12 of 51 RAI 3.4.2-2 By letter dated January 27, 2009, Entergy responded to RAI 3.4.2-1, and provided clarifying details regarding the passive, long-lived component types, materials, environments, aging effects and aging management programs for systems, structures and components that support the auxiliary feedwater (AFW) pump room fire event at Indian Point Nuclear Generating Unit No. 2 (IP2) that were not already within the scope of license renewal for 10 CFR 54.4(a)(1) or (a)(2).
The staff reviewed the response and determined that the systems contain passive, long-lived components made of materials that when exposed to the stated environments may experience aging effects as described in the GALL Report, which must be managed during the period of extended operation in accordance with 10 CFR 54.21(a)(3).
By letter dated May 1, 2009, Entergy submitted a revised commitment list which included a new commitment (Commitment 39) to install a fixed automatic fire suppression system for IP2 in the AFW pump room which would make the suppression configuration of the room similar to that of the AFW pump room at Unit 3.
Because the planned installation is not yet part of the current licensing basis, the staff cannot make a finding consistent with the requirement in 10 CFR 54.29(a). Therefore, the staff requests that the applicant provide information to demonstrate that the effects of aging will be adequately managed so that the intended function(s) will maintained consistent with the current licensing basis for the period of extended operation as required by 10 CFR 54.21(a)(3). Specifically, the staff requests that the applicant list all aging effects and the aging management programs needed to manage the aging effects for the component types provided in the January 27, 2009 letter.
Response for RAI 3.4.2-2 As stated in the initial response to RAI 3.4.2-1 in the January 27, 2009 letter, the function of supporting safe shutdown in the event of a fire in the auxiliary feed pump room is confirmed on an ongoing basis since the required SSCs are performing their intended functions under design basis conditions during normal operation. Performance of intended functions during normal plant operation demonstrates that the systems and components can perform those functions for one hour in the event of a fire in the auxiliary feedwater pump room. Nevertheless, the additional information requested by the staff is provided below in the form of revised tables from the response to RAI 3.4.2-1 provided in the January 27, 2009 letter. This additional information includes aging effects and aging management programs to manage the aging effects for the component types that support the AFW pump room fire event that were not already included in scope and subject to aging management review for 10CFR54.4(a)(1) or (a)(2).
These tables identify changes as strikethroughs for deletions and underlines for additions. During the revision of these tables, the following changes to line items in the tables were identified outside of the addition of aging effects and programs.
3/4 new line items identifying cracking as an aging effect for tubing in the condensate system and loss of material due to selective leaching in heat exchanger tubes for the instrument air system.
 
Attachment 1 NL-09-079 Page 13 of 51 3/4 new line items for component type strainers in the city water system and the IP1 station air system 3/4 new line items for component type strainer housings made of copper alloy
        >15% zn in the city water system 3/4 deleted line items for component type expansion joint made of elastomer in the condensate system since elastomer expansion joints are replaced on a specified time period 3/4 new line items for pump casings made of gray cast iron and stainless steel in the circulating water system 3/4 revised line items in the service water system to change environment from air-outdoor (ext) to condensation (ext) for consistency with other LRA tables 3/4 revised line items for environment of treated water (int) to include > 140&deg;F for high temperature aging effects 3/4 revised line item for pump casings in the wash water system to change material to stainless steel from carbon steel 3/4 revised line item for pump casings for the river water system to change material to gray cast iron from carbon steel 3/4 revised line item for pump casings for the fresh water cooling system to change material to titanium from copper alloy 3/4 Replaced Note 408 with the following:
408      The air - treated environment is the equivalent of dried air and for the purposes of evaluating aluminum components, the air - treated environment is drier than the NUREG-1801 defined air - indoor uncontrolled.
The addition of aging management programs to these tables also resulted in necessary revisions for Appendix A, UFSAR Supplement and Appendix B, Aging Management Programs and Activities which are also provided with this response.
The following revised tables are provided in response to RAI 3.4.2-2.
 
Attachment 1 NL-09-079 Page 14 of 51 Table 3.4.2-5-1-IP2 Conventional Closed Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-1-IP2: Conventional Closed Cooling System (CCC)
Aging Effect                            NUREG-      Table 1 Intended                                                      Aging Management                              Notes Component Type                      Material    Environment          Requiring                              1801 Vol. 2    Item Function                                                            Programs Management                                  Item Pressure                                                        None                    VII.E1-2    3.3.1-51  408 Heat exchanger                    Copper alloy                    None boundary and              Treated water (ext)                  Water Chemistry Control (AP-34)                D (tubes)                          >15% zn                          Loss of material heat transfer                                                  - Closed Cooling Water Heat exchanger                    Copper alloy                                      Water Chemistry Control VII.C2-2    3.3.1-52  408 Heat transfer              Treated water (ext) Fouling (tubes)                          >15% zn                                          - Closed Cooling Water (AP-80)                  B Heat exchanger      Pressure      Copper alloy                                                              VII.C2-6    3.3.1-84  408 Treated water (ext) Loss of material Selective Leaching      (AP-43)                C (tubes)            boundary      >15% zn Pressure                                                                                VII.C1-3    3.3.1-82  408 Heat exchanger                    Copper alloy Treated water Raw None              None                    (A-65)                  C boundary and (tubes)                          >15% zn      water (int)        Loss of material Service Water Integrity heat transfer Heat exchanger                    Copper alloy                                                              VII.C1-6    3.3.1-83  C Heat transfer              Raw water (int)    Fouling          Service Water Integrity (A-72)
(tubes)                          >15% zn Heat exchanger      Pressure      Copper alloy                                                              VII.C1-4    3.3.1-84  C Raw water (int)    Loss of material Selective Leaching      (A-66)
(tubes)            boundary      >15% zn
 
Attachment 1 NL-09-079 Page 15 of 51 Table 3.4.2-5-2-IP2 Condensate System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-2-IP2 Condensate System (COND)
Aging Effect                              NUREG-Intended                                                      Aging Management                      Table 1 Component Type                    Material      Environment        Requiring                              1801 Vol. 2              Notes Function                                                            Programs                        Item Management                                  Item Pressure                                      None            None                    VIII.H-4    3.4.1-22    408 Bolting                          Carbon steel Air - indoor (ext)                                          (S-34)                  A boundary                                      Loss of material Bolting Integrity Pressure    Stainless                                                                VIII.I-10    3.4.1-41    408 Bolting                                      Air - indoor (ext)  None            None                    (SP-12)                  C boundary    steel Pressure                                                                              --          --          408 Expansion joint                  Elastomer    Air - indoor (ext)  None            None                                            --
boundary Pressure                                                                              --          --          408 Expansion joint                  Elastomer    Steam (int)        None            None                                            --
boundary Pressure                                                                              --          --          408 Expansion joint                  Elastomer    Treated water (int) None            None                                            --
boundary None                    VIII.E-34    3.4.1-4    408 Heat exchanger      Pressure                                      None Carbon steel Treated water (int)                  Water Chemistry Control (S-10)                  A, 404 (shell)            boundary                                      Loss of material
                                                                                  - Primary & Secondary None                    VIII.H-7    3.4.1-28    408 Heat exchanger      Pressure                                      None                                    (S-29)                  A Carbon steel Air - indoor (ext)                  External Surfaces (shell)            boundary                                      Loss of material Monitoring None                    VIII.A-16    3.4.1-2    408 Heat exchanger      Pressure                                      None Carbon steel Steam (ext)                          Water Chemistry Control (S-06)                  C, 404 (shell)            boundary                                      Loss of material
                                                                                  - Primary & Secondary
 
Attachment 1 NL-09-079 Page 16 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)
Aging Effect                            NUREG-Intended                                                      Aging Management                    Table 1 Component Type                      Material    Environment        Requiring                              1801 Vol. 2            Notes Function                                                            Programs                        Item Management                                  Item Pressure                                                        None                          --        --    408 Heat exchanger                                                    None                                                            F boundary and  Titanium    Steam (ext)                          Water Chemistry Control (tubes)                                                            Loss of material heat transfer                                                  - Primary & Secondary Heat exchanger                                                                      Water Chemistry Control        --        --    408 Heat transfer Titanium    Steam (ext)        Fouling                                                          F (tubes)                                                                            - Primary & Secondary None                          --        --    408 Pressure                                                                                                        F Heat exchanger                                                    None            Periodic Surveillance boundary and  Titanium    Raw water (int)
(tubes)                                                            Loss of material and Preventive heat transfer Maintenance Periodic Surveillance          --        --    408 Heat exchanger                                                                                                                      F Heat transfer Titanium    Raw water (int)    Fouling          and Preventive (tubes)
Maintenance Pressure                                                        None                    VIII.A-5    3.4.1-15  408 Heat exchanger                                                    None boundary and  Copper alloy Treated water (int)                  Water Chemistry Control (SP-61)                D, 404 (tubes)                                                            Loss of material heat transfer                                                  - Primary & Secondary Heat exchanger                                                                      Water Chemistry Control VIII.E-10    3.4.1-9    408 Heat transfer Copper alloy Treated water (int) Fouling (tubes)                                                                            - Primary & Secondary (SP-58)                  A, 404 Pressure                                                                                VIII.G-8    3.4.1-10  408 Heat exchanger                                                    None            None                    (SP-53)                D, 405 boundary and  Copper alloy Lube oil (ext)
(tubes)                                                            Loss of material Oil Analysis heat transfer Heat exchanger                                                                                              VIII.G-8    3.4.1-10  408 Heat transfer Copper alloy Lube oil (ext)      Fouling          Oil Analysis            (SP-53)                D, 405 (tubes)
None                    VIII.B1-3    3.4.1-37  408 Heat exchanger      Pressure      Stainless                        None Steam (ext)                          Water Chemistry Control (SP-43)                C (tubes)            boundary      steel                            Loss of material
                                                                                    - Primary & Secondary
 
Attachment 1 NL-09-079 Page 17 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)
Aging Effect                              NUREG-Intended                                                      Aging Management                      Table 1 Component Type                      Material    Environment        Requiring                              1801 Vol. 2              Notes Function                                                            Programs                          Item Management                                  Item Heat exchanger      Pressure      Stainless                                        Water Chemistry Control VIII.B1-2    3.4.1-39    408 Steam (ext)        Cracking (tubes)            boundary      steel                                            - Primary & Secondary (SP-44)                    C Heat exchanger                    Stainless                                        Water Chemistry Control --          --          408 Heat transfer              Steam (ext)        Fouling                                                          G (tubes)                          steel                                            - Primary & Secondary None                    VIII.E-36    3.4.1-16    408 Heat exchanger      Pressure      Stainless    Treated water      None Water Chemistry Control (S-22)                  A, 404 (tubes)            boundary      steel        > 140&deg;F (int)      Loss of material
                                                                                    - Primary & Secondary Heat exchanger      Pressure      Stainless    Treated water                        Water Chemistry Control VIII.E-30    3.4.1-14    408 Cracking (tubes)            boundary      steel        > 140&deg;F (int)                        - Primary & Secondary (SP-17)                    C, 404 Heat exchanger                    Stainless    Treated water                        Water Chemistry Control VIII.E-13    3.4.1-9    408 Heat transfer                                  Fouling (tubes)                          steel        > 140&deg;F (int)                        - Primary & Secondary (SP-40)                    A, 404 None                          --          --    408 Heat exchanger      Pressure                                      None                                                              F Titanium    Treated water (int)                  Water Chemistry Control (tubes)            boundary                                      Loss of material
                                                                                    - Primary & Secondary Heat exchanger                                                                      Water Chemistry Control        --          --    408 Heat transfer Titanium    Treated water (int) Fouling                                                          F (tubes)                                                                            - Primary & Secondary None                          --          --    408 Heat exchanger      Pressure                                      None                                                              F Titanium    Steam (ext)                          Water Chemistry Control (tubes)            boundary                                      Loss of material
                                                                                    - Primary & Secondary Heat exchanger                                                                      Water Chemistry Control        --          --    408 Heat transfer Titanium    Steam (ext)        Fouling                                                          F (tubes)                                                                            - Primary & Secondary None                    VIII.E-34    3.4.1-4    408 Pressure                                      None Piping                            Carbon steel Treated water (int)                  Water Chemistry Control (S-10)                  A, 404 boundary                                      Loss of material
                                                                                    - Primary & Secondary
 
Attachment 1 NL-09-079 Page 18 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)
Aging Effect                            NUREG-Intended                                                      Aging Management                    Table 1 Component Type                    Material      Environment          Requiring                            1801 Vol. 2            Notes Function                                                            Programs                        Item Management                                  Item Pressure                                      Cracking -                              VIII.B1-10  3.4.1-1    408 Piping                          Carbon steel Treated water (int)                  Metal Fatigue - TLAA    (S-08)                  C boundary                                      fatigue None                    VIII.H-7    3.4.1-28  408 Pressure                                      None                                    (S-29)                  A Piping                          Carbon steel Air - indoor (ext)                  External Surfaces boundary                                      Loss of material Monitoring None                    VIII.H-7    3.4.1-28  408 Pressure                                      None                                    (S-29)                  A Sight glass                      Carbon steel Air - indoor (ext)                  External Surfaces boundary                                      Loss of material Monitoring None                    VIII.E-34    3.4.1-4    408 Pressure                                      None Sight glass                      Carbon steel Treated water (int)                  Water Chemistry Control (S-10)                  A, 404 boundary                                      Loss of material
                                                                                  - Primary & Secondary Pressure                                                                              VIII.I-5    3.4.1-40  408 Sight glass                      Glass        Air - indoor (ext)  None            None                    (SP-9)                  A boundary Pressure                                                                              VIII.I-8    3.4.1-40  408 Sight glass                      Glass        Treated water (int) None            None                    (SP-35)                A boundary None                    VIII.H-7    3.4.1-28  408 Pressure                                      None                                    (S-29)                  A Thermowell                      Carbon steel Air - indoor (ext)                  External Surfaces boundary                                      Loss of material Monitoring None                    VIII.E-34    3.4.1-4    408 Pressure                                      None Thermowell                      Carbon steel Treated water (int)                  Water Chemistry Control (S-10)                  A, 404 Boundary                                      Loss of material
                                                                                  - Primary & Secondary Pressure                                      Cracking -                              VIII.B1-10  3.4.1-1    408 Thermowell                      Carbon steel Treated water (int)                  Metal Fatigue - TLAA    (S-08)                  C Boundary                                      fatigue
 
Attachment 1 NL-09-079 Page 19 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)
Aging Effect                            NUREG-Intended                                                      Aging Management                    Table 1 Component Type                    Material      Environment          Requiring                            1801 Vol. 2            Notes Function                                                            Programs                        Item Management                                  Item Pressure    Stainless                                                                VIII.I-10    3.4.1-41  408 Thermowell                                    Air - indoor (ext)  None            None                    (SP-12)                A boundary    steel None                    VIII.E-29    3.4.1-16  408 Pressure    Stainless    Treated water      None Thermowell                                                                        Water Chemistry Control (SP-16)                A, 404 boundary    steel        > 140&deg;F (int)      Loss of material
                                                                                  - Primary & Secondary Pressure    Stainless    Treated water                        Water Chemistry Control VIII.E-30    3.4.1-14  A, 404 Thermowell                                                        Cracking boundary    steel        > 140&deg;F (int)                        - Primary & Secondary (SP-17)
Pressure    Stainless    Treated water      Cracking -                              VII.E1-16    3.3.1-2    C, 406 Thermowell                                                                        Metal Fatigue - TLAA    (A-57) boundary    steel        > 140&deg;F (int)      fatigue None                    VIII.E-29    3.4.1-16  408 Pressure    Stainless    Treated water      None Tubing                                                                            Water Chemistry Control (SP-16)                A, 404 boundary    steel        > 140&deg;F (int)      Loss of material
                                                                                  - Primary & Secondary Pressure    Stainless    Treated water                        Water Chemistry Control VIII.E-30    3.4.1-14  408 Tubing                                                            Cracking boundary    steel        > 140&deg;F (int)                        - Primary & Secondary (SP-17)                  A, 404 Pressure    Stainless    Treated water      Cracking -                              VII.E1-16    3.3.1-2    408 Tubing                                                                            Metal Fatigue - TLAA    (A-57)                  C, 406 boundary    steel        > 140&deg;F (int)      fatigue Pressure    Stainless                                                                VIII.I-10    3.4.1-41  A Tubing                                        Air - indoor (ext)  None            None                    (SP-12) boundary    steel None                    VIII.E-34    3.4.1-4    408 Pressure                                      None Valve body                      Carbon steel Treated water (int)                  Water Chemistry Control (S-10)                  A, 404 boundary                                      Loss of material
                                                                                  - Primary & Secondary Pressure                                      Cracking -                              VIII.B1-10  3.4.1-1    408 Valve body                      Carbon steel Treated water (int)                  Metal Fatigue - TLAA    (S-08)                  C boundary                                      fatigue
 
Attachment 1 NL-09-079 Page 20 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)
Aging Effect                            NUREG-Intended                                                    Aging Management                    Table 1 Component Type                    Material      Environment        Requiring                            1801 Vol. 2            Notes Function                                                          Programs                        Item Management                                  Item None                    VIII.H-7    3.4.1-28  408 Pressure                                    None                                    (S-29)                  A Valve body                      Carbon steel Air - indoor (ext)                  External Surfaces boundary                                    Loss of material Monitoring None                    VIII.E-29    3.4.1-16  408 Pressure    Stainless    Treated water      None Valve body                                                                        Water Chemistry Control (SP-16)                A, 404 boundary    steel        > 140&deg;F (int)      Loss of material
                                                                                  - Primary & Secondary Pressure    Stainless    Treated water                      Water Chemistry Control VIII.E-30    3.4.1-14  408 Valve body                                                      Cracking boundary    steel        > 140&deg;F (int)                      - Primary & Secondary (SP-17)                  A, 404 Pressure    Stainless    Treated water      Cracking -                              VII.E1-16    3.3.1-2    408 Valve body                                                                        Metal Fatigue - TLAA    (A-57)                  C, 406 boundary    steel        > 140&deg;F (int)      fatigue Pressure    Stainless                                                                VIII.I-10    3.4.1-41  408 Valve body                                    Air - indoor (ext) None            None                    (SP-12)                A boundary    steel
 
Attachment 1 NL-09-079 Page 21 of 51 Table 3.4.2-5-3-IP2 Circulating Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-3-IP2 Circulating Water System (CIRC)
Aging Effect                            NUREG-Intended                                                        Aging Management                    Table 1 Component Type                    Material      Environment        Requiring                              1801 Vol. 2            Notes Function                                                              Programs                        Item Management                                  Item Pressure                                        None            None                    VII.I-1      3.3.1-43  408 Bolting                          Carbon steel  Air - outdoor (ext)                                          (AP-28)                C boundary                                        Loss of material Bolting Integrity None                    VIII.E-1    3.4.1-11  408 Pressure                                        None Bolting                          Carbon steel  Soil (ext)                          Buried Piping And Tanks (S-01)                  C boundary                                        Loss of material Inspection Periodic Surveillance  VIII.G-36    3.4.1-8    E Pressure                                                                                (S-12)
Bolting                          Carbon steel  Raw water (ext)    Loss of material and Preventive boundary Maintenance None                    VII.C1-1    3.3.1-75  408 Pressure                                        None            Periodic Surveillance  (AP-75)                E Expansion joint                  Elastomer      Raw water (int) boundary                                        Cracking        and Preventive Maintenance Change of        Periodic Surveillance  VII.C1-1    3.3.1-75  408 Pressure                                                                                (AP-75)                E Expansion joint                  Elastomer      Raw water (int)    material        and Preventive boundary properties      Maintenance None                            --        --    408 Pressure                                        None            Periodic Surveillance                          G Expansion joint                  Elastomer      Air -outdoor (ext) boundary                                        Cracking        and Preventive Maintenance
 
Attachment 1 NL-09-079 Page 22 of 51 Table 3.4.2-5-3-IP2 Circulating Water System (CIRC)
Aging Effect                            NUREG-Intended                                                        Aging Management                    Table 1 Component Type                    Material      Environment        Requiring                              1801 Vol. 2            Notes Function                                                            Programs                        Item Management                                  Item Change of        Periodic Surveillance          --        --    408 Pressure                                                                                                        G Expansion joint                  Elastomer      Air -outdoor (ext) material        and Preventive boundary properties      Maintenance None                    VIII.E-1    3.4.1-11  408 Pressure                                      None Piping                          Carbon steel  Soil (ext)                          Buried Piping And Tanks (S-01)                  C boundary                                      Loss of material Inspection None                    VIII.H-8    3.4.1-28  408 Pressure                                      None                                    (S-41)                  A Piping                          Carbon steel  Air outdoor (ext)                  External Surfaces boundary                                      Loss of material Monitoring None                    VIII.G-36    3.4.1-8    408 Pressure                                      None            Periodic Surveillance  (S-12)                  E Piping                          Carbon steel  Raw water (int) boundary                                      Loss of material and Preventive Maintenance None                    VIII.H-8    3.4.1-28  408 Pressure                                      None                                    (S-41)                  A Pump casing                      Carbon steel  Air-outdoor (ext)                  External Surfaces boundary                                      Loss of material Monitoring None                    VIII.G-36    3.4.1-8    408 Pressure                                      None            Periodic Surveillance  (S-12)                  E Pump casing                      Carbon steel  Raw water (int) boundary                                      Loss of material and Preventive Maintenance Periodic Surveillance  VIII.G-36    3.4.1-8    408 Pressure                                                                                (S-12)                  E Pump casing                      Carbon steel  Raw water (ext)    Loss of material and Preventive boundary Maintenance


recovery.
Attachment 1 NL-09-079 Page 23 of 51 Table 3.4.2-5-3-IP2 Circulating Water System (CIRC)
NL-09-079 Page 2 of 51RAI 2.5-1 Response Excerpt (Dated 11/16/2007) General Design Criterion 17 of 10 CFR Part 50, Appendix A, specifies that electric power from the transmission network to the onsite electric distribution system be supplied by two physically independent circuits to minimize the likelihood of their simultaneous failure. As discussed in IP2 UFSAR Section 8.1.2.1, "10 CFR 50 Appendix A General Design Criterion 17 - Electric Power Systems," the two physically independent circuits supplying offsite power to IP2
Aging Effect                          NUREG-Intended                                                        Aging Management                  Table 1 Component Type                    Material        Environment      Requiring                            1801 Vol. 2            Notes Function                                                            Programs                      Item Management                                Item Periodic Surveillance VIII.E-27    3.4.1-32  E Pressure                                                                              (SP-36)
Pump casing                      Stainless steel Raw water (int)  Loss of material and Preventive boundary Maintenance Periodic Surveillance VIII.E-27    3.4.1-32  E Pressure                                                                              (SP-36)
Pump casing                      Stainless steel Raw water (ext)   Loss of material and Preventive boundary Maintenance Pressure                                                        External Surfaces    VIII.H-8    3.4.1-28  A Pump casing                      Gray cast iron  Air-outdoor (ext) Loss of material                      (S-41) boundary                                                        Monitoring Periodic Surveillance VIII.G-36    3.4.1-8   E Pressure                                                                              (S-12)
Pump casing                      Gray cast iron  Raw water (int)  Loss of material and Preventive boundary Maintenance Pressure                                                                              VIII.A-7    3.4.1-36  C Pump casing                      Gray cast iron  Raw water (int)  Loss of material Selective Leaching    (SP-28) boundary Periodic Surveillance VIII.G-36    3.4.1-8    E Pressure                                                                              (S-12)
Pump casing                      Gray cast iron  Raw water (ext)  Loss of material and Preventive boundary Maintenance Pressure                                                                              VIII.A-7    3.4.1-36  C Pump casing                      Gray cast iron  Raw water (ext)  Loss of material Selective Leaching    (SP-28) boundary


are the Buchanan Substation via the Con Edison 138 kV system feeder and the Buchanan 13.8 kV system feeder. The 138 kV system feeder is the primary offsite power source connected to the 6.9 kV buses through the station auxiliary transformer. The 13.8 kV system feeder is the secondary offsite power source connected to the 6.9 kV buses through the GT autotransformer. The station auxiliary transformer and the GT autotransformer perform the functions assigned to the typical startup transformers referred to in the April 1, 2002 letter.
Attachment 1 NL-09-079 Page 24 of 51 Table 3.4.2-5-4-IP2 City Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-4-IP2 City Water System (CYW)
LRA Figure 2.5-2 showed only the primary offsite power source or the 6.9kV source from the 138kV/6.9kV station auxiliary transformer, which is connected to the Buchanan substation through the Con Edison 138kV feeder. Figure 2.5-2 is revised as shown in this response to add the secondary offsite power feeder from the 13.8 kV Buchanan substation via the GT autotransformer. As shown in the revised LRA Figure 2.5-2, the 6.9 kV buses receive power from the two independent sources of offsite power via the 138 kV / 6.9 kV station auxiliary transformer or the 13.8 kV / 6.9 kV GT autotransformer. The station auxiliary transformer is connected to the 138 kV Buchanan substation, the primary offsite power source, via switchyard bus, overhead transmission conductors, and underground transmission conductors through motor-operated disconnect F3A, which is located at the Buchanan substation. The GT autotransformer is connected to the 13.8 kV Buchanan substation, the secondary offsite power source, via underground medium voltage cable through breaker F2-3, which is located at the Buchanan substation. General Design Criterion 17 of 10 CFR Part 50, Appendix A, specifies that electric power from the transmission network to the onsite electric distribution system be supplied by two physically independent circuits to minimize the likelihood of their simultaneous failure. As discussed in IP3 UFSAR Section 8.2.1, "Network Interconnection", and 8.2.3, "Emergency Power - Sources Description," the two physically independent circuits supplying offsite power to IP3 are the Buchanan Substation via the Con Edison 138 kV system feeder and the Buchanan 13.8 kV system feeder. The 138 kV system feeder is the primary offsite power source connected to the 6.9 kV buses through the station auxiliary transformer. The 13.8 kV system feeder is the secondary offsite power source connected to the 6.9 kV buses through the GT autotransformer. The station auxiliary transformer and the GT autotransformer perform the functions assigned to the typical startup transformers referred to in the April 1, 2002 letter.
Aging Effect                        NUREG-Intended                                                      Aging Management                Table 1 Component Type                    Material      Environment        Requiring                          1801 Vol. 2             Notes Function                                                              Programs                    Item Management                                Item Pressure                                      None            None                VII.I-4      3.3.1-43  408 Bolting                          Carbon steel Air - indoor (ext)                                       (AP-27)                A boundary                                      Loss of material Bolting Integrity Pressure      Stainless                                                            VII.J-15    3.3.1-94  408 Bolting                                        Air - indoor (ext) None            None                (AP-17)                 C boundary      steel Pressure                                      None            None                VII.I-1      3.3.1-43  408 Bolting                          Carbon steel Air - outdoor (ext)                                     (AP-28)                A boundary                                      Loss of material Bolting Integrity Pressure      Stainless                        None            None                        --       --   408 Bolting                                        Air - outdoor (ext)                                                             G boundary      steel                            Loss of material Bolting Integrity Pressure      Stainless                                                            VII.J-15    3.3.1-94  408 Flex hose                                      Air-indoor (ext)    None            None                (AP-17)                 A boundary      steel Pressure      Stainless                        None            None                        --        --   408 Flex hose                                      Treated water (int)                                                             G, 407 boundary      steel                            Loss of material One-Time Inspection None                VII.I-9      3.3.1-58  408 Pressure                                      None                                (A-78)                 A Piping                            Carbon steel Air-outdoor (ext)                   External Surfaces boundary                                      Loss of material Monitoring None                VII.I-8      3.3.1-58  408 Pressure                                      None                                (A-77)                 A Piping                            Carbon steel Air-indoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring
NL-09-079 Page 3 of 51 LRA Figure 2.5-3 showed only the primary offsite power source or the 6.9kV source from the 138kV/6.9kV station auxiliary transformer, which is connected to the Buchanan substation through the Con Edison 138kV feeder.. Figure 2.5-3 is revised as shown in this response to add the secondary offsite power feeder from the 13.8 kV Buchanan substation via the GT autotransformer. As shown in the revised LRA Figure 2.5-3, the 6.9 kV buses receive power from the two independent sources of offsite power via the 138 kV / 6.9 kV station auxiliary transformer or the 13.8 kV / 6.9 kV GT autotransformer. The station auxiliary transformer is connected to the 138 kV Buchanan substation, the primary offsite power source, via switchyard bus and overhead transmission conductors through breaker BT2-6, which is located at the Buchanan substation.
The GT autotransformer is connected to the 13.8 kV Buchanan substation, the secondary offsite power source, via underground medium voltage cable through breaker F3-1, which is located at the Buchanan substation. (Revised LRA Figures 2.5-2 and 2.5-3 were also provided with this RAI response.)Based on discussions with the NRC staff on 12/12/07 and 1/30/08 this RAI response was revised for the IP2 138 kV connection point. RAI 2.5-1 Response Clarification Excerpt (Dated 3/24/2008) (A revised LRA Figure 2.5-2 was also provided with this RAI clarification.) The boundaries described in the RAI 2.5-1 response were determined in accordance with the guidance provided in a staff letter dated April 1, 2002. The following excerpt from the RAI 2.5-1 response discusses this determination. RAI 2.5-1 Response Excerpt (Dated 11/16/2007) The staff position in the letter dated April 1, 2002, "Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout (SBO) Rule (10 CFR 50.63) for License Renewal (10 CFR 54.4(a)(3))" is that the plant system portion of the offsite power system should be included within the scope of license renewal. Specifically, the letter states, NL-09-079  Page 4 of 51"For purposes of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule." Implementation of the staff position requires definition of the offsite power source. The April 1, 2002 letter states: "The offsite power systems of U.S. nuclear power plants consist of a transmission system (grid) component that provides a source of power and a plant system component that connects that power source to a plant's onsite electrical distribution system which powers safety equipment. The staff has historically relied upon the well-distributed, redundant, and interconnected nature of the grid to provide the necessary level of reliability to support nuclear power plant operations." In this discussion, the staff defines the offsite power source as the transmission system or the grid. The staff refers to the well-distributed, redundant, and interconnected nature of the grid. The Buchanan substation, which includes the 345 kV, the 138 kV, and the 13.8 kV sections, is a key element of the well-distributed, redundant and interconnected grid or transmission system that constitutes the offsite power source for IP2 and IP3. The Buchanan substation provides for the interconnection of multiple sources of power and provides dispatch control for a multiple county transmission network. The multiple power sources are interconnected through switchyard bus, transmission conductors, and breakers within the substation. In keeping with the guidance in the letter dated April 1, 2002, the SBO recovery paths from the plant systems to the offsite power system or grid connection are included in scope for license renewal. The 138 kV circuit breaker F1, the 345 kV circuit breaker F7, and the 138 kV circuit breaker F3 are part of the Buchanan Substation, which is part of the well-distributed, redundant and interconnected grid or transmission system that constitutes the offsite power source for IP2 and IP3. In other words, these breakers are part of the transmission system (grid) component that provides a source of power; and not plant system components that connect that power source to the plant's onsite electrical distribution system which powers safety equipment. The Buchanan Substation is not the IP2 or IP3 switchyard. The Buchanan Substation is part of the Con Edison transmission and distribution system, and it provides distribution to Westchester County and the New York City area with 345 kV, 138 kV, and 13.8 kV transmission lines. The Con Edison transmission system does not perform a function that meets the license renewal scoping criteria of 10 CFR 54.4. The breakers conservatively included in scope for the offsite power recovery path are the interface points added to the Buchanan Substation during the construction of IP2 and IP3. As stated in LRA Section 2.5:
NL-09-079  Page 5 of 51In addition to the plant electrical systems, certain switchyard components required to restore offsite power following a station blackout were conservatively included within the scope of license renewal even though those components are not relied on in safety analyses or plant evaluations to perform a function that demonstrates compliance with the Commission's regulations for station blackout (SBO) (10 CFR 50.63). The breakers are shown on LRA Figure 2.5-2 (Amended by letter dated 3/24/2008), and LRA Figure 2.5-3 (Amended by letter dated 11/16/2007). Follow-up RAI 2: Open Item 3.0.3.2.15-1 The purpose of this follow-up request for additional information (RAI) is to request additional information and clarification to help the staff to understand the applicant's May 1, 2009 response to Follow-up RAI 1 for Open Item 3.0.3.2.15-1. Specifically, the staff requests the following:  (a)    In part (a) of the applicant's response, Figures 1 through 4 do not clearly identify the flow path from the refueling cavity liner to the A, B, and C water exit locations.
Therefore, please provide the following additional descriptive information. In an elevation view (similar to Figure 2), cut through each of the exit locations A, B, and C, showing the horizontal and vertical dimension between the entry point through the liner and the exit location. To the extent possible, describe the possible circumferential traverse of the leakage, from the entry point through the liner to the exit location. (b)   The staff requests the applicant to provide the following additional information/clarification regarding the revised license renewal commitments in part (b) of the applicant's response: (1)    The current remediation plan has targeted the 2014 outage for completion. Please identify actions that will be taken if the remediation plan is unsuccessful. (2)    Identify the specific location and number of the concrete core samples (e.g., the three water exit locations) that will be removed and tested (i) during the upcoming 2010 refueling outage, and (ii) at 10 years into the extended period of operation (if a permanent solution for the leakage has not been achieved, in accordance with Entergy's current remediation plan). Define the tests that will be performed, and the objective of each test. (3)    Please advise if the revised commitments in the applicant's May 1, 2009 response include chemical analysis of the leaking water (i) during the upcoming 2010 refueling outage, and (ii) at 10 years into the extended period of operation. Please identify the analyses that will be performed, and the objective of each analysis.
NL-09-079  Page 6 of 51Response for Follow-up RAI 2: Open Item 3.0.3.2.15-1 a. Based on leakage investigations, the reactor refueling cavity begins to leak when the water in the cavity reaches an approximate elevation between 80'- 85'. As can be seen on the attached elevation views of the cavity (Figures 1 thru 4), horizontal weld seams exist between these elevations, but the exact liner leakage points are unknown. We can , however, make the following observations regarding the relationship between the leakage areas in the concrete structure denoted as points A, B and C, and conditions of the cavity liner: 1. Above point A, defects in the CeramAlloy patch along a horizontal weld seam located on the south wall at an elevation between 80'- 85' has been observed. The CeramAlloy patch material that covers several weld seams was a previous attempt to mitigate the cavity leakage. This is a potential cavity liner leak point for the observed leakage on the concrete structure at


point A. 2. Above the exit point denoted as B, defects in a CeramAlloy patch along a horizontal weld seam located at an elevation between 80'- 85' on the south wall has been observed. This patch area is an extension from the area discussed in item 1 above. In addition, the upper internals stand support base is attached to the cavity floor above the vicinity of the observed leakage in the concrete structure at point B. Both these areas in the cavity liner are potential leak point sources for the observed leakage at point B. 3. Above the observed leakage area in the concrete structure denoted as point C, defects in both the CeramAlloy patches along weld seams and potential defects in the weld seams themselves at the north cavity wall have been observed. These defects are located approximately 10-15' above the cavity floor and are potential leak points for the leakage observed at point C. b. The following provides Entergy's response to part (b) of the staff's request. 1. Should the remediation plan for the cavity liner targeted for completion during the 2014 outage be unsuccessful, Entergy will perform additional monitoring to assess the condition of potentially affected structures. To assure continued structural integrity of the reactor refueling cavity reinforced concrete walls, Entergy will perform further core sampling and inspect reinforcing steel at suspect locations as described in item 3. 2. (i) During the upcoming 2010 outage, a total of 3 core bore samples will be taken from the reinforced concrete walls that form the outer shell of the reactor refueling cavity steel liner. The locations of these core bores will be
Attachment 1 NL-09-079 Page 25 of 51 Table 3.4.2-5-4-IP2 City Water System (CYW)
Aging Effect                          NUREG-Intended                                                      Aging Management                  Table 1 Component Type                    Material      Environment        Requiring                            1801 Vol. 2            Notes Function                                                          Programs                      Item Management                                  Item None                          --        --    408 Pressure                                      None            Periodic Surveillance                        G, 407 Piping                            Carbon steel Treated water (int) boundary                                      Loss of material and Preventive Maintenance Pressure      Stainless                                                              VII.J-15     3.3.1-94  408 Piping                                        Air-indoor (ext)    None            None                  (AP-17)                 A boundary      steel None                          --        --    408 Pressure      Stainless                        None                                                          G Piping                                        Air-outdoor (ext)                    External Surfaces boundary      steel                            Loss of material Monitoring Pressure      Stainless                        None            None                          --        --    408 Piping                                        Treated water (int)                                                                G, 407 boundary      steel                            Loss of material One-Time Inspection None                  VII.I-9      3.3.1-58  408 Pressure                                      None                                  (A-78)                 A Sight glass                      Carbon steel Air-outdoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring None                          --        --    408 Pressure                                      None            Periodic Surveillance                        G, 407 Sight glass                      Carbon steel Treated water (int) boundary                                      Loss of material and Preventive Maintenance Pressure                                                                                      --        --    408 Sight glass                      Glass        Air-outdoor (ext)  None            None                                          G boundary Pressure                                                                                      --        --    408 Sight glass                      Glass        Treated water (int) None            None                                          G, 407 boundary Stainless                                                                      --        --    G, 407 Strainer            Filtration                Treated water (int) Loss of material One-Time Inspection Steel


chosen based on the following. Locations in the vicinity of observed liner/liner patch degradation in relative proximity to the observed leak points A, B and C on the concrete structure. Accessibility of suspect areas based on the principle of As Low As Reasonably Achievable (ALARA) and physical interferences.
Attachment 1 NL-09-079 Page 26 of 51 Table 3.4.2-5-4-IP2 City Water System (CYW)
NL-09-079 Page 7 of 51The core samples will be tested and chemically analyzed to determine the effect, if any, past leakage has had on the concrete properties. The objectives of the physical and chemical tests of the concrete core samples are as follows. Determine the compressive strength of concrete. Determine boron and chloride concentration in concrete. Determine pH of concrete. In addition, a petrographic examination will be performed on the core samples to evaluate the cementitious matrix, and, to the extent possible, determine the durability of the concrete. In addition, reinforcing steel in the core sample areas will be exposed and inspected. Visual inspections of the reinforcing steel will be performed to determine the extent of material loss, if any, from the steel as a result of the borated water leakage. 2. (ii) If a solution to the leakage has not been achieved, Entergy will perform core samples and reinforcing steel inspections prior to 10 years into the period of extended operation. Locations of the core samples will be chosen based on the extent and location of the leakage remaining following previous repair efforts. Core samples will be tested and chemically analyzed as discussed under part 2 above. Visual inspections of the reinforcing steel will be performed to determine the extent of material loss, if any, from the steel as a result of the borated water leakage. 3. (I and ii) Revised Commitment 36 includes chemical analysis of water leakage from the refueling cavity. During the upcoming 2010 outage, Entergy will collect water samples from the cavity leak and perform chemical analysis.
Aging Effect                          NUREG-Intended                                                      Aging Management                  Table 1 Component Type                    Material      Environment        Requiring                            1801 Vol. 2            Notes Function                                                          Programs                      Item Management                                  Item Stainless                                                                      --        --    G, 407 Strainer            Filtration                Treated water (ext) Loss of material One-Time Inspection Steel None                  VII.I-8      3.3.1-58  408 Pressure                                      None                                  (A-77)                  A Strainer housing                  Carbon steel Air-indoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring Periodic Surveillance        --        --    408 Pressure                                      None                                                          G, 407 Strainer housing                  Carbon steel Treated water (int)                 and Preventive boundary                                      Loss of material Maintenance Pressure      Copper alloy                                                            V.F-3        3.2.1-53  C Strainer housing                              Air-indoor (ext)    None            None                  (EP-10) boundary      >15% zn Periodic Surveillance        --       --   G, 407 Pressure      Copper alloy Strainer housing                              Treated water (int) Loss of material and Preventive boundary      >15% zn Maintenance Pressure      Copper alloy                                                                    --       --   G, 407 Strainer housing                              Treated water (int) Loss of material Selective Leaching boundary      >15% zn Pressure      Stainless                                                              VII.J-15    3.3.1-94  408 Strainer housing                              Air-indoor (ext)   None            None                  (AP-17)                 A boundary      steel Pressure      Stainless                        None            None                          --        --   408 Strainer housing                              Treated water (int)                                                               G, 407 boundary      steel                            Loss of material One-Time Inspection Pressure      Stainless                        None            None                          --        --    408 Tubing                                        Treated water (int)                                                               G, 407 boundary      steel                            Loss of material One-Time Inspection None                          --        --    408 Pressure      Stainless                        None                                                          G Tubing                                        Air - outdoor (ext)                 External Surfaces boundary      steel                            Loss of material Monitoring
If the leakage has not been stopped, Entergy will collect additional water samples of the leak during the same outage as the core samples are taken no later than 10 years into the period of extended operation. The water that is collected will be analyzed for the following. Boron concentration  pH  Iron  Calcium Results of the analysis will be evaluated to assess the aggressiveness of the leaking fluid to reinforced concrete structures.
NL-09-079  Page 8 of 51 NL-09-079  Page 9 of 51 NL-09-079  Page 10 of 51 NL-09-079  Page 11 of 51 NL-09-079  Page 12 of 51 RAI 3.4.2-2 By letter dated January 27, 2009, Entergy responded to RAI 3.4.2-1, and provided clarifying details regarding the passive, long-lived component types, materials, environments, aging effects and aging management programs for systems, structures and components that support the auxiliary feedwater (AFW) pump room fire event at Indian Point Nuclear Generating Unit No. 2 (IP2) that were not already within the scope of license renewal for 10 CFR 54.4(a)(1) or (a)(2). The staff reviewed the response and determined that the systems contain passive, long-lived components made of materials that when exposed to the stated environments may experience aging effects as described in the GALL Report, which must be managed during the period of extended operation in accordance with 10 CFR 54.21(a)(3).
By letter dated May 1, 2009, Entergy submitted a revised commitment list which included a new commitment (Commitment 39) to install a fixed automatic fire suppression system for IP2 in the AFW pump room which would make the suppression configuration of the room similar to that of the AFW pump room at Unit 3. Because the planned installation is not yet part of the current licensing basis, the staff cannot make a finding consistent with the requirement in 10 CFR 54.29(a). Therefore, the staff requests that the applicant provide information to demonstrate that the effects of aging will be adequately managed so that the intended function(s) will maintained consistent with the current licensing basis for the period of extended operation as required by 10 CFR 54.21(a)(3). Specifically, the staff requests that the applicant list all aging effects and the aging management programs needed to manage the aging effects for the component types provided in the January 27, 2009 letter. Response for RAI 3.4.2-2 As stated in the initial response to RAI 3.4.2-1 in the January 27, 2009 letter, the function


of supporting safe shutdown in the event of a fire in the auxiliary feed pump room is confirmed on an ongoing basis since the required SSCs are performing their intended functions under design basis conditions during normal operation. Performance of intended functions during normal plant operation demonstrates that the systems and components can perform those functions for one hour in the event of a fire in the auxiliary feedwater pump room. Nevertheless, the additional information requested by the staff is provided below in the form of revised tables from the response to RAI 3.4.2-1 provided in the January 27, 2009 letter. This additional information includes aging effects and aging management programs to manage the aging effects for the component types that support the AFW pump room fire event that were not already included in
Attachment 1 NL-09-079 Page 27 of 51 Table 3.4.2-5-4-IP2 City Water System (CYW)
Aging Effect                          NUREG-Intended                                                      Aging Management                  Table 1 Component Type                    Material      Environment        Requiring                            1801 Vol. 2            Notes Function                                                            Programs                      Item Management                                  Item Pressure      Stainless                                                              VII.J-15    3.3.1-94  408 Tubing                                        Air - indoor (ext)  None            None                  (AP-17)                A boundary      steel None                          --        --    408 Pressure                                      None            Periodic Surveillance                        G, 407 Valve body                        Carbon steel Treated water (int) boundary                                      Loss of material and Preventive Maintenance None                  VII.I-9      3.3.1-58  408 Pressure                                      None                                  (A-78)                  A Valve body                        Carbon steel Air - outdoor (ext)                  External Surfaces boundary                                      Loss of material Monitoring None                  VII.I-8      3.3.1-58  408 Pressure                                      None                                  (A-77)                  A Valve body                        Carbon steel Air - indoor (ext)                  External Surfaces boundary                                      Loss of material Monitoring Pressure      Stainless                        None            None                          --        --    408 Valve body                                    Treated water (int)                                                                G, 407 boundary      steel                            Loss of material One-Time Inspection None                          --        --    408 Pressure      Stainless                        None                                                          G Valve body                                    Air - outdoor (ext)                  External Surfaces boundary      steel                            Loss of material Monitoring Pressure      Stainless                                                              VII.J-15    3.3.1-94  408 Valve body                                    Air - indoor (ext)  None            None                  (AP-17)                A boundary      steel


scope and subject to aging management review for 10CFR54.4(a)(1) or (a)(2).These tables identify changes as strikethroughs for deletions and underlines for additions. During the revision of these tables, the following changes to line items in the tables were identified outside of the addition of aging effects and programs. new line items identifying cracking as an aging effect for tubing in the condensate system and loss of material due to selective leaching in heat exchanger tubes for the instrument air system.
Attachment 1 NL-09-079 Page 28 of 51 Table 3.4.2-5-5-IP2 Wash Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-5-IP2 Wash Water System (WW) Components Aging Effect                           NUREG-Intended                                                     Aging Management                   Table 1 Component Type                   Material      Environment         Requiring                            1801 Vol. 2             Notes Function                                                            Programs                      Item Management                               Item Pressure                                     None             None                 VII.I-1     3.3.1-43    408 Bolting                          Carbon steel Air-outdoor (ext)                                         (AP-28)                 A boundary                                     Loss of material Bolting Integrity Pressure     Stainless                        None             None                         --         --     408 Bolting                                      Air-outdoor (ext)                                                                   G boundary     steel                           Loss of material Bolting Integrity Pressure    Stainless                                                               VII.C1-15   3.3.1-79    C Bolting                                      Raw water (ext)     Loss of material Bolting Integrity boundary     steel                                                                  (A-54)
NL-09-079 Page 13 of 51 new line items for component type "strainers" in the city water system and the IP1 station air system  new line items for component type "strainer housings" made of copper alloy >15% zn in the city water system  deleted line items for component type "expansion joint" made of elastomer in the condensate system since elastomer expansion joints are replaced on a specified time period new line items for pump casings made of gray cast iron and stainless steel in the circulating water system  revised line items in the service water system to change environment from "air-outdoor (ext)" to "condensation (ext)" for consistency with other LRA tables  revised line items for environment of "treated water (int)" to include "> 140&deg;F" forhigh temperature aging effects  revised line item for pump casings in the wash water system to change material to "stainless steel" from "carbon steel"  revised line item for pump casings for the river water system to change material to "gray cast iron" from "carbon steel" revised line item for pump casings for the fresh water cooling system to change material to "titanium" from "copper alloy" Replaced Note 408 with the following: 408 The "air - treated" environment is the equivalent of dried air and for the purposes of evaluating aluminum components, the "air - treated"environment is drier than the NUREG-1801 defined "air - indoor uncontrolled".The addition of aging management programs to these tables also resulted in necessary revisions for Appendix A, UFSAR Supplement and Appendix B, Aging Management Programs and Activities which are also provided with this response. The following revised tables are provided in response to RAI 3.4.2-2.
None                         --         --     408 Pressure                                     None             Periodic Surveillance                         G Expansion joint                  Elastomer    Air-outdoor (ext) boundary                                     Cracking        and Preventive Maintenance Change of       Periodic Surveillance       --         --     408 Pressure Expansion joint                 Elastomer   Air-outdoor (ext)   material        and Preventive                                 G boundary properties      Maintenance None                  VII.C1-1     3.3.1-75   408 Pressure                                      None            Periodic Surveillance (AP-75)                 E Expansion joint                  Elastomer    Raw water (int) boundary                                     Cracking        and Preventive Maintenance Change of       Periodic Surveillance VII.C1-1     3.3.1-75    408 Pressure Expansion joint                  Elastomer    Raw water (int)     material        and Preventive       (AP-75)                 E boundary properties      Maintenance
NL-09-079  Page 14 of 51 Table 3.4.2-5-1-IP2 Conventional Closed Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-1-IP2: Conventional Closed Cooling System (CCC)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesHeat exchanger (tubes)  Pressure boundary and heat transferCopper alloy
>15% znTreated water (ext)None Loss of materialNoneWater Chemistry Control - Closed Cooling Water VII.E1-2 (AP-34)3.3.1-51 408 DHeat exchanger (tubes)Heat transferCopper alloy
>15% znTreated water (ext)
FoulingWater Chemistry Control - Closed Cooling Water VII.C2-2 (AP-80)3.3.1-52 408 BHeat exchanger (tubes)Pressure boundaryCopper alloy
>15% znTreated water (ext)
Loss of material Selective Leaching VII.C2-6 (AP-43)3.3.1-84 408 CHeat exchanger (tubes) Pressure boundary and heat transferCopper alloy
>15% znTreated water Raw water (int)None Loss of materialNoneService Water Integrity VII.C1-3(A-65)3.3.1-82 408 CHeat exchanger (tubes)Heat transferCopper alloy
>15% znRaw water (int) Fouling Service Water Integrity VII.C1-6(A-72)3.3.1-83 CHeat exchanger (tubes)Pressure boundaryCopper alloy
>15% znRaw water (int) Loss of material Selective Leaching VII.C1-4(A-66)3.3.1-84 C NL-09-079  Page 15 of 51 Table 3.4.2-5-2-IP2 Condensate System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-2-IP2  Condensate System (COND)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes BoltingPressure boundary Carbon steelAir - indoor (ext) None Loss of materialNoneBolting Integrity VIII.H-4(S-34)3.4.1-22 408 A BoltingPressure boundary Stainless steelAir - indoor (ext) None None VIII.I-10 (SP-12)3.4.1-41 408 CExpansion jointPressure boundary Elastomer Air - indoor (ext) None None-- -- 408--Expansion jointPressure boundary Elastomer Steam (int) None None-- -- 408--Expansion jointPressure boundary Elastomer Treated water (int) None None-- -- 408--Heat exchanger (shell)Pressure boundary Carbon steelTreated water (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-34(S-10)3.4.1-4 408 A, 404Heat exchanger (shell)Pressure boundary Carbon steelAir - indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VIII.H-7(S-29)3.4.1-28 408 AHeat exchanger (shell)Pressure boundary Carbon steelSteam (ext) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.A-16(S-06)3.4.1-2 408 C, 404 NL-09-079  Page 16 of 51Table 3.4.2-5-2-IP2 Condensate System (COND) Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesHeat exchanger (tubes)  Pressure boundary and heat transferTitanium Steam (ext) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary
-- -- 408 FHeat exchanger (tubes)Heat transfer Titanium Steam (ext) FoulingWater Chemistry Control
- Primary & Secondary
-- -- 408 FHeat exchanger (tubes) Pressure boundary and heat transferTitanium Raw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance
-- -- 408 FHeat exchanger (tubes)Heat transfer Titanium Raw water (int) FoulingPeriodic Surveillance and Preventive Maintenance
-- -- 408 FHeat exchanger (tubes)  Pressure boundary and heat transferCopper alloyTreated water (int) None Loss of materialNoneWater Chemistry Control
- Primary & SecondaryVIII.A-5 (SP-61)3.4.1-15 408 D, 404Heat exchanger (tubes)Heat transfer Copper alloyTreated water (int) FoulingWater Chemistry Control
- Primary & Secondary VIII.E-10 (SP-58)3.4.1-9 408 A, 404Heat exchanger (tubes) Pressure boundary and heat transferCopper alloyLube oil (ext) None Loss of materialNone Oil Analysis VIII.G-8 (SP-53)3.4.1-10 408 D, 405Heat exchanger (tubes)Heat transfer Copper alloy Lube oil (ext) Fouling Oil Analysis VIII.G-8 (SP-53)3.4.1-10 408 D, 405Heat exchanger (tubes) Pressure boundary Stainless steel Steam (ext) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.B1-3 (SP-43)3.4.1-37 408 C NL-09-079  Page 17 of 51Table 3.4.2-5-2-IP2  Condensate System (COND)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesHeat exchanger (tubes)Pressure boundary Stainless steel Steam (ext) CrackingWater Chemistry Control
- Primary & Secondary VIII.B1-2 (SP-44)3.4.1-39 408 CHeat exchanger (tubes)Heat transfer Stainless steel Steam (ext) FoulingWater Chemistry Control
- Primary & Secondary
-- -- 408 GHeat exchanger (tubes) Pressure boundary Stainless steelTreated water > 140&deg;F (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-36(S-22)3.4.1-16 408 A, 404Heat exchanger (tubes)Pressure boundary Stainless steelTreated water > 140&deg;F (int)CrackingWater Chemistry Control
- Primary & Secondary VIII.E-30 (SP-17)3.4.1-14 408 C, 404Heat exchanger (tubes)Heat transfer Stainless steelTreated water > 140&deg;F (int)
FoulingWater Chemistry Control
- Primary & Secondary VIII.E-13 (SP-40)3.4.1-9 408 A, 404Heat exchanger (tubes)  Pressure boundary Titanium Treated water (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary
-- -- 408 FHeat exchanger (tubes)Heat transfer Titanium Treated water (int) FoulingWater Chemistry Control
- Primary & Secondary
-- -- 408 FHeat exchanger (tubes) Pressure boundary Titanium Steam (ext) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary
-- -- 408 FHeat exchanger (tubes)Heat transfer Titanium Steam (ext) FoulingWater Chemistry Control
- Primary & Secondary
-- -- 408 F PipingPressure boundary Carbon steelTreated water (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-34(S-10)3.4.1-4 408 A, 404 NL-09-079  Page 18 of 51Table 3.4.2-5-2-IP2  Condensate System (COND)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes PipingPressure boundary Carbon steelTreated water (int)Cracking -
fatigue Metal Fatigue - TLAA VIII.B1-10(S-08)3.4.1-1 408 C PipingPressure boundary Carbon steelAir - indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VIII.H-7(S-29)3.4.1-28 408 A Sight glass Pressure boundary Carbon steelAir - indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VIII.H-7(S-29)3.4.1-28 408 A Sight glass Pressure boundary Carbon steelTreated water (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-34(S-10)3.4.1-4 408 A, 404 Sight glass Pressure boundary Glass Air - indoor (ext) None None VIII.I-5 (SP-9)3.4.1-40 408 A Sight glass Pressure boundary Glass Treated water (int) None None VIII.I-8 (SP-35)3.4.1-40 408 AThermowell Pressure boundary Carbon steelAir - indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VIII.H-7(S-29)3.4.1-28 408 AThermowell Pressure Boundary Carbon steelTreated water (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-34(S-10)3.4.1-4 408 A, 404ThermowellPressure Boundary Carbon steelTreated water (int)Cracking -
fatigue Metal Fatigue - TLAA VIII.B1-10(S-08)3.4.1-1 408 C NL-09-079  Page 19 of 51Table 3.4.2-5-2-IP2  Condensate System (COND)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesThermowell Pressure boundary Stainless steelAir - indoor (ext) None None VIII.I-10 (SP-12)3.4.1-41 408 AThermowell Pressure boundary Stainless steelTreated water > 140&deg;F (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-29 (SP-16)3.4.1-16 408 A, 404ThermowellPressure boundary Stainless steelTreated water > 140&deg;F (int)CrackingWater Chemistry Control
- Primary & Secondary VIII.E-30 (SP-17)3.4.1-14 A, 404ThermowellPressure boundary Stainless steelTreated water > 140&deg;F (int)Cracking -
fatigue Metal Fatigue - TLAA VII.E1-16(A-57)3.3.1-2 C, 406 TubingPressure boundary Stainless steelTreated water > 140&deg;F (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-29 (SP-16)3.4.1-16 408 A, 404 TubingPressure boundary Stainless steelTreated water > 140&deg;F (int)CrackingWater Chemistry Control
- Primary & Secondary VIII.E-30 (SP-17)3.4.1-14 408 A, 404 TubingPressure boundary Stainless steelTreated water > 140&deg;F (int)Cracking -
fatigue Metal Fatigue - TLAA VII.E1-16(A-57)3.3.1-2 408 C, 406 TubingPressure boundary Stainless steelAir - indoor (ext) None None VIII.I-10 (SP-12)3.4.1-41 A Valve body Pressure boundary Carbon steelTreated water (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-34(S-10)3.4.1-4 408 A, 404 Valve bodyPressure boundary Carbon steelTreated water  (int)Cracking -
fatigue Metal Fatigue - TLAA VIII.B1-10(S-08)3.4.1-1 408 C NL-09-079  Page 20 of 51Table 3.4.2-5-2-IP2  Condensate System (COND)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes Valve body Pressure boundary Carbon steelAir - indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VIII.H-7(S-29)3.4.1-28 408 A Valve body Pressure boundary Stainless steelTreated water > 140&deg;F (int) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.E-29 (SP-16)3.4.1-16 408 A, 404 Valve bodyPressure boundary Stainless steelTreated water > 140&deg;F (int)CrackingWater Chemistry Control
- Primary & Secondary VIII.E-30 (SP-17)3.4.1-14 408 A, 404 Valve bodyPressure boundary Stainless steelTreated water > 140&deg;F (int)Cracking -
fatigue Metal Fatigue - TLAA VII.E1-16(A-57)3.3.1-2 408 C, 406 Valve body Pressure boundary Stainless steelAir - indoor (ext) None None VIII.I-10 (SP-12)3.4.1-41 408 A NL-09-079  Page 21 of 51 Table 3.4.2-5-3-IP2 Circulating Water System  Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-3-IP2  Circulating Water System (CIRC)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes BoltingPressure boundary Carbon steel Air - outdoor (ext) None Loss of materialNoneBolting Integrity VII.I-1 (AP-28)3.3.1-43 408 C BoltingPressure boundary Carbon steel Soil (ext) None Loss of materialNoneBuried Piping And Tanks InspectionVIII.E-1(S-01)3.4.1-11 408 C BoltingPressure boundary Carbon steel Raw water (ext) Loss of materialPeriodic Surveillance and Preventive Maintenance VIII.G-36(S-12)3.4.1-8 EExpansion joint  Pressure boundary Elastomer Raw water  (int) NoneCrackingNonePeriodic Surveillance and Preventive Maintenance VII.C1-1 (AP-75)3.3.1-75 408 EExpansion joint Pressure boundary Elastomer Raw water  (int)Change of materialpropertiesPeriodic Surveillance and Preventive Maintenance VII.C1-1 (AP-75)3.3.1-75 408 EExpansion joint  Pressure boundary Elastomer Air -outdoor (ext) NoneCrackingNonePeriodic Surveillance and Preventive Maintenance
-- -- 408 G NL-09-079  Page 22 of 51Table 3.4.2-5-3-IP2  Circulating Water System (CIRC)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesExpansion joint Pressure boundary Elastomer Air -outdoor (ext)Change of materialpropertiesPeriodic Surveillance and Preventive Maintenance
-- -- 408 G PipingPressure boundary Carbon steel Soil (ext) None Loss of materialNoneBuried Piping And Tanks Inspection VIII.E-1(S-01)3.4.1-11 408 C PipingPressure boundary Carbon steel Air outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VIII.H-8(S-41)3.4.1-28 408 A PipingPressure boundary Carbon steel Raw water  (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VIII.G-36(S-12)3.4.1-8 408 EPump casing Pressure boundary Carbon steel Air-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VIII.H-8(S-41)3.4.1-28 408 APump casing Pressure boundary Carbon steel Raw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VIII.G-36(S-12)3.4.1-8 408 EPump casingPressure boundary Carbon steel Raw water (ext) Loss of materialPeriodic Surveillance and Preventive Maintenance VIII.G-36(S-12)3.4.1-8 408 E NL-09-079  Page 23 of 51Table 3.4.2-5-3-IP2  Circulating Water System (CIRC)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesPump casingPressure boundaryStainless steelRaw water (int) Loss of materialPeriodic Surveillance and Preventive Maintenance VIII.E-27 (SP-36)3.4.1-32 EPump casingPressure boundaryStainless steelRaw water (ext) Loss of materialPeriodic Surveillance and Preventive Maintenance VIII.E-27 (SP-36)3.4.1-32 EPump casingPressure boundary Gray cast iron Air-outdoor (ext) Loss of materialExternal Surfaces Monitoring VIII.H-8(S-41)3.4.1-28 APump casingPressure boundary Gray cast iron Raw water (int) Loss of materialPeriodic Surveillance and Preventive Maintenance VIII.G-36(S-12)3.4.1-8 EPump casingPressure boundary Gray cast iron Raw water (int) Loss of material Selective LeachingVIII.A-7 (SP-28)3.4.1-36 CPump casingPressure boundary Gray cast iron Raw water (ext) Loss of materialPeriodic Surveillance and Preventive Maintenance VIII.G-36(S-12)3.4.1-8 EPump casingPressure boundary Gray cast iron Raw water (ext) Loss of material Selective LeachingVIII.A-7 (SP-28)3.4.1-36 C NL-09-079  Page 24 of 51 Table 3.4.2-5-4-IP2 City Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-4-IP2  City Water System (CYW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes BoltingPressure boundary Carbon steelAir - indoor (ext) None Loss of materialNoneBolting Integrity VII.I-4 (AP-27)3.3.1-43 408 A BoltingPressure boundary Stainless steelAir - indoor (ext) None None VII.J-15 (AP-17)3.3.1-94 408 C BoltingPressure boundary Carbon steelAir - outdoor (ext) None Loss of materialNoneBolting Integrity VII.I-1 (AP-28)3.3.1-43 408 A BoltingPressure boundary Stainless steelAir - outdoor (ext) None Loss of materialNoneBolting Integrity
-- -- 408 G Flex hose Pressure boundary Stainless steelAir-indoor (ext) None None VII.J-15 (AP-17)3.3.1-94 408 A Flex hose Pressure boundary Stainless steelTreated water (int) None Loss of material Non e One-Time Inspection
-- -- 408 G, 407 PipingPressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 A PipingPressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-8(A-77)3.3.1-58 408 A NL-09-079  Page 25 of 51Table 3.4.2-5-4-IP2  City Water System (CYW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes PipingPressure boundary Carbon steelTreated water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance
-- -- 408 G, 407 PipingPressure boundary Stainless steelAir-indoor (ext) None None VII.J-15 (AP-17)3.3.1-94 408 A PipingPressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G PipingPressure boundary Stainless steelTreated water (int)
None Loss of materialNone One-Time Inspection
-- -- 408 G, 407 Sight glass Pressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 A Sight glass Pressure boundary Carbon steelTreated water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance
-- -- 408 G, 407 Sight glass Pressure boundary Glass Air-outdoor (ext) None  None
-- -- 408 G Sight glass Pressure boundary Glass Treated water (int) None  None
-- -- 408 G, 407 Strainer Filtration Stainless SteelTreated water (int) Loss of material One-Time Inspection
-- -- G, 407 NL-09-079  Page 26 of 51Table 3.4.2-5-4-IP2  City Water System (CYW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes Strainer Filtration Stainless SteelTreated water (ext)
Loss of material One-Time Inspection
-- -- G, 407Strainer housing Pressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-8(A-77)3.3.1-58 408 AStrainer housing Pressure boundary Carbon steelTreated water (int) None Loss of materialPeriodic Surveillance and Preventive Maintenance
-- -- 408 G, 407Strainer housingPressure boundaryCopper alloy
>15% znAir-indoor (ext) None None V.F-3 (EP-10)3.2.1-53 CStrainer housingPressure boundaryCopper alloy
>15% znTreated water (int) Loss of materialPeriodic Surveillance and Preventive Maintenance
-- -- G, 407Strainer housingPressure boundaryCopper alloy
>15% znTreated water (int) Loss of material Selective Leaching
-- -- G, 407Strainer housing Pressure boundary Stainless steelAir-indoor (ext) None  None VII.J-15 (AP-17)3.3.1-94 408 AStrainer housing Pressure boundary Stainless steelTreated water (int) None Loss of materialNone One-Time Inspection
-- -- 408 G, 407 TubingPressure boundary Stainless steelTreated water (int) None Loss of materialNone One-Time Inspection
-- -- 408 G, 407 TubingPressure boundary Stainless steelAir - outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G NL-09-079  Page 27 of 51Table 3.4.2-5-4-IP2  City Water System (CYW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes TubingPressure boundary Stainless steelAir - indoor (ext) None None VII.J-15 (AP-17)3.3.1-94 40 8 A Valve body Pressure boundary Carbon steelTreated water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance
-- -- 408 G, 407 Valve body Pressure boundary Carbon steelAir - outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 A Valve body Pressure boundary Carbon steelAir - indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-8(A-77)3.3.1-58 408 A Valve body Pressure boundary Stainless steelTreated water (int) None Loss of materialNone One-Time Inspection
-- -- 408 G, 407 Valve body Pressure boundary Stainless steelAir - outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G Valve body Pressure boundary Stainless steelAir - indoor (ext) None None VII.J-15 (AP-17)3.3.1-94 408 A NL-09-079  Page 28 of 51 Table 3.4.2-5-5-IP2 Wash Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-5-IP2  Wash Water System (WW) Components  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes BoltingPressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneBolting Integrity VII.I-1 (AP-28)3.3.1-43 408 A BoltingPressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneBolting Integrity
-- -- 408 G BoltingPressure boundary Stainless steelRaw water (ext)
Loss of material Bolting Integrity VII.C1-15(A-54)3.3.1-79 CExpansion joint Pressure boundary Elastomer Air-outdoor (ext) NoneCrackingNonePeriodic Surveillance and Preventive Maintenance
-- -- 408 GExpansion jointPressure boundary Elastomer Air-outdoor (ext)Change of materialpropertiesPeriodic Surveillance and Preventive Maintenance
-- -- 408 GExpansion joint Pressure boundary Elastomer Raw water (int) NoneCrackingNonePeriodic Surveillance and Preventive Maintenance VII.C1-1 (AP-75)3.3.1-75 408 EExpansion jointPressure boundary Elastomer Raw water (int)Change of materialpropertiesPeriodic Surveillance and Preventive Maintenance VII.C1-1 (AP-75)3.3.1-75 408 E NL-09-079  Page 29 of 51Table 3.4.2-5-5-IP2  Wash Water System (WW) Components  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes Flex hose Pressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G Flex hose Pressure boundary Stainless steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-15(A-54)3.3.1-79 408 ENozzles Pressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 ANozzles Pressure boundary Carbon steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-19(A-38)3.3.1-76 408 E PipingPressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 A PipingPressure boundary Carbon steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-19(A-38)3.3.1-76 408 E PipingPressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G NL-09-079  Page 30 of 51Table 3.4.2-5-5-IP2  Wash Water System (WW) Components  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes PipingPressure boundary Stainless steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-15(A-54)3.3.1-79 408 EPump casing  Pressure boundary Carbon steel Stainless steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 GPump casing Pressure boundary Carbon steel Stainless steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-15(A-54)3.3.1-79 408 EPump casingPressure boundary Stainless steelRaw water (ext)
Loss of materialPeriodic Surveillance and Preventive Maintenance VII.C1-15(A-54)3.3.1-79 408 E TubingPressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G TubingPressure boundary Stainless steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-15(A-54)3.3.1-79 408 E Valve body Pressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 A NL-09-079  Page 31 of 51Table 3.4.2-5-5-IP2  Wash Water System (WW) Components  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes Valve body Pressure boundary Carbon steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-19(A-38)3.3.1-76 408 E Valve body Pressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G Valve body Pressure boundary Stainless steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-15(A-54)3.3.1-79 408 E NL-09-079  Page 32 of 51 Table 3.4.2-5-6-IP2 Feedwater System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-6-IP2  Feedwater System (FW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesHeat exchanger (tubes)  Pressure boundary Stainless steel Steam (ext) None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.B1-3 (SP-43)3.4.1-37 408 CHeat exchanger (tubes)Pressure boundary Stainless steel Steam (ext) CrackingWater Chemistry Control
- Primary & Secondary VIII.B1-2 (SP-44)3.4.1-39 408 CHeat exchanger (tubes) Pressure boundary Stainless steelTreated water > 140&deg;F (int)None Loss of materialNoneWater Chemistry Control
- Primary & Secondary VIII.D1-4 (SP-16)3.4.1-16 408 A, 404Heat exchanger (tubes)Pressure boundary Stainless steelTreated water
> 140&deg;F (int)CrackingWater Chemistry Control
- Primary & Secondary VIII.D1-5 (SP-17)3.4.1-14 408 C, 404 NL-09-079  Page 33 of 51 Table 3.4.2-5-7-IP2 Instrument Air System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-7-IP2  Instrument Air System (IA)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes BoltingPressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneBolting Integrity VII.I-1 (AP-28)3.3.1-43 408 A BoltingPressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneBolting Integrity
-- -- 408 GHeat exchanger (tubes)  Pressure boundary and heat transferCopper alloy


>15% znCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.G-9 (AP-78)3.3.1-28 408 EHeat exchanger (tubes)Heat transferCopper alloy
Attachment 1 NL-09-079 Page 29 of 51 Table 3.4.2-5-5-IP2 Wash Water System (WW) Components Aging Effect                          NUREG-Intended                                                    Aging Management                  Table 1 Component Type                    Material      Environment      Requiring                            1801 Vol. 2              Notes Function                                                          Programs                      Item Management                                Item None                        --        --    408 Pressure    Stainless                      None Flex hose                                    Air-outdoor (ext)                  External Surfaces                              G boundary    steel                          Loss of material Monitoring None                  VII.C1-15   3.3.1-79    408 Pressure    Stainless                      None            Periodic Surveillance (A-54)                  E Flex hose                                    Raw water (int) boundary    steel                          Loss of material and Preventive Maintenance None                 VII.I-9      3.3.1-58    408 Pressure                                    None Nozzles                          Carbon steel Air-outdoor (ext)                  External Surfaces    (A-78)                  A boundary                                    Loss of material Monitoring None                  VII.C1-19    3.3.1-76    408 Pressure                                    None            Periodic Surveillance (A-38)                  E Nozzles                          Carbon steel Raw water (int) boundary                                    Loss of material and Preventive Maintenance None                  VII.I-9     3.3.1-58    408 Pressure                                    None Piping                          Carbon steel Air-outdoor (ext)                  External Surfaces    (A-78)                   A boundary                                    Loss of material Monitoring None                  VII.C1-19    3.3.1-76    408 Pressure                                    None            Periodic Surveillance (A-38)                   E Piping                          Carbon steel Raw water (int) boundary                                    Loss of material and Preventive Maintenance None                        --         --     408 Pressure    Stainless                      None Piping                                        Air-outdoor (ext)                 External Surfaces                              G boundary     steel                          Loss of material Monitoring
>15% znCondensation (int) FoulingPeriodic Surveillance and Preventive Maintenance
-- -- 408 GHeat exchanger (tubes) Pressure boundary and heat transferCopper alloy


>15% znTreated Water (ext) None Loss of materialNoneWater Chemistry Control - Closed Cooling Water VII.C2-4 (AP-12)3.3.1-51 408 DHeat exchanger (tubes) Pressure boundary  Copper alloy
Attachment 1 NL-09-079 Page 30 of 51 Table 3.4.2-5-5-IP2 Wash Water System (WW) Components Aging Effect                           NUREG-Intended                                                    Aging Management                   Table 1 Component Type                   Material      Environment       Requiring                            1801 Vol. 2             Notes Function                                                          Programs                      Item Management                                Item None                 VII.C1-15   3.3.1-79    408 Pressure     Stainless                     None             Periodic Surveillance (A-54)                   E Piping                                        Raw water (int) boundary    steel                          Loss of material and Preventive Maintenance Carbon steel                                   None                         --         --     408 Pressure                                   None                                                           G Pump casing                      Stainless   Air-outdoor (ext)                 External Surfaces boundary                                   Loss of material steel                                           Monitoring None                 VII.C1-15   3.3.1-79   408 Carbon steel Pressure                                   None             Periodic Surveillance (A-54)                   E Pump casing                      Stainless   Raw water (int) boundary                                    Loss of material and Preventive steel Maintenance Periodic Surveillance VII.C1-15   3.3.1-79   408 Pressure    Stainless Pump casing                                  Raw water (ext)   Loss of material and Preventive        (A-54)                   E boundary     steel Maintenance None                         --         --     408 Pressure     Stainless                      None Tubing                                        Air-outdoor (ext)                 External Surfaces                             G boundary     steel                         Loss of material Monitoring None                 VII.C1-15   3.3.1-79   408 Pressure     Stainless                     None             Periodic Surveillance (A-54)                   E Tubing                                        Raw water (int) boundary     steel                          Loss of material and Preventive Maintenance None                 VII.I-9      3.3.1-58    408 Pressure                                   None Valve body                      Carbon steel Air-outdoor (ext)                 External Surfaces     (A-78)                   A boundary                                   Loss of material Monitoring
>15% znTreated Water (ext) None Loss of materialNone Selective Leaching VII.C2-6 (AP-43)3.3.1-84 408 CHeat exchanger (tubes)Heat transferCopper alloy
>15% znTreated Water (ext)FoulingWater Chemistry Control - Closed Cooling Water VII.C2-2 (AP-80)3.3.1-52 408 D NL-09-079 Page 34 of 51Table 3.4.2-5-7-IP2 Instrument Air System (IA) Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes TubingPressure boundary Copper alloyAir - indoor (ext) None None V.F-3 (EP-10)3.2.1-53 408 C TubingPressure boundary Copper alloyAir - treated (int) None None VII.J-3 (AP-8)3.3.1-98 A, 408 TubingPressure boundary Stainless steelAir - indoor (ext) None None VII.J-15 (AP-17)3.3.1-94 408 A TubingPressure boundary Stainless steelAir - treated (int) None None VII.J-18 (AP-20)3.3.1-98 A, 408 PipingPressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 A PipingPressure boundary Carbon steelAir-treated (int) None None VII.J-22 (AP-4)3.3.1-98 A, 408 PipingPressure boundary Stainless steelAir-indoor (ext) None None VII.J-15 (AP-17)3.3.1-94 408 A PipingPressure boundary Stainless steelAir-treated (int) None None VII.J-18 (AP-20)3.3.1-98 A, 408 Valve body Pressure boundary Copper alloyAir - indoor (ext) None None V.F-3 (EP-10)3.2.1-53 408 C Valve body Pressure boundary Copper alloyAir - treated (int) None None VII.J-3 (AP-8)3.3.1-98 A, 408 Valve body Pressure boundary Copper alloy
>15% zn Air - indoor (ext) None None V.F-3 (EP-10)3.2.1-53 408 C Valve body Pressure boundary Copper alloy
>15% zn Air - treated (int) None None VII.J-3 (AP-8)3.3.1-98 A, 408 NL-09-079  Page 35 of 51Table 3.4.2-5-7-IP2  Instrument Air System (IA)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes Valve body Pressure boundary Carbon steelAir - indoor (ext) None Loss of material No neExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 A Valve body Pressure boundary Carbon steelAir - treated (int) None None VII.J-22 (AP-4)3.3.1-98 A, 408 Valve body Pressure boundary Stainless steelAir - indoor (ext) None None VII.J-15 (AP-17)3.3.1-94 408 A Valve body Pressure boundary Stainless steelAir - treated (int) None None VII.J-18 (AP-20)3.3.1-98 A, 408 NL-09-079  Page 36 of 51 Table 3.4.2-5-8-IP2 Instrument Air Closed Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-8-IP2  Instrument Air Closed Cooling System (IACC)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesHeat exchanger(tubes)Pressure boundaryCopper > 15% Zn (inhibited)Raw water (int)
Loss of material Service Water Integrity VII.C1-3 A-65)3.3.1-82 408 CHeat exchanger (tubes)  Heat transfer Copper > 15% Zn (inhibited) Raw water  (int) None FoulingNoneService Water Integrity VII.C1-6(A-72)3.3.1-83 408 CHeat exchanger (tubes)Pressure boundaryCopper > 15% Zn (inhibited)Treated water (ext)
Loss of materialWater Chemistry Control - Closed Cooling Water VII.E1-2 (AP-34)3.3.1-51 408 DHeat exchanger (tubes) Heat transfer Copper > 15% Zn (inhibited) Treated water (ext)None FoulingNoneWater Chemistry Control - Closed Cooling Water VII.C2-2 (AP-80)3.3.1-52 408 D NL-09-079  Page 37 of 51 Table 3.4.2-5-9-IP2 Service Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-9-IP2  Service Water System (SW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes BoltingPressure boundary Carbon steel Air-outdoor (ext)Condensation (ext)None Loss of materialNoneBolting Integrity VII.D-1(A-103)3.3.1-44 408 C BoltingPressure boundary Stainless steel Air-outdoor (ext)Condensation (ext) None Loss of materialNoneBolting Integrity VII.F1-1(A-09)3.3.1-27 408 ENozzles Pressure boundary Carbon steel Air-outdoor (ext)Condensation (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-11(A-81)3.3.1-58 408 ANozzles Pressure boundary Carbon steelRaw water (int) None Loss of materialNoneService Water Integrity VII.C1-19(A-38)3.3.1-76 408 A PipingPressure boundary Carbon steel Air-outdoor (ext)Condensation (ext)None Loss of materialNoneExternal Surfaces Monitoring VII.I-11(A-81)3.3.1-58 408 A PipingPressure boundary Carbon steelRaw water (int) None Loss of materialNoneService Water Integrity VII.C1-19(A-38)3.3.1-76 408 A PipingPressure boundary Stainless steel Air-outdoor (ext)Condensation (ext)None Loss of materialNoneExternal Surfaces Monitoring VII.F1-1(A-09)3.3.1-27 408 E NL-09-079  Page 38 of 51Table 3.4.2-5-9-IP2  Service Water System (SW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes PipingPressure boundary Stainless steelRaw water (int) None Loss of materialNoneService Water Integrity VII.C1-15(A-54)3.3.1-79 408 A TubingPressure boundary Copper alloy Air-outdoor (ext)Condensation (ext)  None Loss of materialNoneExternal Surfaces Monitoring VII.F1-16(A-46)3.3.1-25 408 E TubingPressure boundary Copper alloyRaw water (int) None Loss of materialNoneService Water Integrity VII.C1-9(A-44)3.3.1-81 408 A TubingPressure boundary Stainless steel Air-outdoor (ext)Condensation (ext)  None Loss of materialNoneExternal Surfaces Monitoring VII.F1-1(A-09)3.3.1-27 408 E TubingPressure boundary Stainless steelRaw water (int) None Loss of materialNoneService Water Integrity VII.C1-15(A-54)3.3.1-79 408 A Valve body Pressure boundary Carbon steel Air-outdoor (ext)Condensation (ext)None Loss of materialNoneExternal Surfaces Monitoring VII.I-11(A-81)3.3.1-58 408 A Valve body Pressure boundary Carbon steelRaw water (int) None Loss of materialNoneService Water Integrity VII.C1-19(A-38)3.3.1-76 408 A Valve body Pressure boundary Stainless steel Air-outdoor (ext)Condensation (ext)None Loss of materialNoneExternal Surfaces Monitoring VII.F1-1(A-09)3.3.1-27 408 E Valve body Pressure boundary Stainless steelRaw water (int) None Loss of materialNoneService Water Integrity VII.C1-15(A-54)3.3.1-79 408 A NL-09-079  Page 39 of 51 Table 3.4.2-5-10-IP2 Lube Oil System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-10-IP2  Lube Oil System (LO)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesHeat exchanger tubesPressure boundary and heat transferTitanium Lube oil (int) None Loss of materialNone Oil Analysis
-- -- 408 FHeat exchanger tubesHeat transfer Titanium Lube oil (int) Fouling Oil Analysis
-- -- 408 FHeat exchanger tubesPressure boundary and heat transferTitanium Raw water (ext) None Loss of materialNoneService Water Integrity
-- -- 408 FHeat exchanger tubesHeat transfer Titanium Raw water (ext) Fouling Service Water Integrity
-- -- 408 F NL-09-079  Page 40 of 51 Table 3.4.2-5-11-IP2 River Water Service System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management ReviewTable 3.4.2-5-11-IP2  River Water Service System (RW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes BoltingPressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneBolting Integrity VII.I-1 (AP-28)3.3.1-43 408 A BoltingPressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneBolting Integrity
-- -- 408 G PipingPressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 A PipingPressure boundary Carbon steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-19(A-38)3.3.1-76 408 EPump casing Pressure boundary Carbon steel Gray cast ironAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 APump casing Pressure boundary Carbon steel Gray cast ironRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-19(A-38)3.3.1-76 408 E NL-09-079  Page 41 of 51Table 3.4.2-5-11-IP2  River Water Service System (RW)  Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesPump casingPressure boundary Carbon steel Gray cast ironRaw water (int) Loss of material Selective Leaching VII.C1-11(A-51)3.3.1-85 A TubingPressure boundary Stainless steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G TubingPressure boundary Stainless steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-15(A-54)3.3.1-79 408 E Valve body Pressure boundary Carbon steelAir-outdoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.I-9(A-78)3.3.1-58 408 A Valve body Pressure boundary Carbon steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-19(A-38)3.3.1-76 408 E Valve body Pressure boundary Stainless steelAir-outdoor (ext)
Non e Loss of materialNoneExternal Surfaces Monitoring
-- -- 408 G Valve body Pressure boundary Stainless steelRaw water (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.C1-15(A-54)3.3.1-79 408 E NL-09-079  Page 42 of 51 Table 3.4.2-5-12-IP2 Fresh Water Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-12-IP2  Fresh Water Cooling (FWC) System Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item NotesHeat exchanger (tubes)  Heat transfer and p Pressure boundary Copper alloy TitaniumRaw water (int)  None Loss of materialNonePeriodic Surveillance and Preventive Maintenance
-- -- 408 FHeat exchanger (tubes)Heat transfer  Titanium Raw water (int) FoulingPeriodic Surveillance and Preventive Maintenance
-- -- FHeat exchanger (tubes) Heat transfer and p Pressure boundary Copper alloy TitaniumTreated Water (ext) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance
-- -- 408 FHeat exchanger (tubes)Heat transfer  TitaniumTreated Water (ext)FoulingPeriodic Surveillance and Preventive Maintenance
-- -- F NL-09-079  Page 43 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management ReviewTable 3.4.2-5-13-IP2  IP1 Station Air (SA) System Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes BoltingPressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneBolting Integrity VII.I-4 (AP-27)3.3.1-43 408 A BoltingPressure boundary Stainless steelAir-indoor (ext) NoneNone VII.J-15 (AP-17)3.3.1-94 408 AFilter housing Pressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 AFilter Housing Pressure boundary Carbon steelCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.D-2(A-26)3.3.1-53 408 E PipingPressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 A PipingPressure boundary Carbon steelCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.D-2(A-26)3.3.1-53 408 E PipingPressure boundary Stainless steelAir-indoor (ext) NoneNone VII.J-15 (AP-17)3.3.1-94 408 A NL-09-079  Page 44 of 51Table 3.4.2-5-13-IP2  IP1 Station Air (SA) System Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes PipingPressure boundary Stainless steelCondensation (int) None Loss of materialNone One-Time Inspection VII.D-4 (AP-81)3.3.1-54 408 E Strainer Filtration Stainless steelCondensation (int) None Loss of materialNone One-Time Inspection VII.D-4 (AP-81)3.3.1-54 4 08 E Strainer Filtration Stainless steelCondensation (ext)None Loss of materialNone One-Time Inspection VII.D-4 (AP-81)3.3.1-54 408 EStrainer housing Pressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 AStrainer housing Pressure boundary Carbon steelCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.D-2(A-26)3.3.1-53 408 E TankPressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 A TankPressure boundary Carbon steelCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.D-2(A-26)3.3.1-53 408 E TubingPressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 A NL-09-079  Page 45 of 51Table 3.4.2-5-13-IP2  IP1 Station Air (SA) System Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes TubingPressure boundary Carbon steelCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.D-2(A-26)3.3.1-53 408 E TubingPressure boundary Stainless steelAir-indoor (ext) NoneNone VII.J-15 (AP-17)3.3.1-94 408 A TubingPressure boundary Stainless steelCondensation (int) None Loss of materialNone One-Time Inspection VII.D-4 (AP-81)3.3.1-54 408 E TubingPressure boundary Copper alloyAir-indoor (ext) NoneNone V.F-3 (EP-10)3.2.1-53 408 C TubingPressure boundary Copper alloyCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.G-9 (AP-78)3.3.1-28 408 E TrapPressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 A TrapPressure boundary Carbon steelCondensation (int) None Loss of material NonePeriodic Surveillance and Preventive Maintenance VII.D-2(A-26)3.3.1-53 408 E Valve body Pressure boundary Carbon steelAir-indoor (ext) None Loss of materialNoneExternal Surfaces Monitoring VII.D-3(A-80)3.3.1-57 408 A NL-09-079  Page 46 of 51Table 3.4.2-5-13-IP2  IP1 Station Air (SA) System Component Type Intended FunctionMaterial Environment Aging Effect RequiringManagement Aging Management ProgramsNUREG- 1801 Vol. 2 Item Table 1 Item Notes Valve body Pressure boundary Carbon steelCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.D-2(A-26)3.3.1-53 408 E Valve body Pressure boundary Stainless steelAir-indoor (ext) NoneNone VII.J-15 (AP-17)3.3.1-94 408 A Valve body Pressure boundary Stainless steelCondensation (int) None Loss of materialNone One-Time Inspection VII.D-4 (AP-81)3.3.1-54 408 E Valve body Pressure boundary Copper alloyAir-indoor (ext) NoneNone V.F-3 (EP-10)3.2.1-53 408 C Valve body Pressure boundary Copper alloyCondensation (int) None Loss of materialNonePeriodic Surveillance and Preventive Maintenance VII.G-9 (AP-78)3.3.1-28 408 E NL-09-079  Page 47 of 51As a result of the previous table changes, the following changes are required to Appendix A (Changes are shown as strikethroughs for deletions and underlines for additions
).A.2.1.26 One-Time Inspection Program One-time inspection activities on the following confirm that loss of material is not occurring or is so insignificant that an aging management program is not warranted.
*internal surfaces of stainless steel drain piping,.piping elements and components containing raw water (drain water) internal surfaces of stainless steel piping, piping elements and components in the station air containment penetration exposed to condensation Internal surfaces of stainless steel piping, tubing, strainers and valve bodies in the IP1 station air system exposed to condensation internal surfaces of stainless steel EDG starting air tanks, piping, piping elements and components exposed to condensation internal surfaces of carbon steel and stainless steel tanks, piping, piping elements and components in the RCP oil collection system exposed to lube oil internal surfaces of auxiliary feedwater system stainless steel piping, piping elements and components exposed to treated water from the city water system A.2.1.28 Periodic Surveillance and Preventive Maintenance Program The Periodic Surveillance and Preventive Maintenance Program is an existing program that includes periodic inspections and tests that manage aging effects not managed by other aging management programs. In addition to specific activities in the plant's preventive maintenance program and surveillance program, the Periodic Surveillance and Preventive Maintenance Program includes enhancements to add new activities. The preventive maintenance and surveillance testing activities are generally implemented through repetitive tasks or routine monitoring of plant operations. Surveillance testing and periodic inspections using visual or other non-destructive examination techniques verify that the following components are capable of performing their intended function.
reactor building cranes (polar and manipulator), crane rails, and girders, and refueling platform recirculation pump motor cooling coils and housing city water system components charging pump casings plant drain components and backwater valves station air containment penetration piping HVAC duct flexible connections HVAC stored portable blowers and flexible trunks EDG exhaust components NL-09-079  Page 48 of 51 EDG duct flexible connections EDG air intake and aftercooler components EDG air start components EDG cooling water makeup supply valves security generator exhaust components security generator radiator tubes SBO/Appendix R diesel exhaust components SBO/Appendix R diesel turbochargers and aftercoolers SBO/Appendix R diesel cooling water heat exchangers SBO/Appendix R diesel fuel oil cooler diesel fuel oil trailer transfer tank and associated  valves auxiliary feedwater components containment cooling duct flexible connections containment cooling fan units internals control room HVAC condensers and evaporators control room HVAC ducts and drip pans control room HVAC duct flexible connections circulating water, city water, intake structure system, emergency diesel generator, fresh water cooling, instrument air, integrated liquid waste handling, lube oil, miscellaneous,  radiation monitoring, river water, station air, waste disposal, wash water , and water treatment plant system piping, piping components, and piping elements pressurizer relief tank main steam safety valve tailpipes atmospheric dump valve silencers feedwater system sight glass housings off-site power feeder, 138 kV underground transmission cable main condenser tube internal surfaces instrument air aftercooler tube internal surfaces fresh water/river water heat exchanger internal and external surfacesA.2.1.39 Water Chemistry Control - Closed Cooling Water Program The Water Chemistry Control - Closed Cooling Water Program is an existing program that includes preventive measures that manage loss of material, cracking, or fouling for components in closed cooling water systems (component cooling water (CCW), instrument air (IP2 only), conventional closed cooling  (CCC), instrument air closed cooling (IACC), emergency diesel generator cooling, security generator cooling, and SBO/Appendix  R diesel generator cooling). These chemistry activities provide for monitoring and controlling closed cooling water chemistry using procedures and processes based on EPRI guidance for closed cooling water chemistry.
NL-09-079  Page 49 of 51As a result of the previous table changes, the following changes are required to Appendix B (Changes are shown as strikethroughs for deletions and underlines for additions
).B.1.27 One-Time Inspection Program DescriptionOne-time inspection activities on the following confirm that loss of material is not occurring or is so insignificant that an aging management program is not warranted. Internal surfaces of drain system stainless steel piping, tubing, and valve bodies exposed to raw water (drain water) in EDG buildings, primary auxiliary buildings, and electrical tunnels. Also included are drains in the IP3 auxiliary feed pump building  Internal surfaces of stainless steel valve bodies in the station air containment penetration exposed to condensation  Internal surfaces of stainless steel piping, tubing, strainers and valve bodies in the IP1 station air system exposed to condensation Internal surfaces of stainless steel piping, strainers, strainer housings, tanks, tubing and valve bodies exposed to condensation in the emergency diesel generator (EDG) starting air subsystem B.1.29Periodic Surveillance and Preventive Maintenance Program Description The Periodic Surveillance and Preventive Maintenance Program is an existing program that includes periodic inspections and tests that manage aging effects not managed by other aging management programs. In addition to specific activities in the plant's preventive maintenance program and surveillance program, the Periodic Surveillance and Preventive Maintenance Program includes enhancements to add new activities. The preventive maintenance and surveillance testing activities are generally implemented through repetitive tasks or routine monitoring of plant operations. Credit for program activities has been taken in the aging management review of the following systems and structures. All activities are new unless otherwise noted.Reactor building Use visual or other NDE techniques to inspect the surface condition of carbon steel components of the reactor building cranes (polar and manipulator), crane rails, and girders, and refueling platform to manage loss of material. [existing] Containment spray system IP3: Perform wall thickness measurements of the NaOH tank to manage loss of material. [existing]  IP3: Perform visual or other NDE inspections on the inside NL-09-079  Page 50 of 51surfaces of a representative sample of stainless steel components exposed to sodium hydroxide to manage loss of


material and cracking. Safety injection system Perform operability testing to manage fouling for recirculation pump motor cooling coils. Use visual or other NDE techniques to internally inspect the recirculation pump cooler housing to manage loss of  
Attachment 1 NL-09-079 Page 31 of 51 Table 3.4.2-5-5-IP2 Wash Water System (WW) Components Aging Effect                          NUREG-Intended                                                    Aging Management                  Table 1 Component Type                    Material      Environment      Requiring                            1801 Vol. 2              Notes Function                                                          Programs                      Item Management                                Item None                  VII.C1-19    3.3.1-76    408 Pressure                                    None            Periodic Surveillance (A-38)                  E Valve body                      Carbon steel Raw water (int) boundary                                    Loss of material and Preventive Maintenance None                        --        --    408 Pressure    Stainless                      None Valve body                                    Air-outdoor (ext)                  External Surfaces                              G boundary    steel                          Loss of material Monitoring None                  VII.C1-15    3.3.1-79    408 Pressure    Stainless                      None            Periodic Surveillance (A-54)                  E Valve body                                    Raw water (int) boundary    steel                          Loss of material and Preventive Maintenance


material.Main steam system Use visual or other NDE techniques to inspect a representative sample of the internal surfaces of the carbon steel main steam safety valve tailpipes and atmospheric dump valve silencers to manage loss of material. Circulating water system Use visual or other NDE techniques to inspect a representative sample of the internals of circulating water piping, piping elements and components exposed to raw water to manage loss of material, cracking and change in material properties.City water system Use visual or other NDE techniques to inspect a representative sample of the internals of city water piping, piping elements, and components exposed to treated water (city water) to manage loss of material.
Attachment 1 NL-09-079 Page 32 of 51 Table 3.4.2-5-6-IP2 Feedwater System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-6-IP2 Feedwater System (FW)
Condensate system Use visual or other NDE techniques to inspect a representative sample of the internal surfaces of the main condenser tubes exposed to raw water to manage loss of material and fouling.River water system Use visual or other NDE techniques to inspect a representative sample of the internals of river water piping, piping elements and components exposed to raw water to manage loss of material and cracking.Fresh water cooling system Use visual or other NDE techniques to inspect a representative sample of the internal and external surfaces of the fresh water/river water heat exchanger tubes exposed to raw water to manage loss of material and fouling.
Aging Effect                            NUREG-Intended                                                    Aging Management                    Table 1 Component Type                    Material    Environment        Requiring                              1801 Vol. 2            Notes Function                                                          Programs                          Item Management                                  Item None                    VIII.B1-3    3.4.1-37    408 Heat exchanger      Pressure    Stainless                      None Steam (ext)                          Water Chemistry Control (SP-43)                  C (tubes)            boundary    steel                          Loss of material
NL-09-079 Page 51 of 51 Wash water system Use visual or other NDE techniques to inspect a representative sample of the internals of wash water piping, piping elements and components exposed to raw water to manage loss of material, cracking and change in material properties.
                                                                                - Primary & Secondary Heat exchanger      Pressure    Stainless                                      Water Chemistry Control VIII.B1-2    3.4.1-39    408 Steam (ext)        Cracking (tubes)            boundary    steel                                          - Primary & Secondary (SP-44)                    C None                    VIII.D1-4    3.4.1-16    408 Heat exchanger      Pressure    Stainless Treated water       None Water Chemistry Control (SP-16)                  A, 404 (tubes)            boundary    steel      > 140&deg;F (int)      Loss of material
Chemical and volume control system During quarterly surveillances perform visual inspection of the external surface of charging pump casings to manage cracking. [existing] Plant drains Use visual or other NDE techniques to inspect a representative sample of the internals of carbon steel plant drain piping, piping elements, and components to manage loss of material. IP2: Use visual or other NDE techniques to inspect the internals of  backwater valves to manage loss of material.
                                                                                - Primary & Secondary Heat exchanger      Pressure    Stainless  Treated water                        Water Chemistry Control VIII.D1-5    3.4.1-14    408 Cracking (tubes)            boundary    steel     > 140&deg;F (int)                        - Primary & Secondary (SP-17)                    C, 404


[existing]Station air system Use visual or other NDE techniques to inspect a representative sample of containment penetration piping and the internals and externals of station air piping, piping elements and components to manage loss of material. Use visual or other NDE techniques to inspect a representative sample of the internals of station air piping, piping elements and components exposed to raw water to manage loss of material and cracking.
Attachment 1 NL-09-079 Page 33 of 51 Table 3.4.2-5-7-IP2 Instrument Air System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-7-IP2 Instrument Air System (IA)
Instrument air system Use visual or other NDE techniques to internally inspect the heat exchanger tubes on the instrument air aftercoolers to manage loss of material and fouling.
Aging Effect                              NUREG-Intended                                                        Aging Management                    Table 1 Component Type                      Material      Environment        Requiring                              1801 Vol. 2            Notes Function                                                              Programs                        Item Management                                    Item Pressure                                        None            None                    VII.I-1      3.3.1-43  408 Bolting                            Carbon steel Air-outdoor (ext)                                            (AP-28)                A boundary                                        Loss of material Bolting Integrity Pressure      Stainless                        None            None                            --        --    408 Bolting                                        Air-outdoor (ext)                                                                    G boundary      steel                            Loss of material Bolting Integrity None                    VII.G-9      3.3.1-28  408 Pressure Heat exchanger                    Copper alloy                    None            Periodic Surveillance  (AP-78)                E boundary and               Condensation (int)
ATTACHMENT 2 TO NL-09-079List of Regulatory Commitments, Revision 9ENTERGY NUCLEAR OPERATIONS, INC. INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286 Attachment 2 NL-09-079 Page 1 of 17  List of Regulatory Commitments Rev. 9 The following table identifies those actions committed to by Entergy in this document.
(tubes)                            >15% zn                          Loss of material and Preventive heat transfer Maintenance Periodic Surveillance          --        --    408 Heat exchanger                     Copper alloy Heat transfer              Condensation (int) Fouling          and Preventive                                  G (tubes)                            >15% zn Maintenance Pressure                                                        None                    VII.C2-4    3.3.1-51  408 Heat exchanger                    Copper alloy Treated Water      None boundary and                                                    Water Chemistry Control (AP-12)                D (tubes)                            >15% zn      (ext)              Loss of material heat transfer                                                    - Closed Cooling Water Heat exchanger      Pressure      Copper alloy Treated Water      None            None                    VII.C2-6    3.3.1-84  408 (tubes)            boundary      >15% zn      (ext)              Loss of material Selective Leaching      (AP-43)                C Heat exchanger                    Copper alloy Treated Water                        Water Chemistry Control VII.C2-2    3.3.1-52  408 Heat transfer                                  Fouling (tubes)                            >15% zn      (ext)                                - Closed Cooling Water (AP-80)                  D
Changes are shown as strikethroughs for deletions and underlines for additions
 
.#COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED LRA SECTION / AUDIT ITEM 1 Enhance the Aboveground Steel Tanks Program for IP2 and IP3 to perform thickness measurements of the bottom surfaces of the condensate storage tanks, city water tank, and fire water tanks once during the first ten years of the period of extended operation. Enhance the Aboveground Steel Tanks Program for IP2 and IP3 to require trending of thickness measurements when material loss is detected.
Attachment 1 NL-09-079 Page 34 of 51 Table 3.4.2-5-7-IP2 Instrument Air System (IA)
IP2: September 28, 2013 IP3:December 12, 2015NL-07-039A.2.1.1 A.3.1.1 B.1.12 Enhance the Bolting Integrity Program for IP2 and IP3 to clarify that actual yield strength is used in selecting materials for low susceptibility to SCC and clarify the prohibition on use of lubricants containing MoS 2 for bolting.The Bolting Integrity Program manages loss of preload and loss of material for all external bolting.
Aging Effect                        NUREG-Intended                                                      Aging Management              Table 1 Component Type                      Material      Environment        Requiring                        1801 Vol. 2            Notes Function                                                              Programs                  Item Management                            Item Pressure                                                                          V.F-3        3.2.1-53  408 Tubing                            Copper alloy Air - indoor (ext)  None            None boundary                                                                          (EP-10)                C Pressure                                                                          VII.J-3      3.3.1-98  A, 408 Tubing                            Copper alloy Air - treated (int) None            None boundary                                                                          (AP-8)
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.2 A.3.1.2 B.1.2 Audit Items 201, 241, 2703 Implement the Buried Piping and Tanks Inspection Program for IP2 and IP3 as described in LRA Section
Pressure      Stainless                                                          VII.J-15    3.3.1-94 408 Tubing                                          Air - indoor (ext)  None            None boundary      steel                                                              (AP-17)                A Pressure      Stainless                                                          VII.J-18    3.3.1-98  A, 408 Tubing                                          Air - treated (int) None            None boundary      steel                                                              (AP-20)
None              VII.D-3      3.3.1-57  408 Pressure                                        None Piping                            Carbon steel Air-indoor (ext)                    External Surfaces (A-80)                A boundary                                        Loss of material Monitoring Pressure                                                                          VII.J-22    3.3.1-98  A, 408 Piping                            Carbon steel Air-treated (int)  None            None boundary                                                                          (AP-4)
Pressure      Stainless                                                          VII.J-15    3.3.1-94  408 Piping                                          Air-indoor (ext)    None            None boundary      steel                                                              (AP-17)                A Pressure      Stainless                                                          VII.J-18    3.3.1-98  A, 408 Piping                                          Air-treated (int)  None            None boundary      steel                                                              (AP-20)
Pressure                                                                          V.F-3       3.2.1-53  408 Valve body                        Copper alloy Air - indoor (ext)  None            None boundary                                                                          (EP-10)                C Pressure                                                                          VII.J-3      3.3.1-98  A, 408 Valve body                        Copper alloy Air - treated (int) None            None boundary                                                                          (AP-8)
Pressure      Copper alloy                                                        V.F-3        3.2.1-53  408 Valve body                                      Air - indoor (ext)  None            None boundary      >15% zn                                                            (EP-10)                C Pressure      Copper alloy                                                        VII.J-3      3.3.1-98  A, 408 Valve body                                      Air - treated (int) None            None boundary      >15% zn                                                            (AP-8)
 
Attachment 1 NL-09-079 Page 35 of 51 Table 3.4.2-5-7-IP2 Instrument Air System (IA)
Aging Effect                        NUREG-Intended                                                      Aging Management              Table 1 Component Type                      Material      Environment        Requiring                        1801 Vol. 2           Notes Function                                                              Programs                  Item Management                            Item None              VII.D-3      3.3.1-57  408 Pressure                                        None Valve body                        Carbon steel Air - indoor (ext)                  External Surfaces (A-80)                A boundary                                        Loss of material Monitoring Pressure                                                                          VII.J-22    3.3.1-98  A, 408 Valve body                        Carbon steel Air - treated (int) None            None boundary                                                                          (AP-4)
Pressure      Stainless                                                          VII.J-15    3.3.1-94  408 Valve body                                      Air - indoor (ext)  None            None boundary      steel                                                              (AP-17)                A Pressure      Stainless                                                          VII.J-18    3.3.1-98  A, 408 Valve body                                      Air - treated (int) None            None boundary      steel                                                              (AP-20)


B.1.6.This new program will be implemented consistent with the corresponding program described in NUREG-1801 Section XI.M34, Buried Piping and Tanks
Attachment 1 NL-09-079 Page 36 of 51 Table 3.4.2-5-8-IP2 Instrument Air Closed Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-8-IP2 Instrument Air Closed Cooling System (IACC)
Aging Effect                            NUREG-Intended                                                      Aging Management                    Table 1 Component Type                      Material    Environment        Requiring                              1801 Vol. 2            Notes Function                                                            Programs                        Item Management                                  Item Copper >                                                                VII.C1-3    3.3.1-82 Heat exchanger    Pressure                                                                                                        408 15% Zn      Raw water (int)    Loss of material Service Water Integrity A-65)
(tubes)            boundary                                                                                                        C (inhibited)
Copper >                                                                VII.C1-6     3.3.1-83  408 Heat exchanger                                                    None            None                    (A-72)                C Heat transfer  15% Zn      Raw water (int)
(tubes)                                                            Fouling          Service Water Integrity (inhibited)
Copper >                                                                VII.E1-2    3.3.1-51  408 Heat exchanger      Pressure                                                        Water Chemistry Control (AP-34)                D 15% Zn      Treated water (ext) Loss of material (tubes)            boundary                                                        - Closed Cooling Water (inhibited)
Copper >                                        None                    VII.C2-2    3.3.1-52  408 Heat exchanger                                                    None Heat transfer  15% Zn      Treated water (ext)                  Water Chemistry Control (AP-80)                D (tubes)                                                            Fouling (inhibited)                                      - Closed Cooling Water


Inspection.
Attachment 1 NL-09-079 Page 37 of 51 Table 3.4.2-5-9-IP2 Service Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-9-IP2 Service Water System (SW)
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.5 A.3.1.5 B.1.6 Audit Item 173 Attachment 2 NL-09-079  Page 2 of 17   #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 4 Enhance the Diesel Fuel Monitoring Program to include cleaning and inspection of the IP2 GT-1 gas turbine fuel oil storage tanks, IP2 and IP3 EDG fuel oil day tanks, IP2 SBO/Appendix R diesel generator fuel oil day tank, and IP3 Appendix R fuel oil storage tank and day tank once every ten years. Enhance the Diesel Fuel Monitoring Program to include quarterly sampling and analysis of the IP2 SBO/Appendix R diesel generator fuel oil day tank, IP2 security diesel fuel oil storage tank, IP2 security
Aging Effect                            NUREG-Intended                                                      Aging Management                    Table 1 Component Type                    Material      Environment        Requiring                              1801 Vol. 2             Notes Function                                                              Programs                        Item Management                                  Item Pressure                  Air-outdoor (ext)  None            None                    VII.D-1     3.3.1-44  408 Bolting                          Carbon steel                                                              (A-103)                C boundary                  Condensation (ext) Loss of material  Bolting Integrity Pressure      Stainless    Air-outdoor (ext)  None            None                    VII.F1-1    3.3.1-27  408 Bolting                                                                                                    (A-09)                  E boundary      steel        Condensation (ext) Loss of material  Bolting Integrity None                    VII.I-11    3.3.1-58  408 Pressure                  Air-outdoor (ext)  None Nozzles                          Carbon steel                                      External Surfaces      (A-81)                  A boundary                  Condensation (ext) Loss of material Monitoring Pressure                                      None            None                    VII.C1-19    3.3.1-76  408 Nozzles                          Carbon steel Raw water (int)                                              (A-38)                  A boundary                                      Loss of material Service Water Integrity None                    VII.I-11    3.3.1-58   408 Pressure                  Air-outdoor (ext)  None Piping                            Carbon steel                                      External Surfaces      (A-81)                  A boundary                  Condensation (ext) Loss of material Monitoring Pressure                                      None            None                    VII.C1-19    3.3.1-76  408 Piping                            Carbon steel Raw water (int)                                              (A-38)                  A boundary                                      Loss of material Service Water Integrity None                    VII.F1-1     3.3.1-27  408 Pressure      Stainless    Air-outdoor (ext)  None Piping                                                                              External Surfaces      (A-09)                  E boundary      steel        Condensation (ext) Loss of material Monitoring


diesel fuel oil day tank, and IP3 Appendix R fuel oil storage tank. Particulates, water and sediment checks will be performed on the samples. Filterable solids acceptance criterion will be less than or equal to 10mg/l. Water and sediment acceptance criterion will be less than or equal to 0.05%. Enhance the Diesel Fuel Monitoring Program to include thickness measurement of the bottom of the following tanks once every ten years. IP2: EDG fuel oil storage tanks, EDG fuel oil day tanks, SBO/Appendix R diesel generator fuel oil day tank, GT-1 gas turbine fuel oil storage tanks, and diesel fire pump fuel oil storage tank; IP3: EDG fuel oil day
Attachment 1 NL-09-079 Page 38 of 51 Table 3.4.2-5-9-IP2 Service Water System (SW)
Aging Effect                            NUREG-Intended                                                      Aging Management                    Table 1 Component Type                    Material      Environment        Requiring                              1801 Vol. 2            Notes Function                                                            Programs                        Item Management                                  Item Pressure      Stainless                      None            None                    VII.C1-15    3.3.1-79  408 Piping                                        Raw water (int)                                            (A-54)                  A boundary      steel                          Loss of material Service Water Integrity None                    VII.F1-16    3.3.1-25  408 Pressure                  Air-outdoor (ext)  None Tubing                            Copper alloy                                    External Surfaces      (A-46)                  E boundary                  Condensation (ext) Loss of material Monitoring Pressure                                      None            None                    VII.C1-9    3.3.1-81  408 Tubing                            Copper alloy Raw water (int) boundary                                      Loss of material Service Water Integrity (A-44)                  A None                    VII.F1-1    3.3.1-27  408 Pressure      Stainless    Air-outdoor (ext)  None Tubing                                                                            External Surfaces      (A-09)                  E boundary      steel        Condensation (ext) Loss of material Monitoring Pressure      Stainless                      None            None                    VII.C1-15    3.3.1-79  408 Tubing                                        Raw water (int) boundary      steel                          Loss of material Service Water Integrity (A-54)                  A None                    VII.I-11    3.3.1-58  408 Pressure                  Air-outdoor (ext)  None                                    (A-81)                  A Valve body                        Carbon steel                                    External Surfaces boundary                  Condensation (ext) Loss of material Monitoring Pressure                                      None            None                    VII.C1-19    3.3.1-76  408 Valve body                        Carbon steel Raw water (int)                                            (A-38)                  A boundary                                      Loss of material Service Water Integrity None                    VII.F1-1    3.3.1-27  408 Pressure      Stainless    Air-outdoor (ext)  None Valve body                                                                        External Surfaces      (A-09)                  E boundary      steel        Condensation (ext) Loss of material Monitoring Pressure      Stainless                      None            None                    VII.C1-15    3.3.1-79  408 Valve body                                    Raw water (int)                                            (A-54)                  A boundary      steel                          Loss of material Service Water Integrity


tanks, EDG fuel oil storage tanks, Appendix R fuel oil storage tank, and diesel fire pump fuel oil storage
Attachment 1 NL-09-079 Page 39 of 51 Table 3.4.2-5-10-IP2 Lube Oil System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-10-IP2 Lube Oil System (LO)
Aging Effect                            NUREG-Intended                                                        Aging Management                  Table 1 Component Type                      Material  Environment            Requiring                            1801 Vol. 2            Notes Function                                                            Programs                      Item Management                                Item Pressure                                                                                      --        --    408 Heat exchanger                                                    None            None                                          F boundary and  Titanium    Lube oil (int) tubes                                                              Loss of material Oil Analysis heat transfer Heat exchanger                                                                                                  --        --    408 Heat transfer  Titanium    Lube oil (int)      Fouling          Oil Analysis                                  F tubes Pressure                                                                                      --        --    408 Heat exchanger                                                    None            None                                          F boundary and   Titanium    Raw water (ext) tubes                                                              Loss of material Service Water Integrity heat transfer Heat exchanger                                                                                                  --        --    408 Heat transfer  Titanium    Raw water (ext)      Fouling          Service Water Integrity                      F tubes


tank.Enhance the Diesel Fuel Monitoring Program to change the analysis for water and particulates to a quarterly frequency for the following tanks. IP2: GT-1 gas turbine fuel oil storage tanks and diesel fire pump
Attachment 1 NL-09-079 Page 40 of 51 Table 3.4.2-5-11-IP2 River Water Service System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-11-IP2 River Water Service System (RW)
Aging Effect                            NUREG-Intended                                                      Aging Management                    Table 1 Component Type                      Material    Environment        Requiring                            1801 Vol. 2              Notes Function                                                              Programs                      Item Management                                Item Pressure                                      None            None                  VII.I-1      3.3.1-43    408 Bolting                          Carbon steel Air-outdoor (ext)                                          (AP-28)                  A boundary                                      Loss of material Bolting Integrity Pressure      Stainless                        None            None                  --          --          408 Bolting                                        Air-outdoor (ext)                                                                  G boundary      steel                            Loss of material Bolting Integrity None                  VII.I-9      3.3.1-58    408 Pressure                                      None                                  (A-78)                  A Piping                            Carbon steel Air-outdoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring None                  VII.C1-19    3.3.1-76    408 Pressure                                      None            Periodic Surveillance (A-38)                  E Piping                            Carbon steel Raw water (int) boundary                                      Loss of material and Preventive Maintenance Carbon steel                                      None                  VII.I-9      3.3.1-58    408 Pressure                                      None                                  (A-78)                  A Pump casing                      Gray cast    Air-outdoor (ext)                    External Surfaces boundary                                      Loss of material iron                                              Monitoring None                  VII.C1-19    3.3.1-76    408 Carbon steel                                                            (A-38)                  E Pressure                                      None            Periodic Surveillance Pump casing                      Gray cast    Raw water (int) boundary                                      Loss of material and Preventive iron Maintenance


fuel oil storage tank; IP3: Appendix R fuel oil day tank and diesel fire pump fuel oil storage tank. Enhance the Diesel Fuel Monitoring Program to specify acceptance criteria for thickness measurements of the fuel oil storage tanks within the scope of the program. Enhance the Diesel Fuel Monitoring Program to direct samples be taken and include direction to remove water when detected. Revise applicable procedures to direct sampling of the onsite portable fuel oil contents prior to transferring the contents to the storage tanks.
Attachment 1 NL-09-079 Page 41 of 51 Table 3.4.2-5-11-IP2 River Water Service System (RW)
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 NL-08-057 A.2.1.8 A.3.1.8 B.1.9 Audit items 128, 129, 132, 491, 492, 510 Attachment 2 NL-09-079  Page 3 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM  Enhance the Diesel Fuel Monitoring Program to direct the addition of chemicals including biocide when the presence of biological activity is confirmed. 5 Enhance the External Surfaces Monitoring Program for IP2 and IP3 to include periodic inspections of systems in scope and subject to aging management review for license renewal in accordance with 10 CFR 54.4(a)(1) and (a)(3). Inspections shall include areas surrounding the subject systems to identify hazards to those systems. Inspections of nearby systems that could impact the subject systems will include SSCs that are in scope and subject to aging management review for license renewal in accordance with 10 CFR
Aging Effect                            NUREG-Intended                                                    Aging Management                    Table 1 Component Type                      Material    Environment      Requiring                            1801 Vol. 2              Notes Function                                                            Programs                      Item Management                                Item Carbon steel                                                          VII.C1-11    3.3.1-85    A Pressure                                                                            (A-51)
Pump casing                      Gray cast    Raw water (int)  Loss of material Selective Leaching boundary iron None                  --           --         408 Pressure      Stainless                      None                                                            G Tubing                                        Air-outdoor (ext)                  External Surfaces boundary      steel                          Loss of material Monitoring None                  VII.C1-15    3.3.1-79    408 Pressure      Stainless                      None            Periodic Surveillance (A-54)                  E Tubing                                        Raw water (int) boundary      steel                          Loss of material and Preventive Maintenance None                  VII.I-9      3.3.1-58    408 Pressure                                    None                                  (A-78)                  A Valve body                        Carbon steel Air-outdoor (ext)                  External Surfaces boundary                                    Loss of material Monitoring None                  VII.C1-19    3.3.1-76    408 Pressure                                    None            Periodic Surveillance (A-38)                   E Valve body                        Carbon steel Raw water (int) boundary                                    Loss of material and Preventive Maintenance None                  --          --          408 Pressure      Stainless                      None                                                            G Valve body                                    Air-outdoor (ext)                 External Surfaces boundary      steel                          Loss of material Monitoring None                  VII.C1-15    3.3.1-79    408 Pressure      Stainless                      None            Periodic Surveillance (A-54)                  E Valve body                                    Raw water (int) boundary      steel                          Loss of material and Preventive Maintenance


54.4(a)(2).
Attachment 1 NL-09-079 Page 42 of 51 Table 3.4.2-5-12-IP2 Fresh Water Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-12-IP2 Fresh Water Cooling (FWC) System Aging Effect                          NUREG-Intended                                                    Aging Management                Table 1 Component Type                    Material    Environment        Requiring                          1801 Vol. 2            Notes Function                                                        Programs                    Item Management                              Item None                      --        --    408 Heat transfer                                                                                            F Heat exchanger                  Copper alloy                  None            Periodic Surveillance and pPressure              Raw water (int)
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.10 A.3.1.10 B.1.116 Enhance the Fatigue Monitoring Program for IP2 to monitor steady state cycles and feedwater cycles or
(tubes)                          Titanium                      Loss of material and Preventive boundary Maintenance Periodic Surveillance      --        --    F Heat exchanger Heat transfer Titanium    Raw water (int)  Fouling          and Preventive (tubes)
Maintenance None                      --        --    408 Heat transfer Heat exchanger                  Copper alloy Treated Water    None            Periodic Surveillance                      F and pPressure (tubes)                          Titanium    (ext)            Loss of material and Preventive boundary Maintenance Periodic Surveillance      --        --    F Heat exchanger                                Treated Water Heat transfer Titanium                      Fouling          and Preventive (tubes)                                      (ext)
Maintenance


perform an evaluation to determine monitoring is not required. Review the number of allowed events and resolve discrepancies between reference documents and monitoring procedures. Enhance the Fatigue Monitoring Program for IP3 to include all the transients identified. Assure all fatigue analysis transients are included with the lowest limiting numbers. Update the number of design transients accumulated to date.
Attachment 1 NL-09-079 Page 43 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-13-IP2 IP1 Station Air (SA) System Aging Effect                          NUREG-Intended                                                        Aging Management                  Table 1 Component Type                        Material    Environment          Requiring                          1801 Vol. 2             Notes Function                                                              Programs                      Item Management                                Item Pressure                                        None            None                  VII.I-4      3.3.1-43  408 Bolting                            Carbon steel Air-indoor (ext)                                          (AP-27)                A boundary                                        Loss of material Bolting Integrity Pressure      Stainless                                                              VII.J-15    3.3.1-94  408 Bolting                                        Air-indoor (ext)    None            None                  (AP-17)                A boundary      steel None                  VII.D-3      3.3.1-57  408 Pressure                                        None                                  (A-80)                  A Filter housing                    Carbon steel Air-indoor (ext)                    External Surfaces boundary                                        Loss of material Monitoring None                  VII.D-2     3.3.1-53  408 Pressure                                        None            Periodic Surveillance (A-26)                  E Filter Housing                    Carbon steel Condensation (int) boundary                                        Loss of material and Preventive Maintenance None                  VII.D-3      3.3.1-57   408 Pressure                                        None                                  (A-80)                  A Piping                            Carbon steel Air-indoor (ext)                    External Surfaces boundary                                        Loss of material Monitoring None                  VII.D-2      3.3.1-53  408 Pressure                                        None            Periodic Surveillance (A-26)                  E Piping                            Carbon steel Condensation (int) boundary                                        Loss of material and Preventive Maintenance Pressure      Stainless                                                              VII.J-15    3.3.1-94  408 Piping                                          Air-indoor (ext)    None            None                  (AP-17)                 A boundary      steel
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.11 A.3.1.11 B.1.12, Audit Item 164 Attachment 2 NL-09-079  Page 4 of 17   #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 7 Enhance the Fire Protection Program to inspect external surfaces of the IP3 RCP oil collection systems for loss of material each refueling cycle. Enhance the Fire Protection Program to explicitly state that the IP2 and IP3 diesel fire pump engine sub-systems (including the fuel supply line) shall be observed while the pump is running. Acceptance criteria will be revised to verify that the diesel engine does not exhibit signs of degradation while running; such as fuel oil, lube oil, coolant, or exhaust gas


leakage.Enhance the Fire Protection Program to specify that the IP2 and IP3 diesel fire pump engine carbon steel exhaust components are inspected for evidence of corrosion and cracking at least once each operating
Attachment 1 NL-09-079 Page 44 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air (SA) System Aging Effect                          NUREG-Intended                                                      Aging Management                  Table 1 Component Type                        Material    Environment        Requiring                            1801 Vol. 2            Notes Function                                                            Programs                      Item Management                                Item Pressure      Stainless                      None            None                  VII.D-4      3.3.1-54  408 Piping                                          Condensation (int)                                        (AP-81)                E boundary      steel                          Loss of material One-Time Inspection Stainless                      None            None                  VII.D-4      3.3.1-54  408 Strainer          Filtration                  Condensation (int)                                        (AP-81)                E steel                          Loss of material One-Time Inspection Stainless                      None            None                  VII.D-4      3.3.1-54  408 Strainer          Filtration                  Condensation (ext)                                        (AP-81)                E steel                          Loss of material One-Time Inspection None                  VII.D-3      3.3.1-57  408 Pressure                                      None                                  (A-80)                  A Strainer housing                  Carbon steel Air-indoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring None                  VII.D-2      3.3.1-53  408 Pressure                                      None            Periodic Surveillance (A-26)                  E Strainer housing                  Carbon steel Condensation (int) boundary                                      Loss of material and Preventive Maintenance None                  VII.D-3      3.3.1-57  408 Pressure                                      None                                  (A-80)                  A Tank                              Carbon steel Air-indoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring None                  VII.D-2      3.3.1-53  408 Pressure                                      None            Periodic Surveillance (A-26)                  E Tank                              Carbon steel Condensation (int) boundary                                      Loss of material and Preventive Maintenance None                  VII.D-3      3.3.1-57  408 Pressure                                      None                                  (A-80)                  A Tubing                            Carbon steel Air-indoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring


cycle. Enhance the Fire Protection Program for IP3 to visually inspect the cable spreading room, 480V switchgear room, and EDG room CO 2 fire suppression system for signs of degradation, such as corrosion
Attachment 1 NL-09-079 Page 45 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air (SA) System Aging Effect                          NUREG-Intended                                                      Aging Management                  Table 1 Component Type                        Material    Environment        Requiring                            1801 Vol. 2            Notes Function                                                            Programs                      Item Management                                Item None                  VII.D-2      3.3.1-53  408 Pressure                                      None            Periodic Surveillance (A-26)                  E Tubing                            Carbon steel Condensation (int) boundary                                      Loss of material and Preventive Maintenance Pressure      Stainless                                                              VII.J-15    3.3.1-94  408 Tubing                                          Air-indoor (ext)  None            None                  (AP-17)                A boundary      steel Pressure      Stainless                      None            None                  VII.D-4      3.3.1-54  408 Tubing                                          Condensation (int)                                        (AP-81)                E boundary      steel                          Loss of material One-Time Inspection Pressure                                                                              V.F-3        3.2.1-53  408 Tubing                            Copper alloy Air-indoor (ext)  None            None boundary                                                                              (EP-10)                C None                  VII.G-9      3.3.1-28  408 Pressure                                      None            Periodic Surveillance (AP-78)                E Tubing                            Copper alloy Condensation (int) boundary                                      Loss of material and Preventive Maintenance None                  VII.D-3      3.3.1-57  408 Pressure                                      None                                  (A-80)                  A Trap                              Carbon steel Air-indoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring None                  VII.D-2     3.3.1-53  408 Pressure                                      None            Periodic Surveillance (A-26)                  E Trap                              Carbon steel Condensation (int) boundary                                      Loss of material and Preventive Maintenance None                  VII.D-3      3.3.1-57  408 Pressure                                      None                                  (A-80)                  A Valve body                        Carbon steel Air-indoor (ext)                    External Surfaces boundary                                      Loss of material Monitoring


and mechanical damage at least once every six months.IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.12 A.3.1.12 B.1.13 Attachment 2 NL-09-079  Page 5 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 8 Enhance the Fire Water Program to include inspection of IP2 and IP3 hose reels for evidence of corrosion.
Attachment 1 NL-09-079 Page 46 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air (SA) System Aging Effect                          NUREG-Intended                                                      Aging Management                  Table 1 Component Type                        Material    Environment        Requiring                            1801 Vol. 2            Notes Function                                                            Programs                      Item Management                                Item None                  VII.D-2      3.3.1-53  408 Pressure                                      None            Periodic Surveillance (A-26)                  E Valve body                        Carbon steel Condensation (int) boundary                                      Loss of material and Preventive Maintenance Pressure      Stainless                                                              VII.J-15    3.3.1-94  408 Valve body                                      Air-indoor (ext)  None            None                  (AP-17)                 A boundary      steel Pressure      Stainless                      None            None                  VII.D-4      3.3.1-54  408 Valve body                                      Condensation (int)                                        (AP-81)                E boundary      steel                          Loss of material One-Time Inspection Pressure                                                                              V.F-3        3.2.1-53  408 Valve body                        Copper alloy Air-indoor (ext)  None            None                  (EP-10)                C boundary None                  VII.G-9      3.3.1-28  408 Pressure                                      None            Periodic Surveillance (AP-78)                E Valve body                        Copper alloy Condensation (int) boundary                                      Loss of material and Preventive Maintenance
Acceptance criteria will be revised to verify no unacceptable signs of degradation. Enhance the Fire Water Program to replace all or test a sample of IP2 and IP3 sprinkler heads required for 10 CFR 50.48 using guidance of NFPA 25 (2002 edition), Section 5.3.1.1.1 before the end of the 50-year sprinkler head service life and at 10-year intervals thereafter during the extended period of operation to ensure that signs of degradation, such as corrosion, are detected in a timely manner. Enhance the Fire Water Program to perform wall thickness evaluations of IP2 and IP3 fire protection piping on system components using non-intrusive techniques (e.g., volumetric testing) to identify evidence of loss of material due to corrosion. These inspections will be performed before the end of the current operating term and at intervals thereafter during the period of extended operation. Results of the initial evaluations will be used to determine the appropriate inspection interval to ensure aging effects are identified prior to loss of intended function. Enhance the Fire Water Program to inspect the internal surface of foam based fire suppression tanks.
Acceptance criteria will be enhanced to verify no


significant corrosion.
Attachment 1 NL-09-079 Page 47 of 51 As a result of the previous table changes, the following changes are required to Appendix A (Changes are shown as strikethroughs for deletions and underlines for additions).
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 NL-08-014 A.2.1.13 A.3.1.13 B.1.14 Audit Items 105, 106 Attachment 2 NL-09-079  Page 6 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 9 Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to implement comparisons to wear rates identified in WCAP-12866. Include provisions to
A.2.1.26 One-Time Inspection Program One-time inspection activities on the following confirm that loss of material is not occurring or is so insignificant that an aging management program is not warranted.
* internal surfaces of stainless steel drain piping,.piping elements and components containing raw water (drain water)
* internal surfaces of stainless steel piping, piping elements and components in the station air containment penetration exposed to condensation
* Internal surfaces of stainless steel piping, tubing, strainers and valve bodies in the IP1 station air system exposed to condensation
* internal surfaces of stainless steel EDG starting air tanks, piping, piping elements and components exposed to condensation
* internal surfaces of carbon steel and stainless steel tanks, piping, piping elements and components in the RCP oil collection system exposed to lube oil
* internal surfaces of auxiliary feedwater system stainless steel piping, piping elements and components exposed to treated water from the city water system A.2.1.28 Periodic Surveillance and Preventive Maintenance Program The Periodic Surveillance and Preventive Maintenance Program is an existing program that includes periodic inspections and tests that manage aging effects not managed by other aging management programs. In addition to specific activities in the plant's preventive maintenance program and surveillance program, the Periodic Surveillance and Preventive Maintenance Program includes enhancements to add new activities. The preventive maintenance and surveillance testing activities are generally implemented through repetitive tasks or routine monitoring of plant operations.
Surveillance testing and periodic inspections using visual or other non-destructive examination techniques verify that the following components are capable of performing their intended function.
* reactor building cranes (polar and manipulator), crane rails, and girders, and refueling platform
* recirculation pump motor cooling coils and housing
* city water system components
* charging pump casings
* plant drain components and backwater valves
* station air containment penetration piping
* HVAC duct flexible connections
* HVAC stored portable blowers and flexible trunks
* EDG exhaust components


compare data to the previous performances and perform evaluations regarding change to test frequency and scope. Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to specify the acceptance criteria as outlined in WCAP-12866 or other plant-specific values based on evaluation of previous test results. Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to direct evaluation and performance of corrective actions based on tubes that exceed or are projected to exceed the acceptance criteria. Also stipulate that flux thimble tubes that cannot be inspected over the tube length and cannot be shown by analysis to be satisfactory for continued service, must be removed from service to ensure the integrity of the reactor coolant system pressure boundary.
Attachment 1 NL-09-079 Page 48 of 51
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.15 A.3.1.15 B.1.16 Attachment 2 NL-09-079 Page 7 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 10 Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to include the following heat exchangers in the scope of the program. Safety injection pump lube oil heat exchangers  RHR heat exchangers  RHR pump seal coolers  Non-regenerative heat exchangers  Charging pump seal water heat exchangers Charging pump fluid drive coolers  Charging pump crankcase oil coolers  Spent fuel pit heat exchangers  Secondary system steam generator sample coolers Waste gas compressor heat exchangers  SBO/Appendix R diesel jacket water heat exchanger (IP2 only) Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to perform visual inspection on heat exchangers where non-destructive examination, such as eddy current inspection, is not possible due to heat exchanger design limitations. Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to include consideration of material-environment combinations when determining sample population of heat exchangers. Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to establish minimum tube wall thickness for the new heat exchangers identified in the scope of the program. Establish acceptance criteria for heat exchangers visually inspected to include no indication of tube erosion, vibration wear, corrosion, pitting, fouling, or scaling.
* EDG duct flexible connections
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 NL-09-018 A.2.1.16 A.3.1.16 B.1.17, Audit Item 52 Attachment 2 NL-09-079  Page 8 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 11 Delete commitment. Enhance the ISI Program for IP2 and IP3 to provide periodic visual inspections to confirm the absence of aging effects for lubrite sliding supports used in the steam generator and reactor coolant pump support systems.IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 NL-09-056 A.2.1.17 A.3.1.17 B.1.18 Audit item 5912 Enhance the Masonry Wall Program for IP2 and IP3 to specify that the IP1 intake structure is included in the program.
* EDG air intake and aftercooler components
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.18 A.3.1.18 B.1.19 13Enhance the Metal-Enclosed Bus Inspection Program to add IP2 480V bus associated with substation A to the scope of bus inspected. Enhance the Metal-Enclosed Bus Inspection Program for IP2 and IP3 to visually inspect the external surface of MEB enclosure assemblies for loss of material at least once every 10 years. The first inspection will occur prior to the period of extended operation and the acceptance criterion will be no significant loss of material.Enhance the Metal-Enclosed Bus Inspection Program to add acceptance criteria for MEB internal visual inspections to include the absence of indications of dust accumulation on the bus bar, on the insulators, and in the duct, in addition to the absence of indications of moisture intrusion into the duct. Enhance the Metal-Enclosed Bus Inspection Program for IP2 and IP3 to inspect bolted connections at least once every five years if performed visually or at least once every ten years using quantitative measurements such as thermography or contact resistance measurements. The first inspection will occur prior to the period of extended operation. The plant will process a change to applicable site procedure to remove the reference to "re-torquing" connections for phase bus maintenance and bolted
* EDG air start components
* EDG cooling water makeup supply valves
* security generator exhaust components
* security generator radiator tubes
* SBO/Appendix R diesel exhaust components
* SBO/Appendix R diesel turbochargers and aftercoolers
* SBO/Appendix R diesel cooling water heat exchangers
* SBO/Appendix R diesel fuel oil cooler
* diesel fuel oil trailer transfer tank and associated valves
* auxiliary feedwater components
* containment cooling duct flexible connections
* containment cooling fan units internals
* control room HVAC condensers and evaporators
* control room HVAC ducts and drip pans
* control room HVAC duct flexible connections
* circulating water, city water, intake structure system, emergency diesel generator, fresh water cooling, instrument air, integrated liquid waste handling, lube oil, miscellaneous, radiation monitoring, river water, station air, waste disposal, wash water, and water treatment plant system piping, piping components, and piping elements
* pressurizer relief tank
* main steam safety valve tailpipes
* atmospheric dump valve silencers
* feedwater system sight glass housings
* off-site power feeder, 138 kV underground transmission cable
* main condenser tube internal surfaces
* instrument air aftercooler tube internal surfaces
* fresh water/river water heat exchanger internal and external surfaces A.2.1.39 Water Chemistry Control - Closed Cooling Water Program The Water Chemistry Control - Closed Cooling Water Program is an existing program that includes preventive measures that manage loss of material, cracking, or fouling for components in closed cooling water systems (component cooling water (CCW), instrument air (IP2 only), conventional closed cooling (CCC), instrument air closed cooling (IACC), emergency diesel generator cooling, security generator cooling, and SBO/Appendix R diesel generator cooling). These chemistry activities provide for monitoring and controlling closed cooling water chemistry using procedures and processes based on EPRI guidance for closed cooling water chemistry.


connection maintenance.
Attachment 1 NL-09-079 Page 49 of 51 As a result of the previous table changes, the following changes are required to Appendix B (Changes are shown as strikethroughs for deletions and underlines for additions).
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 NL-08-057 A.2.1.19 A.3.1.19 B.1.20 Audit Items 124, 133, 519 Attachment 2 NL-09-079  Page 9 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 14 Implement the Non-EQ Bolted Cable Connections Program for IP2 and IP3 as described in LRA Section
B.1.27 One-Time Inspection Program Description One-time inspection activities on the following confirm that loss of material is not occurring or is so insignificant that an aging management program is not warranted.
* Internal surfaces of drain system stainless steel piping, tubing, and valve bodies exposed to raw water (drain water) in EDG buildings, primary auxiliary buildings, and electrical tunnels. Also included are drains in the IP3 auxiliary feed pump building
* Internal surfaces of stainless steel valve bodies in the station air containment penetration exposed to condensation
* Internal surfaces of stainless steel piping, tubing, strainers and valve bodies in the IP1 station air system exposed to condensation
* Internal surfaces of stainless steel piping, strainers, strainer housings, tanks, tubing and valve bodies exposed to condensation in the emergency diesel generator (EDG) starting air subsystem B.1.29 Periodic Surveillance and Preventive Maintenance Program Description The Periodic Surveillance and Preventive Maintenance Program is an existing program that includes periodic inspections and tests that manage aging effects not managed by other aging management programs. In addition to specific activities in the plant's preventive maintenance program and surveillance program, the Periodic Surveillance and Preventive Maintenance Program includes enhancements to add new activities. The preventive maintenance and surveillance testing activities are generally implemented through repetitive tasks or routine monitoring of plant operations. Credit for program activities has been taken in the aging management review of the following systems and structures. All activities are new unless otherwise noted.
Reactor building                Use visual or other NDE techniques to inspect the surface condition of carbon steel components of the reactor building cranes (polar and manipulator), crane rails, and girders, and refueling platform to manage loss of material. [existing]
Containment spray system        IP3: Perform wall thickness measurements of the NaOH tank to manage loss of material. [existing]
IP3: Perform visual or other NDE inspections on the inside


B.1.22.IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.21 A.3.1.21 B.1.2215 Implement the Non-EQ Inaccessible Medium-Voltage Cable Program for IP2 and IP3 as described in LRA Section B.1.23. This new program will be implemented consistent with the corresponding program described in NUREG-1801 Section XI.E3, Inaccessible Medium-Voltage Cables Not Subject To 10 CFR 50.49 Environmental Qualification Requirements.
Attachment 1 NL-09-079 Page 50 of 51 surfaces of a representative sample of stainless steel components exposed to sodium hydroxide to manage loss of material and cracking.
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.22 A.3.1.22 B.1.23 Audit item 17316 Implement the Non-EQ Instrumentation Circuits Test Review Program for IP2 and IP3 as described in LRA
Safety injection system    Perform operability testing to manage fouling for recirculation pump motor cooling coils.
Use visual or other NDE techniques to internally inspect the recirculation pump cooler housing to manage loss of material.
Main steam system          Use visual or other NDE techniques to inspect a representative sample of the internal surfaces of the carbon steel main steam safety valve tailpipes and atmospheric dump valve silencers to manage loss of material.
Circulating water system  Use visual or other NDE techniques to inspect a representative sample of the internals of circulating water piping, piping elements and components exposed to raw water to manage loss of material, cracking and change in material properties.
City water system          Use visual or other NDE techniques to inspect a representative sample of the internals of city water piping, piping elements, and components exposed to treated water (city water) to manage loss of material.
Condensate system          Use visual or other NDE techniques to inspect a representative sample of the internal surfaces of the main condenser tubes exposed to raw water to manage loss of material and fouling.
River water system        Use visual or other NDE techniques to inspect a representative sample of the internals of river water piping, piping elements and components exposed to raw water to manage loss of material and cracking.
Fresh water cooling system Use visual or other NDE techniques to inspect a representative sample of the internal and external surfaces of the fresh water/river water heat exchanger tubes exposed to raw water to manage loss of material and fouling.


Section B.1.24. This new program will be implemented consistent with the corresponding program described in NUREG-1801 Section XI.E2, Electrical Cables and  
Attachment 1 NL-09-079 Page 51 of 51 Wash water system    Use visual or other NDE techniques to inspect a representative sample of the internals of wash water piping, piping elements and components exposed to raw water to manage loss of material, cracking and change in material properties.
Chemical and volume  During quarterly surveillances perform visual inspection of control system        the external surface of charging pump casings to manage cracking. [existing]
Plant drains          Use visual or other NDE techniques to inspect a representative sample of the internals of carbon steel plant drain piping, piping elements, and components to manage loss of material.
IP2: Use visual or other NDE techniques to inspect the internals of backwater valves to manage loss of material.
[existing]
Station air system    Use visual or other NDE techniques to inspect a representative sample of containment penetration piping and the internals and externals of station air piping, piping elements and components to manage loss of material.
Use visual or other NDE techniques to inspect a representative sample of the internals of station air piping, piping elements and components exposed to raw water to manage loss of material and cracking.
Instrument air system Use visual or other NDE techniques to internally inspect the heat exchanger tubes on the instrument air aftercoolers to manage loss of material and fouling.


Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits.
ATTACHMENT 2 TO NL-09-079 List of Regulatory Commitments, Revision 9 ENTERGY NUCLEAR OPERATIONS, INC.
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.23 A.3.1.23 B.1.24 Audit item 17317 Implement the Non-EQ Insulated Cables and Connections Program for IP2 and IP3 as described in
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286


LRA Section B.1.25. This new program will be implemented consistent with the corresponding program described in NUREG-1801 Section XI.E1, Electrical Cables and  
Attachment 2 NL-09-079 Page 1 of 17 List of Regulatory Commitments Rev. 9 The following table identifies those actions committed to by Entergy in this document.
Changes are shown as strikethroughs for deletions and underlines for additions.
#                          COMMITMENT                        IMPLEMENTATION    SOURCE      RELATED SCHEDULE                  LRA SECTION
                                                                                            / AUDIT ITEM IP2:              NL-07-039    A.2.1.1 1  Enhance the Aboveground Steel Tanks Program for September 28,                  A.3.1.1 IP2 and IP3 to perform thickness measurements of 2013                            B.1.1 the bottom surfaces of the condensate storage tanks, city water tank, and fire water tanks once during the IP3:
first ten years of the period of extended operation.
December 12, Enhance the Aboveground Steel Tanks Program for            2015 IP2 and IP3 to require trending of thickness measurements when material loss is detected.
IP2:              NL-07-039    A.2.1.2 2  Enhance the Bolting Integrity Program for IP2 and IP3 September 28,                  A.3.1.2 to clarify that actual yield strength is used in selecting 2013                            B.1.2 materials for low susceptibility to SCC and clarify the prohibition on use of lubricants containing MoS2 for IP3:              NL-07-153 Audit Items bolting.
December 12,                  201, 241, The Bolting Integrity Program manages loss of              2015                            270 preload and loss of material for all external bolting.
IP2:              NL-07-039    A.2.1.5 3  Implement the Buried Piping and Tanks Inspection September 28,                  A.3.1.5 Program for IP2 and IP3 as described in LRA Section 2013                            B.1.6 B.1.6.
NL-07-153  Audit Item This new program will be implemented consistent with IP3:                                  173 the corresponding program described in NUREG-             December 12, 1801 Section XI.M34, Buried Piping and Tanks              2015 Inspection.


Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements.
Attachment 2 NL-09-079 Page 2 of 17
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.24 A.3.1.24 B.1.25 Audit item 173 Attachment 2 NL-09-079  Page 10 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 18 Enhance the Oil Analysis Program for IP2 to sample and analyze lubricating oil used in the SBO/Appendix R diesel generator consistent with oil analysis for other site diesel generators.
#                        COMMITMENT                        IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
Enhance the Oil Analysis Program for IP2 and IP3 to sample and analyze generator seal oil and turbine hydraulic control oil.
                                                                                    / AUDIT ITEM IP2:           NL-07-039     A.2.1.8 4 Enhance the Diesel Fuel Monitoring Program to September 28,                A.3.1.8 include cleaning and inspection of the IP2 GT-1 gas 2013                          B.1.9 turbine fuel oil storage tanks, IP2 and IP3 EDG fuel oil NL-07-153 Audit items day tanks, IP2 SBO/Appendix R diesel generator fuel IP3:                        128, 129, oil day tank, and IP3 Appendix R fuel oil storage tank December 12,                  132, and day tank once every ten years.
Enhance the Oil Analysis Program for IP2 and IP3 to formalize preliminary oil screening for water and particulates and laboratory analyses including defined acceptance criteria for all components included in the scope of this program. The program will specify corrective actions in the event acceptance criteria are
2015          NL-08-057 491, 492, Enhance the Diesel Fuel Monitoring Program to                                         510 include quarterly sampling and analysis of the IP2 SBO/Appendix R diesel generator fuel oil day tank, IP2 security diesel fuel oil storage tank, IP2 security diesel fuel oil day tank, and IP3 Appendix R fuel oil storage tank. Particulates, water and sediment checks will be performed on the samples. Filterable solids acceptance criterion will be less than or equal to 10mg/l. Water and sediment acceptance criterion will be less than or equal to 0.05%.
Enhance the Diesel Fuel Monitoring Program to include thickness measurement of the bottom of the following tanks once every ten years. IP2: EDG fuel oil storage tanks, EDG fuel oil day tanks, SBO/Appendix R diesel generator fuel oil day tank, GT-1 gas turbine fuel oil storage tanks, and diesel fire pump fuel oil storage tank; IP3: EDG fuel oil day tanks, EDG fuel oil storage tanks, Appendix R fuel oil storage tank, and diesel fire pump fuel oil storage tank.
Enhance the Diesel Fuel Monitoring Program to change the analysis for water and particulates to a quarterly frequency for the following tanks. IP2: GT-1 gas turbine fuel oil storage tanks and diesel fire pump fuel oil storage tank; IP3: Appendix R fuel oil day tank and diesel fire pump fuel oil storage tank.
Enhance the Diesel Fuel Monitoring Program to specify acceptance criteria for thickness measurements of the fuel oil storage tanks within the scope of the program.
Enhance the Diesel Fuel Monitoring Program to direct samples be taken and include direction to remove water when detected.
Revise applicable procedures to direct sampling of the onsite portable fuel oil contents prior to transferring the contents to the storage tanks.


not met. Enhance the Oil Analysis Program for IP2 and IP3 to formalize trending of preliminary oil screening results as well as data provided from independent laboratories.
Attachment 2 NL-09-079 Page 3 of 17
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.25 A.3.1.25 B.1.2619 Implement the One-Time Inspection Program for IP2 and IP3 as described in LRA Section B.1.27. This new program will be implemented consistent with the corresponding program described in NUREG-1801, Section XI.M32, One-Time Inspection.
#                        COMMITMENT                        IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.26 A.3.1.26 B.1.27 Audit item 17320 Implement the One-Time Inspection - Small Bore Piping Program for IP2 and IP3 as described in LRA
                                                                                      / AUDIT ITEM Enhance the Diesel Fuel Monitoring Program to direct the addition of chemicals including biocide when the presence of biological activity is confirmed.
IP2:           NL-07-039   A.2.1.10 5 Enhance the External Surfaces Monitoring Program September 28,              A.3.1.10 for IP2 and IP3 to include periodic inspections of 2013                        B.1.11 systems in scope and subject to aging management review for license renewal in accordance with 10 CFR IP3:
54.4(a)(1) and (a)(3). Inspections shall include areas December 12, surrounding the subject systems to identify hazards to 2015 those systems. Inspections of nearby systems that could impact the subject systems will include SSCs that are in scope and subject to aging management review for license renewal in accordance with 10 CFR 54.4(a)(2).
IP2:           NL-07-039   A.2.1.11 6 Enhance the Fatigue Monitoring Program for IP2 to September 28,              A.3.1.11 monitor steady state cycles and feedwater cycles or 2013                        B.1.12, perform an evaluation to determine monitoring is not NL-07-153  Audit Item required. Review the number of allowed events and 164 resolve discrepancies between reference documents and monitoring procedures.
Enhance the Fatigue Monitoring Program for IP3 to        IP3:
include all the transients identified. Assure all fatigue December 12, analysis transients are included with the lowest          2015 limiting numbers. Update the number of design transients accumulated to date.


Section B.1.28. This new program will be implemented consistent with the corresponding program described in NUREG-1801, Section XI.M35, One-Time Inspection of ASME Code Class I Small-Bore Piping.
Attachment 2 NL-09-079 Page 4 of 17
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.27 A.3.1.27 B.1.28 Audit item 17321 Enhance the Periodic Surveillance and Preventive Maintenance Program for IP2 and IP3 as necessary to assure that the effects of aging will be managed such that applicable components will continue to perform their intended functions consistent with the current licensing basis through the period of extended operation.
#                       COMMITMENT                         IMPLEMENTATION SOURCE      RELATED SCHEDULE              LRA SECTION
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.28 A.3.1.28 B.1.29 Attachment 2 NL-09-079 Page 11 of 17   #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED LRA SECTION / AUDIT ITEM 22 Enhance the Reactor Vessel Surveillance Program for IP2 and IP3 revising the specimen capsule withdrawal schedules to draw and test a standby capsule to cover the peak reactor vessel fluence expected through the end of the period of extended operation. Enhance the Reactor Vessel Surveillance Program for IP2 and IP3 to require that tested and untested specimens from all capsules pulled from the reactor vessel are maintained in storage.
                                                                                      / AUDIT ITEM IP2:           NL-07-039   A.2.1.12 7 Enhance the Fire Protection Program to inspect September 28,               A.3.1.12 external surfaces of the IP3 RCP oil collection 2013                        B.1.13 systems for loss of material each refueling cycle.
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.31 A.3.1.31 B.1.3223 Implement the Selective Leaching Program for IP2 and IP3 as described in LRA Section B.1.33. This new program will be implemented consistent with the corresponding program described in NUREG-1801, Section XI.M33 Selective Leaching of Materials.
Enhance the Fire Protection Program to explicitly         IP3:
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.32 A.3.1.32 B.1.33 Audit item 17324 Enhance the Steam Generator Integrity Program for IP2 and IP3 to require that the results of the condition monitoring assessment are compared to the operational assessment performed for the prior operating cycle with differences evaluated.
state that the IP2 and IP3 diesel fire pump engine        December 12, sub-systems (including the fuel supply line) shall be    2015 observed while the pump is running. Acceptance criteria will be revised to verify that the diesel engine does not exhibit signs of degradation while running; such as fuel oil, lube oil, coolant, or exhaust gas leakage.
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 A.2.1.34 A.3.1.34 B.1.35 25 Enhance the Structures Monitoring Program to explicitly specify that the following structures are included in the program. Appendix R diesel generator foundation (IP3)  Appendix R diesel generator fuel oil tank vault (IP3) Appendix R diesel generator switchgear and enclosure (IP3)  city water storage tank foundation  condensate storage tanks foundation (IP3)  containment access facility and annex (IP3)  discharge canal (IP2/3)  emergency lighting poles and foundations (IP2/3)  fire pumphouse (IP2)  fire protection pumphouse (IP3fire water storage tank foundations (IP2/3)  gas turbine 1 fuel storage tank foundation  maintenance and outage building-elevated passageway (IP2)
Enhance the Fire Protection Program to specify that the IP2 and IP3 diesel fire pump engine carbon steel exhaust components are inspected for evidence of corrosion and cracking at least once each operating cycle.
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 NL-08-057 A.2.1.35 A.3.1.35 B.1.36 Audit items 86, 87, 88, 417 Attachment 2 NL-09-079  Page 12 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM  new station security building (IP2) nuclear service building (IP1)  primary water storage tank foundation (IP3)  refueling water storage tank foundation (IP3)  security access and office building (IP3)  service water pipe chase (IP2/3)  service water valve pit (IP3)  superheater stack  transformer/switchyard support structures (IP2)  waste holdup tank pits (IP2/3) Enhance the Structures Monitoring Program for IP2 and IP3 to clarify that in addition to structural steel and concrete, the following commodities (including their anchorages) are inspected for each structure as applicable. cable trays and supports  concrete portion of reactor vessel supports  conduits and supports  cranes, rails and girders  equipment pads and foundations  fire proofing (pyrocrete)  HVAC duct supports  jib cranes  manholes and duct banks  manways, hatches and hatch covers  monorails  new fuel storage racks  sumps, sump screens, strainers and flow barriers Enhance the Structures Monitoring Program for IP2 and IP3 to inspect inaccessible concrete areas that are exposed by excavation for any reason. IP2 and IP3 will also inspect inaccessible concrete areas in environments where observed conditions in accessible areas exposed to the same environment indicate that significant concrete degradation is occurring.Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspections of elastomers (seals, gaskets, seismic joint filler, and roof elastomers) to Attachment 2 NL-09-079  Page 13 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM identify cracking and change in material properties and for inspection of aluminum vents and louvers to identify loss of material. Enhance the Structures Monitoring Program for IP2 and IP3 to perform an engineering evaluation of groundwater samples to assess aggressiveness of groundwater to concrete on a periodic basis (at least  
Enhance the Fire Protection Program for IP3 to visually inspect the cable spreading room, 480V switchgear room, and EDG room CO2 fire suppression system for signs of degradation, such as corrosion and mechanical damage at least once every six months.


once every five years). IPEC will obtain samples from at least 5 wells that are representative of the ground water surrounding below-grade site structures and perform an engineering evaluation of the results from those samples for sulfates, pH and chlorides.
Attachment 2 NL-09-079 Page 5 of 17
Additionally, to assess potential indications of spent fuel pool leakage, IPEC will sample for tritium in groundwater wells in close proximity to the IP2 spent fuel pool at least once every 3 months. Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspection of normally submerged concrete portions of the intake structures at least once every 5 years. Inspect the baffling/grating partition and support platform of the IP3 intake structure at least once every 5 years. Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspection of the degraded areas of the water control structure once per 3 years rather than the normal frequency of once per 5 years during
#                        COMMITMENT                      IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
                                                                                    / AUDIT ITEM IP2:          NL-07-039    A.2.1.13 8 Enhance the Fire Water Program to include inspection September 28,               A.3.1.13 of IP2 and IP3 hose reels for evidence of corrosion.
2013                        B.1.14 Acceptance criteria will be revised to verify no NL-07-153 Audit Items unacceptable signs of degradation.
IP3:                        105, 106 Enhance the Fire Water Program to replace all or test December 12,     NL-08-014 a sample of IP2 and IP3 sprinkler heads required for 2015 10 CFR 50.48 using guidance of NFPA 25 (2002 edition), Section 5.3.1.1.1 before the end of the 50-year sprinkler head service life and at 10-year intervals thereafter during the extended period of operation to ensure that signs of degradation, such as corrosion, are detected in a timely manner.
Enhance the Fire Water Program to perform wall thickness evaluations of IP2 and IP3 fire protection piping on system components using non-intrusive techniques (e.g., volumetric testing) to identify evidence of loss of material due to corrosion. These inspections will be performed before the end of the current operating term and at intervals thereafter during the period of extended operation. Results of the initial evaluations will be used to determine the appropriate inspection interval to ensure aging effects are identified prior to loss of intended function.
Enhance the Fire Water Program to inspect the internal surface of foam based fire suppression tanks.
Acceptance criteria will be enhanced to verify no significant corrosion.


the PEO. NL-08-127 Audit Item 360 Audit Item 35826 Implement the Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) Program for IP2 and IP3 as described in LRA Section B.1.37. This new program will be implemented consistent with the corresponding program described in NUREG-1801, Section XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) Program.
Attachment 2 NL-09-079 Page 6 of 17
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.36 A.3.1.36 B.1.37 Audit item 173 Attachment 2 NL-09-079  Page 14 of 17  #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 27 Implement the Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) Program for IP2 and IP3 as described in LRA
#                        COMMITMENT                    IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
                                                                                  / AUDIT ITEM IP2:           NL-07-039   A.2.1.15 9 Enhance the Flux Thimble Tube Inspection Program September 28,              A.3.1.15 for IP2 and IP3 to implement comparisons to wear 2013                        B.1.16 rates identified in WCAP-12866. Include provisions to compare data to the previous performances and IP3:
perform evaluations regarding change to test December 12, frequency and scope.
2015 Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to specify the acceptance criteria as outlined in WCAP-12866 or other plant-specific values based on evaluation of previous test results.
Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to direct evaluation and performance of corrective actions based on tubes that exceed or are projected to exceed the acceptance criteria. Also stipulate that flux thimble tubes that cannot be inspected over the tube length and cannot be shown by analysis to be satisfactory for continued service, must be removed from service to ensure the integrity of the reactor coolant system pressure boundary.


Section B.1.38. This new program will be implemented consistent with the corresponding program described in NUREG-1801 Section XI.M13, Thermal Aging and Neutron Embrittlement of Cast Austenitic Stainless Steel (CASS) Program.
Attachment 2 NL-09-079 Page 7 of 17
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-07-153 A.2.1.37 A.3.1.37 B.1.38 Audit item 17328 Enhance the Water Chemistry Control - Closed Cooling Water Program to maintain water chemistry of the IP2 SBO/Appendix R diesel generator cooling
#                      COMMITMENT                        IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
                                                                                    / AUDIT ITEM IP2:           NL-07-039   A.2.1.16 10 Enhance the Heat Exchanger Monitoring Program for September 28,              A.3.1.16 IP2 and IP3 to include the following heat exchangers 2013                        B.1.17, in the scope of the program.
NL-07-153  Audit Item x  Safety injection pump lube oil heat exchangers IP3:                            52 December 12, x  RHR heat exchangers 2015 x  RHR pump seal coolers x  Non-regenerative heat exchangers x  Charging pump seal water heat exchangers x  Charging pump fluid drive coolers x  Charging pump crankcase oil coolers x  Spent fuel pit heat exchangers x  Secondary system steam generator sample coolers x  Waste gas compressor heat exchangers x  SBO/Appendix R diesel jacket water heat exchanger (IP2 only)
Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to perform visual inspection on heat exchangers where non-destructive examination, such as eddy current inspection, is not possible due to heat exchanger design limitations.
Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to include consideration of material-environment combinations when determining sample population of heat exchangers.
Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to establish minimum tube wall thickness for the new heat exchangers identified in the scope of the program. Establish acceptance criteria for heat exchangers visually inspected to include no indication of tube erosion, vibration wear, corrosion, pitting,                  NL-09-018 fouling, or scaling.


system per EPRI guidelines. Enhance the Water Chemistry Control - Closed Cooling Water Program to maintain the IP2 and IP3 security generator and fire protection diesel cooling water pH and glycol within limits specified by EPRI
Attachment 2 NL-09-079 Page 8 of 17
#                        COMMITMENT                        IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
                                                                                      / AUDIT ITEM IP2:          NL-07-039    A.2.1.17 11 Delete commitment.
September 28,                A.3.1.17 Enhance the ISI Program for IP2 and IP3 to provide      2013                          B.1.18 periodic visual inspections to confirm the absence of                  NL-07-153    Audit item aging effects for lubrite sliding supports used in the  IP3:                            59 steam generator and reactor coolant pump support        December 12,  NL-09-056 systems.                                                2015 IP2:          NL-07-039    A.2.1.18 12 Enhance the Masonry Wall Program for IP2 and IP3 September 28,                A.3.1.18 to specify that the IP1 intake structure is included in 2013                          B.1.19 the program.
IP3:
December 12, 2015 Enhance the Metal-Enclosed Bus Inspection Program IP2:                  NL-07-039    A.2.1.19 13 to add IP2 480V bus associated with substation A to      September 28,                A.3.1.19 the scope of bus inspected.                              2013                          B.1.20 NL-07-153 Audit Items Enhance the Metal-Enclosed Bus Inspection Program IP3:                                  124, for IP2 and IP3 to visually inspect the external surface December 12,  NL-08-057 133, 519 of MEB enclosure assemblies for loss of material at      2015 least once every 10 years. The first inspection will occur prior to the period of extended operation and the acceptance criterion will be no significant loss of material.
Enhance the Metal-Enclosed Bus Inspection Program to add acceptance criteria for MEB internal visual inspections to include the absence of indications of dust accumulation on the bus bar, on the insulators, and in the duct, in addition to the absence of indications of moisture intrusion into the duct.
Enhance the Metal-Enclosed Bus Inspection Program for IP2 and IP3 to inspect bolted connections at least once every five years if performed visually or at least once every ten years using quantitative measurements such as thermography or contact resistance measurements. The first inspection will occur prior to the period of extended operation.
The plant will process a change to applicable site procedure to remove the reference to re-torquing connections for phase bus maintenance and bolted connection maintenance.


guidelines.
Attachment 2 NL-09-079 Page 9 of 17
IP2: September 28, 2013 IP3:December 12, 2015 NL-07-039 NL-08-057 A.2.1.39 A.3.1.39 B.1.40 Audit item 50929 Enhance the Water Chemistry Control - Primary and Secondary Program for IP2 to test sulfates monthly in
#                      COMMITMENT                      IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
                                                                                  / AUDIT ITEM IP2:           NL-07-039    A.2.1.21 14 Implement the Non-EQ Bolted Cable Connections September 28,               A.3.1.21 Program for IP2 and IP3 as described in LRA Section 2013                         B.1.22 B.1.22.
IP3:
December 12, 2015 IP2:          NL-07-039     A.2.1.22 15 Implement the Non-EQ Inaccessible Medium-Voltage September 28,                A.3.1.22 Cable Program for IP2 and IP3 as described in LRA 2013                          B.1.23 Section B.1.23.
NL-07-153    Audit item This new program will be implemented consistent with IP3:                          173 the corresponding program described in NUREG-        December 12, 1801 Section XI.E3, Inaccessible Medium-Voltage      2015 Cables Not Subject To 10 CFR 50.49 Environmental Qualification Requirements.
IP2:          NL-07-039    A.2.1.23 16 Implement the Non-EQ Instrumentation Circuits Test September 28,                A.3.1.23 Review Program for IP2 and IP3 as described in LRA 2013                          B.1.24 Section B.1.24.
NL-07-153    Audit item This new program will be implemented consistent with IP3:                          173 the corresponding program described in NUREG-        December 12, 1801 Section XI.E2, Electrical Cables and            2015 Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits.
IP2:          NL-07-039    A.2.1.24 17 Implement the Non-EQ Insulated Cables and September 28,                A.3.1.24 Connections Program for IP2 and IP3 as described in 2013                          B.1.25 LRA Section B.1.25.
NL-07-153    Audit item This new program will be implemented consistent with IP3:                          173 the corresponding program described in NUREG-        December 12, 1801 Section XI.E1, Electrical Cables and            2015 Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements.


the RWST with a limit of <150 ppb.
Attachment 2 NL-09-079 Page 10 of 17
IP2: September 28, 2013NL-07-039A.2.1.40 B.1.4130 For aging management of the reactor vessel internals, IPEC will (1) participate in the industry programs for investigating and managing aging effects on reactor internals; (2) evaluate and implement the results of the industry programs as applicable to the reactor internals; and (3) upon completion of these programs, but not less than 24 months before entering the period of extended operation, submit an inspection plan for reactor internals to the NRC for review and approval.
#                        COMMITMENT                      IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
IP2: September 28, 2011 IP3:December 12, 2013NL-07-039A.2.1.41 A.3.1.4131 Additional P-T curves will be submitted as required per 10 CFR 50, Appendix G prior to the period of  
                                                                                    / AUDIT ITEM IP2:           NL-07-039    A.2.1.25 18 Enhance the Oil Analysis Program for IP2 to sample September 28,                A.3.1.25 and analyze lubricating oil used in the SBO/Appendix 2013                          B.1.26 R diesel generator consistent with oil analysis for other site diesel generators.
IP3:
Enhance the Oil Analysis Program for IP2 and IP3 to    December 12, sample and analyze generator seal oil and turbine      2015 hydraulic control oil.
Enhance the Oil Analysis Program for IP2 and IP3 to formalize preliminary oil screening for water and particulates and laboratory analyses including defined acceptance criteria for all components included in the scope of this program. The program will specify corrective actions in the event acceptance criteria are not met.
Enhance the Oil Analysis Program for IP2 and IP3 to formalize trending of preliminary oil screening results as well as data provided from independent laboratories.
IP2:          NL-07-039    A.2.1.26 19 Implement the One-Time Inspection Program for IP2 September 28,                A.3.1.26 and IP3 as described in LRA Section B.1.27.
2013                          B.1.27 This new program will be implemented consistent with                  NL-07-153    Audit item the corresponding program described in NUREG-          IP3:                          173 1801, Section XI.M32, One-Time Inspection.              December 12, 2015 IP2:           NL-07-039    A.2.1.27 20 Implement the One-Time Inspection - Small Bore September 28,               A.3.1.27 Piping Program for IP2 and IP3 as described in LRA 2013                          B.1.28 Section B.1.28.
NL-07-153    Audit item This new program will be implemented consistent with IP3:                             173 the corresponding program described in NUREG-          December 12, 1801, Section XI.M35, One-Time Inspection of ASME 2015 Code Class I Small-Bore Piping.
IP2:          NL-07-039    A.2.1.28 21 Enhance the Periodic Surveillance and Preventive September 28,                A.3.1.28 Maintenance Program for IP2 and IP3 as necessary 2013                          B.1.29 to assure that the effects of aging will be managed such that applicable components will continue to IP3:
perform their intended functions consistent with the December 12, current licensing basis through the period of extended 2015 operation.


extended operation as part of the Reactor Vessel
Attachment 2 NL-09-079 Page 11 of 17
#                        COMMITMENT                        IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
                                                                                      / AUDIT ITEM IP2:          NL-07-039    A.2.1.31 22 Enhance the Reactor Vessel Surveillance Program for September 28,                A.3.1.31 IP2 and IP3 revising the specimen capsule withdrawal 2013                          B.1.32 schedules to draw and test a standby capsule to cover the peak reactor vessel fluence expected IP3:
through the end of the period of extended operation.
December 12, Enhance the Reactor Vessel Surveillance Program for 2015 IP2 and IP3 to require that tested and untested specimens from all capsules pulled from the reactor vessel are maintained in storage.
IP2:          NL-07-039    A.2.1.32 23 Implement the Selective Leaching Program for IP2 September 28,                A.3.1.32 and IP3 as described in LRA Section B.1.33.
2013                          B.1.33 This new program will be implemented consistent with                    NL-07-153    Audit item the corresponding program described in NUREG-            IP3:                          173 1801, Section XI.M33 Selective Leaching of Materials. December 12, 2015 IP2:          NL-07-039    A.2.1.34 24 Enhance the Steam Generator Integrity Program for September 28,                A.3.1.34 IP2 and IP3 to require that the results of the condition 2013                          B.1.35 monitoring assessment are compared to the operational assessment performed for the prior IP3:
operating cycle with differences evaluated.
December 12, 2015 Enhance the Structures Monitoring Program to            IP2:          NL-07-039    A.2.1.35 25 explicitly specify that the following structures are    September 28,                A.3.1.35 included in the program.                                2013                          B.1.36 x Appendix R diesel generator foundation (IP3)                          NL-07-153 x Appendix R diesel generator fuel oil tank vault        IP3:                      Audit items (IP3)                                                December 12,              86, 87, 88, x Appendix R diesel generator switchgear and            2015          NL-08-057      417 enclosure (IP3) x city water storage tank foundation x condensate storage tanks foundation (IP3) x containment access facility and annex (IP3) x discharge canal (IP2/3) x emergency lighting poles and foundations (IP2/3) x fire pumphouse (IP2) x fire protection pumphouse (IP3) x fire water storage tank foundations (IP2/3) x gas turbine 1 fuel storage tank foundation x maintenance and outage building-elevated passageway (IP2)


Surveillance Program.
Attachment 2 NL-09-079 Page 12 of 17
IP2: September 28, 2013 IP3:December 12, 2015NL-07-039A.2.2.1.2 A.3.2.1.2 4.2.3 32As required by 10 CFR 50.61(b)(4), IP3 will submit a plant-specific safety analysis for plate B2803-3 to the NRC three years prior to reaching the RT PTSscreening criterion. Alternatively, the site may choose to implement the revised PTS rule when approved.
#                       COMMITMENT                       IMPLEMENTATION SOURCE      RELATED SCHEDULE              LRA SECTION
IP3:December 12, 2015 NL-07-039 NL-08-127 A.3.2.1.4 4.2.5 Attachment 2 NL-09-079 Page 15 of 17   #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED LRA SECTION / AUDIT ITEM 33 At least 2 years prior to entering the period of extended operation, for the locations identified in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), under the Fatigue Monitoring Program, IP2 and IP3 will implement one or more of the following: (1) Consistent with the Fatigue Monitoring Program, Detection of Aging Effects, update the fatigue usage calculations using refined fatigue analyses to determine valid CUFs less than 1.0 when accounting for the effects of reactor water environment. This includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following:1. For locations in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), with existing fatigue analysis valid for the period of extended operation, use the existing CUF.2. Additional plant-specific locations with a valid CUF may be evaluated. In particular, the pressurizer lower shell will be reviewed to ensure the surge nozzle remains the limiting component
                                                                                  / AUDIT ITEM x  new station security building (IP2) x  nuclear service building (IP1) x  primary water storage tank foundation (IP3) x  refueling water storage tank foundation (IP3) x  security access and office building (IP3) x  service water pipe chase (IP2/3) x  service water valve pit (IP3) x  superheater stack x  transformer/switchyard support structures (IP2) x  waste holdup tank pits (IP2/3)
.3. Representative CUF values from other plants, adjusted to or enveloping the IPEC plant specific external loads may be used if demonstrated applicable to IPEC. 4. An analysis using an NRC-approved version of the ASME code or NRC-approved alternative (e.g., NRC-approved code case) may be performed to determine a valid CUF. (2) Consistent with the Fatigue Monitoring Program, Corrective Actions, repair or replace the affected locations before exceeding a CUF of 1.0.
Enhance the Structures Monitoring Program for IP2 and IP3 to clarify that in addition to structural steel and concrete, the following commodities (including their anchorages) are inspected for each structure as applicable.
IP2: September 28, 2011 IP3:December 12, 2013 NL-07-039 NL-07-153 NL-08-021 A.2.2.2.3 A.3.2.2.3 4.3.3 Audit item 14634 IP2 SBO / Appendix R diesel generator will be installed and operational by April 30, 2008. This committed change to the facility meets the requirements of 10 CFR 50.59(c)(1) and, therefore, a license amendment pursuant to 10 CFR 50.90 is not
x  cable trays and supports x  concrete portion of reactor vessel supports x  conduits and supports x  cranes, rails and girders x  equipment pads and foundations x  fire proofing (pyrocrete) x  HVAC duct supports x  jib cranes x  manholes and duct banks x  manways, hatches and hatch covers x  monorails x  new fuel storage racks x  sumps, sump screens, strainers and flow barriers Enhance the Structures Monitoring Program for IP2 and IP3 to inspect inaccessible concrete areas that are exposed by excavation for any reason. IP2 and IP3 will also inspect inaccessible concrete areas in environments where observed conditions in accessible areas exposed to the same environment indicate that significant concrete degradation is occurring.
Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspections of elastomers (seals, gaskets, seismic joint filler, and roof elastomers) to


required.April 30, 2008 Complete NL-07-078 NL-08-074 2.1.1.3.5 Attachment 2 NL-09-079 Page 16 of 17   #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED LRA SECTION / AUDIT ITEM 35 Perform a one-time inspection of representative sample area of IP2 containment liner affected by the 1973 event behind the insulation, prior to entering the extended period of operation, to assure liner degradation is not occurring in this area. Perform a one-time inspection of representative sample area of the IP3 containment steel liner at the juncture with the concrete floor slab, prior to entering the extended period of operation, to assure liner degradation is not occurring in this area. Any degradation will be evaluated for updating of the containment liner analyses as needed.
Attachment 2 NL-09-079 Page 13 of 17
IP2: September 28, 2013 IP3:December 12, 2015 NL-08-127 NL-09-018 Audit Item 2736 Perform a one-time Inspection and evaluation of a sample of potentially affected IP2 refueling cavity concrete prior to the period of extended operation.
#                       COMMITMENT                         IMPLEMENTATION SOURCE      RELATED SCHEDULE              LRA SECTION
The sample will be obtained by core boring the refueling cavity wall in an area that is susceptible to exposure to borated water leakage. The inspection will include an assessment of embedded reinforcing
                                                                                      / AUDIT ITEM identify cracking and change in material properties and for inspection of aluminum vents and louvers to identify loss of material.
Enhance the Structures Monitoring Program for IP2                      NL-08-127  Audit Item and IP3 to perform an engineering evaluation of                                          360 groundwater samples to assess aggressiveness of groundwater to concrete on a periodic basis (at least once every five years). IPEC will obtain samples from at least 5 wells that are representative of the ground water surrounding below-grade site structures and perform an engineering evaluation of the results from those samples for sulfates, pH and chlorides.
Additionally, to assess potential indications of spent fuel pool leakage, IPEC will sample for tritium in groundwater wells in close proximity to the IP2 spent fuel pool at least once every 3 months.
Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspection of normally submerged concrete portions of the intake structures at least once every 5 years. Inspect the baffling/grating partition and support platform of the IP3 intake structure at least once every 5 years.
Enhance the Structures Monitoring Program for IP2                                  Audit Item and IP3 to perform inspection of the degraded areas                                      358 of the water control structure once per 3 years rather than the normal frequency of once per 5 years during the PEO.
IP2:           NL-07-039    A.2.1.36 26  Implement the Thermal Aging Embrittlement of Cast September 28,               A.3.1.36 Austenitic Stainless Steel (CASS) Program for IP2 2013                         B.1.37 and IP3 as described in LRA Section B.1.37.
NL-07-153    Audit item This new program will be implemented consistent with IP3:                              173 the corresponding program described in NUREG-            December 12, 1801, Section XI.M12, Thermal Aging Embrittlement        2015 of Cast Austenitic Stainless Steel (CASS) Program.


steel.Additional core bore samples will be taken, if the leakage is not stopped, prior to the end of the first ten
Attachment 2 NL-09-079 Page 14 of 17
#                        COMMITMENT                      IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
                                                                                    / AUDIT ITEM IP2:          NL-07-039    A.2.1.37 27 Implement the Thermal Aging and Neutron Irradiation September 28,                A.3.1.37 Embrittlement of Cast Austenitic Stainless Steel 2013                          B.1.38 (CASS) Program for IP2 and IP3 as described in LRA NL-07-153    Audit item Section B.1.38.
IP3:                          173 This new program will be implemented consistent with December 12, the corresponding program described in NUREG-          2015 1801 Section XI.M13, Thermal Aging and Neutron Embrittlement of Cast Austenitic Stainless Steel (CASS) Program.
IP2:          NL-07-039    A.2.1.39 28 Enhance the Water Chemistry Control - Closed September 28,                A.3.1.39 Cooling Water Program to maintain water chemistry of 2013                          B.1.40 the IP2 SBO/Appendix R diesel generator cooling NL-08-057    Audit item system per EPRI guidelines.
IP3:                          509 Enhance the Water Chemistry Control - Closed            December 12, Cooling Water Program to maintain the IP2 and IP3      2015 security generator and fire protection diesel cooling water pH and glycol within limits specified by EPRI guidelines.
IP2:          NL-07-039    A.2.1.40 29 Enhance the Water Chemistry Control - Primary and September 28,                B.1.41 Secondary Program for IP2 to test sulfates monthly in 2013 the RWST with a limit of <150 ppb.
IP2:          NL-07-039    A.2.1.41 30 For aging management of the reactor vessel internals, September 28,                A.3.1.41 IPEC will (1) participate in the industry programs for 2011 investigating and managing aging effects on reactor internals; (2) evaluate and implement the results of IP3:
the industry programs as applicable to the reactor December 12, internals; and (3) upon completion of these programs, 2013 but not less than 24 months before entering the period of extended operation, submit an inspection plan for reactor internals to the NRC for review and approval.
IP2:          NL-07-039    A.2.2.1.2 31 Additional P-T curves will be submitted as required September 28,              A.3.2.1.2 per 10 CFR 50, Appendix G prior to the period of 2013                          4.2.3 extended operation as part of the Reactor Vessel Surveillance Program.
IP3:
December 12, 2015 As required by 10 CFR 50.61(b)(4), IP3 will submit a IP3:              NL-07-039    A.3.2.1.4 32 plant-specific safety analysis for plate B2803-3 to the December 12,                  4.2.5 NRC three years prior to reaching the RTPTS            2015          NL-08-127 screening criterion. Alternatively, the site may choose to implement the revised PTS rule when approved.


years of the period of extended operation. A sample of leakage fluid will be analyzed to determine the composition of the fluid. If additional core samples are taken prior to the end of the first ten years of the period of extended operation, a sample of leakage fluid will be analyzed.
Attachment 2 NL-09-079 Page 15 of 17
IP2: September 28, 2013 NL-08-127 NL-09-056 NL-09-079 Audit Item 35937 Enhance the Containment Inservice Inspection (CII-IWL) Program to include inspections of the containment using enhanced characterization of degradation (i.e., quantifying the dimensions of noted indications through the use of optical aids) during the period of extended operation. The enhancement includes obtaining critical dimensional data of degradation where possible through direct measurement or the use of scaling technologies for photographs, and the use of consistent vantage points
#                          COMMITMENT                            IMPLEMENTATION    SOURCE      RELATED SCHEDULE                LRA SECTION
                                                                                              / AUDIT ITEM IP2:            NL-07-039    A.2.2.2.3 33 At least 2 years prior to entering the period of September 28,                A.3.2.2.3 extended operation, for the locations identified in LRA 2011                            4.3.3 Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), under NL-07-153    Audit item the Fatigue Monitoring Program, IP2 and IP3 will IP3:                            146 implement one or more of the following:
December 12,    NL-08-021 (1) Consistent with the Fatigue Monitoring Program,            2013 Detection of Aging Effects, update the fatigue usage calculations using refined fatigue analyses to determine valid CUFs less than 1.0 when accounting for the effects of reactor water environment. This includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following:
: 1. For locations in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), with existing fatigue analysis valid for the period of extended operation, use the existing CUF.
: 2. Additional plant-specific locations with a valid CUF may be evaluated. In particular, the pressurizer lower shell will be reviewed to ensure the surge nozzle remains the limiting component.
: 3. Representative CUF values from other plants, adjusted to or enveloping the IPEC plant specific external loads may be used if demonstrated applicable to IPEC.
: 4. An analysis using an NRC-approved version of the ASME code or NRC-approved alternative (e.g., NRC-approved code case) may be performed to determine a valid CUF.
(2) Consistent with the Fatigue Monitoring Program, Corrective Actions, repair or replace the affected locations before exceeding a CUF of 1.0.
April 30, 2008 NL-07-078    2.1.1.3.5 34 IP2 SBO / Appendix R diesel generator will be installed and operational by April 30, 2008. This Complete    NL-08-074 committed change to the facility meets the requirements of 10 CFR 50.59(c)(1) and, therefore, a license amendment pursuant to 10 CFR 50.90 is not required.


for visual inspections.
Attachment 2 NL-09-079 Page 16 of 17
IP2: September 28, 2013 IP3:December 12, 2015NL-08-127Audit Item 361 Attachment 2 NL-09-079 Page 17 of 17   #COMMITMENT IMPLEMENTATION SCHEDULESOURCE RELATED  LRA SECTION / AUDIT ITEM 38 For Reactor Vessel Fluence, should future core loading patterns invalidate the basis for the projected
#                        COMMITMENT                        IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
                                                                                      / AUDIT ITEM IP2:           NL-08-127  Audit Item 35 Perform a one-time inspection of representative September 28,                 27 sample area of IP2 containment liner affected by the 2013 1973 event behind the insulation, prior to entering the extended period of operation, to assure liner degradation is not occurring in this area.
Perform a one-time inspection of representative          IP3:
sample area of the IP3 containment steel liner at the    December 12, juncture with the concrete floor slab, prior to entering  2015 the extended period of operation, to assure liner degradation is not occurring in this area.
Any degradation will be evaluated for updating of the                    NL-09-018 containment liner analyses as needed.
IP2:          NL-08-127  Audit Item 36 Perform a one-time Inspection and evaluation of a September 28,                359 sample of potentially affected IP2 refueling cavity 2013 concrete prior to the period of extended operation.
The sample will be obtained by core boring the refueling cavity wall in an area that is susceptible to exposure to borated water leakage. The inspection will include an assessment of embedded reinforcing steel.
Additional core bore samples will be taken, if the                      NL-09-056 leakage is not stopped, prior to the end of the first ten years of the period of extended operation.
A sample of leakage fluid will be analyzed to                            NL-09-079 determine the composition of the fluid. If additional core samples are taken prior to the end of the first ten years of the period of extended operation, a sample of leakage fluid will be analyzed.
IP2:          NL-08-127   Audit Item 37 Enhance the Containment Inservice Inspection (CII-September 28,                361 IWL) Program to include inspections of the 2013 containment using enhanced characterization of degradation (i.e., quantifying the dimensions of noted IP3:
indications through the use of optical aids) during the December 12, period of extended operation. The enhancement 2015 includes obtaining critical dimensional data of degradation where possible through direct measurement or the use of scaling technologies for photographs, and the use of consistent vantage points for visual inspections.


values of RTpts or C VUSE, updated calculations will be provided to the NRC.
Attachment 2 NL-09-079 Page 17 of 17
IP2: September 28, 2013 IP3:December 12, 2015NL-08-1434.2.1 39 Install a fixed automatic fire suppression system for IP2 in the Auxiliary Feedwater Pump Room.
#                      COMMITMENT                        IMPLEMENTATION  SOURCE      RELATED SCHEDULE              LRA SECTION
IP2: Sept ember 28, 2013 NL-09-056 NL-09-079 2.3.4.5 3.4.2}}
                                                                                    / AUDIT ITEM IP2:          NL-08-143      4.2.1 38 For Reactor Vessel Fluence, should future core September 28, loading patterns invalidate the basis for the projected 2013 values of RTpts or CVUSE, updated calculations will be provided to the NRC.
IP3:
December 12, 2015 IP2:          NL-09-056    2.3.4.5 39 Install a fixed automatic fire suppression system for September 28,                3.4.2 IP2 in the Auxiliary Feedwater Pump Room.
2013           NL-09-079}}

Revision as of 03:36, 14 November 2019

2009/06/12 Indian Point Lr Hearing - NL-09-079 - Reply to License Renewal RAI
ML092150744
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/12/2009
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML092150744 (74)


Text

IPRenewal NPEmails From: Tyner, Donna [dtyner@entergy.com]

Sent: Friday, June 12, 2009 11:12 AM To: Green, Kimberly Cc: Caputo, Charles; STROUD, MICHAEL D; Curry, John J

Subject:

NL-09-079 - Reply to License Renewal RAI Attachments: NL-09-079 - RAI Reply.pdf

Kim, Attached is an advance electronic copy of NL-09-079, License Renewal RAI Reply - Offsite Power, Refueling Cavity, and U2 AFW Pump Rm Fire Event.

Thank you, Donna 1

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 1495 Mail Envelope Properties (3934ABBB09976D4286276A97F3ECA098045ED4AD)

Subject:

NL-09-079 - Reply to License Renewal RAI Sent Date: 6/12/2009 11:12:24 AM Received Date: 6/12/2009 11:12:43 AM From: Tyner, Donna Created By: dtyner@entergy.com Recipients:

"Caputo, Charles" <ccapu90@entergy.com>

Tracking Status: None "STROUD, MICHAEL D" <MSTROUD@entergy.com>

Tracking Status: None "Curry, John J" <jcurry2@entergy.com>

Tracking Status: None "Green, Kimberly" <Kimberly.Green@nrc.gov>

Tracking Status: None Post Office: IPCEXETSP001.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 189 6/12/2009 11:12:43 AM NL-09-079 - RAI Reply.pdf 1436742 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NL-09-079 Page 2 of 2 FRD/dmt

Attachment:

1. Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event
2. List of Regulatory Commitments, Revision 9 cc: Mr. Samuel J. Collins, Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Ms. Kimberly Green, NRC Safety Project Manager Mr. Kenneth Chang, NRC Branch Chief, Engineering Review Branch I Mr. John Boska, NRR Senior Project Manager Mr. Paul Eddy, New York State Department of Public Service NRC Resident Inspectors Office Mr. Francis J. Murray, President and CEO, NYSERDA

ATTACHMENT 1 TO NL-09-079 Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286

Attachment 1 NL-09-079 Page 1 of 51 INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION OFFSITE POWER, REFUELING CAVITY, AND UNIT 2 AUXILIARY FEEDWATER PUMP ROOM FIRE EVENT RAI 2.5-4 In license renewal application (LRA) Section 2.5, as clarified in LRA Amendment 3, dated March 24, 2008, the applicant included in the scope of license renewal the structures and components for one offsite circuit path (138 kV/Station Auxiliary Transformer circuit, the immediate access circuit). The applicant is requested to explain why the second offsite circuit (the delayed access circuit) path, from the first inter-tie with the offsite distribution systems at the Buchanan substations to the safety buses, was not included in the scope of license renewal.

Specifically, the applicant is requested to explain why the components up to and including either 138 kV circuit breaker F1 or 345 kV circuit breaker F7 for IP2 and either 138 kV circuit breaker F3 or 345 kV circuit breaker F7 for IP3 were not included in the scope of license renewal.

Response for RAI 2.5-4 The components up to and including either 138 kV circuit breaker F1 or 345 kV circuit breaker F7 for IP2 and either 138 kV circuit breaker F3 or 345 kV circuit breaker F7 for IP3 were not included in the scope of license renewal because they do not meet the scoping criteria of 10 CFR 54.4. The scoping for offsite power recovery was in accordance with the guidance provided in a staff letter dated April 1, 2002. That letter states, For purposes of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule. The breakers identified in this RAI are part of the offsite power source; and not plant system components that are used to connect the plant to the offsite power source.

Discussion The second offsite circuit path was explicitly added in response to RAI 2.5-1.

RAI 2.5-1 (Dated 10/24/07; ML0729200270) asked the following question.

According to the above, both paths from the safety-related 480 Volt (V) buses to the first circuit breaker from the offsite line, used to control the offsite circuits to the plant, should be age managed. The guidance does not specify that the switchyard is not part of the plant system nor that the switchyard does not need to be included in the scope of license renewal. Explain in detail which high voltage breakers and other components in the switchyard will be connected from the startup transformers up to the offsite power system for the purpose of SBO recovery.

Attachment 1 NL-09-079 Page 2 of 51 RAI 2.5-1 Response Excerpt (Dated 11/16/2007)

General Design Criterion 17 of 10 CFR Part 50, Appendix A, specifies that electric power from the transmission network to the onsite electric distribution system be supplied by two physically independent circuits to minimize the likelihood of their simultaneous failure. As discussed in IP2 UFSAR Section 8.1.2.1, 10 CFR 50 Appendix A General Design Criterion 17 - Electric Power Systems, the two physically independent circuits supplying offsite power to IP2 are the Buchanan Substation via the Con Edison 138 kV system feeder and the Buchanan 13.8 kV system feeder. The 138 kV system feeder is the primary offsite power source connected to the 6.9 kV buses through the station auxiliary transformer. The 13.8 kV system feeder is the secondary offsite power source connected to the 6.9 kV buses through the GT autotransformer. The station auxiliary transformer and the GT autotransformer perform the functions assigned to the typical startup transformers referred to in the April 1, 2002 letter.

LRA Figure 2.5-2 showed only the primary offsite power source or the 6.9kV source from the 138kV/6.9kV station auxiliary transformer, which is connected to the Buchanan substation through the Con Edison 138kV feeder. Figure 2.5-2 is revised as shown in this response to add the secondary offsite power feeder from the 13.8 kV Buchanan substation via the GT autotransformer.

As shown in the revised LRA Figure 2.5-2, the 6.9 kV buses receive power from the two independent sources of offsite power via the 138 kV / 6.9 kV station auxiliary transformer or the 13.8 kV / 6.9 kV GT autotransformer. The station auxiliary transformer is connected to the 138 kV Buchanan substation, the primary offsite power source, via switchyard bus, overhead transmission conductors, and underground transmission conductors through motor-operated disconnect F3A, which is located at the Buchanan substation. The GT autotransformer is connected to the 13.8 kV Buchanan substation, the secondary offsite power source, via underground medium voltage cable through breaker F2-3, which is located at the Buchanan substation.

General Design Criterion 17 of 10 CFR Part 50, Appendix A, specifies that electric power from the transmission network to the onsite electric distribution system be supplied by two physically independent circuits to minimize the likelihood of their simultaneous failure. As discussed in IP3 UFSAR Section 8.2.1, Network Interconnection, and 8.2.3, Emergency Power - Sources Description, the two physically independent circuits supplying offsite power to IP3 are the Buchanan Substation via the Con Edison 138 kV system feeder and the Buchanan 13.8 kV system feeder. The 138 kV system feeder is the primary offsite power source connected to the 6.9 kV buses through the station auxiliary transformer. The 13.8 kV system feeder is the secondary offsite power source connected to the 6.9 kV buses through the GT autotransformer. The station auxiliary transformer and the GT autotransformer perform the functions assigned to the typical startup transformers referred to in the April 1, 2002 letter.

Attachment 1 NL-09-079 Page 3 of 51 LRA Figure 2.5-3 showed only the primary offsite power source or the 6.9kV source from the 138kV/6.9kV station auxiliary transformer, which is connected to the Buchanan substation through the Con Edison 138kV feeder.. Figure 2.5-3 is revised as shown in this response to add the secondary offsite power feeder from the 13.8 kV Buchanan substation via the GT autotransformer.

As shown in the revised LRA Figure 2.5-3, the 6.9 kV buses receive power from the two independent sources of offsite power via the 138 kV / 6.9 kV station auxiliary transformer or the 13.8 kV / 6.9 kV GT autotransformer. The station auxiliary transformer is connected to the 138 kV Buchanan substation, the primary offsite power source, via switchyard bus and overhead transmission conductors through breaker BT2-6, which is located at the Buchanan substation.

The GT autotransformer is connected to the 13.8 kV Buchanan substation, the secondary offsite power source, via underground medium voltage cable through breaker F3-1, which is located at the Buchanan substation.

(Revised LRA Figures 2.5-2 and 2.5-3 were also provided with this RAI response.)

Based on discussions with the NRC staff on 12/12/07 and 1/30/08 this RAI response was revised for the IP2 138 kV connection point.

RAI 2.5-1 Response Clarification Excerpt (Dated 3/24/2008)

(A revised LRA Figure 2.5-2 was also provided with this RAI clarification.)

The boundaries described in the RAI 2.5-1 response were determined in accordance with the guidance provided in a staff letter dated April 1, 2002. The following excerpt from the RAI 2.5-1 response discusses this determination.

RAI 2.5-1 Response Excerpt (Dated 11/16/2007)

The staff position in the letter dated April 1, 2002, Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout (SBO)

Rule (10 CFR 50.63) for License Renewal (10 CFR 54.4(a)(3)) is that the plant system portion of the offsite power system should be included within the scope of license renewal. Specifically, the letter states,

Attachment 1 NL-09-079 Page 4 of 51 For purposes of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule.

Implementation of the staff position requires definition of the offsite power source. The April 1, 2002 letter states:

The offsite power systems of U.S. nuclear power plants consist of a transmission system (grid) component that provides a source of power and a plant system component that connects that power source to a plants onsite electrical distribution system which powers safety equipment. The staff has historically relied upon the well-distributed, redundant, and interconnected nature of the grid to provide the necessary level of reliability to support nuclear power plant operations.

In this discussion, the staff defines the offsite power source as the transmission system or the grid. The staff refers to the well-distributed, redundant, and interconnected nature of the grid. The Buchanan substation, which includes the 345 kV, the 138 kV, and the 13.8 kV sections, is a key element of the well-distributed, redundant and interconnected grid or transmission system that constitutes the offsite power source for IP2 and IP3.

The Buchanan substation provides for the interconnection of multiple sources of power and provides dispatch control for a multiple county transmission network. The multiple power sources are interconnected through switchyard bus, transmission conductors, and breakers within the substation. In keeping with the guidance in the letter dated April 1, 2002, the SBO recovery paths from the plant systems to the offsite power system or grid connection are included in scope for license renewal.

The 138 kV circuit breaker F1, the 345 kV circuit breaker F7, and the 138 kV circuit breaker F3 are part of the Buchanan Substation, which is part of the well-distributed, redundant and interconnected grid or transmission system that constitutes the offsite power source for IP2 and IP3. In other words, these breakers are part of the transmission system (grid) component that provides a source of power; and not plant system components that connect that power source to the plants onsite electrical distribution system which powers safety equipment. The Buchanan Substation is not the IP2 or IP3 switchyard. The Buchanan Substation is part of the Con Edison transmission and distribution system, and it provides distribution to Westchester County and the New York City area with 345 kV, 138 kV, and 13.8 kV transmission lines. The Con Edison transmission system does not perform a function that meets the license renewal scoping criteria of 10 CFR 54.4.

The breakers conservatively included in scope for the offsite power recovery path are the interface points added to the Buchanan Substation during the construction of IP2 and IP3. As stated in LRA Section 2.5:

Attachment 1 NL-09-079 Page 5 of 51 In addition to the plant electrical systems, certain switchyard components required to restore offsite power following a station blackout were conservatively included within the scope of license renewal even though those components are not relied on in safety analyses or plant evaluations to perform a function that demonstrates compliance with the Commission's regulations for station blackout (SBO) (10 CFR 50.63).

The breakers are shown on LRA Figure 2.5-2 (Amended by letter dated 3/24/2008), and LRA Figure 2.5-3 (Amended by letter dated 11/16/2007).

Follow-up RAI 2: Open Item 3.0.3.2.15-1 The purpose of this follow-up request for additional information (RAI) is to request additional information and clarification to help the staff to understand the applicants May 1, 2009 response to Follow-up RAI 1 for Open Item 3.0.3.2.15-1. Specifically, the staff requests the following:

(a) In part (a) of the applicants response, Figures 1 through 4 do not clearly identify the flow path from the refueling cavity liner to the A, B, and C water exit locations.

Therefore, please provide the following additional descriptive information. In an elevation view (similar to Figure 2), cut through each of the exit locations A, B, and C, showing the horizontal and vertical dimension between the entry point through the liner and the exit location. To the extent possible, describe the possible circumferential traverse of the leakage, from the entry point through the liner to the exit location.

(b) The staff requests the applicant to provide the following additional information/clarification regarding the revised license renewal commitments in part (b) of the applicants response:

(1) The current remediation plan has targeted the 2014 outage for completion.

Please identify actions that will be taken if the remediation plan is unsuccessful.

(2) Identify the specific location and number of the concrete core samples (e.g., the three water exit locations) that will be removed and tested (i) during the upcoming 2010 refueling outage, and (ii) at 10 years into the extended period of operation (if a permanent solution for the leakage has not been achieved, in accordance with Entergys current remediation plan). Define the tests that will be performed, and the objective of each test.

(3) Please advise if the revised commitments in the applicants May 1, 2009 response include chemical analysis of the leaking water (i) during the upcoming 2010 refueling outage, and (ii) at 10 years into the extended period of operation.

Please identify the analyses that will be performed, and the objective of each analysis.

Attachment 1 NL-09-079 Page 6 of 51 Response for Follow-up RAI 2: Open Item 3.0.3.2.15-1

a. Based on leakage investigations, the reactor refueling cavity begins to leak when the water in the cavity reaches an approximate elevation between 80- 85. As can be seen on the attached elevation views of the cavity (Figures 1 thru 4), horizontal weld seams exist between these elevations, but the exact liner leakage points are unknown. We can , however, make the following observations regarding the relationship between the leakage areas in the concrete structure denoted as points A, B and C, and conditions of the cavity liner:
1. Above point A, defects in the CeramAlloy patch along a horizontal weld seam located on the south wall at an elevation between 80- 85 has been observed. The CeramAlloy patch material that covers several weld seams was a previous attempt to mitigate the cavity leakage. This is a potential cavity liner leak point for the observed leakage on the concrete structure at point A.
2. Above the exit point denoted as B, defects in a CeramAlloy patch along a horizontal weld seam located at an elevation between 80- 85 on the south wall has been observed. This patch area is an extension from the area discussed in item 1 above. In addition, the upper internals stand support base is attached to the cavity floor above the vicinity of the observed leakage in the concrete structure at point B. Both these areas in the cavity liner are potential leak point sources for the observed leakage at point B.
3. Above the observed leakage area in the concrete structure denoted as point C, defects in both the CeramAlloy patches along weld seams and potential defects in the weld seams themselves at the north cavity wall have been observed. These defects are located approximately 10-15 above the cavity floor and are potential leak points for the leakage observed at point C.
b. The following provides Entergys response to part (b) of the staffs request.
1. Should the remediation plan for the cavity liner targeted for completion during the 2014 outage be unsuccessful, Entergy will perform additional monitoring to assess the condition of potentially affected structures. To assure continued structural integrity of the reactor refueling cavity reinforced concrete walls, Entergy will perform further core sampling and inspect reinforcing steel at suspect locations as described in item 3.
2. (i) During the upcoming 2010 outage, a total of 3 core bore samples will be taken from the reinforced concrete walls that form the outer shell of the reactor refueling cavity steel liner. The locations of these core bores will be chosen based on the following.

3/4 Locations in the vicinity of observed liner/liner patch degradation in relative proximity to the observed leak points A, B and C on the concrete structure.

3/4 Accessibility of suspect areas based on the principle of As Low As Reasonably Achievable (ALARA) and physical interferences.

Attachment 1 NL-09-079 Page 7 of 51 The core samples will be tested and chemically analyzed to determine the effect, if any, past leakage has had on the concrete properties. The objectives of the physical and chemical tests of the concrete core samples are as follows.

3/4 Determine the compressive strength of concrete.

3/4 Determine boron and chloride concentration in concrete.

3/4 Determine pH of concrete.

In addition, a petrographic examination will be performed on the core samples to evaluate the cementitious matrix, and, to the extent possible, determine the durability of the concrete.

In addition, reinforcing steel in the core sample areas will be exposed and inspected. Visual inspections of the reinforcing steel will be performed to determine the extent of material loss, if any, from the steel as a result of the borated water leakage.

2. (ii) If a solution to the leakage has not been achieved, Entergy will perform core samples and reinforcing steel inspections prior to 10 years into the period of extended operation. Locations of the core samples will be chosen based on the extent and location of the leakage remaining following previous repair efforts. Core samples will be tested and chemically analyzed as discussed under part 2 above. Visual inspections of the reinforcing steel will be performed to determine the extent of material loss, if any, from the steel as a result of the borated water leakage.
3. (I and ii) Revised Commitment 36 includes chemical analysis of water leakage from the refueling cavity. During the upcoming 2010 outage, Entergy will collect water samples from the cavity leak and perform chemical analysis.

If the leakage has not been stopped, Entergy will collect additional water samples of the leak during the same outage as the core samples are taken no later than 10 years into the period of extended operation. The water that is collected will be analyzed for the following.

3/4 Boron concentration 3/4 pH 3/4 Iron 3/4 Calcium Results of the analysis will be evaluated to assess the aggressiveness of the leaking fluid to reinforced concrete structures.

NL-09-079 Page 8 of 51

NL-09-079 Page 9 of 51

Attachment 1 NL-09-079 Page 10 of 51

Attachment 1 NL-09-079 Page 11 of 51

Attachment 1 NL-09-079 Page 12 of 51 RAI 3.4.2-2 By letter dated January 27, 2009, Entergy responded to RAI 3.4.2-1, and provided clarifying details regarding the passive, long-lived component types, materials, environments, aging effects and aging management programs for systems, structures and components that support the auxiliary feedwater (AFW) pump room fire event at Indian Point Nuclear Generating Unit No. 2 (IP2) that were not already within the scope of license renewal for 10 CFR 54.4(a)(1) or (a)(2).

The staff reviewed the response and determined that the systems contain passive, long-lived components made of materials that when exposed to the stated environments may experience aging effects as described in the GALL Report, which must be managed during the period of extended operation in accordance with 10 CFR 54.21(a)(3).

By letter dated May 1, 2009, Entergy submitted a revised commitment list which included a new commitment (Commitment 39) to install a fixed automatic fire suppression system for IP2 in the AFW pump room which would make the suppression configuration of the room similar to that of the AFW pump room at Unit 3.

Because the planned installation is not yet part of the current licensing basis, the staff cannot make a finding consistent with the requirement in 10 CFR 54.29(a). Therefore, the staff requests that the applicant provide information to demonstrate that the effects of aging will be adequately managed so that the intended function(s) will maintained consistent with the current licensing basis for the period of extended operation as required by 10 CFR 54.21(a)(3). Specifically, the staff requests that the applicant list all aging effects and the aging management programs needed to manage the aging effects for the component types provided in the January 27, 2009 letter.

Response for RAI 3.4.2-2 As stated in the initial response to RAI 3.4.2-1 in the January 27, 2009 letter, the function of supporting safe shutdown in the event of a fire in the auxiliary feed pump room is confirmed on an ongoing basis since the required SSCs are performing their intended functions under design basis conditions during normal operation. Performance of intended functions during normal plant operation demonstrates that the systems and components can perform those functions for one hour in the event of a fire in the auxiliary feedwater pump room. Nevertheless, the additional information requested by the staff is provided below in the form of revised tables from the response to RAI 3.4.2-1 provided in the January 27, 2009 letter. This additional information includes aging effects and aging management programs to manage the aging effects for the component types that support the AFW pump room fire event that were not already included in scope and subject to aging management review for 10CFR54.4(a)(1) or (a)(2).

These tables identify changes as strikethroughs for deletions and underlines for additions. During the revision of these tables, the following changes to line items in the tables were identified outside of the addition of aging effects and programs.

3/4 new line items identifying cracking as an aging effect for tubing in the condensate system and loss of material due to selective leaching in heat exchanger tubes for the instrument air system.

Attachment 1 NL-09-079 Page 13 of 51 3/4 new line items for component type strainers in the city water system and the IP1 station air system 3/4 new line items for component type strainer housings made of copper alloy

>15% zn in the city water system 3/4 deleted line items for component type expansion joint made of elastomer in the condensate system since elastomer expansion joints are replaced on a specified time period 3/4 new line items for pump casings made of gray cast iron and stainless steel in the circulating water system 3/4 revised line items in the service water system to change environment from air-outdoor (ext) to condensation (ext) for consistency with other LRA tables 3/4 revised line items for environment of treated water (int) to include > 140°F for high temperature aging effects 3/4 revised line item for pump casings in the wash water system to change material to stainless steel from carbon steel 3/4 revised line item for pump casings for the river water system to change material to gray cast iron from carbon steel 3/4 revised line item for pump casings for the fresh water cooling system to change material to titanium from copper alloy 3/4 Replaced Note 408 with the following:

408 The air - treated environment is the equivalent of dried air and for the purposes of evaluating aluminum components, the air - treated environment is drier than the NUREG-1801 defined air - indoor uncontrolled.

The addition of aging management programs to these tables also resulted in necessary revisions for Appendix A, UFSAR Supplement and Appendix B, Aging Management Programs and Activities which are also provided with this response.

The following revised tables are provided in response to RAI 3.4.2-2.

Attachment 1 NL-09-079 Page 14 of 51 Table 3.4.2-5-1-IP2 Conventional Closed Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-1-IP2: Conventional Closed Cooling System (CCC)

Aging Effect NUREG- Table 1 Intended Aging Management Notes Component Type Material Environment Requiring 1801 Vol. 2 Item Function Programs Management Item Pressure None VII.E1-2 3.3.1-51 408 Heat exchanger Copper alloy None boundary and Treated water (ext) Water Chemistry Control (AP-34) D (tubes) >15% zn Loss of material heat transfer - Closed Cooling Water Heat exchanger Copper alloy Water Chemistry Control VII.C2-2 3.3.1-52 408 Heat transfer Treated water (ext) Fouling (tubes) >15% zn - Closed Cooling Water (AP-80) B Heat exchanger Pressure Copper alloy VII.C2-6 3.3.1-84 408 Treated water (ext) Loss of material Selective Leaching (AP-43) C (tubes) boundary >15% zn Pressure VII.C1-3 3.3.1-82 408 Heat exchanger Copper alloy Treated water Raw None None (A-65) C boundary and (tubes) >15% zn water (int) Loss of material Service Water Integrity heat transfer Heat exchanger Copper alloy VII.C1-6 3.3.1-83 C Heat transfer Raw water (int) Fouling Service Water Integrity (A-72)

(tubes) >15% zn Heat exchanger Pressure Copper alloy VII.C1-4 3.3.1-84 C Raw water (int) Loss of material Selective Leaching (A-66)

(tubes) boundary >15% zn

Attachment 1 NL-09-079 Page 15 of 51 Table 3.4.2-5-2-IP2 Condensate System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-2-IP2 Condensate System (COND)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure None None VIII.H-4 3.4.1-22 408 Bolting Carbon steel Air - indoor (ext) (S-34) A boundary Loss of material Bolting Integrity Pressure Stainless VIII.I-10 3.4.1-41 408 Bolting Air - indoor (ext) None None (SP-12) C boundary steel Pressure -- -- 408 Expansion joint Elastomer Air - indoor (ext) None None --

boundary Pressure -- -- 408 Expansion joint Elastomer Steam (int) None None --

boundary Pressure -- -- 408 Expansion joint Elastomer Treated water (int) None None --

boundary None VIII.E-34 3.4.1-4 408 Heat exchanger Pressure None Carbon steel Treated water (int) Water Chemistry Control (S-10) A, 404 (shell) boundary Loss of material

- Primary & Secondary None VIII.H-7 3.4.1-28 408 Heat exchanger Pressure None (S-29) A Carbon steel Air - indoor (ext) External Surfaces (shell) boundary Loss of material Monitoring None VIII.A-16 3.4.1-2 408 Heat exchanger Pressure None Carbon steel Steam (ext) Water Chemistry Control (S-06) C, 404 (shell) boundary Loss of material

- Primary & Secondary

Attachment 1 NL-09-079 Page 16 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure None -- -- 408 Heat exchanger None F boundary and Titanium Steam (ext) Water Chemistry Control (tubes) Loss of material heat transfer - Primary & Secondary Heat exchanger Water Chemistry Control -- -- 408 Heat transfer Titanium Steam (ext) Fouling F (tubes) - Primary & Secondary None -- -- 408 Pressure F Heat exchanger None Periodic Surveillance boundary and Titanium Raw water (int)

(tubes) Loss of material and Preventive heat transfer Maintenance Periodic Surveillance -- -- 408 Heat exchanger F Heat transfer Titanium Raw water (int) Fouling and Preventive (tubes)

Maintenance Pressure None VIII.A-5 3.4.1-15 408 Heat exchanger None boundary and Copper alloy Treated water (int) Water Chemistry Control (SP-61) D, 404 (tubes) Loss of material heat transfer - Primary & Secondary Heat exchanger Water Chemistry Control VIII.E-10 3.4.1-9 408 Heat transfer Copper alloy Treated water (int) Fouling (tubes) - Primary & Secondary (SP-58) A, 404 Pressure VIII.G-8 3.4.1-10 408 Heat exchanger None None (SP-53) D, 405 boundary and Copper alloy Lube oil (ext)

(tubes) Loss of material Oil Analysis heat transfer Heat exchanger VIII.G-8 3.4.1-10 408 Heat transfer Copper alloy Lube oil (ext) Fouling Oil Analysis (SP-53) D, 405 (tubes)

None VIII.B1-3 3.4.1-37 408 Heat exchanger Pressure Stainless None Steam (ext) Water Chemistry Control (SP-43) C (tubes) boundary steel Loss of material

- Primary & Secondary

Attachment 1 NL-09-079 Page 17 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Heat exchanger Pressure Stainless Water Chemistry Control VIII.B1-2 3.4.1-39 408 Steam (ext) Cracking (tubes) boundary steel - Primary & Secondary (SP-44) C Heat exchanger Stainless Water Chemistry Control -- -- 408 Heat transfer Steam (ext) Fouling G (tubes) steel - Primary & Secondary None VIII.E-36 3.4.1-16 408 Heat exchanger Pressure Stainless Treated water None Water Chemistry Control (S-22) A, 404 (tubes) boundary steel > 140°F (int) Loss of material

- Primary & Secondary Heat exchanger Pressure Stainless Treated water Water Chemistry Control VIII.E-30 3.4.1-14 408 Cracking (tubes) boundary steel > 140°F (int) - Primary & Secondary (SP-17) C, 404 Heat exchanger Stainless Treated water Water Chemistry Control VIII.E-13 3.4.1-9 408 Heat transfer Fouling (tubes) steel > 140°F (int) - Primary & Secondary (SP-40) A, 404 None -- -- 408 Heat exchanger Pressure None F Titanium Treated water (int) Water Chemistry Control (tubes) boundary Loss of material

- Primary & Secondary Heat exchanger Water Chemistry Control -- -- 408 Heat transfer Titanium Treated water (int) Fouling F (tubes) - Primary & Secondary None -- -- 408 Heat exchanger Pressure None F Titanium Steam (ext) Water Chemistry Control (tubes) boundary Loss of material

- Primary & Secondary Heat exchanger Water Chemistry Control -- -- 408 Heat transfer Titanium Steam (ext) Fouling F (tubes) - Primary & Secondary None VIII.E-34 3.4.1-4 408 Pressure None Piping Carbon steel Treated water (int) Water Chemistry Control (S-10) A, 404 boundary Loss of material

- Primary & Secondary

Attachment 1 NL-09-079 Page 18 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure Cracking - VIII.B1-10 3.4.1-1 408 Piping Carbon steel Treated water (int) Metal Fatigue - TLAA (S-08) C boundary fatigue None VIII.H-7 3.4.1-28 408 Pressure None (S-29) A Piping Carbon steel Air - indoor (ext) External Surfaces boundary Loss of material Monitoring None VIII.H-7 3.4.1-28 408 Pressure None (S-29) A Sight glass Carbon steel Air - indoor (ext) External Surfaces boundary Loss of material Monitoring None VIII.E-34 3.4.1-4 408 Pressure None Sight glass Carbon steel Treated water (int) Water Chemistry Control (S-10) A, 404 boundary Loss of material

- Primary & Secondary Pressure VIII.I-5 3.4.1-40 408 Sight glass Glass Air - indoor (ext) None None (SP-9) A boundary Pressure VIII.I-8 3.4.1-40 408 Sight glass Glass Treated water (int) None None (SP-35) A boundary None VIII.H-7 3.4.1-28 408 Pressure None (S-29) A Thermowell Carbon steel Air - indoor (ext) External Surfaces boundary Loss of material Monitoring None VIII.E-34 3.4.1-4 408 Pressure None Thermowell Carbon steel Treated water (int) Water Chemistry Control (S-10) A, 404 Boundary Loss of material

- Primary & Secondary Pressure Cracking - VIII.B1-10 3.4.1-1 408 Thermowell Carbon steel Treated water (int) Metal Fatigue - TLAA (S-08) C Boundary fatigue

Attachment 1 NL-09-079 Page 19 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure Stainless VIII.I-10 3.4.1-41 408 Thermowell Air - indoor (ext) None None (SP-12) A boundary steel None VIII.E-29 3.4.1-16 408 Pressure Stainless Treated water None Thermowell Water Chemistry Control (SP-16) A, 404 boundary steel > 140°F (int) Loss of material

- Primary & Secondary Pressure Stainless Treated water Water Chemistry Control VIII.E-30 3.4.1-14 A, 404 Thermowell Cracking boundary steel > 140°F (int) - Primary & Secondary (SP-17)

Pressure Stainless Treated water Cracking - VII.E1-16 3.3.1-2 C, 406 Thermowell Metal Fatigue - TLAA (A-57) boundary steel > 140°F (int) fatigue None VIII.E-29 3.4.1-16 408 Pressure Stainless Treated water None Tubing Water Chemistry Control (SP-16) A, 404 boundary steel > 140°F (int) Loss of material

- Primary & Secondary Pressure Stainless Treated water Water Chemistry Control VIII.E-30 3.4.1-14 408 Tubing Cracking boundary steel > 140°F (int) - Primary & Secondary (SP-17) A, 404 Pressure Stainless Treated water Cracking - VII.E1-16 3.3.1-2 408 Tubing Metal Fatigue - TLAA (A-57) C, 406 boundary steel > 140°F (int) fatigue Pressure Stainless VIII.I-10 3.4.1-41 A Tubing Air - indoor (ext) None None (SP-12) boundary steel None VIII.E-34 3.4.1-4 408 Pressure None Valve body Carbon steel Treated water (int) Water Chemistry Control (S-10) A, 404 boundary Loss of material

- Primary & Secondary Pressure Cracking - VIII.B1-10 3.4.1-1 408 Valve body Carbon steel Treated water (int) Metal Fatigue - TLAA (S-08) C boundary fatigue

Attachment 1 NL-09-079 Page 20 of 51 Table 3.4.2-5-2-IP2 Condensate System (COND)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None VIII.H-7 3.4.1-28 408 Pressure None (S-29) A Valve body Carbon steel Air - indoor (ext) External Surfaces boundary Loss of material Monitoring None VIII.E-29 3.4.1-16 408 Pressure Stainless Treated water None Valve body Water Chemistry Control (SP-16) A, 404 boundary steel > 140°F (int) Loss of material

- Primary & Secondary Pressure Stainless Treated water Water Chemistry Control VIII.E-30 3.4.1-14 408 Valve body Cracking boundary steel > 140°F (int) - Primary & Secondary (SP-17) A, 404 Pressure Stainless Treated water Cracking - VII.E1-16 3.3.1-2 408 Valve body Metal Fatigue - TLAA (A-57) C, 406 boundary steel > 140°F (int) fatigue Pressure Stainless VIII.I-10 3.4.1-41 408 Valve body Air - indoor (ext) None None (SP-12) A boundary steel

Attachment 1 NL-09-079 Page 21 of 51 Table 3.4.2-5-3-IP2 Circulating Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-3-IP2 Circulating Water System (CIRC)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure None None VII.I-1 3.3.1-43 408 Bolting Carbon steel Air - outdoor (ext) (AP-28) C boundary Loss of material Bolting Integrity None VIII.E-1 3.4.1-11 408 Pressure None Bolting Carbon steel Soil (ext) Buried Piping And Tanks (S-01) C boundary Loss of material Inspection Periodic Surveillance VIII.G-36 3.4.1-8 E Pressure (S-12)

Bolting Carbon steel Raw water (ext) Loss of material and Preventive boundary Maintenance None VII.C1-1 3.3.1-75 408 Pressure None Periodic Surveillance (AP-75) E Expansion joint Elastomer Raw water (int) boundary Cracking and Preventive Maintenance Change of Periodic Surveillance VII.C1-1 3.3.1-75 408 Pressure (AP-75) E Expansion joint Elastomer Raw water (int) material and Preventive boundary properties Maintenance None -- -- 408 Pressure None Periodic Surveillance G Expansion joint Elastomer Air -outdoor (ext) boundary Cracking and Preventive Maintenance

Attachment 1 NL-09-079 Page 22 of 51 Table 3.4.2-5-3-IP2 Circulating Water System (CIRC)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Change of Periodic Surveillance -- -- 408 Pressure G Expansion joint Elastomer Air -outdoor (ext) material and Preventive boundary properties Maintenance None VIII.E-1 3.4.1-11 408 Pressure None Piping Carbon steel Soil (ext) Buried Piping And Tanks (S-01) C boundary Loss of material Inspection None VIII.H-8 3.4.1-28 408 Pressure None (S-41) A Piping Carbon steel Air outdoor (ext) External Surfaces boundary Loss of material Monitoring None VIII.G-36 3.4.1-8 408 Pressure None Periodic Surveillance (S-12) E Piping Carbon steel Raw water (int) boundary Loss of material and Preventive Maintenance None VIII.H-8 3.4.1-28 408 Pressure None (S-41) A Pump casing Carbon steel Air-outdoor (ext) External Surfaces boundary Loss of material Monitoring None VIII.G-36 3.4.1-8 408 Pressure None Periodic Surveillance (S-12) E Pump casing Carbon steel Raw water (int) boundary Loss of material and Preventive Maintenance Periodic Surveillance VIII.G-36 3.4.1-8 408 Pressure (S-12) E Pump casing Carbon steel Raw water (ext) Loss of material and Preventive boundary Maintenance

Attachment 1 NL-09-079 Page 23 of 51 Table 3.4.2-5-3-IP2 Circulating Water System (CIRC)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Periodic Surveillance VIII.E-27 3.4.1-32 E Pressure (SP-36)

Pump casing Stainless steel Raw water (int) Loss of material and Preventive boundary Maintenance Periodic Surveillance VIII.E-27 3.4.1-32 E Pressure (SP-36)

Pump casing Stainless steel Raw water (ext) Loss of material and Preventive boundary Maintenance Pressure External Surfaces VIII.H-8 3.4.1-28 A Pump casing Gray cast iron Air-outdoor (ext) Loss of material (S-41) boundary Monitoring Periodic Surveillance VIII.G-36 3.4.1-8 E Pressure (S-12)

Pump casing Gray cast iron Raw water (int) Loss of material and Preventive boundary Maintenance Pressure VIII.A-7 3.4.1-36 C Pump casing Gray cast iron Raw water (int) Loss of material Selective Leaching (SP-28) boundary Periodic Surveillance VIII.G-36 3.4.1-8 E Pressure (S-12)

Pump casing Gray cast iron Raw water (ext) Loss of material and Preventive boundary Maintenance Pressure VIII.A-7 3.4.1-36 C Pump casing Gray cast iron Raw water (ext) Loss of material Selective Leaching (SP-28) boundary

Attachment 1 NL-09-079 Page 24 of 51 Table 3.4.2-5-4-IP2 City Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-4-IP2 City Water System (CYW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure None None VII.I-4 3.3.1-43 408 Bolting Carbon steel Air - indoor (ext) (AP-27) A boundary Loss of material Bolting Integrity Pressure Stainless VII.J-15 3.3.1-94 408 Bolting Air - indoor (ext) None None (AP-17) C boundary steel Pressure None None VII.I-1 3.3.1-43 408 Bolting Carbon steel Air - outdoor (ext) (AP-28) A boundary Loss of material Bolting Integrity Pressure Stainless None None -- -- 408 Bolting Air - outdoor (ext) G boundary steel Loss of material Bolting Integrity Pressure Stainless VII.J-15 3.3.1-94 408 Flex hose Air-indoor (ext) None None (AP-17) A boundary steel Pressure Stainless None None -- -- 408 Flex hose Treated water (int) G, 407 boundary steel Loss of material One-Time Inspection None VII.I-9 3.3.1-58 408 Pressure None (A-78) A Piping Carbon steel Air-outdoor (ext) External Surfaces boundary Loss of material Monitoring None VII.I-8 3.3.1-58 408 Pressure None (A-77) A Piping Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring

Attachment 1 NL-09-079 Page 25 of 51 Table 3.4.2-5-4-IP2 City Water System (CYW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None -- -- 408 Pressure None Periodic Surveillance G, 407 Piping Carbon steel Treated water (int) boundary Loss of material and Preventive Maintenance Pressure Stainless VII.J-15 3.3.1-94 408 Piping Air-indoor (ext) None None (AP-17) A boundary steel None -- -- 408 Pressure Stainless None G Piping Air-outdoor (ext) External Surfaces boundary steel Loss of material Monitoring Pressure Stainless None None -- -- 408 Piping Treated water (int) G, 407 boundary steel Loss of material One-Time Inspection None VII.I-9 3.3.1-58 408 Pressure None (A-78) A Sight glass Carbon steel Air-outdoor (ext) External Surfaces boundary Loss of material Monitoring None -- -- 408 Pressure None Periodic Surveillance G, 407 Sight glass Carbon steel Treated water (int) boundary Loss of material and Preventive Maintenance Pressure -- -- 408 Sight glass Glass Air-outdoor (ext) None None G boundary Pressure -- -- 408 Sight glass Glass Treated water (int) None None G, 407 boundary Stainless -- -- G, 407 Strainer Filtration Treated water (int) Loss of material One-Time Inspection Steel

Attachment 1 NL-09-079 Page 26 of 51 Table 3.4.2-5-4-IP2 City Water System (CYW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Stainless -- -- G, 407 Strainer Filtration Treated water (ext) Loss of material One-Time Inspection Steel None VII.I-8 3.3.1-58 408 Pressure None (A-77) A Strainer housing Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring Periodic Surveillance -- -- 408 Pressure None G, 407 Strainer housing Carbon steel Treated water (int) and Preventive boundary Loss of material Maintenance Pressure Copper alloy V.F-3 3.2.1-53 C Strainer housing Air-indoor (ext) None None (EP-10) boundary >15% zn Periodic Surveillance -- -- G, 407 Pressure Copper alloy Strainer housing Treated water (int) Loss of material and Preventive boundary >15% zn Maintenance Pressure Copper alloy -- -- G, 407 Strainer housing Treated water (int) Loss of material Selective Leaching boundary >15% zn Pressure Stainless VII.J-15 3.3.1-94 408 Strainer housing Air-indoor (ext) None None (AP-17) A boundary steel Pressure Stainless None None -- -- 408 Strainer housing Treated water (int) G, 407 boundary steel Loss of material One-Time Inspection Pressure Stainless None None -- -- 408 Tubing Treated water (int) G, 407 boundary steel Loss of material One-Time Inspection None -- -- 408 Pressure Stainless None G Tubing Air - outdoor (ext) External Surfaces boundary steel Loss of material Monitoring

Attachment 1 NL-09-079 Page 27 of 51 Table 3.4.2-5-4-IP2 City Water System (CYW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure Stainless VII.J-15 3.3.1-94 408 Tubing Air - indoor (ext) None None (AP-17) A boundary steel None -- -- 408 Pressure None Periodic Surveillance G, 407 Valve body Carbon steel Treated water (int) boundary Loss of material and Preventive Maintenance None VII.I-9 3.3.1-58 408 Pressure None (A-78) A Valve body Carbon steel Air - outdoor (ext) External Surfaces boundary Loss of material Monitoring None VII.I-8 3.3.1-58 408 Pressure None (A-77) A Valve body Carbon steel Air - indoor (ext) External Surfaces boundary Loss of material Monitoring Pressure Stainless None None -- -- 408 Valve body Treated water (int) G, 407 boundary steel Loss of material One-Time Inspection None -- -- 408 Pressure Stainless None G Valve body Air - outdoor (ext) External Surfaces boundary steel Loss of material Monitoring Pressure Stainless VII.J-15 3.3.1-94 408 Valve body Air - indoor (ext) None None (AP-17) A boundary steel

Attachment 1 NL-09-079 Page 28 of 51 Table 3.4.2-5-5-IP2 Wash Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-5-IP2 Wash Water System (WW) Components Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure None None VII.I-1 3.3.1-43 408 Bolting Carbon steel Air-outdoor (ext) (AP-28) A boundary Loss of material Bolting Integrity Pressure Stainless None None -- -- 408 Bolting Air-outdoor (ext) G boundary steel Loss of material Bolting Integrity Pressure Stainless VII.C1-15 3.3.1-79 C Bolting Raw water (ext) Loss of material Bolting Integrity boundary steel (A-54)

None -- -- 408 Pressure None Periodic Surveillance G Expansion joint Elastomer Air-outdoor (ext) boundary Cracking and Preventive Maintenance Change of Periodic Surveillance -- -- 408 Pressure Expansion joint Elastomer Air-outdoor (ext) material and Preventive G boundary properties Maintenance None VII.C1-1 3.3.1-75 408 Pressure None Periodic Surveillance (AP-75) E Expansion joint Elastomer Raw water (int) boundary Cracking and Preventive Maintenance Change of Periodic Surveillance VII.C1-1 3.3.1-75 408 Pressure Expansion joint Elastomer Raw water (int) material and Preventive (AP-75) E boundary properties Maintenance

Attachment 1 NL-09-079 Page 29 of 51 Table 3.4.2-5-5-IP2 Wash Water System (WW) Components Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None -- -- 408 Pressure Stainless None Flex hose Air-outdoor (ext) External Surfaces G boundary steel Loss of material Monitoring None VII.C1-15 3.3.1-79 408 Pressure Stainless None Periodic Surveillance (A-54) E Flex hose Raw water (int) boundary steel Loss of material and Preventive Maintenance None VII.I-9 3.3.1-58 408 Pressure None Nozzles Carbon steel Air-outdoor (ext) External Surfaces (A-78) A boundary Loss of material Monitoring None VII.C1-19 3.3.1-76 408 Pressure None Periodic Surveillance (A-38) E Nozzles Carbon steel Raw water (int) boundary Loss of material and Preventive Maintenance None VII.I-9 3.3.1-58 408 Pressure None Piping Carbon steel Air-outdoor (ext) External Surfaces (A-78) A boundary Loss of material Monitoring None VII.C1-19 3.3.1-76 408 Pressure None Periodic Surveillance (A-38) E Piping Carbon steel Raw water (int) boundary Loss of material and Preventive Maintenance None -- -- 408 Pressure Stainless None Piping Air-outdoor (ext) External Surfaces G boundary steel Loss of material Monitoring

Attachment 1 NL-09-079 Page 30 of 51 Table 3.4.2-5-5-IP2 Wash Water System (WW) Components Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None VII.C1-15 3.3.1-79 408 Pressure Stainless None Periodic Surveillance (A-54) E Piping Raw water (int) boundary steel Loss of material and Preventive Maintenance Carbon steel None -- -- 408 Pressure None G Pump casing Stainless Air-outdoor (ext) External Surfaces boundary Loss of material steel Monitoring None VII.C1-15 3.3.1-79 408 Carbon steel Pressure None Periodic Surveillance (A-54) E Pump casing Stainless Raw water (int) boundary Loss of material and Preventive steel Maintenance Periodic Surveillance VII.C1-15 3.3.1-79 408 Pressure Stainless Pump casing Raw water (ext) Loss of material and Preventive (A-54) E boundary steel Maintenance None -- -- 408 Pressure Stainless None Tubing Air-outdoor (ext) External Surfaces G boundary steel Loss of material Monitoring None VII.C1-15 3.3.1-79 408 Pressure Stainless None Periodic Surveillance (A-54) E Tubing Raw water (int) boundary steel Loss of material and Preventive Maintenance None VII.I-9 3.3.1-58 408 Pressure None Valve body Carbon steel Air-outdoor (ext) External Surfaces (A-78) A boundary Loss of material Monitoring

Attachment 1 NL-09-079 Page 31 of 51 Table 3.4.2-5-5-IP2 Wash Water System (WW) Components Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None VII.C1-19 3.3.1-76 408 Pressure None Periodic Surveillance (A-38) E Valve body Carbon steel Raw water (int) boundary Loss of material and Preventive Maintenance None -- -- 408 Pressure Stainless None Valve body Air-outdoor (ext) External Surfaces G boundary steel Loss of material Monitoring None VII.C1-15 3.3.1-79 408 Pressure Stainless None Periodic Surveillance (A-54) E Valve body Raw water (int) boundary steel Loss of material and Preventive Maintenance

Attachment 1 NL-09-079 Page 32 of 51 Table 3.4.2-5-6-IP2 Feedwater System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-6-IP2 Feedwater System (FW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None VIII.B1-3 3.4.1-37 408 Heat exchanger Pressure Stainless None Steam (ext) Water Chemistry Control (SP-43) C (tubes) boundary steel Loss of material

- Primary & Secondary Heat exchanger Pressure Stainless Water Chemistry Control VIII.B1-2 3.4.1-39 408 Steam (ext) Cracking (tubes) boundary steel - Primary & Secondary (SP-44) C None VIII.D1-4 3.4.1-16 408 Heat exchanger Pressure Stainless Treated water None Water Chemistry Control (SP-16) A, 404 (tubes) boundary steel > 140°F (int) Loss of material

- Primary & Secondary Heat exchanger Pressure Stainless Treated water Water Chemistry Control VIII.D1-5 3.4.1-14 408 Cracking (tubes) boundary steel > 140°F (int) - Primary & Secondary (SP-17) C, 404

Attachment 1 NL-09-079 Page 33 of 51 Table 3.4.2-5-7-IP2 Instrument Air System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-7-IP2 Instrument Air System (IA)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure None None VII.I-1 3.3.1-43 408 Bolting Carbon steel Air-outdoor (ext) (AP-28) A boundary Loss of material Bolting Integrity Pressure Stainless None None -- -- 408 Bolting Air-outdoor (ext) G boundary steel Loss of material Bolting Integrity None VII.G-9 3.3.1-28 408 Pressure Heat exchanger Copper alloy None Periodic Surveillance (AP-78) E boundary and Condensation (int)

(tubes) >15% zn Loss of material and Preventive heat transfer Maintenance Periodic Surveillance -- -- 408 Heat exchanger Copper alloy Heat transfer Condensation (int) Fouling and Preventive G (tubes) >15% zn Maintenance Pressure None VII.C2-4 3.3.1-51 408 Heat exchanger Copper alloy Treated Water None boundary and Water Chemistry Control (AP-12) D (tubes) >15% zn (ext) Loss of material heat transfer - Closed Cooling Water Heat exchanger Pressure Copper alloy Treated Water None None VII.C2-6 3.3.1-84 408 (tubes) boundary >15% zn (ext) Loss of material Selective Leaching (AP-43) C Heat exchanger Copper alloy Treated Water Water Chemistry Control VII.C2-2 3.3.1-52 408 Heat transfer Fouling (tubes) >15% zn (ext) - Closed Cooling Water (AP-80) D

Attachment 1 NL-09-079 Page 34 of 51 Table 3.4.2-5-7-IP2 Instrument Air System (IA)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure V.F-3 3.2.1-53 408 Tubing Copper alloy Air - indoor (ext) None None boundary (EP-10) C Pressure VII.J-3 3.3.1-98 A, 408 Tubing Copper alloy Air - treated (int) None None boundary (AP-8)

Pressure Stainless VII.J-15 3.3.1-94 408 Tubing Air - indoor (ext) None None boundary steel (AP-17) A Pressure Stainless VII.J-18 3.3.1-98 A, 408 Tubing Air - treated (int) None None boundary steel (AP-20)

None VII.D-3 3.3.1-57 408 Pressure None Piping Carbon steel Air-indoor (ext) External Surfaces (A-80) A boundary Loss of material Monitoring Pressure VII.J-22 3.3.1-98 A, 408 Piping Carbon steel Air-treated (int) None None boundary (AP-4)

Pressure Stainless VII.J-15 3.3.1-94 408 Piping Air-indoor (ext) None None boundary steel (AP-17) A Pressure Stainless VII.J-18 3.3.1-98 A, 408 Piping Air-treated (int) None None boundary steel (AP-20)

Pressure V.F-3 3.2.1-53 408 Valve body Copper alloy Air - indoor (ext) None None boundary (EP-10) C Pressure VII.J-3 3.3.1-98 A, 408 Valve body Copper alloy Air - treated (int) None None boundary (AP-8)

Pressure Copper alloy V.F-3 3.2.1-53 408 Valve body Air - indoor (ext) None None boundary >15% zn (EP-10) C Pressure Copper alloy VII.J-3 3.3.1-98 A, 408 Valve body Air - treated (int) None None boundary >15% zn (AP-8)

Attachment 1 NL-09-079 Page 35 of 51 Table 3.4.2-5-7-IP2 Instrument Air System (IA)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None VII.D-3 3.3.1-57 408 Pressure None Valve body Carbon steel Air - indoor (ext) External Surfaces (A-80) A boundary Loss of material Monitoring Pressure VII.J-22 3.3.1-98 A, 408 Valve body Carbon steel Air - treated (int) None None boundary (AP-4)

Pressure Stainless VII.J-15 3.3.1-94 408 Valve body Air - indoor (ext) None None boundary steel (AP-17) A Pressure Stainless VII.J-18 3.3.1-98 A, 408 Valve body Air - treated (int) None None boundary steel (AP-20)

Attachment 1 NL-09-079 Page 36 of 51 Table 3.4.2-5-8-IP2 Instrument Air Closed Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-8-IP2 Instrument Air Closed Cooling System (IACC)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Copper > VII.C1-3 3.3.1-82 Heat exchanger Pressure 408 15% Zn Raw water (int) Loss of material Service Water Integrity A-65)

(tubes) boundary C (inhibited)

Copper > VII.C1-6 3.3.1-83 408 Heat exchanger None None (A-72) C Heat transfer 15% Zn Raw water (int)

(tubes) Fouling Service Water Integrity (inhibited)

Copper > VII.E1-2 3.3.1-51 408 Heat exchanger Pressure Water Chemistry Control (AP-34) D 15% Zn Treated water (ext) Loss of material (tubes) boundary - Closed Cooling Water (inhibited)

Copper > None VII.C2-2 3.3.1-52 408 Heat exchanger None Heat transfer 15% Zn Treated water (ext) Water Chemistry Control (AP-80) D (tubes) Fouling (inhibited) - Closed Cooling Water

Attachment 1 NL-09-079 Page 37 of 51 Table 3.4.2-5-9-IP2 Service Water System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-9-IP2 Service Water System (SW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure Air-outdoor (ext) None None VII.D-1 3.3.1-44 408 Bolting Carbon steel (A-103) C boundary Condensation (ext) Loss of material Bolting Integrity Pressure Stainless Air-outdoor (ext) None None VII.F1-1 3.3.1-27 408 Bolting (A-09) E boundary steel Condensation (ext) Loss of material Bolting Integrity None VII.I-11 3.3.1-58 408 Pressure Air-outdoor (ext) None Nozzles Carbon steel External Surfaces (A-81) A boundary Condensation (ext) Loss of material Monitoring Pressure None None VII.C1-19 3.3.1-76 408 Nozzles Carbon steel Raw water (int) (A-38) A boundary Loss of material Service Water Integrity None VII.I-11 3.3.1-58 408 Pressure Air-outdoor (ext) None Piping Carbon steel External Surfaces (A-81) A boundary Condensation (ext) Loss of material Monitoring Pressure None None VII.C1-19 3.3.1-76 408 Piping Carbon steel Raw water (int) (A-38) A boundary Loss of material Service Water Integrity None VII.F1-1 3.3.1-27 408 Pressure Stainless Air-outdoor (ext) None Piping External Surfaces (A-09) E boundary steel Condensation (ext) Loss of material Monitoring

Attachment 1 NL-09-079 Page 38 of 51 Table 3.4.2-5-9-IP2 Service Water System (SW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure Stainless None None VII.C1-15 3.3.1-79 408 Piping Raw water (int) (A-54) A boundary steel Loss of material Service Water Integrity None VII.F1-16 3.3.1-25 408 Pressure Air-outdoor (ext) None Tubing Copper alloy External Surfaces (A-46) E boundary Condensation (ext) Loss of material Monitoring Pressure None None VII.C1-9 3.3.1-81 408 Tubing Copper alloy Raw water (int) boundary Loss of material Service Water Integrity (A-44) A None VII.F1-1 3.3.1-27 408 Pressure Stainless Air-outdoor (ext) None Tubing External Surfaces (A-09) E boundary steel Condensation (ext) Loss of material Monitoring Pressure Stainless None None VII.C1-15 3.3.1-79 408 Tubing Raw water (int) boundary steel Loss of material Service Water Integrity (A-54) A None VII.I-11 3.3.1-58 408 Pressure Air-outdoor (ext) None (A-81) A Valve body Carbon steel External Surfaces boundary Condensation (ext) Loss of material Monitoring Pressure None None VII.C1-19 3.3.1-76 408 Valve body Carbon steel Raw water (int) (A-38) A boundary Loss of material Service Water Integrity None VII.F1-1 3.3.1-27 408 Pressure Stainless Air-outdoor (ext) None Valve body External Surfaces (A-09) E boundary steel Condensation (ext) Loss of material Monitoring Pressure Stainless None None VII.C1-15 3.3.1-79 408 Valve body Raw water (int) (A-54) A boundary steel Loss of material Service Water Integrity

Attachment 1 NL-09-079 Page 39 of 51 Table 3.4.2-5-10-IP2 Lube Oil System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-10-IP2 Lube Oil System (LO)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure -- -- 408 Heat exchanger None None F boundary and Titanium Lube oil (int) tubes Loss of material Oil Analysis heat transfer Heat exchanger -- -- 408 Heat transfer Titanium Lube oil (int) Fouling Oil Analysis F tubes Pressure -- -- 408 Heat exchanger None None F boundary and Titanium Raw water (ext) tubes Loss of material Service Water Integrity heat transfer Heat exchanger -- -- 408 Heat transfer Titanium Raw water (ext) Fouling Service Water Integrity F tubes

Attachment 1 NL-09-079 Page 40 of 51 Table 3.4.2-5-11-IP2 River Water Service System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-11-IP2 River Water Service System (RW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure None None VII.I-1 3.3.1-43 408 Bolting Carbon steel Air-outdoor (ext) (AP-28) A boundary Loss of material Bolting Integrity Pressure Stainless None None -- -- 408 Bolting Air-outdoor (ext) G boundary steel Loss of material Bolting Integrity None VII.I-9 3.3.1-58 408 Pressure None (A-78) A Piping Carbon steel Air-outdoor (ext) External Surfaces boundary Loss of material Monitoring None VII.C1-19 3.3.1-76 408 Pressure None Periodic Surveillance (A-38) E Piping Carbon steel Raw water (int) boundary Loss of material and Preventive Maintenance Carbon steel None VII.I-9 3.3.1-58 408 Pressure None (A-78) A Pump casing Gray cast Air-outdoor (ext) External Surfaces boundary Loss of material iron Monitoring None VII.C1-19 3.3.1-76 408 Carbon steel (A-38) E Pressure None Periodic Surveillance Pump casing Gray cast Raw water (int) boundary Loss of material and Preventive iron Maintenance

Attachment 1 NL-09-079 Page 41 of 51 Table 3.4.2-5-11-IP2 River Water Service System (RW)

Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Carbon steel VII.C1-11 3.3.1-85 A Pressure (A-51)

Pump casing Gray cast Raw water (int) Loss of material Selective Leaching boundary iron None -- -- 408 Pressure Stainless None G Tubing Air-outdoor (ext) External Surfaces boundary steel Loss of material Monitoring None VII.C1-15 3.3.1-79 408 Pressure Stainless None Periodic Surveillance (A-54) E Tubing Raw water (int) boundary steel Loss of material and Preventive Maintenance None VII.I-9 3.3.1-58 408 Pressure None (A-78) A Valve body Carbon steel Air-outdoor (ext) External Surfaces boundary Loss of material Monitoring None VII.C1-19 3.3.1-76 408 Pressure None Periodic Surveillance (A-38) E Valve body Carbon steel Raw water (int) boundary Loss of material and Preventive Maintenance None -- -- 408 Pressure Stainless None G Valve body Air-outdoor (ext) External Surfaces boundary steel Loss of material Monitoring None VII.C1-15 3.3.1-79 408 Pressure Stainless None Periodic Surveillance (A-54) E Valve body Raw water (int) boundary steel Loss of material and Preventive Maintenance

Attachment 1 NL-09-079 Page 42 of 51 Table 3.4.2-5-12-IP2 Fresh Water Cooling System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-12-IP2 Fresh Water Cooling (FWC) System Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None -- -- 408 Heat transfer F Heat exchanger Copper alloy None Periodic Surveillance and pPressure Raw water (int)

(tubes) Titanium Loss of material and Preventive boundary Maintenance Periodic Surveillance -- -- F Heat exchanger Heat transfer Titanium Raw water (int) Fouling and Preventive (tubes)

Maintenance None -- -- 408 Heat transfer Heat exchanger Copper alloy Treated Water None Periodic Surveillance F and pPressure (tubes) Titanium (ext) Loss of material and Preventive boundary Maintenance Periodic Surveillance -- -- F Heat exchanger Treated Water Heat transfer Titanium Fouling and Preventive (tubes) (ext)

Maintenance

Attachment 1 NL-09-079 Page 43 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air System Components Required to Support AFW Pump Room Fire Event Summary of Aging Management Review Table 3.4.2-5-13-IP2 IP1 Station Air (SA) System Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure None None VII.I-4 3.3.1-43 408 Bolting Carbon steel Air-indoor (ext) (AP-27) A boundary Loss of material Bolting Integrity Pressure Stainless VII.J-15 3.3.1-94 408 Bolting Air-indoor (ext) None None (AP-17) A boundary steel None VII.D-3 3.3.1-57 408 Pressure None (A-80) A Filter housing Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring None VII.D-2 3.3.1-53 408 Pressure None Periodic Surveillance (A-26) E Filter Housing Carbon steel Condensation (int) boundary Loss of material and Preventive Maintenance None VII.D-3 3.3.1-57 408 Pressure None (A-80) A Piping Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring None VII.D-2 3.3.1-53 408 Pressure None Periodic Surveillance (A-26) E Piping Carbon steel Condensation (int) boundary Loss of material and Preventive Maintenance Pressure Stainless VII.J-15 3.3.1-94 408 Piping Air-indoor (ext) None None (AP-17) A boundary steel

Attachment 1 NL-09-079 Page 44 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air (SA) System Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item Pressure Stainless None None VII.D-4 3.3.1-54 408 Piping Condensation (int) (AP-81) E boundary steel Loss of material One-Time Inspection Stainless None None VII.D-4 3.3.1-54 408 Strainer Filtration Condensation (int) (AP-81) E steel Loss of material One-Time Inspection Stainless None None VII.D-4 3.3.1-54 408 Strainer Filtration Condensation (ext) (AP-81) E steel Loss of material One-Time Inspection None VII.D-3 3.3.1-57 408 Pressure None (A-80) A Strainer housing Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring None VII.D-2 3.3.1-53 408 Pressure None Periodic Surveillance (A-26) E Strainer housing Carbon steel Condensation (int) boundary Loss of material and Preventive Maintenance None VII.D-3 3.3.1-57 408 Pressure None (A-80) A Tank Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring None VII.D-2 3.3.1-53 408 Pressure None Periodic Surveillance (A-26) E Tank Carbon steel Condensation (int) boundary Loss of material and Preventive Maintenance None VII.D-3 3.3.1-57 408 Pressure None (A-80) A Tubing Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring

Attachment 1 NL-09-079 Page 45 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air (SA) System Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None VII.D-2 3.3.1-53 408 Pressure None Periodic Surveillance (A-26) E Tubing Carbon steel Condensation (int) boundary Loss of material and Preventive Maintenance Pressure Stainless VII.J-15 3.3.1-94 408 Tubing Air-indoor (ext) None None (AP-17) A boundary steel Pressure Stainless None None VII.D-4 3.3.1-54 408 Tubing Condensation (int) (AP-81) E boundary steel Loss of material One-Time Inspection Pressure V.F-3 3.2.1-53 408 Tubing Copper alloy Air-indoor (ext) None None boundary (EP-10) C None VII.G-9 3.3.1-28 408 Pressure None Periodic Surveillance (AP-78) E Tubing Copper alloy Condensation (int) boundary Loss of material and Preventive Maintenance None VII.D-3 3.3.1-57 408 Pressure None (A-80) A Trap Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring None VII.D-2 3.3.1-53 408 Pressure None Periodic Surveillance (A-26) E Trap Carbon steel Condensation (int) boundary Loss of material and Preventive Maintenance None VII.D-3 3.3.1-57 408 Pressure None (A-80) A Valve body Carbon steel Air-indoor (ext) External Surfaces boundary Loss of material Monitoring

Attachment 1 NL-09-079 Page 46 of 51 Table 3.4.2-5-13-IP2 IP1 Station Air (SA) System Aging Effect NUREG-Intended Aging Management Table 1 Component Type Material Environment Requiring 1801 Vol. 2 Notes Function Programs Item Management Item None VII.D-2 3.3.1-53 408 Pressure None Periodic Surveillance (A-26) E Valve body Carbon steel Condensation (int) boundary Loss of material and Preventive Maintenance Pressure Stainless VII.J-15 3.3.1-94 408 Valve body Air-indoor (ext) None None (AP-17) A boundary steel Pressure Stainless None None VII.D-4 3.3.1-54 408 Valve body Condensation (int) (AP-81) E boundary steel Loss of material One-Time Inspection Pressure V.F-3 3.2.1-53 408 Valve body Copper alloy Air-indoor (ext) None None (EP-10) C boundary None VII.G-9 3.3.1-28 408 Pressure None Periodic Surveillance (AP-78) E Valve body Copper alloy Condensation (int) boundary Loss of material and Preventive Maintenance

Attachment 1 NL-09-079 Page 47 of 51 As a result of the previous table changes, the following changes are required to Appendix A (Changes are shown as strikethroughs for deletions and underlines for additions).

A.2.1.26 One-Time Inspection Program One-time inspection activities on the following confirm that loss of material is not occurring or is so insignificant that an aging management program is not warranted.

  • internal surfaces of stainless steel drain piping,.piping elements and components containing raw water (drain water)
  • internal surfaces of stainless steel piping, piping elements and components in the station air containment penetration exposed to condensation
  • Internal surfaces of stainless steel piping, tubing, strainers and valve bodies in the IP1 station air system exposed to condensation
  • internal surfaces of stainless steel EDG starting air tanks, piping, piping elements and components exposed to condensation
  • internal surfaces of carbon steel and stainless steel tanks, piping, piping elements and components in the RCP oil collection system exposed to lube oil
  • internal surfaces of auxiliary feedwater system stainless steel piping, piping elements and components exposed to treated water from the city water system A.2.1.28 Periodic Surveillance and Preventive Maintenance Program The Periodic Surveillance and Preventive Maintenance Program is an existing program that includes periodic inspections and tests that manage aging effects not managed by other aging management programs. In addition to specific activities in the plant's preventive maintenance program and surveillance program, the Periodic Surveillance and Preventive Maintenance Program includes enhancements to add new activities. The preventive maintenance and surveillance testing activities are generally implemented through repetitive tasks or routine monitoring of plant operations.

Surveillance testing and periodic inspections using visual or other non-destructive examination techniques verify that the following components are capable of performing their intended function.

  • reactor building cranes (polar and manipulator), crane rails, and girders, and refueling platform
  • recirculation pump motor cooling coils and housing
  • city water system components
  • charging pump casings
  • plant drain components and backwater valves
  • HVAC duct flexible connections
  • HVAC stored portable blowers and flexible trunks
  • EDG exhaust components

Attachment 1 NL-09-079 Page 48 of 51

  • EDG duct flexible connections
  • EDG air intake and aftercooler components
  • EDG air start components
  • EDG cooling water makeup supply valves
  • security generator exhaust components
  • security generator radiator tubes
  • SBO/Appendix R diesel exhaust components
  • SBO/Appendix R diesel cooling water heat exchangers
  • SBO/Appendix R diesel fuel oil cooler
  • diesel fuel oil trailer transfer tank and associated valves
  • containment cooling duct flexible connections
  • containment cooling fan units internals
  • control room HVAC condensers and evaporators
  • control room HVAC ducts and drip pans
  • control room HVAC duct flexible connections
  • circulating water, city water, intake structure system, emergency diesel generator, fresh water cooling, instrument air, integrated liquid waste handling, lube oil, miscellaneous, radiation monitoring, river water, station air, waste disposal, wash water, and water treatment plant system piping, piping components, and piping elements
  • pressurizer relief tank
  • atmospheric dump valve silencers
  • off-site power feeder, 138 kV underground transmission cable
  • instrument air aftercooler tube internal surfaces
  • fresh water/river water heat exchanger internal and external surfaces A.2.1.39 Water Chemistry Control - Closed Cooling Water Program The Water Chemistry Control - Closed Cooling Water Program is an existing program that includes preventive measures that manage loss of material, cracking, or fouling for components in closed cooling water systems (component cooling water (CCW), instrument air (IP2 only), conventional closed cooling (CCC), instrument air closed cooling (IACC), emergency diesel generator cooling, security generator cooling, and SBO/Appendix R diesel generator cooling). These chemistry activities provide for monitoring and controlling closed cooling water chemistry using procedures and processes based on EPRI guidance for closed cooling water chemistry.

Attachment 1 NL-09-079 Page 49 of 51 As a result of the previous table changes, the following changes are required to Appendix B (Changes are shown as strikethroughs for deletions and underlines for additions).

B.1.27 One-Time Inspection Program Description One-time inspection activities on the following confirm that loss of material is not occurring or is so insignificant that an aging management program is not warranted.

  • Internal surfaces of drain system stainless steel piping, tubing, and valve bodies exposed to raw water (drain water) in EDG buildings, primary auxiliary buildings, and electrical tunnels. Also included are drains in the IP3 auxiliary feed pump building
  • Internal surfaces of stainless steel valve bodies in the station air containment penetration exposed to condensation
  • Internal surfaces of stainless steel piping, tubing, strainers and valve bodies in the IP1 station air system exposed to condensation
  • Internal surfaces of stainless steel piping, strainers, strainer housings, tanks, tubing and valve bodies exposed to condensation in the emergency diesel generator (EDG) starting air subsystem B.1.29 Periodic Surveillance and Preventive Maintenance Program Description The Periodic Surveillance and Preventive Maintenance Program is an existing program that includes periodic inspections and tests that manage aging effects not managed by other aging management programs. In addition to specific activities in the plant's preventive maintenance program and surveillance program, the Periodic Surveillance and Preventive Maintenance Program includes enhancements to add new activities. The preventive maintenance and surveillance testing activities are generally implemented through repetitive tasks or routine monitoring of plant operations. Credit for program activities has been taken in the aging management review of the following systems and structures. All activities are new unless otherwise noted.

Reactor building Use visual or other NDE techniques to inspect the surface condition of carbon steel components of the reactor building cranes (polar and manipulator), crane rails, and girders, and refueling platform to manage loss of material. [existing]

Containment spray system IP3: Perform wall thickness measurements of the NaOH tank to manage loss of material. [existing]

IP3: Perform visual or other NDE inspections on the inside

Attachment 1 NL-09-079 Page 50 of 51 surfaces of a representative sample of stainless steel components exposed to sodium hydroxide to manage loss of material and cracking.

Safety injection system Perform operability testing to manage fouling for recirculation pump motor cooling coils.

Use visual or other NDE techniques to internally inspect the recirculation pump cooler housing to manage loss of material.

Main steam system Use visual or other NDE techniques to inspect a representative sample of the internal surfaces of the carbon steel main steam safety valve tailpipes and atmospheric dump valve silencers to manage loss of material.

Circulating water system Use visual or other NDE techniques to inspect a representative sample of the internals of circulating water piping, piping elements and components exposed to raw water to manage loss of material, cracking and change in material properties.

City water system Use visual or other NDE techniques to inspect a representative sample of the internals of city water piping, piping elements, and components exposed to treated water (city water) to manage loss of material.

Condensate system Use visual or other NDE techniques to inspect a representative sample of the internal surfaces of the main condenser tubes exposed to raw water to manage loss of material and fouling.

River water system Use visual or other NDE techniques to inspect a representative sample of the internals of river water piping, piping elements and components exposed to raw water to manage loss of material and cracking.

Fresh water cooling system Use visual or other NDE techniques to inspect a representative sample of the internal and external surfaces of the fresh water/river water heat exchanger tubes exposed to raw water to manage loss of material and fouling.

Attachment 1 NL-09-079 Page 51 of 51 Wash water system Use visual or other NDE techniques to inspect a representative sample of the internals of wash water piping, piping elements and components exposed to raw water to manage loss of material, cracking and change in material properties.

Chemical and volume During quarterly surveillances perform visual inspection of control system the external surface of charging pump casings to manage cracking. [existing]

Plant drains Use visual or other NDE techniques to inspect a representative sample of the internals of carbon steel plant drain piping, piping elements, and components to manage loss of material.

IP2: Use visual or other NDE techniques to inspect the internals of backwater valves to manage loss of material.

[existing]

Station air system Use visual or other NDE techniques to inspect a representative sample of containment penetration piping and the internals and externals of station air piping, piping elements and components to manage loss of material.

Use visual or other NDE techniques to inspect a representative sample of the internals of station air piping, piping elements and components exposed to raw water to manage loss of material and cracking.

Instrument air system Use visual or other NDE techniques to internally inspect the heat exchanger tubes on the instrument air aftercoolers to manage loss of material and fouling.

ATTACHMENT 2 TO NL-09-079 List of Regulatory Commitments, Revision 9 ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286

Attachment 2 NL-09-079 Page 1 of 17 List of Regulatory Commitments Rev. 9 The following table identifies those actions committed to by Entergy in this document.

Changes are shown as strikethroughs for deletions and underlines for additions.

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.1 1 Enhance the Aboveground Steel Tanks Program for September 28, A.3.1.1 IP2 and IP3 to perform thickness measurements of 2013 B.1.1 the bottom surfaces of the condensate storage tanks, city water tank, and fire water tanks once during the IP3:

first ten years of the period of extended operation.

December 12, Enhance the Aboveground Steel Tanks Program for 2015 IP2 and IP3 to require trending of thickness measurements when material loss is detected.

IP2: NL-07-039 A.2.1.2 2 Enhance the Bolting Integrity Program for IP2 and IP3 September 28, A.3.1.2 to clarify that actual yield strength is used in selecting 2013 B.1.2 materials for low susceptibility to SCC and clarify the prohibition on use of lubricants containing MoS2 for IP3: NL-07-153 Audit Items bolting.

December 12, 201, 241, The Bolting Integrity Program manages loss of 2015 270 preload and loss of material for all external bolting.

IP2: NL-07-039 A.2.1.5 3 Implement the Buried Piping and Tanks Inspection September 28, A.3.1.5 Program for IP2 and IP3 as described in LRA Section 2013 B.1.6 B.1.6.

NL-07-153 Audit Item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.M34, Buried Piping and Tanks 2015 Inspection.

Attachment 2 NL-09-079 Page 2 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.8 4 Enhance the Diesel Fuel Monitoring Program to September 28, A.3.1.8 include cleaning and inspection of the IP2 GT-1 gas 2013 B.1.9 turbine fuel oil storage tanks, IP2 and IP3 EDG fuel oil NL-07-153 Audit items day tanks, IP2 SBO/Appendix R diesel generator fuel IP3: 128, 129, oil day tank, and IP3 Appendix R fuel oil storage tank December 12, 132, and day tank once every ten years.

2015 NL-08-057 491, 492, Enhance the Diesel Fuel Monitoring Program to 510 include quarterly sampling and analysis of the IP2 SBO/Appendix R diesel generator fuel oil day tank, IP2 security diesel fuel oil storage tank, IP2 security diesel fuel oil day tank, and IP3 Appendix R fuel oil storage tank. Particulates, water and sediment checks will be performed on the samples. Filterable solids acceptance criterion will be less than or equal to 10mg/l. Water and sediment acceptance criterion will be less than or equal to 0.05%.

Enhance the Diesel Fuel Monitoring Program to include thickness measurement of the bottom of the following tanks once every ten years. IP2: EDG fuel oil storage tanks, EDG fuel oil day tanks, SBO/Appendix R diesel generator fuel oil day tank, GT-1 gas turbine fuel oil storage tanks, and diesel fire pump fuel oil storage tank; IP3: EDG fuel oil day tanks, EDG fuel oil storage tanks, Appendix R fuel oil storage tank, and diesel fire pump fuel oil storage tank.

Enhance the Diesel Fuel Monitoring Program to change the analysis for water and particulates to a quarterly frequency for the following tanks. IP2: GT-1 gas turbine fuel oil storage tanks and diesel fire pump fuel oil storage tank; IP3: Appendix R fuel oil day tank and diesel fire pump fuel oil storage tank.

Enhance the Diesel Fuel Monitoring Program to specify acceptance criteria for thickness measurements of the fuel oil storage tanks within the scope of the program.

Enhance the Diesel Fuel Monitoring Program to direct samples be taken and include direction to remove water when detected.

Revise applicable procedures to direct sampling of the onsite portable fuel oil contents prior to transferring the contents to the storage tanks.

Attachment 2 NL-09-079 Page 3 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM Enhance the Diesel Fuel Monitoring Program to direct the addition of chemicals including biocide when the presence of biological activity is confirmed.

IP2: NL-07-039 A.2.1.10 5 Enhance the External Surfaces Monitoring Program September 28, A.3.1.10 for IP2 and IP3 to include periodic inspections of 2013 B.1.11 systems in scope and subject to aging management review for license renewal in accordance with 10 CFR IP3:

54.4(a)(1) and (a)(3). Inspections shall include areas December 12, surrounding the subject systems to identify hazards to 2015 those systems. Inspections of nearby systems that could impact the subject systems will include SSCs that are in scope and subject to aging management review for license renewal in accordance with 10 CFR 54.4(a)(2).

IP2: NL-07-039 A.2.1.11 6 Enhance the Fatigue Monitoring Program for IP2 to September 28, A.3.1.11 monitor steady state cycles and feedwater cycles or 2013 B.1.12, perform an evaluation to determine monitoring is not NL-07-153 Audit Item required. Review the number of allowed events and 164 resolve discrepancies between reference documents and monitoring procedures.

Enhance the Fatigue Monitoring Program for IP3 to IP3:

include all the transients identified. Assure all fatigue December 12, analysis transients are included with the lowest 2015 limiting numbers. Update the number of design transients accumulated to date.

Attachment 2 NL-09-079 Page 4 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.12 7 Enhance the Fire Protection Program to inspect September 28, A.3.1.12 external surfaces of the IP3 RCP oil collection 2013 B.1.13 systems for loss of material each refueling cycle.

Enhance the Fire Protection Program to explicitly IP3:

state that the IP2 and IP3 diesel fire pump engine December 12, sub-systems (including the fuel supply line) shall be 2015 observed while the pump is running. Acceptance criteria will be revised to verify that the diesel engine does not exhibit signs of degradation while running; such as fuel oil, lube oil, coolant, or exhaust gas leakage.

Enhance the Fire Protection Program to specify that the IP2 and IP3 diesel fire pump engine carbon steel exhaust components are inspected for evidence of corrosion and cracking at least once each operating cycle.

Enhance the Fire Protection Program for IP3 to visually inspect the cable spreading room, 480V switchgear room, and EDG room CO2 fire suppression system for signs of degradation, such as corrosion and mechanical damage at least once every six months.

Attachment 2 NL-09-079 Page 5 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.13 8 Enhance the Fire Water Program to include inspection September 28, A.3.1.13 of IP2 and IP3 hose reels for evidence of corrosion.

2013 B.1.14 Acceptance criteria will be revised to verify no NL-07-153 Audit Items unacceptable signs of degradation.

IP3: 105, 106 Enhance the Fire Water Program to replace all or test December 12, NL-08-014 a sample of IP2 and IP3 sprinkler heads required for 2015 10 CFR 50.48 using guidance of NFPA 25 (2002 edition), Section 5.3.1.1.1 before the end of the 50-year sprinkler head service life and at 10-year intervals thereafter during the extended period of operation to ensure that signs of degradation, such as corrosion, are detected in a timely manner.

Enhance the Fire Water Program to perform wall thickness evaluations of IP2 and IP3 fire protection piping on system components using non-intrusive techniques (e.g., volumetric testing) to identify evidence of loss of material due to corrosion. These inspections will be performed before the end of the current operating term and at intervals thereafter during the period of extended operation. Results of the initial evaluations will be used to determine the appropriate inspection interval to ensure aging effects are identified prior to loss of intended function.

Enhance the Fire Water Program to inspect the internal surface of foam based fire suppression tanks.

Acceptance criteria will be enhanced to verify no significant corrosion.

Attachment 2 NL-09-079 Page 6 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.15 9 Enhance the Flux Thimble Tube Inspection Program September 28, A.3.1.15 for IP2 and IP3 to implement comparisons to wear 2013 B.1.16 rates identified in WCAP-12866. Include provisions to compare data to the previous performances and IP3:

perform evaluations regarding change to test December 12, frequency and scope.

2015 Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to specify the acceptance criteria as outlined in WCAP-12866 or other plant-specific values based on evaluation of previous test results.

Enhance the Flux Thimble Tube Inspection Program for IP2 and IP3 to direct evaluation and performance of corrective actions based on tubes that exceed or are projected to exceed the acceptance criteria. Also stipulate that flux thimble tubes that cannot be inspected over the tube length and cannot be shown by analysis to be satisfactory for continued service, must be removed from service to ensure the integrity of the reactor coolant system pressure boundary.

Attachment 2 NL-09-079 Page 7 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.16 10 Enhance the Heat Exchanger Monitoring Program for September 28, A.3.1.16 IP2 and IP3 to include the following heat exchangers 2013 B.1.17, in the scope of the program.

NL-07-153 Audit Item x Safety injection pump lube oil heat exchangers IP3: 52 December 12, x RHR heat exchangers 2015 x RHR pump seal coolers x Non-regenerative heat exchangers x Charging pump seal water heat exchangers x Charging pump fluid drive coolers x Charging pump crankcase oil coolers x Spent fuel pit heat exchangers x Secondary system steam generator sample coolers x Waste gas compressor heat exchangers x SBO/Appendix R diesel jacket water heat exchanger (IP2 only)

Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to perform visual inspection on heat exchangers where non-destructive examination, such as eddy current inspection, is not possible due to heat exchanger design limitations.

Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to include consideration of material-environment combinations when determining sample population of heat exchangers.

Enhance the Heat Exchanger Monitoring Program for IP2 and IP3 to establish minimum tube wall thickness for the new heat exchangers identified in the scope of the program. Establish acceptance criteria for heat exchangers visually inspected to include no indication of tube erosion, vibration wear, corrosion, pitting, NL-09-018 fouling, or scaling.

Attachment 2 NL-09-079 Page 8 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.17 11 Delete commitment.

September 28, A.3.1.17 Enhance the ISI Program for IP2 and IP3 to provide 2013 B.1.18 periodic visual inspections to confirm the absence of NL-07-153 Audit item aging effects for lubrite sliding supports used in the IP3: 59 steam generator and reactor coolant pump support December 12, NL-09-056 systems. 2015 IP2: NL-07-039 A.2.1.18 12 Enhance the Masonry Wall Program for IP2 and IP3 September 28, A.3.1.18 to specify that the IP1 intake structure is included in 2013 B.1.19 the program.

IP3:

December 12, 2015 Enhance the Metal-Enclosed Bus Inspection Program IP2: NL-07-039 A.2.1.19 13 to add IP2 480V bus associated with substation A to September 28, A.3.1.19 the scope of bus inspected. 2013 B.1.20 NL-07-153 Audit Items Enhance the Metal-Enclosed Bus Inspection Program IP3: 124, for IP2 and IP3 to visually inspect the external surface December 12, NL-08-057 133, 519 of MEB enclosure assemblies for loss of material at 2015 least once every 10 years. The first inspection will occur prior to the period of extended operation and the acceptance criterion will be no significant loss of material.

Enhance the Metal-Enclosed Bus Inspection Program to add acceptance criteria for MEB internal visual inspections to include the absence of indications of dust accumulation on the bus bar, on the insulators, and in the duct, in addition to the absence of indications of moisture intrusion into the duct.

Enhance the Metal-Enclosed Bus Inspection Program for IP2 and IP3 to inspect bolted connections at least once every five years if performed visually or at least once every ten years using quantitative measurements such as thermography or contact resistance measurements. The first inspection will occur prior to the period of extended operation.

The plant will process a change to applicable site procedure to remove the reference to re-torquing connections for phase bus maintenance and bolted connection maintenance.

Attachment 2 NL-09-079 Page 9 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.21 14 Implement the Non-EQ Bolted Cable Connections September 28, A.3.1.21 Program for IP2 and IP3 as described in LRA Section 2013 B.1.22 B.1.22.

IP3:

December 12, 2015 IP2: NL-07-039 A.2.1.22 15 Implement the Non-EQ Inaccessible Medium-Voltage September 28, A.3.1.22 Cable Program for IP2 and IP3 as described in LRA 2013 B.1.23 Section B.1.23.

NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E3, Inaccessible Medium-Voltage 2015 Cables Not Subject To 10 CFR 50.49 Environmental Qualification Requirements.

IP2: NL-07-039 A.2.1.23 16 Implement the Non-EQ Instrumentation Circuits Test September 28, A.3.1.23 Review Program for IP2 and IP3 as described in LRA 2013 B.1.24 Section B.1.24.

NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E2, Electrical Cables and 2015 Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits.

IP2: NL-07-039 A.2.1.24 17 Implement the Non-EQ Insulated Cables and September 28, A.3.1.24 Connections Program for IP2 and IP3 as described in 2013 B.1.25 LRA Section B.1.25.

NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801 Section XI.E1, Electrical Cables and 2015 Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements.

Attachment 2 NL-09-079 Page 10 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.25 18 Enhance the Oil Analysis Program for IP2 to sample September 28, A.3.1.25 and analyze lubricating oil used in the SBO/Appendix 2013 B.1.26 R diesel generator consistent with oil analysis for other site diesel generators.

IP3:

Enhance the Oil Analysis Program for IP2 and IP3 to December 12, sample and analyze generator seal oil and turbine 2015 hydraulic control oil.

Enhance the Oil Analysis Program for IP2 and IP3 to formalize preliminary oil screening for water and particulates and laboratory analyses including defined acceptance criteria for all components included in the scope of this program. The program will specify corrective actions in the event acceptance criteria are not met.

Enhance the Oil Analysis Program for IP2 and IP3 to formalize trending of preliminary oil screening results as well as data provided from independent laboratories.

IP2: NL-07-039 A.2.1.26 19 Implement the One-Time Inspection Program for IP2 September 28, A.3.1.26 and IP3 as described in LRA Section B.1.27.

2013 B.1.27 This new program will be implemented consistent with NL-07-153 Audit item the corresponding program described in NUREG- IP3: 173 1801,Section XI.M32, One-Time Inspection. December 12, 2015 IP2: NL-07-039 A.2.1.27 20 Implement the One-Time Inspection - Small Bore September 28, A.3.1.27 Piping Program for IP2 and IP3 as described in LRA 2013 B.1.28 Section B.1.28.

NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801,Section XI.M35, One-Time Inspection of ASME 2015 Code Class I Small-Bore Piping.

IP2: NL-07-039 A.2.1.28 21 Enhance the Periodic Surveillance and Preventive September 28, A.3.1.28 Maintenance Program for IP2 and IP3 as necessary 2013 B.1.29 to assure that the effects of aging will be managed such that applicable components will continue to IP3:

perform their intended functions consistent with the December 12, current licensing basis through the period of extended 2015 operation.

Attachment 2 NL-09-079 Page 11 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.31 22 Enhance the Reactor Vessel Surveillance Program for September 28, A.3.1.31 IP2 and IP3 revising the specimen capsule withdrawal 2013 B.1.32 schedules to draw and test a standby capsule to cover the peak reactor vessel fluence expected IP3:

through the end of the period of extended operation.

December 12, Enhance the Reactor Vessel Surveillance Program for 2015 IP2 and IP3 to require that tested and untested specimens from all capsules pulled from the reactor vessel are maintained in storage.

IP2: NL-07-039 A.2.1.32 23 Implement the Selective Leaching Program for IP2 September 28, A.3.1.32 and IP3 as described in LRA Section B.1.33.

2013 B.1.33 This new program will be implemented consistent with NL-07-153 Audit item the corresponding program described in NUREG- IP3: 173 1801,Section XI.M33 Selective Leaching of Materials. December 12, 2015 IP2: NL-07-039 A.2.1.34 24 Enhance the Steam Generator Integrity Program for September 28, A.3.1.34 IP2 and IP3 to require that the results of the condition 2013 B.1.35 monitoring assessment are compared to the operational assessment performed for the prior IP3:

operating cycle with differences evaluated.

December 12, 2015 Enhance the Structures Monitoring Program to IP2: NL-07-039 A.2.1.35 25 explicitly specify that the following structures are September 28, A.3.1.35 included in the program. 2013 B.1.36 x Appendix R diesel generator foundation (IP3) NL-07-153 x Appendix R diesel generator fuel oil tank vault IP3: Audit items (IP3) December 12, 86, 87, 88, x Appendix R diesel generator switchgear and 2015 NL-08-057 417 enclosure (IP3) x city water storage tank foundation x condensate storage tanks foundation (IP3) x containment access facility and annex (IP3) x discharge canal (IP2/3) x emergency lighting poles and foundations (IP2/3) x fire pumphouse (IP2) x fire protection pumphouse (IP3) x fire water storage tank foundations (IP2/3) x gas turbine 1 fuel storage tank foundation x maintenance and outage building-elevated passageway (IP2)

Attachment 2 NL-09-079 Page 12 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM x new station security building (IP2) x nuclear service building (IP1) x primary water storage tank foundation (IP3) x refueling water storage tank foundation (IP3) x security access and office building (IP3) x service water pipe chase (IP2/3) x service water valve pit (IP3) x superheater stack x transformer/switchyard support structures (IP2) x waste holdup tank pits (IP2/3)

Enhance the Structures Monitoring Program for IP2 and IP3 to clarify that in addition to structural steel and concrete, the following commodities (including their anchorages) are inspected for each structure as applicable.

x cable trays and supports x concrete portion of reactor vessel supports x conduits and supports x cranes, rails and girders x equipment pads and foundations x fire proofing (pyrocrete) x HVAC duct supports x jib cranes x manholes and duct banks x manways, hatches and hatch covers x monorails x new fuel storage racks x sumps, sump screens, strainers and flow barriers Enhance the Structures Monitoring Program for IP2 and IP3 to inspect inaccessible concrete areas that are exposed by excavation for any reason. IP2 and IP3 will also inspect inaccessible concrete areas in environments where observed conditions in accessible areas exposed to the same environment indicate that significant concrete degradation is occurring.

Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspections of elastomers (seals, gaskets, seismic joint filler, and roof elastomers) to

Attachment 2 NL-09-079 Page 13 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM identify cracking and change in material properties and for inspection of aluminum vents and louvers to identify loss of material.

Enhance the Structures Monitoring Program for IP2 NL-08-127 Audit Item and IP3 to perform an engineering evaluation of 360 groundwater samples to assess aggressiveness of groundwater to concrete on a periodic basis (at least once every five years). IPEC will obtain samples from at least 5 wells that are representative of the ground water surrounding below-grade site structures and perform an engineering evaluation of the results from those samples for sulfates, pH and chlorides.

Additionally, to assess potential indications of spent fuel pool leakage, IPEC will sample for tritium in groundwater wells in close proximity to the IP2 spent fuel pool at least once every 3 months.

Enhance the Structures Monitoring Program for IP2 and IP3 to perform inspection of normally submerged concrete portions of the intake structures at least once every 5 years. Inspect the baffling/grating partition and support platform of the IP3 intake structure at least once every 5 years.

Enhance the Structures Monitoring Program for IP2 Audit Item and IP3 to perform inspection of the degraded areas 358 of the water control structure once per 3 years rather than the normal frequency of once per 5 years during the PEO.

IP2: NL-07-039 A.2.1.36 26 Implement the Thermal Aging Embrittlement of Cast September 28, A.3.1.36 Austenitic Stainless Steel (CASS) Program for IP2 2013 B.1.37 and IP3 as described in LRA Section B.1.37.

NL-07-153 Audit item This new program will be implemented consistent with IP3: 173 the corresponding program described in NUREG- December 12, 1801,Section XI.M12, Thermal Aging Embrittlement 2015 of Cast Austenitic Stainless Steel (CASS) Program.

Attachment 2 NL-09-079 Page 14 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.1.37 27 Implement the Thermal Aging and Neutron Irradiation September 28, A.3.1.37 Embrittlement of Cast Austenitic Stainless Steel 2013 B.1.38 (CASS) Program for IP2 and IP3 as described in LRA NL-07-153 Audit item Section B.1.38.

IP3: 173 This new program will be implemented consistent with December 12, the corresponding program described in NUREG- 2015 1801 Section XI.M13, Thermal Aging and Neutron Embrittlement of Cast Austenitic Stainless Steel (CASS) Program.

IP2: NL-07-039 A.2.1.39 28 Enhance the Water Chemistry Control - Closed September 28, A.3.1.39 Cooling Water Program to maintain water chemistry of 2013 B.1.40 the IP2 SBO/Appendix R diesel generator cooling NL-08-057 Audit item system per EPRI guidelines.

IP3: 509 Enhance the Water Chemistry Control - Closed December 12, Cooling Water Program to maintain the IP2 and IP3 2015 security generator and fire protection diesel cooling water pH and glycol within limits specified by EPRI guidelines.

IP2: NL-07-039 A.2.1.40 29 Enhance the Water Chemistry Control - Primary and September 28, B.1.41 Secondary Program for IP2 to test sulfates monthly in 2013 the RWST with a limit of <150 ppb.

IP2: NL-07-039 A.2.1.41 30 For aging management of the reactor vessel internals, September 28, A.3.1.41 IPEC will (1) participate in the industry programs for 2011 investigating and managing aging effects on reactor internals; (2) evaluate and implement the results of IP3:

the industry programs as applicable to the reactor December 12, internals; and (3) upon completion of these programs, 2013 but not less than 24 months before entering the period of extended operation, submit an inspection plan for reactor internals to the NRC for review and approval.

IP2: NL-07-039 A.2.2.1.2 31 Additional P-T curves will be submitted as required September 28, A.3.2.1.2 per 10 CFR 50, Appendix G prior to the period of 2013 4.2.3 extended operation as part of the Reactor Vessel Surveillance Program.

IP3:

December 12, 2015 As required by 10 CFR 50.61(b)(4), IP3 will submit a IP3: NL-07-039 A.3.2.1.4 32 plant-specific safety analysis for plate B2803-3 to the December 12, 4.2.5 NRC three years prior to reaching the RTPTS 2015 NL-08-127 screening criterion. Alternatively, the site may choose to implement the revised PTS rule when approved.

Attachment 2 NL-09-079 Page 15 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-07-039 A.2.2.2.3 33 At least 2 years prior to entering the period of September 28, A.3.2.2.3 extended operation, for the locations identified in LRA 2011 4.3.3 Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), under NL-07-153 Audit item the Fatigue Monitoring Program, IP2 and IP3 will IP3: 146 implement one or more of the following:

December 12, NL-08-021 (1) Consistent with the Fatigue Monitoring Program, 2013 Detection of Aging Effects, update the fatigue usage calculations using refined fatigue analyses to determine valid CUFs less than 1.0 when accounting for the effects of reactor water environment. This includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following:

1. For locations in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), with existing fatigue analysis valid for the period of extended operation, use the existing CUF.
2. Additional plant-specific locations with a valid CUF may be evaluated. In particular, the pressurizer lower shell will be reviewed to ensure the surge nozzle remains the limiting component.
3. Representative CUF values from other plants, adjusted to or enveloping the IPEC plant specific external loads may be used if demonstrated applicable to IPEC.
4. An analysis using an NRC-approved version of the ASME code or NRC-approved alternative (e.g., NRC-approved code case) may be performed to determine a valid CUF.

(2) Consistent with the Fatigue Monitoring Program, Corrective Actions, repair or replace the affected locations before exceeding a CUF of 1.0.

April 30, 2008 NL-07-078 2.1.1.3.5 34 IP2 SBO / Appendix R diesel generator will be installed and operational by April 30, 2008. This Complete NL-08-074 committed change to the facility meets the requirements of 10 CFR 50.59(c)(1) and, therefore, a license amendment pursuant to 10 CFR 50.90 is not required.

Attachment 2 NL-09-079 Page 16 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-08-127 Audit Item 35 Perform a one-time inspection of representative September 28, 27 sample area of IP2 containment liner affected by the 2013 1973 event behind the insulation, prior to entering the extended period of operation, to assure liner degradation is not occurring in this area.

Perform a one-time inspection of representative IP3:

sample area of the IP3 containment steel liner at the December 12, juncture with the concrete floor slab, prior to entering 2015 the extended period of operation, to assure liner degradation is not occurring in this area.

Any degradation will be evaluated for updating of the NL-09-018 containment liner analyses as needed.

IP2: NL-08-127 Audit Item 36 Perform a one-time Inspection and evaluation of a September 28, 359 sample of potentially affected IP2 refueling cavity 2013 concrete prior to the period of extended operation.

The sample will be obtained by core boring the refueling cavity wall in an area that is susceptible to exposure to borated water leakage. The inspection will include an assessment of embedded reinforcing steel.

Additional core bore samples will be taken, if the NL-09-056 leakage is not stopped, prior to the end of the first ten years of the period of extended operation.

A sample of leakage fluid will be analyzed to NL-09-079 determine the composition of the fluid. If additional core samples are taken prior to the end of the first ten years of the period of extended operation, a sample of leakage fluid will be analyzed.

IP2: NL-08-127 Audit Item 37 Enhance the Containment Inservice Inspection (CII-September 28, 361 IWL) Program to include inspections of the 2013 containment using enhanced characterization of degradation (i.e., quantifying the dimensions of noted IP3:

indications through the use of optical aids) during the December 12, period of extended operation. The enhancement 2015 includes obtaining critical dimensional data of degradation where possible through direct measurement or the use of scaling technologies for photographs, and the use of consistent vantage points for visual inspections.

Attachment 2 NL-09-079 Page 17 of 17

  1. COMMITMENT IMPLEMENTATION SOURCE RELATED SCHEDULE LRA SECTION

/ AUDIT ITEM IP2: NL-08-143 4.2.1 38 For Reactor Vessel Fluence, should future core September 28, loading patterns invalidate the basis for the projected 2013 values of RTpts or CVUSE, updated calculations will be provided to the NRC.

IP3:

December 12, 2015 IP2: NL-09-056 2.3.4.5 39 Install a fixed automatic fire suppression system for September 28, 3.4.2 IP2 in the Auxiliary Feedwater Pump Room.

2013 NL-09-079