ML18262A375: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 9: | Line 9: | ||
| docket = PROJ0689 | | docket = PROJ0689 | ||
|| license number = | || license number = | ||
| contact person = Garmoe A | | contact person = Garmoe A | ||
| document type = Slides and Viewgraphs | | document type = Slides and Viewgraphs | ||
| page count = 8 | | page count = 8 |
Revision as of 22:11, 12 June 2019
ML18262A375 | |
Person / Time | |
---|---|
Site: | Nuclear Energy Institute |
Issue date: | 09/20/2018 |
From: | Nuclear Energy Institute |
To: | Office of Nuclear Reactor Regulation |
Garmoe A | |
References | |
Download: ML18262A375 (8) | |
Text
1Reactor Oversight Process Enhancement September 20, 2018 2Overview*Four Areas Discussed
- Baseline Inspection Program
- Action Matrix
- Significance Determination Process
- Response to Inspection Issues
- Next Steps 3This proposal-
- Pulls together and integrates recommendations from a variety of sources
- Acknowledges that some of the recommendations are already being worked (e.g., the Engineering Inspections improvement project; the EP SDP assessment)
- Invites further dialogue with NRC these ideas and others to improve the ROP after 18 years of experience 4This is an explanation of the main ideaBaseline Inspection Program 5This is an explanation of the main ideaAction Matrix 6This is an explanation of the main ideaSignificance Determination Process 7This is an explanation of the main ideaResponse to Inspection Issues 8This is an explanation of the main ideaNext Steps
- Discuss recommendations in public meetings
- Assist in prioritizing recommendations
- Work together to develop a plan for NRC and industry actions on ROP enhancements