ML060760046: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/17/2006
| issue date = 03/17/2006
| title = Meeting Agenda for 04/05/2006, Forthcoming Meeting with Entergy Operations, Inc., Regarding Waterford 3 Design Issue
| title = Meeting Agenda for 04/05/2006, Forthcoming Meeting with Entergy Operations, Inc., Regarding Waterford 3 Design Issue
| author name = Fields M B
| author name = Fields M
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = Terao D
| addressee name = Terao D
Line 9: Line 9:
| docket = 05000382
| docket = 05000382
| license number = NPF-038
| license number = NPF-038
| contact person = Fields M B , NRR/ADPT,415-3062
| contact person = Fields M , NRR/ADPT,415-3062
| document type = Meeting Agenda
| document type = Meeting Agenda
| page count = 1
| page count = 1

Revision as of 21:42, 13 July 2019

Meeting Agenda for 04/05/2006, Forthcoming Meeting with Entergy Operations, Inc., Regarding Waterford 3 Design Issue
ML060760046
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/17/2006
From: Fields M
Plant Licensing Branch III-2
To: Terao D
Plant Licensing Branch III-2
Fields M , NRR/ADPT,415-3062
References
Download: ML060760046 (1)


Text

AGENDAMEETING WITH ENTERGY OPERATIONS, INC.DRY CASK STORAGE AND FUEL ISSUES WATERFORD STEAM ELECTRIC STATION, UNIT 3 APRIL 5, 2006BackgroundAs part of the extended power uprate review process, Entergy Operations, Inc. committed to adesign change to the onsite fuel oil storage system that will accommodate fuel oil storagevolume equivalent to the fuel oil needed to run each emergency diesel generator for seven days based on calculational methods described in American National Standards Institute Standard N195-1976, "Fuel Oil Systems for Standby Diesel Generators." The licensee committed to complete the modification by December 31, 2006. Introductions 2:00 p.m.Description of Proposed Onsite Fuel Oil Storage System Design Requirements Specific Discussions of the Proposed Changes to the Seismic Design Criteria Closing Remarks Public Comment/Questions Adjourn4:00 p.m.Attendees:

NRCEntergy Operations, Inc.D. SolorioBill EatonR. KarasDavid Morris K. ManolyGary Payne T. ChengDana MillarM. HartzmanJerry Burford J. Tatum M. Fields, et al.